water resources department - … · government of maharashtra water resources department common...

156
GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT COMMON SCHEDULE OF RATES 2016-17 (Applicable from 01-11-2016)

Upload: vuongcong

Post on 10-Apr-2018

238 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES

2016-17

(Applicable from 01-11-2016)

Page 2: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

DETAILS OF COMMITTEE FORMED FOR PREPARATION OF

COMMON SCHEDULE OF RATES FOR 2016-17

(Reference--Government Resolution Marathi No.MIS-2212/(343/12)/MI-2 Mantralaya

Mumbai 400032 dated 05/07/2014)

1) C.E.(SP),W.R.D.Pune - President

2) C.E. Kokan Region,W.R.D.Mumbai - Member

3) C.E.(SP),W.R.D.Amarwati - Member

4) C.E. & C.A.(CADA)Aurangabad - Member

5) C.E.(WR),W.R.D.Nagpur - Member

6) C.E.Koyana Project Pune - Member

7) C.E.(Mechanical),W.R.D.Nasik - Member

8) S.E.Thane Irrigation Circle,Thane - Member

9) S.E.Kukadi Irrigation Circle,Pune - Member Secretary

Page 3: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

DETAILS OF SUBCOMMITTEE FOR PREPARATION OF

COMMON SCHEDULE OF RATES FOR 2016-17

Sr.No. Component of work Members of subcommittee

(1) Excavation & Embankment CO-ORDINATOR

C.E.(SP), WRD, Pune

MEMBERS

1) C.E., North Maharashtra Region, Nashik

2) C.E., Mechanical, WRD, Nashik

(2) Concrete Work including Centering, CO-ORDINATOR

UCR Masonry, Brick Masonry & C.E.(WR), WRD, Pune

R.C.C. Pipes MEMBERS

1) C.E.(WR), WRD, Aurangabad

2) C.E., Goshikhurd Project, Nagpur

3) C.E.(SP), WRD, Amravati

4) C.E., Tapi, Jalgaon.

(3) Lift Irrigation Scheme CO-ORDINATOR

C.E.( WR), WRD, Nagpur

MEMBERS

1) C.E.(WR), WRD, Pune

2) C.E.(WR), WRD, Aurangabad

3) C.E., Mechanical, WRD, Nashik

(4) Surveying & Investigation CO-ORDINATOR

C.E.(SP), WRD, Amravati

MEMBERS

1) C.E. & C.A., CADA, Aurangabad

2) S.E., T.I.C., Thane

(5) Tunnel Works CO-ORDINATOR

C.E., Hydroelectric Project, Pune

MEMBERS

1) C.E., Konkan Region, WRD, Mumbai

2) C.E.(WR), WRD, Aurangabad

3) C.E.(WR), WRD, Nagpur

(6) Maintenance & Repairs CO-ORDINATOR

C.E. & C.A., CADA, Aurangabad

MEMBERS

1) C.E.(WR), WRD, Aurangabad

2) C.E.(WR), WRD, Nagpur

3) C.E., N.M.R., Nashik

4) C.E., Mechanical, WRD, Nashik

5) C.E.(SP), WRD, Pune

6) S.E. & Director, D.I.R.D., Pune

Page 4: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

Sr.No. Component of work Members of subcommittee

(7) Gates- Manufacturing & Repairs CO-ORDINATOR

C.E., Mechanical, WRD, Nashik

MEMBERS

1) C.E., N.M.R., Nashik

2) S.E., Gates Circle, C.D.O., Nashik

3) C.E.(WR), WRD, Aurangabad

4) S.E., Mechanical Circle, Pune

(8) Hydrology C.E.(WR), WRD, Nagpur

(9) Items for Valuation of Structures in affected villages

C.E.(WR), WRD, Nagpur

(10) Marking Blue Line & Red Line C.E.(WR), WRD, Pune

(11) Flow Measuring Devices C.E.(WR), WRD, Nagpur

Page 5: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2016-17

I N D E X

Sr. No.

Particulars Pages

From To

1 SECTION-1 1 2

1.1 General Note 3 6

1.2 Lift Charges 7 8

1.3 Rates of Construction Materials & Labours 9 13

1.4 Lead Charges Statement for Materials 14 30

2 SECTION-2 31 34

Excavation & Embankment -Item 1 to 19 35 40

3 SECTION-3 41 44

Concrete Work including Centering, UCR Masonry, Brick Masonry & R.C.C. Pipes -Item 20 to 60

45 56

4 SECTION-4 57 60

Maintenance & Repairs-Item 61 to 84 61 64

5 SECTION-5 65 68

Tunnel Works-Item 85 to 98 69 72

6 SECTION-6 73 76

Lift Irrigation Scheme-Item 99 to 131 77 90

7 SECTION-7 91 94

Surveying & Investigation-Item 132 to 152 95 100

Page 6: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

Sr. No.

Particulars Pages

From To

8 SECTION-8 101 104

Hydrology-Item 153 to 159 105 106

9 SECTION-9 107 110

Items for Valuation of Structures in affected villages – Item 160 to 191

111 114

10 SECTION-10 115 118

Gates Manufacturing & Repairs-Item 192 to 208 119 134

11 SECTION-11 135 138

Flow Measuring Devices-Item 209 to 212 139 142

12 SECTION-12 143 146

Marking Blue Line & Red Line -Item 213 to 219 147 149

Page 7: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

1

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2016-17

SECTION-1

1.1 General Note

1.2 Lift Charges

1.3 Rates of Construction Materials & Labour

1.4 Lead charges statement for Materials

Page 8: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

2

Page 9: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

3

सामाईक दरसचूी सन 2016-17

(1.1) सर्वसाधारण टिपणी प्रस्तार्ना :-

सामाईक दरसचूी सन 2016-17 ही ददनाांक 01/11/2016 पासनू अांमलात येईल. सदर दरसचूी सन 2016-17 मध्ये खालील प्रमखु बाबींचा समावेश करण्यात आला आहे.

अ) टर्टर्ध कर, स्र्ाटमत्र् शुल्क, कामगार कल्याण उपकर, टर्मा इ. बाबत.

1) मलु्यर्र्धधत कराचा (VAT) अंतर्भार् दरपथृ:करणात करण्यात येऊ नये. आयकर प्रमाणेच मलु्यवर्धधत कर (M.Vat) TDS द्वारे दवभागामार्फ त कां त्राटदाराच्या दबलामधनू कपात करण्यात येतो. कां त्राटदाराांना अदतदरक्त भरलेला कर परत दमळवण्याकदरता दवक्रीकर दवभागाकडे दवक्रीकर दनयमावलीच्या (M.Vat Act) कलम 31 अन्वये अर्फ करता येतो व सदर अदतदरक्त भरलेला कर परत दमळतो.

2) द्वार दनर्धमती, द्वार उभारणी व इतर बाबींसाठी कें द्रीय व राज्य शासनाचे कर हे गुांतागुांतीचे असनू प्रत्येक कामासाठी याांचे प्रमाण मलु्यवर्धधत सांरचनेवर अवलांबनू असलेमळेु अबकारी कराचा (Excise Duty) दरपथृ:करणात समारे्श करण्यात येऊ नये.

3) र्ाळू, दगड आटण खडी यार्रील स्र्ाटमत्र् शुल्क हे त्या संबंधीत बाबींच्या दरपथृ:करणात अंतर्भुवत नाही. तसेच मातीकामाच्या र् र्भरार् कामाच्या बाबींसाठी लागणारे मरुुम, काळी माती यार्रील स्र्ाटमत्र् शुल्क दरपथृ:करणात अंतर्भुवत नाही. सदरील बाबी अांदार्पत्रकामध्ये स्वतांत्रपणे घेण्यात याव्यात व त्याची अदायगी महसलू खात्यास करण्यात यावी. (शासन पातळीवर महसलू व वन दवभागाच्या वेळोवेळीच्या नोटीदर्केशन प्रमाणे गौण खदनर्ावरील स्वादमत्व शलु्कामध्ये बदल झाल्यास त्याप्रमाणे अांदार्पत्रकातील स्वादमत्व शलु्काच्या रक्कमेत बदल करण्यात यावा.

4)शासन दनणफय क्रमाांक दडएसआर-1090/सीआर-6453/पीएलएन-3, ददनाांक 14/07/1993 नसुार मर्रुाांच्या सदुवधाांसाठी दरसचुीतील प्रत्येक बाबीमध्ये तरतदू करण्यात आली आहे.

5)उद्योग व उर्ा दवभागाचे शासन दनणफय क्रमाांक बीसीए-2009/सीआर-108/लेबर 7-अ, दद.17/06/2010 नसुार कामगार कल्याण उपकराची एक टक्क्याची तरतदू सामाईक दरसचुीतील बाबीमध्ये दर दनश्चचत करताना दवचारात घेतलेली नाही. अांदार्पत्रक तयार करताना प्रत्येक बाबीच्या दरपथृ:करणामध्ये कामगार कल्याण उपकराची 1 टक्के इतकी दरवाढ करण्यात यावी व सांदर्धभत शासन दनणफयामध्ये नमदू केल्याप्रमाणे उपकराची रक्कम ठेकेदाराकडून त्याांच्या देयकातनू वसलू करण्यात यावी.

6) दवत्त दवभागाचा शासन दनणफ य क्र. दवमासां-1008/प्र.क्र.28/98/शा.हमी, ददनाांक 19/08/1998 नसुार तसेच दवमा सांचालनालय, महाराष्ट्र, मुांबई याांचे सचुनेनसुार कामाच्या ककमतीच्या 1 टक्क्याची दवमा कदरताची तरतदू कामाचे अांदार्पत्रकाचे गोषवा-यात करण्यात यावी. सदरची दवमा कदरताची तरतदू सामाईक दरसचुीतील बाबींच्या दरामध्ये करण्यात आलेली नाही. दशवाय या करीताची तरतदू दनदवदेतील कामाच्या बाबींच्या दरपथृ:करणात करण्यात येऊ नये. सांबांधीत कामाचे कां त्राटदाराने दवमा रक्कम भरल्याबाबतचे परुावे सादर केल्यास त्याची दवभागीय लेखापाल पडताळणी करुन त्यानांतर भरलेल्या रक्कमेचा परतावा, दनदवदा रक्कमेच्या [Cost put to tender] 1 टक्केचे मयादेत, कां त्राटदारास अदा करावा.

Page 10: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

4

7) इमारती आदण रस्त्याांची काम ेवगळून इतर कामासाठी र्लसांपदा दवभागाची सन 2016-17 ची दरसचूी वापरण्यात यावी.

8) कां त्राटदारास दवमा, अबकारी कर, सेवाकर वगैरे करासांबांधी परतावा करताना कां त्राटदाराने शासनास ककवा अन्य यांत्रणेकडे भरणा केलेल्या मळू पावत्या याची खातरर्मा करुनच त्याबाबतची रक्कम कां त्राटदारास द्यावी. पडताळणी न करता कां त्राटदारास परतावा अदा करणे ही अदनयदमतता गहृीत धरली र्ाईल. यास दवभागीय लेखापाल व कायफकारी अदभयांता सांयकु्तदरत्या र्बाबदार राहतील.

दटप :- कामाची अांदार्पत्रके तयार करताना व त्या अांतगफत दवदवध बाबीचे दरदवचलेषण करताना वरील अ.क्र. अ (1) ते अ (8) मध्ये नमदू केल्याप्रमाणे अांदार्पत्रकात तरतदू करावी व या तरतदुीशी ससुांगत तरतदुी प्रारुप दनदवदा सांचात कराव्यात. याबाबतची र्बाबदारी प्रारुप दनदवदा कागदपते्र तयार करणा-या व मांर्रू करणा-या अदधका-याांची राहील.

ब) दरपथृ:करणामध्ये टर्चारात घ्यार्याच्या बाबी :-

1) सेवाकर भरणा करण्याची मलुभतू र्बाबदारी ही सेवादात्याची (Service provider) आहे. एखाद्या कामाच्या अांदार्पत्रकातील सवफ बाबींवर सेवाकर लाग ूहोत असल्यास अनजेु्ञय सेवाकर रक्कम पदरगदणत करुन Cross

payment वर स्वतांत्रदरत्या सेवा परुदवणा-या कां त्राटदारास देणे शक्य आहे. (र्से consultancy contract, survey

contract) तथादप, बहुताांशी करारात काही बाबींवर व उप बाबींवर activities सेवाकर देय होतो. उदा. Testing

activity, IIIrd party inspection इत्यादी त्यामळेु अनजेु्ञय बाबींवरील सेवाकराची तरतदू अांदार्पत्रकात करण्यात यावी. परांत ूदनदवदेतील पदरदशष्ट्ट-ब मधील दरात दतचा अांतभाव करु नये. मात्र अांदार्पत्रकात सेवाकर परताव्या बाबतची तरतदु गोषवा-यात करावी. कर भरल्यानांतर त्याबाबतच्या दस्ताऐवर्ाची पडताळणी करुन प्रदतपतुी करण्यात यावी.

2) र्नर्ाती के्षत्रातील कामाांसाठी 10 टक्के र्ास्त दर आकारावेत.

3) या दरसचुीतील दर खारभुमी दवकास कामाांसाठी लाग ूनाहीत. सदरतामापन कें द्राचे कामातील अडचणींचा दवचार करता 30 टक्के र्ादा दर आकारावेत. मात्र अनकु्रमाांक ब-2 मधील 10 टक्के वाढ पनुचच: देय नाही. सदर वाढ 30 टक्के र्ादा वाढीत समादवष्ट्ठ आहे.

4) चांद्रपरू व यवतमाळ या दर्ल्हयाांदशवाय गोंददया, भांडारा व नाांदेड या दर्ल्हयाांचा समावेश आता शासन पदरपत्रक क्रमाांक दरसचूी 2205/(246/2005)/लपा-2, ददनाांक 13/09/2006 अन्वये दवशेष कृती कायफक्रमाांतगफत करण्यात आला आहे व त्यामळेु चांद्रपरू दर्ल्हयातील चांद्रपरू, गोंडकपपरी, रार्रूा, कोरपना, बल्लारशा (बल्लारपरू), पोंभणूा, मलू व सावली, दर्वती, यवतमाळ दर्ल्हयातील झरीझामनी, घाटांर्ी, पाांढरकवडा, वणी व आणी, गोंददया दर्ल्हयातील दतरोडा, गोरेगाांव, सडकअर्ुफनी, सालेकसा, देवरी, अर्ुफनी मोरगाांव, गोंददया व आमगाांव (पोदलस स्टेशनचा भाग), भांडारा दर्ल्हयातील साकोली व लाखनी तसेच नाांदेड दर्ल्हयातील दकनवट या तालकु्यातील दवशेष कृती कायफक्रमाांतगफत त्या तालकु्यातील प्रकल्प घटकाांच्या कामाांसाठी 10 टक्के र्ास्त दर आकारावेत. गडदचरोली दर्ल्हयातील सवफ तालकु्याांना सावफर्दनक दवभागाचे शधु्दीपत्रक क्र.629/ता.दरसचूी 2009-10/2010, ददनाांक 28/01/2010 नसुार 20 टक्के र्ादा दर आकारावे.

Page 11: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

5

5) उपरोक्त टीप क्र.ब-2 व ब-3 मध्ये नमदू केलेली दवशेष वाढ रकने / दटप्परने करावयाच्या बाांधकाम सादहत्याच्या वाहतकुीच्या दराांना लाग ूआहे.

6) बहृन्मुांबईतील रेल्वे स्थानकावर राज्य शासनाची मान्यता असलेल्या कामगार सांघटनेच्या अदधकृत दरपत्रकाप्रमाणे येणा-या दसमेंटच्या भराई / उतराईच्या दरात या कामाच्या र्ागेवरील वरकड खचफ दवचारात घेऊन येणारे दर शासनाचे पत्र क्रमाांक दरस-ू2397/256/97 लपा-2, ददनाांक 27/03/1997 अन्वये अनजेु्ञय करण्यात आले आहे. माथाडी कामगाराच्या सांघटना राज्यातील इतर मोठया रेल्वे स्थानकावर देखील असल्यामळेु सांपणुफ राज्यातील मान्यताप्राप्त कामगार सांघटना असलेल्या रेल्वे स्थानकाकदरता सांबांधीत रेल्वे स्थानकावरील माथाडी कामगार सांघटनेचे दर लाग ूकरण्यास शासनाचे पत्र क्र.1098/146/99/लपा-2, ददनाांक 17 मे 2000 अन्वये परवानगी ददली आहे त्यानसुार दर लाग ूकरावेत.

बाांधकाम सादहत्याचे दर

7अ) स्टील : दरसचुी तयार करताना स्टीलचे दर हे ददनाांक 01/06/2015 रोर्ीचे र्ॉइन्ट प्लनॅ्ट कदमटीनसुार दवचारात घेतलेले आहेत. अांदार्पत्रक करतेवेळी दरदवचलेषणासाठी त्या त्या वेळी प्रचलीत असलेले र्ॉइन्ट प्लनॅ्ट कदमटीचे दर आदण दरसचुीत दवचारात घेतलेले दर यातील र्रक दवचारात घ्यावा.

7ब) दसमेंट : दरसचुी तयार करताना दसमेंटचे दर हे रु.290/गोणी दवचारात घेतलेले आहेत. अांदार्पत्रक करतेवेळी दरदवचलेषणासाठी त्या त्या वेळी प्रादेदशक सदमतीने दनश्चचत केलेले प्रचलीत दर आदण दरसचुीतील (रु.290/गोणी) दर यातील र्रक दवचारात घ्यावा.

8) सांधानकाच्या कामासाठी Concrete with batching plant & Transit Mixer तरतदु गहृीत धरण्यात आलेली आहे. सांधानकाचे पदरमाण आदण कामाचे स्वरुप दवचारात घेता ज्या कामासाठी Batching plant चा वापर सांयशु्क्तक होत नाही अशा दठकाणी सांधानकाचे काम Mixer ने करणे अपदरहायफ असल्यास त्यास सांबांधीत अधीक्षक अदभयांता याांची पवुफ मान्यता घेऊन Concrete with Batching plant & Transit Mixer हा मलुभतू दर 5 टक्क्याने कमी करण्यात यावा. तसेच या कदरता स्वतांत्र Specifications दनदवदेमध्ये अांतभुफत करावेत.

9) ज्या प्रकल्पाचे बाांधकाम पणूफ झाले आहे व रे्थे कसचन होत आहे अशा कालव्याच्या दरुुस्तीची / पनुस्थापनेची कामे यांत्रसामगु्री वापरुन (कालवा बांद कालावधीत) करताना अदतदरक्त 10 टक्के वाढ दवचारात घेण्यात यावी. सदर वाढ कसचन व्यवस्थापनाच्या सवफसाधारण कामासाठी लाग ूराहणार नाही.

10) र्लदनष्ट्कासन (Dewatering) आवचयक असल्यास, सवफसाधारण कामाांसाठी नाला पातळीपयंतच्या कामाच्या ककमतीच्या 1 टक्का तरतदू अांदार्पत्रकात ठेवण्यात यावी. तसेच नदी व मोठया नाल्यावरील कामाांसाठी नदी व मोठा नाला तळपातळीपयंतच्या ककमतीच्या 3 टक्के तरतदू अांदार्पत्रकात दवचारात घेण्यात यावी.

11) Section-9 मधील बाबी या पनुवफसन गावठाणातील प्रकल्पग्रस्ताांच्या घराचे मलु्याांकनासाठी वापरण्यात याव्यात.

* सामाईक दरसचुी सन 2016-17 टह जलसंपदा टर्र्भागाच्या संकेतस्थळार्रुन Down load करुन

उपयोगात आणण्यापरु्ी “संबंधीत टर्र्भागाच्या कायवकारी अटर्भयंता आटण टर्र्भागीय लेखापाल यांच्या स्र्ाक्षरीने प्रमाटणत करुनच उपयोगात आणार्ी.”

Page 12: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

6

Page 13: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

7

COMMON SCHEDULE OF RATES 2016-17

(1.2) Lift charges by Head Load

Lift in m Rate as per CSR 2013-14 Rate as per CSR 2016-17

1.00 4.65 5.60

1.50 5.90 7.10

2.00 6.65 8.00

2.50 8.00 9.60

3.00 9.00 10.80

3.50 10.00 12.00

4.00 11.10 13.30

4.50 12.55 15.05

5.00 13.30 15.95

5.50 14.25 17.10

6.00 15.75 18.90

6.50 17.05 20.45

7.00 17.75 21.30

7.50 18.85 22.60

8.00 20.15 24.20

8.50 20.85 25.00

9.00 22.05 26.45

9.50 23.35 28.00

10.00 24.20 29.05

* These rates are applicable only for manual works & not for work executed by Machinery.

Page 14: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

8

Page 15: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

9

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2016-17

(1.3) RATES OF CONSTRUCTION MATERIALS

Sr. No.

Material Unit Rate in Rs.

1 Acetylene Cum 390.00

2 Admixture Kg 75.00

3 Aldrop 30 cm No. 120.00

4 Bamboo 25 mm Rmt 20.00

5 Binding wire Kg 65.00

6 Black glass No. 89.00

7 Brick No. 6.00

8 Brushes No. 70.00

9 Butt Hinges Iron 125 mm No. 35.00

10 Cement (50 Kg bag) Bag 290.00

11 Coal tar paint Kg 55.00

12 Coaltar epoxy paint Litre 250.00

13 Coir string Kg 42.00

14 Copper plate Kg 572.00

15 Copper water stopper 16 gauge Sqm 9100.00

16 Cotton waste Kg 46.00

17 Curing compound Litre 134.00

18 Delay Detonator No. 20.00

19 Electric Detonator No. 12.00

20 Empty cement bag No. 10.00

21 First Aid Kit No. 250.00

22 Fly Ash Kg 1.00

23 Fuse coil Rmt. 20.00

24 G.P. Electrodes No. 11.00

25 Gelatin Kg 144.00

26 Geru Kg 12.00

27 Goggles No. 154.00

28 Hand gloves Pair 233.00

Page 16: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

10

Sr. No.

Material Unit Rate in Rs.

29 Hand screen No. 370.00

30 Handle Iron 125 mm No. 35.00

31 Hook iron & eye oxi 75 mm No. 18.00

32 Hose pipe Oxygen & DA Rmt 82.00

33 J-Bolt (For soldier fixing) No 36.00

34 Kerosene Litre 30.00

35 L.H. Electrodes No. 15.00

36 Latches 250 mm No. 45.00

37 Manila Rope Kg 221.00

38 Metal size 40 mm & above (Including Royalty charges) Cum. 680.00

39 Metal size 40 mm & above (Excluding Royalty charges)

Cum. 538.66

40 Metal size less than 40 mm (Including Royalty charges)

Cum 780.00

41 Metal size less than 40 mm (Excluding Royalty charges)

Cum 638.66

42 Nails 4 cm Kg 68.00

43 Neoprene pad Cu.cm 2.00

44 Non Teak wood Cum 37000.00

45 Nozzle – 3/64 No. 849.00

46 Nut bolts Kg 64.00

47 Nut bolts and washer Kg 99.00

48 Nylon Rope Kg 280.00

49 Oil paint Litre 250.00

50 Ordinary Detonator No. 7.00

51 Oxygen Cum 47.00

52 P.V.C. water stopper,310mm wide central bulb type Rmt 235.00

53 Painting brush 4” No. 100.00

54 Pickaxe No. 150.00

55 Plum bob No. 100.00

56 Polyethylene film 200 gauge Kg 238.75

57 Primer Litre 160.00

58 Red oxide Litre 140.00

Page 17: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

11

Sr. No.

Material Unit Rate in Rs.

59 Rust cleaner Litre 310.00

60 Safety Helmet No. 250.00

61 Safety shoes Pair 1444.00

62 Sand (Including Royalty charges) Cum. 750.00

63 Sand (Excluding Royalty charges) Cum. 608.66

64 Shalitex super Expansion Pad – 12 mm Tk. Sqm 621.25

65 Spirit level - 150 mm No. 120.00

66 Steel MT Rate as per J.P.C.,

Dt.1/6/2015

67 Stone (Including Royalty charges) Cum. 480.00

68 Stone (Excluding Royalty charges) Cum. 338.66

69 Super plasticizer Kg 106.00

70 Turpentine Litre 70.00

71 Tower bolt Iron 200 mm No. 70.00

72 Tower bolt Iron 250 mm No. 80.00

73 Water 1000 Ltrs 32.00

74 Water proofing compound Kg 58.00

75 Welding cable 600 AMP Rmt 753.00

76 White glass No. 5.00

77 Wire brush No. 80.00

78 Wire mesh 50 X 50 - 13 gauge Sqm 200.00

79 Zink base oil paint Litre 318.00

80 Zink rich Epoxy primer Litre 289.00

Page 18: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

12

Page 19: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

13

GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2016-17

LABOUR RATES

Sr. No.

Labour Unit Rate in Rs.

1 Barbender day 428.00

2 Bhisti day 428.00

3 CAD operator / Civil Engg. Assistant day 564.00

4 Carpenter day 455.00

5 Civil Engineer day 912.00

6 Electrician day 455.00

7 Fitter day 455.00

8 Fitter for shuttering day 455.00

9 Foreman day 455.00

10 Gas cutter day 428.00

11 Grinder day 428.00

12 Gauge Inspector day 428.00

13 Mason day 455.00

14 Mazdoor (Heavy) day 428.00

15 Mazdoor (Light) day 409.00

16 Measurement clerk day 455.00

17 Mechanic / Operator day 455.00

18 Mistri / Mukadam day 455.00

19 Painter day 455.00

20 Semiskilled Mazdoor day 428.00

21 Skilled Mazdoor day 455.00

22 Surveyor day 628.00

23 Tile Turner day 455.00

24 Tracer day 536.00

25 Unskilled Mazdoor day 409.00

26 Welder day 455.00

Page 20: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

14

(1.4) Statement No.1

Average Speed Statement

Including Loading & unloading Charges

Lead in Km

Av speed per hour

No of Trips KM done Qty of

Diesel 4 Km/Litre

Cost of Diesel

Qty of Mobile Oil

168.75 Km/Litre

Cost of Mobile Oil Rs

290/Litre

Cost of 6 Mazdoors @ Rs.409/day

Hire Charges of

Truck Total Cost

Add 10 % Over head

Charges

Total of Col.11+12

Cost per trip =

Col.7/col.3

Lead in Km

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

L S N=8/((2*(L/

S))+1) (2*NL)+6 Col.No.4/4

Col.No.5*57.17

Col. No.4/168.75

Col.No.7*290 6*409 Rs

2000/Day Col.

No.6+8+9+10 Col.No.11*0.

10 Col.11+12

Col.No.13/col.No.3

L

1.00 16.00 7.11 20.22 5.06 289.03 0.12 34.75 2454.00 2000 4778 477.78 5255.56 739 1.00

1.50 16.50 6.77 26.31 6.58 376.00 0.16 45.21 2454.00 2000 4875 487.52 5362.73 792 1.50

2.00 17.00 6.48 31.90 7.98 456.00 0.19 54.83 2454.00 2000 4965 496.48 5461.31 843 2.00

2.50 17.25 6.20 37.01 9.25 528.98 0.22 63.60 2454.00 2000 5047 504.66 5551.25 895 2.50

3.00 17.50 5.96 41.74 10.44 596.64 0.25 71.74 2454.00 2000 5122 512.24 5634.61 946 3.00

3.50 17.75 5.74 46.16 11.54 659.76 0.27 79.33 2454.00 2000 5193 519.31 5712.40 996 3.50

4.00 18.00 5.54 50.31 12.58 719.02 0.30 86.45 2454.00 2000 5259 525.95 5785.43 1045 4.00

4.50 18.25 5.36 54.22 13.56 774.94 0.32 93.18 2454.00 2000 5322 532.21 5854.33 1093 4.50

5.00 18.50 5.19 57.93 14.48 827.96 0.34 99.55 2454.00 2000 5382 538.15 5919.67 1140 5.00

6.00 18.75 4.88 64.54 16.13 922.39 0.38 110.91 2454.00 2000 5487 548.73 6036.03 1237 6.00

7.00 19.00 4.61 70.48 17.62 1007.40 0.42 121.13 2454.00 2000 5583 558.25 6140.79 1333 7.00

8.00 19.30 4.37 75.98 19.00 1085.99 0.45 130.58 2454.00 2000 5671 567.06 6237.62 1426 8.00

9.00 19.60 4.17 81.06 20.27 1158.60 0.48 139.31 2454.00 2000 5752 575.19 6327.11 1517 9.00

10.00 20.00 4.00 86.00 21.50 1229.16 0.51 147.79 2454.00 2000 5831 583.09 6414.04 1604 10.00

15.00 25.00 3.64 115.09 28.77 1644.94 0.68 197.79 2454.00 2000 6297 629.67 6926.39 1905 15.00

20.00 25.00 3.08 129.08 32.27 1844.83 0.76 221.82 2454.00 2000 6521 652.07 7172.72 2331 20.00

25.00 25.00 2.67 139.33 34.83 1991.42 0.83 239.45 2454.00 2000 6685 668.49 7353.36 2758 25.00

30.00 25.00 2.35 147.18 36.79 2103.52 0.87 252.93 2454.00 2000 6810 681.04 7491.49 3184 30.00

35.00 30.00 2.40 174.00 43.50 2486.90 1.03 299.02 2454.00 2000 7240 723.99 7963.91 3318 35.00

40.00 30.00 2.18 180.55 45.14 2580.45 1.07 310.27 2454.00 2000 7345 734.47 8079.19 3703 40.00

45.00 30.00 2.00 186.00 46.50 2658.41 1.10 319.64 2454.00 2000 7432 743.20 8175.25 4088 45.00

50.00 30.00 1.85 190.62 47.65 2724.37 1.13 327.58 2454.00 2000 7506 750.59 8256.54 4472 50.00

60.00 30.00 1.60 198.00 49.50 2829.92 1.17 340.27 2454.00 2000 7624 762.42 8386.60 5242 60.00

70.00 30.00 1.41 203.65 50.91 2910.63 1.21 349.97 2454.00 2000 7715 771.46 8486.06 6011 70.00

80.00 30.00 1.26 208.11 52.03 2974.34 1.23 357.63 2454.00 2000 7786 778.60 8564.57 6780 80.00

90.00 30.00 1.14 211.71 52.93 3025.93 1.25 363.83 2454.00 2000 7844 784.38 8628.14 7550 90.00

100.00 30.00 1.04 214.70 53.67 3068.54 1.27 368.96 2454.00 2000 7891 789.15 8680.65 8319 100.00

125.00 40.00 1.10 281.86 70.47 4028.51 1.67 484.39 2454.00 2000 8967 896.69 9863.59 8939 125.00

150.00 40.00 0.94 288.35 72.09 4121.28 1.71 495.54 2454.00 2000 9071 907.08 9977.91 10602 150.00

175.00 40.00 0.82 293.18 73.29 4190.27 1.74 503.83 2454.00 2000 9148 914.81 10062.91 12264 175.00

200.00 40.00 0.73 296.91 74.23 4243.57 1.76 510.24 2454.00 2000 9208 920.78 10128.60 13927 200.00

Page 21: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

15

STATEMENT NO.2

Lead in Km Rate per

Trip

Lead Charges

Lead in Km Murum Earth Sand

Metal below 40 mm

Metal 40 mm & above

Rubble Water Steel ,

Cement, Stone Block

Excavated Rock Concrete

Block Bricks

L

As per col. No.13 of

Statement No.1

Col. No.2 / pay load

factor

Col. No.2 / pay load factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load factor

Col. No.2 / pay load

factor

Col. No.2 / pay load factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor L

1 2 3 4 5 6 7 8 9 10 11 12 13 1

Unit Cum Cum Cum Cum Cum Cum 1000 Liters MT Cum Cum 1000 Unit

Pay Load Factor

6.00 4.80 5.00 5.00 4.62 4.25 9.00 7.00 3.00 6.00 2.00 Pay Load

Factor

1.00 739 123.18 153.97 147.81 147.81 159.97 173.90 82.12 105.58 246.35 123.18 369.53 1.00

1.50 792 132.04 165.05 158.44 158.44 171.48 186.41 88.02 113.17 264.07 132.04 396.11 1.50

2.00 843 140.55 175.69 168.66 168.66 182.53 198.42 93.70 120.47 281.10 140.55 421.65 2.00

2.50 895 149.17 186.47 179.01 179.01 193.73 210.60 99.45 127.86 298.35 149.17 447.52 2.50

3.00 946 157.63 197.04 189.16 189.16 204.72 222.54 105.09 135.12 315.27 157.63 472.90 3.00

3.50 996 165.94 207.43 199.13 199.13 215.51 234.27 110.63 142.24 331.88 165.94 497.82 3.50

4.00 1045 174.10 217.62 208.92 208.92 226.10 245.79 116.07 149.23 348.20 174.10 522.30 4.00

4.50 1093 182.11 227.64 218.54 218.54 236.51 257.10 121.41 156.10 364.23 182.11 546.34 4.50

5.00 1140 189.99 237.49 227.99 227.99 246.74 268.22 126.66 162.85 379.98 189.99 569.97 5.00

6.00 1237 206.23 257.79 247.48 247.48 267.83 291.15 137.49 176.77 412.46 206.23 618.69 6.00

7.00 1333 222.20 277.75 266.64 266.64 288.57 313.69 148.13 190.46 444.40 222.20 666.60 7.00

8.00 1426 237.68 297.10 285.22 285.22 308.68 335.55 158.45 203.73 475.36 237.68 713.04 8.00

9.00 1517 252.87 316.09 303.44 303.44 328.40 356.99 168.58 216.74 505.74 252.87 758.61 9.00

10.00 1604 267.25 334.06 320.70 320.70 347.08 377.30 178.17 229.07 534.50 267.25 801.76 10.00

15.00 1905 317.46 396.82 380.95 380.95 412.29 448.18 211.64 272.11 634.92 317.46 952.38 15.00

20.00 2331 388.52 485.65 466.23 466.23 504.57 548.50 259.01 333.02 777.04 388.52 1165.57 20.00

25.00 2758 459.58 574.48 551.50 551.50 596.86 648.83 306.39 393.93 919.17 459.58 1378.75 25.00

30.00 3184 530.65 663.31 636.78 636.78 689.15 749.15 353.76 454.84 1061.29 530.65 1591.94 30.00

35.00 3318 553.05 691.31 663.66 663.66 718.25 780.78 368.70 474.04 1106.10 553.05 1659.15 35.00

40.00 3703 617.16 771.45 740.59 740.59 801.51 871.29 411.44 528.99 1234.32 617.16 1851.48 40.00

45.00 4088 681.27 851.59 817.53 817.53 884.77 961.79 454.18 583.95 1362.54 681.27 2043.81 45.00

50.00 4472 745.38 931.73 894.46 894.46 968.03 1052.30 496.92 638.90 1490.76 745.38 2236.15 50.00

60.00 5242 873.60 1092.01 1048.32 1048.32 1134.55 1233.32 582.40 748.80 1747.21 873.60 2620.81 60.00

70.00 6011 1001.83 1252.28 1202.19 1202.19 1301.07 1414.34 667.88 858.71 2003.65 1001.83 3005.48 70.00

80.00 6780 1130.05 1412.56 1356.06 1356.06 1467.59 1595.36 753.37 968.61 2260.10 1130.05 3390.14 80.00

90.00 7550 1258.27 1572.84 1509.92 1509.92 1634.12 1776.38 838.85 1078.52 2516.54 1258.27 3774.81 90.00

100.00 8319 1386.49 1733.12 1663.79 1663.79 1800.64 1957.40 924.33 1188.42 2772.98 1386.49 4159.48 100.00

125.00 8939 1489.81 1862.27 1787.78 1787.78 1934.82 2103.27 993.21 1276.98 2979.63 1489.81 4469.44 125.00

150.00 10602 1766.92 2208.65 2120.31 2120.31 2294.70 2494.48 1177.95 1514.50 3533.84 1766.92 5300.76 150.00

175.00 12264 2044.03 2555.04 2452.83 2452.83 2654.58 2885.69 1362.69 1752.02 4088.06 2044.03 6132.09 175.00

200.00 13927 2321.14 2901.42 2785.36 2785.36 3014.46 3276.90 1547.42 1989.55 4642.27 2321.14 6963.41 200.00

Page 22: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

16

STATEMENT NO.3

LEAD CHARGES STATEMENT FOR 2016-17 (INCLUDING LOADING & UNLOADING CHARGES )

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM

& ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

L As per Col No.3 Of Statement

No.2

As per Col No.4 Of Statement

No.2

As per Col No.5 Of Statement

No.2

As per Col No.6 Of Statement

No.2

As per Col No.7 Of Statement

No.2

As per Col No.8 Of Statement

No.2

As per Col No.9 of Statement

No.2

As per Col No.10 of Statement

No.2

As per Col No.11 of Statement

No.2

As per Col No.12 of Statement

No.2

As per Col No.13 of Statement

No.2

KM Cum Cum Cum Cum Cum Cum 1000 Liters MT Cum Cum 1000

1.00 123.18 153.97 147.81 147.81 159.97 173.90 82.12 105.58 246.35 123.18 369.53

1.50 132.04 165.05 158.44 158.44 171.48 186.41 88.02 113.17 264.07 132.04 396.11

2.00 140.55 175.69 168.66 168.66 182.53 198.42 93.70 120.47 281.10 140.55 421.65

2.50 149.17 186.47 179.01 179.01 193.73 210.60 99.45 127.86 298.35 149.17 447.52

3.00 157.63 197.04 189.16 189.16 204.72 222.54 105.09 135.12 315.27 157.63 472.90

3.50 165.94 207.43 199.13 199.13 215.51 234.27 110.63 142.24 331.88 165.94 497.82

4.00 174.10 217.62 208.92 208.92 226.10 245.79 116.07 149.23 348.20 174.10 522.30

4.50 182.11 227.64 218.54 218.54 236.51 257.10 121.41 156.10 364.23 182.11 546.34

5.00 189.99 237.49 227.99 227.99 246.74 268.22 126.66 162.85 379.98 189.99 569.97

6.00 206.23 257.79 247.48 247.48 267.83 291.15 137.49 176.77 412.46 206.23 618.69

7.00 222.20 277.75 266.64 266.64 288.57 313.69 148.13 190.46 444.40 222.20 666.60

8.00 237.68 297.10 285.22 285.22 308.68 335.55 158.45 203.73 475.36 237.68 713.04

9.00 252.87 316.09 303.44 303.44 328.40 356.99 168.58 216.74 505.74 252.87 758.61

10.00 267.25 334.06 320.70 320.70 347.08 377.30 178.17 229.07 534.50 267.25 801.76

11.00 279.88 349.85 335.86 335.86 363.49 395.13 186.59 239.90 559.76 279.88 839.66

12.00 292.51 365.64 351.02 351.02 379.90 412.96 195.01 250.73 585.02 292.51 877.56

13.00 305.14 381.43 366.18 366.18 396.31 430.79 203.43 261.56 610.28 305.14 915.46

14.00 317.77 397.22 381.34 381.34 412.72 448.62 211.85 272.39 635.54 317.77 953.36

15.00 317.46 396.82 380.95 380.95 412.29 448.18 211.64 272.11 634.92 317.46 952.38

16.00 328.79 410.98 394.55 394.55 427.01 464.18 219.19 281.82 657.58 328.79 986.38

17.00 337.17 425.14 408.15 408.15 441.73 480.18 226.74 291.53 680.24 340.12 1020.38

18.00 345.55 439.30 421.75 421.75 456.45 496.18 234.29 301.24 702.90 351.45 1054.38

19.00 353.93 453.46 435.35 435.35 471.17 512.18 241.84 310.95 725.56 362.78 1088.38

20.00 388.52 485.65 466.23 466.23 504.57 548.50 259.01 333.02 777.04 388.52 1165.57

21.00 398.89 498.62 478.68 478.68 518.04 563.15 265.93 341.91 797.79 398.89 1196.69

22.00 409.26 511.59 491.13 491.13 531.51 577.80 272.85 350.80 818.54 409.26 1227.81

23.00 419.63 524.56 503.58 503.58 544.98 592.45 279.77 359.69 839.29 419.63 1258.93

24.00 430.00 537.53 516.03 516.03 558.45 607.10 286.69 368.58 860.04 430.00 1290.05

25.00 459.58 574.48 551.50 551.50 596.86 648.83 306.39 393.93 919.17 459.58 1378.75

26.00 469.23 586.54 563.08 563.08 609.39 662.45 312.82 402.20 938.46 469.23 1407.69

27.00 478.88 598.60 574.66 574.66 621.92 676.07 319.25 410.47 957.75 478.88 1436.63

28.00 488.53 610.66 586.24 586.24 634.45 689.69 325.68 418.74 977.04 488.53 1465.57

29.00 498.18 622.72 597.82 597.82 646.98 703.31 332.11 427.01 996.33 498.18 1494.51

30.00 530.65 663.31 636.78 636.78 689.15 749.15 353.76 454.84 1061.29 530.65 1591.94

Page 23: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

17

STATEMENT NO.3

LEAD CHARGES STATEMENT FOR 2016-17 (INCLUDING LOADING & UNLOADING CHARGES )

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM &

ABOVE RUBBLE Water

Steel, Cement, Stone Block

Excavated Rock Concrete Block Bricks

31.00 543.25 679.06 651.90 647.54 705.51 766.94 362.16 465.64 1086.49 543.25 1629.73 32.00 555.85 694.81 667.02 658.30 721.87 784.73 370.56 476.44 1111.69 555.85 1667.52 33.00 568.45 710.56 682.14 669.06 738.23 802.52 378.96 487.24 1136.89 568.45 1705.31 34.00 581.05 726.31 697.26 679.82 754.59 820.31 387.36 498.04 1162.09 581.05 1743.10 35.00 553.05 691.31 663.66 663.66 718.25 780.78 368.70 474.04 1106.10 553.05 1659.15

36.00 565.65 707.06 678.78 678.78 734.61 798.57 377.10 484.84 1131.30 565.65 1696.94 37.00 578.25 722.81 693.90 693.90 750.97 816.36 385.50 495.64 1156.50 578.25 1734.73 38.00 590.85 738.56 709.02 709.02 767.33 834.15 393.90 506.44 1181.70 590.85 1772.52 39.00 603.45 754.31 724.14 724.14 783.69 851.94 402.30 517.24 1206.90 603.45 1810.31 40.00 617.16 771.45 740.59 740.59 801.51 871.29 411.44 528.99 1234.32 617.16 1851.48

41.00 629.76 787.20 755.71 755.71 817.87 889.08 419.84 539.79 1259.52 629.76 1889.27 42.00 642.36 802.95 770.83 770.83 834.23 906.87 428.24 550.59 1284.72 642.36 1927.06 43.00 654.96 818.70 785.95 785.95 850.59 924.66 436.64 561.39 1309.92 654.96 1964.85 44.00 667.56 834.45 801.07 801.07 866.95 942.45 445.04 572.19 1335.12 667.56 2002.64 45.00 681.27 851.59 817.53 817.53 884.77 961.79 454.18 583.95 1362.54 681.27 2043.81

46.00 693.87 867.34 832.65 832.65 901.13 979.58 462.58 594.75 1387.74 693.87 2081.60 47.00 706.47 883.09 847.77 847.77 917.49 997.37 470.98 605.55 1412.94 706.47 2119.39 48.00 719.07 898.84 862.89 862.89 933.85 1015.16 479.38 616.35 1438.14 719.07 2157.18 49.00 731.67 914.59 878.01 878.01 950.21 1032.95 487.78 627.15 1463.34 731.67 2194.97 50.00 745.38 931.73 894.46 894.46 968.03 1052.30 496.92 638.90 1490.76 745.38 2236.15

51.00 757.98 947.48 909.58 909.58 984.39 1070.09 505.32 649.70 1515.96 757.98 2273.94 52.00 770.58 963.23 924.70 924.70 1000.75 1087.88 513.72 660.50 1541.16 770.58 2311.73 53.00 783.18 978.98 939.82 939.82 1017.11 1105.67 522.12 671.30 1566.36 783.18 2349.52 54.00 795.78 994.73 954.94 954.94 1033.47 1123.46 530.52 682.10 1591.56 795.78 2387.31 55.00 808.38 1010.48 970.06 970.06 1049.83 1141.25 538.92 692.90 1616.76 808.38 2425.10 56.00 820.98 1026.23 985.18 985.18 1066.19 1159.04 547.32 703.70 1641.96 820.98 2462.89 57.00 833.58 1041.98 1000.30 1000.30 1082.55 1176.83 555.72 714.50 1667.16 833.58 2500.68 58.00 846.18 1057.73 1015.42 1015.42 1098.91 1194.62 564.12 725.30 1692.36 846.18 2538.47 59.00 858.78 1073.48 1030.54 1030.54 1115.27 1212.41 572.52 736.10 1717.56 858.78 2576.26 60.00 873.60 1092.01 1048.32 1048.32 1134.55 1233.32 582.40 748.80 1747.21 873.60 2620.81

61.00 886.20 1107.76 1063.44 1063.44 1150.91 1251.11 590.80 759.60 1772.41 886.20 2658.60 62.00 898.80 1123.51 1078.56 1078.56 1167.27 1268.90 599.20 770.40 1797.61 898.80 2696.39 63.00 911.40 1139.26 1093.68 1093.68 1183.63 1286.69 607.60 781.20 1822.81 911.40 2734.18 64.00 924.00 1155.01 1108.80 1108.80 1199.99 1304.48 616.00 792.00 1848.01 924.00 2771.97 65.00 936.60 1170.76 1123.92 1123.92 1216.35 1322.27 624.40 802.80 1873.21 936.60 2809.76 66.00 949.20 1186.51 1139.04 1139.04 1232.71 1340.06 632.80 813.60 1898.41 949.20 2847.55 67.00 961.80 1202.26 1154.16 1154.16 1249.07 1357.85 641.20 824.40 1923.61 961.80 2885.34 68.00 974.40 1218.01 1169.28 1169.28 1265.43 1375.64 649.60 835.20 1948.81 974.40 2923.13 69.00 987.00 1233.76 1184.40 1184.40 1281.79 1393.43 658.00 846.00 1974.01 987.00 2960.92 70.00 1001.83 1252.28 1202.19 1202.19 1301.07 1414.34 667.88 858.71 2003.65 1001.83 3005.48

Page 24: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

18

STATEMENT NO.3

LEAD CHARGES STATEMENT FOR 2016-17 (INCLUDING LOADING & UNLOADING CHARGES )

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM &

ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

71.00 1014.43 1268.03 1217.31 1217.31 1317.43 1432.13 676.28 869.51 2028.85 1014.43 3043.27

72.00 1027.03 1283.78 1232.43 1232.43 1333.79 1449.92 684.68 880.31 2054.05 1027.03 3081.06

73.00 1039.63 1299.53 1247.55 1247.55 1350.15 1467.71 693.08 891.11 2079.25 1039.63 3118.85

74.00 1052.23 1315.28 1262.67 1262.67 1366.51 1485.50 701.48 901.91 2104.45 1052.23 3156.64

75.00 1064.83 1331.03 1277.79 1277.79 1382.87 1503.29 709.88 912.71 2129.65 1064.83 3194.43

76.00 1077.43 1346.78 1292.91 1292.91 1399.23 1521.08 718.28 923.51 2154.85 1077.43 3232.22

77.00 1090.03 1362.53 1308.03 1308.03 1415.59 1538.87 726.68 934.31 2180.05 1090.03 3270.01

78.00 1102.63 1378.28 1323.15 1323.15 1431.95 1556.66 735.08 945.11 2205.25 1102.63 3307.80

79.00 1115.23 1394.03 1338.27 1338.27 1448.31 1574.45 743.48 955.91 2230.45 1115.23 3345.59

80.00 1130.05 1412.56 1356.06 1356.06 1467.59 1595.36 753.37 968.61 2260.10 1130.05 3390.14

81.00 1142.65 1428.31 1371.18 1371.18 1483.95 1613.15 761.77 979.41 2285.30 1142.65 3427.93

82.00 1155.25 1444.06 1386.30 1386.30 1500.31 1630.94 770.17 990.21 2310.50 1155.25 3465.72

83.00 1167.85 1459.81 1401.42 1401.42 1516.67 1648.73 778.57 1001.01 2335.70 1167.85 3503.51

84.00 1180.45 1475.56 1416.54 1416.54 1533.03 1666.52 786.97 1011.81 2360.90 1180.45 3541.30

85.00 1193.05 1491.31 1431.66 1431.66 1549.39 1684.31 795.37 1022.61 2386.10 1193.05 3579.09

86.00 1205.65 1507.06 1446.78 1446.78 1565.75 1702.10 803.77 1033.41 2411.30 1205.65 3616.88

87.00 1218.25 1522.81 1461.90 1461.90 1582.11 1719.89 812.17 1044.21 2436.50 1218.25 3654.67

88.00 1230.85 1538.56 1477.02 1477.02 1598.47 1737.68 820.57 1055.01 2461.70 1230.85 3692.46

89.00 1243.45 1554.31 1492.14 1492.14 1614.83 1755.47 828.97 1065.81 2486.90 1243.45 3730.25

90.00 1258.27 1572.84 1509.92 1509.92 1634.12 1773.26 838.85 1078.52 2516.54 1258.27 3774.81

91.00 1255.73 1569.67 1525.31 1506.87 1630.82 1791.05 837.16 1076.34 2511.46 1255.73 3767.19

92.00 1253.19 1566.50 1540.70 1503.82 1627.52 1808.84 835.47 1074.16 2506.38 1253.19 3759.57

93.00 1250.65 1563.33 1556.09 1500.77 1663.79 1826.63 833.78 1071.98 2501.30 1250.65 3751.95

94.00 1248.11 1560.16 1571.48 1497.72 1660.49 1844.42 832.09 1069.80 2496.22 1248.11 3744.33

95.00 1245.57 1556.99 1586.87 1494.67 1657.19 1862.21 830.40 1067.62 2491.14 1245.57 3736.71

96.00 1243.03 1553.82 1602.26 1491.62 1653.89 1880.00 828.71 1065.44 2486.06 1243.03 3729.09

97.00 1240.49 1550.65 1617.65 1488.57 1650.59 1897.79 827.02 1063.26 2480.98 1240.49 3721.47

98.00 1237.95 1547.48 1633.04 1485.52 1647.29 1915.58 825.33 1061.08 2475.90 1237.95 3713.85

99.00 1235.41 1544.31 1648.43 1482.47 1643.99 1933.37 823.64 1058.90 2470.82 1235.41 3706.23

100.00 1386.49 1733.12 1663.79 1663.79 1800.64 1957.40 924.33 1188.42 2772.98 1386.49 4159.48

Page 25: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

19

LEAD CHARGES STATEMENT FOR 2016-17 (INCLUDING LOADING & UNLOADING CHARGES )

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM &

ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

101.00 1397.57 1746.97 1668.75 1668.75 1815.03 1973.05 931.72 1197.92 2795.15 1397.57 4192.73

102.00 1408.65 1760.83 1673.71 1673.71 1829.43 1988.70 939.11 1207.42 2817.32 1408.65 4225.98

103.00 1419.73 1774.68 1678.67 1678.67 1843.82 2004.34 946.50 1216.92 2839.49 1419.73 4259.23

104.00 1430.81 1788.54 1683.63 1683.63 1858.22 2019.99 953.88 1226.42 2861.66 1430.81 4292.48

105.00 1441.89 1802.39 1688.59 1688.59 1872.61 2035.64 961.27 1235.92 2883.82 1441.89 4325.73

106.00 1452.97 1816.25 1693.54 1693.54 1887.01 2051.29 968.66 1245.42 2905.99 1452.97 4358.98

107.00 1464.05 1830.10 1698.50 1698.50 1901.40 2066.94 976.05 1254.92 2928.16 1464.05 4392.23

108.00 1475.13 1843.96 1703.46 1703.46 1915.80 2082.58 983.44 1264.42 2950.33 1475.13 4425.48

109.00 1486.21 1857.81 1708.42 1708.42 1930.19 2098.23 990.83 1273.92 2972.50 1486.21 4458.73

110.00 1497.29 1871.67 1713.38 1713.38 1944.59 2113.88 998.22 1283.42 2994.66 1497.29 4491.98

111.00 1508.37 1885.52 1718.34 1718.34 1958.98 2129.53 1005.61 1292.92 3016.83 1508.37 4525.23

112.00 1519.45 1899.38 1723.30 1723.30 1973.38 2145.18 1013.00 1302.42 3039.00 1519.45 4558.48

113.00 1530.53 1913.23 1728.26 1728.26 1987.77 2160.82 1020.39 1311.92 3061.17 1530.53 4591.73

114.00 1541.61 1927.09 1733.22 1733.22 2002.17 2176.47 1027.77 1321.42 3083.34 1541.61 4624.98

115.00 1552.69 1940.94 1738.18 1738.18 2016.56 2192.12 1035.16 1330.92 3105.50 1552.69 4658.23

116.00 1563.77 1954.80 1743.13 1743.13 2030.96 2207.77 1042.55 1340.42 3127.67 1563.77 4691.48

117.00 1574.85 1968.65 1748.09 1748.09 2045.35 2223.42 1049.94 1349.92 3149.84 1574.85 4724.73

118.00 1585.93 1982.51 1753.05 1753.05 2059.75 2239.06 1057.33 1359.42 3172.01 1585.93 4757.98

119.00 1597.01 1996.36 1758.01 1758.01 2074.14 2254.71 1064.72 1368.92 3194.18 1597.01 4791.23

120.00 1608.09 2010.22 1762.97 1762.97 2088.54 2270.36 1072.11 1378.42 3216.34 1608.09 4824.48

121.00 1619.17 2024.07 1767.93 1767.93 2102.93 2286.01 1079.50 1387.92 3238.51 1619.17 4857.73

122.00 1630.25 2037.93 1772.89 1772.89 2117.33 2301.66 1086.89 1397.42 3260.68 1630.25 4890.98

123.00 1641.33 2051.78 1777.85 1777.85 2131.72 2317.30 1094.28 1406.92 3282.85 1641.33 4924.23

124.00 1652.41 2065.64 1782.81 1782.81 2146.12 2332.95 1101.66 1416.42 3305.02 1652.41 4957.48

125.00 1489.81 1862.27 1787.78 1787.78 1934.82 2103.27 993.21 1276.98 2979.63 1489.81 4469.44

126.00 1500.89 1876.12 1801.07 1801.08 1949.22 2118.91 1000.60 1286.48 3001.79 1500.89 4502.69

127.00 1511.97 1889.98 1814.37 1814.38 1963.61 2134.56 1007.99 1295.98 3023.96 1511.97 4535.94

128.00 1523.05 1903.83 1827.67 1827.68 1978.01 2150.21 1015.38 1305.48 3046.13 1523.05 4569.19

129.00 1534.13 1917.69 1840.97 1840.98 1992.40 2165.86 1022.76 1314.98 3068.30 1534.13 4602.44

130.00 1545.21 1931.54 1854.27 1854.28 2006.80 2181.51 1030.15 1324.48 3090.47 1545.21 4635.69

131.00 1556.29 1945.40 1867.57 1867.58 2021.19 2197.15 1037.54 1333.98 3112.63 1556.29 4668.94

132.00 1567.37 1959.25 1880.87 1880.88 2035.59 2212.80 1044.93 1343.48 3134.80 1567.37 4702.19

133.00 1578.45 1973.11 1894.17 1894.18 2049.98 2228.45 1052.32 1352.98 3156.97 1578.45 4735.44

134.00 1589.53 1986.96 1907.47 1907.48 2064.38 2244.10 1059.71 1362.48 3179.14 1589.53 4768.69

135.00 1600.61 2000.82 1920.77 1920.78 2078.77 2259.75 1067.10 1371.98 3201.31 1600.61 4801.94

Page 26: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

20

LEAD CHARGES STATEMENT FOR 2016-17 (INCLUDING LOADING & UNLOADING CHARGES )

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM &

ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

136.00 1611.69 2014.67 1934.06 1934.08 2093.17 2275.39 1074.49 1381.48 3223.47 1611.69 4835.19

137.00 1622.77 2028.53 1947.36 1947.38 2107.56 2291.04 1081.88 1390.98 3245.64 1622.77 4868.44

138.00 1633.85 2042.38 1960.66 1960.68 2121.96 2306.69 1089.27 1400.48 3267.81 1633.85 4901.69

139.00 1644.93 2056.24 1973.96 1973.98 2136.35 2322.34 1096.65 1409.98 3289.98 1644.93 4934.94

140.00 1656.01 2070.09 1987.26 1987.28 2150.75 2337.99 1104.04 1419.48 3312.15 1656.01 4968.19

141.00 1667.09 2083.95 2000.56 2000.58 2165.14 2353.63 1111.43 1428.98 3334.31 1667.09 5001.44

142.00 1678.17 2097.80 2013.86 2013.88 2179.54 2369.28 1118.82 1438.48 3356.48 1678.17 5034.69

143.00 1689.25 2111.66 2027.16 2027.18 2193.93 2384.93 1126.21 1447.98 3378.65 1689.25 5067.94

144.00 1700.33 2125.51 2040.46 2040.48 2208.33 2400.58 1133.60 1457.48 3400.82 1700.33 5101.19

145.00 1711.41 2139.37 2053.76 2053.78 2222.72 2416.23 1140.99 1466.98 3422.99 1711.41 5134.44

146.00 1722.49 2153.22 2067.05 2067.08 2237.12 2431.87 1148.38 1476.48 3445.15 1722.49 5167.69

147.00 1733.57 2167.08 2080.35 2080.38 2251.51 2447.52 1155.77 1485.98 3467.32 1733.57 5200.94

148.00 1744.65 2180.93 2093.65 2093.68 2265.91 2463.17 1163.16 1495.48 3489.49 1744.65 5234.19

149.00 1755.73 2194.79 2106.95 2106.98 2280.30 2478.82 1170.54 1504.98 3511.66 1755.73 5267.44

150.00 1766.92 2208.65 2120.31 2120.31 2294.70 2494.48 1177.95 1514.50 3533.84 1766.92 5300.76

151.00 1778.00 2222.51 2133.60 2133.61 2309.10 2510.12 1185.34 1524.00 3556.01 1778.00 5334.01

152.00 1789.08 2236.36 2146.90 2146.91 2323.49 2525.77 1192.73 1533.50 3578.18 1789.08 5367.26

153.00 1800.16 2250.22 2160.20 2160.21 2337.89 2541.42 1200.11 1543.00 3600.35 1800.16 5400.51

154.00 1811.24 2264.07 2173.50 2173.51 2352.28 2557.07 1207.50 1552.50 3622.51 1811.24 5433.76

155.00 1822.32 2277.93 2186.80 2186.81 2366.68 2572.72 1214.89 1562.00 3644.68 1822.32 5467.01

156.00 1833.40 2291.78 2200.10 2200.11 2381.07 2588.36 1222.28 1571.50 3666.85 1833.40 5500.26

157.00 1844.48 2305.64 2213.40 2213.41 2395.47 2604.01 1229.67 1581.00 3689.02 1844.48 5533.51

158.00 1855.56 2319.49 2226.70 2226.71 2409.86 2619.66 1237.06 1590.50 3711.19 1855.56 5566.76

159.00 1866.64 2333.35 2240.00 2240.01 2424.26 2635.31 1244.45 1600.00 3733.35 1866.64 5600.01

160.00 1877.72 2347.20 2253.30 2253.31 2438.65 2650.96 1251.84 1609.50 3755.52 1877.72 5633.26

161.00 1888.80 2361.06 2266.59 2266.61 2453.05 2666.60 1259.23 1619.00 3777.69 1888.80 5666.51

162.00 1899.88 2374.91 2279.89 2279.91 2467.44 2682.25 1266.62 1628.50 3799.86 1899.88 5699.76

163.00 1910.96 2388.77 2293.19 2293.21 2481.84 2697.90 1274.00 1638.00 3822.03 1910.96 5733.01

164.00 1922.04 2402.62 2306.49 2306.51 2496.23 2713.55 1281.39 1647.50 3844.19 1922.04 5766.26

165.00 1933.12 2416.48 2319.79 2319.81 2510.63 2729.20 1288.78 1657.00 3866.36 1933.12 5799.51

166.00 1944.20 2430.33 2333.09 2333.11 2525.02 2744.84 1296.17 1666.50 3888.53 1944.20 5832.76

167.00 1955.28 2444.19 2346.39 2346.41 2539.42 2760.49 1303.56 1676.00 3910.70 1955.28 5866.01

168.00 1966.36 2458.04 2359.69 2359.71 2553.81 2776.14 1310.95 1685.50 3932.87 1966.36 5899.26

169.00 1977.44 2471.90 2372.99 2373.01 2568.21 2791.79 1318.34 1695.00 3955.03 1977.44 5932.51

170.00 1988.52 2485.75 2386.29 2386.31 2582.60 2807.44 1325.73 1704.50 3977.20 1988.52 5965.76

Page 27: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

21

LEAD CHARGES STATEMENT FOR 2016-17 (INCLUDING LOADING & UNLOADING CHARGES )

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM &

ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

171.00 1999.60 2499.61 2399.58 2399.61 2597.00 2823.08 1333.12 1714.00 3999.37 1999.60 5999.01

172.00 2010.68 2513.46 2412.88 2412.91 2611.39 2838.73 1340.51 1723.50 4021.54 2010.68 6032.26

173.00 2021.76 2527.32 2426.18 2426.21 2625.79 2854.38 1347.89 1733.00 4043.71 2021.76 6065.51

174.00 2032.84 2541.17 2439.48 2439.51 2640.18 2870.03 1355.28 1742.50 4065.87 2032.84 6098.76

175.00 2044.03 2555.04 2452.83 2452.83 2654.58 2885.69 1362.69 1752.02 4088.06 2044.03 6132.09

176.00 2055.11 2568.89 2466.13 2466.13 2668.98 2901.34 1370.08 1761.52 4110.23 2055.11 6165.34

177.00 2066.19 2582.75 2479.43 2479.43 2683.37 2916.98 1377.46 1771.02 4132.39 2066.19 6198.59

178.00 2077.27 2596.60 2492.73 2492.73 2697.77 2932.63 1384.85 1780.52 4154.56 2077.27 6231.84

179.00 2088.35 2610.46 2506.03 2506.03 2712.16 2948.28 1392.24 1790.02 4176.73 2088.35 6265.09

180.00 2099.43 2624.31 2519.33 2519.33 2726.56 2963.93 1399.63 1799.52 4198.90 2099.43 6298.34

181.00 2110.51 2638.17 2532.63 2532.63 2740.95 2979.58 1407.02 1809.02 4221.07 2110.51 6331.59

182.00 2121.59 2652.02 2545.93 2545.93 2755.35 2995.22 1414.41 1818.52 4243.23 2121.59 6364.84

183.00 2132.67 2665.88 2559.23 2559.23 2769.74 3010.87 1421.80 1828.02 4265.40 2132.67 6398.09

184.00 2143.75 2679.73 2572.53 2572.53 2784.14 3026.52 1429.19 1837.52 4287.57 2143.75 6431.34

185.00 2154.83 2693.59 2585.82 2585.83 2798.53 3042.17 1436.58 1847.02 4309.74 2154.83 6464.59

186.00 2165.91 2707.44 2599.12 2599.13 2812.93 3057.82 1443.97 1856.52 4331.91 2165.91 6497.84

187.00 2176.99 2721.30 2612.42 2612.43 2827.32 3073.46 1451.35 1866.02 4354.07 2176.99 6531.09

188.00 2188.07 2735.15 2625.72 2625.73 2841.72 3089.11 1458.74 1875.52 4376.24 2188.07 6564.34

189.00 2199.15 2749.01 2639.02 2639.03 2856.11 3104.76 1466.13 1885.02 4398.41 2199.15 6597.59

190.00 2210.23 2762.86 2652.32 2652.33 2870.51 3120.41 1473.52 1894.52 4420.58 2210.23 6630.84

191.00 2221.31 2776.72 2665.62 2665.63 2884.90 3136.06 1480.91 1904.02 4442.75 2221.31 6664.09

192.00 2232.39 2790.57 2678.92 2678.93 2899.30 3151.70 1488.30 1913.52 4464.91 2232.39 6697.34

193.00 2243.47 2804.43 2692.22 2692.23 2913.69 3167.35 1495.69 1923.02 4487.08 2243.47 6730.59

194.00 2254.55 2818.28 2705.52 2705.53 2928.09 3183.00 1503.08 1932.52 4509.25 2254.55 6763.84

195.00 2265.63 2832.14 2718.81 2718.83 2942.48 3198.65 1510.47 1942.02 4531.42 2265.63 6797.09

196.00 2276.71 2845.99 2732.11 2732.13 2956.88 3214.30 1517.86 1951.52 4553.59 2276.71 6830.34

197.00 2287.79 2859.85 2745.41 2745.43 2971.27 3229.94 1525.24 1961.02 4575.75 2287.79 6863.59

198.00 2298.87 2873.70 2758.71 2758.73 2985.67 3245.59 1532.63 1970.52 4597.92 2298.87 6896.84

199.00 2309.95 2887.56 2772.01 2772.03 3000.06 3261.24 1540.02 1980.02 4620.09 2309.95 6930.09

200.00 2321.14 2901.42 2785.36 2785.36 3014.46 3276.90 1547.42 1989.55 4642.27 2321.14 6963.41

Page 28: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

22

Statement No.1 Average Speed Statement

Excluding Loading & unloading Charges

Lead in Km

Av speed

per hour No of Trips KM done

Qty of Diesel 4 Km/Litre

Cost of Diesel Qty of Mobile Oil 168.75

Km/Litre

Cost of Mobile Oil Rs

290/Litre

Hire Charges of Truck

Total Cost Add 10 % Over head Charges

Total of Col.5+6

Cost per trip = Col.7/col.3

Lead in Km

1 2 3 4 5 6 7 8 9 10 11 12 13 1

L S N=8/((2* (L/S)) +1)

(2*NL)+6 Col.No.4/4 Col.No.5*57.17 Col. No.4/168.75 Col.No.7*290 Rs 2000/Day Col. No.6+8+9 Col.No.10*0.10 Col.10+11 col.No.12/

col.No.3 L

1.00 16.00 7.11 20.22 5.06 289.03 0.12 34.75 2000 2324 232.38 2556.16 359 1.00

1.50 16.50 6.77 26.31 6.58 376.00 0.16 45.21 2000 2421 242.12 2663.33 393 1.50

2.00 17.00 6.48 31.90 7.98 456.00 0.19 54.83 2000 2511 251.08 2761.91 426 2.00

2.50 17.25 6.20 37.01 9.25 528.98 0.22 63.60 2000 2593 259.26 2851.85 460 2.50

3.00 17.50 5.96 41.74 10.44 596.64 0.25 71.74 2000 2668 266.84 2935.21 493 3.00

3.50 17.75 5.74 46.16 11.54 659.76 0.27 79.33 2000 2739 273.91 3013.00 525 3.50

4.00 18.00 5.54 50.31 12.58 719.02 0.30 86.45 2000 2805 280.55 3086.03 557 4.00

4.50 18.25 5.36 54.22 13.56 774.94 0.32 93.18 2000 2868 286.81 3154.93 589 4.50

5.00 18.50 5.19 57.93 14.48 827.96 0.34 99.55 2000 2928 292.75 3220.27 620 5.00

6.00 18.75 4.88 64.54 16.13 922.39 0.38 110.91 2000 3033 303.33 3336.63 684 6.00

7.00 19.00 4.61 70.48 17.62 1007.40 0.42 121.13 2000 3129 312.85 3441.39 747 7.00

8.00 19.30 4.37 75.98 19.00 1085.99 0.45 130.58 2000 3217 321.66 3538.22 809 8.00

9.00 19.60 4.17 81.06 20.27 1158.60 0.48 139.31 2000 3298 329.79 3627.71 870 9.00

10.00 20.00 4.00 86.00 21.50 1229.16 0.51 147.79 2000 3377 337.69 3714.64 929 10.00

15.00 25.00 3.64 115.09 28.77 1644.94 0.68 197.79 2000 3843 384.27 4226.99 1162 15.00

20.00 25.00 3.08 129.08 32.27 1844.83 0.76 221.82 2000 4067 406.67 4473.32 1454 20.00

25.00 25.00 2.67 139.33 34.83 1991.42 0.83 239.45 2000 4231 423.09 4653.96 1745 25.00

30.00 25.00 2.35 147.18 36.79 2103.52 0.87 252.93 2000 4356 435.64 4792.09 2037 30.00

35.00 30.00 2.40 174.00 43.50 2486.90 1.03 299.02 2000 4786 478.59 5264.51 2194 35.00

40.00 30.00 2.18 180.55 45.14 2580.45 1.07 310.27 2000 4891 489.07 5379.79 2466 40.00

45.00 30.00 2.00 186.00 46.50 2658.41 1.10 319.64 2000 4978 497.80 5475.85 2738 45.00

50.00 30.00 1.85 190.62 47.65 2724.37 1.13 327.58 2000 5052 505.19 5557.14 3010 50.00

60.00 30.00 1.60 198.00 49.50 2829.92 1.17 340.27 2000 5170 517.02 5687.20 3554 60.00

70.00 30.00 1.41 203.65 50.91 2910.63 1.21 349.97 2000 5261 526.06 5786.66 4099 70.00

80.00 30.00 1.26 208.11 52.03 2974.34 1.23 357.63 2000 5332 533.20 5865.17 4643 80.00

90.00 30.00 1.14 211.71 52.93 3025.93 1.25 363.83 2000 5390 538.98 5928.74 5188 90.00

100.00 30.00 1.04 214.70 53.67 3068.54 1.27 368.96 2000 5437 543.75 5981.25 5732 100.00

125.00 40.00 1.10 281.86 70.47 4028.51 1.67 484.39 2000 6513 651.29 7164.19 6493 125.00

150.00 40.00 0.94 288.35 72.09 4121.28 1.71 495.54 2000 6617 661.68 7278.51 7733 150.00

175.00 40.00 0.82 293.18 73.29 4190.27 1.74 503.83 2000 6694 669.41 7363.51 8974 175.00

200.00 40.00 0.73 296.91 74.23 4243.57 1.76 510.24 2000 6754 675.38 7429.20 10215 200.00

Page 29: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

23

Statement No.2

Lead in

Km Rate per Trip

Lead Charges Lead in

Km Murum Earth Sand Metal below

40 mm Metal 40 mm

& above Rubble Water

Steel, Cement, Stone Block

Excavated Rock Concrete

Block Bricks

L As per col. No.

13 of Statement No.1

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor

Col. No.2 / pay load factor

Col. No.2 / pay load factor

Col. No.2 / pay load

factor

Col. No.2 / pay load

factor L

1 2 3 4 5 6 7 8 9 10 11 12 13 1

Unit Cum Cum Cum Cum Cum Cum 1000 Liters MT Cum Cum 1000 Unit

Pay Load Factor

6.00 4.80 5.00 5.00 4.62 4.25 9.00 7.00 3.00 6.00 2.00 Pay Load

Factor

1.00 359 59.91 74.89 71.89 71.89 77.81 84.58 39.94 51.35 119.82 59.91 179.73 1.00

1.50 393 65.57 81.97 78.69 78.69 85.16 92.58 43.72 56.21 131.15 65.57 196.72 1.50

2.00 426 71.08 88.85 85.29 85.29 92.31 100.35 47.39 60.92 142.16 71.08 213.24 2.00

2.50 460 76.63 95.79 91.96 91.96 99.53 108.19 51.09 65.69 153.27 76.63 229.90 2.50

3.00 493 82.12 102.65 98.54 98.54 106.64 115.93 54.74 70.39 164.23 82.12 246.35 3.00

3.50 525 87.53 109.41 105.03 105.03 113.67 123.57 58.35 75.02 175.05 87.53 262.58 3.50

4.00 557 92.87 116.08 111.44 111.44 120.61 131.11 61.91 79.60 185.73 92.87 278.60 4.00

4.50 589 98.14 122.68 117.77 117.77 127.46 138.55 65.43 84.12 196.28 98.14 294.42 4.50

5.00 620 103.35 129.19 124.02 124.02 134.22 145.91 68.90 88.59 206.71 103.35 310.06 5.00

6.00 684 114.00 142.50 136.80 136.80 148.05 160.94 76.00 97.72 228.00 114.00 342.00 6.00

7.00 747 124.52 155.65 149.43 149.43 161.72 175.80 83.02 106.73 249.05 124.52 373.57 7.00

8.00 809 134.82 168.53 161.79 161.79 175.09 190.34 89.88 115.56 269.64 134.82 404.47 8.00

9.00 870 144.98 181.23 173.98 173.98 188.29 204.68 96.66 124.27 289.97 144.98 434.95 9.00

10.00 929 154.78 193.47 185.73 185.73 201.01 218.51 103.18 132.67 309.55 154.78 464.33 10.00

15.00 1162 193.74 242.17 232.48 232.48 251.61 273.51 129.16 166.06 387.47 193.74 581.21 15.00

20.00 1454 242.30 302.88 290.77 290.77 314.68 342.08 161.54 207.69 484.61 242.30 726.91 20.00

25.00 1745 290.87 363.59 349.05 349.05 377.76 410.64 193.91 249.32 581.74 290.87 872.62 25.00

30.00 2037 339.44 424.30 407.33 407.33 440.83 479.21 226.29 290.95 678.88 339.44 1018.32 30.00

35.00 2194 365.59 456.99 438.71 438.71 474.79 516.13 243.73 313.36 731.18 365.59 1096.77 35.00

40.00 2466 410.96 513.70 493.15 493.15 533.71 580.17 273.97 352.25 821.91 410.96 1232.87 40.00

45.00 2738 456.32 570.40 547.59 547.59 592.62 644.22 304.21 391.13 912.64 456.32 1368.96 45.00

50.00 3010 501.69 627.11 602.02 602.02 651.54 708.26 334.46 430.02 1003.37 501.69 1505.06 50.00

60.00 3554 592.42 740.52 710.90 710.90 769.37 836.35 394.94 507.79 1184.83 592.42 1777.25 60.00

70.00 4099 683.15 853.93 819.78 819.78 887.20 964.44 455.43 585.55 1366.29 683.15 2049.44 70.00

80.00 4643 773.88 967.35 928.65 928.65 1005.04 1092.53 515.92 663.32 1547.75 773.88 2321.63 80.00

90.00 5188 864.61 1080.76 1037.53 1037.53 1122.87 1220.62 576.41 741.09 1729.22 864.61 2593.82 90.00

100.00 5732 955.34 1194.17 1146.41 1146.41 1240.70 1348.71 636.89 818.86 1910.68 955.34 2866.01 100.00

125.00 6493 1082.09 1352.61 1298.51 1298.51 1405.31 1527.66 721.39 927.51 2164.18 1082.09 3246.27 125.00

150.00 7733 1288.90 1611.13 1546.68 1546.68 1673.90 1819.63 859.27 1104.77 2577.80 1288.90 3866.71 150.00

175.00 8974 1495.71 1869.64 1794.86 1794.86 1942.49 2111.60 997.14 1282.04 2991.43 1495.71 4487.14 175.00

200.00 10215 1702.52 2128.16 2043.03 2043.03 2211.07 2403.56 1135.02 1459.31 3405.05 1702.52 5107.57 200.00

Page 30: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

24

Statement No.3

LEAD CHARGES STATEMENT FOR 2016-17 (EXCLUDING LOADING & UNLOADING )

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM

& ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

L As per Col No.3 Of Statement

No.2

As per Col No.4 Of Statement

No.2

As per Col No.5 Of Statement

No.2

As per Col No.6 Of Statement

No.2

As per Col No.7 Of Statement

No.2

As per Col No.8 Of Statement

No.2

As per Col No.9 of Statement

No.2

As per Col No.10 of Statement

No.2

As per Col No.11 of Statement

No.2

As per Col No.12 of Statement

No.2

As per Col No.13 of Statement

No.2

KM Cum Cum Cum Cum Cum Cum 1000 Liters MT Cum Cum 1000

1.00 59.91 74.89 71.89 71.89 77.81 84.58 39.94 51.35 119.82 59.91 179.73

1.50 65.57 81.97 78.69 78.69 85.16 92.58 43.72 56.21 131.15 65.57 196.72

2.00 71.08 88.85 85.29 85.29 92.31 100.35 47.39 60.92 142.16 71.08 213.24

2.50 76.63 95.79 91.96 91.96 99.53 108.19 51.09 65.69 153.27 76.63 229.90

3.00 82.12 102.65 98.54 98.54 106.64 115.93 54.74 70.39 164.23 82.12 246.35

3.50 87.53 109.41 105.03 105.03 113.67 123.57 58.35 75.02 175.05 87.53 262.58

4.00 92.87 116.08 111.44 111.44 120.61 131.11 61.91 79.60 185.73 92.87 278.60

4.50 98.14 122.68 117.77 117.77 127.46 138.55 65.43 84.12 196.28 98.14 294.42

5.00 103.35 129.19 124.02 124.02 134.22 145.91 68.90 88.59 206.71 103.35 310.06

6.00 114.00 142.50 136.80 136.80 148.05 160.94 76.00 97.72 228.00 114.00 342.00

7.00 124.52 155.65 149.43 149.43 161.72 175.80 83.02 106.73 249.05 124.52 373.57

8.00 134.82 168.53 161.79 161.79 175.09 190.34 89.88 115.56 269.64 134.82 404.47

9.00 144.98 181.23 173.98 173.98 188.29 204.68 96.66 124.27 289.97 144.98 434.95

10.00 154.78 193.47 185.73 185.73 201.01 218.51 103.18 132.67 309.55 154.78 464.33

11.00 162.57 203.21 195.08 195.08 211.13 229.51 108.37 139.34 325.13 162.57 487.71

12.00 170.36 212.95 204.43 204.43 221.25 240.51 113.56 146.02 340.71 170.36 511.08

13.00 178.15 222.69 213.78 213.78 231.37 251.51 118.75 152.70 356.29 178.15 534.46

14.00 185.94 232.43 223.13 223.13 241.48 262.51 123.94 159.38 371.87 185.94 557.83

15.00 193.74 242.17 232.48 232.48 251.61 273.51 129.16 166.06 387.47 193.74 581.21

16.00 203.45 254.31 244.13 244.13 264.22 287.22 135.63 174.38 406.89 203.45 610.35

17.00 213.16 266.45 255.78 255.78 276.83 300.93 142.10 182.70 426.31 213.16 639.49

18.00 222.88 278.59 267.43 267.43 289.44 314.64 148.57 191.02 445.73 222.87 668.63

19.00 232.59 290.73 279.08 279.08 302.05 328.35 155.04 199.34 465.15 232.58 697.77

20.00 242.30 302.88 290.77 290.77 314.68 342.08 161.54 207.69 484.61 242.30 726.91

21.00 252.01 315.02 302.42 302.42 327.29 355.79 168.01 216.01 504.03 252.01 756.05

22.00 261.72 327.16 314.07 314.07 339.90 369.50 174.48 224.33 523.45 261.72 785.19

23.00 271.43 339.30 325.72 325.72 352.51 383.21 180.95 232.65 542.87 271.43 814.33

24.00 281.14 351.44 337.37 337.37 365.12 396.92 187.42 240.97 562.29 281.14 843.47

25.00 290.87 363.59 349.05 349.05 377.76 410.64 193.91 249.32 581.74 290.87 872.62

26.00 300.58 375.73 360.70 360.70 390.37 424.35 200.38 257.64 601.16 300.58 901.76

27.00 310.29 387.87 372.35 372.35 402.98 438.06 206.85 265.96 620.58 310.29 930.90

28.00 320.00 400.01 384.00 384.00 415.59 451.77 213.32 274.28 640.00 320.00 960.04

29.00 329.71 412.15 395.65 395.65 428.20 465.48 219.79 282.60 659.42 329.71 989.18

30.00 339.44 424.30 407.33 407.33 440.83 479.21 226.29 290.95 678.88 339.44 1018.32

Page 31: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

25

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM

& ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

31.00 344.67 430.83 413.60 413.60 447.62 486.59 229.77 295.43 689.34 344.67 1034.01

32.00 349.90 437.36 419.87 419.87 454.41 493.97 233.25 299.91 699.80 349.90 1049.70

33.00 355.13 443.89 426.14 426.14 461.20 501.35 236.73 304.39 710.26 355.13 1065.39

34.00 360.36 450.42 432.41 432.41 467.99 508.73 240.21 308.87 720.72 360.36 1081.08

35.00 365.59 456.99 438.71 438.71 474.79 516.13 243.73 313.36 731.18 365.59 1096.77

36.00 374.66 468.33 449.59 449.59 486.57 528.93 249.77 321.13 749.32 374.66 1123.98

37.00 383.73 479.67 460.47 460.47 498.35 541.73 255.81 328.90 767.46 383.73 1151.19

38.00 392.80 491.01 471.35 471.35 510.13 554.53 261.85 336.67 785.60 392.80 1178.40

39.00 401.87 502.35 482.23 482.23 521.91 567.33 267.89 344.44 803.74 401.87 1205.61

40.00 410.96 513.70 493.15 493.15 533.71 580.17 273.97 352.25 821.91 410.96 1232.87

41.00 420.03 525.04 504.03 504.03 545.49 592.97 280.01 360.02 840.05 420.03 1260.08

42.00 429.10 536.38 514.91 514.91 557.27 605.77 286.05 367.79 858.19 429.10 1287.29

43.00 438.17 547.72 525.79 525.79 569.05 618.57 292.09 375.56 876.33 438.17 1314.50

44.00 447.24 559.06 536.67 536.67 580.83 631.37 298.13 383.33 894.47 447.24 1341.71

45.00 456.32 570.40 547.59 547.59 592.62 644.22 304.21 391.13 912.64 456.32 1368.96

46.00 465.39 581.74 558.47 558.47 604.40 657.02 310.25 398.90 930.78 465.39 1396.17

47.00 474.46 593.08 569.35 569.35 616.18 669.82 316.29 406.67 948.92 474.46 1423.38

48.00 483.53 604.42 580.23 580.23 627.96 682.62 322.33 414.44 967.06 483.53 1450.59

49.00 492.60 615.76 591.11 591.11 639.74 695.42 328.37 422.21 985.20 492.60 1477.80

50.00 501.69 627.11 602.02 602.02 651.54 708.26 334.46 430.02 1003.37 501.69 1505.06

51.00 510.76 638.45 612.90 612.90 663.32 721.06 340.50 437.79 1021.51 510.76 1532.27

52.00 519.83 649.79 623.78 623.78 675.10 733.86 346.54 445.56 1039.65 519.83 1559.48

53.00 528.90 661.13 634.66 634.66 686.88 746.66 352.58 453.33 1057.79 528.90 1586.69

54.00 537.97 672.47 645.54 645.54 698.66 759.46 358.62 461.10 1075.93 537.97 1613.90

55.00 547.04 683.81 656.42 656.42 710.44 772.26 364.66 468.87 1094.07 547.04 1641.11

56.00 556.11 695.15 667.30 667.30 722.22 785.06 370.70 476.64 1112.21 556.11 1668.32

57.00 565.18 706.49 678.18 678.18 734.00 797.86 376.74 484.41 1130.35 565.18 1695.53

58.00 574.25 717.83 689.06 689.06 745.78 810.66 382.78 492.18 1148.49 574.25 1722.74

59.00 583.32 729.17 699.82 699.94 757.56 823.46 388.82 499.95 1166.63 583.32 1749.95

60.00 592.42 740.52 710.90 710.90 769.37 836.35 394.94 507.79 1184.83 592.42 1777.25

61.00 601.49 751.86 721.78 721.78 781.15 849.15 400.98 515.56 1202.97 601.49 1804.46

62.00 610.56 763.20 732.66 732.66 792.93 861.95 407.02 523.33 1221.11 610.56 1831.67

63.00 619.63 774.54 743.54 743.54 804.71 874.75 413.06 531.10 1239.25 619.63 1858.88

64.00 628.70 785.88 754.42 754.42 816.49 887.55 419.10 538.87 1257.39 628.70 1886.09

65.00 637.77 797.22 765.30 765.30 828.27 900.35 425.14 546.64 1275.53 637.77 1913.30

66.00 646.84 808.56 776.18 776.18 840.05 913.15 431.18 554.41 1293.67 646.84 1940.51

67.00 655.91 819.90 787.06 787.06 851.83 925.95 437.22 562.18 1311.81 655.91 1967.72

68.00 664.98 831.24 797.94 797.94 863.61 938.75 443.26 569.95 1329.95 664.98 1994.93

69.00 674.05 842.58 808.82 808.82 875.39 951.55 449.30 577.72 1348.09 674.05 2022.14

70.00 683.15 853.93 819.78 819.78 887.20 964.44 455.43 585.55 1366.29 683.15 2049.44

Page 32: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

26

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM

& ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

71.00 692.22 865.27 830.66 830.66 898.98 977.24 461.47 593.32 1384.43 692.22 2076.65

72.00 701.29 876.61 841.54 841.54 910.76 990.04 467.51 601.09 1402.57 701.29 2103.86

73.00 710.36 887.95 852.42 852.42 922.54 1002.84 473.55 608.86 1420.71 710.36 2131.07

74.00 719.43 899.29 863.30 863.30 934.32 1015.64 479.59 616.63 1438.85 719.43 2158.28

75.00 728.50 910.63 874.18 874.18 946.10 1028.44 485.63 624.40 1456.99 728.50 2185.49

76.00 737.57 921.97 885.06 885.06 957.88 1041.24 491.67 632.17 1475.13 737.57 2212.70

77.00 746.64 933.31 895.94 895.94 969.66 1054.04 497.71 639.94 1493.27 746.64 2239.91

78.00 755.71 944.65 906.82 906.82 981.44 1066.84 503.75 647.71 1511.41 755.71 2267.12

79.00 764.78 955.99 917.70 917.70 993.22 1079.64 509.79 655.48 1529.55 764.78 2294.33

80.00 773.88 967.35 928.65 928.65 1005.04 1092.53 515.92 663.32 1547.75 773.88 2321.63

81.00 782.95 978.69 939.53 939.53 1016.82 1105.33 521.96 671.09 1565.89 782.95 2348.84

82.00 792.02 990.03 950.41 950.41 1028.60 1118.13 528.00 678.86 1584.03 792.02 2376.05

83.00 801.09 1001.37 961.29 961.29 1040.38 1130.93 534.04 686.63 1602.17 801.09 2403.26

84.00 810.16 1012.71 972.17 972.17 1052.16 1143.73 540.08 694.40 1620.31 810.16 2430.47

85.00 819.23 1024.05 983.05 983.05 1063.94 1156.53 546.12 702.17 1638.45 819.23 2457.68

86.00 828.30 1035.39 993.93 993.93 1075.72 1169.33 552.16 709.94 1656.59 828.30 2484.89

87.00 837.37 1046.73 1004.81 1004.81 1087.50 1182.13 558.20 717.71 1674.73 837.37 2512.10

88.00 846.44 1058.07 1015.69 1015.69 1099.28 1194.93 564.24 725.48 1692.87 846.44 2539.31

89.00 855.51 1069.41 1026.57 1026.57 1111.06 1207.73 570.28 733.25 1711.01 855.51 2566.52

90.00 864.61 1080.76 1037.53 1037.53 1122.87 1220.62 576.41 741.09 1729.22 864.61 2593.82

91.00 873.68 1092.10 1048.41 1048.41 1134.65 1233.42 582.45 748.86 1747.36 873.68 2621.03

92.00 882.75 1103.44 1059.29 1059.29 1146.43 1246.22 588.49 756.63 1765.50 882.75 2648.24

93.00 891.82 1114.78 1070.17 1070.17 1158.21 1259.02 594.53 764.40 1783.64 891.82 2675.45

94.00 900.89 1126.12 1081.05 1081.05 1169.99 1271.82 600.57 772.17 1801.78 900.89 2702.66

95.00 909.96 1137.46 1091.93 1091.93 1181.77 1284.62 606.61 779.94 1819.92 909.96 2729.87

96.00 919.03 1148.80 1102.81 1102.81 1193.55 1297.42 612.65 787.71 1838.06 919.03 2757.08

97.00 928.10 1160.14 1113.69 1113.69 1205.33 1310.22 618.69 795.48 1856.20 928.10 2784.29

98.00 937.17 1171.48 1124.57 1124.57 1217.11 1323.02 624.73 803.25 1874.34 937.17 2811.50

99.00 946.24 1182.82 1135.45 1135.45 1228.89 1335.82 630.77 811.02 1892.48 946.24 2838.71

100.00 955.34 1194.17 1146.41 1146.41 1240.70 1348.71 636.89 818.86 1910.68 955.34 2866.01

Page 33: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

27

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM

& ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

101.00 960.41 1200.50 1152.49 1152.49 1247.28 1355.86 640.27 822.24 1920.82 960.41 2881.22

102.00 965.48 1206.83 1158.57 1158.57 1253.86 1363.01 643.65 825.62 1930.96 965.48 2896.43

103.00 970.55 1213.16 1164.65 1164.65 1260.44 1370.16 647.03 832.71 1941.10 970.55 2911.64

104.00 975.62 1219.49 1170.73 1170.73 1267.02 1377.31 650.41 839.80 1951.24 975.62 2926.85

105.00 980.69 1225.82 1176.81 1176.81 1273.60 1384.46 653.79 846.89 1961.38 980.69 2942.06

106.00 985.76 1232.15 1182.89 1182.89 1280.18 1391.61 657.17 853.98 1971.52 985.76 2957.27

107.00 990.83 1238.48 1188.97 1188.97 1286.76 1398.76 660.55 861.07 1981.66 990.83 2972.48

108.00 995.90 1244.81 1195.05 1195.05 1293.34 1405.91 663.93 868.16 1991.80 995.90 2987.69

109.00 1000.97 1251.14 1201.13 1201.13 1299.92 1413.06 667.31 875.25 2001.94 1000.97 3002.90

110.00 1006.04 1257.47 1207.21 1207.21 1306.50 1420.21 670.69 882.34 2012.08 1006.04 3018.11

111.00 1011.11 1263.80 1213.29 1213.29 1313.08 1427.36 674.07 889.43 2022.22 1011.11 3033.32

112.00 1016.18 1270.13 1219.37 1219.37 1319.66 1434.51 677.45 896.52 2032.36 1016.18 3048.53

113.00 1021.25 1276.46 1225.45 1225.45 1326.24 1441.66 680.83 903.61 2042.50 1021.25 3063.74

114.00 1026.32 1282.79 1231.53 1231.53 1332.82 1448.81 684.21 910.70 2052.64 1026.32 3078.95

115.00 1031.39 1289.12 1237.61 1237.61 1339.40 1455.96 687.59 917.79 2062.78 1031.39 3094.16

116.00 1036.46 1295.45 1243.69 1243.69 1345.98 1463.11 690.97 924.88 2072.92 1036.46 3109.37

117.00 1041.53 1301.78 1249.77 1249.77 1352.56 1470.26 694.35 931.97 2083.06 1041.53 3124.58

118.00 1046.60 1308.11 1255.85 1255.85 1359.14 1477.41 697.73 939.06 2093.20 1046.60 3139.79

119.00 1051.67 1314.44 1261.93 1261.93 1365.72 1484.56 701.11 946.15 2103.34 1051.67 3155.00

120.00 1056.74 1320.77 1268.01 1268.01 1372.30 1491.71 704.49 953.24 2113.48 1056.74 3170.21

121.00 1061.81 1327.10 1274.09 1274.09 1378.88 1498.86 707.87 960.33 2123.62 1061.81 3185.42

122.00 1066.88 1333.43 1280.17 1280.17 1385.46 1506.01 711.25 967.42 2133.76 1066.88 3200.63

123.00 1071.95 1339.76 1286.25 1286.25 1392.04 1513.16 714.63 974.51 2143.90 1071.95 3215.84

124.00 1077.02 1346.09 1292.33 1292.33 1398.62 1520.31 718.01 981.60 2154.04 1077.02 3231.05

125.00 1082.09 1352.61 1298.51 1298.51 1405.31 1527.66 721.39 927.51 2164.18 1082.09 3246.27

126.00 1090.36 1362.95 1308.44 1308.44 1416.01 1539.33 726.90 934.60 2180.72 1090.36 3271.08

127.00 1098.63 1373.29 1318.37 1318.36 1426.71 1551.00 732.41 941.69 2197.26 1098.63 3295.89

128.00 1106.90 1383.63 1328.30 1328.29 1437.41 1562.67 737.92 948.78 2213.80 1106.90 3320.70

129.00 1115.17 1393.97 1338.23 1338.21 1448.11 1574.34 743.43 955.87 2230.34 1115.17 3345.51

130.00 1123.44 1404.31 1348.16 1348.14 1458.81 1586.01 748.94 962.96 2246.88 1123.44 3370.32

131.00 1131.71 1414.65 1358.09 1358.07 1469.51 1597.68 754.45 970.05 2263.42 1131.71 3395.13

132.00 1139.98 1424.99 1368.02 1367.99 1480.21 1609.35 759.96 977.14 2279.96 1139.98 3419.94

133.00 1148.25 1435.33 1377.95 1377.92 1490.91 1621.02 765.47 984.23 2296.50 1148.25 3444.75

134.00 1156.52 1445.67 1387.88 1387.84 1501.61 1632.69 770.98 991.32 2313.04 1156.52 3469.56

135.00 1164.79 1456.01 1397.81 1397.77 1512.31 1644.36 776.49 998.41 2329.58 1164.79 3494.37

Page 34: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

28

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM

& ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

136.00 1173.06 1466.35 1407.74 1407.70 1523.01 1656.03 782.00 1005.50 2346.12 1173.06 3519.18

137.00 1181.33 1476.69 1417.67 1417.62 1533.71 1667.70 787.51 1012.59 2362.66 1181.33 3543.99

138.00 1189.60 1487.03 1427.60 1427.55 1544.41 1679.37 793.02 1019.68 2379.20 1189.60 3568.80

139.00 1197.87 1497.37 1437.53 1437.47 1555.11 1691.04 798.53 1026.77 2395.74 1197.87 3593.61

140.00 1206.14 1507.71 1447.46 1447.40 1565.81 1702.71 804.04 1033.86 2412.28 1206.14 3618.42

141.00 1214.41 1518.05 1457.39 1457.33 1576.51 1714.38 809.55 1040.95 2428.82 1214.41 3643.23

142.00 1222.68 1528.39 1467.32 1467.25 1587.21 1726.05 815.06 1048.04 2445.36 1222.68 3668.04

143.00 1230.95 1538.73 1477.25 1477.18 1597.91 1737.72 820.57 1055.13 2461.90 1230.95 3692.85

144.00 1239.22 1549.07 1487.18 1487.10 1608.61 1749.39 826.08 1062.22 2478.44 1239.22 3717.66

145.00 1247.49 1559.41 1497.11 1497.03 1619.31 1761.06 831.59 1069.31 2494.98 1247.49 3742.47

146.00 1255.76 1569.75 1507.04 1506.96 1630.01 1772.73 837.10 1076.40 2511.52 1255.76 3767.28

147.00 1264.03 1580.09 1516.97 1516.88 1640.71 1784.40 842.61 1083.49 2528.06 1264.03 3792.09

148.00 1272.30 1590.43 1526.90 1526.81 1651.41 1796.07 848.12 1090.58 2544.60 1272.30 3816.90

149.00 1280.57 1600.77 1536.83 1536.73 1662.11 1807.74 853.63 1097.67 2561.14 1280.57 3841.71

150.00 1288.90 1611.13 1546.68 1546.68 1673.90 1819.63 859.27 1104.77 2577.80 1288.90 3866.71

151.00 1297.17 1621.47 1556.61 1556.61 1684.60 1831.30 864.78 1111.86 2594.34 1297.17 3891.52

152.00 1305.44 1631.81 1566.54 1566.53 1695.30 1842.97 870.29 1118.95 2610.88 1305.44 3916.33

153.00 1313.71 1642.15 1576.47 1576.46 1706.00 1854.64 875.80 1126.04 2627.42 1313.71 3941.14

154.00 1321.98 1652.49 1586.40 1586.39 1716.70 1866.31 881.31 1133.13 2643.96 1321.98 3965.95

155.00 1330.25 1662.83 1596.33 1596.31 1727.40 1877.98 886.82 1140.22 2660.50 1330.25 3990.76

156.00 1338.52 1673.17 1606.26 1606.24 1738.10 1889.65 892.33 1147.31 2677.04 1338.52 4015.57

157.00 1346.79 1683.51 1616.19 1616.16 1748.80 1901.32 897.84 1154.40 2693.58 1346.79 4040.38

158.00 1355.06 1693.85 1626.12 1626.09 1759.50 1912.99 903.35 1161.49 2710.12 1355.06 4065.19

159.00 1363.33 1704.19 1636.05 1636.02 1770.20 1924.66 908.86 1168.58 2726.66 1363.33 4090.00

160.00 1371.60 1714.53 1645.98 1645.94 1780.90 1936.33 914.37 1175.67 2743.20 1371.60 4114.81

161.00 1379.87 1724.87 1655.91 1655.87 1791.60 1948.00 919.88 1182.76 2759.74 1379.87 4139.62

162.00 1388.14 1735.21 1665.84 1665.79 1802.30 1959.67 925.39 1189.85 2776.28 1388.14 4164.43

163.00 1396.41 1745.55 1675.77 1675.72 1813.00 1971.34 930.90 1196.94 2792.82 1396.41 4189.24

164.00 1404.68 1755.89 1685.70 1685.65 1823.70 1983.01 936.41 1204.03 2809.36 1404.68 4214.05

165.00 1412.95 1766.23 1695.63 1695.57 1834.40 1994.68 941.92 1211.12 2825.90 1412.95 4238.86

166.00 1421.22 1776.57 1705.56 1705.50 1845.10 2006.35 947.43 1218.21 2842.44 1421.22 4263.67

167.00 1429.49 1786.91 1715.49 1715.42 1855.80 2018.02 952.94 1225.30 2858.98 1429.49 4288.48

168.00 1437.76 1797.25 1725.42 1725.35 1866.50 2029.69 958.45 1232.39 2875.52 1437.76 4313.29

169.00 1446.03 1807.59 1735.35 1735.28 1877.20 2041.36 963.96 1239.48 2892.06 1446.03 4338.10

170.00 1454.30 1817.93 1745.28 1745.20 1887.90 2053.03 969.47 1246.57 2908.60 1454.30 4362.91

Page 35: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

29

LEAD MURUM EARTH SAND METAL BELOW

40MM METAL 40MM

& ABOVE RUBBLE Water

Steel , Cement, Stone Block

Excavated Rock Concrete Block Bricks

171.00 1462.57 1828.27 1755.21 1755.13 1898.60 2064.70 974.98 1253.66 2925.14 1462.57 4387.72

172.00 1470.84 1838.61 1765.14 1765.05 1909.30 2076.37 980.49 1260.75 2941.68 1470.84 4412.53

173.00 1479.11 1848.95 1775.07 1774.98 1920.00 2088.04 986.00 1267.84 2958.22 1479.11 4437.34

174.00 1487.38 1859.29 1785.00 1784.91 1930.70 2099.71 991.51 1274.93 2974.76 1487.38 4462.15

175.00 1495.71 1869.64 1794.86 1794.86 1942.49 2111.60 997.14 1282.04 2991.43 1495.71 4487.14

176.00 1503.98 1879.98 1804.79 1804.78 1953.19 2123.27 1002.65 1289.13 3007.97 1503.98 4511.95

177.00 1512.25 1890.32 1814.72 1814.71 1963.89 2134.94 1008.16 1296.22 3024.51 1512.25 4536.76

178.00 1520.52 1900.66 1824.65 1824.63 1974.59 2146.61 1013.67 1303.31 3041.05 1520.52 4561.57

179.00 1528.79 1911.00 1834.58 1834.56 1985.29 2158.28 1019.18 1310.40 3057.59 1528.79 4586.38

180.00 1537.06 1921.34 1844.51 1844.49 1995.99 2169.95 1024.69 1317.49 3074.13 1537.06 4611.19

181.00 1545.33 1931.68 1854.44 1854.41 2006.69 2181.62 1030.20 1324.58 3090.67 1545.33 4636.00

182.00 1553.60 1942.02 1864.37 1864.34 2017.39 2193.29 1035.71 1331.67 3107.21 1553.60 4660.81

183.00 1561.87 1952.36 1874.30 1874.26 2028.09 2204.96 1041.22 1338.76 3123.75 1561.87 4685.62

184.00 1570.14 1962.70 1884.23 1884.19 2038.79 2216.63 1046.73 1345.85 3140.29 1570.14 4710.43

185.00 1578.41 1973.04 1894.16 1894.12 2049.49 2228.30 1052.24 1352.94 3156.83 1578.41 4735.24

186.00 1586.68 1983.38 1904.09 1904.04 2060.19 2239.97 1057.75 1360.03 3173.37 1586.68 4760.05

187.00 1594.95 1993.72 1914.02 1913.97 2070.89 2251.64 1063.26 1367.12 3189.91 1594.95 4784.86

188.00 1603.22 2004.06 1923.95 1923.89 2081.59 2263.31 1068.77 1374.21 3206.45 1603.22 4809.67

189.00 1611.49 2014.40 1933.88 1933.82 2092.29 2274.98 1074.28 1381.30 3222.99 1611.49 4834.48

190.00 1619.76 2024.74 1943.81 1943.75 2102.99 2286.65 1079.79 1388.39 3239.53 1619.76 4859.29

191.00 1628.03 2035.08 1953.74 1953.67 2113.69 2298.32 1085.30 1395.48 3256.07 1628.03 4884.10

192.00 1636.30 2045.42 1963.67 1963.60 2124.39 2309.99 1090.81 1402.57 3272.61 1636.30 4908.91

193.00 1644.57 2055.76 1973.60 1973.52 2135.09 2321.66 1096.32 1409.66 3289.15 1644.57 4933.72

194.00 1652.84 2066.10 1983.53 1983.45 2145.79 2333.33 1101.83 1416.75 3305.69 1652.84 4958.53

195.00 1661.11 2076.44 1993.46 1993.38 2156.49 2345.00 1107.34 1423.84 3322.23 1661.11 4983.34

196.00 1669.38 2086.78 2003.39 2003.30 2167.19 2356.67 1112.85 1430.93 3338.77 1669.38 5008.15

197.00 1677.65 2097.12 2013.32 2013.23 2177.89 2368.34 1118.36 1438.02 3355.31 1677.65 5032.96

198.00 1685.92 2107.46 2023.25 2023.15 2188.59 2380.01 1123.87 1445.11 3371.85 1685.92 5057.77

199.00 1694.19 2117.80 2033.18 2033.08 2199.29 2391.68 1129.38 1452.20 3388.39 1694.19 5082.58

200.00 1702.52 2128.16 2043.03 2043.03 2211.07 2403.56 1135.02 1459.31 3405.05 1702.52 5107.57

Page 36: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

30

Page 37: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

31

SECTION-2

EXCAVATION AND EMBANKMENT

ITEM NO 1 TO 19

Page 38: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

32

Page 39: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

33

Page 40: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

34

Page 41: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

35

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

EXCAVATION & EMBANKMENT

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

1

Item No.1 :- Excavation in all kinds of soil including boulders upto 0.6 m diameter ( 0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and 6m lift.

Cum.

60.15

9.05

2

Item No.2 :- Excavation in hard murum including boulders upto 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated material neatly in dump area or for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and 6m lift.

Cum.

73.35

12.25

3

Item No.3 :- Excavation in soft rock without blasting including boulders upto 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead upto 1 km and 6m lift.

Cum.

89.80

15.60

4

Item No.4 :- Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc., complete with lead upto 1 km and lift upto 6 m.

Cum.

321.80

73.00

Page 42: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

36

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

5

Item No.5 :- Excavation in hard rock of all toughness including boulders above 0.6 m dia. (0.113Cum) for canals cut-off trench of embankment filter / catch water drains and other appurtenant structures by control blasting methods including control of vibrations by use of delay detonators and control of fly rocks by muffling arrangements and adopting only jack hammers for drilling holes and minimising damage to side slopes of canal in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques including cost of all materials, machinery, labour, placing excavated rock neatly approved dump area as directed etc., complete with lead upto 1 km & lift upto 6 m.

Cum.

482.70

109.50

6 Item No.6 :- Excavation in hard rock of all toughness by breaker including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc., complete with lead upto 1 km and lift upto 6 m.

Cum.

502.40

28.50

7 Item No.7 :- Watering the embankment in proper layers by tankers including a lead of water upto 1 km and all lifts etc. complete

Cum.

11.80

---

8 Item No.8 :- Compaction of bankwork with vibratory Compactor to 95 % of Proctor density including watering with a lead upto 1.00 Km.

Cum.

22.65

---

9 Item No.9 :- Providing cut off trench filling using selected impervious soil directly available from material of excavation including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller etc., complete with lead upto1 km for water and 6m lift.

Cum.

45.60

1.70

Page 43: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

37

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

10

Item No.10 :- Providing hearting embankment using selected impervious material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km for watering and 6m lift.

Cum.

45.60

1.70

11 Item No.11 :- Providing casing embankment using selected pervious material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km for watering and 6m lift.

Cum.

55.10

2.30

12 Item No.12 :- Providing cut off trench filling using selected impervious soil from approved borrow areas including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller etc., complete with lead upto1 km and 6m lifts.

Cum.

108.75

1.80

Page 44: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

38

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

13

Item No.13 :- Providing hearting embankment using selected impervious soil from approved borrow areas in layers including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller etc., complete with lead upto1 km and 6m lift.

Cum.

99.30

1.75

14 Item No.14 :- Providing casing embankment using selected pervious material from approved borrow areas in layers including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km and 6m lift.

Cum.

119.45

2.35

15 Item No.15 :- Providing cohesive non-swelling (CNS) material lining to canals using selected material from approved borrow area including cost of all materials, machinery, labour, spreading soil in layers of thickness not more than 150 mm including providing 20 cm or so (perpendicular to side slope) of extra pride ,removing pride just prior to the placement of lining, breaking clods, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with lead upto1 km and 6m lift.

Cum.

162.00

37.10

16 Item No.16 :- Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc., complete with lead upto 50 m and all lifts excluding royalty of material.

Sqm.

216.15

44.35

Page 45: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

39

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

17

Item No.17 :- Providing and constructing 450 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc., complete with lead upto 50 m and all lifts excluding royalty of material.

Sqm.

295.20

66.40

18 Item No.18 :- Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with lead upto 50 m and all lifts excluding royalty of material.

Cum.

551.40

133.00

19 Item No.19 :- Providing and constructing longitudinal and cross graded filter drains using sand and 20mm down approved clean, hard, graded aggregates satisfying specified filter criteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compaction etc., complete as per specifications and approved drawings with lead upto 50 m and all lifts.

Cum.

873.50

175.85

Page 46: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

40

Page 47: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

41

SECTION 3

CONCRETE WORK INCLUDING

CENTERING, UCR MASONRY, BRICK MASONRY AND

R.C.C. PIPES

ITEM NO 20 TO 60

Page 48: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

42

Page 49: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

43

Page 50: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

44

Page 51: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

45

सामाईक दरसचूी 2016-17

संधानक कामे

सर्वसाधारण टिप्पणी (General Notes)

1.0 सामाईक दरसचूीमध्ये दवचारात घेतलेले सवफ प्रकारचे सांधानक हे बकॅचग प्लटँ व राश्न्झट

दमक्सरच्या सहाय्याने करणे अदभपे्रत असनू त्यानसुार दर पदरगदणत केलेले आहेत. काांही

अपवादात्मक पदरश्स्थतीत र्र बकॅचग प्लटँ व राश्न्झट दमक्सर ऐवर्ी दमक्सरच्या सहाय्याने

सांधानकाचे काम करणे अपदरहायफ असलेस त्यास सांबांदधत अधीक्षक अदभयांता याांची पवूफ मान्यता

घेऊन त्याबाबीचे दर मळू दराच्या 5% ने (Total Basic rate worked out in the CSR) कमी

करावेत.

2.0 र्र सांधानकाचे काम 6 मी. ककवा र्ास्त उांचीवर करावयाचे असेल व सांधानकाचे काम पांपाने

अगर टॉवर के्रनच्या सहाय्याने करण्याचे दनयोर्न असेल तर त्यासाठी अदतदरक्त रू.

177.75/घमी एवढा दर अांतभूफत करण्यात यावा. मात्र अशी तरतदू सांबांदधत अधीक्षक अदभयांता

याांचे पवूफ मान्यतेने करावी.

3.0 कालव्यावरील बाांधकामाांसाठी सावफर्दनक बाांधकाम दवभागाच्या दरसचूीचा अवलांब यापढेु करू

नये. कालव्यावरील बाांधकामाांसाठीच्या सवफ स्तरातील खोदकामासाठी सामाईक दरसचूीच्या

प्रकरण-2 मधील खोदकाम या बाबींचे दर हे 1.50 पटीने र्ादा घ्यावेत.

4.0 कामाच्या स्वरूपानसुार लागणारे सेंटरींग व शटरींग सांबांदधत बाबींच्या दरात दवचारात घेतलेले

आहेत. कामाचे स्वरूप दवचारात घेऊन दरसचूीतील यथायोग्य दराची दनवड करण्यात यावी.

याबाबतची र्बाबदारी ताांदत्रक मान्यता देणाऱ्या अदधकाऱ्याची राहील.

5.0 रे्रो दसमेंटचे काम हे सांबांदधत मखु्य अदभयांता याांचे मान्यतेने हाती घ्यावे.

Page 52: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

46

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

CONCRETE WORKS

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

DAM AND ALLIED WORKS

FOUNDATION AND BEDDING

20 Item No.20 :- Providing and laying in situ cement concrete of grade M-10 of trap/ granite / quartzite / graded metal for foundation and bedding with Batching Plant and Transit Mixer including compacting, curing, etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-10 (20 MSA) Cum 3515.80

(B) M-10 (40 MSA) Cum 3515.80

(C) M-10 (80 MSA)

Cum 3455.60

21 Item No.21 :- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for foundation and bedding with Batching Plant & Transit Mixer, compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-15 (20 MSA) Cum 3876.55

(B) M-15 (40 MSA) Cum 3726.15

(C) M-15 (80 MSA)

Cum 3624.95

SUB AND SUPER STRUCTURE

22 Item No.22 :- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for PCC with or without surface reinforcement/RCC concreting requiring heavy or special type of shuttering for works of gallery, sluice, spillway crest, spillway down stream face, energy dissipating structures, intake structures, training walls, piers, abutments etc. with Batching Plant and Transit mixer with shuttering and scaffolding, compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-15 (20 MSA) Cum 4458.70

(B) M-15 (40 MSA) Cum 4267.50

(C) M-15 (80 MSA)

Cum

4243.00

Page 53: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

47

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

23

Item No.23 :- Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss / quartzite / graded metal for RCC works of gallery, sluice, spillway crest, spillway down stream face, energy dissipating structures, intake structures, training walls, piers, abutments, slab etc. with Batching Plant and Transit mixer including shuttering and scaffolding, compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-20 (20 MSA) Cum 4771.10

(B) M-20 (40 MSA)

Cum

4594.65

24 Item No.24 :- Providing and laying in situ cement concrete of grade M-25 of trap / granite / gneiss / quartzite / graded metal for RCC works of gallery, sluice, spillway crest, spillway down stream face, energy dissipating structures, intake structures, training walls, piers, abutments, slab etc. with Batching Plant and Transit mixer including shuttering and scaffolding, compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-25 (20 MSA)

Cum

5103.00

CANAL AND ALLIED WORKS

25 Item No.25 :- Providing and laying in situ M-15 (20 MSA)(28 days cube compressive strength not less than 15N/sqmm) grade cement concrete with clean, hard, graded aggregates for canal lining for side and bed including cost of all materials, machinery, labour, cleaning with batching plant and transit mixer placing in position, finishing with all slope of canal including scaffolding, formwork, compaction, curing, by cutting grooves, filling with sealing compound and providing porous plugs, preparation of sub grade excluding royalty of materials etc. with initial lead of 50 m and lift of 1.5 m

A) For Bed Lining Cum 4954.85

B) For Side Lining

Cum

5209.10

Page 54: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

48

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

26

Item No.26 :- Providing and laying in situ mechanised lining in M-15 (20 MSA)(28 days cube compressive strength not less than 15N/sqmm) grade cement concrete with clean, hard, graded aggregates for canal side and bed using vibrating cylindrical type mechanical paver including cost of all materials, machinery, labour, cleaning with batching plant and transit mixer placing in position, finishing with all slope of canal including scaffolding, formwork, compaction, curing, by cutting grooves, filling with sealing compound and providing porous plugs, preparation of sub grade excluding royalty of materials etc. with initial lead of 50 m and lift of 1.5 m

A) For Bed Lining Cum 5160.90

B) For Side Lining

Cum

5415.20

27 Item No.27 A :- Providing & laying chip masonry back filling behind concrete lining in C.M. 1:8 including striking joints, curing, scaffolding etc. complete but excluding pointing, excluding royalty of material. (35% mortar)

Cum

1551.95

Item No.27 B :- Providing, laying, erecting and dismantling M.S. plates form work for side lining (for steeper slopes only) (to be used with prior approval of C.E.)

Sqm

64.55

28 Item No.28 :- Providing and laying polythene film of 031 properly manufactured from 100% virgin granules confirming to I.S. 2508-1984 with 1.5 to 2.5 m. package in rolls as per specifications.

A) 200 microns Sqm 48.50

B) 400 microns Sqm 95.15

C) 600 microns Sqm 148.45

29

Item No.29 :- Providing and laying 40 and 45 cm. thick UCR masonry in C.M. 1:5 for side lining of the canal including raking joints, scaffolding and curing etc. complete excluding pointing, excluding royalty of material with lead upto 50 m. and lift upto 1.5 m. (35% mortar)

Cum

2185.75

Page 55: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

49

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

30

Item No.30 :- Providing and laying cement plaster 6 mm thick in C.M. 1:3 single coat without neru finish to concrete surface in all position including scaffolding, curing, including etc. complete.

Sqm

89.15

CANAL STRUCTURES

31 Item No.31 :- Providing and laying in situ cement concrete of grade M-10 of trap/ granite / quartzite / graded metal for foundation and bedding with Batching Plant and Transit Mixer including shuttering, compacting, curing, etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-10 (20 MSA) Cum 4037.65

(B) M-10 (40 MSA) Cum 4037.65

(C) M-10 (80 MSA)

Cum

3977.50

32 Item No.32 :- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for foundation and bedding by Batching Plant and Transit Mixer, shuttering, scaffolding, compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-15 (20 MSA) Cum 4398.45

(B) M-15 (40 MSA) Cum 4248.00

(C) M-15 (80 MSA)

Cum

4146.80

33 Item No.33 :- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for RCC works of retaining walls, piers, abutments, etc. with Batching Plant and Transit mixer including shuttering, scaffolding, compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-15 (20 MSA)

i) For Abutment, wing walls, returns, transition walls Cum 4973.35

ii) For Piers Cum 5083.00

(B) M-15 (40 MSA)

i) For Abutment, wing walls, returns, transition walls Cum 4782.10

ii) For Piers Cum 4891.80

(C) M-15 (80 MSA)

i)For Abutment, wing walls, returns, transition walls Cum 4689.30

ii) For Piers Cum 4798.95

Page 56: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

50

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

34

Item No.34 :- Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss / quartzite / graded metal for RCC works of abutment, wing walls, returns, transition walls, columns, beams and slabs, diaphragm walls, Road slabs trough (Box Culvert) trough for aqueduct, wearing coat, etc. with Batching Plant and Transit mixer including shuttering, scaffolding compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) 20 MSA

i) For Abutment, wing walls, returns, transition walls Cum 5285.70

ii) Piers Cum 5395.40

iii) Columns Cum 6930.90

iv) Beams and slabs for building Cum 7192.10

v) Road Slab,kerb,super passage/slab culvert etc. Cum 7010.95

vi) Trough resting on ground Cum 6477.05

vii) Trough for aqueduct Cum 7716.45

viii) Wearing Coat and other required concrete Cum 4188.95

(B) 40 MSA

i) Abutment/retaining walls/wing walls/Transition walls Cum 5109.30

ii) Pier

Cum

5218.95

35 Item No.35 :- Providing and laying in situ cement concrete of grade M-25 of trap / granite / gneiss / quartzite / graded metal for RCC works of columns, beams and slabs, diaphram walls, Road slabs trough (Box Culvert) trough for aqueduct, wearing coat, etc. with Batching Plant and Transit mixer including shuttering, scaffolding compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) 20 MSA

i) Columns Cum 7262.80

ii) Beams and slabs for building Cum 7524.05

iii)Road Slab,kerb,super passage/slab culvert etc. Cum 7342.90

iv) Trough resting on ground Cum 6809.00

v) Trough for aqueduct Cum 8048.40

vi) Wearing Coat

Cum

4520.90

Page 57: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

51

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

36

Item No.36 :- Providing and laying in situ cement concrete of grade M-30 for trough of aqueduct etc. of trap / granite / gneiss / quartzite / graded metal with Batching Plant and Transit mixer including shuttering, scaffolding including compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

(A) M-30 (20 MSA) for trough of aqueduct Cum 8509.10

(B) M-30 (20 MSA) for slab

Cum

7984.75

37 Item No.37 :- Providing and laying expansion / construction joint with 18 SWG copper plate and shalitex expansion pad below and above the copper plate including sealing the joint with shalitex sealing compound etc. complete including 50*50*5 mm angle frame with stainless steel bolts etc. (For all slab thickness ).

A) 60 cm wide copper plate Sqm 13462.55

B) 37.50 cm wide copper plate

Sqm

15480.25

38 Item No.38 :- Providing and laying expansion / construction joint with shalitex super expansion pad (jute fiber) 12 mm thick including sealing the joint with shalitex sealing compound etc. complete (For slab thickness of 30 cm.).

Sqm

1181.15

39 Item No.39 :- Providing and fixing G.I. sheet 24 gauge and 22.5 cm. wide for the construction joint in R.C.C. trough wall including cutting 15 cm. overlap, riveting the joints and fixing in position etc. complete.

Rmt

184.95

40 Item No.40 :- Cutting, bending, hooking, laying in position and tying M.S. bars for reinforcement of R.C.C. work as per detailed drawing etc. complete.

MT

6597.70

Ferro Cement (Items to be implemented with prior permission of Chief Engineer)

41 Item No.41 :- Providing and Fixing and errecting, welding 8 mm MS bar @200 mm C/c both ways for ferro cement walling situ welded mesh of size 100x100x2.30 mm and chiken mesh 3 layers.

Sqm

921.35

Page 58: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

52

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

42

Item No.42 :- Providing and casting Ferro cement wall in C.M. 1:3 including curing etc complete.

A) 30 mm thick wall Sqm 388.65

B) 40 mm thick wall Sqm 511.65

c) 50 mm thick wall Sqm 633.25

CENTERING ITEMS

43 Item No.43 A :- Providing, erecting and laying steel shuttering formwork and making surface suitable for concreting including dismantling etc. complete for abutments, piers, wings, returns etc.

Sqm

343.60

Item No.43 B :- For RCC Solid/Deck slab/Box Cells/ Trough of Aqueduct etc.

Sqm

388.30

Item No.43 C :- For curved surface

Sqm

412.30

44 Item No.44 A :- Providing and erecting steel props centering up to 3.00 m height including bracing, strengthening and dismantling etc. complete.

Sqm

204.15

Item No.44 B :- Rate for centering for every Additional 1.00 m height

Sqm

70.30

U.C.R.S. MASONRY

45 Item No.45 :- Providing U.C.R. masonry in C.M. 1:5 in foundation upto 0.5 m above G.L. with 50 m. lead and lift upto 1.5 m. including striking joints, curing, excluding royalty of material etc. complete.

A) Thickness of wall upto 1 m. (30% mortar) Cum 1739.55

B) Walls of water retaining structures thinner than 1.0 m. and walls of structures thicker than 1.0 m. other than dams and water retaining structures. (35% mortar).

Cum 1786.45

C) For dams and water retaining structures (45% mortar) .

Cum

2007.60

Page 59: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

53

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

46

Item No.46 :- Providing U.C.R. masonry in C.M.1:6 in foundation upto plinth with 50 m. lead and lift upto 1.5 m. including striking joints, curing excluding royalty of material etc. complete.

(A) : (30% mortar). Cum 1646.60

(B) : (35% mortar) Cum 1676.90

(C) : (45% mortar). Cum 1864.85

47

Item No.47 :- Providing U.C.R. masonry in C.M.1:5 in superstructure with 50 m. lead and lift upto 1.5 m. including striking joints and excluding royalty of material etc. complete.

A) Thickness of walls upto 1 m. (30% mortar) Cum 1756.50

B) Walls of water retaining structures thinner than 1.0 m. and walls and structures thicker than 1.0 m. other than dams and water retaining structures. (35% mortar)

Cum 1800.10

C) For dams & water retaining structures (45% mortar)

Cum 2021.30

48

Item No.48 :- Providing khandki facing to the face of masonry with pointing in C.M.1:2 including finishing to the required shape & slope with necessary scaffolding, curing and excluding royalty of material etc. complete with lead of 50m. (It is assumed that the Khandkis are of the size 20cm x 20cm. No mortar for jointing is taken into account, only face pointing of joint is considered)

(A) with khandki facing on one side Sqm 1322.50

B) with khandki facing on both side. Sqm 1268.80

49

I tem No.49 :- Providing and laying dry stone rubble masonry excluding pointing and royalty of material.

Cum

799.00

50

Item No.50 :- Providing pointing with cement mortar for stone masonry including racking joints, scaffolding, curing excluding royalty of material etc. complete.

(A) In Cement mortar 1:3 Sqm 39.85

(B) In Cement Mortar 1:2

Sqm

45.20

Page 60: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

54

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

51

Item No.51 :- Providing and constructing coarse rubble masonry II sort in C.M. 1:4.5 for super structure with lead upto 50m. and lift upto 1.5m. including striking joints, curing excluding royalty of material etc. complete excluding cement pointing etc. complete. 30% mortar.

Cum

3602.90

52 Item No.52 :- Cutting rectangular grooves of size 10 cm. x 10 cm. in stone masonry including clearing pointing etc. to facilitate smooth working of needles etc. complete.

Rmt

917.05

53 Item No.53 :- Providing and laying rough dressed cut stone coping 23 cm. thick in C.M.1:5 excluding cement pointing but including watering with lead 50 m. and lift upto 1.5 m., excluding royalty of material etc. complete.

Cum

4535.15

54 Item No.54 :- Providing coalgrout U.C.R. masonry in C.M.1:3 (43% mortar) proper packing rubble and of the required shape and quality with the coalgrout at required pressure with 50 m. lead and lift upto 1.5 m. including scaffolding, watering and excluding royalty of material etc. complete. (Excluding formwork and staging)

Cum

2818.75

BRICK MASONRY

55 Item No.55 :- Providing B.B. masonry with conventional I.S. type bricks for super structure including striking joints, watering, scaffolding with lead upto 50 m. and lift upto 1.5 m., including cost of material and excluding royalty of material.

A) in C. M. 1:5 Cum 4470.20

56

Item No.56 :- Providing B.B. masonry with conventional I.S. type bricks in cement mortar 1:5 in super structure upto floor level including mild steel reinforcement of 2 bars of 6 mm dia. placed by every 3rd course properly bent, bounded at ends, scaffolding, watering etc. complete with lead upto 50 m. and lift upto 1.5 m. including cost of material and excluding royalty of material.

Sqm

624.75

Page 61: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

55

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

PIPE LAYING

57 Item No.57 :- Laying and jointing R.C.C. pipe of NP2 class or IRC standard in C.M.1:2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc. complete with lead up to 50 m and all leads.

(A) 1200 mm dia. Rmt 411.00

(B) 900 mm dia. Rmt 292.70

(C) 600 mm dia. Rmt 208.45

(D) 450 mm dia. Rmt 159.90

(E) 300 mm dia. Rmt 138.05

58

Item No.58 :- Laying and jointing R.C.C. pipe of NP3 class or IRC standard in C.M.1:2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc. complete with lead up to 50 m and all leads.

(A) 1200 mm dia. Rmt 475.95

(B) 900 mm dia. Rmt 341.40

59

Item No.59 :- Laying and jointing R.C.C. pipe of P1 class of 900 mm dia or IRC standard in C.M.1:2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc. complete with lead up to 50 m and all leads.

Rmt

341.40

60

Item No.60 :- Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss / quartzite / graded metal for Staunch wall with Batching Plant and Transit Mixer including shuttering, scaffolding compacting, curing etc. complete with an initial lead of 50 m. and lift of 1.5 m.

Cum

7529.90

Page 62: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

56

Page 63: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

57

SECTION-4

MAINTENANCE AND REPAIRS

ITEM NO 61 TO 84

Page 64: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

58

Page 65: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

59

Page 66: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

60

Page 67: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

61

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

MAINTAINANCE & REPAIRS

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

61

Item No.61 :- Dismantling stone masonry cement mortar including stacking the material as directed with 15 m. lead and 1.5 mtr. Lift etc complete.

Cum.

153.60

153.60

62 Item No.62 :- Dismantling the old lime concrete or cement concrete including stacking the material as directed with 15 m. lead and 1.5 mtr. lift etc complete.

Cum.

185.05

185.05

63 Item No.63 :- Dismantling R.C.C. works and removing the stuff to a distance of 15 m and 1.50 mtr. lift including stacking etc. complete as directed

Cum.

277.60

277.60

64 Item No.64 :- Cleaning cutting thorny shrubs bushes, grass as directed with 15m lead and lift up to 1.5m.

Sqm.

1.75

1.75

65 Item No.65 :- Cutting down trees including cutting trunks & branches and stacking the material as directed with 15 mtr. lead and lift up to 1.5 mtr. etc. complete including up roofing and refilling the pit with material as directed (excluding extra material required for refilling)

(a) Girth between 30 cm to 60 cm No. 188.45

(b) Girth between 60 cm to 90 cm No. 223.65

(c) Girth between 90 cm to 1.50 mtr. No. 400.00

(d) Girth between 1.50 mtr to 3.00 mtr. No. 576.10

(e) Girth between 3.00 mtr to 4.50 mtr. No. 928.35

66

Item No.66 :- Numbering road and canal sites trees including painting etc. complete

No.

12.20

67

Item No.67 :- Removing dry silt from the canal bed and stacking as directed with 15 mtr. lead and 1.50 mtr. lift etc. complete.

Cum.

41.65

Page 68: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

62

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

68

Item No.68 :- Removing wet silt from canal bed with 15.00 mtr. lead and 1.50 mtr. including depositing the excavated stuff as directed.

Cum.

61.30

69 Item No.69 :- Removing old paint from steel and other surface with flame, cleaning and making the surface even including scaffolding etc. complete.

Sqm.

31.15

70 Item No.70 :- Providing and applying Primer Red Oxide Paint in two coats including surface preparation, chipping the welding, cleaning spatters, dust etc. complete.

Sqm.

195.00

71 Item No.71 :- Providing and applying anticorrosive coal tar black paint IS 290-1961 in two coats including surface preparation, chipping the welding, cleaning spatters, dust etc. complete.

Sqm.

259.50

72 Item No.72 :- Providing and applying anticorrosive H.D. black paint for upstream side in two coats including surface preparation, chipping the welding, cleaning spatters, dust etc. complete.

Sqm.

262.10

73 Item No.73 :- Providing and applying two coats of flat oil paint of approved colour and shade to internal/external plastered surfaces including scaffolding if necessary clearing and preparing surfaces excluding primer paint.

Sqm.

74.00

74 Item No.74 :- Providing and applying two coats of flat oil paint of approved colour to the old structural steel work and iron work previously painted including scaffolding if necessary clearing & preparing surface excluding primer coat etc. complete.

Sqm.

71.25

Page 69: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

63

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

75

Item No.75 :- Providing and applying two coats of lead/zinc base oil paint / bituminous paint of approved colour and shade to wood work/fiber boards previously painted including scaffolding if necessary, preparing surface excluding primary coat etc. complete.

Sqm.

94.80

76 Item No.76 :- Providing and applying coal tar in one coat on previously painted wood work including preparing the surface scaffolding etc. complete

Sqm.

19.45

77 Item No.77 :- Applying geru wash and white wash to canal road side Km stones / Boundary stones / Ch. Stones / bottom of trees, etc.

No.

43.40

78 Item No.78 :- Removing M.S. Needles from the K.T. Weir opening before onset of the monsoon for passing the flood water through the K.T. Weir openings including conveying the same up to the river banks, stacking the same as directed with all leads and lifts etc. complete.

No.

111.00

79 Item No.79 :- Transportation of M.S. Needles from the river bank to the store shed / safe place or from store shed / safe place to river bank by Bullock cart including loading unloading and stacking as directed with all leads and lifts etc. complete.(Lead Half km)

No.

35.00

80 Item No.80 :- Providing, supplying and applying 1 coat of red oxide to the steel structure as a primary coat including cleaning, scrubbing for preparing the surface to apply paint with lead up to 15 mt. and lift up to 1.50 mt.etc complete for one needle.

Sqm.

136.50

81 Item No.81 :- Fixing of M.S. Needles in weir openings after offset of the monsoon for storage of Water from post monsoon river flow and making it water tight by using wooden pegs, Dungry cloth & empty cement bags etc. with all leads & lifts and including all material and labour etc. complete.

Needle

402.70

Page 70: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

64

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

82

Item No.82 :- Cleaning by redrilling the vertical porous drain pipes including removing of leaching material, grout material if any inside of the V.P.D. etc complete with all leads and lifts. (Vertical upward drilling)

a) From 0 to 5 m. Rmt. 5831.55

b) From 5 to 10 m. Rmt. 6415.00

c) From 10 to 15 m. Rmt. 6998.00

d) From 15 to 20 m. Rmt. 7289.00

83 Item No.83 :- Providing and applying single coat of epoxy primer (4.42 sqm/kg) (Resin : Hardner 2:1) on old U C R masonry / concrete surface etc. complete.

Sqm.

406.15

84 Item No.84 :- Providing & applying of Epoxy Mortar layers to Monolith joint of Masonry Dam with all lead & lift etc. complete.

Kg.

186.20

Page 71: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

65

SECTION-5

TUNNEL WORKS

ITEM NO 85 TO 98

Page 72: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

66

Page 73: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

67

Page 74: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

68

Page 75: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

69

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

TUNNEL & ALLIED WORKS

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

85

Item No.85 :- Excavation of tunnel in all type of rock through itself / adit by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside tunnel with initial lead of 1Km (From Average face to Dump yard including length of Adit)etc. Complete.

Cum.

1770.00

86 Item No.86 :- Excavation of tunnel in all type of rock through shaft by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside tunnel with initial lead of 1Km (From Average face to Dump yard) and Initial lift of 50m etc. Complete.

Cum.

2435.00

87 Item No.87 :- Excavation of shaft in all type of rock by drilling and smooth control perimeter blasting, mucking, disposing muck in muck yard, lighting, ventilation inside shaft with initial lead of 500m (From top of shaft to Dump yard) and Initial lift of 25m etc. Complete.

Cum.

2055.00

88 Item No.88 :- Providing and fixing steel rock bolts of various lengths with resin bond cement capsule anchorage including drilling holes, inserting grout capsule, driving bolt, fixing 10mm thick plate and nuts and tightening the same by torque wrench after hardening of cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with lead upto 1km and all lifts.

Kg.

177.00

89 Item No.89 :- Providing and fixing steel rock bolts of various lengths with mechanical/wedge type anchorage including drilling holes, providing tapered steel wedge, plate and nuts and tightening the same by torque wrench after hardening of cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage & other ancillary operations etc complete with lead upto 1km and all lifts.

Kg.

144.00

Page 76: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

70

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

90

Item No.90 (A) :- Providing and fixing steel Anchor (25mm Dia.) with resin bond cement capsule anchorage including drilling holes, inserting grout capsule, driving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with lead upto 1km and all lifts.

Kg.

113.00

Item No.90 (B) :- Providing and fixing steel Anchor (32 mm dia.) with resin bond cement capsule anchorage including drilling holes, inserting grout capsule, driving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc.

Kg.

82.00

91 Item No.91 :- Providing fabricating and fixing in position permanent structural steel supports as per details including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting, ventilation, drainage and all other ancillary operations etc. complete with initial lead upto 1 Km and all lifts.

MT

82643.00

92 Item No.92 :- Providing fabricating and placing in position reinforcement steel for tunnel RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding joints wherever required, tying with binding wire including cost of all materials, labour, machinery, ventilation, lighting, drainage etc., complete with initial lead upto 1 km and all lift.

MT

53688.00

93 Item No.93 :- Drilling 32mm diameter grout holes in concrete/rock by per cusion drilling using jack hammer as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lightening, drainage and all other ancillary operations etc., complete.

Rmt.

544.00

Page 77: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

71

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

94

Item No.94 :- Grouting cement slurry in grout holes under specified pressure for consolidation / contact grouting including cost of all materials, machinery, labour, re drilling wherever necessary ventilation, lightening, drainage and other ancillary operations etc., complete with lead upto 1 Km and all lifts.

MT

10590.00

95 Item No.95 :- Providing and applying M-28 plain Wet shotcrete 50mm thick in layers as directed including admixtures, scaffolding, necessary machinery, labours, ventilation, lighting, drainage and all other ancillary operations etc. complete with lead upto 1Km & all lifts. (By non robotic machine.)(Excluding Royalty)

Sqm. 490.00

Cum. 12740.00

96 Item No.96 :- Providing and applying M-28 plain Wet shotcrete 50mm thick in layers as directed including admixtures, scaffolding, necessary machinery, labours, ventilation, lighting, drainage and all other ancillary operations etc. complete with lead upto 1Km & all lifts. (By robotic machine.) (Excluding Royalty)

Sqm. 473.00

Cum. 12298.00

97 Item No.97 :- Providing & laying in situ vibrated M-20 grade cement concrete using 20mm clean, hard, graded aggregates crushed from tunnel muck for Side and arch lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator car, placing in position, laying, vibrating, finishing, curing, ventilation, lighting, draining and all other ancillary operations etc., complete with lead upto 1Km and all lifts. for Tunnel . (Excluding Royalty)

Cum.

6150.00

Page 78: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

72

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

98

Item No.98 :- Providing & laying in situ vibrated M-20 grade cement concrete using 20mm clean, hard, graded aggregates crushed from tunnel muck for Invert (Kerb and bed) lining including cost of all materials , machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator car, placing in position, laying, vibrating, finishing, curing, ventilation, lighting, draining and all other ancillary operations etc., complete with lead upto 1Km and all lifts. for Tunnel . (Excluding Royalty)

Cum.

6062.00

Page 79: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

73

SECTION-6

LIFT IRRIGATION SCHEME

ITEM NO 99 TO 131

Page 80: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

74

Page 81: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

75

Page 82: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

76

Page 83: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

77

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

LIFT IRRIGATION SCHEME

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

99

Item No.99 :- Excavation for deep trenches for laying rising main in Earth, Soil of all types, sand, gravel and soft murum including trimming to correct line, level and to specified widths including removing the excavated material and stacking or spreading the same upto a distance of 15 meters and lifts of 1.5 m as directed, preparing the bed for foundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum

70.90

11.60

100 Item No.100 :- Excavation for deep trenches for laying rising main in Hard murum, soft bhisa, hard man and boulder including trimming to correct line and level and to specified width, including removing the excavated material and stacking or spreading the same upto a distance of 15 meters and lifts of 1.5 m as directed, preparing the bed for foundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum

86.70

15.40

101 Item No.101 :- Excavation for deep trenches for laying rising main in Soft Rock by crow bar and shavel including trimming to correct line and level and to specified width including trimming and levelling the bed by chiselling, removing the excavated material and stacking the same upto a distance of 15 meters and lifts of 1.5 m as directed, and safety precautions to keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum

105.10

20.60

Page 84: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

78

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

102

Item No.102 :- Excavation for deep trenches for laying rising main in Hard Rock of any toughness by blasting to correct line and level and to specified width including trimming and levelling the bed as directed, removing the excavated material and sorting, stacking the same upto a distance of 15 meters and lifts of 1.5 m as directed, preparing the bed for foundation and keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation)

Cum

384.20

283.70

103 Item No.103 :- Murum bedding in trenches with murum of approved quality in layers not exceeding 150 mm to 200 mm, each layer shall be consolidated by watering and ramming as directed etc complete. (Without royalty)

Cum.

139.00

98.00

104 Item No.104 :- Providing and filling in sand boxing in trenches with sand of approved quality including watering and compaction as directed etc complete.

Cum.

774.10

105 Item No.105 :- Back filling the trenches in layers not exceeding 300 mm, each layer shall be consolidated by watering and ramming without disturbing the pipe line with excavated stuff as directed including breaking of clods of soil etc complete. ( The backfilling on the two sides of the pipeline should be carried out simultaneously.) (Without royalty)

Cum.

144.20

144.20

106 Item No.106 :- Manufacturing, Providing and Supplying spirally welded / ERW / SAW / fabricated M.S. pipes (Commercial Quality) made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size, rolling, tack welding, assembling in suitable lengths to form pipes, all continuous spiral/circumferencial and longitudinal welding to form a pipe on automatic welding machine

Kg.

65.25

12.90

Page 85: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

79

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

using electrodes having weldmark E7018 (Low Hydrogen electrodes) and forming 'V' edge on both ends of pipes, VAT and Excise Duty on materials required, third party inspection charges insurance, ,lowering and laying to correct position on prepared bedding or on pedestals or chairs, field hydraulic testing at specified test pressure as per IS 5822: 1994 sec 11,field welding to join pipes after laying, Radiographic ( 5%) and ultrasonic ( 10%) testing of welds including all equipments submitting report, expert personnel required for testing, interpreting and submitting report along with develop film where applicable, all incidental charges etc complete as per IS - 3589:2001 and as per specifications (No negative Tolerance in thickness is permissible).

107 Item No.107 :- Lowering, laying in position to correct line & level including M.S. pipes with / without any out coating on prepared bedding or on pedestals or chairs or upon prepared formation including loading, unloading, hoisting, marginal cutting wherever required, assembling and tack welding, and transportation upto 500 m etc. completed as specified with all lead & lift etc. complete including field hydraulic testing at specified pressure and as per procedure mentioned in section 11 of IS 5822: 1994. (item to be used only in situations where pipes are already procured )

Kg.

6.00

3.70

108 Item No.108 :- Manufacturing, Providing and Supplying tapers made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication & full welding of stiffeners as per design requirements, including VAT & ED on all materials required , third party inspection charges, insurance, lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable and as per detailed specifications. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect (Item contd. on next page)

Kg.

68.80

15.50

Page 86: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

80

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

MS special to Rising main /delivery pipes is inclusive in the rate however circumferencial welding for connecting the M.S. special to Rising main shall be paid seperately on running meter basis. (No negative Tolerance in thickness is permissible).

109 Item No.109 :- Manufacturing, Providing and Supplying "Y" connection with Crotch plate made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on all the three ends for welding it to pipe, including fabrication and full welding of crotch plate and stiffeners as per design requirements, including VAT & ED on all materials required, third party inspection charges, insurance ,lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of welding of crotch plate is included in the rate. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect MS special to Rising main /delivery pipe is inclusive in the rate however circumferencial welding required for connecting Y-piece to Rising main / manifold pipe shall be paid seperately on running meter basis. (No negative Tolerance in thickness is permissible).

Kg.

79.50

19.30

110 Item No.110 :- Manufacturing, Providing and Supplying "Y " and "T" branches with coller plate made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication & full welding of coller plate and stiffeners as per design requirements, including VAT & ED on all materials required, third party inspection charges, insurance , (Item contd. on next page)

Kg.

70.40

16.75

Page 87: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

81

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of "V" edging, machining and welding of collar plate in "Y" and "T" connection is included in the rate. Cost of longitudinal welding and "V" edging required for circumferencial welding required to connect MS special to Rising main / delivery pipes is inclusive in the rate however circumferencial welding required to connect Y/T to Rising main or manifold shall be paid seperately on running meter basis. (No negative Tolerance in thickness is permissible)

111 Item No.111 :- Manufacturing, Providing and Supplying manhole covers made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding and full welding on either automatic welding machine or manually and forming 'V' edge on both ends, including fabrication and full welding of stiffeners as per design requirements, including VAT & ED on all materials required, insurance, ,lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable and as per detailed specifications. Cost of longitudinal welding and 'V' edging required for circumferencial welding required to connect MS special to Rising main /delivery pipes is inclusive in the rate however circumferencial welding required for connecting man hole to Rising main shall be paid seperately on running meter basis. Cost of washers , nuts, bolts, etc. required for fixing manhole cover is included in the rate. (No negative Tolerance in thickness is permissible).

Kg

70.40

15.50

112 Item No.112 :- Manufacturing, Providing and Supplying M S bends made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication & full welding of stiffeners as per design requirements, including VAT & ED on all materials required, insurance, (Item contd. on next page)

Kg

70.40

15.50

Page 88: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

82

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

,lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect MS special to Rising main /delivery pipes is inclusive in the rate however circumferencial welding required for connecting M.S. special to Rising Main shall be paid seperately on running meter basis. (No negative Tolerance in thickness is permissible).

113 Item No.113 :- Manufacturing, Providing and Supplying short pipes, cants made out of MS plate conforming to IS 2062:1992 including procurement of plates, gas cutting to required size and shape, rolling, tack welding, full welding on either automatic welding machine or manually and forming 'V' edge on both ends for welding it to pipe, including fabrication and full welding of stiffeners as per design requirements, including VAT & ED on all materials required, insurance ,lowering & laying to correct position etc, complete as per IS - 3589 and IS - 5504 as applicable as per detailed specifications. Cost of longitudinal welding and " V " edging required for circumferencial welding required to connect MS special to Rising main /delivery pipes is inclusive in the rate however circumferencial welding required for connecting M.S. special to Rising Main shall be paid seperately on running meter basis. (No negative Tolerance in thickness is permissible).

Kg

65.80

12.20

114 Item No.114 :- Radiographic testing of welded butt joints in Rising main as per Procedure given in IS 4853:1982 including cost of all materials, equipments & expert personnel required for testing, developing, interpreting and submitting report along with developed films, including all incidental charges, transportation to site and local transportation on site etc. complete.

Rmt.

1360.75

555.30

Page 89: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

83

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

115

Item No.115 :- Ultrasonic testing of field welded joints as per Procedure laid down in IS 4260:1986 including actual testing, interpreting and submitting test report in detail including cost of all materials, equipments & expert personnel required for testing, developing, interpreting and submitting report, including all incidental charges, transportation to site and local transportation on site etc. complete.

Rmt.

314.90

164.20

116 Item No.116 :- Cleaning the surface of rising main pipe by Sand Blasting to expose fresh metal surface ready for painting including removal of all rust, oil, grease, etc. as per specification including all material, labour and equipments etc complete.

Sqm.

68.60

16.40

117 Item No.117 :- Providing & applying Liquid epoxy coating system to the external surface of Rising Main Pipes as per Annex-B of IS 3589:2001, preferably by airless spray with one coat of Zinc rich epoxy primer( 90 % zink (DFT 40 micron , coverage 9 Sqm / lit) and two coats of coal tar epoxy paint (DFT 120 X 2 micron coverage 5 Sqm / Lit / coat) including cleaning the surface to the satisfaction of Engineer in charge by sand blasting / chemical cleaning / scraping removing oil, grease, other foreign materials including all necessary material , labour with all leads and lifts etc. complete.

Sqm.

567.80

120.00

118 Item No.118 :- Providing & applying Liquid epoxy coating system to the interior surface of Rising Main Pipes as per Annex - B of IS 3589:2001, preferably by airless spray with one coat of Zinc rich epoxy primer (90% zink, DFT 40 micron , coverage 9 Sqm / lit) and three coats of coal tar epoxy paint (DFT 120 X 3 micron coverage 5 Sqm/Lit/coat) including cleaning the surface to the satisfaction of Engineer in charge by sand blasting / chemical cleaning / scraping removing oil, grease, other foreign materials including all necessary material, labour with all leads and lifts etc. complete.

Sqm.

697.00

120.00

Page 90: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

84

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

119

Item No.119 :- Providing and applying external 25 mm thick cement mortar coating in CM 1 : 3 (cement consumption 15.94 kg/sqm) pneumatically under pressure of 2.1 to 2.8 kg /Sq cm, with weld mesh 50 x 50 x 2.54 mm (13 gauge), after duly cleaning the surface by wire brushing, degreasing etc., including necessary admixtures (200 ml / bag of cement), curing, rehandling the pipe from fabrication shop to guniting place and from guniting place to laying location etc. complete with all leads & lifts.

Sqm.

515.40

43.00

120 Item No.120 :- Providing inner cement mortar lining of specified thickness in proportion 1:1.5 using mechanical spinning machine, including all necessary labour, material, plants and equipments, local handling etc. complete as per procedure laid down in IS 3589:2001.

a For 9 mm thick inner mortar lining Sqm. 309.80 42.30

b For 12 mm thick inner mortar lining Sqm. 388.00

31.75

121 Item No.121 :- Supplying, fixing and commissioning C.I. Tamper proof double orifice type Kinetic Air Valve manufactured by ISO:9001 certified manufacturing company, body and seat ring of bronze, conforming to IS: 14845, of specified diameter with all fixtures including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

P. N. 1.0

Air valve with all accessories

a 80 mm diameter No. 19254.00 ---

b 100 mm diameter No. 22527.00 ---

c 150 mm diameter No. 41467.00 ---

d 200 mm diameter No. 44654.00 ---

P. N. 1.6

Air valve with all accessories

a 80 mm diameter No. 20334.00 ---

b 100 mm diameter No. 25120.00 ---

c 150 mm diameter No. 42061.00 ---

d

200 mm diameter No.

45454.00

---

Page 91: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

85

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

122

Item No.122 :- Supplying, fixing and commissioning C.I. Scour Valve (sluice valve) manufactured by ISO:9001 certified manufacturing company, body and seat ring of bronze, conforming to IS: 14846 of specified diameter and to withstand specified pressure with all accessories true to line and perfect linking with pipes on either side including lifting and placing in position, cleaning ends, inserting gaskets into correct position, jointing pipes and valve to form water tight joint, including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

P. N. 1.0

Scour valve with all accessories

a 100 mm diameter No. 8363.00 ---

b 150 mm diameter No. 12955.00 ---

c 200 mm diameter No. 23121.00 ---

d 250 mm diameter No. 32888.00 ---

P. N. 1.6

Scour valve with all accessories

a 100 mm diameter No. 10036.00 ---

b 150 mm diameter No. 15546.00 ---

c 200 mm diameter No. 27746.00 ---

d 250 mm diameter No. 39466.00 ---

Page 92: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

86

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Complete Rate

1 2 3 4 5 6 7

123 Item No.123 :- Supplying, fixing and commissioning Zero velocity valve with M S fabricated body with flanged ends manufactured by ISO 9001 certified manufacturing company, conforming to IS: 1538 / AWWA standards of specified diameter with all fixtures including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

Zero velocity valve with all accessories

Diameter in mm Unit

Rate for 2016-17 (Rate in Rs.)

Test pressure

10 kg/cm2

15 kgs/cm2

20 kgs/cm2

25 kgs/cm2

600 No. 223697 253146 270080 294353

650 No. 250716 272697 305733 327572

700 No. 293134 318891 357248 382865

750 No. 325245 353661 396219 424636

800 No. 392418 444269 474080 516810

900 No. 467396 529022 554908 615250

1000 No. 570166 570166 570166 764329

1050 No. 578023 578023 578023 803850

1100 No. 718077 803106 868097 946594

1200 No. 858259 934695 1051722 1125776

1400 No. 1278570 1393220 1568762 1679839

1500 No. 1470549 1604097 1804415 1937826

1600 No. 1503433 1639652 1843979 1980054

124 Item No.124 :- Supplying, installing, testing and commissioning (SITC) electrically actuated Wafer type flanged Butterfly valve conforming to BS:5155, of specified diameter and manufactured by ISO 9001 certified manufacturing company, with gear box, electric motor and extension stem and all other accessories for perfect linking with pipes on either side including lifting and placing in correct position, cleaning ends, inserting gaskets into correct position, jointing pipes and valve to form water tight joints, including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

P. N. 1.0

Butterfly valve with all accessories

a 400 mm diameter No. 39867

b 500 mm diameter No. 68715

c 600 mm diameter No. 98966

P. N. 1.6

Butterfly valve with all accessories

a 400 mm diameter No. 44081

b 500 mm diameter No. 72820

c 600 mm diameter No. 103072

Page 93: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

87

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Complete Rate

1 2 3 4 5 6 7

125 Item No.125 :- Supplying, installing, testing and commissioning (SITC) electrically actuated Double flanged Butterfly valve conforming to IS:13095, of specified diameter and manufactured by ISO 9001 certified manufacturing company, with gear box, electric motor and extension stem and all other accessories for perfect linking with pipes on either side including lifting and placing in correct position, cleaning ends, inserting gaskets into correct position, jointing pipes and valve to form water tight joints, including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

P. N. 1.0

Butterfly valve with all accessories (Double Flanged)

a 700 mm diameter No. 325315

b 800 mm diameter No. 405806

c 900 mm diameter No. 486081

d 1000 mm diameter No. 581699

e 1100 mm diameter No. 726259

f 1200 mm diameter No. 917277

P. N. 1.6

Butterfly valve with all accessories (Double Flanged)

a 700 mm diameter No. 364966

b 800 mm diameter No. 447402

c 900 mm diameter No. 553284

d 1000 mm diameter No. 674399

e 1100 mm diameter No. 826630

f 1200 mm diameter No. 1015487

126 Item No.126 :- Providing and Supplying C.I. D/F angle type spring loaded Pressure Relief valves manufactured by ISO 9001 certified manufacturing company with all fixtures including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

a) Pressure relief valves Type - P.N. 1

100 mm No. 16839

125 mm No. 22847

150 mm No. 26241

200 mm No. 57162

250 mm No. 80166

300 mm No. 105564

b) Pressure relief valves Type - P.N. 1.6

100 mm No. 20931

125 mm No. 28427

150 mm No. 32625

200 mm No. 71254

250 mm No. 99981

300 mm No. 132001

Page 94: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

88

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Complete Rate

1 2 3 4 5 6 7

127 Item No.127 :- Providing and Supplying Air Cushion valves, manufactured by ISO 9001 certified manufacturing company and conforming to AWWA standards with all fixtures including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

Diameter in mm Unit

Rate for 2016-17 (Rate in Rs.)

Test pressure

10 kg/cm2

15 kgs/cm2

20 kgs/cm2

25 kgs/cm2

100 No 71115 81783 89960 98952

150 No 108072 124282 136709 150380

200 No 115350 132652 145918 160509

128 Item No.128 :- Supplying, fixing and commissioning ISI mark CI D/F Non Return Valves (Reflux Valves) manufactured by ISO 9001 certified manufacturing company, conforming to IS: 5312 (Part 1 & 2) of specified diameter with all fixtures including all taxes, third party inspection, transportation, loading, unloading, etc. complete.

1 a) Single door : Without by pass arrangement

Dia in mm Unit PN-1 PN-1.6

100 No. 6152 7912

125 No. 8784 11023

150 No. 10635 12337

200 No. 19117 26237

250 No. 32622 42122

300 No. 44701 58854

350 No. 73985 101366

400 No. 101854 117143

450 No. 119990 138215

500 No. 196507 224548

600 No. 288364 329943

1 b) Single door : With by pass arrangement

Dia in mm Unit PN-1 PN-1.6

100 No. 7248 7662

125 No. 9868 10708

150 No. 11721 12997

200 No. 21850 26252

250 No. 35716 39668

300 No. 47941 55132

350 No. 78603 92606

400 No. 105478 121301

450 No. 123408 141919

500 No. 200319 230363

600 No. 292229 336064

Page 95: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

89

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Complete Rate

1 2 3 4 5 6 7

1 c) Multi door

Dia in mm Unit PN-1 PN-2

700 No. 766255 731447

750 No. 838738 902119

800 No. 911222 1340988

900 No. `994060 1609184

1000 No. 1159737 1755473

1100 No. -- 2072435

1200 No. -- 2096816

129 Item No.129 :- Manufacturing, Supplying and installing both side flanged M. S. Dismantling Joints of specified diameter, manufactured by ISO 9001 certified manufacturing company, including all taxes, transportation, loading, unloading , third party inspection charges, with all leads and lifts etc complete . Thickness as per IS : 7322.

Nominal dia in mm

350 No. 57399

400 No. 65775

450 No. 71359

500 No. 85410

600 No. 99384

700 No. 110565

750 No. 113363

800 No. 135724

900 No. 141596

1000 No. 169611

1100 No. 183613

1200 No. 211623

1300 No. 239632

1400 No. 268185

1600 No. 296251

1800 No. 350822

2000 No. 436582

130 Item No.130 :- Providing and fixing in position Expansion joints manufactured by ISO 9001 certified manufacturing company for M.S. Rising Main of specified diameter conforming to detailed specifications including matching the strakes and steel ring, all materials like synthetic rubber, rubber ring, packings, nuts, bolts, etc complete with all taxes, transporting, loading, unloading etc complete.

Expansion joints suitable for pipe diameters.

Dia in mm

300 No. 23646

400 No. 34126

450 No. 44390

500 No. 59513

600 No. 69915

700 No. 87035

750 No. 95913

800 No. 111620

900 No. 129598

1000 No. 155180

1200 No. 206097

Page 96: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

90

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Complete Rate

1 2 3 4 5 6 7

131

Item No.131 :- Providing 'X' Ray Quality M.S. Welding in all positions with required number of runs, for M.S. pipes internally and / or externally including gauging wherever necessary, fixing appurtenances and other accessories in connection with pipe laying work as per specification, using electrodes having weld mark E7018 (Low hydrogen electrodes), including Surface preparation (i.e. Removal of scale, cleaning, etc.) including all materials, labour, equipments, etc. complete.

A : Single 'V' Butt Joint

Butt Joint : Plate thickness

4 mm Rmt 144.00

5 mm Rmt 218.00

6 mm Rmt 367.00

8 mm Rmt 521.00

10 mm Rmt 748.00

12 mm Rmt 828.00

14 mm Rmt 1204.00

16 mm Rmt 1243.00

18 mm Rmt 1491.00

20 mm Rmt 1755.00

22 mm Rmt 1985.00

25 mm Rmt 2273.00

B : Fillet Type Joint

Fillet Weld Size

4 mm Rmt 153.00

5 mm Rmt 239.00

6 mm Rmt 315.00

8 mm Rmt 439.00

10 mm Rmt 671.00

12 mm Rmt 951.00

14 mm Rmt 1279.00

16 mm Rmt 1788.00

Page 97: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

91

SECTION-7

SURVEYING AND INVESTIGATION

ITEM NO 132 TO 152

Page 98: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

92

Page 99: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

93

Page 100: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

94

Page 101: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

95

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

SURVEYING AND INVESTIGATION

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

SURVEY WORK - COMPLETED ITEM (WITH TOTAL STATION)

132

Item No.132 :- Double levelling using Digital State of art Total Station to connect Geodetic Trigonometrical survey, bench mark and establishing permanent bench mark at Dam site at place along the canal alignment, submergence and in command area etc complete.(Excluding cost of B.M. structure)

Km.

1501.00

133 Item No.133 :- Block contour survey of 10 x 10m grid for irrigation projects using digital state of art Total station, Including transfer of entire data to computer system in different geo referential layer/ themes using features of standard plotting Software’s compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale.

Ha.

1250.00

134 Item No.134 :- Block contour survey of 15 x 15m grid for irrigation projects using digital state of art Total station, including transfer of entire data to computer system in different georeferential layer/ themes using features of standard Softwares compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale.

Ha.

842.00

135 Item No.135 :- Block contour survey of 20 x 20m grid for irrigation projects using digital state of art Total station, including transfer of entire data to computer system in different georeferential layer/ themes using features of standard plotting Softwares compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale.

Ha.

631.00

Page 102: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

96

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

136 Item No.136 :- Block contour survey of 30 x 30m grid for irrigation projects using digital state of art Total station, including transfer of entire data to computer system in different georeferential layer/ themes using features of standard plotting Softwares compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale.

Ha.

433.00

137 Item No.137 :- Block contour survey of 60 x 30m grid for irrigation projects using digital state of art Total station, including transfer of entire data to computer system in different georeferential layer/ themes using features of standard plotting Softwares compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale.

Ha.

223.00

138 Item No.138 :- Block contour survey of 150 x 30m grid for irrigation projects using digital state of art Total station, including transfer of entire data to computer system in different georeferential layer/ themes using features of standard plotting Softwares compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale.

Ha.

99.00

139 Item No.139 :- Carrying out line survey using digital state of art Total station for fixing FRL/HFL including C/s survey with levels at 20m interval/ survey for 'L' section of alternative Dam site and 'L' section of river 1Km u/s 1Km D/s of alternative Dam line etc complete including transfer of entire data to computer system in different georeferential layer/ themes using features of standard plotting Softwares compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale.

Km.

1238.00

Page 103: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

97

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

140

Item No.140 :- Survey for main canal, branches, distributaries on falling contour including investigation of alternative line, taking falling contour fixing canal line, taking 'L' section and cross section on final line and distributaries survey be ETS etc complete. (Excluding fixing apex/ chainage stones) including transfer of entire data to computer system in different georeferential layer/ themes using features of standard plotting Softwares compatible with canal irrigation system design Softwares packages including contour plotting at specified interval and scale. Absolutely linear survey for all types of canals (Length of survey for L-section and cross sections to be measured seperately for payment)

Km.

1486.00

141 Item No.141 :- Providing and casting plain cement concrete structure as shown in the sketch attached along with as Permanent Bench Mark (P.B.M) at dam, command site, in submergence area, along canal alignment, in area including excavation necessary backfilling etc complete.

No.

3825.00

142 Item No.142 :- Fixing precast RCC alignment blocks (Pillar) on alternative dam site finally approved of size 900 x 175 x 100 mm at 90 M interval including fixing in 1:4:8 (600 x 450 x 450mm) cement concrete, excavation, backfilling and coloring etc as necessary. (Steel 0.75 Kg.)

No.

460.85

SURVEY ITEMS FOR DEPARTMENTAL EXECUTION – (LABOUR RATES ONLY)

143 Item No.143 :- Supplying labours for Double levelling to connect Geodetic Trignometrical Survey, Bench mark and establishing the permanent Bench mark at Dam site at place along the canal alignment submergence and in command area etc complete. (Excluding cost of P.B.M. structure)

Km.

757.00

Page 104: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

98

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

144 Item No.144 :-

Supplying labours for Submergence survey including establishment of temporary bench mark to prepare submergence plan with 1 to 1.5 mt. interval contours etc complete (Grid size 30 x 60 mt.)

Ha.

428.00

145 Item No.145 :- Supplying labours for Detailed survey of dam seat and waste weir and borrow area finally approved including mapping to the extent 3 meter above the top of dam level on either flanks and 500 meter up-stream and 500m down-stream, showing all important features, rock outcrops, pools, water courses etc complete. (Grid size 30 x 30M)

Ha.

832.00

146 Item No.146 :- Supplying labours for Survey for longitudinal section of Alternative dam alignment and longitudinal section of river 1.00km. up-stream and 1.00 km. down-stream of alternative dam alignment etc complete.

Km.

2423.00

147 Item No.147 :- Supplying labours for Contour survey for command area including preparation of contour map with 1.00m contour interval, including establishing working temporary bench mark in command area etc complete. (Grid size 150 x 30m)

Ha.

186.00

148 Item No.148 :- Supplying labours for Survey for main canal, branches, distributaries on falling contour, including investigation of alternative line, taking falling contour, fixing canal line, taking longitudinal-section and cross-section of final line and distributaries survey etc complete.

Km.

3029.00

Page 105: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

99

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

INVESTIGATION & FOUNDATION EXPLORATION

149

Item No.149 :- Taking trial bore for detailed investigation with NX diamond drill double tube in all sorts of soil like soft murum, hard murum and boulders including all materials such as casing pipes, accessories, grease, steel balsams and other such materials and or as required including conveying such materials and machinery to site of works, preserving the loose samples in glass/plastic jar and core samples serially numbered at site of work and conveying the same to the head quarter of concerned office as directed and submission of detailed bore log sheet complete.(As directed by the Engineer in charge)

(A) Over Burdon Rmt. 2000.00

(B) Soft Rock/Weathered rock Rmt. 3000.00

(C) Hard Rock other than quartzite Rmt. 3900.00

150 Item No.150 :- Providing core boxes of non-teak jungle wood (normal) of size 1.50 x 0.35 x 0.10m for preserving core samples with all fixtures and fastening, painting, handles, locking arrangement including material and labor etc complete.

No.

3152.00

151 Item No.151 :- Carrying out water intake test / permeability test at any stage or depth as may be directed by Engineer In charge by filling the bore hole with water or air at specific pressure of specified limit as and where directed etc complete.

Test

461.85

152 Item No.152 :- Excavation for taking trial pits on final alignment of dam line and canal at specified interval and in Nalla-bed of size 2.00 x 2.00 x 2.50mtr. in length, breadth and depth respectively or size as may be directed by the Engineer In charge including backfilling trial pits etc complete.

Cum.

88.40

Page 106: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

100

Page 107: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

101

SECTION-8

HYDROLOGY

ITEM NO 153 TO 159

Page 108: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

102

Page 109: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

103

Page 110: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

104

Page 111: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

105

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

HYDROLOGY

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

153 Item No.153 :-

Standard Rain Gauge (Measurer) Providing person to take measurement at every morning 8:30 am to SRG station, taking the entry in the register. Send the reading daily to Sub-Dn by post card & monthly progress (reading) to Sub-Dn, including taking care of instruments established on the station. (Required Proforma / post card / Register etc. will be supplied by concern Sub-Dn. The rate of item is for 35 minutes per day working.

Per

Month

1129.00

154 Item No.154 :- Autographic Rain Gauge (Gauge Khalashi) Providing person to take measurement at every morning 8:30 am of autographic rain gauge station including changing graph at 8:30 am, taking reading in the register, also sending reading to Sub-Dn by post card & monthly progress (reading) send to Sub-Dn, with taking care of instruments established on the station. (Required Proforma/post card/Register etc. will be supplied by concern Sub-Dn.) The rate of item is for 75 minutes per day working.

Per

Month

2418.00

155 Item No.155 :- Full Climatic Station (Gauge Karkoon) Providing person to take reading from the scientific instruments established in the F.C.S Station (Given below) including taking reading in the register as per prescribed Proforma given by the Sub-Dn, also send to concern Engineer in the proforma time to time. The rate of item is for daily working. 1) ARG 2) SRG 3) Pan Evaporimeter, 4) Pan Water Temperature, 5) Thermometer (i. Dry, ii. Wet, iii. Minimum, iv. Maximum) 6) Thermo hygrograph. 7) Anemometer,8) Wind Vane, 9) Sunshine Recorder.

Per

Month

15441.00

Page 112: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

106

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

156

Item No.156 :- Gauge Discharge (Gauge Khalashi/ Gauge Karkoon ) Providing to supply of Gauge Khalashi/ Gauge Karkoon (He is a good Swimmer & he must have to take measurements in the river in rainy & other season) including accidental insurance, service tax. The rate of item is for daily working.

Per Month

14960.00

157 Item No.157 :- Gauge Discharge (Gauge Khalashi/ Gauge Karkoon) Providing Gauge Khalashi/ Gauge Karkoon to take measurement by winch &Cradle with current meter or by float method from required compartment in the flood season, taking measurements at every hour or instruction given by concern Engineer, taking Water levels in four times daily, change paper of AWLR and Calculate Velocity as per given area. Taking all readings in the register, send all readings to Concern Engineer/ Higher Engineer as per instructions in the prescribed proforma, including accidental insurance, service tax. The rate of item is for daily working.

Per

Month

15904.00

158 Item No.158 :- Gauge Discharge (Boat Driver) Providing Boat driver for GD Station to drive the boat for taking measurements near compartment in the Steady position. After taking the measurement brought back the boat & concern persons in the boat safely. Installed the boat in out of danger area etc. complete, including accidental insurance, service tax. (Boat Driving Licence given by Govt. Authority or authorised organization must be mandatory to boat driver). The rate of item is for daily working.

Per

Month

16413.00

159 Item No.159 :- Gauge Discharge (Boat Chowkidar) Providing Chowkidar to take care & Security of boat (He is not an ordinary person, he is a good swimmer, when the Water Level of river increase or decrease, he must have tighten the boat of safe place & taking care of boat in the night.) including accidental insurance, service tax. The rate of item is for daily working.

Per

Month

15684.00

Page 113: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

107

SECTION-9

ITEMS FOR VALUATION OF STRUCTURES IN

AFFECTED VILLAGES

ITEM NO 160 TO 191

Page 114: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

108

Page 115: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

109

Page 116: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

110

Page 117: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

111

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

ITEMS FOR VALUATION OF STRUCTURES IN AFFECTED VILLAGES

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

160 Item No.160 :-

Providing and constructing stone masonry in mud mortar in foundation and plinth including scaffolding, finishing etc. complete.

A) Up to Plinth Cum. 957.60

B) Super structure Cum. 1070.20

161 Item No.161 :- Providing and constructing U.C.R. masonry in lime 1:6 mortar in foundation and plinth including scaffolding, finishing etc. complete.

Cum.

1686.40

162 Item No.162 :- Providing second class B.B. masonry with conventional/ I.S. type bricks in mud mortar in super structures, including racking out joints, when plastering is to be done including scaffolding and watering etc. complete.

A) For Super structure Cum. 4091.80

B) For foundation and Plinth Cum. 4031.90

163 Item No.163 :- Providing and constructing arch like B.B. Masonry slab roofing including 'I' Section as a bottom support and tie rods with scaffolding, centering, etc complete.

Cum.

2241.65

164 Item No.164 :- Providing and constructing gawhan for cattle (0.6 x 10.0 M)

Rmt.

1661.80

165 Item No.165 :- Providing 50 mm. mud plaster including racking out joints , scaffolding all finishing etc. complete.

Sqm.

119.10

166 Item No.166 :- Providing and constructing Kud walls including mud plaster with cow dung wash etc. complete.

Sqm.

230.20

167 Item No.167 :- Providing 25 mm thick mud plaster to kud walls including cow dung wash etc. complete.

Sqm.

86.50

168 Item No.168 :-

Providing and constructing Kud roof/walls excluding mud plaster etc. complete.

Sqm.

115.70

169 Item No.169 :-

Providing and constructing Kud walls including mud plaster with cow dung wash etc. complete.

Sqm.

410.90

Page 118: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

112

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

170

Item No.170 :- Providing and constructing Kud walls, splite & Bamboo knitted together & covered with 12 mm. thick mud plaster etc. complete.

Sqm.

418.60

171 Item No.171 :-

Providing and constructing kud roofing excluding mud plaster etc. complete.

Sqm.

418.50

172 Item No.172 :-

Providing and fixing non teak wood Dhaba including mud flooring and mud plaster on non teak planks, rested on non teak rafter at 1.5 X2.5 m. intervals, including mud flooring over the planks etc. complete (Jungle wood Dhaba )

Sqm.

4075.90

173 Item No.173 :-

Providing and fixing teak wood dhaba including mud flooring and mud plasters on non teak wood planks rested on non teak wood rafters 1.5 X2.5 m. intervals including mud flooring etc. complete.

Sqm.

7952.60

174 Item No.174 :-

Providing and constructing wall of bamboo splited and knitted together including all labour material lead and lift etc. complete.

Sqm.

308.80

175 Item No.175 :-

Providing and constructing mud boulder otta with earthen Ranjan.

No.

841.70

176 Item No.176 :-

Providing and constructing Mud Wall including preparation of mud mortars surface done placing scaffolding etc.

Cum.

1245.20

177 Item No.177 :-

Providing and fixing non teak doors /windows 40 mm. Thick ledged with 25 mm. Thick plain planked shutters without ventilators /fan light /iron bars including the frames of the sizes as per standard specification, iron fixtures and fastenings and finishing the wood work with oiling etc. complete.

Sqm.

3762.00

178 Item No.178 :-

Providing and fixing non teak doors / window II class fully pannelled without ventilators /fan light /iron bars including the frames of the sizes as per standard specification, iron fixtures and fastenings and finishing the wood work with oiling etc. complete.

Sqm.

5668.00

Page 119: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

113

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

179

Item No.179 :- Providing and fixing non teak doors ledged and braced with 20 mm. thick planked shutters including the frame without sill with all fixture and fastenings oiling varnishing etc. complete.

Sqm.

5480.30

180 Item No.180 :-

Providing and fixing Jungle wood door of frame 60 mm X 100 mm for second class door's and window with/ without ventilators fan light and clear storey windows including chamfering / rounding rebating and hold fast finishing with one coat of primer etc complete

Sqm.

2367.70

181 Item No.181 :-

Providing and fixing C T W frame with G I Sheet Shutter

Sqm.

1946.70

182 Item No.182 :-

Providing and fixing country teak wood plank ceilling 12 mm. Thick with planked on underside, longuled and grooved including scaffolding , fixtures with oiling and two coats of varnishing etc. complete. ( excluding battens and joists)

Sqm.

1589.20

183 Item No.183 :-

Providing and fixing non teak wood plank ceilling 12 mm. Thick with planked on underside, longuled and grooved including scaffolding , fixtures with oiling and two coats of varnishing etc. complete. ( excluding battens and joists)

Sqm.

875.20

184 Item No.184 :-

Providing and fixing wooden self of country teak wood plank 30 cm. wide and 20 mm. thick with wooden brackets of 50mm. x 50mm without fillets including all fixtures with oiling and painting etc . complete.

Sqm.

755.70

185 Item No.185 :-

Providing and fixing eaves board of country teak wood plank 20 cm. x 20mm thick plan decorative type including scaffolding & painting with 2 coats etc. complete.

Sqm.

409.80

186 Item No.186 :-

Providing and fixing shutter to wall cupboard made 12 mm. Thick teak wood/ particle board one face with approved colour laminated face borided with phenol formal desynthetic lipping, beading oxidized iron fixtures & oil primer coat etc. complete.

Sqm.

2688.50

Page 120: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

114

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

187

Item No.187 :- Providing & fixing xpm Jalli with teak wood /non teak wood frame including fixing oiling etc. complete.

i) Non teak wooden frame into wooden bar jalli Sqm. 1446.80

ii) N.T. Wooden frame & M.S. Bar Sqm. 898.40

iii) Country teak wooden frame with M.S. bar Sqm. 1370.35

iv) xpm. Jalli with wooden frame Sqm. 1309.20

v) Providing and fixing xpm jalli with non teak wood frame including fixing oiling etc. complete.

Sqm.

812.00

88 Item No.188 :- Providing and fixing half round single country tiled roofing over bamboo battens including nails, battens etc. complete.

Sqm.

556.30

189 Item No.189 :-

Providing and fixing medium grade G I pipe below C G I sheet roofing etc complete.

Rmt.

296.90

190 Item No.190 :-

Providing and fixing M S angle of size 35 x 35 x 6 mm

Rmt.

190.50

191 Item No.191 :-

Providing and fixing half round single country tiled roofing over bamboo mats laid on half split bamboo battens including all fastenings etc. complete.

Sqm.

649.70

Page 121: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

115

SECTION-10

GATE MANUFACTURING AND REPAIRS

ITEM NO 192 TO 208

Page 122: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

116

Page 123: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

117

Page 124: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

118

Page 125: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

119

सामाईक दरसचुी 2016-17

द्वार टनर्धमती आटण दरुुस्ती सर्वसाधारण टिप्पणी

1 All materials / bought out components for embedded parts, gates, hoists and allied works shall conform to relevant Indian standards as provided in Annexure-I.

2 The basic rates are INCLUSIVE of preparation of Q.A.P. / working drawings material schedules etc., as per specifications and other technical data including revisions. If the responsibility of the structural designs is on the contractor, additional 1% amount shall be payable.

3 The basic rates are inclusive of 3 percent provision towards cost of packing, forwarding and transportation of all materials from their source of supply up to work site. No separate lead charges and loading unloading shall be added.

4 The basic rates are inclusive of Machinery mobilization (1.5%) & Demobilization (1.5%) Charges on machinery charges.

5 The basic rates are inclusive of 1% labour welfare and 10% overhead charges.

6 The basic rates are inclusive of 1km lead charges of transportation, loading and unloading charges of Gate parts at Site. Additional lead if any shall be considered in the rate analysis.

7 Fabrication charges includes all welding charges including tack welding and full welding and its testing.

8 The basic rates are inclusive of preparatory works such as rectification of damages, repairing shop, painting, cleaning, positioning and anchoring first stage embedment.

9 The basic rates are inclusive of painting with one coat of 90% pure zinc rich primer and 2 coats of solvent less coal tar epoxy paint with sand blasting.

10 Incremental provisions for tribal area, hilly area etc. shall be made on labour component only.

11 HOIST EQUIPMENT -1. Where sand blasting is not possible, hand and power tool/ chemical cleaning be adopted without any additional cost.

12 The excise duty on material component is considered in the rate analysis of the finished item. The excise duty on machinery and labour component is not included in the rate analysis. However, separate provision shall be provided for excise duty on machinery and labour component in the estimate as separate item. Against this provision reimbursement to the contractor can be done. Such reimbursement shall be done on production of voucher of actual paid excise duty by the contractor. This reimbursement shall be minimum of excise duty actually paid by the contractor or entitled excise duty reimbursement as provided in the contract. In contract separate schedule shall be provided indicating maximum reimbursable excise duty and service tax against each item.

13 Excise duty is applicable on supply of finished fabricated parts. The cost of material is inclusive of all taxes/ duties. Therefore for purpose of assessing excise duty 75% of the total cost excluding the cost of material is considered and for assessing service tax on erection 25% of total cost excluding the cost of materials is considered.

Page 126: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

120

Page 127: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

121

Annexure 1

List of IS codes

1 IS 4622 Recommendations for Structural design of fixed wheel gates

2 IS 2062 Hot rolled low, medium, high tensile Structural steel

3 IS 4623 Recommendations for Structural design of radial gates (Second Revision)

4 IS1030 Carbon steel castings for general engineering purposes.

5 IS28 Phosphor bronze ingots and castings

6 IS305 Specification for Aluminum Bronze ingots and casting

7 IS 318 Specification for leaded tin bronze ingots and casting

8 IS 6911 stainless steel plate , sheet and strip

9 IS 209 Zinc Ingot specification

10 IS 11855 Guidelines for Design and use of Different type of Rubber seals for hydraulic gates.

11 IS 14177 Guidelines for painting system for hydraulic gates and hoists.

12 IS 2485 Drop forged sockets for wire ropes for general engineering purposes

13 IS 325 -1996 Three phase induction motor specification

14 IS 2266-2000 Specification of wire ropes.

15 IS7443 Methods for load Rating of Warm Gears

16 IS 10210-1982 Design of hydraulic hoist for gates.

17 IS 7718-1991 Recommendations for inspection, testing and maintenance of fixed wheel and slide gates (first revision).

18 IS 9349 Recommendation for structural design of medium and high head slide gates

19 IS 210 Geay iron castings

20 IS 6938 Design for rope drum and chain hoist for hydraulic gates

21 IS 1030 Carbon steel and castings

22 IS 7215 Tolerances for fabrication of steel structures.

Page 128: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

122

Page 129: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

123

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

GATE MANUFACTURING

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

(A)

RADIAL GATE EMBEDMENT - Manufacturing, Erection, Commissioning & Testing

192 Item No.192 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of embedded parts of Radial gate with parts consisting of Erection Jig, Vertical Anchorages, Trunion Chair, Trunion Girder box/Yoke Girders, Horizontal anchorages, Trunion bracket assly, Wall plate assly, Sill beam assly, trunion supports, Locking arrangement, etc. All material used shall conformed to related IS Codes specified in IS 4623. Above item covers Mild steel confirming to IS 2062. The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Zinc (IS 209), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90% of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges .The embedment & gate assembly shall be reasonably water tight, the maximum permissible leakage being not more than 5 litres/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349).

Note 1 - Provision for Excise duty reimbursement Rs.3863/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1545/ Mt shall be made in the estimate.

MT

114636.00

15166.00

Page 130: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

124

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

193 RADIAL GATE LEAF - Manufacturing, Erection,

Commissioning & Testing

Item No.193 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Gate leaf of Radial gate with parts consisting of End arm assly, Horizontal Girder, Skin plate assly, tie flats/Channels, Bracing Angles & Gusset plate etc. All material used shall conformed to related IS Codes specified in IS 4623. Above item covers Mild steel confirming to IS 2062. The tolerances between Components & assembly Shall confirm to IS 4623. The fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 ( Interference ) as per IS 4623. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Zinc (IS 209), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70+/-5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges .The embedment & gate assembly shall be reasonably water tight, the maximum permissilble leakage being not more than 5 liters/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349). Note 1 - Provision for Excise duty re-imbursement Rs.3089/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1235/ Mt shall be made in the estimate.

MT

107643.00

14203.00

Page 131: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

125

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

194 HOIST BRIDGE - Manufacturing, Erection,

Commissioning & Testing

Item No.194 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Hoist Bridge. All materials used shall conformed to related IS Codes. Mild steel used for manufacturing shall conform to IS 2062. Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges.

Note 1 - Provision for Excise duty reimbursement Rs.2677/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1071/ Mt shall be made in the estimate.

MT

91389.00

18212.00

195 ROPE DRUM HOIST without Hoist Bridge - Manufacturing, Erection, Commissioning & Testing

Item No.195 :- Manufacturing with QAP, fabrication, erection, commissioning & testing with 125 % of rated capacity of Rope Drum Hoist consisting of central drive unit, gear train frames, rope drums, gears, pinions, shafts, 3 phase electric motor, brake, reduction gear box, wire ropes, gate position indicators, manual operation arrangement, ICTP main switch, electric starter, etc. All material used shall conformed to related IS Codes specified in IS 6938. Above item covers Mild steel confirming to IS 2062. the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.I (IS 210), C.S (IS1030), P. Bronze (IS 305), Al. Bronze (IS 318), S.S (IS 6911), Wire rope (IS 2266), Wire rope sockets ( Is 2485), 3p S4 duty Induction Motor (IS 325), Reduction gear box ( IS 7443), Welding electrodes (AWS E6013 for general weld joints. (Item contd. on next page)

MT

195686.00

9698.00

Page 132: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

126

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

& E7018 for X ray quality weld joints ).It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of solvent less coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidental charges including all duties, taxes, levies and insurance charges Note 1 - Provision for Excise duty reimbursement Rs.4718/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1887/ Mt shall be made in the estimate.

196 VERTICAL LIFT BARRAGE GATE EMBEDMENT / STOP LOG GATE EMBEDMENT - Manufacturing, Errection, Commissioning & Testing

Item No.196 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of embedded parts of V.L. Barrage gate/Stop log gate Consisting of Primary Embedments, Sill beam, Roller Track, Side guide, Side seal kit etc.All material used shall conformed to related IS Codes. Mild steel confirming to IS 2062.The tolerances between Bushing/Bearing /Pin Should confirm to IS 919 ( Part I & II). Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177.The embedment & gate assembly shall be reasonably water tight, the maximum permissilble leakage being not more than 5 litres/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349). overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges . Note 1 - Provision for Excise duty reimbursement Rs.2901/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1160/ Mt shall be made in the estimate.

MT

115247.00

12829.00

Page 133: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

127

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

197 VERTIAL LIFT BARRAGE GATE LEAF / STOP LOG

GATE LEAF - Manufacturing, Erection, Commissioning & Testing

Item No.197 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Gate leaf of V.L. Barrage gate Consisting of of following parts. Gate Leaf, Horizontal girder, Guide roller assembly, & Roller Assembly. All material used shall conformed to related IS Codes. Mild steel confirming to IS 2062.The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.S.(IS1030), Bras (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177,The embedment & gate assembly shall be reasonably water tight, the maximum permissible leakage being not more than 5 liters/min/m length of seal. overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges. Note 1 - Provision for Excise duty reimbursement Rs.3375/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1350/ Mt shall be made in the estimate.

MT

103017.00

15001.00

198 PYLON STRUCTURE - Manufacturing, Erection, Commissioning & Testing

Item No.198 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Pylon Structure. All materials used shall conformed to related IS Codes. Mild steel used for manufacturing shall conform to IS 2062. Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, (Item contd. on next page)

MT

91803.00

12987.00

Page 134: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

128

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

machining & machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges . Note 1 - Provision for Excise duty reimbursement Rs.2263/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.905/ Mt shall be made in the estimate.

199 GOLIATH CRANE - Manufacturing, Erection, Commissioning & Testing

Item No.199 :- Manufacturing with QAP, fabrication, erection, commissioning & testing with 125 % of rated capacity of Goliath Crane consisting of drive unit, A Frame, Main Frame, , LT Driving and driven trolleys, CT Crab Including Central Drive unit, gear train frames, rope drums, gears, pinions, shafts, Driving electric motor, brake, reduction gear box, wire ropes, manual operation arrangement, ICTP main switch, electric starter, etc. All material used shall conformed to related IS Codes specified in IS 6938. Above item covers Mild steel confirming to IS 2062. the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) and antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.I (IS 210), C.S (IS1030), P. Bronze (IS 305), Al. Bronze (IS 318), S.S (IS 6911), Wire rope (IS 2266), Wire rope sockets ( Is 2485), 3p S4 duty Induction Motor (IS 325), Reduction gear box ( IS 7443), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints ). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat (Item contd. on next page)

MT

146591.00

9775.00

Page 135: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

129

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

of Zinc rich primer containing not less than 90 % of

zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges . Note 1 - Provision for Excise duty reimbursement Rs.2480/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.992/ Mt shall be made in the estimate.

200 GOLIATH RAIL ARRANGEMENT - Manufacturing, Erection, Commissioning & Testing

Item No.200 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Railing arrangement for Goliath Crane.MS Material used shall conform to IS 2062. The Dimensions, shape and other requirements of Crane rail sections conform to IS 3443.Welding electrodes (AWS E6013 for MS to MS weld joints & E7016 for MS to rail weld joints ). It includes all materials, Labour charges, machining and machinery charges, 1 km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges. Note 1 - Provision for Excise duty reimbursement Rs.1771/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.708/ Mt shall be made in the estimate.

MT

83618.00

6165.00

201 LIFTING BEAM - Manufacturing, Errection, Commissioning & Testing

Item No.201 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Lifting Beam.MS Material used shall conform to IS 2062. All parts of Lifting Beam like Guide rollers, Hooks, Pins, conform to IS 13591.Welding electrodes (AWS E6013 for MS to MS weld joints & E7016 for MS to rail weld joints ). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of (Item contd. on next page)

MT

79820.00

8832.00

Page 136: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

130

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges . Note 1 - Provision for Excise duty reimbursement Rs.1980/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.792/ Mt shall be made in the estimate.

202 OUTLET GATE-SLIDING TYPE EMBEDMENT - Manufacturing, Erection, Commissioning & Testing

Item No.202 :-

Manufacturing with QAP, fabrication, erection, commissioning & testing of Sliding type gate Embedments consisting of following parts. Sill Beam, Track Girder, Vertical Seal & Horizontal Seal assly., Guide Tee & Lining Plate. Anchorages etc.All material used shall conformed to related IS Codes. All material used shall conformed to related IS Codes specified in IS 9349. Mild steel confirming to IS 2062.The tolerances for embeded parts and in components of gate are as per IS 9349. The tolerances between Bushing/Bearing /Pin Should confirm to IS 919 ( Part I & II). Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges .The embedment & gate assembly shall be reasonably water tight, the maximum permissilble leakage being not more than 5 liters/min/m wetted length of seal. The surface finish of seal plates should be within the range of 1.6 to 6.3 µm (IS 9349).

MT

131272.00

14603.00

Note 1 - Provision for Excise duty reimbursement Rs.3357/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1343/ Mt shall be made in the estimate.

Page 137: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

131

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

203 OUTLET GATE-SLIDING TYPE GATE LEAF - Manufacturing, Erection, Commissioning & Testing

Item No.203 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of Gate leaf of Sliding type gate Consisting of following parts. Skin plate skeleton, End Verticals, Guide Brackets, vertical and horizontal stiffeners etc. (As per Drg.) All material used shall conformed to related IS Codes specified in IS 9349. Mild steel confirming to IS 2062.The tolerances for embeded parts and in components of gate are as per IS 9349. The tolerances between Bushing/Bearing /Pin Should confirm to IS 919 ( Part I & II). Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges. The gates shall be reasonably watertight. Leakage, if any, unless otherwise specified, shall not normally exceed 5 and 10 litre/min/m wetted length of periphery of the sealing surface, for medium and high head gates, respectively as per IS 9349. Note 1 - Provision for Excise duty reimbursement Rs.2753/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1101/ Mt shall be made in the estimate.

MT

116517.00

14662.00

204 OUTLET GATE ROLLER TYPE WITH BUSH IN ROLLER- GATE LEAF - Manufacturing, Errection, Commissioning & Testing

Item No.204 :- Manufacturing with QAP, fabrication, erection, commissioning & testing of parts of Roller type gate leaf with bush in the roller consisting of following parts. Skin plate skeleton, End verticals, Guide bracket etc.(As per Drg.) All material used shall conformed to related IS Codes specified in IS 4622. (Item contd. on next page)

MT

123285.00

17207.00

Page 138: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

132

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

Mild steel confirming to IS 2062.The tolerances for embeded parts of gate are as per IS 4622. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing & hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623.The above items also include Sundry Material, Workshop charges, Labour charges, Inspection & Quality control charges, Sand blasting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film, should be applied to give total dry film thickness 70 +/- 5 microns. Also 2 coats of slovent less coal tar epoxy paint should be given with a minimum dry film thickness of 150+/- 5 micron per coat should be applied as per IS 14177.The gates shall be reasonably watertight. Leakage, if any, unless otherwise specified, shall not normally exceed 5 and 10 liter/min/m wetted length of periphery of the sealing surface, for medium and high head gates, respectively as per IS 9349. Note 1 - Provision for Excise duty reimbursement Rs.3347/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1339/ Mt shall be made in the estimate.

205 OUTLET GATE ROLLER TYPE WITH BEARING

IN ROLLER GATE LEAF - Manufacturing, Erection, Commissioning & Testing

Item No.205 :- Manufacturing with QAP, fabrication ,erection, commissioning & testing of Gate leaf of Roller type gate with Bearing in the roller consisting of following parts. Skin plate skeleton, End verticals, roller bearings, Guide bracket etc. (As per Drg.) All material used shall conformed to related IS Codes specified in IS 4622. Mild steel confirming to IS 2062.The tolerances for components of gate are as per IS 4622The tolerances between Components & assembly Shall confirm to IS 4623 the fits & tolerances between the bronze bushing & hub shall be H7r6 (Interference fit) & with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub (Item contd. on next page)

MT

159608.00

17101.00

Page 139: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

133

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. Other Material includes C.S. (IS1030), Brass (IS 28), P. Bronze (IS 305), Al. Bronze (IS 318), S.S. (IS 6911), Rubber seal (IS 11855), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints). The above items also include Sundry Material, Workshop charges, Labour charges, Inspection & Quality control charges, Sand blasting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film, should be applied to give total dry film thickness 70 +/- 5 microns. Also 2 coats of slovent less coal tar epoxy paint should be given with a minimum dry film thickness of 150+/- 5 micron per coat should be applied as per IS 14177.The gates shall be reasonably watertight. Leakage, if any, unless otherwise specified, shall not normally exceed 5 and 10 liter/min/m wetted length of periphery of the sealing surface, for medium and high head gates, respectively as per IS 9349. Note 1 - Provision for Excise duty reimbursement Rs.3489/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1395/ Mt shall be made in the estimate.

206 SCREW STEM HOIST - Manufacturing, Erection, Commissioning & Testing

Item No.206 :- Manufacturing with QAP, fabrication, erection, commissioning & testing with 125 % of rated capacity of Screw stem hoist consisting of Screw stem, Nut, Gear Pinion, Worm wheel, Shaft, Keys etc. All material used shall conformed to IS Codes specified in IS 11228.Mild steel confirming to IS 2062. Other Material includes C.S. (IS1030), P. Bronze (IS 305), Welding electrodes (AWS E6013 for general weld joints & E7018 for X ray quality weld joints).The tolerances between Components & assembly Shall confirm to IS 4623.the fits and tolerances between the bronze bushing and hub shall be H7r6 (Interference fit )& with pin shall be H7f7 (Clearance fit) and for antifriction bearings with hub shall be H7 (Interference) & antifriction bearing with pin shall be r6 (Interference ) as per IS 4623. It includes all materials, Labour charges, machining and machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less (Item contd. on next page)

MT

100649.00

9349.00

Page 140: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

134

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item

Labour

1 2 3 4 5

less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges. Note 1 - Provision for Excise duty reimbursement Rs.2770/ Mt shall be made in the estimate. Note 2 - Provision for Service tax on erection Rs.1108/ Mt shall be made in the estimate.

207 Straight Needle K.T. Weir Gate- Manufacturing

Item No.207 :- Manufacturing with QAP & fabrication of KT weir needle gates - straight type size 2.15 x 0.5M- 94 Kg. weight as per relevant Indian Standards with all material, Mild steel confirming to IS 2062, Rubber seal confirming to IS 4623 & Welding electrodes AWS E6013 for general weld joints. It includes all materials, Labour charges, machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges. Note 1 - Provision for Excise duty reimbursement Rs.1222/ Mt shall be made in the estimate.

MT

81336.00

4777.00

208 Curved Needle K.T. Weir Gate- Manufacturing

Item No.208 :- Manufacturing with QAP & fabrication of KT weir needle gates - curved type size 2.15 x 0.5M- 75 Kg. Weight as per relevant Indian Standards with all material, Mild steel confirming to IS 2062, Rubber seal confirming to IS 4623 & Welding electrodes AWS E6013 for general weld joints. It includes all materials, Labour charges, machinery charges, 1km lead charges of transportation, loading and unloading charges of Gate parts at Site, Inspection & Quality control charges, Sand blasting, Painting with one coat of Zinc rich primer containing not less than 90 % of zinc on dry film to give total dry film thickness 70 +/- 5 microns and 2 coats of sloventless coal tar epoxy paint applied to give minimum dry film thickness of 150+/- 5 micron per coat as per IS 14177, overhead charges of 10%, and all incidential charges including all duties, taxes, levies and insurance charges. Note 1 - Provision for Excise duty reimbursement Rs.1524/ Mt shall be made in the estimate.

MT

96142.00

5987.00

Page 141: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

135

SECTION-11

FLOW MEASURING DEVICES

ITEM NO 209 TO 212

Page 142: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

136

Page 143: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

137

Page 144: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

138

Page 145: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

139

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

FLOW MEASURING DEVICES

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

209 Item No.209 :-

Providing and fixing gauge plate of Aluminum composite panel sheet with exterior panel coated with kynar 500(min 70%) PVDF coating with computerized gauge marking with reflective radium pasting, spray lamination with polyurethane chemical for surface protection including material reqd for fixing, nut bolts, washers, Nylon rope, hanger, drilling machine etc. and including all taxes.

Sqm. 23672.00 1430.00

210 Item No.210 :- Providing, installing & erecting in correct line and level, fiber glass reinforced plastics(FRP) " V notch" of following sizes and discharge capacities, for acurate measurement of water flowing through open channel with prefabricated fiber glass lining moulded engraved gauge marking ( in lit/sec and in cms) including discharge table, capacity marking, flow direction, sand treatment on the back side of " V" notch ,testing , etc. complete and including all taxes. (Excluding base preparation ie CBL, canal section other concrete etc.)

a FRP V notch having discharge capacity 15 lit/ sec of section 20 x 40 cms with upstream and downstream channel

No. 11213.00 477.00

b FRP V notch having discharge capacity 30 lit/ sec of section 25 x 50 cms with upstream and downstream channel

No. 17442.00 596.00

c FRP V notch having discharge capacity 45 lit/ sec of section 28 x 56 cms with upstream and downstream channel

No. 19697.00 715.00

d FRP V notch having discharge capacity 60 lit/ sec of section 30 x 60 cms with upstream and downstream channel

No. 23609.00 834.00

e FRP V notch having discharge capacity 90 lit/ sec of section 35 x 70 cms with upstream and downstream channel

No. 29888.00 953.00

f FRP V notch having discharge capacity 120 lit/ sec of section 42 x 84 cms with upstream and downstream channel

No. 37748.00 1072.00

Page 146: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

140

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

211 Item No.211 :-

Providing, installing & erecting in correct line and level, fiber glass reinforced plastics(FRP) cut throat flume (CTF) measuring devices on calculated hump level for acurate measurement of water flowing through open channel, with prefabricated fiber glass lining moulded engraved gauge marking ( in lit/sec and in cms.) including discharge table, capacity marking, flow direction, sand treatment on the back side of flume, testing, etc. complete and including all taxes. (Excluding CBL and hump preparation, canal section and other concrete required for hump, U/S and D/S slopes of hump etc.)

a Cut throat flume 10 x 90 cms -0.33 cusecs No. 4139.00 715.00

b Cut throat flume 10 x 90 cms 0.50 cusecs No. 4623.00 715.00

c Cut throat flume 20 x 90 cms -1.0 cusecs No. 9023.00 953.00

d Cut throat flume 20 x 90 cms -2.0 cusecs No. 9816.00 953.00

e Cut throat flume 20 x 90 cms -3.0 cusecs No. 11018.00 953.00

f Cut throat flume 20 x 90 cms -4.0 cusecs No. 11417.00 953.00

g Cut throat flume 40 x 80 cms -5.0 cusecs No. 27690.00 1430.00

h Cut throat flume 40 x 80 cms -6.0 cusecs No. 29285.00 1430.00

i Cut throat flume 40 x 80 cms 8.0 cusecs No. 30876.00 1430.00

j Cut throat flume 40 x 80 cms -10.0 cusecs No. 32477.00 1430.00

k Cut throat flume 40 x 80 cms 12.0 cusecs No. 34073.00 1430.00

l Cut throat flume 40 x 80 cms 15.0 cusecs No. 37264.00 1430.00

m Cut throat flume 40 x 80 cms -18.0 cusecs No. 38865.00 1430.00

n Cut throat flume 40 x 80 cms 20.0. cusecs No. 40461.00 1430.00

o Cut throat flume 100 x 270 cms -25 cusecs No. 66425.00 1906.00

p Cut throat flume 100 x 270 cms -30 cusecs No. 68773.00 1906.00

q Cut throat flume 100 x 270 cms -35 cusecs No. 73470.00 1906.00

r Cut throat flume 100 x 270 cms 40 cusecs No. 78161.00 1906.00

s Cut throat flume 100 x 270 cms -50 cusecs No. 82863.00 1906.00

t Cut throat flume 100 x 270 cms 60 cusecs No. 89907.00 1906.00

u Cut throat flume 100 x 270 cms -70 cusecs No. 94604.00 1906.00

v Cut throat flume 100 x 270 cms 80 cusecs No. 101639.00 1906.00

Page 147: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

141

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

212 Item No.212 :-

Providing , installing & erecting in correct line and level, fiber glass reinforced plastics(FRP) parshall flume on calculated hump level of following sizes and discharge capacities, for acurate measurment of water flowing through open channel with prefabricated fiber glass lining moulded engraved gauge marking ( in lit/sec and in cms) including discharge table, capacity marking, flow direction, sand treatment on the back side of flume, testing, etc. complete and including all taxes. (Excluding CBL and hump preparation, canal section and other concrete required for hump, U/sand D/S slopes of hump etc.)

a Parshall flume-242.80 x 437 cms-100 cusecs No. 243372.00 1906.00

b Parshall flume-243.80 x 437 cms-150 cusecs No. 259249.00 1906.00

c Parshall flume-426 x 595.50 cms-200 cusecs No. 465177.00 2859.00

d Parshall flume-426.70 x 595.50 cms-250 cusecs No. 476822.00 2859.00

e Parshall flume- 426 x 595.50 cms-300 cusecs No. 488159.00 2859.00

f Parshall flume-426.70x 595.50 cms-400 cusecs No. 516490.00 2859.00

g Parshall flume - 457 x 1189 cms -500 cusecs No. 852828.00 3812.00

h Parshall flume - 457 x 1189 cms -750 cusecs No. 909292.00 3812.00

i Parshall flume - 610 x 1311 cms -1000 cusecs No. 1220690.00 3812.00

j Parshall flume - 610 x 1311 cms -1250 cusecs No. 1295683.00 3812.00

k Parshall flume - 762 x 1341 cms -1500 cusecs No. 1346940.00 3812.00

Page 148: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

142

Page 149: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

143

SECTION-12

MARKING BLUE LINE AND RED LINE

ITEM NO 213 TO 219

Page 150: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

144

Page 151: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

145

Page 152: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

146

Page 153: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

147

GOVERNMENT OF MAHARASHTRA

COMMON SCHEDULE OF RATES FOR 2016-17

MARKING BLUE LINE & RED LINE

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

213 Item No.213 :- Fixing control points by Differential Global Position System (DGPS) instrument at every One Km. along the both side of river including collection of necessary flood data etc. complete including labour welfare cess, service tax, labour insurance and all applicable taxes etc. complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Km

1031.00

214 Item No.214 :- Traverse Survey along river with cross section at 100 m .c/c along river .The levels on cross section shall be at every 30 m c/c beyond past locally observed flood line, using Differential Global Position System (DGPS) instrument including labor, transportation, using sounding by boat in river water in wet condition and transfer of entire data to computer system in different geo referential layers/ themes using features of standard plotting software computable with design software package including contour plotting at required interval and at a scale and following deliverables etc. all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

A) Survey in dry condition Ha. 403.80

B) Survey in wet condition Ha. 449.75

215 Item No.215 :-

Delivering Contour map of 0.50 m. contour interval by using standard software & superimposing it on village map with scale1:5000 showing Prohibited line( Blue line) & Restricted line (Red line) along with mapping of structures & other details etc all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Ha.

35.90

Page 154: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

148

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

216

Item No.216 :- Providing computerised detailed cross section drawings in two copies at 100 m interval with actual profile of river (levels at every 30m. distance along cross section) on A-3 size paper with scale 1cm = 15m or 1cm = 30m which is suitable as per site condition showing 25 year return flood line (Blue line) and 100 years return flood line (Red line) computed by software analysis and submission in the form of soft and hard copy as directed by Engineer in charge. So as to use the data of above Item No.213 to 215 by HEC-RAS Software. including submission of check print and getting approval of Engineer in charge etc all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Sheet

324.00

217 Item No.217 :- Computation of Blue line ( 25 Year return flood line ) and red line ( 100 year return flood line ) by using HEC-RAS software including estimation of flood getting approval of competent authority for the same giving all the precise necessary input details into the software, viz. cross sectional and longitudinal features of the stream, flow obstructions etc. including site validation & recalculation to the satisfaction of Engineer In charge etc all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Km

2429.00

218 Item No. 218 :-

Providing computerised detailed river alignment with contours on A-1 size paper with scale 1 cm equal to 15 m or 30m whichever is suitable as per site condition. (one sheet for one Km. length of river) with contour at 0.50 m. interval including marking 25 years return flood level (Blue line) & 100 years return flood level (Red line) line & showing locations of bridges, KT Weirs & other permanent structures on each drawing along and across the river as directed by Engineer in Charge, including providing one color check print & six hard copies(color print) with one soft copy etc. all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

Sheet

978.00

Page 155: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1

149

Sr. No.

Item Unit

Rate for 2016-17 (Rate in Rs.)

Completed Item Labour

1 2 3 4 5

219 Item No.219 :-

Marking of 25 years flood level ( blue line) & 100 years flood level ( Red line) on permanent structures like Bridges, Temples & other permanent structures along & across river including painting, lettering at every not less than 100 m. interval & not more than 500 m. on both the banks of river, after the final approval of flood level. as directed by engineer in charge etc. all complete as directed vide Technical circular of MERI Nashik No.DSO/PB-4/1582 dated 16/11/2015.

No.

441.00

Page 156: WATER RESOURCES DEPARTMENT - … · government of maharashtra water resources department common schedule of rates for 2016-17 i n d e x sr. no. particulars pages from to 1 section-1