water quality master planning a barton creek model katherine g. osborne ce 394k.2 surface water...
DESCRIPTION
Background Why does Austin care? A Brief History Christine’s Model Phase IITRANSCRIPT
Water Quality Master PlanningWater Quality Master Planning
A Barton Creek Model
Katherine G. OsborneCE 394K.2 Surface Water Hydrology
Topics of DiscussionTopics of Discussion• Background
• What are we modeling?
• How are we doing it?
• What are the outputs?
• Conclusions
BackgroundBackgroundWhy does Austin care?A Brief History
• Christine’s Model• Phase II
What are we modeling?What are we modeling?Flows
Loads
Best Management Practices removals
How are we doing it?How are we doing it?
• Flows• Loads• BMP removals
Impervious Cover Related to land use
Flows - InputsFlows - Inputs
Flow Direction Based on CRWR Pre-Pro of 30 m DEMs
Correction Grid Not usedRecharge Flow From Recharge script which
requires:Cell Recharge Recharge zone grid,
Creek grid, Flow accumulation, Flow direction, Watershed, and Upstream points.
Flows - EquationsFlows - EquationsRv = 0.3428IC 2+ 0.5677IC + 0.0125
Rv bf = - 0.36IC + 0.1904
In recharge zone, Flow = Raw Flow - Recharge
Flows - OutputsFlows - OutputsCorrected direct runoff generated in each cellCorrected base flow generated in each cell
Total flow without considering recharge
Total predicted flow
Direct runoff
Base flow
Loads - InputsLoads - InputsDirect runoff EMC tableBase flow EMC table
Impervious cover coverage or gridFlow direction gridWater land use zones gridDirect runoff Base flow generated Total flow without considering recharge Cell recharge
Loads - EquationsLoads - Equations• Equations
EMC = a+bICEMC bf = C if IC< undeveloped (15%)
D if IC> undeveloed
Loads - OutputsLoads - OutputsLoad grids for constituents for which the
load is computed. TSSTSS BOD COD TOC DP TP NH3 TKN NO TN Cu Pb Zn
Best Management Practices Best Management Practices Located BMPs defined by mass removed
Located BMPs defined by efficiency
Non-located BMPs defined by efficiency Inputs
Flow direction grid Flow accumulation gridBMPs point coverage - The attribute table must contain a load removed field. Initial load grid - the result of the load computation.
OutputRemoved Load grid
ConclusionsConclusionsNice Tool
Needs to include: Future land useChannel Erosion
Questions?Questions?