GOVERNMENT OF KERALA
PERFORMANCE BUDGET 2017-2018
WATER RESOURCES DEPARTMENT
FINANCE DEPARTMENT
WATER RESOURCES DEPARTMENT
PERFORMANCE BUDGET 2017-2018
FINANCE DEPARTMENT
CONTENTS
Pages
Executive Summary 1 - 3
Irrigation & Administration 4 - 34
Project-I (Cauvery Cell) 35 - 50
Project-II 51 - 85
Kuttanad Package 86 – 105
Irrigation Design & Research Board (IDRB)
106 – 133
Ground Water 134 – 156
AUTONOMOUS BODIES
Kerala Water Authority 157 – 190
Kerala Rural Water Supply and Sanitation Agency –Jalanidhi
191 – 203
Kerala Irrigation Infrastructure Development Corporation (KIIDC)
204 – 234
Comments of Finance Department 235 - 256
EXECUTIVE SUMMARY
Government have reintroduced Performance Budgeting of
developmental schemes and related expenditure implemented by selected
Departments, in view of the recommendation of the Public Accounts
Committee in the 140th Report (2008-11). Water Resource Department
is one among them. For the preparation of Performance Budget (2017-
18) guidelines were issued and circulated to the Departments/Head of the
Departments concerned vide Circular No.48/2018/Fin dated
24/05/2018. The exercise mainly focussed on the developmental
schemes and related expenditure only and not to routine administrative
expenses. It is an endeavour of the government to convert „outlays‰ into
„outcomes‰ by planning expenditure, fixing appropriate targets, qualifying
deliverables in each scheme/programme. It is also intended to serve as a
policy tool to establish effective linkage among allocation/ disbursement of
public funds, transparency, measurable performance, delivery mechanism
and review of past performance and policy initiatives etc.
The Performance Budget 2017-18 of Water Resources Department
consists of the details of performance furnished by the Chief Engineer,
Irrigation and Administration; Chief Engineer, Cauvery Cell (Project I);
Chief Engineer (Project II); Chief Engineer, Kuttanad Package; Chief
Engineer, Irrigation Design and Research Board (IDRB) and Director,
Ground Water Department. The details of autonomous body/ Public
Sector Undertaking such as Kerala Water Authority, Jalanidhi, Kerala
Irrigation Infrastructure Development Corporation (KIIDC) are included
separately. The head of autonomous bodies have furnished the details for
Performance Budget which are included as five chapters. Finance
Department went through all the schemes/ programmes of each
Department / autonomous bodies and its comments are included as
Chapter VII
Chapter I
Introduction
A brief introductory note on the functions of the Department /
autonomous bodies, goals/ objectives, organizational set up, its mandate
Performance Budget 2017-18 1 Water Resources Department
and list of major programmes/ schemes implemented by the Department/
autonomous bodies.
Chapter II
Financial Outlays and Quantifiable Deliverables
This contain a tabular format which visualized as vertical
compression and horizontal expansion of statement of budget estimates.
The main objective is to establish a one to one correspondence between
financial budget 2014-15 and Performance/ Outcome budget 2014-15 of
various schemes and programmes implemented by Water Resources
Department and its autonomous bodies. Details are furnished in Annexure
I.
Chapter III
Reform Measures and Performances
This details reform measures and policy initiatives if any, taken by
the Department and how these relates to the immediate outputs and
financial outcome in various areas/ fields, such as public private
partnerships, alternate delivery mechanisms, social and women
empowerment processes, greater decentralization, transparency etc.
Chapter IV
Review of Past Performance
This indicate the performance of Department during the year
2016-17 in terms of targets already set. It reviews the scheme wise past
performance of various programmes and activities undertaken by the
Department. (A graphical representation showing the comparison of
performance/ outcome during the financial year 2015-16 and 2016-17
for various programmes/schemes may be included) (Annexure II)
Chapter V
Financial Review
Financial review covering overall trends in expenditure vis-a-vis
Budget Estimates/ Revised Estimates/ Actual Expenditure in recent years,
including the current year i.e., 2018-19 (schemes wise, object head wise
Performance Budget 2017-18 2 Water Resources Department
and institution wise in the case of autonomous institution) and the position
of unspent balances with Departments and implementing agencies are
described in this chapter. The details are included in Annexure III.
Chapter VI
Review of Performances of Autonomous Bodies
This chapter have excluded from the Performance Budget Report
of Water Resources Department since the autonomous bodies has
furnished separate reports.
Chapter VII
Comments of Finance Department
The chapter contains a peripheral analysis of schemes based on the
details furnished by the Department and data collected by conducting field
visits in implementing offices by the Finance Team. It contain the
evaluation of selected schemes of Water Resources Department.
Thiruvananthapuram
January 2019
Performance Budget 2017-18 3 Water Resources Department
OFFICE OF THE CHIEF ENGINEER,
IRRIGATION & ADMINISTRATION
General
Irrigation Department
Department of the State. Chief Engineer (Irrigation & Administration) is
the Department Head. The
looking after different activities under the
under the Chief Engineers are controlled by Superintending Engineers and
District level offices by Executive Engineers. Su
are controlled by Assistant Executive Engineers and Assistant Engineers
respectively.
The Department
under the Department
Navigation, Prevention of salinity intrusion,
Mantri Krishi Sinchai Yojana are come under the control of Chief
Engineer, Irrigation. The projects are controlled by Chief Engineer
I, Chief Engineer-Project II and Chief Engineer
Design, investigation and research work of the Irrigation
controlled by the Chief Engineer (Investigation & Design), IDRB
State Water Sharing (ISW) is also controlled by Chief Engineers Irrigation
& administration .The Mech
Mechanical, looks after the works under Public Work
Electrical work related to Irrigation Schemes is controlled by Chief
Electrical Engineer of PWD Electrical wing. The hierarchy of Water
Resource Department
OFFICE OF THE CHIEF ENGINEER,
IRRIGATION & ADMINISTRATION
CHAPTER – I
Department functions under Water Resources
of the State. Chief Engineer (Irrigation & Administration) is
Head. The Department has four more Chief Engineers
looking after different activities under the Department. Regional Offices
under the Chief Engineers are controlled by Superintending Engineers and
level offices by Executive Engineers. Sub Divisions and Sections
are controlled by Assistant Executive Engineers and Assistant Engineers
Department structure is aligned according to the activities
Department. Flood management, Minor Irrigation, Inland
vention of salinity intrusion, Harithakeralam, Pradhan
Mantri Krishi Sinchai Yojana are come under the control of Chief
Engineer, Irrigation. The projects are controlled by Chief Engineer
Project II and Chief Engineer-Kuttanad
Design, investigation and research work of the Irrigation Department
controlled by the Chief Engineer (Investigation & Design), IDRB
State Water Sharing (ISW) is also controlled by Chief Engineers Irrigation
& administration .The Mechanical wing headed by the Chief Engineer
Mechanical, looks after the works under Public Work Department
Electrical work related to Irrigation Schemes is controlled by Chief
Electrical Engineer of PWD Electrical wing. The hierarchy of Water
Department is depicted in the following diagram:-
OFFICE OF THE CHIEF ENGINEER,
IRRIGATION & ADMINISTRATION
functions under Water Resources
of the State. Chief Engineer (Irrigation & Administration) is
has four more Chief Engineers
. Regional Offices
under the Chief Engineers are controlled by Superintending Engineers and
b Divisions and Sections
are controlled by Assistant Executive Engineers and Assistant Engineers
structure is aligned according to the activities
. Flood management, Minor Irrigation, Inland
Harithakeralam, Pradhan
Mantri Krishi Sinchai Yojana are come under the control of Chief
Engineer, Irrigation. The projects are controlled by Chief Engineer-Project
Kuttanad Package.
Department are
controlled by the Chief Engineer (Investigation & Design), IDRB. Inter
State Water Sharing (ISW) is also controlled by Chief Engineers Irrigation
anical wing headed by the Chief Engineer-
Department also.
Electrical work related to Irrigation Schemes is controlled by Chief
Electrical Engineer of PWD Electrical wing. The hierarchy of Water
Performance Budget 2017-18 4 Water Resources Department
Vision
The Departmental activities are framed in line with the State Water Policy
and Kerala Irrigation and Water Conservation Act, 2003.
� Sustainable development, maintenance of quality and efficient
management of water resources to match with the growing
demands on the precious natural resource of the country.
� Providing assured irrigation to facilitate sustainable agriculture
development and food security.
� To develop and implement environmentally sustainable and
ecologically sound inland water transport system.
� Improving agricultural growth by ensuring better
Irrigation/drainage management.
Mission
The Department mainly focuses on conservation/management of
water resources by protecting its sources in an environmentally and
economically sound manner and construction and maintenance of
Irrigation structures.
Offices under Chief Engineer, Irrigation and Administration
The Chief Engineer, Irrigation & Administration is the administrative
head of the Department. The Chief Engineer (I&A) controls the following:
1) Administration of the Department
2) Inter-State water sharing
3) Flood Management
4) Salt Water Exclusion
5) Inland Navigation
6) Minor Irrigation
7) PMKSY
8) Harithakeralam
The Chief Engineer (I&A) is assisted in the Head Quarters at
Thiruvananthapuram, by Deputy Chief Engineer for Work, Deputy Chief
Engineer for Administration, Senior Finance Officer for financial advice,
Senior Administrative Officer for administrative matters relating to non-
Performance Budget 2017-18 5 Water Resources Department
technical wing and Law Officer gives legal opinion to Irrigation & PWD .
Being the Headquarters of the Department, planning, monitoring of
schemes including centrally sponsored schemes updating progress of
schemes on Plan Space, Chief Ministers Web portal and other software,
providing Annual Plan details to Planning Board, budget control, human
resources management including all the establishment matters related to
technical and non-technical staff are handled by the office of the Chief
Engineer (I&A). All matters related to Flood Management, Minor Irrigation
and Inland navigation work are handled at the office of the Chief Engineer
(I&A)
All matters relating to Irrigation work are handled by the Irrigation
Work wing under the Executive Engineer. Issue of Technical Sanctions,
Pre-qualification of tenders, Administrative and Financial Sanction for
work, processing of tenders, etc, are handled by this wing. Senior Finance
Officer and Deputy Chief Engineer (Work) assist the Chief Engineer in
processing these files.
Irrigation planning wing of the Department functions under Executive
Engineer Planning & IT Cell. Planning wing handles all matters related to
Five year plan Annual Plans, plan progress, NABARD Works, HRMS
matters related to Finance Commission Awards, Harithakeralam, Inland
Water Transport, matters related I &WC act, NWP etc. Senior Finance
Officer and Deputy Chief Engineer (Work) advise the Chief Engineer in
these matters.
A full-fledged IT Cell is working under the Executive Engineer,
Planning & IT. This cell has one Assistant Executive Engineer, one
Assistant Engineer and a System Administrator. It focuses primarily on
exploiting all the facets of information and communication technology to
enhance the transparency, efficiency, effectiveness and promptness in
service delivery to citizens thereby simplifying and improving all aspects of
governance in the Department. Department is managing its own web site
and has adopted e-tendering/PRICE/EMLI/BIMS/BAMS application for
its official activities in all the Circle Offices. Enabling other software and
related work are in progress. The Irrigation Project Monitoring wing is
Performance Budget 2017-18 6 Water Resources Department
headed by Joint Director, assisted by 2 Assistant Executive Engineer and 3
Assistant engineers.
The main duties of the division is as follows:
� RTI, Petitions, Progress Report (Major/Minor Irrigation works,
Irrigation Projects, IDRB, Kuttanad Package). Verification of
files/reports.
� LA (Rajya Sabha, Lok Sabha, Assembly), RTI Appeal,
Correspondence with CWC, Centrally Sponsored Schemes,
Coordination of PMKSY/Jal Kranthi Abhiyan works, Files related
to KDSA, ISW, Desiltation of Reservoirs, SSAP in Climate Change,
Disaster Management, State Water Policy Environmental Impact
Assessment, Storage Capacity of Reservoirs, MPs/Chief Secretaries
conference Standing Committee Visits, Review of Prioritised
Projects, NABARD funding for Prioritised Projects, Details of
CADA works, Monitoring the progress of KIIFB works and shortfall
in command area, Processing of Petitions through CMCC, CM web
portal. PMKSY Cell, Bench marking of Irrigation Projects,
Appraisal of Major/Medium Projects. WRIS, Concurrent
Evaluation of Irrigation Projects, Report of A & AG on
Performance Audit. Mapping of Central Schemes with State
Schemes, Reservoir Fishing, Tourism Activities, Sand Auditing,
Sustainable Development Goal, Coordination of all works
(CWC/State Govt.) related to Irrigation Projects. Other General
Topics related to Irrigation Projects/Central Schemes and
preparation of Reports for various meetings. E-monit software
development is also dealt in this division.
Government of India has introduced PMKSY Schemes to bring all
the Centrally Sponsored Schemes under single umbrella. Joint
Director, Monitoring is the Nodal officer for the scheme for monitoring
and coordination of the activities taken up by the Department. He is
the Public Information Officer in the office of the Chief Engineer,
Irrigation and Administration. All petition received in the office are
Performance Budget 2017-18 7 Water Resources Department
processed and transmitted to concerned offices from the Monitoring
Section. The Vigilance wing of the Department is functioning at the
Headquarters under the Chief Engineer, I & A. The wing has technical
support from two Assistant Executive Engineers. All the vigilance files
are handled by this wing.
Administrative Officer handles all matters related to human
resources of non-technical staff. There are different sections for different
category of staff for administrative convenience. Deputy Chief Engineer
(Administration) is in charge of assisting the Chief Engineer in
establishment matters of technical staff. Senior Administrative Officer is in
charge of assisting the Chief Engineer in establishment matters of
Ministerial staff. Senior finance officer handles matters related to Budget
plan & non plan Schemes under Chief Engineer Irrigation&
administration, Fund allotting,performance budget, etc..
Irrigation South Circle, Thiruvananthapuram
Irrigation South Circle stationed at Thiruvananthapuram handles
flood control and coastal zone management work in the Southern Districts
of the State covering Thiruvananthapuram, Kollam, Kottayam, Alappuzha
and Pathanamthitta. Irrigation South Circle has four Divisions under its
control each at Thiruvananthapuram, Kollam, Kottayam and Alappuzha.
Irrigation Central Circle, Thrissur
Irrigation Central Circle located at Thrissur controls completed
projects like Peechi, Vazhani, Cheerakuzhi and Chimony. This office also
handles the flood control and coastal zone management work in Central
Districts of the State. The Circle has four Divisions under its control:
Irrigation Division, Thrissur, Additional Irrigation Division, Thrissur,
Irrigation Division, Ernakulam and Chamravattom Project Division at
Ponnani
Irrigation North Circle, Kozhikode
This Circle handles river training work in 24 rivers of the State
including Manjeswaram, Shiriya, Uppalam, Kallai and Chaliyar and coastal
Performance Budget 2017-18 8 Water Resources Department
protection work. The Circle has four Divisions under its control at
Kozhikode, Malappuram, Thalassery and Kasaragod.
Minor Irrigation South Circle, Thiruvananthapuram
MI Circle, Thiruvananthapuram controls the Minor Irrigation work
and schemes in the Southern Districts of Thiruvananthapuram, Kollam,
Kottayam, Alappuzha and Pathanamthitta. The Circle has four divisions
each at Thiruvananthapuram, Kollam, Pathanamthitta and Kottayam.
Minor Irrigation Central Circle, Ernakulam
MI Central Circle Ernakulam controls the Minor Irrigation work and
schemes in Ernakulam, Idukki, Thrissur and Palakkad Districts. This Circle
has the most number of Irrigation structures under its control.
Minor Irrigation Circle, Kozhikode
Minor Irrigation Circle, Kozhikode controls the Minor Irrigation
work and schemes in five Northern Districts of the State namely
Kozhikode, Wayanad, Malappuram, Kasaragod and Kannur.
Inland Navigation Directorate, Kollam
This office is controlled by Superintending Engineer, who is
designated as Director. It has two Divisions each at Kollam and Kannur.
This Directorate is responsible for the construction, maintenance and
upkeep of state Inland Waterways all over Kerala.
Chief Engineer, Mechanical
Chief Engineer, Mechanical controls all work related to Mechanical
Engineering in the State. There are two Superintending Engineers in the
State under Chief Engineer, Mechanical. One Superintending Engineer is
designated as Deputy Chief Engineer who is stationed at
Thiruvananthapuram and another Superintending Engineer is stationed at
Ernakulam.
Performance Budget 2017-18 9 Water Resources Department
Programmes /Schemes being implemented under Chief Engineer,
Irrigation and Administration
Minor Irrigation Schemes
Minor Irrigation schemes are divided into Class-I and Class-II depending on
the ayacut served. Schemes serving above 50 Ha up to 2000 Ha are
classified as MI Class-I. Works which can serve below 50 Ha come under
MI Class II Scheme. Lift irrigation schemes are also Minor irrigation
schemes serving at least 40Ha.This year Harithakeralam Schemes were
also included under MI class I ,MI class II and Renovation of Tanks and
ponds.
MI Class-I Schemes
Minor works like improvements to tanks and rivulet, construction of check
dams, sluices, regulators, bunds, vented crossbars, salt water barriers,
layout of channels and drainage structures etc are usually undertaken
under MI Class-I schemes. Construction of new water retaining /
conservation Structures included under Harithakeralam
MI Class II Schemes
Minor irrigation works including construction of vented cross bars, canals,
improvements to natural drains etc are taken up under this scheme.
Construction of Check dam /small storage structure, renovation of ponds
in rain shadow area in Palakkad District, especially in Kollamkode in
Chittur block, water shed intervention including construction of VCB,
check dams etc. under Harithakeralam
Lift Irrigation Schemes
Lifting of water is required for irrigating fertile land at a higher elevation
where gravity flow of stored water is not possible. Although mechanical
lifting is required, these schemes are very useful and serve the marginal
farmers of the State.
Renovation of Ponds and Tanks
One of the strategies identified for self sufficiency in food security is to
provide special focus for revival, conservation and up-gradation of local
Performance Budget 2017-18 10 Water Resources Department
water resources and traditional system of water management for
augmenting food crop production. Tanks have been the main source of
irrigation in many parts of Kerala for centuries. At present ponds and
tanks in Kerala do not qualify for central assistance as per Government
norms. Due to shortage of rainfall and possibility of drought expected in
future. Government also given special attention for the renovation of
ponds in the state. Works such as renovation of ponds and linking of large
ponds with Irrigation canal is included under Harithakeralam project.
Flood Management
Flood control is a major activity under irrigation Department due to
the peculiar terrain of the State. The main works for flood control include
flood bunds on the banks of the major rivers to bring the flood waters
within the river regime thereby reducing to destruction to life and
property. Strengthening of river sides by retaining walls is highly essential
in KeralaÊs topographical condition. All the rivers flow through narrow
gorges and the average heights of the sides of rivers is about 6 to 12m in
the midlands and coastal regions. The top soil in these regions are lateritic
and the bottom layer is a mixture of laterite sand and clay. During the
monsoon months due to the high velocity and under currents, the sides of
rivers in the bottom depths to a height of about 1.5m gets washed off due
to the sandy nature and in the subsequent monsoon, the top soil collapses.
Therefore, protection by different methods is essential in the bottom layer.
River training works, construction of flood banks et are works taken up
under flood management programme.
Rehabilitation of LI Scheme
The Lift Irrigation Schemes involves lifting water by mechanical
means to irrigate land at high elevation. Schemes with total ayacut of
42850 Ha is under the control of Irrigation Department. 209 Schemes
were taken up for the renovation under Malabar Irrigation package. If this
scheme is implemented in full stature will be more beneficial to the local
farmers than other major projects.
MI Class I NABARD
NABARD has been providing loan assistance for Irrigation Works
under Rural Infrastructure Development Fund for implementing ongoing
Performance Budget 2017-18 11 Water Resources Department
NABARD assisted Lift Irrigation Schemes, Minor Irrigation Class I & II
Schemes and for taking new Schemes under RIDF
MI Projects in Cauvery basins
Water allocation by the Cauvery Tribunal to the state is 30 TMC in
2007. The award covers 21 TMC in Kabani, 6 TMC in Bhavani and 3
TMC in Pambar basin in the state. Revival of rivers through construction
of check dams and other measures is a priority area. A number of small
streams are mapped in the hilly areas for development. Comprehensive
development of small streams, construction of check dams, Rehabilitation
of ponds etc. in Kabani & Pambar Basin Construction of water structure,
construction and rehabilitation of ponds, development of rain shadow
regions in Idukki Wayanad District are the project aimed under the
scheme.
Bhavani Basin
Under Bhavani basin, construction of check dams is in Attappady valley,
an under Developed tribal area in Palakkad District is envisaged. The
topography of Bhavani sub basin is suitable for implementation of MI
projects such as check dams and LI Schemes which can sustain ground
water recharge, drinking water supply and irrigation facilities in Attapady.
An outlay of 500.00 lakh is set apart for implementing the minor
irrigation projects in Bhavani basin. The amount provided is for
construction of ponds, small water storage structures covering check dams
and lift irrigation schemes benefitting the tribal areas.
PMKSY (Pradhan Mantri Krishi Sinchayi Yojana)
Government of India has introduced PMKSY to achieve
convergence of investment in Irrigation at field level to expand area under
assured Irrigation. The funding of this core scheme will be shared in the
ratio 60 : 40 between centre and the state. The Scheme envisions to
increase the grass Irrigated area by bridging the gap between Irrigation
potential and utilization by means of strengthening the water distribution
network and enhancing water use efficiency and management. In Kerala,
Agriculture Department is the nodal agency for implementation of
PMKSY. Irrigation Department plays a pivotal role in preparing the
District Irrigation plan for each District. Proper implementation of DIPs
Performance Budget 2017-18 12 Water Resources Department
will increase the net irrigated area in the state. This will also enhances the
irrigation efficiency resulting in increase in water security, food security
thereby meeting the environmental needs for the sustainable development
of the state.
Coastal Zone Management
Out of the total 585.60 km of coastal line of Kerala, the length which has
been identified, by the directorate of Central Water Commission and
coastal erosion studies, as vulnerable to erosion and requires protection in
478 km. The State of Kerala with its very high density of population,
has the maximum concentration of population in coastal zone. The
coastline of Kerala is subjected to severe erosion in a major portion of its
length during the monsoon seasons, when the sea becomes rough due to
consistent attack of waves. Erosion is very severe in the coastal areas
during the southwest monsoon period. During the monsoon seasons, the
high waves cause overflow and flooding of the low lying backshore lands
all along the coast, resulting in considerable loss of life and property.
Kerala has taken up coastal protection works from the early sixties using
the design developed by U.S Corps of Engineers. Later, a new design
proposed by CWPRS, Pune was adopted. Latest design of seawall is from
IIT, Madras. As such, works such as construction of new sea-wall,
reformation of sea-wall and construction of gryones are being carried out
to protect the coastal area from erosion and to protect the life and
property of people. Coastal protection using modern technologies like
geo- textiles polyethylene fabrics/sheets and nourishment of for share with
biometrical reformation of existing structures are included in this Scheme
Inland Water Ways
The state of Kerala, with numerous backwaters, is one of the States in
India, where waterways can be successfully used for commercial Inland
water transport. Inland Navigation was the principal mode of
transportation in the region till the middle of twentieth century. With the
modern fast moving road and rail transportation system the navigation
route and Canal system remained ignored for the past fifty years.
Performance Budget 2017-18 13 Water Resources Department
Government of Kerala has undertaken the improvements of West -
Coast Canal to make it fully navigable as per State Waterway standards.
West Cost canal connect Neeleswaram in the north to Kovalam in the
south, and is about 590 km, which included 328 KM of national water
way III. Director, INDT, Kollam. functioning under CE I &A in charge of
the inland water transport works, it mainly aims to renovate the existing
canals and construct new canals wherever no waterway exists, renovation
/ re construct structures to make water way navigable. Once the entire
length becomes navigable, it has to be converted in to National waterway
standards, by providing all infrastructural facilities, such as terminals, boat
jetties, navigational aid, warehouses etc.
Salt Exclusion works
One of the important problems faced by the State is salinity
intrusion. Lowering of the river beds due to unchecked sand mining has
accelerated this problem. Now, salinity is being experienced up to 30Km
into the upstream length of rivers from the sea mouth. Department has
started addressing this problem by the construction of regulators to check
salinity intrusion. This problem is a threat to many drinking water schemes
and irrigation schemes in the State.
Interstate water sharing
Kerala has 3 East flowing rivers that originate from the State and
flow through the neighbouring States. We also share water from Irrigation
projects with neighbouring states. An Interstate wing functions in the
Irrigation Design & Research Board, Thiruvananthapuram. The Chief
Engineer, ISW is in charge of this Interstate wing of IDRB. Under the
Chief Engineer, Joint Director ( Dam Safety and ISW ) with two Deputy
Directors and six Asst. Directors deals with all works related to Interstate
waters. There are disputes which are under the consideration of the
courts. These are continuously monitored and acted upon by the
Department to protect the interests of the State.
The Inter State Water Wing deals with the Interstate water sharing
aspects / cases in various courts and all other allied matters of
Parambikulam Aliyar Project System (a group of 9 dams and 2 weirs);
Performance Budget 2017-18 14 Water Resources Department
Mullaperiyar Dam; Pamba Achenkovil Vaippar link project; Siruvani
Drinking Water Supply project; Walayar Irrigation Project; Kanyamadagu
Dam; Chittar Pattanamkal project ;Neyyar Irrigation Project ; Cauvery
Water Dispute and Unauthorized diversion of the state water resources by
other states.
Specialised Training Programme for officers
The Department is imparting training for the technical personnel in
planning and monitoring, preparation of designs and execution, in
institutions like IITs, Management Institutions. In addition to technical
personnel, training to other officers under Administrative, Finance wing
etc. are also being imparted. Induction Training to newly recruited AEÂs,
OverseersÂs and Clerk are being imparted regularly.
Modernization of e-Governance of offices under Irrigation Department
The main focus is primarily on exploiting all the facets of
information and communication technology to enhance the transparency,
efficiency, effectiveness and promptness in service delivery to citizens
thereby simplifying and improving all aspects of governance in the
Department. Also as part of capacity /buildings/training was given to the
Department officials on Quantum GIS using in house trainers.
Performance Budget 2017-18 15 Water Resources Department
Chapter-II
FINANCIAL OUTLAYS AND QUANTIFIABLE DELIVERABLES
This chapter contains a tabular format which is visualized as vertical
compression and horizontal expansion of Statement of budget estimates.
The objective is to establish a one to one correspondence between
financial budget 2017-18 and outcome of budget 2017-18.
The Irrigation Department has implemented a good number of
schemes under major and medium irrigation. The present strategy adopted
is to focus operation and maintenance of already existing major and
medium irrigation systems along with focus in developing various minor
irrigation system.
The Budget allocation with regard to Plan and Non-Plan is given below.
Budget Allocation 2017-18
(Amount in crores)
Prevention of Salinity ingress has always been a major issue being
addressed by the Department. During 2016-17, various schemes to
prevent salinity ingress have been implemented. Some of the major works
PLAN, 438.3
Non Plan, 451.4
PLAN
Non Plan
Performance Budget 2017-18 16 Water Resources Department
include repairs of shutters of Thaneermukkom barrage, construction of
Kattampally regulator.
Various flood control works including maintenance and protection of river
banks have been carried out. Protection of Coastal areas from erosion and
tidal attacks is another challenge faced by the Department. Works
including construction of new sea-wall, reformation of existing sea-wall
have been completed.
Under Minor Irrigation, various check dams aimed in improving
water availability in rivers during lean season and to recharge ground water
have been constructed. Construction of Minor Irrigation structures were
also initiated under MIRPA(Malabar Irrigation and Rehabilitation Works
under Inland Navigation aims to carry out maintenance and protection of
Inland water ways so as to make the waterways navigable. As such,
different works under Inland Navigation have been completed. Main
highlight of the Department is the introduction of SMS Alert system.
Initially, a pilot project has been carried out in PVIP (Periyar Valley
Irrigation Project). This system will enable the water users to receive the
pattern of water distribution in canals.
In addition to the above, works under Minor and Major Irrigation
have been completed under the grants of Thirteenth Finance Commission
and assistance from NABARD.
Performance Budget 2017-18 17 Water Resources Department
Sl.N
oN
ame
of th
e
Sch
eme/
Pro
gram
me
Obj
ectiv
e/O
utco
me
Del
iver
able
s /P
hysi
cal o
utpu
tsP
roje
cted
Out
com
esP
roce
sses
/
Tim
elin
es
Rem
arks
/Ris
k fa
ctor
12
35
89
10
Non
Pla
nBud
get
(lakh
s)
Pla
n B
udge
t
(lakh
s)
Com
plem
e
ntar
y E
xtra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nc
e if
any
Phy
sica
l F
inan
cial
P
hysi
cal
Fin
anci
al
1C
oast
al Z
one
Man
agem
ent
To
prot
ect t
he s
ea c
oast
from
ero
sion
by c
onst
ruct
ion
of n
ew s
eaw
alls
/gro
ynes
and
mai
nten
ance
of e
xist
ing
seaw
alls
/gro
ynes
and
util
ize
mor
dern
tech
nolo
gies
like
geot
extil
es,p
olye
thyl
ene
fabr
ics
for
coas
tal p
rote
ctio
n.
42 C
onst
ruct
ion
of 1
50M
leng
th o
f new
sea
wal
l and
reno
vatio
n of
771
m o
f sea
wal
l has
bee
n co
mpl
eted
in
vario
us d
istr
icts
.
100%
100%
100%
2279
.06
Con
stru
ctio
n of
sea
wal
l red
uced
the
coas
tal e
rosi
on d
urin
g
Mon
soon
and
oth
er r
ainy
sea
son.
1yea
r
2S
peci
alis
ed
Tra
inin
g
Pro
gram
me
To
impa
rt tr
aini
ng
to th
e te
chni
cal a
nd
non-
tech
nica
l per
sonn
el o
f th
e
depa
rtm
ent a
bout
the
mor
dern
tech
nolo
gies
in th
e re
leva
nt fi
eld
incl
udin
g co
mpu
ter
appl
icat
ions
4510
51
offic
ers
wer
e
trai
ned
unde
r th
is p
rogr
am
8
00.0
0 0
1051
29.4
4T
rain
ing
wou
ld e
quip
the
offic
ers
to u
se m
oder
n te
chno
logy
in
form
ulat
ing
sche
mes
and
fam
iliar
ise
the
offic
ers
in th
e us
e
of d
esig
n to
ols
in v
ogue
. Bet
ter
man
agem
ent o
f ava
ilabl
e
reso
urce
s th
roug
h ef
ficie
nt
man
agem
ent p
ract
ices
is a
lso
expe
cted
. Rep
orts
giv
en b
y
offic
ers
part
icip
atin
g in
trai
ning
prog
ram
mes
are
use
d to
des
ign
futu
re tr
aini
ng p
rogr
amm
es.
1yea
rM
ost o
f the
trai
ning
s
wer
e co
nduc
ted
at
Gov
ernm
ent I
nstit
utio
n
like
IMG
,CW
RD
M e
tc
and
in o
utsi
de s
tate
inst
itutio
n lik
e
NW
A,C
BIP
,CW
C
etc,
whe
re c
ours
e fe
e is
not n
eede
d.
AN
NE
XU
RE
I
F
OR
MA
T O
F T
AB
LE
S IN
CH
AP
TE
R 2
OF
PE
RF
OR
MA
NC
E B
UD
GE
T 2
017-
18
PL
AN
/ M
AJO
R S
CH
EM
ES
(S
chem
es in
PL
AN
WR
ITE
-U
P)
Nam
e o
f D
epar
tmen
t -
Irri
gat
ion
,CE
I&A
R
up
ees
in L
akh
s
Tar
get F
ixed
Tar
get a
chie
ved
67
Out
lay
2017
-18
4
MA
JOR
/ME
DIU
M IR
RIG
AT
ION
SC
HE
ME
S
Per
form
ance
Bud
get 2
017-
1818
Wat
er R
esou
rces
Dep
artm
ent
12
35
89
106
74
3M
oder
nisa
tion
and
e-go
vern
ance
To
impl
emen
t e-G
OV
ER
NA
NC
E in
Irrig
atio
n ep
artm
ent
93 Im
prov
ed th
e se
rvic
e
deliv
ery
by s
trea
mlin
ing
the
proc
esse
s th
roug
h IT
prac
tices
and
im
part
ed
QG
IS tr
aini
ng to
the
depa
rtm
ent o
ffici
als.
1967
Offi
cers
wer
e tr
aine
d un
der
QG
IS p
rogr
amm
e us
ing
in
hous
e tr
aine
rs.
100%
100%
40%
33.3
4E
-ten
derin
g sy
stem
sim
plifi
ed th
e
tend
erin
g pr
oces
s .
PR
ICE
softw
are
sim
plifi
ed th
e pr
oces
ses
behi
nd A
S/T
S s
anct
ioni
ng.Q
GIS
trai
ning
hel
ped
the
offic
ials
in
prep
arin
g m
aste
rpla
n of
HK
proj
ects
.The
y co
uld
mak
e us
e of
GIS
pla
tform
for
an e
ffici
ent
plan
ning
.
1 ye
ar
1M
I CLA
SS
IM
inor
wor
ks li
lke
impr
ovem
ents
to ta
nks
and
rivul
ets,
con
stru
ctio
n of
che
ck
dam
s, s
luic
e , r
egul
ator
s,
bund
s,V
CB
,SW
B, l
ay o
ut o
f cha
nnel
s
and
drai
nage
str
uctu
res
etc
that
ser
ve
an a
rea
mor
e th
an 5
0 ha
up
to 2
000
ha
1900
AS
issu
ed fo
r an
am
ount
of
Rs
277
5/-
lakh
for
the
wor
k
"Con
stru
ctio
n of
Reg
ulat
or
at B
avik
kara
".S
teps
are
bein
g ta
ken
to im
plem
ent
the
wor
k
100%
100%
39%
735.
881
year
The
wor
ks a
re in
var
ious
stag
es o
f exe
cutio
n
2M
I Cla
ss I
Sch
emes
und
er
Har
itha
Ker
alam
4702
-00-
101-
66
To
cons
truc
t new
wat
er
reta
inin
g/co
nser
vtio
n st
ruct
ures
500
AS
for
an a
mou
nt o
f
Rs7
46.8
5/-
lakh
(8 w
orks
)
.Wor
ks a
re in
var
ious
stag
es o
f exe
cutio
n.
100%
100%
0%0.
001
year
New
hea
d al
lotte
d
durin
g 20
17-1
8.T
he
wor
ks a
re in
var
ious
stag
es o
f exe
cutio
n
Cre
atin
g ne
w a
yacu
t of a
bout
1086
ha
and
cons
erva
tion
of
wat
er b
y co
nstr
uctin
g ch
eck
dam
s,V
CB
,SW
EC
B a
nd
impr
ovin
g irr
igat
ion
faci
litie
s to
diffe
rent
pad
asek
hara
ms
MIN
OR
IRR
IGA
TIO
N S
CH
EM
ES
Per
form
ance
Bud
get 2
017-
1819
Wat
er R
esou
rces
Dep
artm
ent
12
35
89
106
74
3M
I CLA
SS
IIM
inor
Irrig
atio
n w
orks
whi
ch c
an s
erve
belo
w 5
0 ha
com
e un
der
the
sche
me.
1700
Out
of 4
0 w
orks
, 15
wor
ks
near
ing
com
plei
on.O
ther
s
are
in v
ario
us s
tage
s of
exec
utio
n
100%
100%
83%
1415
.47
1 ye
ar
4M
I Cla
ss II
Sch
emes
und
er
Har
itha
Ker
alam
4702
-00-
101-
65
It is
inte
nded
to
have
an
inte
grat
ed
wat
ersh
ed a
ppro
ach
to e
nhan
ce w
ater
avai
labi
lity
of b
oth
surf
ace
and
grou
nd
wat
er.
500
AS
issu
ed fo
r 9
wor
ks
(Rs.
484.
60/-
Lak
hs)
from
this
offi
ce a
nd th
e w
orks
are
in v
ario
us s
tage
s of
exec
utio
n
100%
100%
0%0.
001
year
New
hea
d al
lotte
d
durin
g 20
17-1
8.T
he
wor
ks a
re in
var
ious
stag
es o
f exe
cutio
n
5M
I CLA
SS
I
NA
BA
RD
NA
BA
RD
has
bee
n pr
ovid
ing
loan
assi
stan
ce fo
r M
inor
Irrig
atio
n w
orks
unde
r R
ural
Infr
astr
uctu
re D
evel
opm
ent
Fun
d (R
IDF
). T
he m
inor
irrig
atio
n w
orks
assi
sted
by
NA
BA
RD
incl
ude
cons
truc
tion
of R
CB
s, S
WE
CB
s, p
onds
,
VC
Bs,
che
ck d
ams,
sto
rage
wei
rs, c
ross
bars
, and
pro
tect
ion
wor
ks e
tc. T
he
assi
stan
ce o
f NA
BA
RD
is b
y w
ay o
f
reim
burs
emen
t.
1000
0A
S fo
r an
am
ount
of
Rs.
6541
/- l
akh
issu
ed .a
nd
are
in v
ariu
os s
tage
s of
exec
utio
n
100%
100%
78%
7803
.30
1 ye
arT
he w
orks
are
in v
ario
us
stag
es o
f exe
cutio
n
6Li
ft Ir
rigat
ion
Wor
ks in
volv
ing
liftin
g of
wat
er b
y
mec
hani
cal m
eans
with
a c
omm
and
area
not
less
than
40
hect
ares
com
e
unde
r th
is c
ateg
ory
500
Dur
ing
2017
-18
AS
issu
ed
for
an a
mou
nt o
f Rs
750L
akhs
for
5wor
ks (
LI
Sch
emes
in v
ario
us
dist
ricts
).S
teps
are
bei
ng
take
n to
exe
cute
the
wor
k
100%
100%
52%
259.
55B
y im
plem
enta
tion
of th
e sc
hem
e
an a
yacu
t of a
bout
719
ha c
an b
e
crea
ted.
1 ye
arT
he w
orks
are
in v
ario
us
stag
es o
f exe
cutio
n
Cre
atin
g ne
w a
yacu
t of a
bout
516
ha a
nd c
onse
rvat
ion
of w
ater
by c
onst
ruct
ing
chec
k
dam
s,V
CB
,SW
EC
B a
nd
reno
vatin
g po
nds
in r
ain
shad
ow
area
s in
Chi
ttur,
Kol
lenk
ode
bloc
k
and
in T
hala
ppal
ly T
halu
k
Per
form
ance
Bud
get 2
017-
1820
Wat
er R
esou
rces
Dep
artm
ent
12
35
89
106
74
7R
ehab
ilita
tion
of
LI S
chem
e
The
mai
n w
orks
to b
e ca
rrie
d ou
t und
er
the
sche
me
are
repa
irs/r
epla
cem
ent o
f
pum
ps,e
lect
rical
inst
alla
tion,
repa
irs to
pum
p ho
uses
,pip
e sy
stem
and
all
the
mai
nten
ance
of f
ixtu
res
for
upke
epin
g of
LI S
chem
e.
700
Out
of 5
0 W
OR
KS
3 w
orks
com
plet
ed a
nd o
ther
wor
ks
are
in v
ario
us s
tage
s of
exec
utio
n
100%
100%
730.
66S
tabi
lizat
ion
of e
xist
ing
ayac
ut o
f
abou
t 200
0 ha
can
be
achi
eved
1 ye
arT
he w
orks
are
in v
ario
us
stag
es o
f exe
cutio
n
8M
I PR
OJE
CT
S IN
CA
UV
ER
Y B
AS
IN
Rev
ival
of r
iver
s th
roug
h co
nstr
uctio
n of
chec
k da
ms
and
othe
r m
easu
res
is a
prio
rity
area
. A
num
ber
of s
mal
l
stre
ams
are
map
ped
in th
e hi
ll ar
eas
for
deve
lopm
ent.
The
topo
grap
hy o
f
way
anad
is s
uita
ble
for
min
or ir
rigat
ion
proj
ects
whi
ch c
an s
usta
in g
roun
d w
ater
rech
arge
, drin
king
wat
er s
uppl
y an
d
irrig
atio
n fa
cilit
ies.
2200
Dur
ing
2017
-18,
AS
for
an
amou
nt o
f Rs.
396
Lakh
s
issu
ed fo
r 6
wor
ks in
Pam
bar
subd
ivis
ion.
The
wor
ks a
re o
n th
e st
ages
of
exec
utio
n.
100%
100%
13%
287.
411
year
The
wor
ks a
re in
var
ious
stag
es o
f exe
cutio
n
9P
radh
an M
anth
ri
Kris
hi S
inch
ayee
Yoj
ana
To
achi
eve
con
verg
ence
of
inve
stm
ents
in ir
rigat
ion
at th
e fie
ld le
vel
by a
mal
gam
atin
g di
ffere
nt s
chem
es
rela
ted
to ir
rigat
ion,
agr
icul
ture
, soi
l
cons
erva
tion,
gro
und
wat
er
deve
lopm
ent a
nd r
ural
dev
elpm
ent.
2400
"Ren
ovat
ion
and
rest
orat
ion
of
Poo
mal
a M
inor
irrig
atio
n
Pro
ject
in T
hris
sur
Dis
t"am
ount
ing
to R
s.2.
46 C
r
was
app
rove
d by
CW
C a
nd
appr
oval
was
obt
aine
d fr
om
the
Inte
r de
part
men
tal w
orki
ng
Gro
up fo
r an
am
out o
f Rs.
2.25
cror
es.N
ow a
ppro
val o
f SLS
C
is r
equi
red
for
cent
ral r
elea
se
and
the
proc
ess
is u
nder
prog
ress
100%
100%
0.00
0.00
Impl
emen
tatio
n of
the
proj
ect w
ill
enha
nce
agr
icul
ture
prod
utio
n,Im
prov
e th
e ca
tchm
ent
area
of t
he P
oom
ala
Res
ervo
ir,in
crea
se
the
ava
ilabi
lityo
f drin
king
wat
er
and
deve
lop
tour
ism
and
cul
tura
l
activ
ities
.
1 ye
arF
or o
btai
ning
cen
tral
assi
stan
ce u
nder
PM
KS
Y g
uide
lines
issu
ed b
y M
oWR
to b
e
follo
wed
and
app
rova
l
from
com
mitt
ees
cons
titut
ed a
t diff
eren
t
leve
ls. A
s it
is d
iffic
ult t
o
achi
eve
the
guid
elin
es
due
to th
e pe
culia
r
geog
raph
ical
con
ditio
ns
of th
e st
ate.
The
fact
has
been
rep
orte
d to
GoK
and
req
uest
ed to
appr
aise
Gov
t.of I
ndia
to
Per
form
ance
Bud
get 2
017-
1821
Wat
er R
esou
rces
Dep
artm
ent
12
35
89
106
74
10B
hava
ni B
asin
-
4702
-00-
101-
71
For
the
cons
truc
tion
of p
onds
,sm
all
wat
er s
tora
ge s
truc
ture
s co
verin
g
chec
kdam
s an
d lif
t irr
igat
ion
sche
Mes
bene
fittin
g th
e tr
ibal
are
as
500
In 2
017-
18 a
dmin
istr
ativ
e
sanc
tion
issu
ed fo
r an
amou
nt R
s .6
93/-
Lak
hs fo
r
3 w
orks
. .
100%
100%
0.00
0.00
The
pro
ject
env
isag
ed to
enha
nce
the
gro
und
wat
er
rech
arge
,drin
king
wat
er s
uppl
y
and
irrig
atio
n fa
cilit
ies
in
Atta
ppad
y di
stric
t.Cre
ate
an
ayac
ut o
f 200
ha
in A
ttapp
ady
area
1 ye
arT
he w
orks
are
in v
ario
us
stag
es o
f exe
cutio
n
11R
enov
atio
n of
Tan
ks &
Pon
ds
4702
-00-
101-
64
300
In 2
017-
18 a
dmin
istr
ativ
e
sanc
tion
issu
ed fo
r an
amou
nt R
s .8
5.77
/- L
akhs
for
2 w
orks
. .
100%
100%
0.00
0.00
1 ye
arN
ew h
ead
allo
tted
in
2017
-18.
The
wor
ks a
re
in v
ario
us s
tage
s of
exec
utio
n
12R
enov
atio
n of
Tan
ks &
Pon
ds
Sch
emes
und
er
Har
itha
Ker
alam
4702
-00-
101-
63
500
In 2
017-
18 a
dmin
istr
ativ
e
sanc
tion
issu
ed fo
r an
amou
nt R
s .9
80.0
8/-
Lakh
s
.Out
of 5
29 w
orks
, 2
70
wor
ks a
re c
ompl
eted
,Oth
ers
are
at v
ario
us
stag
es o
f exe
cutio
n.A
S fo
r
an a
mou
nt o
f Rs.
980.
08/-
100%
100%
0.00
0.00
1 ye
arN
ew h
ead
allo
tted
in
2017
-18.
The
wor
ks a
re
in v
ario
us s
tage
s of
exec
utio
n
To
unde
rtak
e re
nova
tion
and
reva
mpi
ng
of m
ajor
exi
stin
g pu
blic
/com
mun
ity p
ond
in th
e st
ate
river
bas
in w
ise
.M
ain
activ
ities
pro
pose
d ar
e re
nova
tion
of
pond
s an
d lin
king
of p
onds
with
irrig
atio
n ca
nals
Pon
ds a
re th
e m
ain
sour
ce o
f
irrig
atio
n in
sev
eral
par
ts o
f the
stat
e.T
he r
eviv
al ,c
onse
rvat
ion
and
upgr
adat
ion
of th
ese
trad
ition
al w
ater
sou
rces
will
hel
p
to a
ttain
sel
f suf
ficie
ncy
in fo
od
secu
rity,
augm
enta
tion
of fo
od
prod
uctio
n,w
ater
con
serv
atio
n by
desi
lting
and
rem
ovin
g ve
gita
tion
etc.
Per
form
ance
Bud
get 2
017-
1822
Wat
er R
esou
rces
Dep
artm
ent
12
35
89
106
74
1In
land
Wat
er
Tra
nspo
rtS
tate
sect
or s
chem
e-
5075
-60-
800-
94
7000
100%
974.
2620
17-1
8D
ispo
sal o
f dre
dged
mat
eria
ls, l
and
acqu
isiti
on a
nd e
vict
ion
of e
ncro
ache
rs, d
elay
in
getti
ng d
esig
n an
d
timel
y sa
nctio
n of
proj
ects
, rev
ised
estim
ates
etc
. del
ayed
the
proj
ect.
2D
evel
opm
ent o
f
feed
er c
anal
IWT
5075
-60-
800-
86
5000
100%
95.3
7 P
ropo
sal f
rom
IWT
for
an a
mou
nt o
f R
s.21
25/-
lakh
has
bee
n
subm
itted
to G
ovt.
for
getti
ng A
dmin
istr
ativ
e
San
ctio
n,bu
t rej
ecte
d.
To
mak
e be
tter
use
of th
e w
ater
way
s in
the
Sta
te b
y m
akin
g th
em n
avig
able
to
carr
y pa
ssen
gers
and
car
go a
s an
alte
rnat
ive
to r
oad
tran
spor
t tak
ing
adva
ntag
e of
the
avai
labi
lity
of s
uch
wat
er w
ays
in th
e S
tate
. Als
o, It
is
prop
osed
to d
evel
op fe
eder
can
als
Dev
elop
men
t/ fo
rmat
ion
of
cana
l for
a le
ngth
of 5
3 km
at v
ario
us p
lace
s w
ere
to b
e
com
plet
ed th
roug
h th
ese
year
s. C
onst
ruct
ion
of 1
7
carg
o/ b
oat j
ettie
s,
deve
lopm
ent o
f fee
der
cana
l for
a le
ngth
of 4
.75
km, c
onst
ruct
ion
of 1
0 no
s
cros
s st
ruct
ures
acr
oss
Vad
akar
a- M
ahe
cana
l etc
wer
e ta
rget
ed in
this
per
iod.
17 n
os b
oat
jetti
es,
deve
lopm
ent
of c
anal
stre
tch
at
vario
us
plac
es a
long
stat
e
wat
erw
ay,
4.75
km
feed
er c
anal
,
4 no
s br
idge
s
and
6 no
s
stee
l foo
t
brid
ges
wer
e
targ
ette
d in
this
fina
cial
year
.
5 no
s of
boa
t
jetti
es in
Ala
ppuz
ha d
ist
has
been
com
plet
ed. 1
2
nos
boat
/car
go
jetty
has
bee
n
near
ing
com
plet
ion/
prog
ress
ing.
Abo
ut 2
4.50
km
of d
evel
opm
ent
of c
anal
str
etch
had
been
com
plet
ed
thro
ugh
thes
e
year
s.
Impr
ovem
ents
to fe
eder
can
al
for
a le
ngth
of
1.25
km
is
prog
ress
ing.
2
road
brid
ges
are
near
ing
com
plet
ion
and
6 st
eel f
oot
brid
ges
are
star
ted.
wat
erw
ays
prov
ide
an e
nerg
y
effic
ient
,acc
iden
t fre
e al
tern
ativ
e
to r
oad
tran
spor
t.Inl
and
wat
erw
ays
conn
ects
the
coas
tal
ship
ping
cha
nnel
s al
so fo
r
haza
rdou
s go
ods
Inla
nd
Tra
nsp
ort
wo
rks
Per
form
ance
Bud
get 2
017-
1823
Wat
er R
esou
rces
Dep
artm
ent
12
35
89
106
74
3In
vest
igat
ion
of
IWT
Sch
emes
3056
-00-
001-
96
For
taki
ng u
p fe
asib
ility
stu
dy ,P
lann
ing
and
desi
gn,P
repa
ratio
n of
DP
Rs
on
Inla
nd w
ater
way
s fo
r m
akin
g it
an
effe
ctiv
e an
d ef
ficie
nt tr
ansp
ort s
yste
m
and
prep
arat
ion
of d
atab
ase
for
feed
er
cana
ls
585
91 n
os o
f inv
estig
atio
n
wor
ks a
re c
ompl
eted
/
prog
ress
ing
at v
ario
us
stag
es.S
oil i
nves
tigat
ion
wor
ks fo
r th
e in
land
navi
gatio
n sc
hem
es h
as
been
targ
ette
d th
roug
h th
is
sche
me.
91 n
os o
f
inve
stig
atio
n
sche
mes
100%
AS
had
bee
n
acco
rded
for
91
nos
of
inve
stig
atio
n
wor
ks
0T
he s
chem
e en
visa
ges
prep
arat
ion
of c
ompr
ehen
sive
mas
ter
plan
of s
tate
wat
erw
ays
,thei
r cl
assi
ficat
ion
and
deve
lopm
ent i
n th
e 13
th p
lan
incl
udin
g po
tent
ial u
se o
f the
wat
erw
ays
for
carg
oes
and
traf
fic.
As
the
allo
tted
HoA
was
prev
ious
ly o
pera
ted
by
SW
TD
,thi
s de
part
men
t
coul
d no
t be
utili
se th
e
fund
till
Nov
201
7.A
fter
disc
ussi
on w
ith
secr
etar
y,W
R&
CS
IND
and
Fin
ance
dep
artm
ent
the
HO
A a
llotte
d to
this
depa
rtm
ent o
n
03.1
1.20
17
4In
land
Shi
ppin
g
Pro
mot
ion
Fun
d
3075
-60-
800-
87
The
sch
eme
inte
nds
to p
rovi
de
ince
ntiv
es to
attr
act s
hipp
ers
usin
g
inla
nd w
ater
way
s by
shift
ing/
div
ertin
g
tran
spor
tatio
n of
haz
ardo
us a
nd b
ulk
carg
oes
to IW
T m
ode
so a
s to
red
uce
cong
estio
n in
the
road
s an
d to
leve
rage
inve
stm
ent m
ade
by G
ovt.
of K
eral
a an
d
Gov
t. of
Indi
a in
the
Inla
nd W
ater
Way
s..
200
Dur
ing2
017-
18 a
n am
ount
of R
s. 4
0.80
/- L
akhs
is
incu
rred
as
expe
nditu
re fo
r
the
Qty
mov
emen
t of
1675
49 M
T o
f car
goes
.
100%
100%
19%
36.9
1pr
ovid
ing
oper
atio
nal
ince
ntiv
e/su
bsid
y @
Rs.
1/to
n/K
m fo
r C
argo
mov
emen
t
thro
ugh
Inla
nd W
ater
Way
s
enha
nced
the
carg
o m
ovem
ent
thro
ugh
Inla
nd w
ater
way
s
Car
go m
ovem
ent m
ainl
y
rest
ricte
d in
the
area
s of
FA
CT
in N
WW
III
Per
form
ance
Bud
get 2
017-
1824
Wat
er R
esou
rces
Dep
artm
ent
Chapter-III
REFORM MEASURES AND PERFORMANCES
1. E Governance Initiatives
E-tendering system simplified the tendering process and PRICE
software simplified the processes behind AS/TS sanctioning. The
HQ of CE I &A will be soon integrated with KSWAN and e Office
will be implemented. Department owns the official website in CMF
(Content Management Framework).
In order to have a centralized management of Departmental assets
proposal for e Asset Management System is prepared and under
processing of Government. Other projects like e-RTS , Project
Monitoring system, Transfer & Postings -Online are under pre
implementation stage.
2. Water conservation
Government of Kerala have declared specific measures to augment
water conservation through construction of check dams and
renovation of water bodies.
2.1 Construction of Check dams
The scheme envisages construction of check dams at indentified
locations in the rivers of Kerala. This would enable ground water
recharge and water availability in rivers during lean season. WorkÊs
are under different stages of execution.
2.2 One pond in One Panchayath
As many as 237 ponds have been renovated under this scheme
Ponds are essentially used by the public for domestic as well as
irrigation purposes. Women are direct beneficiaries of this scheme.
Performance Budget 2017-18 25 Water Resources Department
Chapter-IV
REVIEW OF PAST PERFORMANCE
This chapter indicates the performance of the Department during the
year 2016-17 in terms of targets already set. It reviews the scheme wise
past performance of various programmes and activities undertaken by the
Department. The details of which are also furnished in Annexure-II. The
main schemes implemented are as listed below:
1. Coastal Zone Management
2. Minor Irrigation schemes
3. Specialised Training Programme
4. Inland Water Transport
Coastal Zone Management,
The total outlay provided for the year 2015-16 was 35.lakh and for 2016-
17 was Rs.42.lakh. The expenditure for the year 2015-16 was 8.78 Cr.
and for the year 2016-17 was Rs.8.60 Cr. A graphical representation of
the same is detailed below
Comparison of Outlay and expenditure for 2015-16 & 2016-17 (in lakh)
Minor Irrigation Schemes
The total outlay provided for the year 2015-16 was 91.72 Cr and for
2016-17 was Rs.387.07 Cr. The total expenditure incurred was
Rs.207.62 Cr and 445.86 Cr. Timely completion of the major works and
35 42
878 860
0
100
200
300
400
500
600
700
800
900
1000
2015-16 2016-17
outlay
Expenditure
Performance Budget 2017-18 26 Water Resources Department
expenditure regarding spill-over works lead to increase in expenditure. A
graphical representation of the same is detailed below:
Comparison of Outlay and expenditure for 2015-16 & 2016-17
Specialised Training Programme
Almost 596 officers has been trained under this scheme in 2015-
16. Out of the total outlay of Rs.25 Lakh, an amount of Rs.5.79 Lakh
has been expended and an amount of 10.31 Lakh was expended for the
same outlay in 2016-17. Short-fall occurred as most of the trainings were
conducted at Government-aided institutions like IMG, CWRDM. As such,
costs of the trainings were minimum. Sometimes, there occurs delay in
obtaining sanctions from Government for trainings conducted outside the
State. This also reflects in overall financial performance. However,
considering the demand in improving technical competence, future
trainings will have to be imparted through State Govt/Central Govt
Institutes for which expenses will be higher. A graphical representation of
the same is detailed below:
91.72
387.07
207.62
446.86
0
50
100
150
200
250
300
350
400
450
500
2015-16 2016-17
outlay
Expenditure
Performance Budget 2017-18 27 Water Resources Department
Comparison of Outlay and expenditure for 2015-16 & 2016-17
Inland Water Transport
With regard to Inland Water Transport, the outlay for the year 2015-16
and 2016-17 was Rs.125.32 Cr and Rs.128.97 Cr. Out of the above; the
expenditure incurred is Rs.27.44 Cr and Rs.37.78 Cr. The short-fall is
due to non-completion of works in stipulated time because of problems
that arose at site such as eviction of families due to encroachment, local
protests and various court cases. A graphical representation of the same is
detailed below:
Comparison of Outlay and expenditure for 2015-16 & 2016-17
25 25
5.79
10.31
0
5
10
15
20
25
30
2015-16 2016-17
outlay
Expenditure
125.32 128.97
27.4437.78
0
20
40
60
80
100
120
140
2015-16 2016-17
outlay
Expenditure
Performance Budget 2017-18 28 Water Resources Department
Nam
e o
f D
epar
tmen
t -
Irri
gat
ion
,CE
I&A
in L
akhs
Sl.N
oN
ame
of
the
Sch
eme/
Pro
gra
mm
eO
bje
ctiv
e/O
utc
om
eB
ud
get
Ou
tlay
2016
-17
Exp
end
itu
re 2
016-
17D
eliv
erab
les
/Ph
ysic
al o
utp
uts
Ach
ieve
men
tR
easo
n f
or
vari
atio
n
12
34
56
78
1M
ajo
r &
Med
ium
Irri
gat
ion
-
Co
asta
l Zo
ne
Man
agem
ent
To
prot
ect t
he s
ea c
oast
from
ero
sion
by
cons
truc
tion
of n
ew s
eaw
alls
/gro
ynes
and
mai
nten
ance
of e
xist
ing
seaw
alls
/gro
ynes
and
utili
ze
mor
dern
tech
nolo
gies
like
geot
extil
es,p
olye
thyl
ene
fabr
ics
for
coas
tal
prot
ectio
n.
42.
00
860
.92
Con
stru
ctio
n of
119
0m le
ngth
of n
ew s
ea w
ll an
d re
nova
tion
of
675m
se
wal
l ha
ve b
een
com
plet
ed
Con
stru
ctio
n of
sea
wal
l red
uced
the
coa
stal
eros
ion
durin
g M
onso
on a
nd o
ther
rai
ny
seas
on.
2M
ajo
r &
Med
ium
Irri
gat
ion
-
Sp
ecia
lised
Tra
inin
g P
rog
ram
me
To
impa
rt tr
aini
ng
to th
e te
chni
cal a
nd n
on-
tech
nica
l per
sonn
el o
f th
e de
part
men
t abo
ut th
e
mor
dern
tech
nolo
gies
in th
e re
leva
nt fi
eld
incl
udin
g co
mpu
ter
appl
icat
ions
25.
00
1
0.32
57
5 of
ficer
s w
ere
tr
aine
d un
der
this
pro
gram
.T
rain
ing
wou
ld e
quip
the
offic
ers
to u
se
mod
ern
tech
nolo
gy in
form
ulat
ing
sche
mes
and
fam
iliar
ise
the
offic
ers
in th
e us
e of
des
ign
tool
s
in v
ogue
. Bet
ter
man
agem
ent o
f ava
ilabl
e
reso
urce
s th
roug
h ef
ficie
nt m
anag
emen
t
prac
tices
is a
lso
expe
cted
. Rep
orts
giv
en b
y
offic
ers
part
icip
atin
g in
trai
ning
pro
gram
mes
are
used
to d
esig
n fu
ture
trai
ning
pro
gram
mes
.
Mos
t of t
he tr
aini
ngs
wer
e
cond
ucte
d at
Gov
ernm
ent
Inst
itutio
n lik
e IM
G,C
WR
DM
etc
and
in o
utsi
de s
tate
inst
itutio
n lik
e
NIR
D,C
BIP
,CW
C e
tc,w
here
cour
se fe
e is
not
nee
ded.
3M
od
ern
isat
ion
an
d e
-
Go
vern
ance
.
To
impl
emen
t E-G
over
nanc
e ac
tiviti
es in
Irrig
atio
n D
epar
tmen
t
28.
00
9
8.06
M
oden
izat
ion
effe
cted
SD
impr
oved
thru
gh IT
pra
ctie
s.
E-t
ende
ring
syst
em s
impl
ified
the
tend
erin
g
proc
ess
and
with
the
intr
oduc
tion
of S
MS
ale
rt
syst
em p
rope
r w
arni
ng c
anbe
giv
en d
urin
g
disa
ster
, and
for
bette
r w
ater
dis
trib
utio
n.
PR
ICE
sof
twar
e si
mpl
ified
the
proc
esse
s
behi
nd A
S/T
S s
anct
ioni
ng.
e G
over
nanc
e pr
ojec
ts li
ke e
RT
I,
RT
S a
re u
nder
pre
impl
emen
tatio
n sa
tge
Sta
tem
ent
of
Ou
tlay
s/O
utc
om
es/T
arg
et 2
016-
17 a
nd
act
ual
ach
ieve
men
t in
201
6-17
P
LA
N /
MA
JOR
SC
HE
ME
S
AN
NE
XU
RE
-II
Per
form
ance
Bud
get 2
017-
1829
Wat
er R
esou
rces
Dep
artm
ent
12
34
56
78
4M
ajo
r &
Med
ium
Irri
gat
ion
-
Irri
gat
ion
Mu
zeu
m a
t
Th
od
up
uzh
a
To
crea
te a
war
enes
s am
ong
the
visi
tors
on
diffe
rent
agr
icul
tura
l pra
ctic
es h
ighl
ight
ing
the
iriga
tion
com
pone
nt ,n
eed
for
wat
er c
onse
rvat
ion
exhi
bitin
g th
e tr
aditi
onal
pra
ctic
es i
n irr
igat
ion
,farm
ing
and
wat
er o
nser
vatio
n al
ong
with
mor
dern
pra
ctic
es in
a s
cien
tific
way
.
50.
00
0.00
Will
favo
ur e
duca
tion
over
con
serv
atio
n an
d w
ill p
rovi
de e
xhib
its a
nd
prog
ram
s to
stim
ulat
e in
form
al le
arni
ng e
xper
ienc
es fo
r th
e vi
sito
rs
,par
ticul
arly
for
child
ren
It al
so e
xpec
ted
to im
part
kno
wle
dge
abou
t
vario
us ir
rigat
ion
prac
tices
that
wer
e ad
opte
d du
ring
pre-
hist
oric
times
to th
e pr
esen
t day
.
5M
ICL
AS
S I
Min
or w
orks
like
impr
ovem
ents
to ta
nks
and
rivul
ets,
con
stru
ctio
n of
che
ck d
ams,
slu
ices
,
bund
s, v
ente
d cr
oss
bars
, sal
t wat
er b
arrie
rs,
layo
ut o
f cha
nnel
s an
d dr
aina
ge s
truc
ture
s et
c.
that
ser
ve a
n ar
ea m
ore
than
50
ha a
nd u
p to
2000
ha
com
e un
der
this
cat
egor
y.
450.
00
72
0.46
AS
issu
ed fo
r an
am
ount
of R
s 3
90/-
lak
h
6M
I CL
AS
S II
Min
or Ir
rigat
ion
wor
ks w
hich
can
ser
ve b
elow
50
ha c
ome
unde
r th
e sc
hem
e.
800.
00
82
9.27
AS
issu
ed fo
r an
am
ount
of R
s 1
000/
- la
khfo
r T
hala
ppal
ly
Pac
kage
sch
eme
7M
I CL
AS
S I
NA
BA
RD
NA
BA
RD
has
bee
n pr
ovid
ing
loan
ass
ista
nce
for
Min
or Ir
rigat
ion
wor
ks u
nder
Rur
al In
fras
truc
ture
Dev
elop
men
t Fun
d (R
IDF
). T
he m
inor
irrig
atio
n
wor
ks a
ssis
ted
by N
AB
AR
D in
clud
e co
nstr
uctio
n
of R
CB
s, S
WE
CB
s, p
onds
, VC
Bs,
che
ck d
ams,
stor
age
wei
rs, c
ross
bar
s, a
nd p
rote
ctio
n w
orks
etc.
The
ass
ista
nce
of N
AB
AR
D is
by
way
of
reim
burs
emen
t.
5,00
0.00
15
047.
42A
S is
sued
for
an a
mou
nt o
f Rs
275
0/-
lakh
for
the
cons
truc
tion
of 2
VC
Bs
in K
asar
gode
dis
t and
RC
B in
Way
anad
Dis
t
Impr
oved
the
agric
ultu
re p
rodu
ctio
n,G
roun
d
wat
er r
echa
rgee
tc a
chie
ved.
With
the
cons
truc
tion
of r
egul
ator
s sa
lt w
ater
ingr
essi
on
has
been
pre
vent
ed f
rom
the
agric
ultu
re
area
.Drin
king
wat
er s
ourc
es a
re p
rote
cted
and
addi
tiona
l sto
rage
of w
ater
is a
chie
ved
with
the
cons
truc
tion
of c
heck
dam
s an
d
regu
lato
rs.G
roun
d w
ater
rec
harg
e is
als
o
impr
oved
.
8L
I SC
HE
ME
Wor
ks in
volv
ing
liftin
g of
wat
er b
y m
echa
nica
l
mea
ns w
ith a
com
man
d ar
ea n
ot le
ss th
an 4
0
hect
ares
com
e un
der
this
cat
egor
y
40.0
0
135.
52
9R
EH
AB
ILIT
AT
ION
OF
LI S
CH
EM
ET
he m
ain
wor
ks to
be
carr
ied
out u
nder
the
sche
me
are
repa
irs/r
epla
cem
ent o
f
pum
ps,e
lect
rical
inst
alla
tion,
repa
irs to
pum
p
hous
es ,p
ipe
syst
em a
nd a
ll th
e m
aint
enan
ce o
f
fixtu
res
for
upke
epin
g of
LI S
chem
e,
572.
00
10
1.08
AS
issu
ed fo
r an
am
ount
of R
s 8
17/-
lak
h
Gov
ernm
ent h
ave
dire
cted
to fi
nalis
e th
e ar
chite
ctur
al d
esig
n an
d pr
epar
e D
PR
usin
g th
e al
loca
tion
of R
s. 5
0 la
kh v
ide
GO
(Rt)
No.
456
/201
5/W
RD
dat
ed,
09.0
6.20
15 .D
raft
bid
docu
men
t for
invi
ting
Exp
ress
ion
of In
tere
st (
EO
I) fr
om
arch
itect
s su
bmitt
ed to
Gov
ernm
ent f
or a
ppro
val.
MIN
OR
IRR
IGA
TIO
N S
CH
EM
ES
Impl
emen
tatio
n of
the
the
enha
ced
the
agric
ultu
re p
rodu
ctio
n in
impr
oved
aya
cut
area
.Impr
oved
Irrig
atio
n fa
cilit
ies,
Con
serv
atio
n
of w
ater
, st
abili
zatio
n of
of t
he a
rea
etc.
achi
eved
Ach
ieve
d im
prov
emet
in a
gric
ultu
re
prod
uctio
n,irr
igat
ion
in h
igh
altit
ude
terr
ains
etc
Per
form
ance
Bud
get 2
017-
1830
Wat
er R
esou
rces
Dep
artm
ent
12
34
56
78
10M
I PR
OJE
CT
S IN
CA
UV
ER
Y
BA
SIN
Rev
ival
of r
iver
s th
roug
h co
nstr
uctio
n of
che
ck
dam
s an
d ot
her
mea
sure
s is
a p
riorit
y ar
ea.
A
num
ber
of s
mal
l str
eam
s ar
e m
appe
d in
the
hill
area
s fo
r de
velo
pmen
t. T
he to
pogr
aphy
of
way
anad
is s
uita
ble
for
min
or ir
rigat
ion
proj
ects
whi
ch c
an s
usta
in g
roun
d w
ater
rec
harg
e,
drin
king
wat
er s
uppl
y an
d irr
igat
ion
faci
litie
s.
2,20
0.00
22
.09
AS
issu
ed fo
r an
am
ount
of R
s 3
526/
- la
khfo
r M
I Pro
ject
s in
Kab
ani B
asin
Impl
emen
tatio
n of
the
proj
ect a
ims
to u
tiliz
e th
e
awar
ded
quan
tity
(30
TM
C)
of w
ater
by
Cau
very
Trib
unal
Pra
dh
an M
anth
ri K
rish
i
Sin
chay
ee Y
oja
na
To
achi
eve
con
verg
ence
of i
nves
tmen
ts in
irrig
atio
n at
the
field
leve
l by
amal
gam
atin
g
diffe
rent
sch
emes
rel
ated
to ir
rigat
ion,
agric
ultu
re, s
oil c
onse
rvat
ion,
gro
und
wat
er
deve
lopm
ent a
nd r
ural
dev
elpm
ent.
2400
0N
o s
anct
ion
wer
e re
ceiv
ed f
or
the
wo
rks
sub
mit
ted
Impl
emen
tatio
n of
the
proj
ect w
ill e
nhan
ce
agric
ultu
re p
rodu
tion,
Impr
ove
the
catc
hmen
t
area
of t
he P
oom
ala
Res
ervo
ir,in
crea
se
the
ava
ilabi
lityo
f drin
king
wat
er a
nd d
evel
op
tour
ism
and
cul
tura
l act
iviti
es.
For
obt
aini
ng c
entr
al a
ssis
tanc
e
unde
r P
MK
SY
gui
delin
es is
sued
by M
oWR
to b
e fo
llow
ed a
nd
appr
oval
from
com
mitt
ees
cons
titur
=te
d at
diff
eren
t lev
els.
As
it is
diff
icul
t to
achi
eve
the
guid
elin
es d
ue to
the
pecu
liar
geog
raph
ical
con
ditio
ns o
f the
stat
e. T
he fa
ct h
as b
een
repo
rted
to G
oK a
nd r
eque
sted
to
appr
aise
gov
t.of I
ndia
to m
odify
the
norm
s,an
d to
cla
ssify
the
stat
e as
spe
cial
cat
egor
y.
11In
lan
d W
ater
Tra
nsp
ort
7,03
2.00
1,
098.
89
La
nd a
cqui
sitio
n an
d ev
ictio
n o
f
fam
ilies
,tim
ely
sanc
tion
of
proj
ects
,rev
ised
est
imat
es e
tc.
12D
evel
opm
ent o
f fee
der
cana
l
IWT
50
75-6
0-80
0-86
5,00
0.00
63
4.11
S
anct
ion
coul
d no
t be
mad
e to
the
prop
osal
s of
impr
ovem
ents
to
feed
er c
anal
s un
der
this
hea
d
13In
land
Shi
ppin
g P
rom
otio
n F
und
3075
-60-
800-
87
For
the
deve
lopm
ent o
f
v
ario
us
stre
tche
s of
Inla
nd w
ater
way
s
500.
00
64.
52 D
urin
g th
e ye
ar 2
016-
17 a
n am
ount
of R
s. 6
4518
09/-
is in
curr
ed a
s
expe
nditu
re fo
r qu
antit
y of
409
771
MT
prov
idin
g op
erat
iona
l inc
entiv
e/su
bsid
y @
Rs.
1/to
n/K
m fo
r C
argo
mov
emen
t thr
ough
Inla
nd
Wat
er W
ays
enha
nced
the
carg
o m
ovem
ent
thro
ugh
Inla
nd w
ater
way
s
Inla
nd
Wat
erT
ran
spo
rt W
ork
s
Con
stru
ctio
n of
7 N
os o
f boa
t jet
ties,
renn
ovat
ion
of 4
nos
can
al
reac
hes,
cons
truc
tion
of 6
nos
Can
al c
ross
str
uctu
res
, are
prop
osed
. By
carr
ying
out
thes
e w
orks
,9.9
2Km
of c
anal
bec
omes
navi
gabl
e an
d al
lied
infr
astr
uctu
re c
an b
e de
velo
ped
for
prom
otin
g
the
navi
gatio
n an
d to
uris
m.
wat
erw
ays
prov
ide
an e
nerg
y ef
ficie
nt
,acc
iden
t fre
e al
tern
ativ
e to
roa
d
tran
spor
t.Inl
and
wat
erw
ays
conn
ects
the
coas
tal s
hipp
ing
chan
nels
als
o fo
r ha
zard
ous
good
s
To
mak
e be
tter
use
of th
e w
ater
way
s in
the
Sta
te
by m
akin
g th
em n
avig
able
to c
arry
pas
seng
ers
and
carg
o as
an
alte
rnat
ive
to r
oad
tran
spor
t
taki
ng a
dvan
tage
of t
he a
vaila
bilit
y of
suc
h w
ater
way
s in
the
Sta
te.
Per
form
ance
Bud
get 2
017-
1831
Wat
er R
esou
rces
Dep
artm
ent
CHAPTER –V
FINANCIAL REVIEW
This Chapter contains a financial review covering overall trends in
expenditure viz-a-Viz budget estimate/revised estimate in recent years,
which is detailed in Annexure-III
Performance Budget 2017-18 32 Water Resources Department
[A]
PLA
N S
CH
EM
ES
Na
me
of
De
pa
rtm
en
t -
Irri
ga
tio
n ,
CE
I&
A
No
.S
che
me
/Pro
gra
mm
eM
ajo
r
He
ad
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
1M
ed
ium
Irr
iga
tio
n-P
lan
2701
53
.00
53
.00
13
8.0
0
57
.00
54
.20
14
7.4
1
16
.77
11
.29
62
.78
2
Flo
od
Co
ntr
ol
an
d D
rain
ag
e-
Ca
pit
al
Ou
tla
y -
Pla
n4711
35
.00
42
.00
42
.00
42
.40
46
.55
89
.39
24
33
84
,66
2.4
9
2,0
27
.24
3
Me
diu
m I
rrig
ati
on
-Ca
pit
al
Ou
tla
y-P
lan
4701
50
.00
50
.00
NIL
52
.00
57
.6N
IL0
-
-
4M
ino
r Ir
rig
ati
on
-Pla
n2702
10
0.0
0
11
0.0
0
37
0.0
0
10
0.0
0
11
6.2
54
2.9
81
66
.76
74
.31
17
7.9
0
5
Min
or
Irri
ga
tio
n-C
ap
ita
l
Ou
tla
y -
Pla
n4702
3,0
40
.00
9,0
62
.00
24
,80
0.0
0
3,2
40
.00
91
02
.50
27
20
0.0
01
10
68
.12
18
,21
5.6
6
17
,35
5.8
7
6
Inla
nd
Na
vig
ati
on
-Ca
pit
al
Ou
tla
y -
Pla
n5075
8,5
82
.00
12
,71
4.0
0
12
,78
5.0
0
8,6
06
.00
12
91
2.0
01
31
20
.00
30
37
.64
2,0
46
.27
1,1
42
.80
To
tal
11
,86
0.0
22
,03
1.0
38
,13
5.0
12
,09
7.4
22
,28
9.0
0
41
,59
9.7
8
38
62
7.2
92
5,0
10
.02
20
,76
6.5
9
Bu
dg
et
Est
ima
teR
ev
ise
d E
stim
ate
Act
ua
l E
xp
en
dit
ure
AN
NE
XU
RE
III
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
tes/
Re
vis
ed
Est
ima
tes
in r
ece
nt
ye
ars
Per
form
ance
Bud
get 2
017-
1833
Wat
er R
esou
rces
Dep
artm
ent
[B]
NO
N-P
LAN
SC
HE
ME
S
Na
me
of
De
pa
rtm
en
t -
Irri
ga
tio
n ,
CE
I&
A
No
.S
che
me
/Pro
gra
mm
eM
ajo
r
He
ad
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
1M
ajo
r Ir
rig
ati
on
-No
n P
lan
2700
21
5.0
0
13
7.2
51
1.0
12
32
.00
14
5.4
2
25
.32
16
.77
70
.73
2.5
6
2M
ed
ium
Irr
iga
tio
n-N
on
Pla
n2701
36
8.5
0
29
8.7
73
14
.01
40
2.2
0
31
2.4
2
32
8.7
22
46
.42
42
.45
23
6.7
2
3
Flo
od
Co
ntr
ol
an
d D
rain
ag
e -
No
n P
lan
2711
3,7
00
.00
26
03
.03
33
03
.03
3,8
95
.00
2,8
12
.00
42
54
.00
43
24
.18
37
44
.98
34
51
.87
4
Flo
od
Co
ntr
ol
an
d D
rain
ag
e -
Ca
pit
al
Ou
tla
y -
No
n P
lan
4711
1,2
00
.00
81
0.0
25
11
.52
1,2
00
.00
91
0.7
2
51
3.0
17
60
.63
55
7.8
71
02
.04
5M
ino
r Ir
rig
ati
on
-No
n P
lan
2702
7,6
11
.02
66
38
.03
16
99
6.8
78
,01
2.6
2
6,9
21
.23
16
99
6.8
76
63
5.5
77
39
51
80
90
.2
6
Min
or
Irri
ga
tio
n -
Ca
pit
al
Ou
tla
y -
No
n P
lan
4702
2,0
00
.02
11
00
.02
11
00
.02
2,0
00
.02
1,1
00
.02
11
00
.02
44
86
.94
21
61
.35
17
17
.2
7In
lan
d N
avig
ati
on
-No
n P
lan
3075
18
2.5
0
18
2.5
01
82
.50
18
2.5
0
18
2.5
0
18
2.5
02
74
.49
21
8.7
91
68
.89
To
tal
15
,27
7.0
4
11
76
9.6
22
24
18
.96
15
,92
4.3
4
12
,38
4.3
1
2
34
00
.44
16
74
4.9
81
43
91
.17
23
76
9.4
8
AN
NE
XU
RE
III
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
tes/
Re
vis
ed
Est
ima
tes
in r
ece
nt
ye
ars
Bu
dg
et
Est
ima
teR
ev
ise
d E
stim
ate
sA
ctu
al
Ex
pe
nd
itu
re
Per
form
ance
Bud
get 2
017-
1834
Wat
er R
esou
rces
Dep
artm
ent
PROJECTS - I (CAUVERY CELL)
Chapter 1
INTRODUCTION
The Chief Engineer, Projects-1, Kozhikode is in charge of all the
Major and Medium Irrigation Projects in the Northern Part of the state, i.e.
from Palakkad to Kasargod. At present there are 13 completed Projects
in the region viz. Malampuzha, Mangalam, Pothundy, Gayathri,
Meenkara, Chulliyar, Walayar, Chitturpuzha, Kuttiyadi, Pazhassi,
Kanhirapuzha and Regulator cum Bridge at Thrithala. In addition to the
increasing irrigation facilities, these projects have helped the overall
development of the region to a great extend by way of improving
infrastructure, employment opportunities and availability of drinking water.
The ongoing projects under the control of this office are Karapuzha
Project, Banasura Sagar Project and Chammravattom Project.
KARAPUZHA IRRIGATION PROJECT
Karapuzha Irrigation Project is located in the Karapuzha stream of
Wayanad District. The Karapuzha stream is east flowing which joins the
Panamaram river, which is a tributary of the river Kabini. Kabini river
joins the inter - state river Cauvery which flows through 3 states - Kerala,
Karnataka and Tamil Nadu and the Union territory of Pondicherry.
Catchment area of Karapuzha river up to dam site is 62 Sq.Km. and lies
entirely in the state of Kerala.
Karapuzha Irrigation Project envisages construction of an earthen
dam with concrete spillway across Karapuzha river at Vazhavatta in Vythiri
Taluk of Wayanad District for providing irrigation to an area of 5600 Ha
with an ultimate irrigation potential of 8721 Ha in Vythiri, S.Bathery and
Mananthavady Taluk of Wayanad District through a net work of canal
system. The reservoir has a gross storage capacity of 76.50 Mm3 (2.70
TMC) and live storage capacity of 72 Mm3 water. As per Cauvery Water
Performance Budget 2017-18 35 Water Resources Department
Disputes Tribunal ( CWDT ) final award 2.80 TMC water from the
Cauvery basin is allotted to this project.
The project was cleared by Planning Commission vide No.11-
20(4)/77-1 & CAD dated, 19.4.1978 and Administrative Sanction issued
vide G.O. (MS) No.67/78/W&T dated, 28.7.1978 for an amount of 7.60
crores. The upto date expenditure for the project as on 31.03.2018 is
322.79 crores. The revised estimate cost of the project as per 2010
Schedule of Rates is Rs. 441.50 Crores. AIBP assistance is also availed
for this project.
PRESENT STATUS OF PROJECT
1) Head Works - 100%
2) Right Bank Canal 8.80Km.-8.80Km: - 100%
3) Left Bank Canal 16.74Km.-16.74Km.: - 100%
4) Branch Canal - Right Bank Canal
a) Kariyambadi 8.50Km./8.5Km.: - 100%
b) Koliyil 2.995Km./18.6Km. : - 16.10%
5) Branch Canal-Left Bank Canal Padinjaraveedu: - 95%
6) Distributaries LBC & RBC: - 8.77%
The project was partially commissioned on 20th June 2010. Water
distribution has started through RBMC & LBMC for a length of 3.7 km
and 8 km respectively since 2011-12 onwards. Water distribution
through Arimunda Distributory (RBC) for a length of 2.12 km is also
commenced. The total Cultural Command Area created is 601 Ha.
and the corresponding irrigation potential is 938 Ha.
There are proposals for incorporating a Mini Hydel Scheme for
producing 0.50 to 0.75 MW of electricity by Kerala State Electricity
Board and Drinking water supply schemes to Kalpetta Municipality and
adjoining Panchayaths by Kerala Water Authority ( KWA ) . The
drinking water supply scheme by Kerala Water Authority is under
progress and nearing completion.
Performance Budget 2017-18 36 Water Resources Department
As this project is situated in the Kabini Sub basin of the Cauvery
basin and as it is the first irrigation project taken up for implementing
as early as in the year 1978 in the Kabini basin of Kerala state and
2.80TMC of water is allotted to this project from the total 30TMC
allotted to the state of Kerala from the Cauvery Basin by the CWDT in
itÊs final award it is high time that this Project should be fully
commissioned urgently to reach the benefits to the farmers and to
utilize at least a small portion of the quantity of water allotted to the
Kabini basin ( 21 TMC ) by the CWDT.
Identifying the great tourism potential of the Karapuzha Irrigation
Project located in the picturesque Wayanad District, the Ministry of
Tourism, Government of India have accorded sanction for the
development of the Karapuzha dam site and surroundings into a major
destination in Kerala with a Central Financial Assistance of Rs. 492.03
Lakhs. Government of Kerala accorded sanction for execution of this
Project ÂDevelopment of Karapuzha Dam Site and surroundings into a
major Tourist destination of KeralaÊ under the supervision of
Karapuzha Division, Kalpetta. Beautification work I Phase is
completed.
Banasura Sagar Project
BanasuraSagar Irrigation Project envisages to irrigate 2800 Ha (Net) of
agricultural land (net) for the second crop and third crops (The first crop
being rain fed crop Vythiri and MananthavadyTaluks of Wayanad District.
The Dam is located at Padinjarathara near Thariode town across
Karamanthode, which is a Tributary of Panamaram river.
According to the scheme now finalized, there will be only one
common reservoir across Karamanthode for irrigation as well as hydel
power. The water required for irrigation under the Banasurasagar project
of about 43.40 Mm3 (1700Mcft) annually will be let down as per irrigation
requirement from the storage constructed by the KSEB. A share of the
cost of the storage scheme will be met by the Irrigation Department.
The CWDT has awarded only 0.84TMC of water and the
requirement of water to irrigate the proposed ayacut of 2800Ha. is 1.70
Performance Budget 2017-18 37 Water Resources Department
TMC. This requirement of 1.7 TMC for irrigation part of BSP has already
been taken up in the appeal before CWDT and also in the SLP filed
before Supreme Court.
PRESENT STATUS OF PROJECT
1) Main Canal 2.73Km : 84%
a) Aqueduct barrel work in progress 0/0Km.-0/150Km.: 98%
b) Aqueduct barrel 1130m. To 1500m.: 60%
c) BSP- Construction of Diversion chamber between main canal and
branch canals( Padinjarethara branch canal and Venniyode branch canal)
100%
2) BSP-Venniyode Branch Canal aqueduct from ch: 570m.to
1730m.:56%
The works of both branch canals are in progress. There are 14
Nos. of distributaries in this canal system. Land acquisition process of
distributaries is in progress.
The total expenditure incurred for the project upto 31.3.2018 is Rs
57.90 Crores.
3. Modernization of Field Channels and Drains of CADA Canals of Major
Projects
As per GO(Rt) 773/2015/WRD dated 17.09.2015 Administrative
Sanction for the Modernisation of field channels and drains of CADA
canals of Major Projects have been issued for a total amount of Rs.20
Crores for the financial year 2017-18 for Chitturpuzha Project,
Malampuzha Project, Mangalam Project and Pothundy Project.
1. MALAMPUZHA PROJECT
The Malampuzha irrigation project has more than 950 numbers of
field channels and almost all the field channels are damaged and
dilapidated condition as the maintenance of these canals are done long
ago. Rs.5.00 crores has been sanctioned to rectify the critical portion of
Performance Budget 2017-18 38 Water Resources Department
44 field channels, stabilization of 2704.98 hectares can be achieved, even
in the adverse climatic conditions. Out of 44 works, 43 works completed
and 1 work cancelled. An amount of Rs. 432.57 Lakhs incurred upto
2017-18.
2. POTHUNDY PROJECT
The Pothundy irrigation project has more than 401 numbers of
field channels and almost all the field channels are damaged and
dilapidated condition as the maintenance of these canals are done long
ago. Rs.4.00 crores has been sanctioned to rectify the critical portion of
19 field channels, stabilization of 892.33 hectares can be achieved, even
in the adverse climatic conditions. Out of 19 works, 17 works completed,
1 work cancelled. An amount of Rs.268.45 Lakhs incurred upto 2017-
18.
3. MANGALAM PROJECT
The Mangalam irrigation project has more than 216 numbers of
field channels and almost all the field channels are damaged and
dilapidated condition as the maintenance of these canals are done long
ago. Rs. 4.00 crores has been sanctioned to rectify the critical portion of
10 field channels, stabilization of 381.81 hectares can be achieved, even
in the adverse climatic conditions. All the 10 works completed. An
amount of Rs. 199.52 Lakh incurred upto 2017-18.
4. CHITTURPUZHA PROJECT
Chitturpuzha Project has 336 field Channels. Most of the field were
damaged in several portions due to the non-maintenance. Due to crossing
of field channel by cattles, tractor, and pedestrian formation of new work
way and for diversion of water by farmers, the field channels were
damaged at many places. The project aim at the renovation &
modernization of the selected 140 field channel at the different location of
the canal network. The excavation of project is proposed for 2 year. The
project is sanctioned for an amount of Rs 15 cores. Out of 140 works,
Performance Budget 2017-18 39 Water Resources Department
132 works completed 8 works cancelled. An amount of Rs.1142.86 lakhs
incurred upto 2017-18.
5. INTER STATE WATER HUB
The Administrative Sanction for the work „Construction of Inter
State Water Hub at Palakkad‰ has been accorded by Government vide GO
(Rt) No: 532/2015/WRD dated, 26-06-2015 for an amount of Rs. 1.50
crores. A provision of Rs. 1 crore has been provided in the Budget 2017-
18 under the head of account „4701-80-800-75‰. The design of the
building has been approved by Chief Engineer, IDRB, Trivandrum and
works arranged.
Irrigation Department has an Interstate Waters Wing which is
looking after all matters pertaining to various interstate water projects.
Many interstate water issues are relevant to Palakkad. Parambikulam –
Aliyar, Siruvani and Bhavani of Cauvery etc are some of the interstate
water issues which have particular importance in conserving and managing
the water resource in Palakkad District. The Joint Water Regulation (JWR)
Division, Palakkad is the nodal office of Kerala to look after all matters
related to Parambikulam Aliyar Project (PAP) and its interstate water
sharing agreement between Kerala and Tamil Nadu. The proposal is to
construct ÂISW HUB Âbuilding after demolishing the existing old dilapidated
JWR Division office building.
Administrative sanction has been accorded by Government for Rs.
1.5 crore vide GO (Rt) No: 532/2015/WRD dated 26-06-2015.
Technical sanction has obtained from the office of Chief Engineer,
Project –I, Kozhikode for Rs. 1.45 crore. A provision of Rs. 1 crore has
been provided in the Budget 2017-18. The design of the building has
been approved by Chief Engineer, IDRB, Thiruvananthapuram. The
design is for a G+1 building.
AS and TS has obtained only for the work for the construction of
ground floor and it is arranged.
The facilities provided in the ground floor are
Performance Budget 2017-18 40 Water Resources Department
1) JWR Division Office
2) ISW HUB
a) Interstate Waters Museum to store all 3D models and very important
records related to all interstate water projects
b) Irrigation Projects Data Interpretation Centre accessible to all farmers
c) Library of Interstate Water documents and Water conservation
publications
The facilities proposed in the first floor are
1) Conference hall with its dining & wash area
2) Two Guest rooms.
The works to be arranged are the construction of first floor, internal
arrangement of JWR Division Office, interiors of ISW HUB portion and
conference hall, landscaping and architectural works. It is also proposed to
provide a truss over first floor and thus available space can be used to
provide some rooms and dormitory.
The total amount required for the whole work is approximately Rs.
7.5 crore including the arranged work of Rs. 1.5 crore.
Performance Budget 2017-18 41 Water Resources Department
Chapter II
FINANCIAL OUTLAYS AND QUANTIFIABLE DELIVERABLES
1. Banasura Sagar Project
The construction of Kappumkunnu distributoryÊs three reaches and
the main canal except one aqua duct are completed. The concrete core
samples from portion of the work (Aqueduct ch.1130m to 1500m)
already completed, were collected by the NIT, Calicut and as per the test
results, it was recommended that the completed structural parts of main
canal of BSP from ch.1130 m to 1500m is safe for the expected load of
the complete structure. Land acquisition of the Padinjarathara Branch
Canal from on to 4370m is completed and the remaining is in progress.
The land acquisition process of other required reaches and 10
distributaries are yet to be started. The construction of Venniyode branch
canal, Kappumkunnu Distributory is in various stages.
2. Karapuzha Project
The project was partially commissioned on 20th June 2010. Water
for irrigation is presently done through LBC for a length of 6.10 Km,
RBC for a length of 7.02 Kms and Arimunda distributory for a length of
2.12 Kms.. The total CCA created is 601Ha against corresponding
irrigation potential is 938 Ha.
3. Modernization of Field Channels and Drains of CADA Canals of
Major Projects
As per GO(Rt) 773/2015/WRD dated 17.09.2015 Administrative
Sanction for the Modernisation of field channels and drains of CADA
canals of Major Projects have been issued for a total amount of Rs.28
Crores. For Chitturpuzha Project 15 Crores, Malampuzha Project 5
Crores, Mangalam Project 4 Crores and Pothundy Project 4 Crores.
4. Inter State Water Hub
The Administrative Sanction for the work „Construction of Inter
State Water Hub at Palakkad‰ has been accorded by Government vide GO
(Rt) No: 532/2015/WRD dated 26-06-2015 for an amount of Rs. 1.50
crores. A provision of Rs. 1 crore has been provided in the Budget 2017-
18 under the head of account „4701-80-800-75‰.
Performance Budget 2017-18 42 Water Resources Department
Non Plan
budget
Plan budget
Complementar
y extra
budgetary
resources
Central
Assistance if
any
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
1
Banasura Sagar Project
To Irrigate ayacut area of 2800 Ha
through canal system
NIL
250.00
NIL
NIL
Mai
n ca
nal 2
3.60
Km
and
Dis
trib
utor
ies
5.45
Km
com
plet
ed.
The
re is
no
prog
ress
from
200
9.
700
Ha
0%
376.
42
Thi
s pr
ojec
t is
inte
nded
for
irrig
atio
n 28
00 H
a of
cul
tivab
le
land
in W
ayan
ad D
istr
ict b
y
cons
truc
ting
a ne
twor
k of
cana
ls. (
The
dam
is
cons
truc
ted
by K
SE
B).
The
talu
ks b
enef
itted
are
Vyt
hiri
and
Man
anth
avad
y. T
he w
ork
star
ted
in th
e 20
00 a
nd is
cont
inui
ng.
No
wat
er
dist
ribut
ion
has
star
ted
yet.
It is
exp
ecte
d to
be c
ompl
eted
in
2020
-21.
Mai
n C
anal
Com
plet
ed
exce
pt a
n
aque
duct
from
ch.1
130
to
1500
m
2
Karapuzha Project
To Irrigate ayacut area (Geographical)
of 5221 Ha through canal system.
Ultimate Irrigation potential is 8721.
NIL
600.00
NIL
NIL
Dam
100
% c
ompl
eted
Mai
n ca
nal
100%
com
plet
ed B
ranc
h 47
.26%
com
plet
ed D
istr
ibut
orie
s 8.
77%
com
plet
ed.
Are
a P
oten
tial
(Util
ised
CC
A)
9388
Ha
4620
Ha
500
0%52
0.30
Alth
ough
an
ayac
ut o
f 601
ha
had
alre
ady
been
ach
ieve
d
durin
g th
e w
ater
dis
trib
utio
n
brea
ch o
ccur
red
and
no fu
rthe
r
wat
er d
istr
ibut
ion
was
not
poss
ible
bey
ond
340
Ha
Pro
ject
par
tially
com
mis
sion
ed o
n
2010
. Pro
ject
is
prop
osed
to b
e
com
plet
ed o
n
2020
-21
Par
tially
com
plet
ed.
Wat
er
dist
ribut
ion
star
ted
3
Interstate Water Hub
An Office building for
ISW
NIL
100.00
NIL
NIL
Nil
Bui
ldin
g10
00%
0.00
Offi
ce B
uild
ing
for
Inte
r S
tate
Wat
er Is
sues
.
Wor
k no
t sta
rted
till n
ow
AS
and
TS
Obt
aine
d.
Projected outcomes
Period of
implementation
Rem
arks
/ Ris
k
fact
or
An
nex
ure
-IF
OR
MA
T O
F T
AB
LE
S IN
CH
AP
TE
R II
OF
PE
RF
OR
MA
NC
E B
UD
GE
T 2
017-
18O
ffic
e o
f th
e C
hie
f E
ng
inee
r, P
roje
cts-
1, K
ozh
iko
de
Ru
pee
s in
lakh
s
Out
lay
2017
-18
Sl.
No.
Name of Scheme/
Programme
Objective
Qua
ntifi
able
Del
iver
able
s/ p
hysi
cal
outp
uts
Tar
get f
ixed
Target achieved
Per
form
ance
Bud
get 2
017-
1843
Wat
er R
esou
rces
Dep
artm
ent
4
Modernization of Field Channels and Drains of CADA Canals of Major
Projects
Modernization of field channels and Drains of CADA canals of
Malampuzha, Pothundy, Mangalam and Chitturpuzha projects
Nil
2000.00
Nil
Nil
Man
gala
m -
All
the
10 w
orks
com
plet
ed
Pot
hund
y -
Out
of
19 w
orks
17
wor
ks c
ompl
eted
. 1 w
ork
canc
elle
d.
Mal
ampu
zha
- O
ut o
f 44
wor
ks 4
3
wor
ks c
ompe
lete
d. 1
can
celle
d.
Chi
tturp
uzha
- O
ut o
f 140
wor
ks
132
wor
ks c
ompl
eted
and
8 w
orks
canc
elle
d.
213 Works
2000
94%
0.00
A
yacu
t sta
bilis
ed.
Wor
k st
arte
d
5
4701-18-RCB at Chammravattom
To rectifying the Phenomenon of
Piping in RCB at Chammravattom
Project
0.00
1000.00
00
Rec
tific
atio
n of
Pip
ing
Phe
nom
enon
1000
00
Ful
l util
izat
ion
of
Cha
mm
rava
ttom
Pro
ject
2019
-20
As
Obt
aine
d
Per
form
ance
Bud
get 2
017-
1844
Wat
er R
esou
rces
Dep
artm
ent
Chapter – III
REFORM MEASURES AND PERFORMANCES
In order to ensure faster processing of Administrative and Technical
Sanctions related to works, a web-based software called ÂPriceÊ is
developed by Public Works Department. Irrigation Department also hopes
to gain from the exercise and to implement it with suitable customization.
As a reform measure, Government have proposed to switch over
from Kerala State Data in the calculation of cost of works to the Delhi
Schedule of Rates (DSR) based system to ensure uniformity and better
acceptability.
Performance Budget 2017-18 45 Water Resources Department
Chapter – IV
REVIEW OF PAST PERFORMANCE
Although healthy targets for physical and financial achievements
were set by the Division offices for implementation of Banasurasagar and
Karapuzha irrigation projects, two major bottlenecks have prevented the
Department from achieving them. First is the delay in taking possession
of the land. The land acquisition process is time-consuming and this
coupled with the manpower issues in the LA TahsildarÊs office, delays the
acquisition of land and hence execution of works.
In the view to speed up the land acquisition process, a proposal was
submitted to Government vide letter no. WP3/2700/06 dated
19.04.2017 to grant permission to acquire the land by direct purchase
through negotiation.
Karapuzha Irrigation Project has been included in PMKSY 99
Prioritised projects (Priority- 2) and detailed project report has been
submitted to Government for approval.
A Technical Committee has been constituted for evaluating four
ongoing project which includes Karapuzha Irrigation Project and Banasura
Sagar Project. Committee members visited both the projects on
19.08.2017 and 20.08.2017. It is expected that the report will be
submitted to Government soon.
Performance Budget 2017-18 46 Water Resources Department
Sl. No.Name of the
Scheme/programmeObjective/Outcomes
Outlay
2017-18
Expenditu
re 2017-
18
Deliverable/Physical
outputsAchievement Reason for variation
1Banasura Sagar
Project
To Irrigate ayacut area of
2800 Ha through canal
system
250.00 273.81
The amount used for
establishment
expenditure and
clearing contractors
pending bills.
NilSlow Progress in land
acquisition process
2 Karapuzha Project
To Irrigate ayacut area of
5221 Ha through canal
system
600.00 572.73
The amount used for
establishment
expenditure and
clearing contractors
pending bills.
An ayacut of
601 Ha is
achieved till
now.
Slow Progress in land
acquisition process
3
4701-80-800-72-
Modernisation of
Field Channels and
drains of CADA canals
of Major Projects
Stabilising the existing
ayacut under Chitturpuzha,
mangalam, Pothundy and
Malampuzha Project.
2000.00 0.00
Pending bills not paid
during this Financial
Year
NilWorks nearing
completion
4 Interstate Water HubTo build a building for
Offices of ISW100.00 0.00 Nil Nil AS and TS obtained
5RCB at
Chammravattom
To rectifying the
Phenomenon of Piping in
RCB at Chammravattom
Project
1000.00 0.00 Work Not started Nil AS obtained
Office of the Chief Engineer, Projects-1, Kozhikode
Annexure II
Statement of Outlay/Outcomes/Target 2017-18 and actual Achievement 2017-18 Plan/Major Schemes
Rs. In lakhs
Performance Budget 2017-18 47 Water Resources Department
Chapter – V
FINANCIAL REVIEW
Karapuzha Project:
The expenditure up to 31.03.2017 was Rs. 317.59 Crores .
Revised cost as per 2014 DSR is Rs. 560 Crores. An amount of Rs.
271.88 lakhs was obtained as central share in 2006-07. Expenditure in
2017-18 was Rs. 5.20 Crores.
BanasuraSagar Project:
The expenditure up to 31.03.2017 was Rs. 54.14 Crores. Revised
cost as per 2016 DSR is Rs. 390 Crores. Expenditure in the financial year
2017-18 was Rs.3.76 Crores.
Modernization of Field Channels and Drains of CADA Canals of Major
Projects:
No expenditure in the financial year 2017-18.
Inter State Water Hub: There is no expenditure during 2017-18
Performance Budget 2017-18 48 Water Resources Department
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
1B
an
asu
ra S
ag
ar
Pro
ject
47
00
-28
-BS
P2
50
.00
25
0.0
02
50
.00
10
56
.00
25
0.0
02
50
.00
25
02
83
.06
32
8.5
83
76
.42
2K
ara
pu
zha
Pro
ject
47
01
-13
-KR
P6
00
.00
50
0.0
05
00
.00
13
75
.00
60
0.0
06
38
.20
50
05
72
.73
65
9.0
95
20
.30
3R
CB
at
Ch
am
mra
va
tto
m
47
01
-18
-RC
B a
t
Ch
am
mra
va
tto
m0
.00
0.0
01
00
0.0
04
80
0.0
02
49
.00
12
50
.00
10
00
19
0.7
82
20
.94
27
0.4
5
4A
IBP
47
01
-80
-80
0-8
2-
AIB
P0
.00
0.0
00
.00
0.0
00
.00
0.0
00
0.0
00
.00
12
.67
5In
ters
tate
Wa
ter
Hu
b4
70
1-8
0-8
00
-75
10
0.0
01
00
.00
10
0.0
01
00
.00
50
.00
10
0.0
01
00
0.0
00
.00
0.0
0
6
Mo
de
rniz
ati
on
of
Fie
ld
Ch
an
ne
ls a
nd
Dra
ins
of
CA
DA
Ca
na
ls o
f M
ajo
r
Pro
ject
s
47
01
-80
-80
0-7
22
80
0.0
02
00
0.0
02
00
0.0
09
00
.00
20
00
.00
10
00
.00
20
00
0.0
02
04
3.3
90
.00
Off
ice
of
the
Ch
ie E
ng
ine
er,
Pro
ject
s-1
, K
ozh
iko
de
An
ne
xure
III
No
.S
che
me
/Pro
gra
mm
eM
ajo
r H
ea
d
Bu
dg
et
Est
ima
tes
Re
vis
ed
Est
ima
tes
Act
ua
l E
xpe
nd
itu
re
Ru
pe
es
in l
ak
hs
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
te/R
ev
ise
d E
stim
ate
s in
re
cen
t y
ea
rs o
f P
lan
Sch
em
es
Per
form
ance
Bud
get 2
017-
1849
Wat
er R
esou
rces
Dep
artm
ent
20
13
-14
20
14
-15
20
15
-16
20
16
-17
20
13
-14
20
14
-15
20
15
-16
20
13
-14
20
14
-15
20
15
-16
1M
ala
mp
uzh
a P
roje
ct2
70
0-0
2-M
ala
mp
uzh
a1
47
1.5
16
39
.83
15
68
.85
16
29
.85
15
48
.50
15
94
.58
17
80
.42
11
25
.27
98
3.8
61
23
2.4
4
2W
ala
ya
r P
roje
ct2
70
0-0
3-W
ala
ya
r1
40
.61
09
.34
98
.77
13
3.7
72
51
.34
13
1.0
01
33
.77
86
.31
48
.23
13
3.5
6
3M
an
ga
lam
Pro
ject
27
00
-04
-Ma
na
gla
m1
34
.71
14
6.3
81
36
.21
77
.04
16
3.2
11
64
.88
22
2.5
41
17
.85
35
.27
65
.85
4M
ee
nk
ara
Pro
ject
27
00
-05
-Me
en
ka
ra9
9.8
12
6.9
71
25
.31
12
.31
12
0.6
02
07
.27
10
9.0
06
0.8
57
0.9
68
0.4
3
5P
azh
ass
i Ir
rig
ati
on
Pro
ject
27
00
-12
-Pa
zha
ssi
Pro
ject
29
9.6
53
58
.80
36
6.8
33
62
.25
41
2.3
14
82
.45
59
2.0
73
01
.90
19
7.5
11
94
.33
6K
utt
ya
di
Irri
ga
tio
n P
roje
ct2
70
0-1
3-K
utt
ya
di
Pro
ject
67
7.2
87
21
.65
69
7.8
36
82
.75
69
9.6
27
22
.36
12
86
.44
59
6.1
24
46
.01
64
5.9
7
7C
hit
turp
uzh
a P
roje
ct
27
00
-17
-Ch
ittu
rpu
zha
Pro
ject
40
9.0
03
62
.00
31
5.0
03
65
.00
46
2.0
04
37
.00
70
9.3
71
69
.47
24
6.1
03
95
.65
8M
RB
C2
70
0-2
5-M
RB
C2
6.0
02
6.0
01
6.0
01
5.0
09
3.0
03
2.0
02
00
.00
9.3
14
.44
16
.85
9
Ka
nh
ira
pu
zha
Irr
iga
tio
n
Pro
ject
27
00
-18
-Ka
nh
ira
pu
zha
Pro
ject
73
0.5
28
36
.09
86
5.3
47
79
.86
79
1.0
71
12
6.1
11
27
9.3
77
01
.84
52
7.6
45
71
.71
10
Po
thu
nd
y P
roje
ct2
70
1-1
1-P
oth
un
dy
Pro
ject
16
2.0
01
61
.00
16
6.0
01
10
.01
16
5.0
01
65
.00
19
8.0
08
2.0
39
8.6
51
81
.66
11
Ch
era
ma
ng
ala
m P
roje
ct
27
01
-17
-Ch
era
ma
ng
ala
m
Pro
ject
70
.50
40
.01
70
.01
50
.01
70
.50
70
.50
13
0.5
06
8.8
59
.88
40
.24
12
Ve
lliy
am
ka
llu
Ca
use
wa
y
27
01
-20
-Ve
lliy
am
ka
llu
Ca
use
wa
y2
5.5
02
5.5
02
5.5
02
0.5
02
5.5
02
5.5
02
0.7
53
2.6
21
1.8
20
.5
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
te/R
ev
ise
d E
stim
ate
s in
re
cen
t y
ea
rs (
No
n P
lan
)
An
ne
xu
re I
II
Off
ice
of
the
Ch
ie E
ng
ine
er,
Pro
ject
s-1
, K
ozh
iko
de
Ru
pe
es
in l
ak
hs
Bu
dg
et
Est
ima
tes
Re
vis
ed
Est
ima
tes
Act
ua
l E
xpe
nd
itu
re
No
.S
che
me
/Pro
gra
mm
eM
ajo
r H
ea
d
Per
form
ance
Bud
get 2
017-
1850
Wat
er R
esou
rces
Dep
artm
ent
IRRIGATION PROJECT II
Chapter 1
INTRODUCTION
Irrigation Project II is a part of Irrigation Department. The
Project II is implementing the major Projects such as Muvattuppuzha
Valley Irrigation Project, Idamalayar Irrigation Projects, Pampar Basin
Projects and Meenchil River Valley Projects. The project wing is entrusted
with the responsibility of implementation of major and medium Irrigation
projects in central and south Kerala. The project wing is also entrusted
with the work of maintenance and upkeep of completed projects. They
are-
1) Pampa Irrigation Project
2) Periyar Valley Irrigation Project
3) Kallada Irrigation Project
4) Vazhani Scheme
5) Neyyar Irrigation Project
6) Chalakudy River Diversion Project
7) Cheerakuzhy scheme
8) Chimony Dam Project
9) Kole lands
Organizational structure:-
The Irrigation Project II is headed by the Chief Engineer. There
are five circle office headed by Superintending Engineers with Division
office headed by Executive Engineers, Sub Division offices headed by
Assistant Executive Engineers and assisted by section office headed by
Assistant Engineers.
Performance Budget 2017-18 51 Water Resources Department
The five circle office are :-
1) Muvattupuzha Valley Irrigation Project Circle, Muvattuppuzha
with three Division offices viz. MVIP Divisions at Muvattuppuzha
,Piravom and Pambar Project Division, Palai.
2) Project circle Piravom with five Divisions viz Idamalayar
Irrigation Project Divisions at Angamaly and Chalakudy, Periyar
Valley Irrigation Project Divisions at Aluva and Perumbavoor
and Pampa Irrigation Project Division at Chenganoor.
3) Kallada Irrigation Project circle, Kottarakkara with two
Divisions viz. KIP Division at Kollam and Kottarakkara.
4) Irrigation Central Circle, Thrissur (dual control) with Irrigation
Division, Thrissur
5) Irrigation South Circle, Thiruvananthapuram (dual control)
with Irrigation Division, Thiruvananthapuram (Neyyar Irrigation
Project)
The Quality Control Division Kottarakkara and Thrissur are also
coming under this project.
Performance Budget 2017-18 52 Water Resources Department
Performance Budget 2017-18 53 Water Resources Department
Objectives and Functions:-
The main activity of the Project II Wing of the Irrigation
Department includes planning, designing execution and monitoring of the
major and medium irrigation projects and maintenance of commissioned
projects. The main projects under execution are as follows.
1) Muvattuppuzha Valley Irrigation Project :-
The Muvattupuzha Valley Irrigation Project, one of the major
projects in Kerala envisages the utilization of the tailrace discharge from
the Moolamattom Power House of the Idukki Hydro-Electric Project and
the dependable runoff from the catchments of Thodupuzha River. It
comprises of an earth cum masonry dam at Malankara in river
Thodupuzha, a tributary of Muvattupuzha River and right bank and left
bank canal systems to irrigate a cultivable command area of 18173 ha
(35619 ha. gross), in Idukki, Ernakulam and Kottayam Districts. In
addition to these, the project envisages to supplement canal water for
drinking water supply schemes, industrial benefit to the Hindustan News
Print Factory, generation of hydel power at the toe of the dam with an
installed capacity of 10.5 M.W and other indirect benefits to Ernakulam,
Idukki and Kottayam Districts. The power production commenced from
9/2005 onwards. The project was partially commissioned in 1994 and as
the completed canal net work will be charged during the summer season,
the ground water level in the entire area will be much benefited, solving
drinking water problem without incurring any additional expenditure. The
tail end of Kurumulloor MD and Kuravilangadu MD discharge in to Pennar
thodu and Meenachil River respectively. Through this, the vast low level
paddy fields in Kottayam District can also be made cultivable through its
desalination and the drinking water problems in summer can be avoided.
Dam and connected works are completed. Left bank main canal
and right banks main canal are completed to its full length. 37-100km and
28.337km respectively. Branch canal works for 54.645km are completed
out of 57.154km. Distributories are completed up to 90%. Irrigation
potential upto 31-3-2017 is 32608 Ha and expenditure up to 31-3-2018
Performance Budget 2017-18 54 Water Resources Department
is Rs.957.15 Cr. Cost as per DSR 2014 is Rs.945 Cr. Budget for 2017-
18 is Rs. 40.61 Cr. The project is proposed to be completed by March
2018.
2) Idamalyar Irrigation Project:-
The Idamalayar Irrigation Project is mainly aiming for
irrigating vast cultivable land lying in Periyar Basin on right side of
Periyar River in Aluva and Paravur Taluks of Ernakulam District and
Mukundapuram Taluk of Thrissur District. It also envisages extension
of irrigation on left and right bank of Chalakudy River. Now water
distribution through Chalakudy left bank and right bank canals under
CRDS are being done through Thumburmuzhy weir across Chalakudy
river. After completing Idamalayar Irrigation Project, water from
Bhoothathankettu barrage will be benefitted to Main canal, Low Level
Canal and Chalakudy left Bank canal (under CRDS) through connecting
Link Canal and hence water from Thumburmuzhi weir will be benefitting
exclusively for Chalakudy Right Bank Canal. The total additional ayacut
for irrigation aimed at by the implementation of the Project using the
water of Periyar and Chalakudy Rivers is 14394 hectares. The main
source of water is the Idamalayar Dam of Kerala State Electricity Board
which is already completed and the run off from the free catchment
upstream of Bhoothathankettu barrage. The Project started in 1981 with
approved cost of Rs. 17 crores. The project was approved by State
Government for Rs. 107 crores as per 1992 Schedule of Rates. The
expenditure up to 31/03/2018 is Rs.459 Crores.
3)Pambar Basin Project:-
Pambar river , an east flowing river is a tributary of Cauvery river .
The basin area of Pambar scheme in Kerala is 384KM2. It is located
in Idukki District. Pambar river is flowing upstream of Amaravathy
reservoir in Tamilnadu. This is an interstate river. According to final
verdict of Cauvery river water tribunal, Kerala is eligible for 30 TMC of
water from Cauvery basin. Out of this 3 TMC is the share of Pambar
Performance Budget 2017-18 55 Water Resources Department
basin. In order to utilize this share effectively, the following schemes
proposed in Pambar basin.
1.Chengalar Scheme
2.Thalayar Scheme
3.Vattavada Scheme
4.Champakadad Scheme
Chengalar Scheme
The state share for this scheme is 0.78 TMC and the three Dams
proposed under this schemes are
1.Pattissery Dam
2.Kanthalloor Dam
3.Pullardy Dam
As Pullardy Dam is in the forest area of Mannavan Shola,land
acquisition is not easy. The submergence area of Kanthalloor Dam is
thickly populated private land.Hence the only proposal which is feasible is
Re-Construction of Pattissety Dam and Canal system.
Re - Construction of Pattissery Dam and Canal system.
The scheme is located in Kanthalloor Village in Devikulam Taluk of
Idukki District. The proposal was to construct a dam of height 18 M and
180 M span and is a composite dam of concrete and earth.
Administrative sanction was received for an amount of Rs. 26 crores, as
per GO (Rt) No.327/2013/WRD dated 23.3.2013 . The Technical
sanction was received as per GO(Rt)No. 92/2014/WRD dated
28.01.2014. By the implementation of Pattissery dam and canal
system, 0.075 TMC of water can be effectively utilized. The TS for the
work has been accorded for an amount of Rs. 23 crores and the work
has been awarded to M/s. Paulose George , Construction Company
Performance Budget 2017-18 56 Water Resources Department
Private Ltd. The site was handed over to the contractor on 22.07.2014
and the work has been started.
Earth work excavation and rock blasting were carried out for the
concrete portion of the dam as per the agreement. Meanwhile the
geologists from G.S.I inspected the site and recommended to conduct
permeability test also. On their visit, they suggested for further excavation
as the rock surface was not suitable for foundation of the dam. While
examining the rock strata certain foliation, fault, joint etc were met with,
which resulted in deepening the strata for sound foundation. During the
course of execution, quantities of a number of items varied considerably
from the sanctioned estimate and also led to the formation of revised
estimate.
At present, blasting is completed up to the recommended level of
the geologist. TOC expired on 21.07.2016. As the depth of excavation
increased, revised design was necessitated and hence the estimate. The
Revised Estimate amounting to 45.90 crores was submitted based on
revised design for Government approval.
For resuming the work, the Revised estimate is to be sanctioned
and Time of completion has to be extended. An amount of Rs. 7 Crores is
set apart in 2018-19 budget. Discussions are going at Government level
regarding rate enhancement, sanction of revised estimate etc.
The work can be resumed soon after getting sanction for Revised
estimate. It is expected that 50% of work can be completed during the
financial year 2018-19.
There is an out lay of Rs. 2 Crores for Pambar basin Projects other
than Pattissery Dam under R.I.D.F. The various schemes proposed for this
include Thalayar scheme and Vattavada scheme.
Thalayar Scheme
The state share for this scheme is 0.78 TMC and proposals under this
schemes are
1. Upper Chattamunnar Dam
Performance Budget 2017-18 57 Water Resources Department
2. Lower Chattamunnar Dam
3. Thalayar Dam
4. Marayoor Tribal colony
5. Eravikulam
As the submergible area of Marayoor Tribal colony and Eravikulam
Dam comes under forest land, hence preliminary investigation could not
be carried out.
Preliminary investigation for remaining three dams namely Upper
Chattamunnar, Lower Chattamunnar and Thalayar Dam were done. Since
there is an existing Minor Irrigation scheme at Coffee store near Thalayar
the following two dams only are under considerations.
PRESENT PROPOSALS
1.Upper Chattamunar Dam
The scheme is located in Devikulam Taluk in Idukki District. The
site is very near to the Munnar – Udumalpetta road and about 160 M
downstream of the Vaguvarai Chattamunnar estate.
2. Lower Chattamunnar Dam
The proposed Lower Chattamunnar dam site is located in the
Chattamunnar Tea estate below the road bridge to Pombumalai Estate.
The Munnar – Udumalpetta road passes near the site on left bank.
The land required for proposed scheme is under the lease of
Thalayar Tea Company. Hence release of the land from lease agreement
is necessitated.
The Detailed contour survey for both the dams have been
completed. Soon after the completion of Investigation works and
obtaining design and drawings from IDRB, detailed estimate and Detailed
Project Report can be prepared. Construction of Dams can be done only
after getting Administrative Sanction for the DPR.
Performance Budget 2017-18 58 Water Resources Department
3 .Vattavada Scheme.
The State share for this scheme is 0.52 TMC and proposals under the
schemes are
1. Ottamaram Dam
2. Kottakombur Dam
3. Padagiri Dam
4. Vattavada Dam
5. Kadavary Dam
6. Kalladan Kannavai mettu Dam
Out of this, preliminary investigation of Ottamaram dam and
Kottakombur dam were done. But the reservoir area for the Kottakombur
dam has been declared as ÂNeelakurinji sanctuary Â. As reservoir area of
remaining dams come under forest land, preliminary investigation could
not be carried out. Hence the only feasible project is construction of
Ottamaram dam.
Ottamaram Dam
The proposed dam can store 2.81 Mm3 of water. Once the
scheme is implemented 0.0995 TMC of water can be effectively utilized to
irrigate an area of 415 Ha in Vattavada village in Devikulam Taluk. The
reservoir submerges 19.93 Ha which is under the possession of Revenue
Department. The dam site is 4.5 Km away from Vattavada. The present
site can be reached through the deviation road which passes through
Chundavary Tea estate and which deviates from Munnar.- Vattavada road
at 18th Mile.
The DPR can be prepared only after getting design from IDRB based
on soil investigation report. The work can be executed only after obtaining
Administrative sanction and Technical sanction.
Performance Budget 2017-18 59 Water Resources Department
4. Champakkad Scheme in Tribal Colony
The state share for this scheme is 0.03 TMC.
As submergible area comes under forest land, preliminary
investigation could not be carried out.
4)Meenachil River Valley Project:-
Meenachil River having a length of 78 km originates from
Kurishumala and Melukavu mala and flows through
Erattupetta,Kidangoor,Ettumanoor,Kottayam and finally joins Vembanadu
lake.Meenachil basin is located in the south of Muvattupuzha basin and
north of Manimala basin. At present there are no major projects in
Meenachil Basin.
Meenachil basin experiences severe water shortage during summer
season. Every year a large amount of money is being spent for drinking
water supply, control of salinity intrusion and for prevention of epidemics
spreading with the contaminated water, apart from shortage of water for
agricultural development.
The first proposal for Meenachil River Valley Project was the
construction of a dam at Adukkam and it was dropped due to public
protest against acquisition of land.
The second proposal was to divert surplus water from
Moovattupuzha Basin to Meenachil Basin through a Tunnel. It was also
temporarily dropped due to the protest of people in Muvattupuzha Basin.
Based on the decision of the expert committee vide G.O (Rt) No
712/2011/WRD dated 23/7/2011 a DPR was prepared consisting of
construction of a series of Mini Dam cum Regulators, a Dam at
Pazhukkakanam and construction of a modified tunnel in three different
phases.
At present investigations have been done in Meenachil river and
its tributaries to find out suitable locations for mini dams . Thus site at
Performance Budget 2017-18 60 Water Resources Department
Pazhukkakanam for a dam and 7 Nos of Mini Dam cum Regulators have
been located as follows.
PAZHUKKAKANAM DAM
The height and length of the proposed dam is 34m & 190m
respectively. It is designed as a concrete gravity type dam. The reservoir
formed by the dam can store 7.96 Mm3 of water. Using this water 995
Ha of land can be irrigated in Meenachil taluk in Kottayam District. 19
Km length of canal is proposed to feed the ayacut area. 119 Ha of
private land to be acquired for this project. Administrative sanction was
accorded as per GO(Rt)No.832/2014/WRD dated 22/08/2014 for an
amount of Rs.131crore . By the implementation of this project deficiency
of drinking water in Meenachil taluk can be solved to a great extent. Also
flood in Meenachil river can be controlled to a certain extent. There is a
scope for generating power about 2 MW for 9 months. Since the reservoir
is only about 26 Km from Bharananganam and is near to Vagamon, there
is a scope for tourism development also.
Detailed contour survey of Pazhukkakanam dam for collecting
details of dam, acquisition required etc. were tendered and work started.
Due to the heavy protest from the public, the work was stopped on
25.11.2014. Hence only 25 % of work was carried out and could not
complete the work. Block level and District level meetings were convened
for the settling the issue with the co-operation of political leaders and
government officials. But not succeeded yet. These matters were
reported to higher officials.
Efforts are being carried out to solve the public issue by the District
Collector.
MINI DAM CUM REGULATORS
There are a few check dams in Meenachil river and its tributaries.
But , the storage capacity of these check dams are very low to cater the
needs of the people in this area for domestic and irrigation purposes.
Hence as part of implementing the Meenachil River Valley Project,
investigation have been carried out for constructing mini dam cum
Performance Budget 2017-18 61 Water Resources Department
regulators with high storage capacity. Based on this 7 nos. of mini dam
cum regulators with bridge are proposed across Meenachil river and its
tributaries. These mini dams can store water up to 4m height without
acquiring any land.
Present stage of these mini Dams are as follows.
1.MRVP- Construction of Mini dam with regulator cum Bridge across
Meenachil River at Arunapuram in Pala Municipality.
The proposed site is located at Arunapuram near St. Thomas
college about 3Km from Pala town. By constructing this mini dam of 4m
height , it is expected that water can be stored in the Meenachil river up to
a distance of about 4 Km. The mini dam will be beneficial to the existing
bathing Ghats and to ensure water to KWA water supply schemes. The
bridge will serve as a bye pass and the traffic conjunction of Pala
municipality will be reduced. This is also a link from Pala municipality to
Mutholy Panchayat. A.S. received as per order No. GO(Rt)No.
253/2014/WRD dtd. 4.3.2014.and T S accorded vide order
No.GO(MS)No.73/2015/WRD dated 16/07/2015 for an amount of
Rs.11.314 crore .
There was no fund allotment in the budget during 2015-16,
2016-17 , 2017-18 and 2018-19 for MRVP. Utilizing the fund allotted
in the budget 2015-16 to this work alone under the head of Account:
Â4702-00-102-96 Meenachil Check damsÊ the work was tendered. The
site was handed over to the contractor and the work was started. During
the excavation it was found that the original rock level varied considerably
from the approved design. As per the instruction of IDRB, revised design
was necessitated to continue with the work. Further investigation was
done by KERI, Peechi and redesign received from
IDRB.(Lr.No.1345A/2013/IDRB/DD/D&B dated 22.12.2016).
Based on the redesign, a revised estimate amounting Rs. 16.60
Crores was submitted incorporating recommendations of Chief Technical
Examiner. Recently the Revised Administrative sanction accorded for an
amount of 15.94 Crores as per the order No.GO(Rt)
Performance Budget 2017-18 62 Water Resources Department
No.245/2018/WRD dated 06.04.2018.But discussions are going on
about rate enhancement. The work can be resumed soon after obtaining
necessary orders from Government and also supplementary budget
allocation.
2. MRVP- Construction of Mini dam with regulator cum Bridge across
Meenachil River at Parampuzha in Kottayam Municipality.
The proposed site is located at Parampuzha near timber depot about
1.50 Km from Chavittuvary junction on Kottayam- Ettumanoor road. By
constructing this mini dam of 4m height it is expected that water can be
stored in the Meenachil river up to a distance of 8.5 Km. A.S. received as
per GO (Rt) No. 418/2014/WRD dated 26.4.2014. Based on the local
complaints, an inspection was done by the higher officers. It is found that
the work is not so feasible due to environmental problems. Hence the
work is kept in abeyance.
3. MRVP- Construction of Mini dam with regulator across Meenachil
River at
Pallikkunnu in Ettumanoor Panchayath.
The proposed site is located at Pallikkunnu about 800 m from
Kannampuzha junction in Ettumannoor- Ayarkkunnam road. By
constructing this mini dam of 4m height, it is expected that water can be
stored in the Meenachil river up to a distance of 4 Km. A.S. received as
per GO(Rt)No. 252/2014/WRD dated 4.3.2014.and TS received vide TS
slip bearing No.14/TS/CE PII /2014-15 dated 31/03/2015 for an
amount of Rs. 8.32 crores.
IDRB recommended for taking additional bore holes and hence
redesign is necessitated. As there was no budget provision during 2016-
17, 2017-18 and 2018-19, the work could not be tendered. A.S. and
T.S. expired. Revised estimate may be prepared after getting redesign
from IDRB and the work can be tendered after obtaining budget
provision.
Performance Budget 2017-18 63 Water Resources Department
4. MRVP- Construction of Mini dam with regulator across Meenachil
River at
Chemplavu in Kidangoor Panchayath.
The proposed site is located at Chemplavu kadavu about 3 Km
from Kidangoor town in Kidangoor panchayath. By constructing this mini
dam 4m height it is expected that water can be stored in the Meenachil
river up to a distance of 6 Km A.S. received as per GO (Rt) No.
253/2014/WRD dated. 4.3.2014.and TS received vide TS slip bearing
No.13/TS/CE PII /2014-15 dated 31/03/2015 for an amount of
Rs.8.05 crores.
As there was no budget provision during 2016-2017 and 2017-18,
the work could not be tendered. A.S. and T.S. Expired. Subsequently the
schedule of rates changed, and hence estimate revised as per current
schedule of rates amounting Rs. 10.00 Crore submitted through PRICE
for getting revised AS & TS. Even though the estimate submitted to
NABARD during 2016-17,but no sanction was accorded due to lack of
state share. Now the work included under KIIFB Scheme. And DPR
amounting Rs. 9.10 Crores submitted to KIIFB.
5. MRVP- Construction of regulator cum Bridge across Meenachil River
at
Kuttanal Kadavu in Bharananganam Panhayath.
The proposed site is located at Koottanal Kadavu near
Bharananganam about 1.00 Km from Bharananganam junction on Pala-
Erattupetta road. By constructing this mini dam of 4m height it is
expected that water can be stored in the Meenachil river up to a distance
of 5 Km. A.S. received as per GO (Rt) No. 884/2014/WRD dated
05/09/.2014. for an amount of Rs. 10.75 crores.
As there was no budget provision during 2016-17 and 2017-18,
the work could not be tendered. A.S. and T.S. expired. Estimate under
preparation for obtaining revised A.S. and T.S. through PRICE. Also
submitted the Project under NABARD Schemes. But no sanction
Performance Budget 2017-18 64 Water Resources Department
accorded since there was no state share. Now the work included under
KIIFB Scheme. And DPR amounting Rs. 10.13 Crores submitted to
KIIFB.
6. MRVP- Construction of Mini dam with regulator across Teekoy River
at
Cherippadu in Teekoy Panchayath.
The proposed site is located at Cherippad near 1 Km from Kalathukadavu
and also the down stream of location at which the Kalathoorthodu &
Teekoy thodu combine. A.S. received as per GO (Rt) No.
253/2014/WRD dated 4.3.2014.and TS received vide TS slip bearing
No.12/TS/CE PII /2014-15 dated 31/03/2015 for an amount of
Rs.7.15 crores.
No fund was allotted in the budget 2016-17 and 2017-18. The
A.S. expired. The revised estimate amounting Rs. 7.68 Crores submitted
through PRICE for AS & TS. Even though the estimate submitted to
NABARD, but no sanction was accorded.
7.MRVP- Construction of Check Dam cum Bridge across Meenachil River
( Kalathukkadavu river ) at Chillachi bhagam in Moonnilavu and
Thalappalm Panchayath.
The proposed site is located at Chillachi bhagam about 3.00 Km
from Kalathukkadavu junction on Kalathukkadavu- Vakakkadu road. By
constructing this check dam of 2.00m height it is expected that water can
be stored in the Meenachil river ( Kalathukkadavu river ) up to a distance
of 1.50 Km. A.S. received as per GO (Rt) No. 282/2015/WRD dated
10/04/2015. for an amount of Rs. 3.07 crores.
No fund was allotted in the budget 2016-17 and 2017-18. The
A.S. expired. Based on the Investigation result and IDRB Design DPR
amounting to Rs.3.07 Crores submitted to Government for revised AS.
Performance Budget 2017-18 65 Water Resources Department
GRAPHICAL REPRESENTATION OF
COMPLETED PERCENTAGE OF CANALS UNDER
IDAMALYAR IRRIGATION PROJECT
IIP AYACUT TARGET/ACHIEVED
IIP- WATER DISTRIBUTION PERCENTAGE
GRAPHICAL REPRESENTATION OF
COMPLETED PERCENTAGE OF CANALS UNDER
IDAMALYAR IRRIGATION PROJECT
IIP AYACUT TARGET/ACHIEVED
Total Ayacut Achieved - 2998 Ha
WATER DISTRIBUTION PERCENTAGE
COMPLETED PERCENTAGE OF CANALS UNDER
2998 Ha
Performance Budget 2017-18 66 Water Resources Department
Chapter II
Financial Outlays and Quantifiable Deliverables
The Project II wing of Irrigation Department implements plan schemes
namely Idamalayar Irrigation Project, Muvattupuzha Valley Irrigation
Project, Pambar basin Project, Meenachal River Valley Project and number
of non-plan schemes for the maintenance of completed projects. The Plan
scheme also includes Accelerated Irrigation Benefit Programs and
CADWM for Muvattupuzha Valley Irrigation Scheme.
Plan Scheme : 6389.00 Lacs
Non Plan Scheme : 7400.00 Lacs
Non plan schemes are mainly for the maintenance and upkeep of the
already completed Irrigation Projects and includes Periyar Valley Irrigation
Scheme, Neyyar Irrigation Project, Vazhani Scheme, Pampa Irrigation
Project, Kallada Irrigation Project, Cheerakuzhy Scheme, Chimoni Dam
Project and maintenance of other Irrigation Projects.
The scheme wise financial outlay and quantifiable deliverables are
explained in Annexure-1.
Performance Budget 2017-18 67 Water Resources Department
Irri
gat
ion
Pro
ject
- II
(R
upee
s in
Lak
hs)
Sl.
No
Nam
e of
Sch
eme
Obj
ectiv
esQ
uant
ifiab
le
Del
iver
able
s/P
hysi
c
al o
utpu
t
Pro
ject
ed
Out
com
es
Per
iod
of
impl
emen
tatio n
Rem
arks
/ Ris
kfac
tors
12
35
89
10
4(i)
4(ii)
4(iii
)4(
iv)
Non
Pla
n
Bud
get
Pla
n B
udge
tC
ompl
emen
ta
ry E
xtra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nc
e if
any
21M
UV
AT
TU
PU
ZH
A
VA
LL
EY
IRR
IGA
TIO
N
PR
OJE
CT
.
To
achi
eve
2098
Ha.
Tar
get A
chie
ved
46
7
1345
Lak
hs
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
549.
60
Lakh
s
0
Out
lay
2017
-18
Tar
get f
ixed
3561
9 H
a.19
-Dec
Rev
ised
Est
imat
e
sanc
tion
awai
ted
from
Gov
t. an
d a
bit
of la
nd is
to b
e
rece
ived
for
whi
ch
fund
allo
tted
and
acqu
isiti
on in
fina
l
stag
e.
0
Con
stru
ctio
n
wor
k of
karik
ode,
dist
ribut
ory,
Pira
avom
Br.
Can
al,E
ttum
anoo
r B
r.
Can
al, M
anjo
or,
Mad
akka
than
a
m, &
Eda
yar
dist
y. a
re g
oing
on.
3561
9 H
a16
86.6
3
Lakh
s
3260
8 H
a.
00
Uta
lizat
ion
of 3
TM
C
wat
er a
lloca
ted
as
shar
e of
ker
ala
from
pam
bar
basi
n as
per
final
ver
idic
t of C
auve
ry
dist
ribut
e tr
ibun
al.
00
0P
AM
BA
R B
AS
IN
PR
OJE
CT
S
00
0
AN
NE
XU
RE
– 1
FO
RM
AT
OF
TA
BL
ES
IN C
HA
PT
ER
II O
F P
ER
FO
RM
AN
CE
BU
DG
ET
201
7-18
Per
form
ance
Bud
get 2
017-
1868
Wat
er R
esou
rces
Dep
artm
ent
Wor
k te
mpo
raril
y
stop
ped.
For
resu
min
g th
e w
ork
revi
sed
estim
ate
is
to b
e sa
nctio
ned
and
Tim
e O
f
Com
plet
ion
mus
t be
exte
nded
. Dec
isio
n
rega
rdin
g ra
te
enha
ncem
ent n
ot
rece
ived
from
high
er a
utho
ritie
s.
.
2M
aint
enan
ce
of IB
and
com
poun
d at
Mar
ayur
for
the
year
201
6-
17
Mai
nten
ance
of
Insp
ectio
n B
unga
low
incl
udin
g pu
rcha
se o
f
furn
iture
Civ
il w
ork
com
plet
ed.
Pla
ced
purc
hase
ord
e
for
furn
iture
Mai
nten
anc
e of
IB.
purc
hase
of
furn
iture
11.5
Mai
nten
ance
of C
ivil
wor
k
com
plet
ed
6.5
Ful
l
furn
ishe
d IB
4 m
onth
sP
art b
ill s
ubm
itted
for
Civ
il w
orks
but
no fu
nd a
llotte
d so
far.
Pla
ced
purc
hase
ord
er fo
r
furn
iture
.
1C
onst
ruct
ion
of
Low
er C
hatta
Mun
nar
Dam
in T
hala
yar
sche
me
Con
stru
ctio
nof
ada
m
for
utili
zing
0.21
TM
C
ofw
ater
from
Cau
very
Bas
in
Nil
4000
Nil
Nil
Nil
Com
plet
ion of
inve
stig
atio
n w
orks
Nil
Det
aile
d
Con
tour
Sur
vey
star
ted.
And
soil
inve
stig
atio
n
wor
k te
nder
ed.
Nil
Com
plet
ion
of th
e da
m
24 M
onth
sIn
vest
igat
ion
wor
ks
are
to b
e co
mpl
eted
for
prep
arin
g D
PR
a.
Pat
tisse
ry P
roje
ct
1300
Nil
Nil
Nil
Allo
tmen
t for
prev
ious
bill
s.
12.5
Com
plet
ion
of th
e D
am
cons
truc
tion
24 M
onth
s
b.
Pam
bar
basi
n P
roje
cts
othe
r th
an P
attis
sery
Dam
(RID
F)
Geo
logi
cal
insp
ectio
n of
Geo
logi
sts.
Rev
ised
estim
ate
subm
itted
as
per
revi
sed
desi
gn fo
r
appr
oval
.
To
obta
in
Rev
ised
Adm
inis
trat
i
ve s
anct
ion
from
Gov
ernm
en
t.
nil
1P
amba
r ba
sin-
Re
cons
truc
tion
of
Pat
tisse
ry D
am
and
Can
al
syst
em u
nder
Che
ngal
ar
sche
me
- D
am
and
App
urte
nant
wor
ks.
Con
stru
ctio
nof
ada
m
for
utili
zing
0.07
5T
MC
ofw
ater
from
Cau
very
Bas
in.
Per
form
ance
Bud
get 2
017-
1869
Wat
er R
esou
rces
Dep
artm
ent
2C
onst
ruct
ion
of
Upp
er
Cha
ttam
unna
r
dam
in
Tha
laya
r
sche
me.
Con
stru
ctio
nof
ada
m
for
utili
zing
0.23
TM
C
of w
ater
from
Cau
aver
y
Bas
in.
Nil
Com
plet
ion of
inve
stig
atio
n w
orks
Nil
Det
aile
d
cont
our
surv
ey
star
ted.
Est
imat
e
subm
itted
for
soil
inve
stig
atio
n
wor
ks.
Nil
Com
plet
ion
of th
e da
m
24 M
onth
sIn
vest
igat
ion
wor
ks
are
to b
e co
mpl
eted
for
prep
arin
g D
PR
3C
onst
ruct
ion
of
Otta
mar
am
dam
in
Vat
tava
da
sche
me.
Con
stru
ctio
nof
ada
m
for
utili
zing
0.43
TM
C
ofw
ater
from
Cau
very
Bas
in.
Nil
Com
plet
ion of
inve
stig
atio
n w
orks
Nil
Det
aile
d
cont
our
surv
ey
com
plet
ed.
Est
imat
e
subm
itted
for
soil
inve
stig
atio
n
wor
ks.
Nil
Com
plet
ion
of th
e da
m
24 M
onth
sIn
vest
igat
ion
wor
ks
are
to b
e co
mpl
eted
for
prep
arin
g D
PR
3M
EE
NA
CH
IL R
IVE
R
VA
LL
EY
PR
OJE
CT
S
00
00
00
To
prov
ide
Irrig
atio
n
faci
litie
s in
Par
ts o
f
Mee
nach
il,K
otta
yam
and
Cha
ngan
asse
rry
Tal
uks
by c
onst
ruct
ing
6 N
os o
f Reg
ulat
or
cum
Brid
ge a
cros
s
Mee
nach
il R
iver
.
00
0
Per
form
ance
Bud
get 2
017-
1870
Wat
er R
esou
rces
Dep
artm
ent
a.M
RV
P-
Con
stru
ctio
n of
Min
i Dam
with
Reg
ulat
or c
um
brid
ge a
cros
s
Mee
nach
il
river
at
Aru
napu
ram
in
Pal
a
Mun
cipa
lity
Con
stru
ctio
nof
Reg
ulat
orcu
mB
ridge
atA
runa
pura
mto
prov
ide
Irrig
atio
n
faci
litie
sin
Par
tsof
Mee
nach
ilT
aluk
and
redu
cetr
affic
conj
unct
ion
inP
ala
mun
cipa
lity.
Nil
Nil
Nil
Nil
To
obta
in
Rev
ised
Adm
inis
trat
ive
sanc
tion
from
Gov
ernm
ent.
Nil
Nil
Nil
Nil
Con
stru
ctio
n of
Min
i
Dam
with
Reg
ulat
or
cum
brid
ge
acro
ss
Mee
nach
il
river
at
Aru
napu
ra
m in
Pal
a
Mun
cipa
lity
24 M
onth
sD
ecis
ion
rega
rdin
g
rate
enh
ance
men
t
and
sanc
tion
of
Rev
ised
Adm
inis
trat
ive
sanc
tion
pend
ing
with
Gov
ernm
ent.
b.M
RV
P-
Con
stru
ctio
n of
Min
i Dam
with
Reg
ulat
or c
um
brid
ge a
cros
s
Mee
nach
il
river
at
Par
ampu
zha
in K
otta
yam
Mun
icip
ality
To
prov
ide
Irrig
atio
n
faci
litie
sin
Par
tsof
Mee
nach
il,K
otta
yam
and
Cha
ngan
asse
rry
Tal
uks
byco
nstr
uctin
g
6N
osof
Reg
ulat
or
cum
Brid
geac
ross
Mee
nach
il R
iver
.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Rev
ised
AS
and
TS
to b
e ac
cord
ed
Per
form
ance
Bud
get 2
017-
1871
Wat
er R
esou
rces
Dep
artm
ent
c.M
RV
P-
Con
stru
ctio
n of
Min
i Dam
cum
Reg
ulat
or
acro
ss
Mee
nach
il
river
at
Pal
likku
nnu
in
Ettu
man
oor
Pan
chay
at.
To
prov
ide
Irrig
atio
n
faci
litie
sin
Par
tsof
Mee
nach
il,K
otta
yam
and
Cha
ngan
asse
rry
Tal
uks
byco
nstr
uctin
g
6N
osof
Reg
ulat
or
cum
Brid
geac
ross
Mee
nach
il R
iver
.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Rev
ised
AS
and
TS
to b
e ac
cord
ed
d.M
RV
P-
Con
stru
ctio
n of
Min
i Dam
with
Reg
ulat
or
acro
ss
Mee
nach
il
river
at
Che
mpi
lavu
in
Kid
ango
or
Pan
chay
at.
To
prov
ide
Irrig
atio
n
faci
litie
sin
Par
tsof
Mee
nach
il,K
otta
yam
and
Cha
ngan
asse
rry
Tal
uks
byco
nstr
uctin
g
6N
osof
Reg
ulat
or
cum
Brid
geac
ross
Mee
nach
il R
iver
.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Rev
ised
AS
and
TS
to b
e ac
cord
ed
e.M
RV
P-
Con
stru
ctio
n of
Min
i Dam
with
Reg
ulat
or c
um
brid
ge a
cros
s
Mee
nach
il
river
at
Kui
ttana
l
Kad
avu
in
Bha
rana
ngan
a
m P
anch
ayat
To
prov
ide
Irrig
atio
n
faci
litie
sin
Par
tsof
Mee
nach
il,K
otta
yam
and
Cha
ngan
asse
rry
Tal
uks
byco
nstr
uctin
g
6N
osof
Reg
ulat
or
cum
Brid
geac
ross
Mee
nach
il R
iver
.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Rev
ised
AS
and
TS
to b
e ac
cord
ed
Per
form
ance
Bud
get 2
017-
1872
Wat
er R
esou
rces
Dep
artm
ent
f.M
RV
P-
Con
stru
ctio
n of
Min
i Dam
cum
Reg
ulat
or
acro
ss T
eeko
y
river
at
Che
rippa
d in
Tee
koy
Pan
chay
at.
To
prov
ide
Irrig
atio
n
faci
litie
sin
Par
tsof
Mee
nach
il,K
otta
yam
and
Cha
ngan
asse
rry
Tal
uks
byco
nstr
uctin
g
6N
osof
Reg
ulat
or
cum
Brid
geac
ross
Mee
nach
il R
iver
.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Rev
ised
AS
and
TS
to b
e ac
cord
ed
g.M
RV
P-
Con
stru
ctiio
n
of c
heck
da
m
cum
brid
ge
acro
ss
Mee
nach
il
river
(Kal
athu
kada
v
u) a
t C
hilla
chi
kada
vu in
Moo
nnila
vu
Pan
chay
at.
To
prov
ide
Irrig
atio
n
faci
litie
sin
Par
tsof
Mee
nach
il,K
otta
yam
and
Cha
ngan
asse
rry
Tal
uks
byco
nstr
uctin
g
6N
osof
Reg
ulat
or
cum
Brid
geac
ross
Mee
nach
il R
iver
.
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Rev
ised
AS
and
TS
to b
e ac
cord
ed
Per
form
ance
Bud
get 2
017-
1873
Wat
er R
esou
rces
Dep
artm
ent
4T
o ac
hiev
e an
aya
cut
of 1
4394
Ha
Nil
2000
lakh
sN
ilN
ilT
otal
aya
cut
achi
eved
is
3048
Ha
5098
Ha.
10 c
rore
for
wor
ks
3048
Ha.
2504
lakh
s30
48 H
a.M
ain
Can
al b
und
road
thro
ugh
For
est
area
of l
engt
h 13
Km
has
bee
n ta
rred
durin
g th
is y
ear
wat
er d
istr
ibut
ion
was
don
e th
roug
h
Mai
n ca
nal a
nd L
LC
upto
900
0m. A
nnua
l
mai
nten
ance
of
cana
ls a
nd
build
ings
and
rect
ifica
tion
wor
ks
also
don
e du
ring
this
yea
r.
IDA
MA
LA
YA
R
IRR
IGA
TIO
N P
RO
JEC
T
Per
form
ance
Bud
get 2
017-
1874
Wat
er R
esou
rces
Dep
artm
ent
Chapter III
REFORM MEASURES AND PERFORMANCES
The Muvattupuzha Valley Irrigation Project and Idamalayar
Irrigation Projects are in the later stage of completion. If adequate funds
are provided, the works of the projects can be completed in the coming
years.
The major functions of this project wing consists of planning,
designing monitoring and execution of major and medium irrigation
projects and maintenance of completed projects. The main ongoing
projects are as follows:-
1. Muvattupuzha Valley Irrigation Project (MVIP)
2. Idamalayar Irrigation Project (IIP)
3. Pambar Basin Project (PBP)
4. Meenachil River Valley Project
Maintenance of completed Projects
The Department is responsible for proper maintenance of completed projects,
viz.
1. Periyar Valley Irrigation Project
2. Pamba Irrigation Project
3. Kallada Irrigation Projects
4. Neyyar Irrigation Project
5. Vazhani Scheme
6. Chalakkudy River Diversion Scheme
7. Cheerakkuzhy Scheme
8. Chimmoni Dam Project
1. MVIP :- The project MVIP consists of two canal system, one on the
Right Bank and the other on the Left Bank. The left bank main canal is
37.10km long and have five branches namely Marady, Ramamangalm,
Piravom, Mulakkulam and Ettumanur. The Right Bank main canal is
28.337km long has only one branch canal, Muvattupuzha branch canal.
Left bank main canal and right bank main canals are completed to its full
Performance Budget 2017-18 75 Water Resources Department
length. Branch canal works for 54.645km are completed out of
57.154km and works are in progress for a length of 2.509km. Out of
overall length of 213 km of distributaries, works in 190.959 km is
completed and works in 14.245 km is in progress. The works in 7.796
km is to be arranged. Since 1994, water distribution is being carried out
in the completed stretches of canals. Out of the 35619 Ha potential,
envisaged through the project, 32,608 Ha had been created till date.
Since some intervening missing links could not be completed till date, the
gross potential achieved through the project is 30627 Ha.
2. IIP:-. The Main canal 32.278 km (100%) completed, 14.76 km of
Low level canal is completed out of 27.25 km, 2.793 km of Link canal is
completed out of 7.575 km. Proposed ayacut is 14394 Ha. Out of this
an ayacut of 3048 Ha is achieved.
3. Pambar Basin Project:- Pambar River is an east flowing river which is a
tributary of Cauvery River. It is located in Idukki District. Pambar river is
flowing upstream of Amaravathy Reservoir in Tamilnadu. This is an
interstate river. Kerala is eligible for 30TMC of water from Cauvery basin
out of this 3TMC is Pambar basinÊs share. 4 dams are proposed in three
river scheme viz. Thalayar Scheme, Chengalar Scheme and Vattavada
Scheme. AS and TS have been issued for reconstruction of Pattissery Dam
under Chengular Scheme (26 Crore) work is under construction.
Investigation works has been done for other three Dams.
4. Meenachil Project:- Meenachil Project envisages construction of mini
dams and regulators and Pazhukkakanam Dam and canal in Phase 1 and
2. Administrative sanction has been received for 6 mini dams & one check
Dam Pazhukkakanam Dam and canals. There is no budget provision
provided during 2017-18. Technical sanctions were accorded for 3 mini
dams and the works were to be taken up for execution, but A S expired.
Hence proposals submitted to govt. for revised A S.
Works of 2 mini dams Chempilavu and Kuttanalkadavu were
included under KIIFB and in principal sanction accorded vide GO(Rt)
No.851/2017/WRD dated 17.10.2017. Work of mini dam at
Arunapuram was awarded and work started.
Performance Budget 2017-18 76 Water Resources Department
Chapter IV
REVIEW OF PAST PERFORMANCE
During 2017-18 the total Budget allocation for the major Irrigation
Projects under plan scheme was 6389.00 lakhs and mainly includes the
Idamalayar Irrigation Projects and Muvattupuzha Valley Irrigation Project.
The maintenance and running of commissioned projects and canals are
carried out under Non plan scheme. The budget allocation for non-plan
scheme was Rs.7400.00 Lakhs. The twelfth plan policy emphasized the
need for faster completion of long pending Irrigation Projects and the
completion of Muvattupuzha Irrigation Projects was given priority and to
achieve the envisaged ayacut in the project .Constructing branch canal and
distributors were carried out.
Reconstruction of Pattissery Dam at Chengular Scheme and
Arunapuram was started.
The details of target and achievement are shown
below. ( ANNEXURE-II )
Performance Budget 2017-18 77 Water Resources Department
Irri
ga
tio
n P
roje
ct -
II
S
l. N
o.
Na
me
of
the
Sch
em
e/P
rog
ram
me
Ob
ject
ive
/Ou
tco
me
Bu
dg
et
Ou
tla
y i
n
Lak
hs
20
17
-18
Ex
pe
nd
itu
re
in L
ak
hs
20
17
-18
De
liv
era
ble
s /
Ph
ysi
cal
ou
tpu
tsA
chie
ve
me
nt
Re
aso
n f
or
va
ria
tio
n
13
45
67
8
Fo
r sa
nct
ion
of
Re
vis
ed
Est
ima
te
aw
ait
ed
fro
m G
ovt.
Lan
d a
cqu
isit
ion
of
mis
sin
g l
ink
s.
2U
tali
zati
on
of
3 T
MC
wa
ter
all
oca
ted
as
sha
re o
f k
era
la f
rom
pa
mb
ar
ba
sin
as
pe
r fi
na
l ve
rid
ict
of
Ca
uve
ry d
istr
ibu
te t
rib
un
al.
Ua
.P
am
ba
r b
asi
n-R
e
con
stru
ctio
n o
f P
att
isse
ry
Da
m a
nd
Ca
na
l sys
tem
u
nd
er
Ch
en
ga
lar
sch
em
e
- D
am
an
d A
pp
urt
en
an
t w
ork
s.
Co
nst
ruct
ion
of
a d
am
fo
r u
tiliz
ing
0.0
75
TM
C o
f w
ate
r fr
om
C
au
ave
ry B
asi
n.
10
00
1.1
3N
ilN
ilA
s p
er
the
dir
ect
ion
of
Ge
olo
gis
ts f
ou
nd
ing
le
vel o
f co
ncr
ete
da
m d
ee
pe
ne
d u
p t
o
11
M.H
en
ce R
evi
sed
d
esi
gn
is
ne
cess
itia
ted
.
b.
Pa
mb
ar
ba
sin
Pro
ject
s o
the
r th
an
Pa
ttis
sery
D
am
(RID
F)
Co
stru
ctio
n o
f D
am
s a
t U
pp
er
cha
tta
mu
nn
ar,
Lo
we
r ch
att
am
un
na
r a
nd
Ott
am
ara
m
70
0N
ilN
ilN
ilIn
vest
iga
tio
n w
ork
s fo
r th
ree
d
am
s in
terr
up
ted
PA
MB
AR
BA
SIN
PR
OJE
CT
S
Ch
ap
ter
IV:
Re
vie
w o
f P
ast
Pe
rfo
rma
nce
Sta
tem
en
t o
f O
utl
ay
/ O
utc
om
es/
Ta
rge
t 2
01
7-1
8 a
nd
Act
ua
l A
chie
ve
me
nt
20
17
-18
PLA
N/
MA
JOR
SC
HE
ME
S
2
1M
UV
AT
TU
PU
ZH
A V
ALL
EY
IR
RIG
AT
ION
PR
OJE
CT
For
ach
ievin
g 3
011 H
a.
Ayacu
t
54
9.6
72
6.8
6T
he
wo
rk o
f E
ttu
ma
no
or
Br.
Ca
na
l o
ve
r ra
ilw
ay
po
rtio
n n
ea
rin
g
com
ple
tio
n.
An
ica
d e
ast
an
d E
lan
ji d
istr
ibu
tary
wo
rk t
en
de
red
an
d
sta
rte
d.
Ma
jor
wo
rk i
n
Ra
ilw
ay
po
rtio
n a
lso
ne
ari
ng
co
mp
leti
on
. D
RIP
wo
rks
in D
am
po
rtio
n
com
ple
ted
.
15
08
Ha
.
AN
NE
XU
RE
- I
I
Per
form
ance
Bud
get 2
017-
1878
Wat
er R
esou
rces
Dep
artm
ent
3M
EE
NA
CH
I
L R
IVE
R
VA
LLE
Y
PR
OJE
CT
S
To
pro
vid
e I
rrig
ati
on
faci
liti
es
in P
art
s o
f
Me
en
ach
il,K
ott
ay
am
an
d
Ch
an
ga
na
sse
rry
Ta
luk
s b
y
con
stru
ctin
g 6
No
s o
f
Re
gu
lato
r cu
m B
rid
ge
acr
oss
Me
en
ach
il R
ive
r.
a.
MR
VP
-Co
nst
ruct
ion
of
Min
i Da
m w
ith R
eg
ula
tor
cum
bri
dg
e a
cro
ss
Me
en
ach
il ri
ver
at
A
run
ap
ura
m in
Pa
la
Mu
nci
pa
lity
To
pro
vid
e I
rrig
atio
n f
aci
litie
s in
P
art
s o
f M
ee
na
chil,
Ko
tta
yam
an
d
Ch
an
ga
na
sse
rry
Ta
luks
by
con
stru
ctin
g 6
No
s o
f R
eg
ula
tor
cum
Bri
dg
e a
cro
ss M
ee
na
chil
Riv
er.
11
80
Nil
Nil
Wo
rk
ten
de
red
a
nd
st
art
ed
Ag
ree
me
nt
exe
cute
d o
nly
on
F
eb
20
16
b.
MR
VP
-Co
nst
ruct
ion
of
Min
i Da
m w
ith R
eg
ula
tor
cum
bri
dg
e a
cro
ss
Me
en
ach
il ri
ver
at
Pa
ram
pu
zha
in
K
ott
aya
m M
un
icip
alit
y
To
pro
vid
e I
rrig
atio
n f
aci
litie
s in
P
art
s o
f M
ee
na
chil,
Ko
tta
yam
an
d
Ch
an
ga
na
sse
rry
Ta
luks
by
con
stru
ctin
g 6
No
s o
f R
eg
ula
tor
cum
Bri
dg
e a
cro
ss M
ee
na
chil
Riv
er.
Nil
Nil
Nil
Nil
AS
an
d T
S w
ere
ob
tain
ed
. B
ut
wo
rk n
ot
ten
de
red
du
e t
o n
on
a
vila
bili
ty o
f B
ud
ge
t a
lloca
tio
n.
c.M
RV
P-C
on
stru
ctio
n o
f M
ini D
am
cu
m R
eg
ula
tor
acr
oss
Me
en
ach
il ri
ver
at
Pa
llikk
un
nu
in
Ett
um
an
oo
r P
an
cha
yat.
To
pro
vid
e I
rrig
atio
n f
aci
litie
s in
P
art
s o
f M
ee
na
chil,
Ko
tta
yam
an
d
Ch
an
ga
na
sse
rry
Ta
luks
by
con
stru
ctin
g 6
No
s o
f R
eg
ula
tor
cum
Bri
dg
e a
cro
ss M
ee
na
chil
Riv
er.
Nil
Nil
Nil
Nil
AS
an
d T
S w
ere
ob
tain
ed
. B
ut
wo
rk n
ot
ten
de
red
du
e t
o n
on
a
vila
bili
ty o
f B
ud
ge
t a
lloca
tio
n.
A
s d
ire
cte
d b
y ID
RB
, a
dd
itio
na
l b
ore
ho
les
to b
e t
ake
n,
Re
d
esi
gn
aw
aite
d f
rom
ID
RB
.
d.
MR
VP
-Co
nst
ruct
ion
of
Min
i Da
m w
ith R
eg
ula
tor
acr
oss
Me
en
ach
il ri
ver
at
Ch
em
pila
vu in
Kid
an
go
or
Pa
nch
aya
t.
To
pro
vid
e I
rrig
atio
n f
aci
litie
s in
P
art
s o
f M
ee
na
chil,
Ko
tta
yam
an
d
Ch
an
ga
na
sse
rry
Ta
luks
by
con
stru
ctin
g 6
No
s o
f R
eg
ula
tor
cum
Bri
dg
e a
cro
ss M
ee
na
chil
Riv
er.
Nil
Nil
Nil
Nil
Wo
rk in
clu
de
d u
nd
er
KII
FB
Per
form
ance
Bud
get 2
017-
1879
Wat
er R
esou
rces
Dep
artm
ent
e.
MR
VP
-Co
nst
ruct
ion
of
Min
i Da
m w
ith R
eg
ula
tor
cum
bri
dg
e a
cro
ss
Me
en
ach
il ri
ver
at
Ku
itta
na
l Ka
da
vu in
B
ha
ran
an
ga
na
m
Pa
nch
aya
t
To
pro
vid
e I
rrig
atio
n f
aci
litie
s in
P
art
s o
f M
ee
na
chil,
Ko
tta
yam
an
d
Ch
an
ga
na
sse
rry
Ta
luks
by
con
stru
ctin
g 6
No
s o
f R
eg
ula
tor
cum
Bri
dg
e a
cro
ss M
ee
na
chil
Riv
er.
Nil
Nil
Nil
Nil
Wo
rk in
clu
de
d u
nd
er
KII
FB
f.M
RV
P-C
on
stru
ctio
n o
f M
ini D
am
cu
m R
eg
ula
tor
acr
oss
Te
eko
y ri
ver
at
Ch
eri
pp
ad
in T
ee
koy
Pa
nch
aya
t.
To
pro
vid
e I
rrig
atio
n f
aci
litie
s in
P
art
s o
f M
ee
na
chil,
Ko
tta
yam
an
d
Ch
an
ga
na
sse
rry
Ta
luks
by
con
stru
ctin
g 6
No
s o
f R
eg
ula
tor
cum
Bri
dg
e a
cro
ss M
ee
na
chil
Riv
er.
Nil
Nil
Nil
Nil
AS
an
d T
S w
ere
ob
tain
ed
. B
ut
wo
rk n
ot
ten
de
red
du
e t
o n
on
a
vila
bili
ty o
f B
ud
ge
t a
lloca
tio
n.
g.
MR
VP
-Co
nst
ruct
iion
of
ch
eck
d
am
cu
m b
rid
ge
a
cro
ss M
ee
na
chil
rive
r (K
ala
thu
kad
avu
) a
t
Ch
illa
chi
kad
avu
in
Mo
on
nila
vu P
t.
To
pro
vid
e I
rrig
atio
n f
aci
litie
s in
P
art
s o
f M
ee
na
chil,
Ko
tta
yam
an
d
Ch
an
ga
na
sse
rry
Ta
luks
by
con
stru
ctin
g 6
No
s o
f R
eg
ula
tor
cum
Bri
dg
e a
cro
ss M
ee
na
chil
Riv
er.
Nil
Nil
Nil
Nil
AS
ob
tain
ed
. B
ut
wo
rk n
ot
ten
de
red
du
e t
o n
on
avi
lab
ility
of
Bu
dg
et
allo
catio
n.
Pro
po
sal
sub
mitte
d t
o G
ovt
. fo
r re
vise
d
AS
.
Low
Le
ve
l C
an
al
(LLC
) –
19
01
mLL
C -
Nil
LLC
- W
ork
arr
an
ge
d f
or
19
01
m
Lin
k C
an
al
– 2
03
mLi
nk
Ca
na
l -
Wo
rk a
rra
ng
ed
fo
r
26
3m
Mo
dif
ica
tio
n o
f R
BM
C –
24
00
mLi
nk
Ca
na
l –
Nil
RB
MC
- W
ork
Mo
dif
ica
tio
n o
f R
BM
C -
Nil
arr
an
ge
d f
or
10
50
m
Nil
4ID
AM
ALA
YA
R I
RR
IGA
TIO
N P
RO
JEC
T1
05
01
34
2.9
3
Per
form
ance
Bud
get 2
017-
1880
Wat
er R
esou
rces
Dep
artm
ent
Chapter V
FINANCIAL REVIEW
This section Financial Review depicts the trends in expenditure of a
particular scheme priority works which is outlined in Annexure III
Performance Budget 2017-18 81 Water Resources Department
Irri
ga
tio
n P
roje
ct -
II
(Rs.
in
la
kh
)
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
1Id
am
ala
y I
rrig
tio
n P
roje
ct4
70
02
12
12
00
02
00
01
35
02
12
11
63
01
00
02
12
11
62
9.9
72
59
0
2M
uv
att
up
uzh
Va
lle
y
Irri
ga
tio
n P
roje
ct4
70
02
00
02
10
01
00
01
50
02
22
83
93
31
06
22
22
83
93
2.6
63
09
1
Bu
dg
et
Est
ima
tes
Re
vis
ed
Est
ima
tes
Act
ua
l E
xpe
nd
itu
re
Ch
ap
ter
V:
Fin
an
cia
l R
ev
iew
AN
NE
XU
E –
III
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
tes/
Re
vis
ed
Est
ima
tes
in r
ece
nt
ye
ars
- [
A]
PLA
N
No
.S
che
me
/Pro
gra
mm
eM
ajo
r
He
ad
2Ir
rig
ati
on
Pro
ject
47
00
20
00
21
00
10
00
15
00
22
28
39
33
10
62
22
28
39
32
.66
30
91
3P
am
ba
r b
asi
n P
roje
ct4
70
11
70
05
00
05
30
07
00
1.1
35
60
1.1
35
5.7
41
3
4M
ee
na
cha
l P
roje
ct4
70
0--
----
----
----
----
--
Per
form
ance
Bud
get 2
017-
1882
Wat
er R
esou
rces
Dep
artm
ent
AN
NE
XU
E –
III
Gra
ph
ica
l v
iew
of
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
tes/
Re
vis
ed
Est
ima
tes
in r
ece
nt
ye
ars
-
[A
] P
LAN
30
00
40
00
50
00
60
00
Ida
ma
lay Irr
igti
on
Pro
ject
Mu
va
ttu
pu
zh V
alle
y
Irri
ga
tio
n P
roje
ct
Pa
mb
ar
ba
sin
Pro
ject
Rupees in Lakh
0
10
00
20
00
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
Ma
jor
He
ad
Bu
dg
et
Est
ima
tes
Re
vis
ed
Est
ima
tes
Act
ua
l Exp
en
dit
ure
Me
en
ach
al P
roje
ct
Rupees in Lakh
Fin
an
cia
l Y
ea
rs
Per
form
ance
Bud
get 2
017-
1883
Wat
er R
esou
rces
Dep
artm
ent
Irrig
ati
on
Pro
ject
- II
No
.S
ch
em
e/P
rog
ram
me
Majo
r
Head
12
3
Ch
ap
ter V
: F
ina
ncia
l R
ev
iew
AN
NE
XU
E –
III
Tren
ds i
n E
xp
en
dit
ure v
iz-a
-viz
Bu
dg
et
Esti
ma
tes/
Rev
ised
Esti
ma
tes i
n r
ecen
t y
ea
rs -
[B
] N
ON
-PL
AN
Bu
dg
et
Est
imate
sR
ev
ised
Est
imate
sA
ctu
al
Ex
pen
dit
ure
(Ru
peess
in
lak
h)
Bu
dg
et
Est
imate
sR
ev
ised
Est
imate
sA
ctu
al
Ex
pen
dit
ure
Sch
em
e/P
rog
ram
me
Majo
r
Head
45
6
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
201
5-1
62
01
6-1
72
01
7-1
8
Pri
ori
ty w
ork
47
01
0.0
10
.01
0.0
10
.01
56
82
65
.46
55
56
82
65
.46
55
Head
Per
form
ance
Bud
get 2
017-
1884
Wat
er R
esou
rces
Dep
artm
ent
Gra
ph
ica
l v
iew
of
Tren
ds i
n E
xp
en
dit
ure v
iz-a
-viz
Bu
dg
et
Esti
ma
tes/
Rev
ised
Esti
ma
tes i
n r
ecen
t y
ea
rs -
[B
] N
ON
-PL
AN
AN
NE
XU
E –
III
35
00
40
00
45
00
50
00
Pri
ori
ty w
ork
0
50
0
10
00
15
00
20
00
25
00
30
00
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
Ma
jor
He
ad
Bu
dg
et
Est
ima
tes
Re
vis
ed
Est
ima
tes
Act
ua
l Exp
en
dit
ure
Pri
ori
ty w
ork
Per
form
ance
Bud
get 2
017-
1885
Wat
er R
esou
rces
Dep
artm
ent
KUTTANAD PACKAGE
Chapter- I
INTRODUCTION
The Kuttanad Wet Land System Comprising of 32 Panchayaths of
Alappuzha District, 27 panchayaths of Kottayam District and 5
Panchayaths of Pathanamthitta District is predominantly agriculture belt of
Kerala, where people are dependent on farming and allied activities like
fishing, animal husbandry etc for livelihood. Cultivation is taken up along
continuous blocks or padasekharam or polders bounded by rivers and
canals. Before sowing, the flooded water is pumped out using engine
pumps after the bunds are repaired. But during the monsoon and other
heavy rains the flow in the canals and rivers increases, which may lead to
breach of weak bund causing floods in the paddy field and result in heavy
crop loss. Also the standing crops are subject to extensive damage due to
salinity intrusion through the estuaries during the dry seasons.
Kuttanad region and its community were facing severe agrarian
distress for the last many decades owing to the above problems and due to
variety of other factors. Based on the request of the Government of Kerala
to address the perennial problem faced in Kuttanad, the Union
Government entrusted Dr. M.S. Swaminathan Foundation, Chennai to
conduct a scientific study of the region and suggest suitable measurers to
mitigate agrarian distress in Kuttanad.
To mitigate the agrarian distress the MSSRF recommended a
variety of interventions to be implemented as a Package with a total cost
of Rs. 1840 Cr. (2007 Price Level ) which was accepted by the Union
Government of funding under ongoing central sector schemes out of
which those related to Flood Control, Salinity Management and drainage
with a total cost of 1517.90 Cr are undertaken by the Irrigation
Department under the Chief Engineer Kuttanad Package, Alappuzha.
Performance Budget 2017-18 86 Water Resources Department
Functions and objectives of Department
The strategy of Management of Flood is by erection of strong
bunds along the periphery of the padasekharms of Kuttanad wet land with
clay obtained from deepening the channels all around and protecting the
clay bund thus formed by constructing retaining wall using rubble
masonery or Pile & Slab along the channel side where the existing bund is
very weak. Also modernization of Thanneermukkom Barrage (TMB) which
regulates saline water intrusion during dry season is also taken up for
execution which includes construction of RCB at the 3rd stage replacing
existing earthen bund and replacing old shutters with stainless steel
shutters in the 1st& 2nd stage etc. This will contribute immensely to
manage flood efficiently. A scheme for improving the efficiency to
Thottappally Spillway (TSW) which diverts the excess flood water directly
to the sea is also taken up for alleviating problem caused by flood in
Kuttanad Region.
The Central Government while accepting the report of M.S
Swaminathan foundation has reiterated that proposals made in the report
shall be proposed for funding under the appropriate schemes of the
concerned ministries. Accordingly all the schemes under Kuttanad package
were proposed for funding under „Flood Management Programme‰
After extensive study and surveys detailed project reports were
prepared & submitted to Government of India for funding under FMP. So
far 4 schemes namely (1) KEL -1 –FMP – Mitigation of Floods in Group -
1, 14 Padasekharams in Kuttanad Region of Kerala (2). KEL-2 – FMP-
Regulation of flood water in Kayal area -4 padashekharams and Mitigation
of Flood in Group 9-5 padasekharams in Kuttanad region of Kerala, (3)
KEL-III –FMP- Mitigation of flood in Kuttanad Region phase –I (Group 2-
5,7-8,8-10), 231 padasekharams (4) KEL-IV – Mitigation of flood in
Onattukara region comprising of 12 water sheds have been sanctioned in
2010 and 2011 Besides 3 Projects namely „ Mitigation of flood in 397
padasekharams of Kuttanad Taluk and Mitigation of flood in 14
Performance Budget 2017-18 87 Water Resources Department
padasekharams of Veeyapuram panchayath of Kuttanad Constituency in
Alappuzha District‰ , „Modernization of Thanneermukkom bund to
manage salinity and minimize ecological decay‰ & „ Renovation of
Leading Channel For efficient flood Water Disposal from the confluence of
Pamba and Achankovil Rivers to Sea At Thottappally‰ have been
proposed for central assistance under FMP. The DPR for Modernization of
Thanneermukkom Bund has been approved by 124th meeting Advisory
committee of MoWR on 16/10/2014. The investment clearance was
issued by investment clearance committee of MoWR on 10/02/2017.
2. Organizational set up
The office headed by a Chief Engineer at Alappuzha with two
Circle offices at Chengannur & Kottayam four division offices at
Mancombu. Chengannur, Kottayam and Thanneermukkom, 10 Sub
divisions and 31 Sections along with all supporting staffs In addition to
this, a Quality control and Monitoring wing under the Chief Engineer with
an Executive Engineer and two Assistant Engineers at Chief EngineerÊs
office, Alappuzha and Quality Control Lab at Thanneermukkom is also
functioning.
3. Major Schemes :
Seven schemes are undertaken by Irrigation Department under
Kuttanad package under the Head of Account 4711-01-103-87 (PV). The
work executed during 2016-17 was spill over works that were taken up
during previous year under the Head of Account 4711-01-103-87 KP
(PV). The details are given in the table below.
Sl.No Name of projects (AS amount
Rs.In lakhs)
Scheme Details Status as on
31-03-2017
1
Sch
em
e a
ppro
ved
by
GoI
KEL-1 –FMP –
Mitigation of floods in
Group-1, 14
padashekharams in
Kuttanad Region of
Kerala
2476.0 Mitigation of flood
by outer bund
construction in 14
padasekharams in
Nedumudy
Panchayat
All the 14
works
arranged and
completed as
on 31-03-
2016.
Performance Budget 2017-18 88 Water Resources Department
2 KEL-2 – FMP regulation
of flood water in Kayal
area -4
padashekharams and
Mitigation of Flood in
Group -9-5
padashekharams and
Mitigation of Flood
inGroup 9-5
padashekharams in
Kuttanad region of
Kerala
11891.30 Mitigation of
flood by outer
bund construction
in 9
padasekharams in
Kayal area
All the three
works covering
9
padasekharam
were
completed as
on 30-09-
2016
3 KEL-3 – FMP
Mitigation of flood in
Kuttanad Region –
Phase –I, (Group 25,7-
8,10-19), 231
padasekharams
37915.0 Mitigation of
flood by outer
bund construction
in 12 nos
watersheds in
Onattukara region
57 works
covering 94
padasekharams
were arranged
for execution,
46 works
completed.
4 KEL-4 – Mitigation of
flood in Onattukara
region comprising of 12
water sheds
25275.00 Mitigation of
flood by outer
bund construction
in 12 nos
watersheds in
Onattukara
region.
21 works that
spread over 5
watershed in
Onattukara
were arranged
9 works
completed
balance work
are in progress
Performance Budget 2017-18 89 Water Resources Department
5
New
pro
ject
s (to b
e sa
nct
ioned b
y G
OI) Mitigation of flood in
397 padashekharams of
Kuttanad Taluk and
Mitigation of flood in
14 padashekharams of
Veeyapuram
panchayath of Kuttanad
Constituency in
Alappuzha District
75839.00
(*)
Mitigation of
flood by outer
bund construction
in 397
padasekharams of
Kuttanad Taluk
and 14
padashekharms of
Veeyapuram
panchayath of
Kuttanad
Constituency
57 works
covering 57
padasekharams
of Kuttanad
Taluk were
arranged for
execution 50
works
completed
three works
terminated
balance work
are in progress 6
New
Pro
ject
s (to b
e s
anct
ioned b
y G
OI)
Modernization of
Thanneermukkom bund
to manage salinity and
minimize ecological
decay
25534.00 Mitigation of
flood and
controlling salinity
in the
padasekharams of
Kuttanad region.
Modernization
includes
construction of
third stage of
Thanneermukkom
bund,
Replacement of
existing shutters
with stainless steel
shutters with
automatic control
system.
84% of Civil,
Mechanical
works of 3rd
stage
completed. 52
Nos of shutters
of 1st& IInd
stage replaced
with new SS
shutters 20
feet lock gate
works
completed.
Balance work
nearing
completion.
7 Renovation of Leading
Channel For efficient
Flood Water Disposal
From the confluence of
Pamba and Achankovil
Rivers to Sea At
Thottappally
1349.00(#) Flood mitigation
works of two
padasekharams,
dredging of
leading channel,
Sand bar removal
at the mouth of
spillway and
replacement of
As per original
DPR works
was arranged
by mechanical
wing. The
replacement of
40 nos of
shutters has
been
Performance Budget 2017-18 90 Water Resources Department
40 nos corroded
spillway shutters
with stainless steel
shutters.
completed.
The dredging
work was
taken up
Departmently
by mechanical
wing of
Irrigation. The
dredging work
at Kayal area
was arranged
at to the extent
of fund
released. No
further work is
intended to be
taken up at the
present.
*Original administrative sanction was issued for the scheme „
Mitigation of flood in Padasekharams of Kuttanad Taluk „ for Rs.
758.39 Cr covering 397 padasekharams of Kuttanad taluk and
works were tendered. Later, due to revision of SoR and as per the
decision of the prosperity Council on 07-10-14 to include 14
padasekharams of Veeyapuram Panchayat. DPR has been revised
with an estimate cost of Rs. 1212.45 Cr and submitted to
government for obtaining Central assistance. Revised Administrative
Sanction has to be issued.
# Original Administrative sanction was accorded for „ Improving
efficiency of Thottappally spillway for Rs.13.49 Cr. The work of
fabrication and erection of stainless steel shutters tendered and
arrange. Dredging work taken up Department by mechanical wing.
Later DPR has been revised within estimate cost of Rs.47 Cr based
on revised SoR and including 2 adjoining Padasekharams in
Performance Budget 2017-18 91 Water Resources Department
veeyapuram panchayath and submitted to Government for getting
Central assistance under FMP.
The KEL-1 project has been completed. An area of 574.83
Hectare of paddy field has been protected by constructing
/strengthening 39.93 km bund. In KEL-II, 65.25 Km of bund has
been strengthened/constructed to protect 3266 hector of paddy
field. The work of 128.636 km bund in KEL-III and 33.2 Km bund
in KEL-IV has been completed.
As per government direction the works under „Mitigation of
Flood in Padasekharams of Kuttanad Taluk‰ were tendered. Out of
57 works arranged 50 works were completed. 177.66 Km of bund
were constructed. The work „ Modernization of Thanneermukkom
bund‰ to manage salinity and mining ecological decay is progress in
very fast. Overall physical progress of civil and mechanical
components is 84%. The DPR for the work is under the
consideration on Government of India for central assistance under
FMP. Investment clearance of MoWR has been obtained. The
approval of IMC, MoWR is to be obtained at Thottappally, the work
of fabrication and erection of stainless steel shutters completed.
Dredging work completed to the extent of fund released. New work
„Reconstruction of bund at D-Block puthanarayiram padasekharam
in Kuttanad Taluk‰ was taken up for execution during 2018-19.
Performance Budget 2017-18 92 Water Resources Department
Chapter- II
FINANCIAL OUTLAYS AND QUANTIFIABLE DELIVERABLES
In the annual budget for 2017-18 an amount of Rs. 100/- Crores
was provided under the Head of Account 4711-01-103-86 PMKSY
Kuttanad flood management component 50% CSS including share debit
figures. The work bills for the ongoing schemes were submitted through
EMLI software under the Head of Account 4711-01-103-87 (PV) and an
amount of Rs. 105.22 Crores was additionally authorized under the Head
of Account 4711-01-103-87 (PV) excluding the Share Debit figures.
Hence the total expenditure comes to Rs. 127.74 Crores including Share
Debit figures.
The proposal submitted to Government for re-appropriation An
amount of Rs. 182,31,241/- was expended for KEL I during 2017-18.
This scheme was intended to protect the paddy field by constructing outer
bund. The up to date construction of outer bund was 39.938 KM and
work has been completed on 30-03-2016. In KEL-2 Scheme the up to
date achievement in construction of outer bund as 65.25 km and the
scheme was completed on 30-09-2016. An amount of Rs. 178,47,834/-
was expended during 2017-18 Similarly for KEL-3 Scheme, the up to
date construction of outer bund was 128.636 KM and 10.92 Kms during
2017-18. An amount of Rs. 788,94,299/- was expended for KEL-III
scheme during 2017-18.
For KEL-4 Scheme, the up to date construction of outer bund was
33.2 KM and 8.1 Kms during 2017-18. An amount of Rs.
16,15,33,243/- was expended during 2017-18. For the scheme
Performance Budget 2017-18 93 Water Resources Department
„mitigation of flood in Padasekharams of Kuttanad Taluk. The up to date
construction of outer bund was 128.26 KM as on 31.03.2017 and 85.6
Kms during 2017-18. An amount of Rs. 47,45,35,582/- was expended
during 2017-18. For the scheme Modernization of Thannermukkom
Bund, Physical progress of work was 84% and 16% during 2017-18. An
amount of Rs. 30,11,56,296/- was expended during 2017-18. For the
scheme „
Improving the efficiency of Thottappally spill way‰, the mechanical
work of replacing the shutters was completed as on 31-03-2017. The
dredging work which was Departmentally executed by Mechanical wing of
Irrigation Department was completed to the extent of fund received. The
expenditure incurred for the scheme during 2017-18 was Nil. The above
expenditure is excluding establishment share debit of 20% & T&P share
debit of 1.4%. The total overall expenditure for the year 2017-18 under
all the schemes comes to Rs. 105,21,98,495/- excluding the Share Debit
figures.
Performance Budget 2017-18 94 Water Resources Department
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Co
mp
lem
en
tary
Ex
tra
Bu
dg
eta
r
y
Re
so
urc
e
Ce
ntr
al
Assis
tan
ce
if
an
y
12
35
67
89
1KEL -
I-
FM
P-
Mitig
ation o
f Flo
ods
in
Gro
up-1
,14
Padash
ekhara
ms
in
Kutt
anad R
egio
n o
f
Kera
la.
Flo
od M
itig
ation
of
574.8
3 h
ec.
of
paddy f
ield
s by
const
ruct
ion o
f
40.1
98 k
m o
f
bunds
0180.0
00
129.0
7
Const
ruct
ion o
f
oute
r bund
incl
udin
g c
ross
dra
inage s
truct
ure
s
Nil
Tota
l 39.9
38
km
length
of
bund
com
ple
ted f
or
flood m
itig
ation
of
paddy f
ield
s
The w
ork
com
ple
ted o
n
31-0
3-2
016
2KEL -
II-
FM
P-
Regula
tion o
f flood
wate
r in
Kayal are
a -
4
padash
ekhara
ms
and
Mitig
ation o
f Flo
od in
Gro
up-9
– 5
padash
ekhara
ms
in
Kutt
anad r
egio
n o
f
Kera
la
Flo
od m
itig
ation
of
3265.9
1 h
ec.
of
paddy f
ield
s by
const
ruct
ion o
f
65.2
5km
of
bunds
0998.0
00
Const
ruct
ion o
f
oute
r bund
incl
udin
g c
ross
dra
inage s
truct
ure
s
Nil
Tota
l 65.2
46km
length
of
bund
com
ple
ted f
or
flood m
itig
ation
of
paddy f
ield
s
The w
ork
com
ple
ted o
n
30-0
9-2
016
Ta
rge
t
Fix
ed
Pro
jecte
d
ou
tco
me
s
Pe
rio
d o
f
Imp
lem
en
tati
on
Ru
pe
es i
n l
ak
h
Ta
rg
et
Ach
ie
ve
d
Re
ma
rks/
Ris
k F
acto
rs
4
FO
RM
AT
OF T
AB
LE
S I
N C
HA
PT
ER
II
OF P
ER
FO
RM
AN
CE
BU
DG
ET
20
17
-18
AN
NE
XU
RE
- I
Ou
tla
y 2
01
7-1
8
SI.
No .
Na
me
of
Sch
em
e
Ob
jecti
ve
s
Qu
an
tifi
ab
le
De
live
rab
les /
Ph
ysic
al
ou
tpu
ts
Nam
e o
f D
epart
ment:
Irr
igation D
epart
ment
(Kutt
anad P
ack
age)
Per
form
ance
Bud
get 2
017-
1895
Wat
er R
esou
rces
Dep
artm
ent
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Co
mp
lem
en
tary
Ex
tra
Bu
dg
eta
r
y
Re
so
urc
e
Ce
ntr
al
Assis
tan
ce
if
an
y
Ta
rge
t
Fix
ed
Pro
jecte
d
ou
tco
me
s
Pe
rio
d o
f
Imp
lem
en
tati
on
Ta
rg
et
Ach
ie
ve
d
Re
ma
rks/
Ris
k F
acto
rs
Ou
tla
y 2
01
7-1
8
SI.
No .
Na
me
of
Sch
em
e
Ob
jecti
ve
s
Qu
an
tifi
ab
le
De
live
rab
les /
Ph
ysic
al
ou
tpu
ts
3
KEL -
III
- FM
P -
Mitig
ation o
f flood in
Kutt
anad R
egio
n-
Phase
–I
, (G
roup 2
- 5,
7-8
, 10-1
9),
231
padase
khara
ms
Flo
od m
itig
ation
of
9311 h
ec.
of
paddy f
ield
s and
const
ruct
ion o
f
511km
of
bunds
The t
arg
et
revis
ed t
o 2
818
Ha a
nd 1
41.1
57
Km
base
d o
n
work
s act
ually
arr
anged f
or
execu
tion.
01878.0
00
1776.1
4
Const
ruct
ion o
f
oute
r bund
incl
udin
g c
ross
dra
inage s
truct
ure
s
12.5
20
Tota
l 128.6
36
km
length
of
bund
com
ple
ted f
or
flood m
itig
ation
of
paddy f
ield
s
Pro
posa
l fo
r
the
exte
nsi
on
of
ToC u
p
to
30/0
9/2
018
have b
een
subm
itte
d
Out
of
96
work
s only
57
work
s w
ere
taken u
p f
o
execu
tion a
nd
hence
the
targ
et
for
bund
const
ruct
ion
revis
ed t
o
141.1
57 K
m
out
of
this
128.6
36 k
m
com
ple
ted
4KEL_IV
- M
itig
ation o
f
flood in O
natt
ukara
regio
n c
om
prisi
ng o
f
12 w
ate
r sh
eds.
Flo
od m
itig
ation
of
23648 h
ec.
of
paddy f
ield
s and
const
ruct
ion o
f
109.6
64km
of
bunds
The t
arg
et
revis
ed t
o 5
834
Hr
and 5
4.0
29
Km
base
d o
n
work
s act
ually
arr
anged f
or
execu
tion.
01946.0
00
0.0
0
Const
ruct
ion o
f
oute
r bund
incl
udin
g c
ross
dra
inage s
truct
ure
s
20.8
30
Tota
l 33.2
Km
length
of
bund
com
ple
ted f
or
flood m
itig
ation
of
paddy f
ield
Pro
posa
l fo
r
the
exte
nsi
on
of
ToC u
p
to
31/0
3/2
019
have b
een
subm
itte
d
Out
of
44
work
s under
12 w
ate
r sh
eds
21 w
ork
s and 5
wate
rsheds
were
arr
anged
and h
ence
targ
et
for
bund
lengh r
evis
ed
to 5
4.0
29 k
m
33.2
Km
length
com
ple
ted
Per
form
ance
Bud
get 2
017-
1896
Wat
er R
esou
rces
Dep
artm
ent
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Co
mp
lem
en
tary
Ex
tra
Bu
dg
eta
r
y
Re
so
urc
e
Ce
ntr
al
Assis
tan
ce
if
an
y
Ta
rge
t
Fix
ed
Pro
jecte
d
ou
tco
me
s
Pe
rio
d o
f
Imp
lem
en
tati
on
Ta
rg
et
Ach
ie
ve
d
Re
ma
rks/
Ris
k F
acto
rs
Ou
tla
y 2
01
7-1
8
SI.
No .
Na
me
of
Sch
em
e
Ob
jecti
ve
s
Qu
an
tifi
ab
le
De
live
rab
les /
Ph
ysic
al
ou
tpu
ts
5M
itig
ation o
f flood in
397 p
adash
ekham
s of
Kutt
anad T
alu
k a
nd
Mitig
ation o
f flood in
14 p
adash
ekhara
ms
of
Veeyapura
m
panch
ayath
of
Kutt
anad C
onst
ituency
in A
lappuzh
a D
istr
ict.
Flo
od m
itig
ation
of
19459 h
ec.
of
paddy f
ield
s and
const
ruct
ion o
f
1170km
of
bunds
02448.0
00
0.0
0
Const
ruct
ion o
f
oute
r bund
incl
udin
g c
ross
dra
inage s
truct
ure
s
45
49.4
Tota
l 177.6
6
km
length
of
bund
com
ple
ted f
or
flood m
itig
ation
of
paddy f
ield
s
up t
o 2
018-
19
Revis
ed
Appro
val not
Obta
ined o
nly
57 w
ork
s
arr
anged f
or
Execu
tion.
6M
odern
ization o
f
Thannerm
ukkam
bund
to m
anage s
alin
ity a
nd
min
imiz
e e
colo
gic
al
deca
y.
Flo
od m
itig
ation
and p
revention o
f
salin
ity in 55874
ha p
addy f
ield
in
Kutt
anad r
egio
n
0
2550.0
0
0
Civ
il &
mech
anic
al
const
ruct
ion
incl
udes
const
ruct
ion o
f
Thanneerm
ukkom
bund , r
epla
cem
ent
of
exis
ting s
hutt
ers
with n
ew
sta
inle
ss
steel sh
utt
ers
and
auto
mation w
ork
s
32%
16%
84%
of
work
com
ple
ted
up t
o 2
019-
20
work
neaaring
com
ple
tion.
Per
form
ance
Bud
get 2
017-
1897
Wat
er R
esou
rces
Dep
artm
ent
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Co
mp
lem
en
tary
Ex
tra
Bu
dg
eta
r
y
Re
so
urc
e
Ce
ntr
al
Assis
tan
ce
if
an
y
Ta
rge
t
Fix
ed
Pro
jecte
d
ou
tco
me
s
Pe
rio
d o
f
Imp
lem
en
tati
on
Ta
rg
et
Ach
ie
ve
d
Re
ma
rks/
Ris
k F
acto
rs
Ou
tla
y 2
01
7-1
8
SI.
No .
Na
me
of
Sch
em
e
Ob
jecti
ve
s
Qu
an
tifi
ab
le
De
live
rab
les /
Ph
ysic
al
ou
tpu
ts
Repla
cem
ent
of
40
nos
corr
oded
spill
way s
hutt
ers
with s
tain
less
ste
el
shutt
ers
.0%
0%
repla
cem
ent
of
40 N
os
of
shutt
ers
com
ple
ted
Dre
dgin
g o
f le
adin
g
channel, S
and b
ar
rem
oval at
the
mouth
of
spill
way
and
0%
0%
Dre
dgin
g w
ork
to
be w
ere
execu
tied
depart
em
etly b
y
mech
anic
al w
ing
work
execu
ted t
o
the e
xte
nt
of
fund r
ele
ase
d.
010000.0
00.0
01905.2
1
7Renovation o
f Leadin
g
Channel For
Eff
icie
nt
Flo
od W
ate
r D
isposa
l
Fro
m T
he C
onfluence
Of
Pum
ba A
nd
Ach
ankovil
Riv
ers
To
Sea A
t Thott
appally
(A)
Repla
cem
ent
of
spill
way s
hutt
ers
(B)
dru
dgin
g
Flo
od m
itig
ation
and p
revention o
f
salin
ity in 5
5874
ha p
addy f
ield
in
Kutt
anad r
egio
n
00.0
00
To
tal
Per
form
ance
Bud
get 2
017-
1898
Wat
er R
esou
rces
Dep
artm
ent
Chapter- III
REFORM MEASURES AND PERFORMANCES
The completion of the schemes have been delayed due to various
reasons which adversely affected physical and financial progress of these
schemes. The site specific problem related to delivery of inputs or
manpower management experienced in previous year was analyzed and
correct measures were taken consequently significant physical progress
could be achieved during 2017-18 in respect of arranged works. It is
targeted to complete all arranged works during 2018-19
Performance Budget 2017-18 99 Water Resources Department
Chapter - IV
REVIEW OF PAST PERFORMANCE
During 2016-17, an amount Rs.1,56,48,05,042/- was expended
for the whole programmes under kuttand Package against the budget
provision of Rs. 156.48 Crores. The progress achieved for the schemes
during the year is better in comparison with the performance in previous
year. Unfavorable site conditions, Scarcity of raw materials, delay in
getting sanction for tender excess etc were the prime reasons for the slow
progress in financial years
Non release of central share in time is another reason for the slow
progress
Performance Budget 2017-18 100 Water Resources Department
Rupees
in lakh
1
KEL -
I-
FM
P-
Mitig
ation o
f
Flo
ods
in G
roup-1
,14
Padash
ekhara
ms
in
Kutt
anad R
egio
n o
f Kera
la.
Flo
od M
itig
ation o
f
574.8
3 h
ec.
of
paddy
field
s by co
nst
ruct
ion o
f
40.1
98 k
m o
f bunds
260.0
0183.6
2
Const
ruct
ion o
f o
ute
r bund
incl
udin
g c
ross
dra
inage
stru
cture
s
Nil
Due t
o u
nfa
voura
ble
site
conditio
ns
the r
equired
pro
gre
ss c
an n
ot
be a
chie
ved
2
KEL -
II-
FM
P-
Regula
tion o
f
flood w
ate
r in
Kayal are
a -
4 p
adash
ekhara
ms
and
Mitig
ation o
f Flo
od in G
roup-
9 –
5 p
adash
ekhara
ms
in
Kutt
anad r
egio
n o
f Kera
la
Flo
od m
itig
ation o
f
3265.9
1 h
ec.
of
paddy
field
s by c
onst
ruct
ion o
f
65.2
46 k
m o
f bunds
1440.0
0455.1
7
Const
ruct
ion o
f o
ute
r bund
incl
udin
g c
ross
dra
inage
stru
cture
s
Nil
Due t
o u
nfa
voura
ble
site
conditio
ns
the r
equired
pro
gre
ss c
an n
ot
be a
chie
ved
3
KEL -
III
- FM
P -
Mitig
ation
of
flood in K
utt
anad R
egio
n-
Phase
–I
, (G
roup 2
- 5, 7-8
,
10-1
9),
231 p
adase
khara
ms
Flo
od m
itig
ation o
f 9311
hec.
of
paddy f
ield
s and
const
ruct
ion o
f 511km
of
bunds
targ
et
rivis
ed t
o
2818 h
a a
nd 1
41.5
7km
base
d o
n w
ork
s act
ually
arr
anged f
or
execu
tion
2000.0
01465.6
1
Const
ruct
ion o
f o
ute
r bund
incl
udin
g c
ross
dra
inage
stru
cture
s
10.9
2
Work
s co
uld
not
be a
rranged
in t
ime d
ue t
o p
roce
dura
l
dela
ys
Ex
pe
nd
itu
re 2
01
6-
17
Nam
e o
f D
epart
ment:
Irr
igation D
epart
ment
(Kutt
anad P
ack
age)
De
live
rab
les/P
hysic
al
ou
tpu
ts
Ach
ieve
m
en
t R
ea
so
n f
or
va
ria
tio
n
AN
NE
XU
RE
- I
IS
tate
me
nt
of
Ou
tla
ys /
Ou
tco
me
s /
Ta
rge
t 2
01
6-1
7 &
Actu
al
Ach
ieve
me
nt
20
16
-17
PLA
N /
MA
JO
R S
CH
EM
ES
SI.
No .
Na
me
of
Sch
em
e /
Pro
gra
mm
eO
bje
cti
ve
/ o
utc
om
e
Bu
dg
et
Ou
tla
y
20
16
-17
Per
form
ance
Bud
get 2
017-
1810
1W
ater
Res
ourc
es D
epar
tmen
t
4
KEL_IV
- M
itig
ation o
f flood
in O
natt
ukara
regio
n
com
prisi
ng o
f 12 w
ate
r
sheds.
Flo
od m
itig
ation o
f
23648 h
ec.
of
paddy
field
s and c
onst
ruct
ion
of
109.6
64km
of
bunds
The t
arg
et
revis
ed t
o
5834 H
r and 5
4.0
29 K
m
base
d o
n w
ork
s act
ually
arr
anged f
or
execu
tion.
1700.0
01697.6
4
Const
ruct
ion o
f o
ute
r bund
incl
udin
g c
ross
dra
inage
stru
cture
s
8.1
0
work
s co
uld
not
be a
rranged
in t
ime d
ue t
o p
roce
dura
l
dela
ys
5
Mitig
ation o
f flood in 3
97
padash
ekham
s of
Kutt
anad
Talu
k a
nd M
itig
ation o
f
flood in 1
4 p
adash
ekhara
ms
of
Veeyapura
m p
anch
ayath
of
Kutt
anad C
onst
ituency
in
Ala
ppuzh
a D
istr
ict.
Flo
od m
itig
ation o
f
19459 h
ec.
of
paddy
field
s and c
onst
ruct
ion
of
1170km
of
bunds
2000.0
04502.9
5
Const
ruct
ion o
f o
ute
r bund
incl
udin
g c
ross
dra
inage
stru
cture
s
85.6
0
work
s co
uld
not
be a
rranged
in t
ime d
ue t
o p
roce
dura
l
dela
ys
6
Modern
ization o
f
Thannerm
ukkam
bund t
o
manage s
alin
ity a
nd
min
imiz
e e
colo
gic
al deca
y.
Flo
od m
itig
ation a
nd
pre
vention o
f sa
linity in
55874 h
a p
addy f
ield
in
Kutt
anad r
egio
n
2500.0
07076.6
4
Civ
il &
mech
anic
al co
nst
ruct
ion
incl
udes
third s
tage c
onst
ruct
ion
of
Thanneerm
ukkom
bund ,
repla
cem
ent
of
exis
ting s
hutt
ers
with n
ew
sta
inle
ss s
teel sh
utt
ers
and a
uto
mation w
ork
s
16%
work
s co
uld
not
be a
rranged
in t
ime d
ue t
o p
roce
dura
l
dela
ys
7
Renovation o
f Leadin
g
Channel For
Eff
icie
nt
Flo
od
Wate
r D
isposa
l Fro
m T
he
Confluence
Of
Pum
ba A
nd
Ach
ankovil
Riv
ers
To S
ea A
t
Thott
appally
Flo
od m
itig
ation a
nd
pre
vention o
f sa
linity in
55874 h
a p
addy f
ield
in
Kutt
anad r
egio
n
100.0
0260.6
4
Flo
od m
itig
ation w
ork
s of
two
padase
khara
ms,
dre
dgin
g o
f
leadin
g c
hannel, S
and b
ar
rem
oval at
the m
outh
of
spill
way
and r
epla
cem
ent
of
40nos
corr
oded s
pill
way s
hutt
ers
with
stain
less
ste
el sh
utt
ers
.
6%
work
s co
uld
not
be a
rranged
in t
ime d
ue t
o p
roce
dura
l
dela
ys
Tota
l10000.0
015642.2
7
Per
form
ance
Bud
get 2
017-
1810
2W
ater
Res
ourc
es D
epar
tmen
t
Chapter - V
FINANCIAL REVIEW
The financial performance for the period from 2014-15 to
2017-18 is evaluated in the table below.
Year Budget provision
( In crores)
Expenditure( In
Crores)
Financial
achievement(%)
2014-15 200 68.562 34.28
2015-16 200 190.432 93.215
2016-17 156.48 156.48 100
2017-18 105.22 105.22 100
During 2014-15 the financial achievement was poor, mainly due to
delay in arranging the work and other site specific problems. During
2014-15 financial achievement was 34.28%, During later years financial
performance has been improved considerably and during 2016-17 the
achievement is 100%. The performance is graphically represented in the
figure attached. An amount of Rs. 100 Crs is provided in the 2017-18
Budget under the Head 4711-01-103-86 PMKSY (50% CSS) and the
expenditure incurred under the Head 4711-01-103-87-(PV) which was
additionally authorized by the Government.
Performance Budget 2017-18 103 Water Resources Department
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
12
3
1
KEL -
I-
FM
P-
Mitig
ation
of
Flo
ods
in G
roup-1
,14
Padash
ekhara
ms
in
Kutt
anad R
egio
n o
f
Kera
la.
300
260
180
01,0
00
183.6
1203.7
7183.6
1182.3
1
2
KEL -
II-
FM
P-
Regula
tion o
f flood
wate
r in
Kayal are
a -
4
padash
ekhara
ms
and
Mitig
ation o
f Flo
od in
Gro
up-9
– 5
padash
ekhara
ms
in
Kutt
anad r
egio
n o
f
Kera
la
2,5
00
1,4
40
998
729
3,2
00
455
2415.8
4455.1
7178.4
8
3
KEL -
III
- FM
P -
Mitig
ation o
f flood in
Kutt
anad R
egio
n-P
hase
–I
, (G
roup 2
- 5, 7-8
, 10-
19),
231
padase
khara
ms
4,5
00
2,0
00
1878
729
4,5
00
1465.6
11431.6
1465.6
1788.9
4
4
KEL_IV
- M
itig
ation o
f
flood in O
natt
ukara
regio
n c
om
prisi
ng o
f 12
wate
r sh
eds.
5,0
00
1,7
00
1946
2725
2,4
00
1703.4
2559.3
41703.4
21615.3
3
Am
t in
la
kh
s
62015-16 (4711-01-103-90) KP (P)
(FMP), 2016-17-2017-18 (4711-01-103-87) PV, 2018-19 ((4711-01-103-
86) PMKSY 50% CSS
45
AN
NE
XU
RE
- I
II
Tre
nd
s i
n E
xp
en
dit
ure
viz
-z-v
iz B
ud
ge
t E
sti
ma
tes /
Re
vis
ed
Esti
ma
tes/A
ctu
al
ex
pe
nd
itu
re
in r
ece
nt
ye
ars
PLA
N S
CH
EM
ES
SI.
No .
Na
me
of
Sch
em
e /
Pro
gra
mm
e
Ma
jor
He
ad
Bu
dg
et
Esti
ma
tes
Re
vis
ed
Esti
ma
tes
Actu
al
Ex
pe
nd
itu
re
Nam
e o
f D
epart
ment:
Irr
igation D
epart
ment
(Kutt
anad P
ack
age)
Per
form
ance
Bud
get 2
017-
1810
4W
ater
Res
ourc
es D
epar
tmen
t
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
12
36
45
SI.
No .
Na
me
of
Sch
em
e /
Pro
gra
mm
e
Ma
jor
He
ad
Bu
dg
et
Esti
ma
tes
Re
vis
ed
Esti
ma
tes
Actu
al
Ex
pe
nd
itu
re
5
Mitig
ation o
f flood in
397 p
adash
ekham
s of
Kutt
anad T
alu
k a
nd
Mitig
ation o
f flood in 1
4
padash
ekhara
ms
of
Veeyapura
m
panch
ayath
of
Kutt
anad
Const
ituency
in
Ala
ppuzh
a D
istr
ict.
1,2
00
2,0
00
2448
4024
2,4
00
4502.9
55333.2
64502.9
54745.3
6
6
Modern
ization o
f
Thannerm
ukkam
bund
to m
anage s
alin
ity a
nd
min
imiz
e e
colo
gic
al
deca
y.
6,0
00
2,5
00
2550
3112
6,0
00
7076.6
48479.9
37076.6
43011.5
6
7
Renovation o
f Leadin
g
Channel For
Eff
icie
nt
Flo
od W
ate
r D
isposa
l
Fro
m T
he C
onfluence
Of
Pum
ba A
nd
Ach
ankovil
Riv
ers
To
Sea A
t Thott
appally
500
100
00
500
260.6
4619.4
7260.6
40.0
0
8
Reco
nst
ruct
ion o
f bund
at
D b
lock
puth
anara
yiram
padse
khara
m in
kutt
anad t
alu
k
-
-
0
295
-
0
00
00.0
0
Tota
l20,0
00
10,0
00
10,0
00.0
0
11,6
14
20,0
00.0
0
15,6
48.0
4
-
19,0
43.2
1
15,6
48.0
4
10,5
21.9
8
During 2
017-1
8 B
udget
Pro
vis
ion o
f Rs.
100 C
rs p
rovid
ed t
o t
he h
ead o
f acc
ount
4711-0
1-1
03-8
6(P
MKSY)
and e
xpenditur
incu
rred u
nder
the
head o
f acc
count
4711-0
1-1
03-8
7 (
PV)
2015-16 (4711-01-103-90) KP (P)
(FMP), 2016-17-2017-18 (4711-01-103-87) PV, 2018-19 ((4711-01-103-86)
PMKSY 50% CSS
Per
form
ance
Bud
get 2
017-
1810
5W
ater
Res
ourc
es D
epar
tmen
t
IRRIGATION DESIGN AND RESEARCH
BOARD (IDRB)
Chapter - I
INTRODUCTION
The Irrigation Design and Research Board (IDRB) is the Central
Design and Research Organization of Irrigation Department, Government
of Kerala. The Design, Research, Quality Control, Coastal Erosion studies,
Field Studies Circle and Investigation wing of the Department are under
the control of the Chief Engineer (Investigation and Design) with
headquarters at Thiruvananthapuram. IDRB was formed in August 1986
vide G.O.(MS).No.24/86/Irrgn dated 14-08-1986 and subsequently
started functioning under the Chief Engineer IDRB vide G.O. (MS) No.
7/1987/Irrgn. dated 24/03/1987.
VISION
The Departmental activities are framed in line with the State Water
Policy and Kerala Irrigation and Water Conservation Act.
* Sustainable development, maintenance of quality and efficient
management of water resources to match with the growing demands on
the precious natural resource of the country.
* Providing assured irrigation to facilitate sustainable agriculture
development and food security.
Functions of IDRB
The Irrigation Design and Research Board (IDRB) is the Design and
Research Organization of Water Resources Department. The Design,
Research, Quality Control, Coastal Erosion studies, Hydrological studies
and Investigation wings of the Department are under the control of the
Chief Engineer (Investigation and Design) with headquarters at
Thiruvananthapuram.
Performance Budget 2017-18 106 Water Resources Department
The Board is headed by the Chief Engineer (Investigation and
Design) who is assisted by three Superintending Engineers and they are
designated as
� Director ( Designs)
� Director ( Research)
� Superintending Engineer (Field Studies)
The office of the Director (Designs) is stationed at
Thiruvananthapuram and is in charge of Designs , while the office of the
Director (Research) stationed at Peechi is in charge of Research. Works
related to Water Resources and Hydrology are being dealt with by the
office of the Superintending Engineer (Field Studies) stationed at Thrissur.
The Chief Engineer (Investigation and Design) co-ordinates,
monitors and reviews all the works relating to Investigation, Design,
Research, Quality control, Coastal Erosion, Water Resources and
Hydrology. The Peechi Irrigation project is also monitored by the Chief
Engineer (I&D).
1. DIRECTOR (DESIGNS)
The Director (Designs) assists the Chief Engineer (I&D) in all
technical activities.
The activities under the Director (Designs) have been assigned to
five divisions under five Joint Directors. The design of any structure
referred to the Board is originated and carried out by the concerned
Assistant Director. The Deputy Director checks the design and
incorporates the modifications and alterations if required. The Joint
Director reviews it and Director (Designs) recommends the same to the
Chief Engineer (I&D). The final approval of the design is given by the
Chief Engineer (I&D). Apart from the design works, other duties assigned
to the respective Assistant Directors are carried out in the same manner as
above.
Performance Budget 2017-18 107 Water Resources Department
FUNCTIONS OF DIFFERENT DIVISIONS UNDER DIRECTOR (DESIGNS)
The present organizational set up under Director (Designs) was
developed considering the requirements of the Board during its inception
period.
There are five divisions under Director (Designs). They are
Director
(Designs)
Joint
Director
(Dams)
Joint
Director
(Canals)
Joint
Director
(Dam
safety &
ISW)
Joint
Director
(Hydrolog
y)
Joint
Director
(Design
Manual)
I.1 JOINT DIRECTOR (DAMS)
This division deals with the design of
3) None overflow and overflow sections of dams under execution and
under investigation.
4) Spillway channel including flood routing studies.
5) Embankments and earthen dams.
6) Galleries, sluices, energy dissipaters, Regulator cum Bridges, Weirs
and Barrages.
7) Navigation locks, Penstock, Saddle dam, High embankments,
Training walls, bridges.
8) Spill way and Regulator gates, Sluice gates, Emergency shutters etc.
I.2 JOINT DIRECTOR (CANALS)
This Division deals with
• Hydraulic particulars of various Irrigation Projects.
• Design of canals, canal structures like head regulators, sluices, under
tunnels, super passage, foot bridges, drops, major aqueducts,
Performance Budget 2017-18 108 Water Resources Department
tunnels, Elephant passage, Syphon well drop, Cut and Cover,
Pressure Syphons, Flumes, canal bridges etc.
• Design of Storage weirs, Buildings, Minor Bridges, design of flood
control works like flood banks, river side protection works and
bridges for IWT (Inland Water Transport) canal etc.
• Checkdams, Regulator-cum-bridges, Vented Cross bar cum bridges.
• Water requirement calculation for determining the canal capacity of
projects.
Reservoir based tourism-Beautification of Reservoir area
I.3 JOINT DIRECTOR ( DAM SAFETY & INTER STATE WATER (ISW) )
This wing is having dual control from Chief Engineer (IDRB) and Chief
Engineer (ISW).
I.3.1 Dam safety Wing
The main functions of Dam Safety Wing are,
• Conducting inspection of dams during post and pre-monsoon
seasons, investigation of defects noticed in completed dams and
suggestions for remedial measures.
• Scrutinizing the Quarterly Inspection reports of dams.
• Conducting training programmes on dam safety
• Preparation of emergency action plans for dams, Disaster
Management Plan, Security arrangements to the dams
• Hydrologic Review Study of dams.
• Interaction with the Dam Safety Organisation of Central Water
Commission (CWC).
• Activities regarding allotment of funds under head of accounts of
Dam Safety Wing.
• Works in connection with de-silting of reservoirs, technical
documentation of dams.
• Preparation of Health Status Report of various dams for onward
submission to CWC.
• Instrumentation of Dams.
Performance Budget 2017-18 109 Water Resources Department
I.3.2 Inter State Waters (ISW) Wing
This wing is under the control of Chief Engineer (ISW). Only
the administrative control is vested with Chief Engineer (IDRB).
• All interstate matters related to Parambikulam, Aliyar, Mullaperiyar,
Pampa-Achenkovil – Vaipar Link , Siruvani Drinking Water Project,
Walayar Irrigation Project, Kanyamadagu Dam , Neyyar issue,
Pandiyar Punnapuzha project, Cauvery water dispute etc.
• Works related to Integrated Master Plan of various rivers.
• Unauthorised diversion of water.
• Interlinking of rivers and correspondences with NWDA.
I.4 JOINT DIRECTOR (HYDROLOGY)
I.4.1 Hydrology Wing
A number of gauging stations have been installed in the rivers of the State
since the inception of the Department and the data collection and the
related works are presently entrusted with the Field Studies Circle,
Thrissur.
The important functions of this wing are
• Collection, tabulation and processing of daily reservoir level and
storage volumes from the various completed irrigation projects.
• Flood discharge assessment of Irrigation structures, Peak flood
estimation and Water Balance studies of river basins.
• Preparation of comments related to State Water Policy, National
Water Policy.
• Preparation of State Specific Action Plan under National Water
Mission
• Implementation of National Hydrology Project
I.4.2 Investigation Wing
The main functions of the Investigation wing are
Performance Budget 2017-18 110 Water Resources Department
• Scrutinising the various investigation estimates of all projects under
the Department and issuing Administrative and Technical Sanction
according to the delegation of powers).
• Scrutinising investigation estimates of various schemes in all the
ongoing projects like New Mullaperiyar Dam, Chaliyar Irrigation
Project, Meenachil River valley Project, Attappady Valley Irrigation
Project, Schemes in Kabani Basin and Pambar Basin, Shiriya River
project.
• Preparation of annual plan proposals for onward submission to the
Planning Board and Government.
• Bench marking of irrigation structures.
• Up keeping of Hydro meteorological stations under the state.
• Scrutiny of Kuttanad package report, flood management
programme etc.
I.5 JOINT DIRECTOR (DESIGN MANUAL)
• Examination of Project Reports projects, Review of post-Facto
Evaluation studies, works related to MinisterÊs review meetings,
CWC meetings, Preparation of Annual Plan proposals and
Modernization proposals for submission to Planning Board, General
correspondences, activities related to the meetings attending by the
Chief Engineer, GovernorÊs address, budget speech, Economic
review, conferences, seminars etc, and conducting training
programmes.
• Works related to information technology, updating the website for
IDRB
• Scrutiny of inspection reports from Joint Director, CEFS Division,
Thrissur regarding the alignment fixation for sea wall construction
under 13th finance commission.
• Reporting the coastal damages occurred along the sea coast of
Kerala to the concerned authorities for taking appropriate action.
• Answering to the L. A. Interpellation, Loksabha and Rajyasabha
questions, L. A. Assurance.
• Scrutinizing the documents for the Pre- qualification Committee
meeting. .
Performance Budget 2017-18 111 Water Resources Department
• Activities related to Right to Information Act and Right to Service
Act.
• Works related to the technical matters for the activities under KERI,
Peechi, Peechi Irrigation Project and Coastal Engineering Field
Studies Division, Thrissur.
• Scrutiny of reports from KERI, Peechi, regarding the Sedimentation
studies conducted in various reservoirs of Kerala using Integrated
Bathymetric System (IBS).
• Maintaining Technical Library of IDRB and its administration.
• Works related to the implementation of e-office in IDRB.
• Conducting Board meetings of IDRB and its follow up action.
• Providing infrastructure facilities to IDRB and subordinate offices
and formulating periodic proposals for the modernization and
upgradation of computing facilities in conformity with the latest
developments in technology for design purpose and allied activities.
The Statistics Wing is entrusted with the Post facto evaluation
studies of all completed Major and Medium Irrigation projects in the
State and preparation of socio-economic impact study report of the
completed projects. The study report will contain various
difficulties/ problems faced by the beneficiaries/ Department and
also practical remedial measures to overcome the same.
2. DIRECTOR (RESEARCH)
The KERI, Peechi is headed by the director with the following
divisions
2.1 JOINT DIRECTOR, HYDRAULIC RESEARCH
There are three Divisions under the Joint Director, Hydraulic
Research.
The functions of these Divisions are detailed below.
2.1.1 Hydraulics Division
The main functions of this division are: -
Performance Budget 2017-18 112 Water Resources Department
• Studies on various problems in Applied Hydraulics, Irrigation
Engineering and Flood Control are taken up and propose solutions
for the same.
• The major Irrigation and Hydro-Electric Projects in the state are
undertaken only after conducting model studies/ research studies on
that project.
• various aspects related to spillways, sluices, chutes, energy dissipating
arrangement, operation of gate, flow condition in tail-race, silt
excluding arrangements, hydraulic behaviour of canal structures, river
training works etc., are studied and solutions to specific problems are
recommended
• Attends the meteorological observations relating to Peechi.
2.1.2 Coastal Engineering Division
The main functions of this division are: -
Conducting studies on problems of coastal erosion in Kerala, by way of
collecting compiling and analyzing costal data and data of coastal
protection works; and evolving remedial measures for coastal erosion
• Conducting model studies on specific coastal situations and on
problems related to the development of Ports, Fishing Harbours
and Estuaries etc.
2.1.3 Sedimentation Division
The main functions of this division are
• To conduct the sedimentation survey of dams and other water
bodies using appropriate technology [Presently the sedimentation
survey is being carried out using Integrated Bathymetric System.
This system consists of DGPS Leica MX-400 (Mobile Station), NS-
415 Echo-sounder, Sound Velocity Probe, Survey PC (Laptop),
Survey software viz., Navisoft survey software and Surfer software]
Performance Budget 2017-18 113 Water Resources Department
2.2 JOINT DIRECTOR, CONSTRUCTION MATERIALS &
FOUNDATION ENGINEERING
There are four Divisions under Joint Director, Construction
Materials & Foundation Engineering .The functions of these Divisions are
detailed below.
2.2.1 Construction Materials Division
The activities of this division are broadly divided into two.
a) Fundamental and applied research works
b) Routine tests
a) Fundamental and Applied Research Studies:
• Proposals for fundamental and applied studies of topical interest and
of the nature of original research work are prepared and submitted
for sanction and funding. [The works are carried out according to
the availability of funds]
b) Routine tests:
• Building materials like Cement, building stones, bricks, roofing tiles,
flooring tiles, sand, aggregates, steel rods, etc. are tested in the
Construction Materials laboratory in accordance with the relevant
Indian Standards for their engineering properties.
• This division is a major centre for the designing of mixes of different
grades of concrete based on the requirements of the client. Many
major private construction companies make use of this facility.
i. 2.2.2. Soil Mechanics and Foundations Division
• Problems connected with soil investigations for the designs of
foundation of different structures like buildings, bridges, factories etc.,
are attended. They include
• gives technical advice on all types of foundation problems.
• The Soil Mechanics laboratory attached is well equipped for
undertaking all standard tests on soil samples. Soil samples taken by
Performance Budget 2017-18 114 Water Resources Department
the Instrumentation Division and soil samples supplied by external
agencies are tested in this laboratory.
Following are the main works conducted in this division.
� Determination of the bearing capacity of soil and hence to
design the most economical and safe foundation
� Determination of the safe height and slope of the unprotected
embankments and design of retaining walls for protected
embankments
� Determination of thickness of base and sub base course roads
� Classification of soil strata etc.
• Analysis of engineering problems such as bearing capacity
computations, settlement analysis, stability analysis of slopes etc. are
also taken up.
• Instrumentation and analysis of seepage data from various Irrigation
Projects carried out.
• Undertakes fundamental studies of original research work according to
the availability of funds.
2.2.2.1. Instrumentation Division
• This Division acts as a mobile unit of the Soil Mechanics division for
field exploration works and collection of soil samples from sites. Soil
samples collected are transferred to Soil Mechanics and Foundation
Division for testing.
• Pile load test, Plate load test, Standard penetration test, Dynamic
cone penetration test, collection of undisturbed/disturbed samples by
hand augur and machine boring etc are the common tests carried out
by this division.
• Investigation works are also taken up by this division.
• This Division maintains the mechanical workshop, which attends to
fabrication works needed for conducting model studies and laboratory
tests.
Performance Budget 2017-18 115 Water Resources Department
2.2.2.2 Publications Division
• This is the information bureau of the Institute which provides the
necessary technical information to all other divisions through its
technical library containing around 10,000 books and a number of
latest periodicals subscribed.
• This Division prepares the research summary of the various works
done in the institute in every quarter.
• An annual report is also prepared and kept in the library. These
documents summarize the activities of KERI.
• An Engineering Museum consisting of the models of various
completed irrigation projects, important bridges etc is maintained by
this division and these replicas are quite useful and informative
references for the technical persons and students.
• The three dimensional model of Kerala, known as the relief map of
Kerala is a centre of attraction for people from any sector of life.
This model is built to a scale of 1/16,000 horizontal and 1/1000
vertical and is absolutely of a unique configuration.
• This division conducts seminars and training programmes for the
benefit of the staff of the Institute and also the refresher courses
and Training programmes for the staff of the Irrigation Department.
It is emerging as the major training centre of the Department.
2.3 JOINT DIRECTOR , COASTAL ENGINEERING FIELD STUDIES
DIVISION, THRISSUR
Coastal Engineering Field Studies, Thrissur and its three Sub
Divisions at Kozhikode, Ernakulam, Kollam and nine sections at
Thalassery, Parappanangady, Chavakkad, Ernakulam, Cherthala,
Thottappally, Kollam and Thiruvananthapuram are mainly entrusted with
the collection of coastal field data based on the research studies and survey
works.
2.4 EXECUTIVE ENGINEER, QUALITY CONTROL DIVISIONS
The Quality Control Wing headed by Executive Engineer is created
for the purpose of quality assurance of works of Irrigation Department.
Performance Budget 2017-18 116 Water Resources Department
The jurisdiction of this wing is all over Kerala. There are two Divisions at
Thrissur and Kottarakkara, nine Subdivisions at Kannur, Kozhikode,
Palakkad, Thrissur, Moovattupuzha, Kottayam, Alappuzha, Kottarakkara
and Thiruvananthapuram and 18 sections, at Thiruvananthapuram,
Kollam, Kottarakkara, Pathanamthitta, Alappuzha, Idukki, Kottayam,
Aluva, Moovattupuzha, Koothattukulam, Angamaly, Thrissur, Palakkad,
Malappuram, Kozhikode, Kalpetta, Kannur and Kasargod. These divisions
were originally attached to the Investigation & Planning (I&P) Circle
Thrissur. When I&P circle was abolished, these divisions were attached to
KERI, Peechi.
FUNCTIONS OF DIVISIONS UNDER FIELD STUDIES CIRCLE
DIVISIONAL OFFICES
In the Hydrological Information System (HIS) maintained by Field
Studies Circle under Kerala State Irrigation Department, the following
observation networks are operational.
� Hydro-meteorological network of rainfall and full climatic
stations
� Hydrometric network
� Surface water quality network
These activities are being carried out through divisional offices.
2. Collecting data from gauging Stations maintained under Hydrology
Project and also CGO stations (state fund Stations). [Under National
Hydrology Project there are 140 rain gauges out of which 46 Nos
are Autographic Rain Gauges (ARG) and 8 Nos are Telemetric
Tipping bucket type rain gauges and maintained 9 SRG stations
under state fund. Data also collected from external agencies. These
offices also operate 9 Full Climatic Stations].
Performance Budget 2017-18 117 Water Resources Department
State Data Processing Centre at Thrissur
3. Comprehensive data validation, processing, analysis of Hydrological
and Meteorological data in consultations with the staff from two
division offices is being carried out in this office. The main activities
are
� To consult staff of Divisional DPCs / Sub-divisional DPCs for
ensuring necessary feedback about field conditions.
� To carry out comprehensive data validation, correction and
completion of data.
� To give feed back to the Divisional DPCs at regular intervals
on the basis of findings of comprehensive data validation.
� To transfer observed and processed data sets to the Data
Storage Centre and transfer data to inter agency data
validation.
� To take regular backups of temporary databases.
The Section offices are directly dealing with the collection of data,
entering `data in prescribed manuscripts, routine Inspection of hydrometric
stations and submission of station-wise inspection reports and periodical
maintenance & upkeep of the stations and instruments. The collected data
is submitted to Sub Divisional office in the prescribed format by day 5 after
the month of observation. The Sub Divisional offices are dealing with the
Data-Entry in dedicated software. After primary validation of all types of
data on the basis of information available at individual stations, the details
submitted to divisional office for Secondary validation. Data from various
Sub Divisions are consolidated in the Divisional Data Processing Centre.
Secondary validation of data is being done at Division level. Then the
validated data submitted to State data Processing Centre at Thrissur for
further validation and analysis
• Water Quality Laboratories are also established in Hydrology
Project with an objective to analyze Physical, Chemical and
Microbiological parameters of water samples and to create a
comprehensive Water Quality database of the river basins of the
Performance Budget 2017-18 118 Water Resources Department
state of Kerala, which did not have such a water quality monitoring
programme before the inception of Hydrology Project.
a) Objectives of IDRB
The Irrigation Design and Research Board (IDRB) is the Central
Design and Research Organization of Water Resources Department,
Government of Kerala. IDRB, the only one pioneering Institution of Water
Resources Department, is entrusted with the activities of investigation and
design of all irrigation Projects; all water retaining structures like Dams,
Check Dams, Regulators and other various irrigation structures. The Chief
Engineer (Investigation and Design) co-ordinates, monitors and reviews all
the works relating to Investigation, Design, Research, Quality control,
Coastal Erosion, Water Resources and Hydrology.
The primary objective is to bring IDRB as one of the best Institution
in the Country for design, research, Investigation, hydrology and other
related works.
For achieving this various schemes were incorporated.
� Modernization of IDRB
� Formation of River basin Organization
� DRIP work
The major works include
� Examination and formulation of Project reports of medium
irrigation projects for getting clearance from CWC .
� To conduct trainings for the capacity building of officers of
Irrigation Department
� Receiving and submitting of design indent of various works and
submission of drawings of design
� Online monitoring of Dams.
� To conduct investigation works for the design of Irrigation
Structures.
Performance Budget 2017-18 119 Water Resources Department
� Publication of „Water Resources of Kerala‰ with a databank of
the existing structures in a GIS platform.
Dam Rehabilitation and Improvement Project (DRIP)
The main objective of this project is to improve the safety and
operational performance of selected dams and associated appurtenance.
The project duration is six years. The project agreement has been signed
between Govt. Of Kerala and World Bank on December 21,2011 and
the project agreement has become effective on 18.04.2012.
Administrative sanction was accorded as per G.O. (MS) No.7/2016/WRD
dated 29.01.2016 for an amount of Rs. 360 Crores for DRIP works for
Irrigation Department. Sixteen dams/Barrages/ regulator of Irrigation
Department namely Malampuzha, Neyyar, Peechi, Walayar, Kuttiyadi,
Kanhirapuzha, Chimony, Malankara, Kallada, Pothundy, Vazhani,
Meenkara, Chulliar, Pazhassi, Periyar valley and Mulathara regulator had
been selected for rehabilitation or upgrading the existing basic dam safety
facilities under DRIP.
Works relating to DRIP are being dealt by the Dam Safety wing for the
last four years which includes:
� Arranging DSRP inspection and accompanying the team, making
timely disbursements for the team
� Scrutiny of Project Screening Templates, Estimates and Bid
documents for dam rehabilitation works
� Convening TS committee meetings and issue of TS for DRIP
works
� Inviting EOIs, preparation of RFPs and drafting of agreements
for consultancy works
� Attending Technical Committee meetings of DRIP, conducting as
well as attending various trainings
� Preparation of Emergency Action Plans(EAP) for all DRIP dams
� Hydrologic Review Study of Dams
� Instrumentation and surveillance of Dams
Performance Budget 2017-18 120 Water Resources Department
b) Objectives of KERI, Peechi
This is the research wing of IDRB. The primary objective of KERI is to
take up the challenges of Research and Development in the field of
investigation, soil exploration & construction of irrigation structures,
hydroelectric and other hydraulic structures in the State. The major
schemes under this wing are
� Modernization of Quality Control Wing
� Development of KERI ( Kerala Engineering Research Institute)
The major tasks of this Institution are as follows
� To identify the quantity of silt deposited in major dams by
conducting sedimentation studies using Integrated Bathymetric
system for taking necessary steps to remove the excess silt
deposited and thus to improve the capacity of Reservoir.
� To conduct survey of River Basins using total station.
� To conduct model studies of hydraulic structures, field investigation
for foundations, mix design, testing of materials for the safe and
economical construction.
� To ensure the quality of engineering works of the Irrigation
Department.
� To collect and analyze the coastal data to study the applicability of
various innovative methods instead of conventional methods.
c) Objectives of Field Studies Circle, Thrissur
Kerala State Surface Water Hydrological and Meteorological data
collection and its management is carried out by Field Studies Circle,
Thrissur, since 1962 which is within the Jurisdiction of Chief Engineer,
IDRB, Thiruvananthapuram under Kerala State Irrigation Department.
This wing is entrusted with the surface water resources planning,
development and management based on the historical hydro
meteorological data and current data collected from all river basins.
The major scheme in this wing is
� Modernization of hydrology information system
The main tasks of this wing include
Performance Budget 2017-18 121 Water Resources Department
� Collection of meteorological and hydrological data of the State and
its management.
� Publication of Surface Water Year Book for each year incorporating
river gauge and rain gauge data in four volumes viz,
Vol I Surface Water Year Book (South zone)
Vol II Surface Water Year Book (Central zone)
Vol III Surface Water Year Book (North zone)
Vol IV Surface Water Year Book (Abstract)
II. Schemes Implemented (under Joint Director, Design Manual)
Modernisation of Investigation and Design
The various works under this section include
i) Modernization of Design wing- 2701-80-005-93
Modernisation of IDRB was introduced in 2013-14 and the works
almost completed in the financial year 2015-16. Delay in completion and
submission of designs is avoided due to the recent modernisation of IDRB.
Designs of 31 (thirty one) various irrigation structures have been
completed.
ii) Modernization of hydrology information system 2701-80-005-92
Hydrological and Meteorological data collection of the State and its
management carried out by Field Study Circle, Thrissur, which is within
the Jurisdiction of IDRB. The objective of the scheme is to establish real
time Data Acquisition System in the river basins of Kerala for collecting
reliable and real time rainfall and climatologically and water level data.
iii) Development of KERI ( Kerala Engineering Research Institute), Peechi -
Stage II
Head of account : 4701-80-800-99
Kerala Engineering Research Institute (KERI) is the Research
wing of IDRB.
KERI stage II modernization has been modernized by procuring Sub
bottom Profiler Smart Station, Engineering Seismograph, Pile Echo
Tester, Rebar locator, Instruments for Tomographer , Remote sensing
software, ERDAS, Ansys with FEM.
Performance Budget 2017-18 122 Water Resources Department
The major achievements are
1. Conducted sedimentation study of Mangalam, Meenkara,
Neyyar, Pazhassi, and Karappuzha Reservoir using sub bottom
profiler.
2. Procured sophisticated instruments for testing Engineering
materials and for conducting soil exploration.
3. Determined the current profile of Meenkara Dam using smart
stations
4. Upgradation of Engineering Seismograph for conducting cross
face tomography survey of rigid dam.
5. Survey of Chandragiri River basin as part of investigation for
identifying suitable locations for construction of checkdams and
regulators
6. Consultancy works were carried out in Construction Material
Division producing total Revenue of about 11 lakhs from various
forms.
7. Various investigation works were done.
Formation of River basin Organisation
Head of account : 4701-80-800-88
The main extension behind the compilation of ÂÊWater
Resources of KeralaÊÊ is to asses water resources of the State under GIS
platform. The draft book of ÂWater Resources of KeralaÊ was submitted to
Government and awaiting sanction for publication. The construction of
Mannannur Checkdam across Bharathapuzha has been completed.
Performance Budget 2017-18 123 Water Resources Department
Chapter- II
FINANCIAL OUTLAYS AND QUANTIFIABLE DELIVERABLES
The Department of IDRB implemented a vast number of schemes
for development of IDRB during 2017-18.There was total outlay of
Rs.331.20 Crores for the Annual plan for 2017-18 including Non-Plan
as given below.
Plan Schemes - Rs. 263.10 Crores
Non-Plan Schemes - Rs. 68.10 Crores
Performance Budget 2017-18 124 Water Resources Department
IDR
BS
l.
No .
Nam
e o
f S
chem
e/
Pro
gra
mm
eO
bje
ctive
Quantifiable
/Deliv
era
ble
/
phys
ical
outp
uts
Pro
ject
ed
outc
om
es
Period o
f im
ple
men
tation
Rem
ark
s/R
isk f
acto
r
4(i)
4(ii)
4(iii)
4(iv)
Non Plan Budget
Plan Budget
Complementary Extra Budgetary Resources
Central Assistance if any
Phys
ical
Fin
ancia
lP
hys
ical
Fin
ancia
l
1In
vestigation o
f Ir
rigation S
chem
es
4700-8
0-0
05-9
9
Investigation W
ork
s o
f various s
chem
es
/pro
jects
com
ing u
nder
Irrigation d
epart
ment
150
Nil
Nil
Investigation o
f various
schem
es/P
roje
cts
com
ing u
nder
Dept.
150
182.4
Investigation w
ork
s a
re
not
arr
anged d
irectly
from
this
off
ice.
But
based o
n I
nvestigation
report
Desig
n a
nd D
PR
pre
pare
d.
2B
ench m
ark
ing o
f Ir
rigation S
yste
ms
4701-8
0-8
00-8
1
To c
onduct
bench
mark
ing o
f com
ple
ted
irrigation p
roje
cts
to
ascert
ain
irr
igation
eff
icie
ncy
5N
ilN
ilN
il5
Nil
Nil
Govt
had d
irecte
d t
o
carr
y out
the w
ork
of
Benchm
ark
ing o
f M
ala
mpuzh
a I
rrig
ation
Pro
ject
as a
Pilo
t pro
ject
.Pro
ject
report
subm
itte
d t
o g
ovt.
for
appro
val.
AN
NE
XU
RE
– I
F
OR
MA
T O
F T
AB
LE
S IN
CH
AP
TE
R II O
F P
ER
FO
RM
AN
CE
BU
DG
ET
2017-1
8 (
Ru
pees in
Lakh
s)
Targ
et
fixe
dT
arg
et
Achie
ved
910
12
34
56
78
Outlay
2017-1
8
Per
form
ance
Bud
get 2
017-
1812
5W
ater
Res
ourc
es D
epar
tmen
t
3M
ulla
periya
r P
roje
ct-
D
am
and
appurt
enant
work
s
4700-2
9-8
00-9
7
Various w
ork
s r
ela
ted
to N
ew
Mulla
periya
r dam
500
Nil
Nil
EIA
Stu
dy
of
New
M
ulla
periya
r dam
Nil
Nil
Constr
uction o
f new
dam
to r
epla
ce e
xisting
Mulla
periya
r dam
, re
quires s
tatu
tory
cle
ara
nces f
rom
M
oE
FC
C,
ie
Environm
enta
l C
leara
nce a
nd F
ore
st
Cle
ara
nce.
MoE
FC
C
delis
ted t
he a
pplic
ation
for
EIA
stu
dy,
whic
h is
a p
rere
quis
ite f
or
obta
inin
g E
C.
Ste
ps t
o
get
appro
val of
MoE
FC
C t
o c
om
mence
the E
IA s
tudy
is u
nder
pro
cessin
g.
4In
vestigation a
nd
Desig
n 2
701-8
0-0
05-
97
The w
ork
of
Insta
llation o
f R
eal
Tim
e R
ain
Gauges in
the C
atc
hm
ent
are
a o
f M
ulla
periya
r dam
was
pro
posed u
nder
this
H
/A
109.2
0N
ilN
il109.2
0T
echnic
al sanction f
or
the w
ork
of
Real T
ime
Rain
Gauges in t
he
catc
hm
ent
are
a o
f dam
fo
r R
s 9
0 L
has b
een
issued.T
he t
ender
is
bein
g p
rocessed b
y F
ore
st
Dept.
An a
mount
of
Rs15 L
giv
en t
o E
E
PW
D E
lectr
onic
Dn
Thrissur
for
sett
ing
data
serv
er
at
thrissur.
Per
form
ance
Bud
get 2
017-
1812
6W
ater
Res
ourc
es D
epar
tmen
t
5M
odern
isation o
f D
esig
n W
ing
(Head
of
Account
2701-8
0-
005-9
3
Modern
ization o
f ID
RB
130
Modern
ization
Phase I
II g
oes o
n13.2
9T
he d
ela
y in
the
issuance o
f T
echnic
al
Sanction is d
ue t
o t
he
finaliz
ation o
f th
e
insta
llation o
f serv
er
facili
ties in c
onsultation
with E
lectr
onic
s
Depart
ment
of
PW
D
for
routing t
he d
ata
deliv
ere
d t
hro
ugh
RT
DA
S e
quip
ments
.
6M
odern
isation o
f hyd
rolo
gy
info
rmation s
yste
m
2701-8
0-0
05-9
2
Modern
isation o
f H
ydro
logic
al
info
rmation s
yste
m
130
5 N
os T
ippin
g
Bucket
rain
gauges 2
5 N
os.
of
Radar
Level
Sensors
1 N
o.
Auto
matic
Weath
er
sta
tion.
27.5
0
7D
evelo
pm
ent
of
KE
RI,
Peechi sta
ge
II (
Head o
f A
ccount:
4701-8
0-8
00-9
9)
To c
onduct
researc
h
activitie
s a
nd
imple
ment
investigation w
ork
s
entr
uste
d t
o K
ER
I P
eechi.
90
Sedim
enta
tion
surv
ey
of
Dam
s,
model stu
dy
of
Dam
s,
investigation
surv
ey
usin
g
sm
art
sta
tion,
NA
BL a
cre
ditation
intim
ation,
topogra
phic
surv
ey
work
s,
purc
hase o
f sophis
ticate
d
scie
ntific
machin
eries,
soil
and c
onstr
uction
mate
rials
testing
for
Sedim
enta
tion
surv
ey
of
Dam
s,
model stu
dy
of
Dam
s,
investigation
surv
ey
usin
g s
mart
sta
tion,
NA
BL,
acre
ditation
intim
ation,
topogra
phic
surv
ey
work
s,
purc
hase o
f sophis
ticate
d
scie
ntific
machi9
neries,
soil
and c
onstr
uction
mate
rials
testing f
or
private
and
61.9
81 y
ear
DE
VE
LO
PIN
G K
ER
I in
to a
centr
e o
f exc
elle
nce.
Diffe
rent
work
estim
ate
pre
para
tion in p
rogre
ss
Per
form
ance
Bud
get 2
017-
1812
7W
ater
Res
ourc
es D
epar
tmen
t
8F
orm
ation o
f R
iver
Basin
Org
anis
ation
(Head o
f A
ccount:
4701-8
0-
800-8
8)
Re-p
ublic
ation o
f “w
ate
r re
sourc
es o
f K
era
la”
whic
h w
ere
earlie
r publis
hed in
1958 a
nd 1
974.
The
main
inte
ntion b
ehin
d
the c
om
pila
tion o
f W
ate
r R
esourc
es o
f K
era
la is t
o a
ssess t
he
wate
r re
sourc
es o
f th
e
Sta
te in G
IS P
latf
orm
, to
pre
dic
t th
e f
utu
re
wate
r re
sourc
es
scenario.
100
The d
raft
book o
f ‘w
ate
r re
sourc
e o
f K
era
la w
as
subm
itte
d t
o
Govern
ment
and
aw
aitin
g s
anction
for
public
ation
The d
raft
book o
f ‘w
ate
r re
sourc
es o
f K
era
la w
as
subm
itte
d t
o
Govern
ment
and
aw
aitin
g s
anction
for
public
ation.
4.6
6P
rocess s
tudy
is g
oin
g
on
9D
am
Rehabili
taio
n
and I
mpro
pvem
ent
Pro
ject
(DR
IP)
4701-
80-5
800-7
7
Rehabili
tation o
f 16
Dam
pro
jects
25000
9326.0
0P
out
of
44 p
ackages
41 h
as b
een t
endere
d
and 1
1 c
om
ple
ted
10
Non-P
lan
34163000
Per
form
ance
Bud
get 2
017-
1812
8W
ater
Res
ourc
es D
epar
tmen
t
Chapter- III
REFORMS MEASURES AND PERFORMANCES
The IDRB wing of Irrigation Department is primarily concerned
with Design and Research works. There works entrusted are diligently
carried out within the established means and according to codes and GOÊs.
Performance Budget 2017-18 129 Water Resources Department
Chapter- IV
REVIEW OF PAST PERFORMANCE
This chapter indicates the performance of the Department during
the financial year 2016 – 2017. The Scheme wise past performance and
activities are given in Annexure II.
Performance Budget 2017-18 130 Water Resources Department
IDR
BR
upees
in L
akhs
Deli
vera
ble
/
ph
ysi
cal
ou
tpu
ts
12
34
56
78
1In
vest
igati
on o
f Ir
rigati
on
Schem
es
4700-8
0-0
05-9
9
Invest
igati
on W
ork
s of
vari
ous
schem
es
/pro
jects
com
ing u
nder
Irri
gati
on d
epart
ment
150
96.45
Th
e i
nv
est
igati
on
wo
rks
co
nsi
dere
d
du
rin
g t
he p
eri
od
has
been
co
mp
lete
d
2B
ench m
ark
ing o
f Ir
rigati
on
Syst
em
s 4701-8
0-8
00-8
1
To c
onduct
bench m
ark
ing o
f com
ple
ted
irri
gati
on p
roje
cts
to a
scert
ain
irr
igati
on
eff
icie
ncy
50
Th
e w
ork
was
no
t
tak
en
up
du
e t
o
ad
min
istr
ati
ve
reaso
ns
3M
ull
ap
eri
yar
Pro
ject-
Dam
and
appurt
enant
work
s 4700-2
9-
800-9
7
Vari
ous
work
s re
late
d t
o N
ew
Mull
aperi
yar
dam
50
00
Du
e d
isp
ute
an
d
co
urt
case
s th
e w
ork
was
held
up
4In
vest
igati
on
an
d D
esi
gn
27
01
-80
-
00
5-9
7
Modern
isati
on o
f H
ydro
logy I
nfo
rmati
on S
yst
em
25
04
5.2
3C
on
sid
era
ble
pro
gre
ss a
ch
iev
ed
5D
RIP
47
01
-80
-80
0-7
7D
am
Rehabil
itati
on a
nd I
mpro
vem
ent
40
00
39
93
2 p
ack
ag
es
co
mp
lete
d
AN
NE
XU
RE
– I
I
Sta
tem
en
t of
Ou
tlay
s/O
utc
om
es/T
arg
et
20
16
-17
an
d A
ctu
al
Ach
ievem
en
t 2
01
6-1
7
PL
AN
/MA
JOR
SC
HE
ME
S
Reaso
n f
or
vari
ati
on
Sl.
No
.N
am
e o
f th
e S
ch
em
e/
Pro
gra
mm
eO
bje
cti
ve/o
utc
om
eB
ud
get
ou
tlay
20
16
-
17
Ex
pen
dit
ur
e 2
01
6-1
7
Ach
iev
em
en
t
Per
form
ance
Bud
get 2
017-
1813
1W
ater
Res
ourc
es D
epar
tmen
t
Chapter - V
FINANCIAL REVIEW
The Department of IDRB implemented a vast number of schemes
for development 2017-18.There was total outlay of Rs.263.1 Crore for
the Annual plan for 2017-18 as given below.
Plan Schemes - Rs.263.1 Crores
Budget Allocation and Expenditure of the State
Year Allocation (in lakhs) Expenditure(in lakhs)
2014-15 8745 833.23
2015-16 6898.98 1144.11
2016-17 9795 4442.41
2017-18 26423.39 9812.00
Performance Budget 2017-18 132 Water Resources Department
IDR
BN
o.
Sch
em
e/P
rog
ram
me
Majo
r H
ead
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-62
01
6-1
72
01
7-8
20
15
-16
20
16
-17
20
17
-18
1In
vest
igati
on
of
Irri
gati
on
Sch
em
es
47
00
-80
-00
5-9
9
47
00
-80
-00
5-9
91
50
15
01
50
15
05
3.6
81
53
.98
96
.45
2B
en
ch
mark
ing
of
Irri
gati
on
Sy
stem
s 4
70
1-8
0-
80
0-8
1
47
01
-80
-80
0-8
15
55
50
00
3M
ull
ap
eri
yar
Pro
ject-
Dam
an
d a
pp
urt
en
an
t w
ork
s
47
00
-29
-80
0-9
7
47
00
-29
-80
0-9
75
05
00
50
00
50
00
23
.83
0
4In
vest
igati
on
an
d D
esi
gn
27
01
-80
-00
5-9
7
27
01
-80
-00
5-9
72
00
35
02
50
02
6.9
13
7.0
74
5.2
3
5P
lan
-co
nst
ructi
on
of
ISW
Hu
b
47
01
-80
-80
0-7
5-
Inte
rsta
te W
ate
r
Hu
b
5,0
00
,00
01
,00
,00
,00 0
1,0
0,0
0,0
0 0
1,0
0,0
0,0
0 0
5,0
00
,00
05
,00
0,0
00
1,0
0,0
0,0
0 0
Nil
Nil
Nil6
12
34
5
AN
NE
XU
RE
– I
II
PL
AN
Tre
nd
s in
Ex
pen
dit
ure
viz
-a-v
iz B
ud
get
Est
imate
s/R
ev
ised
Est
imate
s/ A
ctu
al
Ex
pendit
ure
in r
ecent
years
Bu
dg
et
Est
imate
sR
ev
ised
Est
imate
sA
ctu
al
Ex
pen
dit
ure
Per
form
ance
Bud
get 2
017-
1813
3W
ater
Res
ourc
es D
epar
tmen
t
GROUNDWATER DEPARTMENT
Chapter - I
INTRODUCTION
Ground water Department is the nodal agency for groundwater
exploration and development in the state. The Department also focuses on
sustainable management of groundwater resources with special attention
on groundwater quality and enforcement of Groundwater (control and
regulation) Act 2002. Exploitation of ground water in many parts of the
state has increased by many folds over the last few years. Establishment of
industries using groundwater as raw material are on a rise in recent times.
Complaints of ground water over exploitation and contamination are
frequently raised from various parts of the state. So in the present scenario
groundwater management is as important as groundwater development.
The main activities of the Department are:-
a) Ground water resource estimation
b) Groundwater investigation
c) Construction of groundwater abstraction structures (Bore well, Tube
well and Filter point well)
d) Implementation of Mini Drinking Water Supply Schemes and Hand
Pump Schemes
e) Implementation of Artificial Recharge Structures
f) Implementation of Kerala Groundwater (Control & Regulation) Act
2002
g) Water Quality Analysis
h) Groundwater related studies with valid data generation for different
purposes.
i) Conducting Pumping tests
j) Specific studies for disputes on ground water resource exploitation
k) Renovation of mini drinking water supply schemes and Repair of
Hand pump schemes.
Performance Budget 2017-18 134 Water Resources Department
l) Conducting Hydrogeological studies for issuing Environmental
Clearance to Quarries under District Level Expert Appraisal
Committee (DEAC).
m) Implementation of National Hydrology Project (100% Central Sector
Scheme)
Organisational Set up
The Director is the head of the Department and has officers in
various wings to assist him. There are 14 District officers to implement the
different schemes of the Department and in addition there is an analytical
lab level II+ at Thiruvananthapuram and 2 regional analytical labs II at
Ernakulam and Kozhikode. There is a central workshop and stores at
Kollam for the maintenance of machinery and drilling rigs.
OBJECTIVES OF SCHEMES IMPLEMENTED BY THE DEPARTMENT
The following are the objectives of different schemes implemented by
Department during the financial year 2017-18.
1.Ground Water Investigation and Development
(Head of Account: 2702-02-005-99)
This scheme aims for the realistic evaluation of the groundwater
resources and for providing infrastructural facilities like drilling machines
and other materials for the development of groundwater resources. This
scheme envisages groundwater resource estimation, groundwater
investigation by hydrogeological, geophysical and remote sensing studies
and construction of water extraction structures such as bore well, tube
well and filter point well. Preparation of hydrogeological reports,
groundwater data collection, data analysis and water quality studies will
also be carried out under this scheme. Water quality being an important
aspect in groundwater utilisation, necessary infrastructure have been set
up in the Department to monitor the change in water quality during pre-
monsoon , monsoon and post monsoon periods every year. Procurement
of machineries and accessories and materials for well construction,
maintenance of machineries and vehicles, procurement of new vehicles
Performance Budget 2017-18 135 Water Resources Department
and pumping test units, procurement of IT hardware and software,
geophysical equipment and other field related instruments, chemicals for
labs has also been included in this scheme.
II. Scheme for Groundwater Control and regulation
(Head of Account: 2702-02-005-93)
The objective of the scheme is to enforce ground water act to avoid
ground water depletion and to ensure equitable distribution of resources to
all section of the society. The Kerala Groundwater (Control and Regulation
act) 2002 has been implemented in the State to provide for the
conservation of groundwater and for the regulation and control of its
extraction and use in the State. Issuance of permits and conversion
permits, granting NOCs to water intensive units, other industries and
infrastructure projects which use groundwater as raw material, registration
of drilling rigs, conducting mass awareness programmes on groundwater
conservation and management are also included under this scheme.
Systematic scientific investigations including pumping tests are conducted
before granting permission to industrial and infrastructure projects.
Addressing complaints of overexploitation of groundwater, addressing
different disputes of groundwater use are also envisaged under this
scheme.
III- Scheme for training of personnel
(Head of Account: 2702-02-005-92)
The objectives of the scheme is to provide training to the Scientific,
Technical and Administrative personnel of the Department in the relevant
fields to upgrade/improve knowledge, skill and abilities, by exposing them
to latest and advancements in Groundwater investigation, Water well
construction, Groundwater conservation and Management Practices,
Modern computer application studies etc.
Performance Budget 2017-18 136 Water Resources Department
IV.Groundwater Based Drinking Water Scheme
(Head of Account: 2702-02-103-99 & 4702-00-102-94)
The main objective of the scheme is to provide drinking water
supply to non-covered/partially covered habitats. About 25 to 100
families are benefitted by one scheme. Mini water supply schemes are
implemented where the bore wells drilled have high yield and hand pump
schemes are implemented where the bore wells drilled are of low yield.
The schemes are then handed over to the beneficiary committee who in
turn operates and maintain the schemes. During the 2017-18 financial
year, an amount of Rs.225 lakhs has been allotted under the Head of
Account 2702-02-103-99 and an amount of Rs.75 lakhs under the Head
of Account 2702-02-103-99 for implementing bore well /tube well based
drinking water schemes, construction of BW/TW and hand pump
schemes. 18 nos of MWSS, 16 nos of bore well construction and 1 no of
hand pump scheme have been completed under the scheme and
benefitted to 574 families of the State.
In addition to the budget provision, an amount of Rs.432 lakhs has
been allotted through e-LAMS under Rajiv Gandhi Drinking water
mission Scheme. The Department has undertaken 23 Nos of MWSS, 19
Nos of bore well construction, 4 Nos of hand pump scheme, 1300 Nos
of hand Pump repair and 117 No of renovation works of MWSS under
the scheme. The Scheme has been benefitted to 18,854 families and 3
No of school in the State.
V.Scheme for Ground water conservation and recharge
(Head of Account: 4702-00-102-97)
This scheme envisages construction of artificial recharge structures to
augment groundwater resource. In the present ground water scenario of
over exploitation and depletion, ground water conservation and recharge
is having utmost importance. Construction of sub surface dykes and small
check dams; dug well and bore well recharging are envisaged under this
scheme
Performance Budget 2017-18 137 Water Resources Department
Because of the increased urbanisation leading to the changes in land
use pattern, reclamation of wet lands, the chances of recharging of ground
water is very limited. Hence implementation of artificial recharge
structures is the only solution to enhance the ground water table. In
Kerala, majority of people depend open wells for their domestic needs.
Hence the Department will be given top priority to recharge open wells in
the state. During the financial year 2017-18 an amount of Rs 157 lakhs
has been allotted to the Department as budget provision for implementing
artificial recharge schemes. 83 Nos of dug well recharging structures in
various Districts, 5 Nos of Bore well recharging and 18 Nos of renovation
structures in Idukki District have been completed under the scheme.
V1. National Hydrology Project (Central Sector Scheme):
National Hydrology Project, a Central Sector Scheme with 100%
central grant has been approved by the Ministry of Water Resources,
Government of India on 23-06-2016. The project envisages to
implement in the state for a period from 2016-17 to 2023-2024. An
amount of Rs. 40 crores has been tentatively allotted to the state for the
project implementation. The objective of the project is to develop a
water budgeting system enable for integrated water resource
management. It also enables the administrator / water users for a
better water management. The main activities including enhancement
of groundwater monitoring network, infrastructure development for
ground water estimation. The main components of the NHP are:
1. Water Resources Data acquisition
2. Water Resources Information System
3. Water Resources Operation and Planning
4. Institutions capacity Enhancement
Major Activities proposed under the components are:-
A .Water Resources Data acquisition
1. Expand and upgrade water resources monitoring systems including
Automation with Real Time Data Acquisition System (DWLR
Telemetry)
Performance Budget 2017-18 138 Water Resources Department
2. Community based Groundwater level monitoring and water
management (students, public participation)
3. Mapping and data collection of groundwater abstraction Structures
– Well census (Women Empowerment Groups / NGOs)
4. Upgrading/ procurement of IT equipments, Lab equipments etc
5. Up gradation of DATA Processing Centers, Analytical Laboratories
etc
• Water Resources Information System
a) Developing watershed wise water budgeting system
b) E-Gems maintenance
c) Website up gradation and maintenance
d) Awareness Raising programmes
2.5 Preparation and publication of Groundwater year book/Pamphlets
etc
2.6 Development of e-library
2.7 Water Resources Operation and Planning
2.8 Institutions capacity Enhancement
2.8.2 Water Resources Operation and Planning
2.9 River basin model developing in collaboration with surface water
Department (DSS-Planning)
i) Purpose driven studies –Hydrogeology
2.10 Estimation of Hydrological parameters of different geological
formations ( for Groundwater resource estimation )
2.11 Recharge zone demarcation of tertiary aquifers and ensuring
sustainability of water sources
2.12 Impact assessment, implementation and modeling of rainwater
harvesting / artificial recharge structures in overexploited block-
Chittur Block
2.13 Management of Groundwater pumping for irrigation with special
reference to calcified zones in Palakkad District
Performance Budget 2017-18 139 Water Resources Department
2.14 Development of Groundwater potential through Managed Aquifer
Recharge(MAR) in Athiyannur block
ii) Purpose driven studies- Hydrochemistry
2.15 Impact of pesticide residues in ground water resources in the
cardamom cultivating areas of Idukki District.
2.16 Mapping of groundwater quality in the industrial belt of Ernakulum
District
D.Institutions capacity Development
• Establishment of State PMU
• Maintenance of Infrastructure created procurement of
vehicles etc.
9) Organizing /participation in Workshops/ trainings etc.
Performance Budget 2017-18 140 Water Resources Department
Chapter –II
FINANCIAL OUTLAYS AND QUANTIFIABLE DELIVERABLES
The Financial Outlays and Quantifiable Deliverables pertaining to
Groundwater Department during 2017-18 on various schemes and
programmes are attached in Annexure - I. The financial Allocation for the
plan period was 1951.5 Lakhs and the expenditure incurred was
Rs. 1535.721 lakhs. The total financial achievement of plan schemes
during the year was 79%.
Performance Budget 2017-18 141 Water Resources Department
Gro
un
d W
ater
Dep
artm
ent
12
34(
i)4(
ii)4(
iii)
4(iv
)5
89
10
1
Groundwater investigation and development/
Head of Account: 2702-02-005-99.
Thi
s sc
hem
e ai
ms
for
the
real
istic
eva
luat
ion
of
the
grou
ndw
ater
res
ourc
es a
nd fo
r pr
ovid
ing
infr
astr
uctu
ral f
acili
ties
like
drill
ing
mac
hine
s an
d
othe
r m
ater
ials
. Thi
s sc
hem
e en
visa
ges
grou
ndw
ater
res
ourc
e es
timat
ion,
gro
undw
ater
inve
stig
atio
n .
Pre
para
tion
of h
ydro
geol
ogic
al
repo
rts,
gro
undw
ater
dat
a co
llect
ion,
dat
a
anal
ysis
and
wat
er q
ualit
y st
udie
s w
ill a
lso
be
carr
ied
out u
nder
this
sch
eme.
Pro
cure
men
t of
mac
hine
ries
and
acce
ssor
ies
and
mat
eria
ls fo
r
wel
l con
stru
ctio
n, m
aint
enan
ce o
f mac
hine
ries
and
vehi
cles
, pro
cure
men
t of n
ew v
ehic
les,
proc
urem
ent o
f IT
har
dwar
e an
d
softw
ares
.Geo
phys
ical
equ
ipm
ent a
nd o
ther
fiel
d
rela
ted
inst
rum
ents
, che
mic
als
for
labs
hen
ce
been
incl
uded
und
er th
is s
chem
e
1242
.5G
roun
dwat
er
Inve
stig
atio
n,D
rillin
g,
othe
r w
orks
incl
udin
g
hand
pum
p
repa
ir,lo
ggin
g of
wel
ls,d
evel
opin
g of
wel
ls,p
umpi
ng te
st
,han
dpum
p er
ectio
n
and
wat
er s
ampl
e
anal
ysis
Dem
and
Bas
ed12
47.5
Con
duct
ed 1
2773
nos
of
grou
nd w
ater
inve
stig
atio
n,
drill
ed 1
566
nos.
of b
ore
wel
l/ T
ube
wel
l, 87
nos
. of
hand
pum
p re
pair,
94
nos.
of w
ell l
oggi
ng,3
02
pum
ping
test
s, 2
0 ha
nd
pum
p er
ectio
n, 3
24 n
os o
f
bore
wel
l dde
velo
ping
an
d
3343
wat
er q
ualit
y
anal
ysis
. Pur
chas
ed 5
nos
.
of v
echi
cle
for
depa
rtm
ent
use.
869.
525
The
gro
undw
ater
inve
stig
atio
n he
lps
the
publ
ic to
obta
in s
uita
ble
loca
tion
for
cons
truc
ting
bore
wel
ls/tu
be w
ells
and
othe
r
sche
mes
for
ache
ivin
g sa
fe
drin
king
wat
er
sour
ce. W
ater
for
dom
estic
and
agric
ultu
re
purp
ose
is m
ade
avai
labl
e to
the
publ
ic b
y
cons
truc
ting
tube
wel
l/bor
e
wel
l/filt
er p
oint
wel
ls s
afe
yiel
d of
the
wel
ls a
re
asce
rtai
ned
for
impl
emen
ting
sche
me
and
indu
stria
l pur
pose
As
per
the
Rig
ht
toS
ervi
ce A
ct, t
he ti
me
fram
e fo
r th
e sc
hem
e
is o
ne y
ear
but
mos
t
of th
e in
vest
igat
ions
coul
d no
t be
com
plet
ed
with
in th
e tim
e fr
ame
beca
use
of th
e
shor
tage
of s
cien
tific
staf
f str
engt
h an
d la
ck
of p
rope
r in
fras
truc
ture
fasc
ility
Sl.N o
Tar
get
Fix
ed
Ph
ysic
alF
inan
cial
Rem
arks
/Ris
k F
acto
r
67
Tar
get
Ach
ieve
d
An
nex
ure
-1
FO
RM
AT
OF
TA
BL
ES
IN C
HA
PT
ER
II O
F P
ER
FO
RM
AN
CE
BU
DG
ET
201
7-20
18
Qu
anti
fiab
le
Del
iver
able
s/P
hys
ic
al o
utp
uts
Ob
ject
ive
/ou
tco
me
Nam
e o
f
Sch
eme
Ph
ysic
alF
inan
cial
Pro
ject
ed
ou
tco
mes
Pro
cess
es /
Tim
elin
es
Ou
tlay
201
7-20
18
No
n P
lan
Bu
dg
et
Pla
n
Bu
dg
et
Co
mp
lem
enta
ry
Ext
ra B
ud
get
ary
Res
ou
rces
Cen
tral
Ass
ista
nce
if
any
Per
form
ance
Bud
get 2
017-
1814
2W
ater
Res
ourc
es D
epar
tmen
t
2
Scheme for Control & Regulation of Ground Water/
Head of Account: 2702-02-005-93
The
obje
ctiv
eof
the
sche
me
isto
enfo
rce
grou
ndw
ater
act
toav
oid
grou
ndw
ater
depl
etio
nan
dto
ensu
re
equi
tabl
edi
strib
utio
nof
reso
urce
sto
all
sect
ion
ofth
eso
ciet
y.Is
suan
ceof
perm
its,
gran
ting
NO
Cs
todr
inki
ng
wat
erbo
ttlin
gpl
ants
and
othe
r
indu
strie
sw
hich
use
grou
ndw
ater
as
raw
mat
eria
lar
eal
soin
clud
edun
der
this
sch
eme.
15G
roun
dwat
er
Legi
slat
ion
and
its
impl
emen
tatio
n
Dem
and
Bas
ed
Per
mit
issu
ed -
175
9
Nos
.
Con
vers
ion
perm
it-
545N
os.
Con
duct
ed 2
2 N
os. o
f
awar
enes
s P
rogr
amm
es
on G
roun
dWat
er C
ontr
ol
and
Reg
ulat
ion
in
vario
us d
istr
icts
. The
Sta
te G
roun
dWat
er
Aut
horit
y ha
s ac
cord
ed
NO
C to
25
Nos
. of
bottl
ing
units
and
4
conv
ersi
on p
erm
its a
t
Chi
ttor
bloc
k in
Pal
akka
d
dist
rict.
7.13
Pro
per
enfo
rcem
ent o
f
grou
nd w
ater
act t
o av
oide
grou
nd w
ater
depl
etio
n to
ensu
re
equi
tabl
e
dist
ribut
ion
of
reso
urce
s to
all s
ectio
n of
the
soci
ty.
Impl
emen
ting
grou
nd w
ater
(con
trol
and
regu
latio
n) a
ct
2002
3
Scheme for Training Personnal
Head of Account: 2702-02-005-92
The
obje
ctiv
esof
the
sche
me
isto
prov
ide
trai
ning
toth
eS
cien
tific
,T
echn
ical
and
Adm
inis
trat
ive
pers
onne
lin
the
depa
rtm
ent
and
expo
sed
them
inad
vanc
emen
tsin
Gro
undw
ater
inve
stig
atio
n,W
ater
wel
l
cons
truc
tion,
Gro
undw
ater
cons
erva
tion
and
Man
agem
ent
Pra
ctic
es,
Mod
ern
com
pute
r
appl
icat
ion
stud
ies
etc.
4U
pgra
ding
ski
lls o
f
depa
rtm
enta
l
pers
onne
l
Dem
and
Bas
ed
403
offi
cers
atte
nded
trai
ning
on
Geo
phys
ical
Tec
hniq
ues
in
Gro
undw
ater
Stu
dies
at
CG
WB
, Rai
pur.
Indu
ctio
n
trai
ning
giv
en to
new
ly
recr
uite
d 46
dril
ling
assi
stan
ts. C
ondu
cted
a
one
day
trai
ning
on
pum
ping
test
ana
lysi
s at
Dire
ctor
ate,
26
offic
ers
atte
nded
the
trai
ning
.
2.4
The
trai
ning
s
help
ed th
e
offic
ers
to
expo
se v
ario
us
mod
ern
tech
niqu
es in
grou
nd w
ater
inve
stig
atio
n,
expl
orat
ion
and
adm
inis
trat
ion.
With
in th
e fin
anci
al
year
.
Per
form
ance
Bud
get 2
017-
1814
3W
ater
Res
ourc
es D
epar
tmen
t
4
Scheme for Ground Water Conservation &
Recharge/
Head of Account: 4702-00-102-97
Thi
ssc
hem
een
visa
ges
cons
truc
tion
ofar
tific
ial
rech
arge
stru
ctur
esto
augm
ent
grou
ndw
ater
.
Con
stru
ctio
nof
sub
surf
ace
dyke
s;V
CB
s,sm
all
chec
kda
ms
and
dug
wel
lre
char
gear
e
envi
sage
d un
der
this
sch
eme
157
Con
stru
ctio
n of
Art
ifici
al R
echa
rge
Sch
emes
80 s
chem
es fo
r
diffe
rent
art
ifici
al
rech
arge
stru
ctur
es
157
com
plet
ed 8
3 no
s of
dug
wel
l rec
harg
e st
ruct
ures
, 5
nos.
of b
ore
wel
l rec
harg
e
and
reno
vatio
n of
18
nos.
of r
echa
rge
sruc
ture
.
124.
32T
he r
echa
rge
stru
ctur
es h
elps
to
rech
arge
the
grou
nd w
ater
and
ther
e by
enh
ance
wat
er ta
ble
of th
e
area
.
The
who
le w
ork
com
plet
ed w
ith in
the
finan
cial
yea
r.
5
Schme of Groundwater Based Drinking Water
Scheme/
Head of Account: 2702-02-103-99
The
mai
n ob
ject
ive
of th
e sc
hem
e is
to p
rovi
de
drin
king
wat
er s
uppl
y to
non
-cov
ered
/par
tially
cove
red
habi
tats
. 25
to 1
00 fa
mili
es b
enef
ited
by
one
sche
me.
Mic
ro w
ater
sup
ply
sche
mes
are
impl
emen
ted
whe
re th
e bo
re w
ells
dril
led
have
high
yie
ld w
here
as h
and
pum
p sc
hem
es a
re
impl
emen
ted
whe
re th
e bo
re w
ells
dril
led
are
low
yiel
d. T
he s
chem
es a
re th
en h
ande
d ov
er to
the
bene
ficia
ry c
omm
ittee
who
in tu
rn o
pera
tes
and
mai
ntai
n th
e sc
hem
es.
25Im
plem
enta
tion
of
MW
SS
, an
d
cons
truc
tion
of b
ore
wel
ls/tu
be w
ells
.
Dem
and
Bas
ed25
Com
plet
ed 4
Nos
. of
MW
SS
and
9 N
os o
f bor
e
wel
ls c
onst
ruct
ion.
24.9
815
9 fa
mili
s
bene
fitte
d w
ith
safe
drin
king
wat
er u
nder
this
sche
me
The
sch
emes
hav
e
com
plet
ed w
ih in
the
Fin
anci
al y
ear
6
Schme of Groundwater Based Drinking Water Scheme/
Head of Account: 4702-00-102-94
Impl
emen
tatio
n of
MW
SS
with
bor
e w
ell a
s
sour
ce p
rovi
ding
saf
e dr
inki
ng w
ater
to p
ublic
.
75Im
plem
enta
tion
of
MW
SS
, H
P s
chem
e
and
cons
truc
tion
of
bore
wel
ls/tu
be w
ells
.
Dem
and
Bas
ed75
Com
plet
ed 1
4 N
os. o
f
MW
SS
, 7 N
os o
f Bor
e w
ell
and
1 no
. of h
and
pum
p
sche
me.
7541
5 fa
mili
es
bene
fitte
d w
ith
safe
drin
king
wat
er
unde
r th
is s
chem
e
Per
form
ance
Bud
get 2
017-
1814
4W
ater
Res
ourc
es D
epar
tmen
t
7
Rajiv Gandhi Drinking Water Mission
Head of Account: 2702-02-005-77
The
mai
n ob
ject
ive
of th
e sc
hem
e is
to p
rovi
de
drin
king
wat
er s
uppl
y to
non
-cov
ered
/par
tially
cove
red
habi
tats
. 25
to 1
00 fa
mili
es b
enef
ited
by
one
sche
me.
Mic
ro w
ater
sup
ply
sche
mes
are
impl
emen
ted
whe
re th
e bo
re w
ells
dril
led
have
high
yie
ld w
here
as h
and
pum
p sc
hem
es a
re
impl
emen
ted
whe
re th
e bo
re w
ells
dril
led
are
low
yiel
d. T
he s
chem
es a
re th
en h
ande
d ov
er to
the
bene
ficia
ry c
omm
ittee
who
in tu
rn o
pera
tes
and
mai
ntai
n th
e sc
hem
es.
Impl
emen
tati
on o
f
drou
ght
relie
f wor
ks
432
Impl
emen
tatio
n of
MW
SS
and
HP
sche
me.
Con
stru
ctio
n of
bor
e
wel
ls, R
enov
atio
n of
MW
SS
and
Han
d
pum
p re
pair
Dem
and
Bas
ed43
2C
ompl
eted
23
Nos
. of
MW
SS
, 4 N
os. o
f han
d
pum
p sc
hem
e an
d 19
nos
.
of b
ore
wel
l con
stru
ctio
n.
Com
plet
ed 1
17 r
enov
atio
n
of M
WS
S a
nd 1
300
hand
pum
p re
pair.
431.
984
1885
4 fa
mili
es
and
3 sc
hool
s
have
sup
plie
d w
ith
safe
drin
king
wat
er fr
om th
is
schm
e.
the
sche
mes
hav
e
com
plet
ed w
ith in
the
finan
cial
yea
r.
8
National Hydrology Project (Groundwater 100% CSS)/
Head of Account: 2702-02-103-98
Nat
iona
lH
ydro
logy
Pro
ject
,a
Cen
tral
Sec
tor
Sch
eme
with
100%
cent
ral
gran
tha
sbe
en
appr
oved
byth
eM
inis
try
ofW
ater
Res
ourc
es,
Gov
ernm
ent
ofIn
dia
on23
-06-
2016
.T
he
proj
ect
envi
sage
sto
impl
emen
tin
the
stat
efo
ra
perio
dfr
om20
16-1
7to
2023
-202
4.T
heob
ject
ive
ofth
epr
ojec
tis
tode
velo
pa
wat
erbu
dget
ing
syst
emen
able
for
inte
grat
edw
ater
reso
urce
man
agem
ent.
Ital
soen
able
sth
ead
min
istr
ator
/
wat
erus
ers
for
abe
tter
wat
erm
anag
emen
t.A
n
amou
ntof
Rs.
40cr
ores
has
been
allo
tted
toth
e
stat
efo
rth
epr
ojec
tim
plem
enta
tion.
The
mai
n
activ
ities
incl
udin
gen
hanc
emen
tof
grou
ndw
ater
mon
itorin
gne
twor
k,in
fras
truc
ture
deve
lopm
ent
for
grou
nd w
ater
est
imat
ion.
1N
ILD
ata
colle
cted
from
obse
rvat
ion
wel
ls a
nd
data
dis
sem
inat
ed to
vario
us u
ser
agen
cies
.
Wat
er
Res
ourc
es D
ata
acqu
isiti
on,
wat
er
Res
ourc
es
Info
rmat
ion
Sys
tem
,
Wat
er
Res
ourc
es
Ope
ratio
n an
d
Pla
nnin
g,
Inst
itutio
ns
capa
city
Enh
ance
men
t
Dat
a co
llect
ed fr
om
obse
rvat
ion
wel
ls a
nd d
ata
diss
emin
ated
to v
ario
us
user
age
ncie
s. S
ince
it is
a
100%
Cen
tral
Sec
tor
Sch
me,
sal
ary
com
pone
nt
is b
eing
met
from
the
Non
-
Pla
n S
chem
e. H
ence
the
savi
ngs.
Dat
a C
olle
ctio
n is
a
cont
inuo
us p
roce
ss
Per
form
ance
Bud
get 2
017-
1814
5W
ater
Res
ourc
es D
epar
tmen
t
Chapter –III
REFORM MEASURES AND PERFORMANCE
Groundwater Investigation and Development: - The Department has
conducted 12773 nos of groundwater investigation, drilled 1566 nos. of
bore well/ Tube well, 87 nos. of hand pump repair, 94 nos. of well
logging,302 pumping tests, 20 hand pump erection, 324 nos of bore well
developing and 3343 water quality analysis under this scheme. Action
has been taken to purchase new sophisticated machineries instead of old
ones for drilling works. During the plan period, Department has Purchased
5 nos. of vehicles for Department use. The Department has 4 pumping
test units only and the demand for pumping tests is increasing day by day.
So that the Department will be taking initiative to purchase pumping test
units in 9 Districts as it is essential to ensure the safe yield of the wells for
implementing bore well / Tube well based MWSS,agricultural purposes ,
issuing NOCÊs to industrial, infrastructure and water intensive projects etc.
Scheme for Control and Regulation of Ground Water:-
The State Groundwater Authority has been reconstituted by the
Government as per G.O. (P) No. 19/2017/WRD Dated 23/09/2017
and convened 2 authority meetings during 2017-18 plan period. The
State Groundwater Authority has accorded NOC to 25 Nos. of bottling
units and 4 conversion permits at Chittor block in Palakkad District. The
State Groundwater Authority has constituted a technical committee to
study the amendment of Groundwater (Control and Regulation) Act 2002
and action in this regard has been taken by the Committee. The Act
Amendment proposal will be placed before the next authority meeting and
send to the Government for approval.
Performance Budget 2017-18 146 Water Resources Department
Scheme for Groundwater Conservation and Recharge:-The Department is
implementing different artificial recharge structures to enhance the
groundwater levels and giving priority in over exploited, Semi Critical and
Critical areas also.
Ground Water Based Drinking Water Scheme: -
The schemes implemented by the Department are highly beneficial
to the public in the non-covered/partially covered habitats. Under this
scheme, the Department is implementing mini water supply schemes (bore
well /tube well), construction of wells (bore well /tube well), Hand pump
Schemes, Hand pump repair and renovation of MWSS. The Department
has achieved 100% financial progress, received as budget allocation from
the Government under the scheme. The applications received could not be
considered entirely since the budget allocation is insufficient to meet the
demand.
Performance Budget 2017-18 147 Water Resources Department
Chapter - IV
REVIEW OF PAST PERFORMANCE
This chapter indicates the performance of the Department during the
financial year 2016-2017. The scheme wise past performance and
activities are given in Annexure II.
Performance Budget 2017-18 148 Water Resources Department
Gro
und
Wat
er D
epar
tmen
t
Sl.
No
.
Nam
e of
sche
mes
/Pro
gra
mm
e
Ob
ject
ive
/ ou
tco
me
Ou
tlay
2016
-201
7
(in
lakh
s)
Exp
end
it
ure
201
6-
2017
Del
iver
able
s/P
hys
ical
ou
tpu
ts
Ach
ieve
men
tR
easo
n f
or
vari
atio
n
12
34
56
78
1G
roun
dwat
er
inve
stig
atio
n an
d
deve
lopm
ent(
He
ad o
f Acc
ount
:
2702
-02-
005-
99.
Thi
s sc
hem
e ai
ms
for
the
real
istic
eva
luat
ion
of th
e
grou
ndw
ater
res
ourc
es a
nd fo
r pr
ovid
ing
infr
astr
uctu
ral
faci
litie
s lik
e dr
illin
g m
achi
nes
and
othe
r m
ater
ials
. Thi
s
sche
me
envi
sage
s gr
ound
wat
er r
esou
rce
estim
atio
n,
grou
ndw
ater
inve
stig
atio
n .
Pre
para
tion
of h
ydro
geol
ogic
al
repo
rts,
gro
undw
ater
dat
a co
llect
ion,
dat
a an
alys
is a
nd
wat
er q
ualit
y st
udie
s w
ill a
lso
be c
arrie
d ou
t und
er th
is
sche
me.
Pro
cure
men
t of m
achi
nerie
s an
d ac
cess
orie
s an
d
mat
eria
ls fo
r w
ell c
onst
ruct
ion,
mai
nten
ance
of m
achi
nerie
s
and
vehi
cles
.
1106
872.
3A
ll th
e pr
ogra
mm
s ar
e
dem
and
base
d. D
urin
g th
e
finan
cial
yea
r de
pt c
ondu
cted
8655
gro
und
wat
er
inve
stia
tion,
dril
led
1342
bore
wel
ls/ t
ube
wel
ls, r
epai
red
294
hand
pum
p, c
ondu
cted
44
wel
l log
ging
, 208
pum
ping
test
anal
ysis
and
335
1 w
ater
qual
ity a
naly
sis.
Dur
ing
the
finan
cial
yea
r de
pt c
ondu
cted
865
5
grou
nd w
ater
inve
stia
tion,
dril
led
1342
bor
ewel
ls/
tube
wel
ls, r
epai
red
294
hand
pum
p, c
ondu
cted
44 w
ell l
oggi
ng, 2
08 p
umpi
ng te
st a
naly
sis
and
3351
wat
er q
ualit
y an
alys
is.
The
obj
ectiv
es a
re
dem
and
base
d an
d he
nce
ther
e is
no
varia
tion
betw
een
obje
ctiv
es a
nd
achi
evem
ent
2S
chem
e fo
r
Con
trol
&
Reg
ulat
ion
of
Gro
und
Wat
er(2
702-
02-
005-
93)
The
obje
ctiv
eof
the
sche
me
isth
een
forc
emen
tof
grou
nd
wat
erac
tto
avoi
dgr
ound
wat
erde
plet
ion
and
toen
sure
equi
tabl
edi
strib
utio
nof
reso
urce
sto
all
sect
ion
ofth
e
soci
ety.
Issu
ance
ofpe
rmits
,gr
antin
gN
OC
sto
drin
king
wat
erbo
ttlin
gpl
ants
and
othe
rin
dust
ries
whi
chus
e
grou
ndw
ater
asra
wm
ater
ial
are
also
incl
uded
unde
rth
is
sche
me.
107.
25D
eman
d B
ased
785
perm
its a
nd 1
04 c
onve
rstio
n pe
rmit
issu
ed
.Enf
orce
men
t of g
roun
dwat
er (
Con
trol
and
Reg
ulat
ion)
act
200
2
The
obj
ectiv
es a
re
dem
and
base
d an
d he
nce
ther
e is
no
varia
tion
betw
een
obje
ctiv
es a
nd
achi
evem
ent
PL
AN
/ M
AJO
R S
CH
EM
ES
An
nex
ure
- II
Sta
tem
ent
of
Ou
tlay
s/O
utc
om
es/T
arg
et 2
016-
17 a
nd
Act
ual
Ach
ieve
men
t 20
16-1
7
Rs.
in L
akh
s
Per
form
ance
Bud
get 2
017-
1814
9W
ater
Res
ourc
es D
epar
tmen
t
3S
chem
e fo
r
Tra
inin
g
Per
sonn
al(2
702-
02-0
05-9
2)
The
obje
ctiv
esof
the
sche
me
isto
prov
ide
trai
ning
toth
e
Sci
entif
ic,
Tec
hnic
alan
dA
dmin
istr
ativ
epe
rson
nel
inth
e
depa
rtm
ent
and
expo
sed
them
inad
vanc
emen
tsin
Gro
undw
ater
fiel
d.
43.
0914
offi
cers
atte
nded
var
oius
trai
ning
pro
gram
mes
orga
nise
d by
CG
WB
and
CW
RD
M. 3
4 of
ficer
s at
tend
ed
the
trai
ning
pro
gram
me
on
pum
ping
test
con
duct
ed b
y
the
depa
rtm
ent.2
offi
cers
atte
nded
one
day
wor
ksho
p
on g
roun
dwat
er e
stim
atio
n
met
hodo
logy
201
5 at
Pun
e
Upr
adin
g sk
ills
of th
e oi
ffice
rs in
gro
undw
ater
man
agem
ent a
nd g
roun
dwat
er p
rosp
ectin
g
4S
chem
e fo
r
grou
nd W
ater
Con
serv
atio
n &
Rec
harg
e(47
02-
02-1
02-9
7)
Thi
ssc
hem
een
visa
ges
cons
truc
tion
ofar
tific
ial
rech
arge
stru
ctur
esto
augm
ent
grou
ndw
ater
.C
onst
ruct
ion
ofsu
b
surf
ace
dyke
s;V
CB
s,sm
all
chec
kda
ms
and
dug
wel
l
rech
arge
are
env
isag
ed u
nder
this
sch
eme
4039
.68
Com
plet
ed 4
1 op
en w
ell
rech
arge
str
uctr
es.
The
rec
harg
es s
truc
ture
s he
lp to
rec
harg
e th
e
grou
nd w
ater
and
ther
e by
gro
und
wat
er le
vel o
f
the
area
ris
es.
5R
ajiv
Gan
dhi
Drin
king
Wat
er
Mis
sion
(270
2-02
-
005-
77)
The
mai
n ob
ject
ive
of th
e sc
hem
e is
to p
rovi
de d
rinki
ng
wat
er s
uppl
y to
non
-cov
ered
/par
tially
cov
ered
hab
itats
. 25
to 1
00 fa
mili
es b
enef
ited
by o
ne s
chem
e. M
icro
wat
er
supp
ly s
chem
es a
re im
plem
ente
d w
here
the
bore
wel
ls
drill
ed h
ave
high
yie
ld w
here
as h
and
pum
p sc
hem
es a
re
impl
emen
ted
in lo
w y
ield
ing
wel
ls.
1340
.33
906.
84C
ompl
eted
32
Nos
. of M
WS
S,
24 N
os. o
f han
d pu
mp
sche
me
and
99 n
os. o
f bor
e
wel
l con
stru
ctio
n. C
ompl
eted
230r
enov
atio
n of
MW
SS
and
4900
hand
pum
p re
pair.
Priv
idin
g sa
fe d
rinki
ng w
ater
to n
on c
over
ed /
part
ially
cov
ered
hab
itats
. Abo
ut 6
1995
fam
ilies
, 2
offic
es, 2
hos
pita
ls a
nd 5
sch
ools
ben
ifite
d un
der
this
sch
eme
An
amou
nt o
f R
s.10
0
lakh
s ha
s be
en a
llotte
d as
budg
et p
rovi
sion
. Lat
er a
s
per
Ord
er N
o: G
.O (
Rt)
No.
318
/201
7/F
in
date
d:13
.01.
2017
an
addi
tiona
l am
ount
of
Rs.
124
0.33
lakh
s ha
s
been
allo
tted
for
Dro
ught
Miti
gatio
n w
orks
und
er th
e
sche
me.
The
bal
ance
amou
nt o
f Rs.
432
lakh
s
has
been
tran
sfer
red
to e
-
LAM
S.
Per
form
ance
Bud
get 2
017-
1815
0W
ater
Res
ourc
es D
epar
tmen
t
6N
atio
nal
Hyd
rolo
gy
Pro
ject
(G
roun
d
Wat
er
Com
pone
nts)
(100
% C
entr
al
sect
or S
chem
e)
Nat
iona
lH
ydro
logy
Pro
ject
,a
Cen
tral
Sec
tor
Sch
eme
with
100%
cent
ral
gran
tha
sbe
enap
prov
edby
the
Min
istr
yof
Wat
erR
esou
rces
,G
over
nmen
tof
Indi
aon
23-0
6-20
16.
The
proj
ecte
nvis
ages
toim
plem
ent
inth
est
ate
for
ape
riod
from
2016
-17
to20
23-2
024.
The
obje
ctiv
eof
the
proj
ect
is
tode
velo
pa
wat
erbu
dget
ing
syst
emen
able
for
inte
grat
ed
wat
erre
sour
cem
anag
emen
t.It
also
enab
les
the
adm
inis
trat
or/
wat
erus
ers
for
abe
tter
wat
erm
anag
emen
t.
The
mai
nac
tiviti
esin
clud
ing
enha
ncem
ent
ofgr
ound
wat
er
mon
itorin
gne
twor
k,in
fras
truc
ture
deve
lopm
ent
for
grou
nd
wat
er e
stim
atio
n.
800
87.4
61.
Mon
thly
Dat
a C
olle
ctio
n
a.O
penw
ells
. b
.
Pie
zom
eter
s.
. F
CS
- 8
nos
1. D
ata
Col
lect
ed (
OW
-399
, PZ
-403
Ful
l Clim
atic
Sta
tions
-8no
s.
Dire
ctor
, GW
D a
ttend
ed o
rient
atio
n
mee
ting
of IA
s &
NH
P a
t New
Del
hi, W
orld
Ban
k
Offi
ce. 3
. T
wo
offic
ers
atte
nded
PIP
of o
f NH
P
final
isat
ion
mee
ting
at W
orld
Ban
k O
ffice
, New
Del
hi.
4. N
HP
impl
emen
tatio
n w
ork
is p
rogr
essi
ng.5
. As
per
the
read
ines
s cr
iteria
of M
oWR
&W
orld
Ban
k th
e
stat
us o
f NH
P p
repe
ratio
n sc
ore
is 7
0%.C
entr
al
cabi
net h
ad is
sued
ord
ers
on th
e ap
prov
al o
f
impl
emen
ting
NH
P.R
eadi
ness
crit
eria
of M
oWR
&W
orld
Ban
k th
e st
atus
of N
HP
pre
pera
tion
is 1
00
%.T
hree
offi
cers
atte
nded
wor
ld b
ank
mis
sion
mee
ting
held
at N
ew D
elhi
. Ove
r al
l rea
dine
ss s
tatu
s of
NH
P is
80%
. New
obs
erva
tion
wel
l siti
ng w
ork
is p
rogr
ess.
Pro
ject
impl
emen
tatio
n pl
an r
evie
ved
by M
oWR
and
mad
e co
mm
ents
. con
tinuo
us.
Re-
appr
opria
tion
of
budg
et p
rovi
sion
act
ion
is p
rogr
essi
ng w
ith g
ovt.
.
1st S
tate
Lev
el P
roje
ct S
terin
g C
omm
ittee
mee
ting
(SLP
SC
) he
ld b
y A
CS
.
NH
P is
a 1
00%
Cen
tral
Sec
tor
Sch
eme.
Dur
ing
the
finan
cial
yea
r 20
16-1
7,
Gov
ernm
ent o
f Ind
ia h
as
allo
tted
suffi
cien
t fun
ds fo
r
the
impl
emen
tatio
n of
the
proj
ect.
The
Sta
te
Gov
ernm
ent h
ad to
mee
t
only
the
sala
ry c
ompo
nent
and
for
the
sust
aina
bilit
y
of th
e pr
ojec
t. H
ence
the
savi
ngs.
Per
form
ance
Bud
get 2
017-
1815
1W
ater
Res
ourc
es D
epar
tmen
t
Chapter –V
FINANCIAL REVIEW
This chapter indicates financial review covering overall trends in
expenditure viz –a viz Budget Estimate/Revised Estimates for the last three
years, including the current year 2018-2019.The financial trends in
expenditure are given in Annexure III including plan and non- plan. The
graphical representations of performances during the financial year 2015-
2016, 2016-17 and 2017-18 are as follows:-
Performance Budget 2017-18 152 Water Resources Department
Performance Budget 2017-18 153 Water Resources Department
Performance Budget 2017-18 154 Water Resources Department
Performance Budget 2017-18 155 Water Resources Department
Gro
un
d W
ate
r D
ep
art
me
nt
No
Sch
em
e /
Pro
gra
mm
eM
ajo
r H
ea
d
20
15
-
20
16
20
16
-
20
17
2
01
7-1
82
01
8-1
92
01
5-
20
16
20
16
-20
17
2
01
7-1
82
01
8-2
01
92
01
5-
20
16
20
16
-17
20
17
-18
2
01
8-1
9
(As o
n
Ju
ly 2
01
8)
1G
round W
ate
r In
vest
igatio
n
& D
eve
lopm
ent
27
02
-02
-00
5-9
91
01
61
10
61
21
01
40
01
01
61
10
61
24
2.5
14
00
85
38
72
.38
69
.52
52
42
.30
8
2N
atio
nal H
ydro
logy
Pro
ject
2
70
2-0
2-0
05
-82
10
00
10
00
71
.90
00
3S
chem
e for
Gro
und W
ate
r
Conse
rvatio
n &
Rech
arg
e4
70
2-0
2-1
02
-97
40
40
15
73
50
40
40
15
73
50
38
.23
9.6
81
24
.32
1.3
57
4S
chem
e for
Contr
ol &
Regula
tion o
f G
round
Wate
r2
70
2-0
2-0
05
-93
10
10
15
17
10
10
15
17
2.2
57
.25
7.1
30
5S
chem
e for
Tra
inin
g
Pers
onnal
27
02
-02
-00
5-9
24
44
54
44
51
.47
3.0
92
.40
6R
ajiv
Gandhi D
rinkin
g
Wate
r M
issi
on
27
02
-02
-00
5-7
71
00
10
00
02
00
13
40
.33
43
20
19
99
06
.84
43
1.9
84
0
7N
atio
nal H
ydro
logy
Pro
ject
Phase
III
27
02
-02
-00
5-7
60
80
00
00
80
00
00
87
.46
00
8G
roundw
ate
r B
ase
d
Drinkin
g w
ate
r S
chem
e
27
02
-02
-10
3-9
90
02
57
50
02
57
50
02
51
.07
9G
roundw
ate
r B
ase
d
Drinkin
g w
ate
r S
chem
e
47
02
-00
-10
2-9
40
07
52
25
00
75
22
50
07
59
6.2
35
10
Imple
menta
tion o
f O
ffic
ial
Language
27
02
-02
-00
5-9
9-2
60
00
00
0.2
50
01
00
.24
90
0
11
Natio
nal H
ydro
logy
Pro
ject
(100%
Centr
al S
ect
or
Sch
em
e)
27
02
-02
-10
3-9
81
01
00
00
AN
NE
XU
RE
- III
12
3
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Es
tim
ate
/ R
evis
ed
Es
tim
ate
s in
re
ce
nt
ye
ar
PL
AN
R
up
ee
s in
La
kh
s
Bu
dg
et
Es
tim
ate
sR
evis
ed
Es
tim
ate
s
Ac
tua
l E
xp
en
dit
ure
Per
form
ance
Bud
get 2
017-
1815
6W
ater
Res
ourc
es D
epar
tmen
t
KERALA WATER AUTHORITY
Chapter –I
INTRODUCTION
Kerala Water Authority was established on 1st April 1984 as an
autonomous body of Govt. of Kerala under the Kerala Water Supply and
Waste Water Ordinance 1984 as a successor to the erstwhile Public
Health Engineering Department of the Government of Kerala for the
development and regulation of water supply and waste water collection
and disposal in the state of Kerala. The ordinance was replaced by the
Kerala Water Supply and Sewerage Act 1986
Responsibilities
• Design, construction, execution, promotion, operation,
maintenance and financing of schemes for the supply of water and
for the collection and disposal of the waste water.
• Rendering all necessary services to the Government relating to
water supply and collection & disposal of the waste water in the
State of Kerala.
• Establishment of standards for water supply and waste water
services.
• Fixation and revision of rates for water supply and sewerage
maintenance with the approval of Government.
• Taking other measures necessary to ensure water supply in time of
emergency.
VISION
To provide quality water supply and wastewater services in an
environmental friendly and sustainable manner.
MISSION
To transform ourselves into a customer-friendly organisation
providing services at the doorstep.
Performance Budget 2017-18 157 Water Resources Department
by being:-
• Open and honest in our business dealings
• Financially self-sufficient
• Valuing and developing our employees
• Continuously improving our work practices
Nine Strategic Aims of KWA are
1 Meet our statutory obligations
2 Operate as a financially, independent and autonomous body
3 Improve commercial and operational practices
4 Focus on customer services
5 Restructure KWA to become a Process organisation
6 Invest in developing our employees
7 Plan, invest in and maintain assets
8 Operate all our assets efficiently
9 Making full use of IT and IS investments
Organization set up
Water Resources Department of Kerala Government is vested with the
ownership of Kerala Water Authority.
The Board of the Authority consists of Chairman, Managing Director,
Secretary to Government (Water Supply), Secretary to Government
(Finance), Secretary to Government (Local Administration), Secretary to
Government (Rural Development), two members representing local
bodies, two members appointed by the Government , Technical
Performance Budget 2017-18 158 Water Resources Department
Member and Accounts Member. Managing Director is the Chief Executive
of Kerala Water Authority.
Kerala Water Authority is headquartered at Thiruvananthapuram. The
three regional offices at Thiruvananthapuram, Kochi and Kozhikode are
headed by a Chief Engineer.
There are three more Chief Engineers, one dealing with Human
Resources Development & General matters another with Projects and
Operations third being Chief Engineer PPD & Chief Consultant
WASCON. The Finance Manager & Chief Accounts Officer looks after
the Funds, Accounting and related matters of Kerala Water Authority.
KWA has about 465 field offices and around 9000 employees.
The activities of the Authority are handled in the following offices:
No. Offices Head of the Office Function
1 Head office Managing Director Chief Executive of the Authority
2 Regional offices Chief Engineer Region Head
3 Circle offices Superintending Engineer Supervision
4 Divisions Executive Engineer Execution
5 Sub Divisions Assistant Exe. Engineer -do-
6 Section offices Assistant Engineer
Performance Budget 2017-18 159 Water Resources Department
Chapter –II
FINANCIAL OUTLAY AND QUANTIFIABLE DELIVERABLES
An amount of Rs. 57855 lakhs was provided as budget outlay
during 2017-18 under 17 Head of Accounts for plan schemes with sub
components/sub schemes under each head including Centrally Sponsored
Schemes and EAPs. 50% Central Assistance of Rs. 8000 lakhs was
received during the period for Accelerated Rural WSS (NRDWP).
Annexure I contain head wise details of financial budget 2017-18
and physical output.
Performance Budget 2017-18 160 Water Resources Department
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
1S
urve
y &
Inve
stig
atio
n
(221
5-01
-190
-99-
01)
Inve
stig
atio
nw
orks
and
prep
arat
ion
ofpr
ojec
tre
port
s
for
vario
usw
ater
supp
ly
sche
mes
,pr
ocur
emen
tof
surv
ey e
quip
men
ts
200.
00P
repa
ratio
n of
eng
inee
ring
repo
rts
base
d on
sur
vey
repo
rts.
40 N
os. o
f
DE
R
200.
0011
5%49
.75
2017
-18,
46nu
mbe
rs o
f pro
ject
s am
ount
ing
to
Rs.
99.4
9Lak
hs h
ave
been
ach
ieve
d.
one
year
2N
AB
AR
D A
ssis
ted
RW
SS
(421
5-01
-102
-98-
01)
For
prov
idin
gpi
ped
wat
er
supp
lyto
rura
lar
eas
ofK
eral
a
byco
mpl
etin
gth
eN
AB
AR
D
assi
stan
ce s
chem
es.
1000
0.00
Pip
ed w
ater
sup
ply
will
be
prov
ided
to r
ural
are
as o
f
Ker
ala
with
NA
BA
RD
ass
ista
nce.
Abo
ut 2
7.35
lakh
s pe
ople
in 1
24 p
anch
ayat
s /
villa
ges
are
bene
fitte
d.44
Pro
ject
s ar
e co
nsid
erin
g as
ongo
ing
with
diff
eren
t tra
nche
s.
The
pen
ding
wor
ks h
ave
to b
e co
mpl
eted
with
in th
e
stip
ulat
ed ti
me
limit
.
10 N
os. o
f
sche
mes
to
be
com
plet
ed
1000
00
127.
19R
IDF
XIV
- O
ut o
f 39s
chem
es, 5
sche
mes
are
com
plet
ed.
Fou
r s
chem
es p
artia
lly c
ompl
eted
.
Rem
aini
ng s
chem
es o
ngoi
ng.
RID
F X
VI –
5 S
chem
es a
re o
ngoi
ng .
RID
F X
VII
-2 m
ajor
sch
emes
RID
F X
VIII
-7 s
chem
es a
re o
ngoi
ng.
RID
F X
IX-
8 sc
hem
es a
re in
wor
k in
prog
ress
.
RID
F X
X-
9 S
chem
es a
re in
wor
k in
prog
ress
.
RID
F X
XII
-6 S
chem
es a
re in
wor
k in
prog
ress
.
RID
F X
XIII
- 3
sch
emes
are
in w
ork
in p
rogr
ess
3YE
AR
S
3M
anuf
actu
ring
units
for
Bot
tled
wat
er
(221
5-01
-190
-96)
To
set u
p th
e B
ottle
d w
ater
plan
t at T
rivan
drum
.
1300
.00
For
pro
vidi
ng g
ood
qual
ity p
acka
ged
/bot
tled
wat
er
thro
ugh
KW
A a
t rea
sona
ble
pric
e to
pub
lic.
1 N
os. o
f
unit
1300
.00
0.00
15.0
9C
ivil
and
Mec
hani
cal w
ork
is a
lmos
t
com
plet
ed.
ele
ctric
al c
onne
ctio
n
com
plet
ed.
BIS
/ Foo
d an
d sa
fety
depa
rtm
ents
san
ctio
n aw
aita
ed.
1ye
ar
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
An
nex
ure
-I
FO
RM
AT
OF
TA
BLE
S I
N C
HA
PT
ER
II O
F P
ER
FO
RM
AN
CE
BU
DG
ET
201
7-18
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Ker
ala
Wat
er A
uth
ori
tyP
roje
cted
Ou
tco
mes
Per
form
ance
Bud
get 2
017-
1816
1W
ater
Res
ourc
es D
epar
tmen
t
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Pro
ject
ed O
utc
om
es
4R
enov
atio
n of
Exi
stin
g C
ivil
stru
ctur
es o
wne
d by
KW
A
(221
5-01
-190
-92)
For
the
Ren
ovat
ion
of E
xist
ing
Civ
il st
ruct
ures
ow
ned
by K
WA
1500
.00
Ens
ure
that
the
stru
ctur
es o
f KW
A in
clud
ing
filte
r
beds
, res
ervo
irs,O
ffice
bui
ldin
gs ,T
P ,
Pum
p H
ouse
s
, tan
ks a
nd s
taff
quar
ters
.etc
are
in g
ood
cond
ition
.
55 N
os. o
f
stru
ctur
es
1500
52%
53.5
FS
issu
ed fo
r R
s. 1
500
lakh
s an
d A
S
issu
ed fo
r R
s. 1
392.
42 la
khs
for
vario
us w
orks
. R
enov
atio
n of
civ
il
stru
ctur
es s
uch
as K
WA
offi
ce
build
ings
, gue
st h
ouse
s &
pum
p
hous
es i
n K
ochi
, Kot
taya
m ,
Pal
akka
d, K
ozhi
kode
etc
- ar
e un
der
vario
us s
tage
s of
impl
emen
tatio
n.
1 ye
ar
5In
nova
tive
Tec
hnol
ogie
s
(Des
alin
atio
n in
kutta
nadu
) (2
215-
01-1
90-8
9)
To
inst
all
wat
ertr
eatm
ent
units
with
appr
opria
tete
chno
logy
to
solv
epr
oble
ms
like
salin
ity,
iron,
fluor
ide,
orga
nic
pollu
tion,
NR
W e
tc.
2000
.00
Pro
blem
s lik
e sa
linity
, iro
n, fl
uorid
e, o
rgan
ic p
ollu
tion
can
be s
olve
d to
a g
reat
ext
ent.
Red
uctio
n in
NR
W
is ta
rget
td th
roug
h aw
aren
ess
prog
ram
me,
auto
mat
ed n
etw
roks
inst
allin
g flo
wm
eter
s, s
mar
t
met
res
etc.
5 w
orks
20
0011
%0.
27
6M
oder
nisa
tion
of
Aru
vikk
ara
pum
ping
stat
ion
(421
5-01
-101
-96)
For
mod
erni
satio
n ol
d sc
hem
es
func
tioni
ng a
ccor
ding
to
trad
ition
al m
etho
ds.
600.
00Im
prov
e w
ater
sup
ply
and
red
uce
pow
er c
harg
es to
KW
A.
1 U
nit
600
0A
ctio
n be
ing
initi
ated
6. 2
016-
17 –
10
RO
pla
nts
set u
p in
Sab
arim
ala
to b
enef
it 2
cr d
evot
ees
durin
g th
e ye
ar 2
016-
17.
Pro
ject
s un
der
NR
W m
anag
emen
t inc
lude
1. W
ater
Aud
it in
Triv
andr
um, K
ochi
, Kot
taya
m, K
asar
agod
and
Ned
uman
gad.
2. 2
4 x
7 w
ater
sup
ply
in P
eroo
rkad
a zo
ne o
f
Thi
ruva
nant
hapu
ram
. 3.
Bul
k m
eter
ing
for
all m
ajor
sche
mes
in K
WA
. 4.
SM
AR
T m
eter
ing
for
cons
umer
s w
ith
cons
umpt
ion
abov
e 50
0 K
L pe
r m
onth
. 5.
Rep
lace
men
t of
met
ers
of a
ll N
on D
omes
tic a
nd p
art o
f Dom
estic
con
sum
ers
in K
owdi
ar w
ith F
CR
I cer
tifie
d m
eter
s. 6
. Pum
p ho
use
Aut
omat
ion
- P
ilots
tudy
. 7. D
esal
inat
ion
prog
ram
me.
8. B
asel
ine
surv
ey fo
r as
sess
ing
serv
ice
leve
l
for
KW
A.
Per
form
ance
Bud
get 2
017-
1816
2W
ater
Res
ourc
es D
epar
tmen
t
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Pro
ject
ed O
utc
om
es
7H
uman
Res
ourc
e
Dev
elop
men
t,
Res
earc
h &
Dev
elop
men
t and
Qua
lity
Con
trol
(X
X)
(421
5-01
-190
-99)
Pro
vidi
ngH
RD
and
trai
ning
activ
ities
inK
WA
for
reso
urce
s
impr
ovem
ent,
qual
ityco
ntro
l
mea
sure
s,ne
wre
sear
ch
activ
ities
etc
.
275.
00Im
prov
ing
tech
nica
l kno
wle
dge
of K
WA
sta
ff30
00
part
icip
ants
275
94%
45.4
520
17-1
8- 1
18 tr
aini
ng c
ours
es w
ith
3018
par
ticip
ants
was
con
duct
ed
8S
ewer
age
sche
mes
of K
WA
(X
X)
(421
5-02
-190
-99)
For
layi
ngba
lanc
ese
wer
lines
inzo
neI
and
IIof
'D'
bloc
k,
zone
I,II
and
IIIof
'E'b
lock
and
for
carr
ying
out
the
rem
aini
ng
wor
ks.
2000
.00
To
enha
nce
the
unde
rsiz
ed li
nes
to th
e de
sire
d si
ze
to r
epai
r da
mag
ed m
anho
les
so a
s to
avo
id o
verf
low
of s
ewag
e to
sat
isfy
the
requ
irem
ents
of t
he
resi
dent
s an
d to
pro
vide
sew
erag
e fa
cilit
y to
are
as
whe
re n
o ot
her
sour
ce o
f sew
erag
e di
spos
al s
yste
m
exis
t. In
orde
r to
ove
rcom
e th
e th
reat
of
envi
ronm
enta
l dam
ages
,ade
quat
e at
tent
ion
is
esse
ntia
l for
str
eant
heni
ng th
e ex
istin
g se
wer
age
syat
ems.
27 N
os. o
f
DE
R
prep
ared
2000
37%
19.5
9 1
. Thi
ruva
nant
hapu
ram
sew
erag
e D
ivis
ion
mai
ntai
ns th
e
sew
erag
e ne
t wor
k of
Thi
ruva
nant
hapu
ram
Cor
pora
tion.
In
addi
tion
to th
e m
aint
enan
ce w
ork
take
up
wor
ks u
nder
sta
te
Pla
n,A
MR
UT
,MLA
's fu
nd a
nd v
ario
us d
epos
it w
orks
Dur
ing
2017
-18
Sew
erag
e ne
t wor
k au
gmen
ted
by a
ddin
g 35
75m
of n
ew s
ewer
pip
e lin
e an
d 20
4 M
anho
les.
Und
er
erna
kula
m d
istr
ict i
n 4.
5 M
LD S
TP
8 n
os o
f are
tor
fans
wer
e
repl
aced
for
9 la
khs
rupe
es. I
n G
uruv
ayoo
r dr
aina
ge th
e 3
MLD
trea
tmen
t pla
nt a
t Cha
kkum
kand
am is
99%
com
plet
ed.6
815
mtr
e pi
pe is
laid
and
249
man
hole
is
cons
truc
ted
till d
ate.
Sto
rage
tank
s in
tand
em w
ith 3
pum
ping
sta
tions
is a
lread
y co
mpl
eted
long
bac
k. S
tora
ge
wel
ls r
eairi
ng w
ork
is c
ompl
eted
.. M
otor
, P
umps
ets
and
gene
rato
rs a
re in
stal
led.
Ele
ctric
aal i
nspe
ctra
te p
erm
isio
n ia
s aw
aite
d.
Per
form
ance
Bud
get 2
017-
1816
3W
ater
Res
ourc
es D
epar
tmen
t
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Pro
ject
ed O
utc
om
es
9R
ehab
itatio
n /
Impr
ovem
ent w
orks
of U
rban
WS
Ss
(XX
) (4
215-
01-1
01-
97)
For
repa
ir/re
plac
emen
tsof
pum
pset
sor
conn
ecte
d
acce
ssor
ies,
repl
acem
ent
of
wor
nout
pipe
lines
-pu
mpi
ng
mai
ns,
grav
ity
mai
ns,d
istr
ibut
ion
lines
etc.
and
maj
orim
pt.
Wor
ksof
urba
n
wat
ersu
pply
sche
mes
are
targ
eted
tobe
carr
ied
out
for
com
plet
ing
all
ongo
ing
UW
SS
take
n up
und
er S
AA
RK
.
5000
.00
Red
uctio
n in
O&
M c
harg
es a
nd th
ereb
y sa
ving
s on
pow
er c
harg
es a
nd a
lso
for
NR
W r
educ
tion.
The
re
are
man
y U
rban
Loc
al b
odie
s th
at h
ave
no tr
eate
d
wat
er s
uppl
y sc
hem
s . A
n am
ount
of R
s 50
000
lakh
s
is p
rovi
ded
for
impr
ovem
ent o
f WS
S A
ugm
enta
tion
of e
xist
ing
Sch
emes
and
the
com
plet
ion
of o
ngoi
ng
UW
SS
sch
emes
for
2017
-18.
1 sc
hem
e
targ
ette
d
5000
.00
100%
110.
62 W
orks
on
the
sche
mes
are
in v
ario
us
stag
es o
f im
plem
enta
tion.
2
nos
of
Urb
an S
chem
es h
ave
been
com
plet
ed
1.
Nila
mbo
or W
SS
. A
nd
2. K
otta
yam
pat
tiyam
CT
WS
S
1 ye
ar
10R
ural
Wat
er S
uppl
y
Sch
eme
[XX
]
(421
5-01
-102
-97)
For
pro
vidi
ng w
ater
sup
ply
to
rura
l are
as o
f the
sta
te
9000
.00
At p
rese
nt th
ere
are
arou
nd 2
00 G
ram
a pa
ncha
yath
whi
ch d
o no
t hav
e an
y tr
eate
d w
ater
sup
ply
sche
mes
und
er K
WA
.Thi
s is
uue
has
to b
e so
lved
in
phas
ed m
anne
r.S
o it
is e
ssen
tial t
o co
mpl
ete
the
wor
ks o
f ong
oing
sch
emes
. An
amou
nt o
f Rs
9000
0
lakh
s ha
s be
en p
rovi
decd
dur
ing
2017
-18.
42 s
chem
e
targ
ette
d
9000
81%
81.4
820
17-1
8- 1
. Kili
man
oor
pazh
ayak
unnu
mal
2. W
SS
to K
umar
akam
thiru
varp
u
3. W
SS
to F
erok
e an
d
Kar
uvan
thur
uthy
Hav
e be
en c
ompl
eted
11W
SS
toS
peci
fied
Inst
itutio
ns/L
ocat
ion
s [X
X]4
215-
01-1
90-
98
225.
00 F
or p
rovi
ding
min
or s
chem
es to
spe
cifie
d
Gov
ernm
ent I
nstit
utio
ns li
ke M
edic
al c
olle
ges,
SC
I
etc.
and
for
up k
eep
of R
O p
lant
s, p
rovi
ding
filte
r et
c.
at S
abar
imal
a th
ereb
y en
surin
g u
nint
erru
pted
supp
ly to
thes
e in
stitu
tions
and
loca
tions
.
2 sc
hem
es
250
100%
33.9
720
17-1
8 –
RO
pla
nts
have
bee
n
inst
alle
d at
Sab
arim
aly
and
dist
ribut
ed 6
.6 la
khs
litre
s of
qua
lity
wat
er to
pilg
rims.
Thi
s tim
e K
WA
have
intr
oduc
ed th
e ho
t wat
er s
uppl
y
also
.
Per
form
ance
Bud
get 2
017-
1816
4W
ater
Res
ourc
es D
epar
tmen
t
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Pro
ject
ed O
utc
om
es
12E
-
GO
VE
RN
AN
CE
,GI
S a
nd In
form
atio
n
Man
agem
ent[X
X]2
2
15-0
1-19
0-88
To
roll
out C
entr
alis
ed B
illin
g
and
Col
lect
ion
Sys
tem
to a
ll
reve
nue
offic
es, d
evel
opm
ent o
f
appl
icat
ion
pack
ages
, dat
a
capt
urin
g/ p
repa
ratio
n.
700.
00co
mpu
teris
atio
n of
KW
A o
ffice
s.D
ocum
ente
d re
port
s of
WS
sch
emes
Act
iviti
es p
ropo
sed
unde
r th
is
prog
ram
me
are
supp
ort a
nd s
usta
inab
ility
of e
-aba
cus,
KW
A W
ide
Are
a N
etw
ork
and
for
deve
lopm
ent o
f sm
all
utili
ty s
oftw
are,
Sup
port
of D
igita
l Doc
umen
t Fili
ng
Sys
tem
, Mon
itorin
g A
ccou
ntin
g &
Rep
ortin
g by
Cen
tral
ized
HR
Sys
tem
, Ope
ratio
n an
d M
anag
emen
t,
KW
A O
ngoi
ng B
ill M
onito
ring
Sys
tem
, Lab
orat
ory
Info
rmat
ion
Man
agem
ent S
yste
m &
Pro
ject
Ale
rt
Sys
tem
for
KW
A, E
xten
sion
of a
ttend
ance
man
agem
ent s
yste
m, p
rovi
ding
Tab
lets
to fi
eld
offic
ers,
purc
hase
of n
ew c
ompu
ters
and
thei
r pe
riphe
rals
,
Net
wor
k co
mpo
nent
s sp
ares
, Ant
i-Viru
s S
oftw
are,
Ser
ver/
Bac
kup
devi
ces,
Sca
nner
s, P
lotte
rs, P
rinte
rs,
Lapt
ops,
UP
S, U
PS
Bat
terie
s, U
TM
(U
nifie
d T
hrea
t
Man
agem
ent)
, Wor
k C
entr
es, N
etw
ork
com
pone
nts
spar
es (
Sw
itche
s an
d R
oute
rs),
Net
wor
k M
onito
ring
Sof
twar
e et
c
An
amou
nt o
f `70
0 la
khs
is p
rovi
ded
for
the
prog
ram
me
durin
g th
e ye
ar 2
017-
18.
700
Dur
ing
2016
–20
17 K
eral
a W
ater
Aut
horit
y br
ough
t 4,0
0,00
0 m
ore
conn
ectio
ns to
Cen
tral
ized
Spo
t Bill
ing
Sys
tem
– e
-Aba
cus
. Ach
ievi
ng 9
3%
of C
onsu
mer
Pop
ulat
ion
(ie m
ore
than
196
0630
out
of 2
1,00
,000
Wat
er
Con
nect
ions
). D
evel
opm
ent a
nd In
tegr
atio
n of
Sta
te S
ervi
ce D
eliv
ery
Gat
eway
(S
SD
G)
proj
ect,
form
ulat
ed u
nder
the
Nat
iona
l e-G
over
nanc
e P
lan
(NeG
P),
is to
fulfi
ll th
e vi
sion
of p
rovi
ding
eas
y an
d co
nven
ient
ser
vice
s to
the
citiz
ens
thro
ugh
rem
ote
acce
ss p
rimar
ily th
roug
h C
omm
on S
ervi
ce
Cen
tres
(C
SC
s). A
nd th
ere
by e
nabl
ing
the
Sta
te P
orta
l by
impl
emen
ting
the
key
com
pone
nts
Sta
te P
orta
l viz
. SS
DG
, ele
ctro
nic
For
m (
e-F
orm
s),
App
licat
ion
and
Com
putin
g In
fras
truc
ture
was
com
plet
ed.
KW
A In
tegr
ated
5
new
Ser
vice
s to
SS
DG
Por
tal.
Als
o M
obile
app
s fo
r S
ervi
ce D
eliv
ery
deve
lope
d as
a p
art o
f SS
DG
Pro
ject
whi
ch is
a m
ajor
foot
ste
p in
MG
over
nanc
e . K
WA
rev
ampe
d its
web
site
to u
ptod
ate
stan
dard
and
cut
ting
edge
tech
nolo
gy. K
WA
Dev
elop
ed a
Sof
twar
e fo
r M
onito
ring
of C
onsu
mer
com
plai
nts
whi
ch h
as a
pro
visi
on fo
r co
nsum
ers
to r
egis
ter
com
plai
nts
onlin
e. .
The
spe
cial
ity o
f the
sys
tem
is th
at H
ighe
r m
anag
emen
t can
eas
ily
give
imm
edia
te d
irect
ion
rela
ted
to c
ompl
aint
red
ress
al to
the
conc
erne
d
offic
ial a
nd th
ey c
an in
volv
e if
ther
e is
any
del
ay in
the
proc
ess
and
can
have
a c
hat l
ike
disc
ussi
on in
eac
h ca
se s
epar
atel
y . K
eral
a W
ater
Aut
horit
y
Inte
grat
ed w
ith S
WIF
T-
Sin
gle
Win
dow
Inte
rfac
e fo
r F
ast a
nd T
rans
pare
nt
Cle
aran
ce. a
n in
itiat
ive
by K
SID
C to
del
iver
fast
ser
vice
s to
Ent
repr
eneu
rs
whi
le s
tart
ing
a ne
w In
dust
ry.
Per
form
ance
Bud
get 2
017-
1816
5W
ater
Res
ourc
es D
epar
tmen
t
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Pro
ject
ed O
utc
om
es
13O
ptim
isat
ion
of
Pro
duct
ion
and
Tra
nsm
issi
on[X
X]4
2
15-0
1-19
0-97
To
avoi
d fr
eque
nt b
reak
age
of
pipe
s an
d th
ereb
y m
inim
ize
the
heav
y lo
ss to
Ker
ala
Wat
er
Aut
horit
y, a
t lea
st 1
0 %
of t
hese
pipe
s ne
ed to
be
repl
aced
/
reha
bilit
ated
eve
ry y
ear
. In
orde
r to
impr
ove
the
drin
king
wat
er q
ualit
y in
the
stat
e,
prov
isio
n is
mad
e fo
r re
nova
ting
43 w
ater
trea
tmen
t pla
nts
.For
carr
ying
out
ene
rgy
cons
erva
tion
mea
sure
s an
d
reha
bilit
atio
n of
obs
olet
e pu
mps
and
mot
ors
and
elec
tric
al
inst
alla
tions
.
1400
0.00
The
mai
n ob
ject
ives
of t
he s
chem
e ar
e to
ens
ure
unin
terr
upte
d w
ater
sup
ply,
red
uctio
n of
wat
er lo
ss
due
to le
akag
e an
d br
eaka
ge a
nd e
nerg
y
cons
erva
tion.
Maj
or a
ctiv
ities
are
,
.
Ren
ovat
ion
and
capa
city
enh
ance
men
t of
old
wat
er tr
eatm
ent p
lant
s fo
r re
duce
the
dist
ribut
iona
l los
s an
d to
impr
ove
perf
orm
ance
.
.
Rep
lace
men
t of o
ld p
ipes
of e
xist
ing
wat
er
supp
ly s
chem
es-t
o pr
even
t los
s of
wat
er d
ue to
leak
age
and
brea
kage
.
.
Ene
rgy
cons
erva
tion
mea
sure
s an
d
Reh
abili
tatio
n of
obs
olet
e pu
mps
and
Mot
ors
and
othe
r E
lect
rical
inst
alla
tions
.
For
the
abov
e w
orks
, an
amou
nt o
f `14
000.
00 la
khs
is p
rovi
ded
durin
g 20
17-1
8. P
rovi
ding
pip
elin
e
exte
nsio
n to
wat
er s
carc
e ar
eas
from
the
exis
ting
WS
S.
235
sche
mes
1400
.00
30%
113.
5920
16-1
7 -
1) A
S is
sued
for
Opt
imis
atio
n of
prod
uctio
n an
d tr
ansm
issi
on fo
r R
s.
1624
0.8
lakh
s. 2
24 w
orks
com
plet
ed
out o
f 218
wor
ks a
nd o
ther
wor
ks a
re
unde
r va
rious
sta
ges
of e
xecu
tion.
Per
form
ance
Bud
get 2
017-
1816
6W
ater
Res
ourc
es D
epar
tmen
t
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Pro
ject
ed O
utc
om
es
14K
eral
a W
ater
Sup
ply
Pro
ject
JIC
A
(One
tim
e su
stai
ns
supp
ort u
nder
the
Sta
te P
lan)
[XX
]
(42
15-0
1-19
0-96
)
For
impl
emen
ting
5 JB
IC
proj
ects
in
Thi
ruva
nant
hapu
ram
, Che
thal
a,
Mee
nad,
Koz
hikk
ode
and
Pat
tuva
m.
7000
.00
JIC
A A
ssis
ted
wat
er s
uppl
y pr
ojec
t is
one
of th
e
maj
or e
xter
nal a
ided
drin
king
wat
er p
rogr
amm
es o
f
the
stat
e. T
he p
roje
ct e
nvis
ages
Thi
ruva
nant
hapu
ram
, Mee
nad,
Che
rtha
la,
Koz
hiko
de a
nd P
attu
vam
. On
com
plet
ion
the
proj
ect
will
ben
efit
a to
tal p
opul
atio
n of
41
lakh
peo
ple
in fi
ve
dist
ricts
, fu
ll im
plem
enta
tion
of J
ICA
pro
ject
is
pend
ing
due
to d
elay
ed o
btai
ning
of p
erm
issi
on fr
om
vario
us a
genc
ies
such
as
Rai
lway
s, N
atio
nal
Hig
hway
s, F
ores
t and
Pub
lic W
orks
Dep
artm
ent.
The
wor
k pr
opos
ed is
the
com
plet
ion
wor
ks o
f
Mee
nad
& K
ozhi
kode
and
reh
abili
tatio
n of
exi
stin
g
wat
er s
uppl
y sc
hem
e of
Thi
ruva
nant
hapu
ram
and
Koz
hiko
de.
An
amou
nt o
f `70
00.0
0 la
kh is
pro
vide
d
durin
g 20
17-1
8
7000
45.4
1. T
hiru
vana
ntha
pura
m S
chem
e-
93.8
% c
ompl
eted
2. M
eena
d S
chem
e- 9
1.52
%
com
plet
ed
3. C
hert
hala
-10
0% c
ompl
eted
4. K
ozhi
kkod
e S
chem
e -
91.1
3%
com
plet
ed
5. P
attu
vam
Sch
eme
-99.
29%
com
plet
ed
15E
nter
pris
es
Res
ourc
e P
lann
ing
(ER
P)
1000
.00
Impl
emen
tatio
n of
ER
P in
KW
A -
Sel
ectio
n of
Pro
ject
Con
sulta
nt, P
repa
ratio
n of
ER
P, t
ende
r do
cum
ents
,
sele
ctio
n of
sys
tem
inte
grat
or e
tc.
917
4.51
Ret
ende
red
the
wor
k fo
r E
RP
and
sele
ctio
n of
pro
ject
con
sulta
nt
16C
ompl
etio
n of
Ong
oing
NR
DW
P
XX
(42
15-1
-102
-95)
For
pro
vidi
ng 5
0% S
tate
sha
re
for
the
ongo
ing
AR
WS
S. 2
5
sche
mes
are
targ
ette
d fo
r
com
mis
sion
ing
durin
g 20
16-
2017
.
1000
0.00
1000
0.00
Pip
ed w
ater
sup
ply
to r
ural
are
as o
f Ker
ala
with
50%
Cen
tral
ass
ista
nce
25
sche
mes
1000
020
8%12
4.96
201
7-18
-
52 s
chem
es c
ompl
eted
.
Per
form
ance
Bud
get 2
017-
1816
7W
ater
Res
ourc
es D
epar
tmen
t
No
n
Pla
n
Bu
dg
et
Pla
n
Bu
dg
et
Com
plem
enta
ry
Ext
ra
Bud
geta
ry
Res
ourc
es
Cen
tral
Ass
ista
nce
if a
ny
Phy
sica
lF
inan
cial
Phy
sica
lF
inan
cial
Ou
tlay
201
7-18
Sl
No
.
Nam
e o
f S
chem
eO
bje
ctiv
esQ
uan
tifi
able
Del
iver
able
s/ P
hys
ical
ou
tpu
t P
erio
d o
f
imp
lem
e
nta
tio
n
Rem
arks
/
Ris
k
Fac
tors
Tar
get
fix
edT
arg
et A
chie
ved
(in
% g
e)
Pro
ject
ed O
utc
om
es
17D
rinki
ng W
ater
Sup
ply
- D
roug
ht
Miti
gatio
n -
Dro
ught
hit a
reas
impl
emen
ted
by
KW
A -
XX
(22
15-0
1-
800-
47)
3055
.00
Dro
ught
has
bec
ome
a th
reat
to o
ur s
tate
. Ade
quat
e
infr
astr
uctu
re h
as to
be
ensu
red
for
this
une
ven
clim
ate
chan
ge. T
he u
npre
cede
nted
dro
ught
in 2
017
was
an
exam
ple
of s
uch
cala
miti
es. B
esid
es n
atur
al
cala
miti
es, e
mer
genc
y si
tuat
ions
like
bur
stin
g of
larg
e di
amet
er p
ipes
whi
ch r
esul
ted
in d
amag
es to
prop
ertie
s re
quire
imm
edia
te in
terv
entio
ns. F
or
mee
ting
drou
ght r
elie
f act
iviti
es a
nd u
nfor
esee
n
emer
genc
y in
terv
entio
ns, a
n am
ount
of `
3055
.00
lakh
is p
rovi
ded
in th
e bu
dget
201
7-18
1178
Nos
.
of w
orks
3055
80%
65.8
5
6785
5.00
1000
0.00
TO
TA
L
Per
form
ance
Bud
get 2
017-
1816
8W
ater
Res
ourc
es D
epar
tmen
t
Chapter –III
REFORM MEASURES AND PERFORMANCE
The major works undertaken during 2018-19 include
1. WSS under National Rural Drinking Water Programme (50%
Central Assistance)
2. WSS with financial and of NABARD
3. Balance works of JICA WSS to Thiruvananthapuram, Meenad
in Kollam, Cherthala, Kozhikkode and Pattuvom in Kannur
with allocation in State Budget 2017-18.
4. State Plan schemes
5. KIIFB Work .
6. AMRUT Works.
Performance Budget 2017-18 169 Water Resources Department
Chapter –IV
REVIEW OF PAST PERFORMANCE
The performance of Kerala Water Authority against target set
during 2016-17 is given as Annexure-II
Performance Budget 2017-18 170 Water Resources Department
Ke
rala
Wa
ter
Au
tho
rity
( R
s. i
n L
ak
hs
)
Sl
No
.
Nam
e o
f S
ch
em
e/
Pro
gra
mm
e
Ob
jecti
ve/ O
utc
om
eO
utl
ay
2016-1
7
Exp
en
dit
ure
2016-1
7D
eli
ve
rab
les/
P
hy
sica
l O
utp
uts
Ach
iev
em
en
tR
ea
son
fo
r
va
ria
tio
n
12
34
56
78
1S
urv
ey
& I
nve
stig
ati
on
(22
15
-01
-19
0-9
9-0
1)
Inve
stig
ati
on
wo
rks
an
d p
rep
ara
tio
n o
f
pro
ject
re
po
rts
for
va
rio
us
wa
ter
sup
ply
sch
em
es,
pro
cure
me
nt
of
surv
ey
eq
uip
me
nts
75
.00
74
.90
pre
pa
rati
on
of
en
gin
ee
rin
g r
ep
ort
s b
ase
d
on
su
rve
y r
ep
ort
s.
20
16
-17
- 4
6 N
os.
of
pro
ject
s a
mo
un
tin
g t
o R
s. 5
72
6 l
ak
hs.
2N
AB
AR
D A
ssis
ted
RW
SS
(42
15
-01
-10
2-9
8(0
1))
Ou
t o
f 3
6 s
che
me
s s
an
ctio
ne
d u
nd
er
NA
BA
RD
un
de
r R
IDF
XIV
(S
PA
N).
16
sch
em
es
we
re c
om
ple
ted
.
11
00
0.0
08
83
0.1
0 p
ipe
d w
ate
r su
pp
ly t
o r
ura
l a
rea
s o
f
Ke
rala
wit
h N
AB
AR
D a
ssis
tan
ce.
Ab
ou
t
27
.35
la
kh
s p
eo
ple
in
12
4 p
an
cha
ya
ts /
vil
lag
es
are
be
ne
fitt
ed
RID
F X
IV -
Ou
t o
f 3
6 s
che
me
s,3
1 s
che
me
s a
re c
om
ple
ted
. F
ou
r sc
he
me
s
pa
rtia
lly
co
mp
lete
d.
Re
ma
inin
g
sch
em
es
on
go
ing
.RID
F X
VI
-Sch
em
es
are
on
go
ing
(2
5 s
che
me
s).
RID
F X
VII
-2
ma
jor
sch
em
es
an
d
Ou
t o
f 5
2
En
do
sulp
ha
n s
che
me
s 2
5 a
re c
om
ple
ted
an
d 2
7 s
che
me
s a
re
on
go
ing
.RID
F X
VII
I- O
ut
of1
0 s
che
me
s 3
sch
em
es
are
En
do
sulp
ha
n a
nd
are
on
go
ing
. R
IDF
XIX
- 8
sch
em
es
are
in
wo
rk i
n p
rog
ress
. R
IDF
XX
- O
ut
of
9 S
che
me
s o
ne
sch
em
e i
s co
mp
lete
d r
em
ain
ing
sch
em
es
are
are
in
wo
rk i
n p
rog
ress
. R
IDF
XX
II-6
Sch
em
es
are
in
wo
rk i
n p
rog
ress
. 1
sch
em
e c
om
ple
ted
in
20
16
-17
.
3M
an
ufa
ctu
rin
g u
nit
s fo
r
Bo
ttle
d w
ate
r
(22
15
-01
-19
0-9
6)
To
se
t u
p t
he
Bo
ttle
d w
ate
r p
lan
t a
t
Tri
va
nd
rum
.
10
0.0
04
22
.44
go
od
qu
ali
ty p
ack
ag
ed
/b
ott
led
w
ate
r
thro
ug
h K
WA
.
Civ
il w
orks
sta
rted
in 2
015-
16 a
nd it
is a
lmos
t com
plet
ed. 7
5% o
f the
Ele
ctric
al w
orks
com
plet
ed
4R
en
ova
tio
n o
f E
xist
ing
Civ
il
stru
ctu
res
ow
ne
d b
y K
WA
(22
15
-01
-19
0-9
2)
Fo
r th
e R
en
ova
tio
n o
f E
xist
ing
Civ
il
stru
ctu
res
ow
ne
d b
y K
WA
70
0.0
04
15
.80
En
sure
th
at
the
str
uct
ure
s o
f K
WA
incl
ud
ing
fil
ter
be
ds,
re
serv
oir
s e
tc a
re i
n
go
od
co
nd
itio
n.
FS
iss
ue
d f
or
Rs.
14
99
.20
la
kh
s a
nd
AS
iss
ue
d f
or
Rs.
73
3.5
3 l
ak
hs
for
va
rio
us
wo
rks.
R
en
ov
ati
on
of
civ
il s
tru
ctu
res
( K
WA
off
ice
bu
ild
ing
,
gu
est
ho
use
) in
Ko
chi,
Ko
tta
ya
m,
Pa
lak
ka
d,
Ko
zhik
ko
de
etc
. u
nd
er
va
rou
s st
ag
es
of
imp
lem
en
tati
on
.
5In
no
va
tive
Te
chn
olo
gie
s
(De
sali
na
tio
n i
n
ku
tta
na
du
)(2
21
5-0
1-1
90
-89
)
To
in
sta
ll w
ate
r tr
ea
tme
nt
un
its
wit
h
ap
pro
pri
ate
te
chn
olo
gy
fo
r e
ach
of
the
pro
ble
ms
lik
e s
ali
nit
y,
iro
n,
flu
ori
de
,
org
an
ic p
oll
uti
on
etc
.
70
0.0
02
6.9
5p
rob
lem
s li
ke
sa
lin
ity
, ir
on
, fl
uo
rid
e,
org
an
ic p
oll
uti
on
ca
n b
e s
olv
ed
to
a g
rea
t
ext
en
t.
20
16
-17
– 1
0 R
O p
lan
ts s
et
up
in
Sa
ba
rim
ala
to
be
ne
fit
2 c
r d
ev
ote
es
du
rin
g t
he
ye
ar
20
16
-17
.
Pro
ject
s u
nd
er
NR
W m
an
ag
em
en
t in
clu
de
1.
Wa
ter
Au
dit
in
Tri
va
nd
rum
,
Ko
chi,
Ko
tta
ya
m,
Ka
sara
go
d a
nd
Ne
du
ma
ng
ad
. 2
. 2
4 x
7 w
ate
r su
pp
ly i
n
Pe
roo
rka
da
zo
ne
of
Th
iru
va
na
nth
ap
ura
m.
3.
Bu
lk m
ete
rin
g f
or
all
ma
jor
sch
em
es
in K
WA
. 4
. S
MA
RT
me
teri
ng
fo
r co
nsu
me
rs w
ith
con
sum
pti
on
ab
ov
e 5
00
KL
pe
r m
on
th.
5.
Re
pla
cem
en
t o
f m
ete
rs o
f a
ll
No
n D
om
est
ic a
nd
pa
rt o
f D
om
est
ic c
on
sum
ers
in
Ko
wd
iar
wit
h F
CR
I
cert
ifie
d m
ete
rs.
6.
Pu
mp
ho
use
Au
tom
ati
on
- P
ilo
tstu
dy
. 7
. D
esa
lin
ati
on
pro
gra
mm
e.
8.
Ba
seli
ne
su
rve
y f
or
ass
ess
ing
se
rvic
e l
ev
el
for
KW
A.
ST
AT
EM
EN
T O
F O
UT
LAY
S/
OU
TC
OM
ES
/TA
RG
ET
20
16
-17
AN
D A
CT
UA
L A
CH
IEV
EM
EN
T 2
01
6-1
7
An
ne
xu
re -
II
Per
form
ance
Bud
get 2
017-
1817
1W
ater
Res
ourc
es D
epar
tmen
t
Sl
No
.
Nam
e o
f S
ch
em
e/
Pro
gra
mm
e
Ob
jecti
ve/ O
utc
om
eO
utl
ay
2016-1
7
Exp
en
dit
ure
2016-1
7D
eli
ve
rab
les/
P
hy
sica
l O
utp
uts
Ach
iev
em
en
tR
ea
son
fo
r
va
ria
tio
n
12
34
56
78
6M
od
ern
isa
tio
n o
f
Aru
vik
ka
ra p
um
pin
g s
tati
on
(42
15
-01
-10
1-9
6)
Fo
r m
od
ern
izin
g o
ld s
che
me
s
fun
ctio
nin
g
acc
ord
ing
to
tra
dit
ion
al
me
tho
ds
10
00
.00
0Im
pro
ve
wa
ter
sup
ply
an
d t
he
reb
y
red
uce
lo
ss t
o K
WA
.
AS
iss
ue
d f
or
Rs.
10
00
la
kh
s
7H
um
an
Re
sou
rce
De
ve
lop
me
nt,
R
ese
arc
h &
De
ve
lop
me
nt
an
d Q
ua
lity
Co
ntr
ol
(XX
)
(42
15
-01
-19
0-9
9)
Pro
vid
ing
HR
Da
nd
tra
inin
ga
ctiv
itie
sin
KW
Afo
rre
sou
rce
sim
pro
ve
me
nt,
qu
ali
ty
con
tro
lm
ea
sure
s,n
ew
rese
arc
h
act
ivit
ies
etc
.
10
0.0
09
9.9
4Im
pro
vin
g t
ech
nic
al
kn
ow
led
ge
of
KW
A
sta
ff
20
16
-17
- 1
87
tra
inin
g c
ou
rse
s w
ith
30
18
pa
rtic
ipa
nts
wa
s co
nd
uct
ed
.
Pu
rch
ase
of
che
mic
als
an
d h
ard
wa
re c
om
ple
ted
. C
ali
be
rati
on
of
eq
uip
me
nt
un
de
r p
rog
ress
.
8S
ew
era
ge
sch
em
es
of
KW
A
(XX
)
(42
15
-02
-19
0-9
9)
Fo
rla
yin
gb
ala
nce
sew
er
lin
es
inzo
ne
I
an
dII
of
'D'
blo
ck,
zon
eI,
IIa
nd
III
of
'E'
blo
cka
nd
for
carr
yin
go
ut
the
rem
ain
ing
wo
rks.
75
0.0
04
82
.79
To
en
ha
nce
th
e u
nd
ers
ize
d l
ine
s to
th
e
de
sire
d s
ize
to
sa
tisf
y t
he
re
qu
ire
me
nts
of
the
re
sid
en
ts a
nd
to
pro
vid
e s
ew
era
ge
faci
lity
to
are
as
wh
ere
no
oth
er
sou
rce
of
sew
era
ge
dis
po
sal
syst
em
e
xist
.
sew
er
lines
and c
onst
ructi
on o
f m
anhole
s in
the v
ari
ous
blo
cks
of
Thir
uvananth
apura
m
Sew
era
ge s
chem
e-
in p
rogre
ss2016-1
7 r
ehabil
itati
on o
f se
wer
lines
and c
onst
ructi
on o
f
manhole
s in
the v
ari
ous
blo
cks
of
Thir
uvananth
apura
m S
ew
era
ge s
chem
e. C
ivil
work
alm
ost
Com
ple
ted e
xcept
som
e f
inis
hin
g w
ork
s, m
echanic
alw
ork
s. M
an h
ole
const
ructi
on c
om
ple
ted.
Repair
and m
ain
tenance o
f coll
ecti
ng s
um
ps
and p
um
p h
ouse
- com
ple
ted. F
or
supply
,
ere
cti
ng a
nd c
om
mis
sionin
g o
f pum
p s
ets
- 3
moto
r su
ppli
ed.
Layin
g n
ew
PV
C s
ew
er
lines
and m
anhole
s 110 m
m t
o 3
15 m
m P
VC
se
wer
pip
es
4
Kg (
SN
4)
11100m
com
ple
ted. 12 N
os
moto
r su
ppli
ed.e
rrecti
opn s
tart
ed. T
ransf
orm
er
for
pum
pin
g s
tati
on 1
fit
ted b
y K
SE
B.
Supply
and i
nst
all
ati
ons
of
die
sel
genera
tors
for
pum
pin
g s
tati
ons-
Genera
tor
suppli
ed.
3 M
LD
ST
P f
ull
y c
om
ple
ted e
xcept
som
e f
inis
hin
g w
ork
s, M
echanic
al
work
s.R
epair
and m
ain
tenance o
f coll
ecti
ng s
um
ps
and p
um
p h
ouse
com
ple
ted. W
ork
s in
pro
gre
ss.
Per
form
ance
Bud
get 2
017-
1817
2W
ater
Res
ourc
es D
epar
tmen
t
Sl
No
.
Nam
e o
f S
ch
em
e/
Pro
gra
mm
e
Ob
jecti
ve/ O
utc
om
eO
utl
ay
2016-1
7
Exp
en
dit
ure
2016-1
7D
eli
ve
rab
les/
P
hy
sica
l O
utp
uts
Ach
iev
em
en
tR
ea
son
fo
r
va
ria
tio
n
12
34
56
78
9C
om
ple
tio
n o
f o
ng
oin
g
Urb
an
Wa
ter
Su
pp
ly
Sch
em
es-
Sp
eci
al
pa
cka
ge
(22
15
-01
-10
1-9
8)
Fo
r co
mp
leti
ng
all
on
go
ing
UW
SS
ta
ke
n
up
un
de
r S
AA
RK
.
0.0
00
17
sch
em
es
tak
en
up
un
de
r th
e h
ea
d.
Fiv
e s
che
me
s co
mp
lete
d.
WS
S t
o
Ku
thu
pp
ara
mb
a M
un
icip
ali
ty a
nd
Pa
ttia
m a
nd
Ko
tta
ya
m C
T -
Su
pp
ly,
ere
ctio
n a
nd
ma
ce o
f E
lect
rica
l su
b
sta
tio
n a
nd
all
ied
wo
rks
at
Ed
ak
ka
na
m i
n
pro
gre
ss .
Re
ha
bil
ati
on
of
dis
trib
uti
on
syte
m a
nd
se
rvic
e c
on
ne
ctio
n i
n S
A r
oa
d -
Su
pp
lyin
g,
lay
ing
, te
stin
g a
nd
com
mis
sio
nin
g o
f 3
15
mm
OD
HD
PE
pip
e
PN
10
PE
10
0 a
nd
dis
trib
uti
on
lin
es
an
d
inte
rco
nn
ect
ion
wo
rks
fro
m P
uth
en
pa
lan
to V
ytt
ila
in
S.A
ro
ad
Ko
chi
- W
ork
Co
mp
lete
d.
Au
gm
en
tati
on
an
d
Imp
rov
em
en
t o
f W
SS
to
Nil
am
bu
r
Mu
nci
pa
lity
sta
rte
d.
Wo
rks
of
the
rem
ain
ing
sc
he
me
s a
re i
n v
ari
ou
s st
ag
es
of
imp
lem
en
tati
on
Wa
ter
sup
ply
to
urb
an
are
as
of
Ke
rala
Ne
arl
y 1
2.6
la
kh
s p
eo
ple
are
be
ne
fitt
ed
.
10
Re
ha
bil
ita
tio
n/
Imp
rove
me
nts
wo
rks
of
Urb
an
WS
Ss
(XX
)
(42
15
-01
-10
1-9
7)
Fo
rre
pa
ir/r
ep
lace
me
nts
of
pu
mp
sets
or
con
ne
cte
da
cce
sso
rie
s,re
pla
cem
en
to
f
wo
rno
ut
pip
eli
ne
s-p
um
pin
gm
ain
s,
gra
vit
ym
ain
s,d
istr
ibu
tio
nli
ne
se
tc.
an
d
ma
jor
imp
t.W
ork
so
fu
rba
nw
ate
r
sup
ply
sch
em
es
are
targ
ete
dto
be
carr
ied
ou
t.F
or
com
ple
tin
ga
llo
ng
oin
g
UW
SS
ta
ke
n u
p u
nd
er
SA
AR
K.
60
00
.00
23
38
.46
Re
du
ctio
n i
n O
&M
ch
arg
es
an
d t
he
reb
y
sav
ing
s o
n p
ow
er
cha
rge
s a
nd
als
o f
or
NR
W
red
uct
ion
. W
ate
r su
pp
ly t
o u
rba
n
are
as
of
Ke
rala
Ne
arl
y 1
2.6
la
kh
s p
eo
ple
are
be
ne
fitt
ed
. I
mp
rov
ed
wa
ter
sup
ply
to m
ajo
r ci
tie
s. A
ug
me
nta
tio
n o
f W
S t
o
Ko
chi
city
a
nd
Ko
lla
m c
ity
ta
ke
n u
p.
AS
fo
r R
s. 8
48
0.0
8 l
ak
hs
an
d F
S f
or
Rs.
29
7.3
la
kh
s is
sue
d f
or
carr
yin
g
ou
t w
ork
s o
f th
e U
WS
S a
nd
th
ere
are
in
va
rio
us
sta
ge
s o
f
imp
lem
en
tati
on
. A
S i
ssie
d f
or
2 w
ork
s. (
1)
WS
S t
o K
och
i ci
ty f
or
Rs.
23
85
3 l
ak
hs.
(2
) W
SS
- p
rov
idin
g a
dd
itio
na
l so
urc
e f
rom
Ka
lla
da
riv
er
at
Ka
da
pu
zha
-R
s. 1
45
0 l
ak
hs.
17
sch
em
es
tak
en
up
un
de
r th
e h
ea
d.
"Co
mp
leti
on
of
on
go
ing
UW
SS
-S
pe
cia
l p
ack
ag
e"
- 5
co
mp
lete
d.
11
Ru
ral
Wa
ter
Su
pp
ly S
che
me
[XX
]
(42
15
-01
-10
2-9
7)
Fo
r p
rov
idin
g w
ate
r su
pp
ly t
o r
ura
l a
rea
s
of
the
sta
te
87
35
.00
32
40
.12
Ab
ou
t 6
.5 l
ak
hs
pe
op
le o
f ru
ral
are
as
of
the
sta
te b
en
efi
tte
d t
hro
ug
h t
his
pro
ject
.
20
16
-17
- 1
) Im
pro
ve
me
nts
to
WS
S t
o K
on
do
tty
an
d N
Ed
iyir
up
pu
-
com
ple
ted
2)
WS
S t
o F
ero
ke
Ka
ruv
an
thu
ruth
y c
om
ple
ted
Inv
est
iga
tio
n a
nd
pre
pa
rati
on
of
DP
Rs
we
re p
rep
are
d f
or
7 w
ork
s.
Oth
er
Wo
rks
of
the
sch
em
es
are
in
va
rio
us
sta
ge
s o
f im
ple
me
nta
tio
n.
Per
form
ance
Bud
get 2
017-
1817
3W
ater
Res
ourc
es D
epar
tmen
t
Sl
No
.
Nam
e o
f S
ch
em
e/
Pro
gra
mm
e
Ob
jecti
ve/ O
utc
om
eO
utl
ay
2016-1
7
Exp
en
dit
ure
2016-1
7D
eli
ve
rab
les/
P
hy
sica
l O
utp
uts
Ach
iev
em
en
tR
ea
son
fo
r
va
ria
tio
n
12
34
56
78
12
WS
S t
oS
pe
cifi
ed
Inst
itu
tio
ns/
Loca
tio
ns
[XX
]42
15
-01
-19
0-9
8
22
5.0
00
Fo
r u
p k
ee
p o
f R
O p
lan
ts a
t S
ab
ari
ma
la
an
d f
or
pro
vid
ing
min
or
sch
em
es
for
spe
cifi
ed
Go
ve
rnm
en
t In
stit
uti
on
s
20
16
-17
- A
S i
ssu
ed
fo
r 8
wo
rks
am
ou
nti
ng
Rs.
28
3 l
ak
hs
13
E-G
OV
ER
NA
NC
E,G
IS a
nd
Info
rma
tio
n
Ma
na
ge
me
nt[
XX
]22
15
-01
-
19
0-8
8
To
ro
ll o
ut
Ce
ntr
ali
sed
Bil
lin
g a
nd
Co
lle
ctio
n S
yst
em
to
all
re
ve
nu
e o
ffic
es,
de
ve
lop
me
nt
of
ap
pli
cati
on
pa
cka
ge
s,
da
ta c
ap
turi
ng
/ p
rep
ara
tio
n,
tra
inin
g t
o
sta
ff,
civ
il w
ork
s fo
r th
e m
od
ern
iza
tio
n o
f
rev
en
ue
off
ice
s e
tc.T
o a
chie
ve
To
tal
Ne
two
rkin
g,
Se
rve
r In
fra
stru
ctu
re,
De
ve
lop
me
nt
of
Ap
pli
cati
on
Pa
cka
ge
s,
Da
ta c
ap
turi
ng
/pre
pa
rati
on
, T
rain
ing
to
sta
ffs
un
de
r JB
IC/R
GN
DW
M P
roje
ct.F
or
Do
cum
en
tati
on
of
Pro
ject
Da
ta b
y K
WA
22
9.0
03
9.9
3co
mp
ute
risa
tio
n o
f K
WA
off
ice
s.D
ocu
me
nte
d r
ep
ort
s o
f W
S
sch
em
es
20
15
-16
- 1
.Su
pp
ort
fo
r 1
8 d
ivis
ion
s ,
45
su
b d
ivis
ion
s a
nd
60
se
ctio
ns
are
be
ing
ca
rrie
d o
ut
this
ye
ar.
5 m
ore
div
isio
ns
16
mo
re s
ub
div
isio
ns
an
d 2
2
sect
ion
off
ice
s a
re r
oll
ed
ou
t w
ith
E-
Ab
acu
s.-
Th
e E
nte
rpri
se b
illi
ng
ap
pli
cati
on
of
KW
A.S
ite
pre
pa
rati
on
im
ple
me
nta
tio
n a
nd
po
st
imp
lem
en
tati
on
act
ivit
ies
ove
r fo
r a
bo
ve
off
ice
s. 2
.Dig
itis
ati
on
w
ork
of
con
sum
er
ha
s b
ee
n a
lmo
st co
mp
lete
d s
tate
wid
e.
3.
Inte
gra
ted
wit
h R
ese
rve
Ba
nk
of
Ind
ia f
or
EC
S p
ay
me
nt
un
de
r N
EC
S
pro
ject
fo
r R
BI.
4.I
nte
gra
ted
wit
h S
tate
Se
rvic
e d
eli
ve
ry g
ate
wa
y –
Go
ve
rnm
en
t o
f K
era
la
for
ne
w c
on
ne
ctio
n s
erv
ice
.
5.A
pp
lica
tio
n d
eve
lop
me
nt
for
cash
co
lle
ctio
n t
hro
ug
h p
alm
he
ld m
ach
ine
com
ple
ted
.
6.L
oca
l b
od
y b
illi
ng
fo
r 1
8 d
ivis
ion
s co
mp
lete
d.
7.
ER
P i
mp
lem
en
tati
on
in
itia
ted
. T
en
de
rin
g p
roce
ss c
om
ple
ted
an
d
sele
ctio
n o
f P
MC
un
de
rwa
y.
8.
GP
F a
pp
lica
tio
n in
teg
rate
d t
o n
ew
so
ftw
are
fro
m L
eg
acy
so
ftw
are
an
d
cre
dit
ca
rd i
ssu
e s
tart
ed
.
20
16
-17
- A
S i
ssu
ed
fo
r R
s.2
29
.00
la
kh
s
14
Op
tim
isa
tio
n o
f P
rod
uct
ion
an
d T
ran
smis
sio
n[X
X]4
21
5-
01
-19
0-9
7
To
av
oid
fre
qu
en
t b
rea
ka
ge
of
pip
es
an
d
the
reb
y m
inim
ize
th
e h
ea
vy
lo
ss t
o
Ke
rala
Wa
ter
Au
tho
rity
, a
t le
ast
10
% o
f
the
se p
ipe
s n
ee
d t
o b
e r
ep
lace
d/
reh
ab
ilit
ate
d e
ve
ry y
ea
r .
In o
rde
r to
imp
rov
e t
he
dri
nk
ing
wa
ter
qu
ali
ty i
n t
he
sta
te,
pro
vis
ion
is
ma
de
fo
r re
no
va
tin
g
43
wa
ter
tre
atm
en
t p
lan
ts .
Fo
r ca
rry
ing
ou
t e
ne
rgy
co
nse
rva
tio
n m
ea
sure
s a
nd
reh
ab
ilit
ati
on
of
ob
sole
te p
um
ps
an
d
mo
tors
an
d e
ctri
cal
inst
all
ati
on
soth
er
el.
10
53
6.0
04
74
8sm
oo
th a
nd
pro
pe
r su
pp
ly o
f d
rin
kin
g
wa
ter
to t
he
pu
bli
c a
s w
ell
as
min
imiz
ing
the
lo
ss i
ncu
rre
d b
y
Ke
rala
Wa
ter
Au
tho
rity
th
rou
gh
NR
Wsm
oo
th a
nd
pro
pe
r su
pp
ly o
f d
rin
kin
g w
ate
r to
th
e
pu
bli
c a
s w
ell
as
min
imiz
ing
th
e
loss
incu
rre
d b
y
Ke
rala
Wa
ter
Au
tho
rity
thro
ug
h N
RW
20
16
-17
- 1
) A
S i
ssu
ed
fo
r O
pti
mis
ati
on
of
pro
du
ctio
n a
nd
tra
nsm
issi
on
for
Rs.
94
58
.69
la
kh
s. 3
4 w
ork
s co
mp
lete
d o
ut
of
21
8 w
ork
s a
nd
oth
er
wo
rks
are
un
de
r v
ari
ou
s st
ag
es
of
exe
cuti
on
.
15
Ke
rala
Wa
ter
Su
pp
ly
Pro
ject
, JI
CA
(O
ne
tim
e
sust
en
an
ce s
up
po
rt u
nd
er
the
sta
te p
lan
)-[X
X]
(4
21
5-0
1-1
90
-96
)
Fo
r im
ple
me
nti
ng
5 J
BIC
pro
ject
s in
Th
iru
va
na
nth
ap
ura
m,
Ch
eth
ala
, M
ee
na
d,
Ko
zhik
ko
de
an
d P
att
uv
am
.
15
00
0.0
04
79
4th
e f
ive
sta
nd
alo
ne
pro
ject
s o
n
com
ple
tio
n e
nsu
res
wa
ter
sup
ply
to
40
.82
la
kh
s p
eo
ple
.
1.
Th
iru
va
na
nth
ap
ura
m S
che
me
- 9
3.8
% c
om
ple
ted
2.
Me
en
ad
Sch
em
e-
91
.52
% c
om
ple
ted
3.
Ch
ert
ha
la -
10
0%
co
mp
lete
d
4.
Ko
zhik
ko
de
Sch
em
e -
91
.13
% c
om
ple
ted
5.
Pa
ttu
va
m S
che
me
-9
9.2
9%
co
mp
lete
d
Per
form
ance
Bud
get 2
017-
1817
4W
ater
Res
ourc
es D
epar
tmen
t
Sl
No
.
Nam
e o
f S
ch
em
e/
Pro
gra
mm
e
Ob
jecti
ve/ O
utc
om
eO
utl
ay
2016-1
7
Exp
en
dit
ure
2016-1
7D
eli
ve
rab
les/
P
hy
sica
l O
utp
uts
Ach
iev
em
en
tR
ea
son
fo
r
va
ria
tio
n
12
34
56
78
16
En
terp
rise
s R
eso
urc
e
Pla
nn
ing
(E
RP
)
10
00
.00
Imp
lem
en
tati
on
of
ER
P i
n K
WA
-
Se
lect
ion
of
Pro
ject
Co
nsu
lta
nt,
Pre
pa
rati
on
of
ER
P,
ten
de
r d
ocu
me
nts
,
sele
ctio
n o
f sy
ste
m i
nte
gra
tor
etc
.
Re
ten
de
red
th
e w
ork
fo
r E
RP
an
d s
ele
ctio
n o
f p
roje
ct c
on
sult
an
t
17
En
suri
ng
Acc
ess
ibil
ity
to
Dri
nk
ing
wa
ter
in I
de
nti
fie
d
Pa
nch
ay
ats
[XX
] 4
21
5-0
1-1
02
-
96
11
00
.00
18
Acc
ele
rate
d R
ura
l W
SS
s -
50
% S
tate
sh
are
(22
15
-01
-19
0-9
9-1
8)
Fo
r p
rov
idin
g 5
0 %
Sta
te s
ha
re f
or
the
on
go
ing
AR
WS
S.
56
sch
em
es
are
targ
ett
ed
fo
r co
mm
issi
on
ing
du
rin
g 2
01
3-
20
14
12
48
3.0
0P
ipe
d w
ate
r su
pp
ly t
o r
ura
l a
rea
s o
f K
era
la w
ith
50
% C
en
tra
l a
ssis
tan
ce1
20
00
.00
19
Te
chn
olo
gy
Mis
sio
n
Sch
em
es
25
% &
50
% S
tate
sha
re
(22
15
-01
-19
0-9
9-2
0)
Fo
r im
ple
me
nti
ng
th
e 6
on
go
ing
sch
em
es.
Pip
ed
wa
ter
sup
ply
to
ru
ral
are
as
of
Ke
rala
un
de
r T
ech
no
log
y M
issi
on
wit
h
Ce
ntr
al
Ass
ista
nce
.
0.0
0
20
5%
Ea
rma
rke
d Q
ua
lity
Fu
nd
for
wa
ter
Qu
ali
ty a
ffe
cte
d
ha
bit
ati
on
ide
nti
fy q
ua
lity
aff
ect
ed
are
as
an
d
imp
lem
en
t sc
he
me
s fo
r p
rov
idin
g g
oo
d
qu
ali
ty w
ate
r.
20
3.0
0
21
Dri
nk
ink
wa
ter
Su
pp
ly i
on
Dro
ug
ht
Hit
are
as
Imp
lim
en
ted
by
KW
A [
XX
]
22
15
-01
-10
1-9
8.;
Fo
r m
ee
tin
g d
rou
gh
t re
lie
f a
ctiv
itie
s a
nd
un
fore
see
n e
me
rge
nce
in
terv
en
tio
ns
.
0.0
01
13
6.6
0
67
25
0.0
03
91
33
.03
10
00
0.0
0
20
16
-17
- 1
. 1
9 s
che
me
s co
mp
lete
d,
2.
Ou
t o
f th
e 6
sch
em
es
san
ctio
ne
d
5%
ea
rma
rke
d q
ua
lity
fu
nd
, 4
sch
em
es
com
ple
ted
, re
ma
inin
g 2
sch
em
es
are
in
pro
gre
ss.
Ou
t o
f th
ese
15
sch
em
es
san
ctio
ne
d u
nd
er
Te
chn
olo
gy
mis
sio
n s
che
me
s 9
sch
em
es
we
re c
om
ple
ted
& 5
sch
em
es
pa
rtia
lly
com
ple
ted
, 1
sch
em
e w
as
rem
ain
ing
on
31
.03
.20
17
fo
r co
mp
leti
on
.
To
tal
Per
form
ance
Bud
get 2
017-
1817
5W
ater
Res
ourc
es D
epar
tmen
t
Chapter - V
FINANCIAL REVIEW
Government of Kerala releases fund to Kerala Water Authority for
implementation of water supply schemes throughout the state can be
mainly classified in three categories
1. State plan schemes including matching share for NRDWP .
2. NABARD assisted Water Supply Schemes
3. JBIC assisted water supply schemes.
(A).REVISED ESTIMATE / BUDGET ESTIMATE
The details of Revised Estimate for last three years and Budget Estimate
for 2018-19 is shown below.
( Rs. In Lakh)
Category
Revised Estimate Budget
2015-16 2016-17 2017-18 2018-19
STATE PLAN 34262.00 44971.00 52355.00 60143.00
NABARD 8918.00 11000.00 10000.00 10000.00
JICA 20000.00 15000.00 7000.00 7500.00
TOTAL 63180.00 70971.00 69355.00 77643.00
Performance Budget 2017-18 176 Water Resources Department
(B). DETAILS OF FUND RELEASE AGAINST EACH SCHEME
The details of fund released against budget provision by Government of
Kerala to Kerala Water Authority for the last three years is shown below.
( Rs. In Lakh)
Category
Release
2015-16 2016-17 2017-18
STATE
PLAN 36560.07 32865.72 35528.35
NABARD 7359.00 10291.33 8463.31
JICA 8000.00 5117.00 2056.00
TOTAL 51919.07 48274.05 46047.66
63180
7097169355
77643
0.00
10000.00
20000.00
30000.00
40000.00
50000.00
60000.00
70000.00
80000.00
90000.00
2015-16 2016-17 2017-18 2018-19
Performance Budget 2017-18 177 Water Resources Department
( C).DETAILS OF EXPENDITURE
The category wise details of expenditure met by Kerala Water Authority
for last three years is shown below.
( Rs. In Lakh)
Category
Expenditure
2015-16 2016-17 2017-18
STATE
PLAN 32538.81 25509.71 44961.37
NABARD 8456.44 8830.10 6881.39
JICA 7226.35 4793.37 3178.25
TOTAL 48221.60 39133.18 55021.01
51919.07
48274.05
46047.66
43000.00
44000.00
45000.00
46000.00
47000.00
48000.00
49000.00
50000.00
51000.00
52000.00
53000.00
2015-16 2016-17 2017-18
Performance Budget 2017-18 178 Water Resources Department
.
(D).COMPARISON BETWEEN BUDGET AND EXPENDITURE
The comparison between the budget and actual expenditure met by KWA
for last three years is given below.
( Rs. In Lakh)
Category
2015-16 2016-17 2017-18
Budget Expenditure Budget Expenditure Budget Expenditure
STATE
PLAN 34262.00 32538.81 41250.00 25509.68 50855.00 44961.37
NABARD 8918.00 8456.44 11000.00 8830.13 10000.00 6881.39
JICA 20000.00 7226.35 15000.00 4793.37 7000.00 3178.25
TOTAL 63180.00 48221.60 67250.00 39133.18 67855.00 55021.01
48221.6
39133.18
55021.01
0.00
10000.00
20000.00
30000.00
40000.00
50000.00
60000.00
2015-16 2016-17 2017-18
Performance Budget 2017-18 179 Water Resources Department
The graphic representation is shown below.
(E).COMPARISON BETWEEN BUDGET RELEASE AND
EXPENDITURE
The details of budget release and actual expenditure met by KWA is
given below.
( Rs. In Lakh)
Category
2015-16 2016-17 2017-18
Release Expenditure Release Expenditure Release Expenditure
STATE
PLAN 36560.07 32538.81 32865.72 25509.68 35528.35 44961.37
NABARD 7359.00 8456.44 10291.33 8830.13 8463.31 6881.39
JICA 8000.00 7226.35 5117.00 4793.37 2056.00 3178.25
TOTAL 51919.07 48221.60 48274.05 39133.18 46047.66 55021.01
63180
67250 67855
48221.6
39133.18
55021.01
0.00
10000.00
20000.00
30000.00
40000.00
50000.00
60000.00
70000.00
80000.00
2015-16 2016-17 2017-18
Budget
Expenditure
Performance Budget 2017-18 180 Water Resources Department
(F).COMPARISON BETWEEN BUDGET ESTIMATE , RELEASE AND
EXPENDITURE
The statement of budget estimate , release and actual expenditure met by
KWA is given below.
( Rs. In Lakh)
51919.07
48274.0546047.66
48221.6
39133.18
55021.01
0.00
10000.00
20000.00
30000.00
40000.00
50000.00
60000.00
2015-16 2016-17 2017-18
Release
Expenditure
Categoy 2015-16 2016-17 2017-18
Budget Release Expdr Budget Release Expdr. Budget Release Expdr
State
Plan
34262.00 36560.07 32538.81 50855.00 34365.72 25509.71 50855.00 35528.35 44961.37
Nabard 8918.00 7359.00 8456.44 10000.00 10291.33 8830.10 10000.00 8463.31 6881.39
Jica 20000.00 8000.00 7226.35 7000.00 5117.00 4793.37 7000.00 2056.00 3178.25
Total 63180.00 51919.07 48221.60 67855.00 49774.05 39133.18 67855.00 46047.66 55021.01
Performance Budget 2017-18 181 Water Resources Department
(G) DETAILS OF UNSPENT BALANCE FOR LAST THREE YEARS
The details of unspent balance of fund received from Government of
Kerala for last three years is given below.
(Rs. In Lakh )
Year 2015-16 2016-17 2017-18
Opening Balance 631.74 4329.21 13470.08
Release 51919.07 48274.05 46047.66
Expenditure 48221.6 39133.18 55021.01
Less: Amount resumed and
expenditure met 4253.31
Closing Balance 4329.21 13470.08 243.42
56680
63180
67855
28338.72
51919.07
46047.66
38329.77
48221.6
55021.01
0.00
10000.00
20000.00
30000.00
40000.00
50000.00
60000.00
70000.00
80000.00
2014-15 2015-16 2017-18
Budget
Release
Expenditure
Performance Budget 2017-18 182 Water Resources Department
(Rs. In Lakh )
NOTE ON KIIFB
Under KIIFB funding, Administrative sanction amounting to Rs.
1257.1 crores was sanctioned under 3 project codes WRD002, WRD003
& WRD010 for implementing 23 water supply projects during 2016-17.
Through which water supply schemes can be implemented in 13
municipalities and 68 panchayaths. Out of this, Rs 163.10 crore is set
apart for completing 8 water supply schemes. The remaining Rs 1094
crore is used for the implementation of new projects (15 schemes). Four
lakhs habitations from 14 panchayaths will get immediate benefit on
completion of the 8 water supply schemes. These projects are
implemented in 56 packages. Out of this 38 packages have been tendered
for Rs. 747.18 cr and agreement has been executed for 33 packages for
Rs. 592.83cr. Tenders for 5 packages are under processing, 11 packages
kept pending due to land issues and 7 packages will be tendered on
progress of other works.
KIIFB has also accorded approval for proposals submitted under
project code WRD 005 -Replacement of old Transmission mains in 5
circles and proposals of 6 circles are under processing in KIIFB.
4329.21
13470.08
243.420
2000
4000
6000
8000
10000
12000
14000
16000
2015-16 2016-17 2017-18
Chart Title
Performance Budget 2017-18 183 Water Resources Department
NOTE ON AMRUT (ATAL MISSION FOR REJUVENATION
AND URBAN TRANSFORMATION)
KWA is entrusted to execute projects under Atal Mission for
Rejuvenation and Urban Transformation (AMRUT) in Water supply and
Sewerage sector, for 6 Corporations and 3 Municipalities in Kerala. The
Administrative sanction accorded to KWA for executing water supply and
sewerage projects under SAAP 2015-16 is Rs.306.99 Crores for 36
works, SAAP 2016-17 is Rs. 421.06 Crores for 33 works and SAAP
2017-18 is Rs. 521.61 Crores for 45 works (Total of 114 works for
Rs.1249.66 Crores)
Technical sanction (TS) has been accorded for 109 works (87 water
supply and 22 sewerage works), 107 works have tendered, work arranged
for 69 works and 25 works started at site and 6 works have been
completed.
Performance Budget 2017-18 184 Water Resources Department
An
ne
xu
re -
III
B
( R
s. i
n L
ak
hs
)
Sl N
o. N
am
e o
f S
ch
em
e/ P
rog
ram
me
Majo
r H
ead
12
3
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
1S
urv
ey
& I
nv
est
iga
tio
n
(22
15
-01
-19
0-9
9-0
1)
(22
15
-01
-19
0-9
9-0
1)
75
.00
75
.00
20
0.0
02
00
.00
75
.00
75
.00
20
0.0
09
.41
74
.89
99
.49
2T
rain
ing
, Q
ua
lity
Co
ntr
ol,
Re
sea
rch
& D
ev
elo
pm
en
t
(22
15
-01
-19
0-9
9-0
2)
(22
15
-01
-19
0-9
9-0
2)
10
0.0
01
00
.00
16
2.2
3
3S
ew
era
ge
sch
em
es
(22
15
-02
-19
0-9
9-0
1)
(22
15
-02
-19
0-9
9-0
1)
60
0.0
06
00
.00
45
1.1
8
4W
SS
to
Me
dic
al
Co
lle
ge
Ho
spit
als
(22
15
-01
-19
0-9
9-0
3)
(22
15
-01
-19
0-9
9-0
3)
75
.00
75
.00
5O
the
r U
rba
n W
SS
s,
Imp
rov
em
en
ts
& R
eh
ab
ita
tio
n o
f e
xist
ing
Sch
em
es
(22
15
-01
-19
0-9
9-0
4)
(22
15
-01
-19
0-9
9-0
4)
70
0.0
07
00
.00
32
8.7
8
6O
the
r R
ura
l W
SS
s -
imp
rov
em
en
ts
to e
xist
ing
sch
em
es
(22
15
-01
-19
0-9
9-0
7)
(22
15
-01
-19
0-9
9-0
7)
70
0.0
03
90
.00
22
8.6
7
7W
SS
to
Sa
ba
rim
ala
(22
15
-01
-19
0-9
9-1
0)
(22
15
-01
-19
0-9
9-1
0)
10
0.0
01
00
.00
8C
om
pu
teri
sati
on
of
Bil
lin
g &
Co
lle
ctio
n S
yst
em
Ph
ase
I (
22
15
-01
-
19
0-9
8)
(22
15
-01
-19
0-9
8)
75
.00
75
.00
33
.79
9C
om
pu
teri
sati
on
- R
GN
DW
M.
&C
om
pu
teri
sati
on
of
KW
A o
ffic
ers
-
Ph
ase
-II
(22
15
-01
-19
0-9
7)
(22
15
-01
-19
0-9
7)
75
.00
75
.00
7.9
4
Tre
nd
s in
Ex
pe
nd
itu
re
viz
-a-v
iz B
ud
ge
t E
stim
ate
s/ R
ev
ise
d E
stim
ate
s in
re
cen
t y
ea
rs
( P
LAN
)
Bu
dg
et
Esti
mate
Revis
ed
Esti
mate
Actu
al E
xp
en
dit
ure
Kerala
Wate
r A
uth
orit
y
Per
form
ance
Bud
get 2
017-
1818
5W
ater
Res
ourc
es D
epar
tmen
t
Sl N
o. N
am
e o
f S
ch
em
e/ P
rog
ram
me
Majo
r H
ead
12
3
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
Bu
dg
et
Esti
mate
Revis
ed
Esti
mate
Actu
al E
xp
en
dit
ure
10
Co
mp
leti
on
of
Ru
ral
WS
S o
the
r
tha
n A
RW
SP
Sch
em
es
(22
15
-01
-10
2-9
9)
(22
15
-01
-10
2-9
9)
50
0.0
04
00
.00
58
.67
11
NA
BA
RD
Ass
iste
d R
WS
S
(42
15
-01
-10
2-9
8-0
1)
(42
15
-01
-10
2-9
8-0
1)
89
18
.00
11
00
0.0
01
00
00
.00
10
00
0.0
08
91
8.0
01
10
00
.00
10
00
0.0
08
45
6.4
48
83
0.1
06
88
1.3
9
12
Te
chn
olo
gy
Mis
sio
n S
che
me
s 2
5%
& 5
0%
Sta
te s
ha
re
(22
15
-01
-19
0-9
9-1
3)
(22
15
-01
-19
0-9
9-1
3)
50
0.0
02
00
.00
49
9.1
1
13
Gu
ruv
ay
ur
Dra
ina
ge
Sch
em
e -
Sp
eci
al
Ass
ista
nce
(22
15
-02
-10
5-9
2)
(22
15
-02
-10
5-9
2)
25
0.0
02
50
.00
10
5.7
8
14
Sta
te W
ate
r Q
ua
lity
Re
ferr
al
Inst
itu
te a
t A
luv
a (
Sp
eci
al
Ass
ista
nce
)
(22
15
-01
-80
0-7
9)
(22
15
-01
-80
0-7
9)
50
.00
75
.00
15
Ma
nu
fact
uri
ng
un
its
for
Bo
ttle
d
wa
ter
(22
15
-01
-19
0-9
6)
(22
15
-01
-19
0-9
6)
10
0.0
01
30
0.0
05
00
.00
10
0.0
01
30
0.0
01
.14
42
2.4
41
95
.08
16
Co
mp
leti
on
of
on
go
ing
Urb
an
Wa
ter
Su
pp
ly S
che
me
s- S
pe
cia
l
pa
cka
ge
(22
15
-01
-10
1-9
8)
(22
15
-01
-10
1-9
8)
45
00
.00
17
50
.00
30
75
.53
23
38
.46
17
En
erg
y c
on
serv
ati
on
me
asu
res
an
d
reh
ab
ilit
ati
on
of
ob
sole
te p
um
ps
an
d m
oto
rs a
nd
oth
er
ele
ctri
cal
inst
all
ati
on
s (2
21
5-0
1-8
00
-65
)
(22
15
-01
-80
0-6
5)
25
0.0
02
50
.00
80
.95
18
Acc
ele
rate
d R
ura
l W
SS
s -5
0%
Sta
te
sha
re
(22
15
-01
-19
0-9
9-1
8)
(22
15
-01
-19
0-9
9-1
8)
65
00
.00
10
00
0.0
01
00
00
.00
65
00
.00
11
50
0.0
01
00
00
.00
82
71
.04
12
48
3.8
21
24
96
.36
19
SA
AR
K 2
01
0-1
1 (
Sp
eci
al
Ass
ista
nce
Ag
ain
st R
ece
ssio
n i
n K
era
la)
(22
15
-01
-80
0-6
0)
(22
15
-01
-80
0-6
0)
49
9.0
04
99
.00
50
4.6
1
20
WS
S t
o M
ala
ba
r C
an
cer
Ce
ntr
e
,Th
ala
sse
ry
(2
21
5-0
1-8
00
-59
)
(2
21
5-0
1-8
00
-59
)5
0.0
06
0.0
05
9.5
7
Per
form
ance
Bud
get 2
017-
1818
6W
ater
Res
ourc
es D
epar
tmen
t
Sl N
o. N
am
e o
f S
ch
em
e/ P
rog
ram
me
Majo
r H
ead
12
3
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
Bu
dg
et
Esti
mate
Revis
ed
Esti
mate
Actu
al E
xp
en
dit
ure
21
Re
pla
cem
en
t o
f o
ld p
ipe
s o
f
exi
stin
g W
SS
(22
15
-01
-19
0-9
4)
(22
15
-01
-19
0-9
4)
95
00
.00
62
00
.00
84
27
.91
33
00
.00
22
Re
no
va
tio
n o
f o
ld W
ate
r
Tre
atm
en
t P
lan
ts
(22
15
-01
-19
0-9
3)
(22
15
-01
-19
0-9
3)
20
0.0
02
00
.00
39
.38
23
Re
no
va
tio
n o
f E
xist
ing
Civ
il
stru
ctu
res
ow
ne
d b
y K
WA
(22
15
-01
-19
0-9
2)
(22
15
-01
-19
0-9
2)
70
0.0
07
00
.00
15
00
.00
50
0.0
03
50
.00
70
0.0
01
50
0.0
04
50
.99
41
5.7
78
03
.06
24
Do
cum
en
tati
on
of
Pro
ject
Da
ta b
y
KW
A
(22
15
-01
-19
0-9
1)
(22
15
-01
-19
0-9
1)
10
0.0
01
00
.00
38
.23
25
NR
W M
an
ag
am
an
t b
y K
WA
(2
21
5-
01
-19
0-9
0)
(22
15
-01
-19
0-9
0)
30
0.0
02
00
.00
26
Inn
ov
ati
ve
Te
chn
olo
gie
s
(De
sali
na
tio
n i
n k
utt
an
ad
u)
(22
15
-
01
-19
0-8
9)
(2
21
5-0
1-1
90
-89
)4
00
.00
36
5.0
0
27
WS
S t
o A
na
kk
all
u (
22
15
-01
-10
2-
87
)
(22
15
-01
-10
2-8
7)
28
Mo
de
rnis
ati
on
of
Wa
ter
Su
pp
ly
Sch
em
e
(42
15
-01
-80
0-9
5)
(42
15
-01
-80
0-9
5)
20
0.0
02
00
.00
29
Inv
est
me
nt
in m
ajo
r C
ap
ita
l
pro
ject
s (W
ate
r su
pp
ly)
(42
15
-01
-80
0-9
6)
(42
15
-01
-80
0-9
6)
40
0.0
04
00
.00
30
5%
Ea
rma
rke
d Q
ua
lity
Fu
nd
fo
r
wa
ter
Qu
ali
ty a
ffe
cte
d h
ab
ita
tio
n
(22
15
-01
-19
0-9
9(2
3)
20
3.0
02
03
.00
48
.61
31
JBIC
ass
iste
d K
era
la W
ate
r S
up
ply
Pro
ject
(6
21
5-0
1-1
90
-98
)
(6
21
5-0
1-1
90
-98
)2
00
00
.00
20
00
0.0
05
11
7.0
07
22
6.3
54
79
3.3
7
Per
form
ance
Bud
get 2
017-
1818
7W
ater
Res
ourc
es D
epar
tmen
t
Sl N
o. N
am
e o
f S
ch
em
e/ P
rog
ram
me
Majo
r H
ead
12
3
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
Bu
dg
et
Esti
mate
Revis
ed
Esti
mate
Actu
al E
xp
en
dit
ure
32
Dro
ug
ht
Re
lie
f W
ork
s sa
nct
ion
ed
by
Go
ve
rnm
en
t o
f K
era
la (
22
15
-
01
-80
0-8
4)
( 2
21
5-0
1-8
00
-84
)8
80
0.0
04
00
0.0
06
09
5.2
11
13
6.6
02
01
1.6
0
33
Ru
ral
Wa
ter
Su
pp
ly S
che
me
( 2
21
5-
01
-10
2-8
3)
( 2
21
5-0
1-1
02
-83
)6
56
0.0
04
97
0.0
03
56
0.0
81
59
0.7
2
34
Imp
lem
en
tati
on
of
Pri
ori
ty
Sch
em
e u
nd
er
Ke
rala
Pe
rsp
ect
ive
Pla
n 2
03
0
(22
15
-01
-10
1-9
7)
10
0.0
01
00
.00
35
Hu
ma
n R
eso
urc
es
De
ve
lop
me
nt
Re
sea
rch
&
qu
ali
ty c
on
tro
l
(42
15
-01
-19
0-9
9)
10
0.0
02
75
.00
27
5.0
01
00
.00
27
5.0
09
9.9
41
24
.98
36
Se
we
rag
e s
che
me
of
Ke
rala
Wa
ter
Au
tho
rity
(42
15
-02
-19
0-9
9)
75
0.0
02
00
0.0
05
00
0.0
07
50
.00
20
00
.00
48
2.7
93
91
.72
37
Re
ha
bil
ita
tio
n /
Imp
rov
em
en
t o
f
UW
SS
(42
15
-01
-10
1-9
7)
60
00
.00
50
00
.00
50
00
.00
60
00
.00
50
00
.00
55
30
.92
38
Mo
de
rnis
ati
on
of
Aru
vik
ka
ra
Pu
mp
ing
Sta
tio
n
(42
15
-01
-10
1-9
6)
10
00
.00
60
0.0
01
.00
10
00
.00
60
0.0
0
39
Ru
ral
Wa
ter
Su
pp
ly S
che
me
(42
15
-01
-10
2-9
7)
87
35
.00
90
00
.00
80
00
.00
87
35
.01
90
00
.00
16
49
.40
73
33
.63
40
En
suri
ng
acc
ess
ibil
ity
to
Dri
nk
ing
Wa
ter
in I
de
nti
fie
d p
an
cha
ya
ths
(42
15
-01
-10
2-9
6)
11
00
.00
11
00
.00
41
Wa
ter
Su
pp
ly S
che
me
to
Sp
eci
fie
d
Inst
itu
tio
ns
/ Lo
cati
on
s
(42
15
-01
-19
0-9
8)
22
5.0
02
25
.00
25
0.0
02
25
.00
22
5.0
07
6.4
4
42
E.g
ov
ern
an
ce,
GIS
an
d i
nfo
rma
tio
n
ma
na
ge
me
nt
(22
15
-01
-19
0-8
8)
22
9.0
07
00
.00
91
7.0
01
00
.00
70
0.0
03
9.9
33
1.5
6
Per
form
ance
Bud
get 2
017-
1818
8W
ater
Res
ourc
es D
epar
tmen
t
Sl N
o. N
am
e o
f S
ch
em
e/ P
rog
ram
me
Majo
r H
ead
12
3
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
Bu
dg
et
Esti
mate
Revis
ed
Esti
mate
Actu
al E
xp
en
dit
ure
43
Op
tim
isa
tio
n o
f p
rod
uct
ion
an
d
tra
nsm
issi
on
(42
15
-01
-19
0-9
7)
10
53
6.0
01
40
00
.00
14
00
0.0
01
05
36
.00
14
00
0.0
01
44
8.0
11
58
61
.21
44
Inn
ov
ati
ve
te
chn
olo
gie
s a
nd
Mo
de
rn M
an
ag
em
en
t P
ract
ice
s
(22
15
-01
-10
1-9
7 (
01
))7
00
.00
20
00
.00
20
00
.00
50
.00
20
00
.00
26
.94
5.3
2
45
ER
P(2
21
5-0
1-1
01
-97
(0
2))
10
00
.00
10
00
.00
10
00
.00
46
JBIC
ass
iste
d P
roje
cts
(42
15
-01
-19
0-9
6)
15
00
0.0
07
00
0.0
07
50
0.0
09
88
3.0
17
00
0.0
03
17
8.2
5
47
Dri
nk
ing
wa
ter
Dro
ug
ht
Mit
iga
tio
n2
21
5-0
1-8
00
-47
30
55
.00
30
00
.00
30
55
.00
48
Acc
ele
rate
d R
ura
l W
SS
s -5
0%
Sta
te
sha
re
NR
DW
P
42
15
-01
-10
2-9
31
00
00
.00
49
Co
mp
leti
on
of
on
go
ing
NR
DW
P4
21
5-0
1-1
02
-95
10
00
0.0
0
50
So
urc
e I
mp
rov
em
en
t a
nd
wa
ter
Co
nse
rva
tio
n
42
15
-01
-80
0-9
25
00
.00
TO
TA
L6
31
80
.00
67
25
0.0
06
78
55
.00
77
64
3.0
06
31
80
.00
70
97
1.0
26
78
55
.00
48
22
1.6
03
91
33
.18
55
02
1.0
1
Per
form
ance
Bud
get 2
017-
1818
9W
ater
Res
ourc
es D
epar
tmen
t
An
ne
xu
re -
III
B
( R
s. i
n L
ak
hs
)
Sl
No
.
Na
me
of
Sc
he
me
/
Pro
gra
m
me
Ma
jor
He
ad
12
3
20
11
-12
20
14
-15
20
15
-16
20
16
-17
20
17
-18
20
11
-12
20
14
-15
20
15
-16
20
16
-17
20
11
-12
20
14
-15
2
01
5-1
62
01
7-1
8
1P
roje
cts
un
de
r LA
C-
AD
F
(42
15
-01
-
80
0-9
3)
40
.00
29
00
.00
40
00
.00
20
00
.00
20
00
.00
40
.00
29
00
.00
40
00
.00
20
00
.00
40
.00
40
0.0
09
31
.31
14
75
.67
TO
TA
L2
90
0.0
04
00
0.0
02
00
0.0
02
00
0.0
04
0.0
02
90
0.0
04
00
0.0
02
00
0.0
04
0.0
04
00
.00
93
1.3
11
47
5.6
7
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
tes/
Re
vis
ed
Est
ima
tes
in r
ece
nt
ye
ars
(N
ON
P
LAN
)
Bu
dg
et
Es
tim
ate
Re
vis
ed
Es
tim
ate
Ac
tua
l E
xp
en
dit
ure
45
6
Kera
la W
ate
r A
uth
orit
y
Per
form
ance
Bud
get 2
017-
1819
0W
ater
Res
ourc
es D
epar
tmen
t
JALANIDHI
(Kerala Rural Water Supply and Sanitation Agency (KRWSA)
Chapter-I
INTRODUCTION
PRINCIPLE AND OBJECTIVES
Kerala Rural Water Supply and Sanitation Agency (KRWSA) is a
Society registered under Travancore-Cochin Literary Scientific and
Charitable Societies Registration Act 1955 in order to act as an
independent autonomous body to manage the implementation of Rural
Water Supply and Environmental Sanitation Projects including World Bank
Aided Kerala Rural Water Supply and Environmental Sanitation Project."-
(Jalanidhi-I).
Location: The KRWSA has its head office at Thiruvananthapuram in the
State of Kerala and may establish one or more subordinate offices or
outlets elsewhere in the State, if required
Area of Operation: The State of Kerala
Headquarter of the Society: KRWSA, PTC Towers, Thampanoor, TVPM-1
INSTITUTIONAL DESIGN/ ORGANIZATIONAL STRUCTURE
General Body: The Minister in charge Water Resources Department is the
President. The Secretaries to Government –WRD, Finance, LSGD,
Planning and the Chief Executives of CWRDM, KWA, Panchayath
Presidents and representatives of NGOs nominated by the Government
are the members. The Executive Director of KRWSA is the Member
Secretary.
Governing Council: The Secretary to Government in charge of Water
Resources Department is the Chairman. The Secretaries to Government ,
Finance, LSGD, and the Chief Executive of KWA and Panchayaths
Presidents representatives of NGOs nominated by the Government are the
Performance Budget 2017-18 191 Water Resources Department
members. The Executive Director of KRWSA is the Member Secretary.
The Governing Council is having the control and management of the
business and affairs of the Society and shall have all advisory executive and
financial powers to conduct the affairs of the Society through its
Executive Director.
Project Management Unit (PMU): Head office of KRWSA, PTC Towers,
Thampanoor, TVPM-1- The PMU has five operational units: one each for
Operations, Technical, Finance and Administration, Human Resources
Development and Monitoring & Evaluation. The PMU is headed by the
Executive Director and has some key professional staff. The staffs are
multi-disciplinary and include specialists in Operations, Technical, Finance,
HRD and M&E. The PMU is vested with overall management of the
Project and implementation support.
Regional Project Management Units (RPMUs): KRWSA is having three
RPMUsin Kannur, Malappuram and Idukki; each is headed by a Regional
Project Director. The RPMUs are entrusted with on-site project
implementation support.
JALANIDHI-I PROJECT
During the period from its inception till 2009-10, KRWSA was
implementing World Bank assisted Kerala Rural Water Supply and
Sanitation Project Jalanidhi-I. It was implemented successfully as role
model in the WATSAN sector and KRWSA was awarded the First Runner
up-Peoples First Award given by World Bank in 2008. The credit period
of the project was ended on 31-01-2009 and the spills over works were
continued till 2012-13 by utilising the funds provided in the state budget
under state plan.
The Jalanidhi – I project was implemented in 112 GPs all over
Kerala and completed and commissioned 3693 small water supply
schemes and 16 large water supply schemes which benefitted 11.28 lakh
population. In addition to water supply schemes, other components like
Ground Water Recharge activities, construction of Latrines, Environmental
Sanitation measures, Rain Water Harvesting etc. were also undertaken
Performance Budget 2017-18 192 Water Resources Department
and successfully completed under the project. Among the out puts of
Jalanidhi-I project, the following stand out as glaring achievements.
Sl.
No
Item Achievement
1 No. of small Water Supply Schemes
Commissioned 3693
2 No. of large Water Supply Schemes
Commissioned 16
3 No.of Households covered through commissioned
water supply schemes 1.69 lakh
4 No.of population covered through commissioned
water supply schemes 11.28 lakhs
5 Total number of new latrines constructed 68023
6 Total number of latrines conversion from single pit
to two pits 24194
7 Total number of Environment Management Units
(compost pit, soak pit etc.) 89319
8 Drainage Constructed in Metres 68362
9 No of BGs where GWR done 1013
10 No of Rain Water Harvesting Units constructed 13304
11 No of school Sanitations work completed 126
12 No of Public Comforts Stations Constructed 73
13 Revised Estimate of Jalanidhi-I Project Rs 381.50 Crs
14 Total Expenditure till the end of World Bank
Credit Period –till 31-1-2009 Rs 382.03 Crs
15 World Bank assistance Received Rs 276.15 Crs
14 Total Expenditure till date Rs 418 .50 Crs
KRWSA is the nodal Agency of the State Government for the
implementation of Rain Water Harvesting Programme in State. A separate
cell –Rain Centre- is functioning under KRWSA for undertaking the
activities under RWH Scheme. KRWSA is also acting as WSSO of
Government of Kerala to co-ordinate water related activities in the State.
Performance Budget 2017-18 193 Water Resources Department
JANLANIDHI-II PROJECT
Inspired by the successful implementation of Phase-I project, Government
have decided to launch the World Bank Aided Second Kerala Rural Water
Supply and Sanitation Project with the objectives to increase the access of
rural communities to improve and sustain water supply and sanitation
services in Kerala, using a decentralized, demand driven approach. It has
been proposed to implement the project in about 200 Grama
Panchayaths in the 8 Districts of Kerala –Kasaragod, Kannur, Wayanad,
Kozhikode, Malappuram, Palakkad, Idukki and Kottayam during the
period of 5 ½ years from 1st January 2012 to 30th June 2017 . The
overall project size is estimated to Rs 1022 Crore (original) out of which
an amount of Rs 119 crores will be provided by Grama Panchayaths and
Rs 49 crore by Beneficiaries of the Project. Balance Rs 854 crore has to
be provided by GoK through budget for 5 ½ years under plan schemes. An
amount of equivalent to USD 155 million will get towards re-imbursement
from World Bank. Later restructuring proposal by revising the estimate to
Rs 1358 Crs and extending the period of project by 1 1/2 years up to
31-12-2018 was approved by the Government. The details of the physical
targets are as follows:
No.Panchayaths proposed to be covered -200
No of Households proposed to be covered – 2.87 million
Population to be covered - 1.15 million (Water Supply), 0.69 million
(Sanitation)
Total 1.84 million
No of small water supply schemes proposed – 3938 (including 396 for
Tribes)
No of Multi Grama Panchayath Large water supply schemes proposed-5
no (covering 23 GPs)
Number of Tribal Grama Panchayaths to be covered -22
Population to be covered (Tribal) - 64944.
Performance Budget 2017-18 194 Water Resources Department
Chapter-II
FINANCIAL OUTLAYS AND QUANTIFIABLE DELIVERABLES
1. Jalanidhi-II Project
During the year under report the implementation of Jalanidhi-Phase-II
Project was going on in 115 Grama Panchayaths all over Kerala. A total
amount of Rs 361.49 crores was the state budget outlay for the year
2017-18 out of which Rs 278.84 crores was expected as Central
Assistance by way of external aid. Complementary Extra Budgetary
Resource to the tune of Rs. 74.04 crores was also anticipated by means of
Grama Panchayath and Beneficiary Contribution.
Jalanidhi Phase-II is a continuous project for the period of 7 years
(revised project period). Hence the net outcome can only be assessed after
the completion of the project. As per the project implementation plan
3938 nos of Water Supply Schemes are to be completed and
commissioned within the project period. As such the main physical target
for the year 2017-18 was set at completion of 313 nos of Water Supply
Schemes. But during the year under report 434 nos of water supply
schemes have been completed and commissioned and therefore the target
achieved can be worked out as 139 %. Besides this 1242 nos of
community level sanitation schemes and 123 nos of GWR schemes have
also been completed during the year 2017-18. Another 410 nos of water
supply schemes were under the various stages of construction though out
of the year.
Performance Budget 2017-18 195 Water Resources Department
2. Popularization of Rain Water Harvesting and GWR measures through
KRWSA
For the Scheme of the Scaling up of Rain Water Harvesting and GWR
Programme through KRWSA the budget out lay for the year 2017-18 was
Rs 18.20 crores. But Due to the administrative constrains the
Administrative Sanction, for a scheme proposed for 2017-18, was
delayed. Out of the Budget provision for Rs 20.20 crores, a total amount
Rs 5.00 crores (Out of this Rs 4.50 crores was resumed by Government
during March-18) was released to KRWSA for implementing the schemes
sanctioned for 2015-16 and 2016-17. Construction of 1368 nos of RWH
structures in individual households were completed during the year 2017-
18. The details in this chapter is summarized in tabular form and shown as
Annexure-I
Performance Budget 2017-18 196 Water Resources Department
Na
me
of
the
De
pa
rtm
en
t:Ja
lan
idh
i (
KE
RA
LA R
UR
AL
WA
TE
R S
UP
PLY
AN
D S
AN
ITA
TIO
N A
GE
NC
Y)
Jala
nid
hi
Sl.
No
Na
me
of
Sch
em
e/
Pro
gra
mm
e
Ob
ject
ive
/ou
tco
me
Qu
an
tifi
ab
le
De
live
rab
les/
Ph
ysi
cal
Ou
tpu
ts
Ta
rge
t
Ach
ieve
d
Pro
ject
ed
ou
tco
me
s
Pro
cess
es/
Tim
eli
n
es
Re
ma
rks
/Ris
k f
act
or
4(i
)4
(ii)
4(i
ii)
4 (
iv)
No
n P
lan
Bu
dg
et
Pla
n
Bu
dg
et
Co
mp
lem
e
nta
ry E
xtra
Bu
dg
eta
ry
Re
sou
rce
s
Ce
ntr
al
Ass
ista
nce
, if
an
y
1Ja
lan
idh
i-P
ha
se-I
I
(Wo
rld
Ba
nk
Aid
ed
Se
con
d K
era
la R
ura
l
Wa
ter
sup
ply
an
d
Sa
nit
ati
on
Pro
ject
)
Imp
lem
en
tati
on
of
the
pro
ject
in
11
5 G
ram
a
Pa
nch
ay
ath
s
Nil
36
14
97
40
42
78
84
29
6 n
os
of
Sm
all
Wa
ter
Su
pp
ly S
che
me
s, 4
no
s o
f
Larg
e W
ate
r S
up
ply
Sch
em
es
, 1
87
5 n
os
of
Sa
nit
ati
on
Sch
em
es
, 1
04
no
s o
f G
WR
Sch
em
es
an
d
36
73
6 n
os
of
ho
use
ho
ld
latr
ine
s a
s p
art
of
the
OD
F c
am
pa
ign
ha
ve
be
en
com
ple
ted
an
d
com
mis
sio
ne
d
13
9%
Ne
t o
utc
om
e o
f
the
pro
ject
as
a
wh
ole
ca
n b
e
ass
ess
ed
on
ly
aft
er
the
com
ple
tio
n o
f
the
pro
ject
Co
nti
nu
ou
s
pro
ject
. S
tart
ed
in
20
12
.Wil
l b
e
com
ple
ted
by
-
20
18
So
me
Gra
ma
Pa
nch
ay
ath
s d
o n
ot
ha
ve
ad
eq
ua
te f
un
ds
to c
on
trib
ute
th
eir
sha
re o
f th
e p
roje
ct.,
Dif
ficu
lty
fo
r g
ett
ing
po
we
r co
nn
ect
ion
ne
ar
fore
st a
rea
s a
nd
Na
tura
l ca
lam
itie
s
2S
cali
ng
up
of
Ra
in
Wa
ter
Ha
rve
stin
g a
nd
GW
R P
rog
ram
me
thro
ug
h K
RW
SA
to su
sta
in th
e
Ra
in W
ate
r
Ha
rve
stin
g
Act
ivit
ies
in t
he
Sta
te t
hro
ug
h
KR
WS
A.
Nil
18
20
18
2N
il1
36
8 R
WH
Str
uct
ure
s
com
ple
ted
in
in
vid
ua
l
ho
use
ho
lds
68
%C
om
ple
tio
n o
f
20
00
no
s o
f
RW
H S
tru
ctu
res
Sch
em
e S
tart
ed
to
imp
lem
en
t b
y J
un
e-
17
a
nd
w
ill
be
com
ple
ted
du
rin
g
Ma
rch
-20
18
Dif
ficu
lty
in
ge
ttin
g
con
stru
ctio
n m
ate
ria
l.
An
ne
xu
re-I
9
FO
RM
AT
OF
TA
BLE
S I
N C
HA
PT
ER
II
OF
PE
RF
OR
MA
NC
E B
UD
GE
T 2
01
7-1
8
12
5
Ou
tla
y 2
01
7-1
8
43
Ru
pe
es
in L
ak
hs
67
8
Per
form
ance
Bud
get 2
017-
1819
7W
ater
Res
ourc
es D
epar
tmen
t
Chapter-III
REFORM MEASURES AND PERFORMANCES
An important and major feature of Jalanidhi–II is in deepening
decentralisation in the state by envisaging Grama Panchayaths (GPs) to
play a critical role in Project implementation. The Project proposes greater
participation of GPs by:
• making GPs joint owners (with BGs) of scheme assets;
• increasing GPÊs share of capital costs in a scheme from 10 per
cent to 15 percent (and correspondingly reducing that of
Beneficiary Groups from 15 per cent to 10 per cent);
• assigning GPs to arrange O&M support to Beneficiary Groups
(BGs);
• granting GPs greater fiduciary control over BGs and other
stakeholders at grass root level;
• encouraging GPs to avail services of technical support providers
(such as individual experts, LSGD Engineering wing, the Kerala
Water Authority, the KRWSA) as needed, for a fee; and
• conferring more powers in monitoring and evaluating activities
of BGs and other stakeholders at grass root level.
Since GPs will be responsible for successful implementation of the
Project at the local level (including BG activities), GPs are to be extended
extra capacity support under Jalanidhi–II. Thus, the ProjectÊs institutional
arrangements too will be decentralised by:
• setting up a GP-level Support Team (GPST) in the GP to
provide speedy, onsite support to GPs and BGs, and work
closely with the GP;
• downsizing the District project management unit, in favour of
employing engineering and accounting personnel in the GP for
local strengthening; and delegating more administrative and
financial powers from the PMU to field units (RPMUs and
GPSTs).
Performance Budget 2017-18 198 Water Resources Department
Jalanidhi–II, there will be greater integration in rural water supply at village
levels. The up-front setting up of an operating institutional mechanism at
the GP level will provide sustainable O&M backup support to all rural
water supply schemes (not only Jalanidhi schemes) in the GP.
Achievements of Jalanidhi II Project-As on 31-08-2018
No of Grama Panchayath Covered -115.
Number of Water Supply Schemes Commissioned -1933
Number of Sanitation Structures Completed-45404
(Including 36376 ODF Latrines)
GWR structures completed-1541 nos
Beneficiaries of Commissioned Water Supply Schemes-809576
Beneficiaries of Sanitation Structures completed-363454
Expenditure from the Budget Provision – Rs 1035.84 crores
Central Assistance-ACA-Received - Rs 750.44 crores (upto 30-06-
2018)
RWH – Programme
7310 nos of household RWH-units have been setup under RWH-
Programme under state plan in fifteen Grama Panchayaths of Kasargod,
Kannur, Ernakulam, Idukki, Kottayam, Alappuzha, Kollam, Palakkad,
Pathanamthitta and Thiruvananthapuram Districts during the years 2013--
2018. Another 840 nos of RWH units have been constructed in selected
Government Schools as the programmes sanctioned for the year 2015-
16.
Performance Budget 2017-18 199 Water Resources Department
Chapter-IV
REVIEW OF PAST PERFORMANCE
The Budget Outlay for Jalanidhi-Phase-II Project for the year 2016-
-17 was Rs 314.42crores and the entire provision was released. During
the year the implementation activities were going on in 115 Granma
PanchayatÊs and could complete and commission 300 nos of water supply
schemes against the target of 350 nos as per Project Implementation
Plan. During the year under report, the works related to 716 nos of water
supply schemes were in progress.
An amount of Rs 10.00 crores was allocated for the year 2016-17,
for scaling up of Rain Water Harvesting and GWR Programme though
KRWSA. Construction of 656 nos of RWH Structures in selected
Government School was constructed which were proposed for the year
2015-16.The details are also shown as Annexure-II
Performance Budget 2017-18 200 Water Resources Department
Na
me
of
the
De
pa
rtm
en
t:Ja
lan
idh
i (
KE
RA
LA R
UR
AL
WA
TE
R S
UP
PLY
AN
D S
AN
ITA
TIO
N A
GE
NC
Y)
Jala
nid
hi
Sl.
No .
Na
me
of
Sch
em
e/
Pro
gra
mm
eO
bje
ctiv
e/o
utc
om
eO
utl
ay
20
16
-17
Exp
en
dit
ure
20
16
-17
De
live
rab
les/
P
hy
sica
l
Ou
tpu
ts
Ach
ieve
me
nt
Re
aso
n f
or
Va
ria
tio
n
12
34
56
78
1
Ad
d-o
n P
roje
ct o
f Ja
lan
idh
i
(Wo
rld
Ba
nk
Aid
ed
Se
con
d
Ke
rala
Ru
ral
Wa
ter
sup
ply
an
d S
an
ita
tio
n P
roje
ct)-
Jala
nid
hi-
Ph
ase
-II
Imp
lem
en
tati
on
of
the
pro
ject
in
90
Gra
ma
Pa
nch
ay
ath
s
31
44
23
14
42
35
0 N
os
of
Wa
terS
up
ply
Sch
em
es
30
0 N
os
of
Wa
ter
Su
pp
ly S
che
me
s
com
ple
ted
an
d
Co
mm
issi
on
ed
As
it i
s a
co
nti
nu
ou
s p
roje
ct f
or
the
pe
rio
d o
f 7
ye
ars
, a
ctu
al
ach
ieve
me
nt
can
be
qu
an
tifi
ed
o
nly
on
co
mp
leti
on
of
the
pro
ject
.
2
Sca
lin
g u
p o
f R
ain
Wa
ter
Ha
rve
stin
g a
nd
GW
R
Pro
gra
mm
e t
hro
ug
h K
RW
SA
to su
sta
in th
e R
ain
Wa
ter
Ha
rve
stin
g
Act
ivit
ies
in t
he
Sta
te
thro
ug
h K
RW
SA
.
10
00
62
0
84
0 N
os
of
RW
H
Str
uct
ure
s
Co
mp
lete
d 6
56
No
s
of
RW
H T
an
ks
in
Sch
oo
ls
Ad
min
istr
ati
ve
Sa
nct
ion
wa
s d
ela
ye
d
Sta
tem
en
t o
f O
utl
ay
s /O
utc
om
es
/Ta
rge
t 2
01
6-1
7 a
nd
Act
ua
l A
chie
ve
me
nt
20
16
-17
An
ne
xu
re-I
I
P
LAN
/MA
JOR
SC
HE
ME
S R
s in
La
kh
s
Per
form
ance
Bud
get 2
017-
1820
1W
ater
Res
ourc
es D
epar
tmen
t
Chapter-V
FINANCIAL REVIEW
The Budget Estimates/Revised Estimates and the expenditure in
respect of Jalanidhi-Phase-II Project were in an increasing trend during the
period from 2012-13 to 2017-18. The actual Plan for expenditure for the
project for the year was Rs 202.28 crores by utilising the unspent balance
of the previous years and also using the extra budgetary resources.
But the Budget Estimates/Revised Estimates and expenditure there
from in respect of the scheme of Scaling up of Rain Water Harvesting and
GWR Programme through KRWSA is in a varying trend for the period
from 2012-13 to 2017-18. This was mainly due to the administrative
constrains in selection of Grama Panchayaths on the basis of the
necessity of RWH structures due to scarcity of water.
The details are shown as Annexure-III.
Performance Budget 2017-18 202 Water Resources Department
PLA
N
Sl.
No
S
che
me
/ P
rog
ram
me
Ma
jor
He
ad
20
15
-16
20
16
-17
20
17
-18
20
18
-19
20
15
-16
20
16
-17
20
17
-18
20
15
-16
20
16
-17
20
17
-18
1
Jala
nid
hi-
Ph
ase
-II
(Wo
rld
Ba
nk
Aid
ed
Se
con
d K
era
la
Ru
ral
Wa
ter
sup
ply
an
d
Sa
nit
ati
on
Pro
ject
)
2215-01-800-
67
26
44
23
14
42
36
14
92
16
00
26
44
23
14
42
36
14
9*
*2
64
42
31
44
22
02
28
*
2
Sca
lin
g u
p o
f R
ain
Wa
ter
Ha
rve
stin
g a
nd
GW
R
Pro
gra
mm
e t
hro
ug
h K
RW
SA
2215-01-800-64
42
01
00
01
82
02
02
04
20
10
00
20
20
42
06
20
41
6*
3
Su
sta
ina
bil
ity
Su
pp
ort
in
Co
mm
un
ity
ma
ng
ed
Wa
ter
Su
pp
ly S
che
me
s
2215-01-102-
80
00
01
00
00
00
00
0
* i
ncl
ud
ing
th
e u
nsp
en
t b
ala
nce
s o
f th
e p
rev
iou
s y
ea
rs a
nd
als
o t
he
ex
tra
bu
dg
eta
ry r
eso
urc
es.
**
Th
e H
ea
d o
f A
cco
un
t C
ha
ng
ed
as
42
15
-01
-10
2-9
4 f
or
the
ye
ar
20
18
-19
Act
ua
l E
xpe
nd
itu
re
6
Bu
dg
et
Est
ima
tes
4
An
ne
xu
re-I
II
Tre
nd
s in
Exp
en
dit
ure
viz
-a-v
iz B
ud
ge
t E
stim
ate
s /R
ev
ise
d E
stim
ate
s i
n r
ece
nt
ye
ars
Na
me
of
the
De
pa
rtm
en
t:K
era
la R
ura
l W
ate
r S
up
ply
an
d S
an
ita
tio
n A
ge
ncy
(Ja
lan
idh
i)
12
3
Re
vis
ed
Est
ima
tes
5
Per
form
ance
Bud
get 2
017-
1820
3W
ater
Res
ourc
es D
epar
tmen
t
KERALA IRRIGATION INFRASTRUCTURE
DEVELOPMENT CORPORATION LTD
(KIIDC)
Chapter -1
INTRODUCTION
BRIEF DESCRIPTION OF THE COMPANY
The Kerala Irrigation Infrastructure Development
Corporation Ltd (KIIDC) is a wholly owned company of Government of
Kerala, for the promotion and development of medium and large scale
irrigation and water supply projects units in the State.
The main objectives to be pursued by the ÂKerala Irrigation
Infrastructure Development Corporation LimitedÊ are to undertake and
execute construction of irrigation and water supply projects of major,
medium and small size under any of the schemes such as Build, Own and
Operate (BOO), Build, Operate and Transfer (BOT), Build, Own, Operate
and Transfer (BOOT), Build, Own, Lease and Transfer (BOLT) anywhere
in India.
Incidental to this the Company is also authorized to undertake the
following:
1. the construction, execution and subsequent maintenance of projects
entrusted by the State Government
2. to utilize the water stored in the reservoir created in the river course
for any utilities like drinking water, irrigation, domestic, industrial,
tourism, or for any other purpose according to the directions of the
Government from time to time.
3. To undertake or render any assistance to individual, firm, society,
company, corporation, development authority, municipality,
panchayath or any Department of Government of Kerala with the
Performance Budget 2017-18 204 Water Resources Department
object of providing irrigation facilities, water supply and distribution
system especially to farmers, agriculturists, cultivators and producers
so as to improve all types of operation of farming, periculture,
sericulture, horticulture and agriculture and for this to construct wells,
ponds, tanks, culverts, canals, bunds, water treatment plants,
reservoirs etc.
4. To carry on in India or elsewhere the business of generating,
producing, refining, receiving, improving, buying, selling, reselling,
acquiring, using, transmitting, accumulating, employing, distributing,
developing, handling, supplying and to act as producer, agent,
broker, representative, consultant, collaborator or otherwise to deal in
undertake, assist, encourage, promote development of scientific,
technical, engineering, research activities associated with generation,
transmission and distribution of power which is derived through
conventional/ non conventional methods including hydel, thermal,
turbine, thermo electric generator, thermionic convertor, hydrogen
magneto hydro dynamic, fuel cell technology, solar energy, wind
energy, tidal energy and deal in all apparatus and things required for
or capable of being used in connection with generation, transmission,
distribution, energy conservation, development of means, modes and
methods for conservation and efficient utilization of energy,
measuring the output and improving the efficiency thereof, supply or
otherwise trade in accumulation and employment of electricity, all
power that may directly or indirectly be derived there from and for
that purpose acquire, establish, contract, lay down, promote, erect,
build, install, commission carry out and run all necessary power sub
stations, workshops, repair shops or any other facility or property
required for the purpose of carrying on such business for captive,
commercial uses.
5. To carry on the activity of acquiring, processing including
desalination, treating, producing and merchandising bottled drinking
water and for that purpose acquire, establish, contract, lay down,
promote, erect, build, install, commission, carry out and run all
necessary processing units, workshops, repair shops or any other
facility or property required for the purpose of carrying on such
business and buy, import, export, procure, process, pack, repack,
Performance Budget 2017-18 205 Water Resources Department
add, remove, heat, preserve, store, forward, consign, distribute,
franchise, dispose, develop, assemble, handle and transport, supply
as stockiest, commission agent or otherwise to deal in bottled water.
The Board of Directors of the Company is as hereunder:
HonÊble Minister for Water Resources CHAIRMAN
Secretary, Water Resources DIRECTOR
Deputy Secretary, Finance Department DIRECTOR
Chief Engineer, (I&D, IDRB), Irrigation
Department.
DIRECTOR
Chief Engineer (Inland Navigation &Kuttanad
Package), Irrigation Department
DIRECTOR
Managing Director, Kerala Water Authority. DIRECTOR
Chief Engineer (Retd.), Irrigation Department MANAGING
DIRECTOR
MAIN LINES OF BUSINESS
• CIVIL CONSTRUCTION.
• MANUFACTURINING
CIVIL CONSTRUCTION
At present KIIDC is an empanelled agency under
Government of Kerala to undertake civil works, irrigation works, micro
irrigation works, environmental support works etc and is executing works
for different Departments of the Government viz. Water Resources
Department, Environment and Climate Change Department, Agriculture
Department, Tourism Department, Tribal Welfare Department, Kerala
Water Authority, KSIDC etc.
In addition Water Resources Department of Government of
Kerala have nominated Kerala Irrigation Infrastructure Development
Corporation Ltd. as the Special Purpose Vehicle (SPV) of Irrigation
Department for undertaking all works proposed for funding under KIIFB
subject to the condition that specific in principal sanction for individual
items of work shall be issued for each individual work or a group of works
upon submission of Detailed Project Report by Kerala Irrigation
Performance Budget 2017-18 206 Water Resources Department
Infrastructure Development Corporation Ltd./Irrigation Department for
those works.
Some of the projects successfully completed and ongoing under KIIDC
are:
• Construction of ezhuthonipadam aqueduct between Ch. 18220
and Ch. 18275.50.
The left bank canal of MoovattupuzhaValley Irrigation Project
under Irrigation Department has a length of 37.10 km. It is
designed to irrigate an area of 13,592 ha. The right bank canal
is 28.34 km long to irrigate 5024 ha. The Ettumanoor Branch
Canal starts from the tail end of the LBMC and runs for a length
of 18525m. The Kurumaloor Distributory off takes from the tail
end of Ettumanoor Branch Canal at Ch. 18525m. The
Ettumanoor Minor Distributory off takes from the Ettumanoor
Branch Canal at Ch. 17860m and from Ch. 17860m to Ch.
18525m of the canal is designed to carry water for 500 ha
ayacut under Kurumaloor ayacut. The Ettumanoor Branch
Canal is complete up to Ch. 18220m and from Ch.
18275.50m to Ch. 18525 and Kurumaloor Disributory for a
length of 10748m is complete. The main bottle neck for the
distribution of the water to the 500 ha ayacut is the non –
completion of the ezhuthonipadam aqueduct between Ch.
18220 and Ch. 18275.50. Three spans of the aqueduct are not
complete and of the three, the central span crosses the railway
line. Now 21 trains cross this point during day time. The rail
way line is electrified. The staging and bottom shuttering for the
central span has to be executed by the railways as a deposit
work. The amount for the same has already been remitted with
the railways. The design of the central aqueduct has been
approved by railway as a pre-stressed aqueduct. The upstream
and downstream of canals and aqueducts are complete. By the
completion of this portion an additional 500 ha of ayacut can be
brought under irrigation immediately.
Performance Budget 2017-18 207 Water Resources Department
In the meeting held on 26.11.2015, the government had decided
to entrust KIIDC with the implementation of this work and accordingly
KIIDC had submitted a proposal for Rs. 1,39,30,300.00 for the
„Construction of Ezhuthonipadam Aqueduct Between Ch.18220m to
18275.50m of Ettumanoor Branch Canal over Railway Crossing at 44/9-
10 Km.-Between Kuruppanthara and Ettumanoor‰. Based on this
proposal the government vide order G.O (Rt) No.95/2016/WRD dated
04.02.2016 have accorded administrative sanction for the balance work
„Construction of Ezhuthonipadam Aqueduct Between Ch.18220m to
18275.50m of Ettumanoor Branch Canal over Railway Crossing at 44/9-
10 Km.-Between Kuruppanthara and Ettumanoor‰.
Now with close liaising and day today co-ordination with the railway
authorities the aqueduct portion above the electrified railway line is
complete and the work of the balance two spans are fast progressing and
the aqueduct will be ready for water distribution in the coming season
itself.
Performance Budget 2017-18 208 Water Resources Department
• the Development of Backwater Circuits in Alappuzha Backwater
region as a mega circuit in Kerala,
House Boat Terminal at Arookkutty - Project Cost - Rs216.47lakhs
House Boat Terminal at Thanneermukkom- Project Cost - Rs162.01
lakhs
House Boat Terminal at Pallathuruthy- Project Cost - Rs 95.32 lakhs
House Boat Terminal at Nedumudy - Project Cost - Rs96.68 lakhs
House Boat Terminal at Kanjipadam- Project Cost - Rs32.86 lakhs
House Boat Terminal at Thottappally- Project Cost - Rs108.61lakhs
House Boat Terminal at Kayamkulam- Project Cost - Rs783.07 Lakhs
Night halt Terminal at Vattakkayal West- Project Cost - Rs 1225.25
Lakhs
Night halt Terminal at Karumadivilakkumaram-Project Cost -
Rs85.04 Lakhs
Development of Micro destination at Thazhappu - Project Cost-
Rs138.06 Lakhs
Performance Budget 2017-18 209 Water Resources Department
Performance Budget 2017-18 210 Water Resources Department
Performance Budget 2017-18 211 Water Resources Department
Performance Budget 2017-18 212 Water Resources Department
• The Karapuzha Tourism Project.
Karapuzha Dam located in the Wayanad District of Kerala, is
one of the biggest earth dams in India. Karapuzha Dam is located in the
greenish and natural regions of Wayanad, Kerala on the Karapuzha River,
a tributary of the Kabini River. Construction on the dam began in 1977
and it was complete in 2004. The purpose of the dam is irrigation.
Karapuzha dam is a large irrigation dam set in a backdrop of
picturesque panorama of Wayanad Hills. The Dam's reservoir with
Performance Budget 2017-18 213 Water Resources Department
partially submerged hills & lush green islands is an ideal breeding ground
for aquatic birds.The view of sunset from the dam site is splendid and
serene view for the eyes. The major advantage of the dam is the easy
accessibility from all points in Wayanad which raises the need for
converting the dam as a tourist hub for the entire Wayanad District. It has
the potential to become a tourist hub due to its inherent profile and
attributes.
As per the order No. 5-PSW(41)/2011 dated 08/12/2011,
Government of India had accorded sanction for the implementation of the
project „Development of Karappuzha Dam site and Surroundings into a
major destination in Kerala‰ amounting to Rs. 492.03 lakhs. Based on
this Government of Kerala had issued the Administrative Sanction
amounting to Rs. 492.03 lakhs on 09.03.2012 vide its order GO (Rt) No.
1953 / 12 / TSM. Subsequently on 08.03.2013 Government vide GO
(Rt) No. 254 / 13 / WRD had issued the order entrusting KIIDC to
execute the work in respect of „Development of Karapuzha Dam site and
Surroundings into a major destination in Kerala‰.Accordingly the work is
complete with the following components.
• Tourist arrival cum Facilitation Centre
• Open air Theatre and Video Presentation Hall
• Souvenir and Spice Stalls
• Walkway and Parking area Paving
• Landscaping at Karapuzha
• Electrification and Area lighting at Karapuzha
This being tourism as well as an environmental friendly
scheme, the construction activities has been minimised and landscaping
works like Rose Garden, bamboo park etc were implemented.
The first phase of the tourism project was inaugurated by the
HonÊble Minister for Tourism on 21st May 2017 and the Rose Garden
was inaugurated by the HonÊble Minister for Water Resources on the same
day. Every weekend the dam is visited by more than 2000 tourists and on
working days also there is a tourist flow of more than 200 people. This
being the situation, the Government had formed a Tourism Management
Committee with the local MLA as Chairman and District Collector,
Performance Budget 2017-18 214 Water Resources Department
Wayanad and Executive Engineer, KRP Division, Kalpatta as members and
the 1st phase has been handed over to this Committee.
Considering the importance of the project The Tourism
Department has sanctioned the 2nd phase of the project with proposal for
integrated and effective utilization on Karapuzha Dam and surrounding
land at an estimated cost of Rs. 229 lakhs vide order no. G O (Rt) No.
3928 / 2014 / TSM dated 21.05.2014. The work is in progress and
nearing completion.
Performance Budget 2017-18 215 Water Resources Department
Performance Budget 2017-18 216 Water Resources Department
Performance Budget 2017-18 217 Water Resources Department
Performance Budget 2017-18 218 Water Resources Department
MANUFACTURING
The main focus of this PSU is to involve itself in the social service sector
as well as in the infrastructure development sector of the state which is
quite evident from the past and present projects undertaken by KIIDC.
� The KIIDC has established a water bottling plant at Malankara,
Idukki District. The plant was formally inaugurated in 24th August
2015. The packaged water bottles are brought to the market
under the brand name „Hilly Aqua‰. The Hilly Aqua project
makes affordable bottled drinking water available to the common
man at reasonable rates - one litre bottle at Rs. 15.00 and two
litre bottle at Rs. 20.00. This has been done to arrest the
Performance Budget 2017-18 219 Water Resources Department
uncontrolled price hike by the hundred and above private
manufactures in Kerala who are selling their products at Rs.
20.00and Rs. 35.00 for one litre and two litre bottles
respectively. We have to a great extent achieved our goal as there
has been no hike in prices for the last two years by the private
manufacturers and there are instances where the manufactures
have even reduced their prices.
PROJECT INITIATIVES DURING 2017 – 18.
PROJECT WORKS WITH KIIFB FUNDING.
Government vide its order No315/2016/Fin. Dated 08/08/2016 have
issued guidelines for ensuring necessary standardization and efficiency in
the preparation, processing and implementation of project proposals of
the various Departments, PSUs and other public agencies of the State
which have been permitted to avail of funding through KIIFB by
Government. As per this guideline eligible projects shall be those projects
which are identified in the Annual Budget. And for projects identified in
the Budget or Budget Announcements for inclusion under KIIFB
financing, the Administrative Department may issue the Administrative
Sanction directly without further consultation with Finance Department.
Now the Water Resources Department has included the following projects
for funding under KIIFB and the works that are being arranged under
KIIFB are:
Status report of works entrusted to kiidc which are being funded under kiifb
As on 01.10.2018
Sl.
No Name of project
Project
code Pro
ject
est
imat
e in
rs.
Cro
res
Budget speech – 2016 -17
Projects for which project reports prepared
01 Modernizing water transport in Alappuzha canals Tra003-01 108.00
Performance Budget 2017-18 220 Water Resources Department
02 Construction of groynes at ambalapuzha Wrd001-
01 45.55+
03
Construction of groyne field at kattoor from chainage
168.465 to 171.627 km (old c99.535 km ) at Alappuzha
District
Wrd001-
07 34.50+
04
Construction of 21nos groyne field at arattupuzha in
between chainage. 56.600 to 57.800 km at arattupuzha
grama panchayath in harippad constituency
Wrd001-
02 21.10+
05
Construction of 13 nos groyne field at pathiankara in
between chainage. 60.100 to 61.600 km at
trikkunnapuzha grama panchayath in harippad
constituency in Alappuzha District
Wrd001-
03 14.95+
06
Construction of 16 nos groyne field at vattachal in between
chainage. 53.400 to 55.200 km at arattupuzha grama
panchayath in harippad constituency
Wrd001-
04 20.20+
07 Chittoor - moolathara rbc - extension of moolathara right
bank canal from korayar to varattayar
Wrd010-
08 105.00
08 improvement works to anthakarathodu in thripunithura
municipality, Ernakulam District
Wrd010-
08 14.21
Budget speech 2017 - 18
Construction of 30 nos of regulators in 20 rivers – 600cr.
09.1 Construction of rcb upstream of perincheri kadavu across
kuttiady river (gulikapuzha) 57.00
09.2
Mrvp construction of regulator cum bridge across
meenachil river at koottanal kadavu in bharananganam
panchayath-
11.80
09.3 Construction of regulator at puzhankavu across kadalundi
river 12.80
09.4 Construction of rcb across kuppam river at kooveri
kattampally in chapparappadavupanchayat 31.50
09.5 Mrvp construction of mini dam cum regulator at
chempilavu in kidangoor panchayath- 10.10
09.6 Construction of regulator across chaliyar river at
pannippara – pallimukku in edavanna panchayath 30.00
09.7
Construction of rcb across thoothapuzha at
keezhumurikkadavu - mothikkayam in moorkkanad
panchayath of Malappuram dist in mankada lac
70.00
09.8 Construction of rcb at kanka kadavu across bharathapuzha
in kuttippuram panchayath 100.00
The remaining rcbs are under different stages such as
investigation, design & draft dpr preparation
Performance Budget 2017-18 221 Water Resources Department
QUALITY CONTROL
KIIDC has already initiated steps to implement the Government Order
G.O(P) No. 590/15/Fin dated 28.12.2015 and Circular No. Insp-
Tech/16/2016/Fin dated 24.02.2016 of Finance (Inspection Wing-
Technical) Department with immediate effect. In continuation to this
KIIDC, has already conducted separate one day workshops for engineers
working under KIIDC as well as the Contractors and their supervisory staff
who have taken up and executing works under KIIDC.
PROJECT MONITORING UNIT
Presently in addition to the projects that are being handled by KIIDC, the
company has been designated as the agency to undertake many works
that are being funded by Kerala Infrastructure Investment Fund Board
(KIIFB). For these projects and for the projects to be taken up it is very
important that strict cost control as well as conformity to the time schedule
is adhered to. Hence proper Project Management from the day one of the
implementation of the projects is necessary. KIIDC has already procured
the requisite software ie. Primavera P6 for proper monitoring of the
existing projects. At present it is being done with the available staff at the
Headquarters of the Company. Now that KIIDC is venturing into more
and more mega projects, it is imperative that a proper Project
Management Unit is formed and made operative at the headquarters of
the Company with proper interlinking with site personnel for regular
monitoring of the progress of works.
Hence the Board of Directors of KIIDC have already accorded sanction for
the formation of a Project Monitoring Unit with expert staff in that field.
Audited Accounts of the Company.
The accounts of the Company have been audited upto 2013-14 and the
Annual Report enclosing the Audited Accounts of the Company for the
year 2013-14 is also prepared. The company has progressed to make a
profit of Rs. 13,93,107.00 during the financial year 2013 – 14. Revenue
from operations have also shown a hike compared to previous year. There
Performance Budget 2017-18 222 Water Resources Department
has been a marked growth in fixed assets also. The statutory audit for
year 2014-15 is completed and for the year, 2015-16, is in progress.
In the budget for 2017-18 Government have not allocated any
amount for utilization by KIIDC.
The Company had been constituted with an equity capital of Rs. 10
crores and the paid up equity capital of the Company is Rs. 10 crores.
Performance Budget 2017-18 223 Water Resources Department
CHAPTER –II
FINANCIAL OUTLAYS AND QUANTIFIABLE DELIVERABLES.
1. 4702-00-101-76- Micro Irrigation projects for efficient utilization of
water resources in the Pambar Basin.
Objective: The sustainable development of water resources for the
water security of Kanthaloor Panchayath in Idukki
District.
Outcome: Participatory Rural Appraisal has been completed.
Plan Budget allocation: Nil
Proposed Deliverables: Source Development by Minor Irrigation
wing of Irrigation Department + micro irrigation in the
ayacut available under this source is to be developed.
Remarks: The following components are proposed under this
scheme.
SITE 1 - KEZHATHOOR VILLAGE DRIP IRRIGATION SCHEME
1. CHECK DAM - Rs. 93,40,000.00.
2. Laying HD pipe main line - Rs. 10,60,000.00.
3. Storage Tank and Sub tanks. - Rs. 15,00,000.00.
4. Drip irrigation for 100 acre - Rs. 100,00,000.00.
5. Community management - Rs. 3,00,000.00.
SITE 2 - SUB SURFACE DRIP IRRIGATION AT KOYAKKAD
SUGARCANE FIELD.
6. Construction of check dams -Rs. 33,00,000.00.
7. Drip irrigation for 20 acre - Rs. 20,00,000.00.
8. Community management - Rs. 0.60,000.00.
SITE 3 - CHECK DAM AT KUTHURA AREA NEAR VETTUKADU
9. Construction of check dams -Rs. 64,40,000.00
10. Drip Irrigation for 40 acre - Rs. 40,00,000,00.
11. Community management - Rs. 1,20,000.00.
Performance Budget 2017-18 224 Water Resources Department
SITE - 4 - PERUMALAI KUDI
12. CHECK DAM - Rs. 98,60,000.00.
13. PRA and formation of team of specialists -Rs 6,90,000.00
14. Consultancy charges of KIIDC (7%)-Rs. 13,30,000.00
---------------------------------
Total - Rs. 500,00,000.00
Of the above components 1,2,6,9&12 is entrusted with the
Minor Irrigation wing of Irrigation Department for source development.
Hence the components 3,4,5,7,8,10,11 & 13 amounting to Rs. 2 crores,
entrusted to KIIDC can be taken up for execution only after the
components 1,2,6,9&12 are taken up for execution by the Minor
Irrigation wing of Irrigation Department. Of the four Check Dams
proposed to be completed by Irrigation Department, the Check Dams at
Koyakkad & Kuthura are complete and the checkdams at Kezhathoor &
Perumalai are yet to be taken up. Out of the 610 acre proposed to be
brought under micro irrigation by the completion of these four schemes
only 60 acres can be brought under micro irrigation by the presently
completed two checkdams. Hence KIIDC has not started the work.
Further there is no allocation of funds for the last three years.
2. 4702 – 101 – 72 – Sustainable Management of Water Resources
for Water Security in Vattavada Panchayat
1. Objective: The sustainable development of water resources for
the water security of Vattavada Panchayath in Idukki District.
2. Outcome: Survey work completed. The development of source
improving is almost complete. Installation of three steel tanks of 3
lakh litre capacity has been completed. Laying of main and sub –
main pipes and fixing of laterals in progress.
3. Plan Budget allocation: nil.
4. Proposed Deliverables: Source Development + micro irrigation
in the ayacut available under this source that is being developed.
Remarks: In the budget for 2014-15 there was no allocation of funds
and in the SDG for 2014-15 (July 2014) a token provision was granted
Performance Budget 2017-18 225 Water Resources Department
under this head of account to satisfy ÂNew Service ProcedureÊ.
Authorisation of Additional Expenditure vide G O (Rt) No. 7878 / 2014 /
Fin dated 17. 10. 2014 for Rs.50,00,000/- was sanctioned. An
expenditure of Rs. 38,46,765.00 was incurred and the balance amount of
Rs. 11,53,235.00 has been posted under the ELA. In the budget for
2014-15 there was no allocation of funds and no funds were allotted
under SDGs also. Hence funds to the tune of Rs. 11,53,235.00 could
not be used. There was a physical progress of nearly 60% during 2015-
16, but the bills of contractors amounting to Rs. 4.90 crores was not been
paid as there was no budget allocation. Subsequently during 2016-17 an
amount of Rs. 4.90 crores was allocated. Arrangement of works related to
water lifting is necessary for the utilisation of water source improvement,
erection of storage tanks and micro irrigation lines already completed. An
amount of Rs. 316.50 lakhs is required for completion of the scheme and
there is no budget allocation during the financial year 2017-18 and 2018-
19.
Performance Budget 2017-18 226 Water Resources Department
Na
me
of
De
pa
rtm
en
t: K
IID
CR
up
ee
s in
La
kh
s
Sl
No
Na
me
of
sch
em
e/P
rog
ra
mm
e
Ob
ject
ive
/ou
tco
m
e
Qu
an
tifi
ab
le
De
liv
era
ble
s /
Ph
ysi
cal
ou
tpu
ts
Ta
rge
t
Ach
iev
ed
Pro
ject
ed
Ou
tco
me
s
Pro
gre
sse
s
/Tim
eli
ne
s
Re
ma
rks/
Ris
k F
act
or
12
35
67
89
4 (
i)4
(ii
)4
(ii
i)4
(iv
)
No
n P
lan
Bu
dg
et
Pla
n B
ud
ge
tC
om
ple
me
nta
ry
Ext
ra B
ud
ge
tary
Re
sou
rce
s
Ce
ntr
al
Ass
ista
nce
if
an
y
14
70
2-0
0-1
01
-
76
- M
icro
Irri
gati
on
pro
jects
for
eff
icie
nt
uti
lisa
tion o
f
wate
r
reso
urc
es
in
the P
am
bar
Basi
n
Ob
jecti
ve:
the
sust
ain
ab
le
develo
pm
ent
of
wate
r re
sourc
es
for
the w
ate
r
securi
ty o
f
Kanth
alo
or
Panchayath
Ou
tco
me:
PR
A
com
ple
ted
.
-N
on
e-
No
ne
So
urc
e D
ev
elo
pm
en
t
by
Min
or
Irri
ga
tio
n
win
g o
f Ir
rig
ati
on
De
pa
rtm
en
t +
mic
ro
irri
ga
tio
n i
n t
he
ay
acu
t a
va
ila
ble
un
de
r th
is s
ou
rce
tha
t is
be
ing
de
ve
lop
ed
.
Wo
rks
on
th
e
de
ve
lop
me
nt
of
sou
rce
s b
y
Min
or
Irri
ga
tio
n
win
g o
f
Irri
ga
tio
n
De
pa
rtm
en
t
in p
rog
ress
.
Ste
ps
be
ing
tak
en
fo
r
imp
lim
en
tati
on
of
the
sch
em
e
Th
e c
om
po
ne
nts
1,2
,6,9
&1
2 e
ntr
ust
ed
wit
h t
he
Min
or
Irri
ga
tio
n w
ing
of
Irri
ga
tio
n D
ep
art
me
nt
is f
or
sou
rce
de
ve
lop
me
nt.
He
nce
th
e c
om
po
ne
nts
3,4
,5,7
,8,1
0,1
1 &
13
am
ou
nti
ng
to
Rs.
2 c
rore
s, e
ntr
ust
ed
to
KII
DC
ca
n b
e t
ak
en
up
fo
r e
xecu
tio
n o
nly
aft
er
the
co
mp
on
en
ts 1
,2,6
,9&
12
are
tak
en
up
fo
r e
xecu
tio
n b
y t
he
Min
or
Irri
ga
tio
n w
ing
of
Irri
ga
tio
n D
ep
art
me
nt.
Of
the
fo
ur
Ch
eck
Da
ms
pro
po
sed
to b
e c
om
ple
ted
by
Irr
iga
tio
n D
ep
art
me
nt,
th
e C
he
ck D
am
s
at
Ko
ya
kk
ad
& K
uth
ura
are
co
mp
lete
an
d t
he
ch
eck
da
ms
at
Ke
zha
tho
or
& P
eru
ma
lai
are
ye
t to
be
ta
ke
n u
p.
Ou
t o
f th
e
61
0 a
cre
pro
po
sed
to
be
bro
ug
ht
un
de
r m
icro
irr
iga
rio
n b
y
the
co
mp
leti
on
of
the
se s
che
me
s o
nly
60
acr
es
can
be
bro
ug
ht
un
de
r m
icro
irr
iga
tio
n b
y t
he
pre
sen
tly
co
mp
letl
ed
two
ch
eck
da
ms.
He
nce
KII
DC
ha
s n
ot
sta
rte
d t
he
wo
rk a
nd
the
re i
s n
o a
llo
cati
on
of
fun
ds
to K
IID
C f
or
the
la
st t
hre
e
ye
ars
.
24
70
2 –
10
1 –
72
–
Sust
ain
ab
le
Managem
ent
of
Wate
r
Reso
urc
es
for
Wate
r
Securi
ty i
n
Vatt
avad
a
Panchayat
Ob
jecti
ve:
the
sust
ain
ab
le
develo
pm
ent
of
wate
r re
sourc
es
for
the w
ate
r
securi
ty o
f
Vatt
avad
a
Panchayath
Ou
tco
me:
Surv
ey w
ork
com
ple
ted
.
-N
on
e-
No
ne
So
urc
e D
ev
elo
pm
en
t
+ m
icro
irr
iga
tio
n i
n
the
ay
acu
t a
va
ila
ble
un
de
r th
is s
ou
rce
tha
t is
be
ing
de
ve
lop
ed
.
Wo
rks
on
th
e
de
ve
lop
me
nt
of
sou
rce
imp
rov
em
en
t
alm
ost
com
ple
te,
ste
el
sto
rag
e
tan
ks
ha
ve
be
en
se
tup
an
d m
icro
irri
ga
tio
n
wo
rks
in
pro
gre
ss.
Ste
ps
be
ing
tak
en
fo
r
imp
lim
en
tati
on
of
the
sch
em
e
In t
he b
ud
get
for
20
15
-16
there
was
no a
llocati
on o
f
fund
s and i
n 2
01
6-1
7 a
n a
mount
of
Rs.
4.9
0 c
rore
was
all
ocate
d.
Ou
tla
y 2
01
6-1
7
4
An
ne
xu
re -
1
No
te:
Ite
ms
in c
olu
mn
2 s
ha
ll b
e a
s p
er
De
tail
ed
Bu
dg
et
Est
ima
tes.
Ma
jor
Pro
gra
mm
es
list
ed
in
th
e D
eta
ile
d B
ud
ge
t E
stim
ate
s a
nd
Pla
n w
rite
up
ma
y b
e s
ho
wn
se
pa
rate
ly w
hil
e s
ma
lle
r it
em
s m
ay
be
co
nv
ine
ntl
y c
lub
be
d
FO
RM
AT
OF
TA
BLE
S I
N C
HA
PT
ER
II
OF
PE
RF
OR
MA
NC
E B
UD
GE
T 2
01
7-1
8
Per
form
ance
Bud
get 2
017-
1822
7W
ater
Res
ourc
es D
epar
tmen
t
Chapter- III
REFORM MEASURE AND PERFORMANCE.
1. KIIDC is an ISO 9001:2005 certified Company for promotion
and development of various irrigation and water supply projects
in the State and execution of projects entrusted and funded by
various government Departments / public sector undertakings /
autonomous bodies / cultural and other institutions / universities
& colleges / welfare fund board / co-operative organizations /
development authorities / local self-government bodies /
devaswom boards / central government institutions etc.
2. With the Government support, KIIDC have already setup a
drinking water bottling plant at Thodupuzha in Idukki. This
Endeavour has been initiated by KIIDC to safeguard the policy
of the Government to make available the best quality water at
affordable rates to public. Now 300 ml, 1000ml and 2000ml
water bottles branded „Hilly Aqua‰ are being made available to
the public at Rs. 10, Rs. 15.00 and Rs. 20.00 per bottle
respectively. This Hilly Aqua packaged drinking water bottling
plant has already been certified as a ISO 22000:2005 Certified
Company for processing of raw water to packaged drinking
water and all related activities.
3. Right from 16.08.2012 when the first tender was published,
KIIDC has been following the e-tender system and has till now
published more than 220 tenders. A global tender as well as an
auction tender were published under e-tender system. By this
KIIDC has maintained strict transparency in the tender process
system.
Performance Budget 2017-18 228 Water Resources Department
Chapter- IV
DETAILS OF PROJECTS RECEIVED / ONGOING / COMPLETED
DURING 2017-18.
Sl
No
Name of work Department Amount of
contract in
Rs. Lakhs
Remarks
1a
Arrorkkutty-house boat terminal Tourism Department 216.47 Completed
1b Micro destination-thazhappu Tourism Department 138.06 Completed
1c Kayamkulam houseboat terminal Tourism Department 783.07 Completed
1d Pallathuruthy house boat terminal Tourism Department 95.32 Completed
1e Thanneermukkom house boat terminal Tourism Department 162.01 Completed
1f Thottappally house boat terminal Tourism Department 108.61 Completed
1g Nedumudi house boat terminal Tourism Department 96.68 Completed
1h Kanjippadam house boat terminal Tourism Department 32.86 Completed
1i Karumadi vilakkumaram hb terminal Tourism Department 85.04 Completed
1j Vattakkayal house boat termianl Tourism Department 1225.25 Completed
2 Pandanad tourism development Tourism Department 149.00 Completed
3 Karappuzha tourism hub - phase i Tourism Department 492.03 Completed
4 Karappuzha tourism hub - phase ii Tourism Department 229.00 Completed
5 Kappil tourism Tourism Department 409.00 Completed
6 Thirunelly tourism development Tourism Department 150.00 Completed
7 Pallikunnu,chundel, cheeyambam church Tourism Department 150.00 Completed
8 Pallikunnu,chundel, cheeyambam church-
phase ii
Tourism Department 50.00 Completed
9 Development of tourism infrastructure at
gonginikkari inkumarakom, kottayam
Tourism Department 75.00 Completed
10 Development of tourism in the pilgrim
circuit at st.george's church of
kolathuvayal in kozhikode
Tourism Department 30.00 Completed
11 Additional tribal special plan pulpally
comprehensive work
11a Basavanakolly colony Tribal Welfare 135.48 Completed
11b Melekkappu paniya & kattunaika colony Tribal Welfare 104.68 Completed
Tribal hamlet Completed
12 Puthussery alakkal colony Tribal Welfare 100 Completed
13 Pancharakolly colony Tribal Welfare 100 Completed
14 Kallumuttomkunnu-thupparimoola Tribal Welfare 100 Completed
15 Chakkampadi & vattathuvayal Tribal Welfare 100 Completed
16 Oomman chandy colony Tribal Welfare 100 Completed
17 Nadukani thumbichi colony Tribal Welfare 100 Completed
18 Kozhimala colony Tribal Welfare 100 Completed
Performance Budget 2017-18 229 Water Resources Department
19 Infrastructure development in
akkolikkunnu,
mannundi,beppanamala,ambedkarandpe
edikkunnu colonies of wayanad
Tribal Welfare 177.02 Completed
20 Development of infrastructure in
connection with development of roads in
mangalasserymala scheduled tribal colony
and valaramkunnu colony in
vellamundapanchyathwayanad District
Tribal Welfare 172.34 Completed
Hada Completed
21 Muttilcheckdam in wayanad District HADA 75.00
Completed
Agricultural Department Completed
22 Wayanad package Agriculture
Department
500.00
Completed
Urban environment improvement project Completed
23 Ueip Environment 1005.00 Completed
24 Ueip Environment 400.00 Completed
25 Ueip Environment 350.00 Completed
26 Construction of steel sheet check dam
acroos bharathapuzha at mannanur in
vaniyamkulam
Water Resources 489.40 Completed
27 Formation of manjjor distributory pipe
line crossing at 42/700-800 km
Water Resources 58.50 Completed
28 Construction of check dam at
kallakkayam in kadalundy river
Revenue 366.00 Completed
29 Construction work of cultural complex
and conventon center at chamravattom
Tourism Department 360.00 Completed
Works arranged
30 Construction of pathway at chungam Tourism Department 92 Tender
Stage
31 Modernising water transport in
alappuzha canals
KIIFB 4285.39 Tender
Stage
32 Modernising of andhakarathodu KIIFB 1105 Tender
Stage
Ongoing works
33
Institute of hotel management and
catering technology , pala
Tourism 1600.00 In Progress
34 Development of tourism infrastructure at
kumarakom, kottayam
Tourism 977.00 In Progress
Rural development Department
35 State institute of rural development,
kottarakkara
Rural Development 200.00 In Progress
36 Construction of ezhuthonipadam
aqueduct between ch;18220 & ch;
18275.50m
WRD 130.17 In Progress
Performance Budget 2017-18 230 Water Resources Department
37 Sustainable management of water
resources for water security in vattavada
panchayat
WRD 815.00 In Progress
38 Sustainable development of water
resources for the water security of
kanthalloor panchayath
WRD 200.00 In Progress
39 Construction work of cultural complex
and convention centre at chamravattom
Tourism 160.00 In Progress
40 Pipe line network for etp in mega food
park at igc cherthala
KSIDC 200.00 In Progress
41 Construction of eco lodge at peerumed Tourism 505.00 In Progress
42 Construction of eco lodge at idukki Tourism 505.00 In Progress
43 Construction of cultural center and
bamboo hut at kadammanitta
Tourism 127.00 In Progress
44 Beautification changanacherry boat
terminal
Tourism 100.00 In Progress
45 Karappuzha tourism hub - phase iii Tourism 400.00 In Progress
46 Additional work at alappuzha house boat
terminal
Tourism 97.00 In Progress
47 Construction of boat race terminal at
kumarakom
Tourism 55.00 In Progress
Performance Budget 2017-18 231 Water Resources Department
Na
me
of
De
pa
rtm
en
t: K
ea
la I
rrig
ati
on
In
fra
stru
ctu
re D
ev
elo
pm
en
t C
orp
ora
tio
n L
tdR
up
ee
s in
la
kh
s
Sl
No
Na
me
of
the
Sch
em
e /
Pro
gra
mm
e
Ob
ject
ive
/ou
tco
me
ou
tla
y 2
01
6-1
7E
xp
en
dit
ure
20
16
-17
De
liv
era
ble
s /
Ph
ysi
cal
ou
tpu
ts
Ach
iev
em
en
tR
ea
son
fo
r v
ari
ati
on
12
34
56
78
14
70
2-0
0-1
01
-76
-
Mic
ro I
rrig
ati
on
pro
jects
fo
r
eff
icie
nt
uti
lisa
tio
n
of
wate
r re
sou
rces
in t
he P
am
bar
Basi
n
Ob
jecti
ve:
the s
ust
ain
ab
le
dev
elo
pm
en
t o
f w
ate
r
reso
urc
es
for
the w
ate
r
secu
rity
of
Kan
thalo
or
Pan
ch
ay
ath
Ou
tco
me:
PR
A
co
mp
lete
d.
NIL
NIL
So
urc
e D
eve
lop
me
nt
by
Min
or
Irri
ga
tio
n
win
g o
f Ir
rig
ati
on
De
pa
rtm
en
t +
mic
ro
irri
ga
tio
n i
n t
he
ay
acu
t a
va
ila
ble
un
de
r th
is s
ou
rce
tha
t is
be
ing
de
ve
lop
ed
.
Wo
rks
on
th
e
de
ve
lop
me
nt
of
sou
rce
s b
y M
ino
r
Irri
ga
tio
n w
ing
of
Irri
ga
tio
n D
ep
art
me
nt
in p
rog
ress
.
Th
e c
om
po
ne
nts
1,2
,6,9
&1
2 e
ntr
ust
ed
wit
h
the
Min
or
Irri
ga
tio
n w
ing
of
Irri
ga
tio
n
De
pa
rtm
en
t is
fo
r so
urc
e d
eve
lop
me
nt.
He
nce
th
e c
om
po
ne
nts
3,4
,5,7
,8,1
0,1
1 &
13
am
ou
nti
ng
to
Rs.
2 c
rore
s, e
ntr
ust
ed
to
KII
DC
can
be
ta
ke
n u
p f
or
exe
cuti
on
on
ly a
fte
r th
e
com
ple
tio
n o
f th
e c
om
po
ne
nts
1,2
,6,9
&1
2
wh
ich
are
ta
ke
n u
p f
or
exe
cuti
on
by
th
e
Min
or
Irri
ga
tio
n w
ing
of
Irri
ga
tio
n
De
pa
rtm
en
t. O
ut
of
the
61
0 a
cre
pro
po
sed
to
be
bro
ug
ht
un
de
r m
icro
irr
iga
rio
n b
y t
he
com
ple
tio
n o
f th
ese
sch
em
es
on
ly 6
0 a
cre
s
can
be
bro
ug
ht
un
de
r m
icro
irr
iga
tio
n b
y t
he
pre
sen
tly
co
mp
letl
ed
tw
o c
he
ckd
am
s. H
en
ce
KII
DC
ha
s n
ot
sta
rte
d t
he
wo
rk a
nd
th
ere
is
no
all
oca
tio
n o
f fu
nd
s a
lso
.
24
70
2 –
10
1 –
72
–
Su
stain
ab
le
Man
ag
em
en
t o
f
Wate
r R
eso
urc
es
for
Wate
r S
ecu
rity
in V
att
av
ad
a
Pan
ch
ay
at
Ob
jecti
ve:
the s
ust
ain
ab
le
dev
elo
pm
en
t o
f w
ate
r
reso
urc
es
for
the w
ate
r
secu
rity
of
Vatt
av
ad
a
Pan
ch
ay
ath
Ou
tco
me:
Su
rvey
wo
rk
co
mp
lete
d.
Rs.
4,9
0,0
0,0
00
.00
R
s. 4
,90
,00
,00
0.0
0 So
urc
e D
eve
lop
me
nt
+ m
icro
irr
iga
tio
n i
n
the
ay
acu
t a
va
ila
ble
un
de
r th
is s
ou
rce
tha
t is
be
ing
de
ve
lop
ed
.
Wo
rks
on
th
e
de
ve
lop
me
nt
of
sou
rce
im
pro
ve
me
nt
alm
ost
co
mp
lete
, st
ee
l
sto
rag
e t
an
ks
setu
p
an
d m
icro
irr
iga
tio
n
wo
rks
in p
rog
ress
.
He
nce
no
exp
en
de
ture
du
rin
g 2
01
6-1
7.I
n t
he
bu
dg
et
for
20
17
-18
th
ere
is
no
all
oca
tio
n o
f
fun
ds
in t
he
bu
dg
et.
Th
ere
is
no
all
ocati
on
in t
he b
ud
get
for
the f
inan
cia
l y
ear
20
18
-
19
als
o.
Sta
tem
en
t o
f O
utl
ay
s /O
utc
om
es/
Ta
rge
t 2
01
6-1
7 a
nd
Act
ua
l A
chie
ve
me
nt
20
16
-17
PLA
N/M
AJO
R S
CH
EM
ES
An
ne
xu
re -
II
Per
form
ance
Bud
get 2
017-
1823
2W
ater
Res
ourc
es D
epar
tmen
t
Chapter – V
FINANCIAL REVIEW.
1. Investment in Public Sector and other Undertaking - 4700 - 80 -
190 - 99 - Kerala Irrigation Infrastructure Development
Corporation Ltd (KIDCO) – Investment.
Under this head of account an amount of Rs. 10.15 crores was
budgeted during 2013-14. Of this an amount of Rs. 9,78,86,400.00 was
utilised for enhancement of paid up share capital of KIIDC for setting up
of Packaged Drinking water Plant at Malankara to Rs. 10 crores during
2013-14 itself.
The accounts of the Company have been audited up to 2013-14 and
the audit for the financial year 2014 – 15, 2015 – 16 is in progress.
Performance Budget 2017-18 233 Water Resources Department
No
Sch
em
e/
pro
gra
mm
e
Ma
jor
He
ad
12
3
20
13
-14
20
14
-15
20
15
-16
20
16
-17
20
17
-18
20
13
-14
20
14
-15
20
15
-16
20
16
-17
20
13
-14
20
14
-15
20
15
-16
20
16
-17
20
17
-18
1In
ve
stm
en
t in
Pu
bli
c
Se
cto
r a
nd
oth
er
Un
de
rta
kin
g -
47
00
-
80
- 1
90
- 9
9 -
Ke
rala
Irri
ga
tio
n
Infr
ast
ruct
ure
De
ve
lop
me
nt
Co
rpo
rati
on
Ltd
(KID
CO
) -
Inv
est
me
nt
47
00
- 8
0 -
19
01
01
5-
--
10
15
--
97
8.8
64
--
-
24
70
2-0
0-1
01
-76
-
Mic
ro I
rrig
ati
on
pro
jects
for
eff
icie
nt
uti
lisa
tion
of
wate
r
reso
urc
es
in t
he
Pam
bar
Basi
n
47
02
-00
-10
15
00
NIL
NIL
NIL
50
0N
ILN
ILN
ILN
ILN
AN
A
34
70
2 –
10
1 –
72
–
Su
stain
ab
le
Man
agem
en
t of
Wate
r R
eso
urc
es
for
Wate
r S
ecu
rity
in
Vatt
avad
a P
an
ch
ayat
47
02
-10
1-7
2N
ILN
ILN
ILN
IL5
0N
ILN
IL3
8.4
67
65
N
IL4
90
NIL
Ru
pe
es
in L
ak
hs
An
ne
xu
re -
III
Tre
nd
s in
Ex
pe
nd
itu
re v
iz-a
-viz
Bu
dg
et
Est
ima
tes/
Re
vis
ed
Est
ima
tes
in r
ece
nt
ye
ars
PLA
N/N
ON
PLA
N
4
Bu
dg
et
Est
ima
tes
5
Re
vis
ed
Esi
ma
tes
Act
ua
l E
xp
en
dit
ure
6
Na
me
of
De
pa
rtm
en
t: K
ea
la I
rrig
ati
on
In
fra
stru
ctu
re D
ev
elo
pm
en
t C
orp
ora
tio
n L
td
Per
form
ance
Bud
get 2
017-
1823
4W
ater
Res
ourc
es D
epar
tmen
t
CHAPTER -VII
COMMENTS OF THE FINANCE DEPARTMENT
Kerala has an undulating topography with plain lands, valleys and
hills. The coastal line extends upto 580 Km in length. Kerala has 44
rivers, 27 backwaters, 7 lagoons, 16681 ponds and over 30 lakh wells as
per the data in the website of Kerala Irrigation Department. Rivers in
Kerala also functions as a drainage system during Monsoon season, the
rain water flow fastly through the rivers and tributaries due to the steep
slope between the western ghat and the Arabian Sea.
Kerala is sufficient with many river basins, out of which 13 basins
have an area more than 1000 Km2.There are many other basins which
have area less than 1000 Km2.Out of the 44 rivers, 10 rivers have a
length between 244 Km and 105 Km. All these 44 rivers drain to a total
of 3210 Km length along the state. The length of tributaries are not
available.
Kerala receives an average rainfall of 3107 mm which is about
thrice of all India average of 1197 mm. All the above factors making
Kerala sufficient in water resources.
Water Resources Department comprises Irrigation Department,
Ground Water Department, and three autonomous bodies- Kerala Water
Authority, Jalanidhi and Kerala Irrigation Infrastructure Development
Corporation (KIIDC). These agencies perform various functions to
preserve the Water resources, to give irrigation facilities and to supply pure
drinking water at every nook and corner of the state.
Chief Engineer, Irrigation and Administration is the Head of the
Irrigation Department. Administration of the Department, Inter State
water sharing, Minor Irrigation works, Salt water exclusion, Inland water
transport, Flood control and Coastal zone management etc are under his
control. Besides, Project I (cauvery cell), Project II, Kuttanad Package and
Irrigation Design and Research Board (IDRB) are functions under other
four Chief Engineers of Irrigation Department.
Performance Budget 2017-18 235 Water Resources Department
The Ground Water Department is also under the control of Water
Resources Department of the state, which started as an independent
Department in 1978. Now it is the nodal Department in the state for the
monitoring and management of the ground water. The Director is the
head of the Department and 14 District offices functions under him.
Kerala Water Authority was established on 1st April 1984 under
the Kerala Water and Waste Water Ordinance, 1984 by converting the
erstwhile Public Health Engineering Department to provide for the
development and regulation of water supply and waste water collection
and disposal in the state of Kerala. The ordinance was replaced by the
Kerala Water Supply and Sewage Act 1986. Managing Director is its
head. The Head Quarters situate in Thiruvananthapuram. Chief Engineers
are the head of regional offices at Thiruvananthapuram, Kochi and
Kozhikode. Another three Chief Engineers control three wings in Water
Authority. KWA has about 465 filed offices and around 9000
employees
Jalanithi or Kerala Rural Water supply and sanitation Agency (KRWSA)
is another autonomous body functioning under Water Resources
Department. It has been promoting mainly small water supply schemes
and a few large surface water based, drinking water supply schemes in the
rural villages.
The Kerala Irrigation Infrastructure Development Corporation Ltd
(KIIDC) is a wholly owned company of Govt of Kerala formed for the
promotion and development of medium and large scale irrigation and
water supply projects units in the state. At present KIIDC Ltd has been
entrusted with works related to civil works, irrigation works, environmental
support works etc by different Departments of Government.
The plan outlay provided for Irrigation and flood control during
2017-18 was Rs.676.21crores. Out of which Rs.413.23 crore was
earmarked for „Major and Medium Irrigation‰ and 208.56 crore was
provided for „Minor Irrigation‰ works. Total plan outlay during 2017-18
for KRWSA (Jalanidhi) was Rs.379.69 crore and for Kerala Water
Authority was Rs.678.55 crore. The team visited and evaluated some
Performance Budget 2017-18 236 Water Resources Department
selected offices and selected new schemes from about 60 schemes under
Water Resources Department. In previous financial year, the team
evaluated 9 schemes and some non-plan works under Minor Irrigation and
Water Authority. Unexpected devastating flood and rain witnessed during
the year affected the visits of the team. Also almost offices of Irrigation
Department are in the pressure of flood management works. Hence the
evaluation of plan schemes of Water Resources Department confined to
five schemes during this Financial Year. Evaluation notes of the selected
team may be seen below:
COASTAL ZONE MANAGEMENT
1. Plan Outlay : Rs.42.00 lakh
2. HOA : 4711-02-103-99 (Plan)
2711-02-103-99(Non Plan)
3. Component Examined:
ASE Work – Renovation of Sea wall for a length of 40m from
Chavara 29.350 km to 29.390 km near IRE Mining Area at Karithura in
Chavara Constituency.
4. Name of Office : Irrigation Sub Division, Chavara.
5. Date of Visit : 10/07/2018
6. Plan Objectives :
The budgetary support made available under the head „Anti-Sea
Erosion‰ is being utilized for construction of new sea wall and reformation
of old Sea Wall. The total coastal line identified as vulnerable for
erosion/accretion in Kerala is 478 Km. Out of this, 316 km of Sea Wall
has been newly constructed using State funds and Central funds in Kerala.
The balance length of the sea coast need to be protected on a priority
basis. Moreover, the stabilization of the structure requires proper and
timely maintenance and repair. And it is proposed to utilize modern
technologies like geo-textiles, polyethylene fabrics/sheets and nourishment
Performance Budget 2017-18 237 Water Resources Department
of foreshore with bio materials for coastal protection. Already
constructed seawall under 12th and 13th Finance Commission requires
constant reformation and this comes to 164 km. As per the plan objective
during 2017-18, these works have to be arranged on a priority basis.
7. Social & Economical Significance :
The sea wall constructed near Indian Rare Earth Limited for
protection was very vulnerable due to heavy sea attack during monsoon
periods in the last many years. A good portion of the coastal land has
been washed off and many coconut trees were uprooted due to the heavy
sea attacks in past years. During high tide times, sea water was over
topping the damaged sea walls and entered into the main land, causing
threat to the life and properties of the poor local inhabitants. By reforming
the damaged sea walls to its original design levels overtopping of sea water
during high wave attack could be restricted. The reformation of the sea
wall is done with the clear objective of protecting the life and properties of
the poor fisherman community in this coastal belt.
The stretch of sea coast along Karithura is one with national
importance for the availability of rare sand rich in minerals for industrial
and nuclear related purposes. The famous public Limited Company „Rare
Earth Limited‰ is situated very near to the Karithura sea coast. Apart from
the importance of richness of precious sand availability, the fisherman
community contributes their livelihood, fishing in Arabian Sea. The
protection of sea coast in Karithura will provide a feel of security in the
minds of fishermen.
8. Constraint/Risk Factors
(a) Major item in this type of work is 200 dm3 stones (weighing
574 Kg). The handling of the high weighted stone is a risk factor because
there is a chance of accident. For avoiding such causality workers are
deployed at the site for the job. Qualified site supervisors on behalf of the
contractors are also ensured to perform the work in safe manner. This is
one of the obligations of the contractor as per agreement. Experienced
and trained Department officials are needed to be deployed at sites to
supervise the works.
Performance Budget 2017-18 238 Water Resources Department
(b) Since the work is being carried out in front of the sea, chances
for casualty due to slippage of workers and supervisors from the top of
stones, falling of stones from existing sea wall etc are high. These types of
casualty are to be avoided by implementing proper brakes during
execution. Off season period during the peak of monsoon is also enforced
as per the present rules for AISE workers. Close supervision from the side
of the contractor and the Department are also ensured for the safety
during high wave attack.
(c) This work is done to reform the sea wall for a length of 40 m
only. Actually the length of damaged sea wall in Karithura stretch is more
than 1.5 km. Out of the total 1.5 km, only 40 metre length is constructed.
The reason for the short length is due to non availability of funds for this
type of scheme. Assistant Executive Engineer of Irrigation Sub Division
opined that if enough funds are available, the entire damaged stretch could
be reformed, thereby safety of the entire Karithura coastal area may be
ensured.
9. Observation of Finance Department:
The total plan allocation for the scheme „Coastal Zone
Management‰ during 2017-18 was Rs. 42 lakh. But Rs 2449.02 was
allotted as Additional Authorization out of which Rs 1860.5 lakh was
expended. Physical target achievement during the financial year was 54-
84 km of the coastline.
The team visited the Irrigation Division Chavara on 10th July 2018.
„Reformation of seawall‰ for a length of 40 km
„Reformation of Seawall‰ for a length of 40m from Chavara
29.350 Km to 29.390 Km near IRE Mining area at Karithura in Chavara
Constituency is a non plan-work constructed under the head „2711-02-
103-99‰. The estimate cost of this work was Rs 15 lakh only. Sea attack
is very severe in this area. The inhabitants in the area are poor fishermen
and their houses situates very close to the sea. Since the existing structure
of the sea wall is damaged, sea water is overtopping the sea wall and
water enters into the nearby houses and the topsoil in this stretch of
coastal land started washed away. The officials of the Irrigation Sub
Performance Budget 2017-18 239 Water Resources Department
Division informed that this condition caused real threats to the life and
properties of the local people.
This work consists of 3 component
(a) Core 20 to 40 dm3 stones- Rs.104535/-
(b) Core 45 dm3 stones -Rs.155643/-
1. Armour 200 dm3 stones - Rs.10,83,097/-
Total expanded amount for its construction was Rs.13,42,312/-
The team has sought feedback from the fishermen who were the
inhabitants of the area. They constructed home very close to the sea
coast, are fearless and informed that natural fence formed beside the coast
is efficient to defend the sea wave attack. But the construction of sea wall
is inevitable, because it protect the natural fence from the direct attacking
of the sea waves.
The officials shared their concerns that the construction of only
40m is not a remedy for the existing issue. The length of actual sea wall in
Karithura is more than 1500m. The reason for the short length is due to
non availability of funds for this types of schemes. If enough fund is
available, the entire damaged stretch could be reformed, thereby safety of
the entire Karithura coastal area could have been ensured. Total vulnerable
sea coast under the Sub Division is about 4.65Km. Sea coast in areas like
Parimanam, Shakthikulangara, Neendakara etc are need maintenance
works to ensure the protection of the sea coast. As per the views of
officials, the reformation of all the sea wall at a time only will give the
proper result. The team visited the site, and saw the sea wall beyond the
reformation which is in a demolished stage and powerful waves move to
the coast and spread towards the constructed structure with great
pressure, which will affect its strength.
10. Suggestions of Finance Department
Kerala is just 1.2% of the total area of India which lies as a narrow
stretch of low land between the Arabian Sea and the Western Ghat with a
570 km long Coast line. The protection of coastline of Kerala is very
Performance Budget 2017-18 240 Water Resources Department
important which revealed at the time of Tsunami that crashed against
India's South Eastern Coast line and killed thousands on December
26,2004. The Green House Effect has been creating climate changes is
a cause of the chaos due to irregular winds, intensified rainfall, increased
sea attack and extreme sea erosions. The importance of Coastal
Management is a reality. Provision for this purpose is only Rs. 42 lakh is
not justifiable. Expenditure towards this was more than 18 crore which is
obtained through additional authorization. In the meeting held on
26/06/2018, the officials of Chief Engineer Office, I &A remarked on
the essentiality of increasing the allocation for this purpose. Considering
the emergency nature of this work, the proposal for enhancing the budget
provision may be considered.
(2) The officials of Irrigation Sub Division, Chavara has reported
about the shortage of stones in Kollam District. The number of quarries
are reduced. 200 dm3 stones are not available in existing quarries which
need more labour cost and money for shaping it. Considering the
environmental impacts, the possibility of starting new quarries should not
be encouraged. The possibilities of modern technologies like Geo Textiles,
Polyethylene Fabrics/Sheets and nourishment of foreshore with bio
materials for coastal protection should be sought as per reference in the
plan write up. The possibilities of concrete sea wall or natural barrier such
as mangroves, coral reefs or coastal vegetation should also be considered.
1. Name of the Scheme : LIFT IRRIGATION
2. Plan Outlay : Rs.1200 Lakh
3. HOA : 4702-00-101-73-01-00
4. Name of the Office : Minor Irrigation Sub Division, Thiruvalla &
Minor Irrigation Sub Division, Chittoor
Date of Visit : 13/07/2018, 04/08/2018
5. Plan Objective :
Lift Irrigation Scheme are using to lifting of water by mechanical
means for irrigating mostly for paddy fields having a command area of
Performance Budget 2017-18 241 Water Resources Department
not less than 40 Ha. Rivers or canals are using for sources of the scheme.
Under the Water Resources Department, there are about 442 lift irrigation
schemes, which are used for agriculture. Also an ayacut area of around
42000 Hectres (42,848.07) has been achieved by the various lift irrigation
scheme in the state.
The State Food Security Project has been launched during 2008-09
for augmenting rice production in the State. But a large number of lift
irrigation schemes are not functioning. A comprehensive project has been
initiated during 2005-10, under State Food Security Project and Malabar
package to rehabilitate Lift Irrigation Schemes.
The outlay provided is to meet the expenditure for new works and
for meeting the spill over commitments. Out of the total outlay, an amount
of Rs.700 lakh is set apart to complete the balance rehabilitation works of
Lift Irrigating Schemes taken under Malabar Irrigation Package and also
for renovating and repairing the defunct Lift Irrigating schemes. The
carried out works are repairs or replacement of pumps, electrical
installations, repairs to pump houses, pipe systems etc.
6. The Social and Economical Significance:
In Palakkad District, there are many projects like Chitturpuzha,
Malampuzha and Mangalam which are the main sources of irrigation and
Lift Irrigation Schemes are just a supplement. Under Minor Irrigation,
there are 41 numbers of lift Irrigation schemes which cater to 4815.82
Ha of ayacut areas in which 4000 Ha plus are Paddy Cultivation. The Lift
Irrigation scheme of Vazhapuzha Lifts water from Seetharkundu Thode
and Irrigates 69 Ha of Paddy fields. These areas are fully irrigated for
both first and second crops by the Lift Irrigation scheme. Many of the Lift
Irrigation Schemes in Palakkad Districts are fed from the Bharathapuzha
and Thoothapuzha in the western part of the District which does not
come under the ayacut of any major projects. These Lift Irrigation
Schemes are keeping Palakkad as „the granary of Kerala‰. Lift Irrigation
Schemes also supply water to the water storage structures like wells and
ponds for drinking water purposes in summer.
Performance Budget 2017-18 242 Water Resources Department
Performance Budget Team visited at Minor Irrigation Sub Division,
Thiruvalla on 13/07/2018. The works were on final stage of completion.
Under Minor Irrigation Sub Division Thiruvalla, there are 21 Lift Irrigation
Schemes are functioning. It is informed that the total ayacut area of the
total schemes are 1767 Ha. The officials assured that the Lift Irrigation
Schemes have great potential to increasing water availability for the
agriculture and thereby improving the agricultural productivity. It can
improve the ground water recharge to the nearby wells through which an
additional irrigation potential is also created. It will attract farmers to
cultivate different crops of vegetable, paddy etc which will increase the
productivity and income of farmer and cause the development of the
region.
7. Components Examined:
Finance team examined three rehabilitation works of Lift Irrigation
Schemes under Minor Irrigation Sub Division, Thiruvalla and Chittoor.
1.Rehabilitation of Lift Irrigation Schemes:Keezhvaipur No.1 Lift Irrigation
Station in Mallappally Panchayat:
The estimate cost of the Lift Irrigation Scheme is Rs. 25 Lakh. This
Lift Irrigation scheme is situated in Mallappally Gramapanchayat in
Pathanamthitta District and the scheme is aimed to irrigate water for an
ayacut area of 20 Ha by lifting water from Manimala river using pump and
motor and distributing through network of canals. Length of canal system
is 1470m and it was damaged at various points. The aim of this work is to
revamp the entire system by constructing new pump house with provision
of maintenance to the damaged canal system. There was an existing
pump house which was situated at the river bank in a height of more than
5 metres from the normal water level of Manimala river. A three storied
pump house has constructed for the purpose of lifting the motor to the
second floor to avoid periodical conveyance after pumping season.
Agreed PAC of this work is Rs.25,53,146/- and date of commencement
of this work was on 20/10/2017. Only 10% of this work is completed as
on 31/08/2018.
Performance Budget 2017-18 243 Water Resources Department
(2)Rehabilitation of lift Irrigation Scheme- Keezhvaipur No.2 Lift
Irrigation Station of Mallappally:- This scheme is also situated in
Mallappally. This scheme is aimed to irrigate water to an ayacut of 15 Ha
by lifting water from Manimala river. Length of the canal is 1967m.
Agreed PAC of this work is Rs.24,98,372/- . Date of commencement of
this work was on 19/10/2017. 85% of the work has completed as on
31/08/2018.
3.Rehabilitation of Lift Irrigation scheme at Vazhapuzha in Kollengode
Grama Panchayat:
The lift irrigation scheme at Vazhapuzha is one of the major
schemes in Venkalakayam section. It situates in Kollengode Grama
Panchayat. It irrigates an ayacut of 60 Ha Paddy field for first and second
crops. The scheme was constructed about 27 years back and the canal of
many portions are damaged and water entering into fields and hence
sufficient water is not reacting to the tail end portions. The side bunds are
also eroded.
8. Observation of Finance Department
The team visited Minor Irrigation Sub Division, Thiruvalla on 13th
July and Chittoor on 4th August 2018. Keezhaipur No.1 Lift Irrigation
Station provides irrigation facility to about 20 Ha ayacut area of the west
part of Thekke Bhagum, Padasekharam. About 21 farmers are benefitted
by the scheme. The ayacut area of the Keezhvaipur No.2 Lift Irrigation
station in Mallappally Panchayat is 15 Ha, which is beneficial to 19
farmers of east part of Thekke Bhagum Padasekharam and Paduthodu
Padasekharam. Irrigated water is used for the cultivation of paddy and
vegetables. Both paddy fields were not cultivated during the last three
years due to the deficiency of irrigation facilities.
In Chittoor, the team visited the field of Vazhappuzha Lift Irrigation
scheme. About 69 Hectre area of paddy fields are under cultivation. Out
of total estimated cost of the Rs.8 lakh, major portion is expended for
protection works of side wall of canal.
Performance Budget 2017-18 244 Water Resources Department
9. Suggestions/Recommendation of Finance Department:
1. In Thiruvalla, there are 26 Seasonal Labour Roll employees are
used for pumping duties of 21 Lift Irrigation Schemes. Mr.Srilal, former
Secretary of Thekkebhagum Padasekhara Samithi, opined that they are
not able to receive irrigated water till the month December. Pumping
usually starts only from the month of December. The office head should
earnestly use the workers force (Seasonal Labour Roll employees) for
providing water for irrigation at any time they are needed.
(2) At the same time, in Minor Irrigation Sub Division, Chittoor,
there are Nine lift irrigation schemes are controlled by five daily wage
workers and two Seasonal Labour Roll workers. Out of 9, only seven Lift
Irrigation Schemes are in working condition. Ayacut area of 3 schemes
are above 100 Ha and 3 schemes have ayacut area between 50-100 Ha.
In Thiruvalla, almost schemes have very low ayacut area which comes
below 30 Ha. The shuffling of daily wages/SLR workers from excess to
deficient area is essential.
3. Lift Irrigation schemes are intended for an ayacut area not less
than 40 Ha as per the plan write up. Team examined a scheme in
Thiruvalla which have an ayacut area of only 15 Ha. The expenditure per
Hectares for each scheme should be examined. If the expenditure is very
high, a suitable new scheme should be introduced there after a feasibility
study.
4. In Thiruvalla, half of the amount of the total estimate of two Lift
Irrigation Schemes are used for the construction of a three storey pump
house for keeping the motor. Till the construction of the building, the
motors of lift irrigation were kept in Kottadu store during non season
period. Construction of Pump House should be restricted to the Lift
Irrigation Schemes below an ayacut area of 40 Ha.
Performance Budget 2017-18 245 Water Resources Department
1. Name of the Scheme : MINOR IRRIGATION CLASS- I
2. Plan Outlay : 12400 Lakh
3. Head of Account : 4702-00-101-93
4702-00-101-94
4702-00-101-66
4. Name of Office : Irrigation Sub Division, Kaduthuruthy
5. Date of visit : 13/08/2018
6. Plan Objective :
Irrigation Department, Kerala is the agency that investigates,
designs, constructs, operates and maintains Minor, Medium and Major
Irrigation Schemes/Projects. As per the classification followed by the
Department, schemes having a cultivable command area upto 2000 Ha
are treated as Minor Irrigation works. Medium irrigation works are those
with an ayacut area of more than 2000 Ha, but less than 10,000 Ha.
Those schemes above 10,000 Ha are classified as Major Irrigation
Schemes.
Minor Irrigation schemes are divided into Class I and Class II
depending on the ayacut served. Schemes serving above 50 Ha upto
2000 Ha are classified as Minor Irrigation Class I. Minor works like
improvements to tanks and rivulets, construction of check dams, sluices
regulators, bunds, vented cross bars, salt water barriers, layout of channels
and drainage structures etc are usually undertaken under Minor Irrigation
Class I schemes.
Under Minor Irrigation Class I Schemes, total outlay of Rs.12400
lakh is provided. An amount of Rs.2400 lakh is provided to meet the
expenditure towards completing the ongoing works and for taking up new
works. Out of the Rs. 2400 lakh, Rs.500 lakh is provided for the
construction of new water retaining or conservation structures under
Haritha Keralam. NABARD has been providing loan assistance for works
under RIDF for implementing the ongoing NABARD assisted Lift
Irrigation Schemes, Minor Irrigation Class I and Class II and for taking
new schemes. Rs.10,000 lakh was the provision for Minor Irrigation Class
I schemes during 2017-18.
Performance Budget 2017-18 246 Water Resources Department
7.Component Examined and the social and economical significance:-
Construction of check dam and improvements to Valiyathode
upstream of Kaduthuruthy Main Bridge is the selected project for
evaluation.
As per G.O(Rt) No.53/2015/WRD dated 20/01/2015
administrative sanction was accorded for an amount of Rs.800 lakh. The
site for this work was handed over on 01/03/2016 and completed by
24/05/2017 within the agreement period. This work have four
Appendixes
(a) Construction of Check Dam cum bridge of Vakad :
Its total expenditure was Rs.48,23,804/-. This check dam is
constructed across in the Valiyathode at Vakad. The width of the Thode
in this location is 10m. The upstream bed slope is constructed for the
storage of water to facilitate irrigation and drinking water usage during
summer season. For the drinking water the people are mainly using the
wells and underground water level is expected to increase during summer
period with the execution of work. The bridge is also helpful for local
transportation.
The left branch canal of Muvattupuzha Valley Irrigation project is
passing through this area and it supply water to this canal, in regular
intervals, through a regulator at these areas. The storage of this water can
increase irrigation facility to 50 Ha of land directly and also water is
available through the thode in the entire summer season.
(b) Construction of Check Dam at Manippally : The width of the thodu at
proposed site is 13m and exposed irregular shaped rock bed is visible in
this location. The upstream bed slope is adequate to store enough water to
facilitate irrigation and drinking water during summer season. This area
too is heavily affected by the shortage of water in the summer season.
Most of the people depends wells for their drinking water. By the
construction of this check dam, during rainy season, the sudden flow of
water is reduced and automatically the water can be percolated to the
ground and the ground water table will be raised. About 40 Ha of land can
Performance Budget 2017-18 247 Water Resources Department
be now irrigating after its construction and the water in the stream is
available throughout the season. Expenditure of this appendix is
Rs.34,40,893/-
(c) Construction of protection works:
The total protection works proposed are with a height of 3.5m for
a length of 975m and with 3m height for a length of 3110m and with
2.5m height, 1105m is also proposed. Total expenditure for this appendix
of the work is Rs.7,15,39,516/-
Valiyathode is the main water stream of the Panchayats of
Kaduthuruthy, Neezhoor, Kuruvilangadu, Uzhavoor and Marangattupally.
It is started from Uzhavoor and ends at Kaduthuruthy. The total length of
the stream is around 35Km. All of these areas are agricultural fields mainly
rubber, coconut, vegetables, banana, tapioca, ginger, nutmeg etc. So
irrigation is highly demanded. The stream banks were severely damaged
in different location. Officials informed that protection work has been
provided in 64 different locations having a total length of 6.25 km. The
protection is made up in Dry Rubble masonry wall. The officials claimed
that about 120 Ha of agricultural field is protected by this work. And the
protection work has helped to smooth the flow of water through the
stream and erosion of the bank has been terminated.
(d)Silt Removal and deepening of the thodu bed:
Total expenditure of this Appendix is Rs.1,75,320/-. The
accumulation of silt in the river bed should obstruct the gravitational flow
of water. In monsoon, it will lead to the breaches of the river banks, and
flow path will be deviated. Periodical dredging is very important to
streams. In this work, desilting and deepening was executed for a length of
1.25 Km.
8. Observations of Finance Department:
The team visited project fields of Valiyathodu on 13/08/2018. The
work is distributed in various places. It includes the construction of a check
dam cum bridge, a check dam, side protection works and silt removal of
the Thode. About 90% of the total expenditure is for the protection works
Performance Budget 2017-18 248 Water Resources Department
of side walls while just Rs.1,75,320/- is expended for the silt removal and
deepening of the Thode. Streams like Valiyathode are rich by ecological
resource of living beings.. They have a prominent role in the existence of
life. But numerous streams have already dried up or have became seasonal
due to rapid development, urbanization, poor management, due to lack of
sufficient funds and poor enforcement of laws and regulations.
9. Suggestions/Recommendations:
Instead of existing method of canal and river bank protection work
using stones, a natural eco-friendly river bank protection method should
be evolved out. In the improvement work of Valiyathode under
Kaduthuruthy Sub Division, a good portion of the estimate amount
Rs.7,15,39,516/- is expended for side wall protection works of the
Thode. It is a sample of almost water resources protection works in
Kerala. Excessive stone using should adversely affect the environment,
hence a parallel method which is convenient to the state, affable to the
nature and cost-effective to the state economy should be find out, after
studying such methods in other nations with similar physiographical
condition.
MINOR IRRIGATION CLASS - II
1.Plan Outlay : Rs.2200 Lakh
2.Head of Account : 4700-00-101-82
3.Name of the Works:
1. Improvements to Ezhuthanikulam in Perumatty Grama
Panchayat
2. Improvements to Mancherikulam Uppukaranchalla in
Perumatty Grama Panchayat in Palakkad District
3.
4.Date of visit : 04/08/2018
Performance Budget 2017-18 249 Water Resources Department
5. Plan Objectives :
Minor Irrigation Works which can serve below 50 Ha come under
the scheme. The outlay provided is to meet the expenses connected with
completion of the ongoing Minor Irrigation Class II schemes and for
taking up new works after meeting the spill over commitments for
developing Minor Irrigation Structures, including renovation of ponds,
lining and side protection in order to strengthen the food production. An
outlay of Rs.2200 Lakh have provided during 2017-18 for the execution
of new Minor Irrigation Schemes and for the completion of ongoing Class
II works. Amount has also provided for construction of check dams/small
storage structures, renovation of ponds in rain shadow areas in Palakkad
District especially in Kollangode, Chittoor blocks. Watershed interventions
(including construction of VCBs, check dams etc) under Haritha Keralam
has also been taken up under the scheme for which Rs.500 lakh is
provided out of the total outlay.
6. Social and Economical Significance:
The area of Chittoor is one of the most drought prone area of the
state. The ground water level has gone down and the taluk is marked as
over-exploited in the case of ground water extraction, taking out more
water than what the soil offers and it is imperative that the measure is
taken to improve the ground water storage. The deepening of ponds will
improve the ground water storage of the area. Chittoor Taluk has about
1500 ponds including public, Private and Temple Ponds. Many of ponds
are networked and many can be fed from the network of canals of
Chitturpuzha project. Many ponds in Chittoor Taluk act as storage
reservoirs of the irrigation water supplied by the above irrigation canals.
Storing of the flood water during rainy season can using for irrigation
during second crop of paddy.
7. Components Examined :
(1)Improvements to Ezhuthanikulam in Perumatty Grama Panchayat.
This renovation work was for an estimated amount of Rs.8.75
lakh. This pond is situated just 250m away from Chittur, Vandithavalam
Performance Budget 2017-18 250 Water Resources Department
road at Ezhuthani in Perumatty Panchayat. This pond collects water
supplied by left bank canal of Chitturpuzha and distributes water for
irrigation to more than 20 Ha of Paddy fields. The bank of the pond is to
be protected on North Side and the height of it is to be increased on the
East and South sides apart from removal of the silt deposited in the pond
to increase the storage capacity of pond. The protection of the sides of
ponds on North side for a length of 30m and a height of 2.4m;
heightening the side wall on Eastern side for a height of 0.70m and South
side for a height of 0.90m were the components of this renovation work.
Two bathing Ghats are also part of this work.
The area of Chittur in which the pond is located is experiencing
severe draught during every summer. The protection of ponds like it will
improve the ground water storage of the locality. The estimate has
included 11 items in which clearing, deepening, protection of banks with
rubble masonry, cement concrete 1:3:6 and 1:2:4 are included.
2.Improvements to Mancherikulam, Uppukaranchalla in Perumatti
Grama Panchayath:
The estimate amount of this work is Rs.26.5 lakh. This pond
collects water supplied by left bank canal of Chitturpuzha and distributes
water to 50 Ha of Paddy fields. The renovation works are protection of
banks and the removal of silt deposited in the pond. The protection of side
wall for a length of 174 m and a height of 2.8m, two bathing ghats and
an outlet channel for releasing water to the fields from pond are the
components of the work.
8. Observation of Finance Department :
The team visited Chittoor Minor Irrigation Sub Division on
04/08/2018 and conducted field visit of two ponds. As per information
from officials under Chittoor Sub Division, there are hundreds of ponds
are recharging by the canals of Chitturpuzha during draught season. The
exploitation of ground water using borewell is very higher in this locality.
Over exploitation of ground water in this area has led to water scarcity in
Performance Budget 2017-18 251 Water Resources Department
this area. Rainfall in this taluk is about half of the state average. It affirms
the importance of the conservation of existing water resources like ponds
and streams. Rainwater harvesting and artificial recharging should be
promoted in this area under the Sub Division. As per a discussion with
the Agriculture Officer, Kanjirampuzha, the over dependence of bore well
water is very high in this area. The bore well water is collecting in farm
ponds and distributing it to land for agricultural purposes. In Palakkad
District, an amount of Rs.5 crore is expending for electricity subsidy by
Agriculture Department. They also observed that the canals for irrigation
purpose is very narrow in width, which causing slowing and insufficiency
in water supply for agricultural purposes. In Chittur Taluk, about 65% of
canals are dry during the second crop period.
In Mancherikulam, there is a canal of Chitturpuzha to recharge the
pond. But the canal work of about 20m is incomplete. At the time of
visit, a lot of soil remains between the canal and pond, and has a
possibility to refill the soil to pond due to water flow from the canal. The
Assistant Engineer, Thathamangalam has informed that a silt trap in the
inlet channel has constructed after the team visit, which will prevent the
refilling of soil to the pond. The piled silt which accumulated around the
pond during the visit has also been removed now.
9.Suggestions/Recommendations by Finance Department:
1. There are plenty of ponds and Minor Irrigation Water Sub
Division, which requires maintenance for their conservation.
Priority should be given to such small irrigation projects by
Irrigation Department.
2. The team has also been observed that many ponds and tanks
are being encroached for settlement purposes. Every existing
ponds and tanks should be cleaned and preserved as water
resources for natural water recharge under various schemes like
„Pradhan Manthri Krishi Sinchai Yojana(40% SS) and „
Renovation of Tanks and Ponds‰ of Irrigation Department.
Performance Budget 2017-18 252 Water Resources Department
1.Name of the Scheme : NABARD ASSISTED RURAL WATER
SUPPLYSCHEMES- NABARD ASSISTANCE
2.Plan Outlay : 10,000 Lakh
3.HOA : 4215-01-102-98-(1)
4.Name of the Office & Date of visit : Project Division, Adoor -
08/08/2018 to 09/08/2018
5. Plan Objectives :
There are 132 NABARD assisted schemes sanctioned under
various RIDF(Rural Infrastructure Development Fund). Of which 59
schemes have been completed under different Rural Infrastructure
Development Fund Projects of RIDF XIV, 30 schemes have been fully
completed, 3 schemes partially completed and balance is under execution.
Projects coming under Rural Infrastructure Development Fund XXI are
only replacement of obsolete pumps and motors. Under Rural
Infrastructure Development Fund XVI, water supply schemes to Kottoor,
Padiyoor & Poomangalam panchayaths in Thrissur District are partially
commissioned while water supply schemes to Mananthavady, Edavaka and
Nalloornadu Panchayaths in Wayanad Districts are under various stages of
execution. 52 endosulphan schemes are also sanctioned of which 20
schemes are completed and 32 schemes are under various stages of
execution. For these schemes which are of different stages of
implementation, an amount of Rs.10,000 lakh has been provided during
2017-18.
6. Components Examined :
Comprehensive Rural Water Supply scheme to Mallappalli, Anicadu and
Kottangal Panchayats -Phase I
Water Supply Scheme to Seethathode Panchayath and Nilakkal-Plappally
area in Perunadu Panchayats - Phase I
Performance Budget 2017-18 253 Water Resources Department
7. Social and Economical Significance of the Scheme :
Seethathode and Perunadu are two Panchayaths situated in Ranni
Taluk in Pathanamthitta District. The world renowned Sabarimala Temple
is located in Perunadu Panchayat. This project is aimed to providing
drinking water to the entire population of Seethathode panchayat and to
the base camps enroute to the holy shrine 'Sabarimala' namely Plappally
and Nilakkal in Perunadu Panchayat. Seethathode is the only one
panchayat in the District in which no water supply schemes are in
operation. At present, Pampa area is fed with water from Pampa river
through the pumping station situated near the Pamba - Triveni bridge
after pressure infiltration and disinfection by chlorination. There is no full
fledged water supply facility available here. This project is designed to
meet the water demand for next 30 years.
Mallappally, Anicadu and Kottangal panchayaths are situated in the
north-western region of Pathanamthitta District and belongs to Mallappally
Taluk. This project is aimed at providing portable drinking water to the
entire population of Mallappally and Anicadu panchayaths and to 6 wards
of Kottangal Panchayats. The scheme area is characterised by steep hills,
narrow gorges and precipitated escarpments. The topography of scheme
area is not suitable to retain rain water. The existing water supply scheme
such as Rural Water Supply Schemes to Mallappally, Rural Water Supply
Scheme to Anicadu and Rural Water Supply Scheme to Kottangal were
commissioned 30 to 40 years back and are very inadequate to meet water
demand of entire population of the Panchayaths. In the present water
supply system, the only treatment given to the supplied water is
disinfection by adding the bleaching powder.
A full fledged piped water supply project with proper treatment
plant is the only solution to solve the increasing water scarcity problem in
the scheme area. (The scheme area lies close to the NRI city Thiruvalla
which is one of richest place. Major income of the villagers is from rubber
tree plantation and foreign money by NRIs. People are most concern
about health aspects and are aware of using good quality drinking water.
But people residing in the peripheral areas, especially in the hilly regions
Performance Budget 2017-18 254 Water Resources Department
lack the basic amenities like safe drinking water and better sanitation
facilities).
8.Observation of Finance Department :
Finance Team visited Project Division, Adoor from 08/08/2018 to
09/08/2018, verified concerned files and visited the selected fields.
Rural Infrastructure Development Fund XIX Water Supply and Sanitation
to Seethathode Nilakkal and Plappally area in Perunadu Panchayat is
sanctioned as per AS No. WS16/2014-15 dated 21/06/2014 for an
amount of Rs.909 Lakh. It is a spill over work. About 60% of this work is
completed. It is expected to complete the work within 01/2019. Total
expenditure as on 30/06/2018 was 560.93 Lakh. Total population
benefitted by this work is 1,46,396. This project work have 3
components- (1) Construction of new well-cum-pump house in Rocky
strata (2) Construction of 13 MLD Treatment Plant, providing chlorination
units, development of site and (3) Construction of Clear Water Sump at
Treatment Plant .
Rural Infrastructure Development Fund- XIX Water Supply Scheme to
Mallappally, Anicadu and Kottangal panchayat is sanctioned as per AS
No.WS17/2014-15 dated 21/06/14 for an amount of Rs.798 Lakh. It is
also a spill over work. Overall 80% of this work is completed. It is
expected that the work will be completed within 12 /2018. About 42,537
people will get the benefit of this work. There are 3 component in this
work. They are (1) Construction of new well-cum-pump house (2)
Construction of 10 MLD Treatment Plant, providing Chlorination units
and development of site (3) Construction of Clear Water sump at
Treatment Plant.
9. Constraints and Risk factors:
Aftermath of the discussions with official, the report may be
concluded with the constraints and risk factors, they are facing while the
execution of work. Pathanamthitta District is hilly, hence for implementing
various water supply schemes, some components are need to be
constructed by the blasting of hard rocks. The officials always arranging
the blasting process of hard rocks very safely, but some local people are
Performance Budget 2017-18 255 Water Resources Department
protesting against it. This cause in delay for the specific implementations
of project works.
Another constraint is the delay of road cutting as part of the work.
During Sabarimala festival season (from September to January), road
cutting is not allowed for laying pipe. With the increases of road cutting
charges, project cost also increases. Availability of suitable land for the
construction work is another constraint, they are facing.
10. Suggestions/Recommendations by Finance Department:
(1)Around 40% of water is lost during transmission through the Pre-
Stressed Concrete (PSC) in almost existing old schemes. It will augment
the production cost of drinking water immensely. Tariff acquired from
customers are also very meagre which is not enough to compensate even
the salary of a permanent staff as Meter Readers. In this context, the only
possible method to avoid the transmission loss is by the usage of
advanced quality pipes like Mild Steel (MS) Pipes or Ductile Iron pipes by
changing old existing Pre Stressed Concrete pipes in huge transmission
water loss areas. Its feasibility in rural areas should also be sought out.
(2)As per information from officials, land acquisition for the
construction process is facing a great complexity. Local Self Government
Department and Revenue Department should join with Water Authority
for acquiring the required land for Water Supply Projects. The
implementation of a new scheme should commence only after acquiring
enough land, which should minimize the unnecessary lagging of ongoing
projects.
~~~~~~~~~~~~~~
Performance Budget 2017-18 256 Water Resources Department