water & development daventry waterspace east midlands councils planning cpd 28 june 2012

28
Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Upload: adelia-mcdonald

Post on 17-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Water & DevelopmentDaventry WaterSpace

East Midlands Councils Planning CPD 28 June 2012

Page 2: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Contents

• Daventry• Why WaterSpace?• Evolution of the scheme• Challenges

Page 3: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Daventry

• Saxon origins• Norman Priory• Elizabethan ‘new town’• Georgian coaching town• 1793: Grand Junction Canal• 1838: Bypassed by the railway• 1960-70s: ‘new’ town• 1980-90s: Development by DDC

Page 4: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Daventry 1571

Page 5: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Daventry 2009

Page 6: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Daventry 2009

Page 7: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Daventry, early 00s

• Population growth ongoing• Constrained town centre• Mixed economic base (low wage)• Limited infrastructure• Poor sustainability

• …MKSM Study, then Strategy…

Page 8: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Approach

• Ride the tiger:• Renew the town centre • Secure infrastructure• Enhance job opportunities• Transform education• Or end up with growth anyway

“Building social and economic success on the basis of environmental excellence”

Page 9: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Town Centre Vision

• Town Centre Vision (TCV)– Issues– Ideas– Plans– Action

• Working with Civic Trust• Adopted 2004

Page 10: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Town Centre Vision 2004

Page 11: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Why water?

• People like water• UK’s busiest canal only 3km

away: An opportunity too good to miss

• Property values enhanced• A new ‘heart’ for Daventry:

Quality public space and buildings around water

• Public support

Page 12: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Feasibility study

• Full feasibility study required by Town Centre Vision• Tendered and Mouchel Parkman/DTZ Peida Consulting

team appointed• Outputs required to comply with HM Treasury ‘Green

Book’ standards for evaluation

Page 13: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Stage 1 report

• Canal and waterside viable• Added benefit of active water (canal connection)• No “show stoppers”• Water supply within catchment sufficient.• Potential ecological benefits.• Potential benefits to town centre and wider development• Recommends 100 berth marina and additional ‘casual’

moorings• Cost about £10 million plus optimism bias (44%)• Five route options

Page 14: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Stage 2 report

• Option selected• Design worked out in detail:

– Bed level 125.0m– Water level 126.5m

• Runs under Northern Way• Welton Road diverted• Extensive risk management and “buildability” work done.• Costs: £10.2 million + £1.7 million for risks + optimism bias

at 11% (down from 44%).• NPV of costs £4.3 million

Page 15: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Study conclusions

• Outcomes, not outputs• Environmental benefits – biodiversity, green corridor, etc.• Economic – ‘investment edge’, tourism brand, etc.• Other – cultural vitality, civic pride, etc.• Overall: Transformative project cf. Tate St Ives

Page 16: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

How?

• Take steps• Studies• Design• Incremental strategy• Enabling infrastructure – secured funding for:

– Diversion of one road– Bridge under town ring road

• No major physical obstacles remaining• Town centre water areas first … momentum• The then ‘link’

Page 17: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

How?

• Council own resources – value of surrounding land• ‘Growth’ funding:• S106/CIL• ‘Growth’ funds • Lottery, benefactors, etc.

Page 18: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Evolution: Town Centre Vision

Page 19: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Evolution: Town Masterplan

Page 20: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Evolution: Town Masterplan

Page 21: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Evolution: Site Masterplan 1

Page 22: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Evolution: Site Masterplan 2

Page 23: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Evolution: Site Masterplan 3

Page 24: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Evolution: Site Masterplan 4

• UTC secured … but needed larger area• Village Green application removed … but concession was

‘voluntary green’ on part of the area• Continued changes in economic circumstances• Replanning required … keeping the concept

Page 25: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Challenges

• Funding and viability• Changing economic circumstances• Fear of the unknown: opposition• Other priorities – complementary or completing• Change of development control authority

Page 26: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Benefits

• iCon• Centre of excellence in

sustainable construction• First HE presence in

Daventry• Opened May 2011• Would it have happened

without the vision?

Page 27: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

What next?

• Resolve remaining issues• Obtain planning permission:

– Waterside– Canal link

• Select development partner(s)• Some self-development?

Page 28: Water & Development Daventry WaterSpace East Midlands Councils Planning CPD 28 June 2012

Questions?