Pittsburgh Water and Sewer Authority
2017‐2021 Capital Improvement Program (CIP)
This page was intentionally left blank
Page 1
TableofContentsIntroduction ............................................................................................................................................................... 2
Capital Improvement Program .................................................................................................................................. 2
Overview ................................................................................................................................................................ 2
Development and Approval Process ...................................................................................................................... 2
Capital Project Prioritization .................................................................................................................................. 3
Funding Sources ..................................................................................................................................................... 3
Capital Improvement Plan Organization ............................................................................................................... 3
2017 to 2021 Capital Improvement Program Summary ............................................................................................ 5
Page 2
Introduction
In February 1984, the City of Pittsburgh (City) established The Pittsburgh Water and Sewer Authority (PWSA) under the provisions of the Commonwealth of Pennsylvania. The City charged the PWSA with the responsibility of carrying out a major Capital Improvements Program (CIP) designed to refurbish the infrastructure of the entire water system, including the water treatment plant and distribution system. This project was to ensure that the water system met the rapidly expanding water quality requirements of the federal and state Safe Drinking Water Acts.
In 1995, PWSA also became responsible for producing and supplying the water for City of Pittsburgh residents and maintaining and operating the water distribution system. Then, in 1999 PWSA became responsible for operating and maintaining the entire City of Pittsburgh sewer system.
Today, PWSA provides quality water and quality services to approximately 83,000 customers throughout the City of Pittsburgh. PWSA operates and maintains a 117 million gallons per day (MGD) rapid sand type treatment plant, a 26 MGD microfiltration plant, approximately 1,000 miles of water mains, over 25,000 valves and 7,400 fire hydrants, 1 raw water pump station, 10 finished water pump stations, 4 in‐ground reservoirs, 13 storage tanks (2 of which are above‐ground reservoirs), approximately 1,220 miles of sanitary, storm, and combined sewers, 29,000 manholes, 27,000 catch basins and inlets, 38 Combined Sewer Overflow (CSO) outfalls, 185 storm outfalls, and four wastewater pump stations.
PWSA's vision is to provide water and wastewater services that meet or exceed regulations and customer expectations at the lowest possible cost.
CapitalImprovementProgram
Overview
PWSA's Capital Improvement Program focuses on sustaining cost‐effective operations, while optimizing the system's asset performance and life expectancy. The 2017‐2021 Capital Improvement Program invests in programs which consider risk and consequence of asset failure and levels of service benefits.
Development and Approval Process
PWSA’s CIP process begins each year in January when project nominations are solicited from the entire organization. At the completion of the nomination period, the Planning Department screens and evaluates the nominated projects using a predefined scoring system and recommends which projects should be considered for further planning. Further planning efforts consist of the preparation of a Project Sheet, which provides more detailed information on a project’s potential scope options, risks, schedule, and the development of a preliminary cost estimate. This process lasts several months and culminates with the presentation of the updated CIP to PWSA’s Board of Directors.
Page 3
Projects that are not selected for execution at any stage will be re‐assessed during the next year’s CIP development process.
Capital Project Prioritization
Due to funding limitations and the need to renew/replacing a significant amount of aging infrastructure, the following criteria are used to evaluate and prioritize capital projects:
Safety ‐ Potential health and safety risks to personnel and the public if action is not taken Regulatory Compliance – Regulatory compliance schedule and potential fines for non‐compliance Reliability/Operational Flexibility – Location, age, and condition of infrastructure and risk if action is not
taken Capacity – Meets community health needs and growth, as needed Operations and Maintenance Efficiency – Potential for operating cost savings Regional Cooperation/Stewardship – Coordination with external stakeholders or meeting the
communities needs Level of Service – Improvement to customer service Sustainability – Energy efficiency and “green” approach to improving water quality
Funding Sources
The PWSA Capital Improvement Program is funded through several primary sources to which specific programs and projects are allocated. These funding sources include, but are not limited to, PWSA Future Capital Bond Authorizations, cost shares with other utilities, and grants. PWSA is dedicated to identifying and pursuing funding from all potential sources to offset planned capital investments.
Capital Improvement Plan Organization
The CIP is organized into seven project classes (types):
Water Treatment Plant Water Pumping and Storage Water Distribution System, which includes lead service line replacements Wastewater System Stormwater System Green Infrastructure Miscellaneous
Each project class is then made up of individual projects. Projects are defined based upon current information, which range from annual allowances for asset renewal and/or replacement activities, to major, multiple phase facility renewal projects.
Page 4
The following information is provided for each project:
Project Class – Type of project.
Project Name – Descriptive name assigned to the project.
Project No. – Unique number assigned to track the project from inception to completion. This number is established once a project is approved.
Neighborhood/Ward – Project location(s) based on the City of Pittsburgh’s Geographical Information System (GIS).
Status – Phase in the project life‐cycle (i.e. assessment/design/construction).
Priority – Criteria utilized to prioritize the project.
Project Description ‐ A basic understanding of the project’s intent and scope of work.
Project Justification ‐ A detailed explanation to why the project is needed.
Risk(s) ‐ Outlines the risk(s) to PWSA if the project is delayed or is not selected.
Impact on Operations – Describes the anticipated impact to PWSA’s operations when the project is completed.
Alternatives to the Recommended Action – Lists the alternatives that were considered or evaluated.
Funding Source(s) – Proposed funding source(s) for the project.
Commitment Schedule – Preliminary award schedule for the project in thousands of dollars.
Cash Flow Summary – Preliminary cash flow for the project in thousands of dollars.
Note: Costs shown are concept level costs, including contingencies, and are based on previous reports, CIPs, or similar type projects, and are subject to change as the projects are more completely assessed through the project phases. Construction costs shown are escalated from the estimated midpoint of construction, at 3% per year, and include allowances for construction management and inspection and design services during construction. Design costs shown are based on pre‐defined percentages based on the estimated construction cost.
Page 5
2017to2021CapitalImprovementProgramSummary
The charts below illustrate the proposed breakdown of the project classes and yearly cash flows for the 2017 to 2021 CIP. Costs shown are in Millions.
2017‐2021 Proposed Capital Cash Flow by Project Class
Page 6
Proposed Yearly Capital Cash Flow by Project Class
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Aspinw
all W
ater Treatmen
t Plant Utility
Water Piping Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy
PROJECT
DESCR
IPTION
Replacem
ent o
f the
utility
water sy
stem
s in the Screen
Roo
m, R
oss P
ump Station, and
Che
mical Building.
PROJECT
JUSTIFICAT
ION
Num
erou
s pipe failures h
ave occurred
due
to corrosio
n. A
ddition
ally, m
any of th
e iso
latio
n valves in
the piping
system
are on
ly m
arginally fu
nctio
nal and
do no
t provide
a tight shu
t‐off. Failure of this system prevents c
hemical add
ition
. Ad
ditio
nally, the
utility
water sy
stem
is not prope
rly isolated
from
the po
table water sy
stem
through the use of
backflo
w preventers, which present sa
fety hazards to
staff.
RISK
(S)
An unsched
uled
/unp
lann
ed interrup
tion in th
e supp
ly of service water due
to pipe failure(s).
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
0 12
0
120
Constructio
n
600
60
0To
tal Project Cost
0 72
0 0
00
00
720
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 12
0 60
00
00
0 72
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PROJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Clarifier and
Solids H
andling Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility
PROJECT
DESCR
IPTION
Improvem
ents to
clarifiers, sed
imen
ation, and
associated system
s, includ
ing evaluatin
g process c
onditio
ns to
optim
ize
treatm
ent.
PROJECT
JUSTIFICAT
ION
Existing clarifiers d
o no
t ope
rate as inten
ded du
e to equ
ipmen
t and
process issues. Ad
dressin
g these will im
prove
system
ope
ratio
n, effc
iency, and
solids h
andling/slu
dge removal.
RISK
(S)
The bu
ildup
of solids a
nd slud
ge in
the clarifiers a
nd se
dimen
tatio
n basin
s impact treatm
ent capacity
. The
clarifier
building will con
tinue
to be subject to furthe
r degradatio
n and the roadway utilize
d for che
mical delivery may not be
navigable du
ring winter m
onths. Leakage m
ay und
ermine the structural su
pport o
f the
building.
IMPA
CT ON OPE
RATIONS
Completed
project will increase ope
ratin
g effectiven
ess b
y increasin
g safety fo
r staff, re
storing integrity
to th
e bu
ilding structure, providing
reliable de
livery truck access to
the chem
ical fe
ed area du
ring the winter m
onths, and
fle
xibility of clarifier o
peratio
n, and
improve solids h
andling and slu
dge disposal.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
0 3,410
3,410
Constructio
n
1,060
19,830
20
,890
Total Project Cost
0 4,47
0 0
19,830
00
0 24
,300
CASH
FLO
W SUMMAR
Y** (000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 1,10
0 2,71
02,55
07,56
07,56
02,82
0 24
,300
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Pretreatmen
t System Che
mical Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Ope
ratio
ns and
Mainten
ance Efficien
cy
PROJECT
DESCR
IPTION
Improvem
ents to
pretreatm
ent che
mical sy
stem
s to provide im
proved
water treatm
ent capabilitie
s.
PROJECT
JUSTIFICAT
ION
Chem
ical treatm
ent systems a
re a critical com
pone
nt to
produ
cing
safe drin
king
water. Com
pone
nts o
f the
chem
ical treatm
ent systems c
an no longer be op
erated
in a sa
fe, effe
ctive, or reliable manne
r to meet w
ater
quality
requ
iremen
ts. M
any bu
lk water treatm
ent che
micals p
resent sa
fety hazards to
staff. Th
e storage and
pumping
system
s associated with
these chem
icals h
ave reache
d the en
d of th
eir u
seful life
. Failures resultin
g in
dust creation and chem
ical sp
ills c
an place ope
rators in
unsafe working
con
ditio
ns and
can
cause physical
damage to equ
ipmen
t and
structures, as w
ell as e
nviro
nmen
tal con
tamination.
RISK
(S)
Inefficient ope
ratio
n of che
mical sy
stem
s result in increased op
erating costs, includ
ing chem
ical con
sumption,
labo
r, solids g
eneration an
d disposal, and
wear o
n eq
uipm
ent. Failure of a
che
mical sy
stem
poses a significant
health and
safety risk to
personn
el as w
ell as a
n increased risk to water quality compliance.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, reliability, and
life expectancy and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
cFU
NDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
54
5
545
Constructio
n
2,805
2,805
Total Project Cost
0 3,35
0 0
00
00
3,35
0CA
SH FLO
W SUMMAR
Y** (000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 53
0 2,82
00
00
0 3,35
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PROJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Aspinw
all W
ater Treatmen
t Plant Fiberglass R
einforced Plastic
Che
mical Tank Inspectio
ns and
Re
habilitation/Re
placem
ent
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility
PROJECT
DESCR
IPTION
Inspectio
n and rehabilitation and/or re
placem
ent o
f the
fibe
rglass re
inforced
plastic che
mical ta
nks.
PROJECT
JUSTIFICAT
ION
Existing tanks a
re near to a cond
ition
in which a catastrop
hic failure can
occur with
out n
otice. Sod
ium Hypochlorite
Tank
No. 2 is currently out of service due
to active leaks a
nd needs to
be relined
. With
out a
backup tank, disrup
tion to
delivery will quickly im
pact th
e ability to
provide
regulatory‐req
uired disin
fection.
RISK
(S)
Failure of a
che
mical storage tank
poses a significant health
and
safety risk to
personn
el as w
ell as a
n increased risk to
water quality compliance.
IMPA
CT ON OPE
RATIONS
Increased system
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
The plant d
esign requ
ires c
hlorine to be available. The
re are no practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
25
25Co
nstructio
n
68
68
Total Project Cost
0 93
0
00
00
93CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 60
33
00
00
93*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Aspinw
all W
ater Treatmen
t Plant Calcium
Hypochlorite
Storage
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility
PROJECT
DESCR
IPTION
Procurem
ent o
f a storage bu
ilding for calcium
hypochlorite
.
PROJECT
JUSTIFICAT
ION
Calcium hypochlorite
are so
lid ta
blets w
hich can
be used
for d
isinfectio
n of pipes and
tanks. A
supp
ly of the
se ta
blets
is maintaine
d to provide
plann
ed and
emergency disin
fection of water storage facilities a
ssociated with
water
prod
uctio
n. Currently th
ese tablets a
re stored
in an existing garage which doe
s not m
eet the
safety standards for th
is chem
ical. Storage of th
e tablets in this garage has also
deteriorated the bu
ilding.
RISK
(S)
With
out a
supp
ly of calcium
hypochlorite
available, emergency disin
fection of water storage facilities c
anno
t occur,
impacting water quality and prod
uctio
n.
IMPA
CT ON OPE
RATIONS
Improved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
A custom
storage room
cou
ld be de
signe
d with
in an existing area
of the
water plant. This will likely be at a highe
r cost
to m
eet fire
and
building code
s for storage and to integrate into an existing structure.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
18
18Co
nstructio
n
105
10
5To
tal Project Cost
0 12
3 0
00
00
123
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 11
5 8
00
00
123
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Aspinw
all W
ater Treatmen
t Plant Electricaland Ba
ckup
Pow
erIm
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Ope
ratio
ns and
Mainten
ance Efficien
cy
PROJECT
DESCR
IPTION
Improvem
ents to
electrical sy
stem
s at A
spinwall W
ater Treatmen
t Plant (W
TP), includ
ing provision
s for stand‐by
or
backup
pow
er sy
stem
s, upgrade
s to existing electrical distrib
ution system
, rep
lacemen
t of m
otor con
trol cen
ters, and
associated
panels, con
duit, wiring, and
system
s.
PROJECT
JUSTIFICAT
ION
Electrical sy
stem
s at the
WTP
have gene
rally m
et th
e en
d of th
eir u
seful lives and
spare/replacem
ent p
arts are
unavailable. Electrical panels d
o no
t meet current sa
fety standards, includ
ing lack of arc flash protectio
n.
Additio
nally, the
WTP
doe
s not have redu
ndant p
ower sy
stem
s or a
means fo
r stand
‐by po
wer fo
r critical pum
ping
and treatm
ent systems.
RISK
(S)
Electrical pow
er is critical to
maintain pu
mping
and
treatm
ent o
f water. Failure of the
se sy
stem
s will re
sult in th
e inability to
produ
ce water to
meet d
emand and/or quality requ
iremen
ts.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
Desig
n
2,970
2,970
Constructio
n
23
,350
23
,350
Total Project Cost
0 2,97
0 0
23,350
00
0 26
,320
CASH
FLO
W SUMMAR
Y(000’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 54
0 1,81
02,94
08,87
08,86
03,30
0 26
,320
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Clearw
ell D
emolition
PR
OJECT
NO.
Unassigne
d STAT
US
Not Started
PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Demolition
of the
existing 108 year old clearwell (fin
ished
water structure).
PROJECT
JUSTIFICAT
ION
The clearw
ell w
as con
structed
in 1908 and has n
ot und
ergone
any
major m
odificatio
ns or u
pgrade
s since. The en
tire
plant m
ust b
e shutdo
wn to inspect a
nd perform
mainten
ance of the
clearwell. It has two main functio
ns: p
roviding
eq
ualization storage that allows the
filte
rs to
ope
rate inde
pend
ently
of p
oten
tial fluctuatio
ns in
system
dem
ands and
providing sufficien
t reten
tion contact tim
e for d
isinfectio
n agen
ts to
meet the
requ
iremen
ts of the
Surface W
ater
Treatm
ent R
ule and Long
‐Term 2 Enh
anced Surface Water Treatmen
t Rule. Con
sidering age and cond
ition
of the
clearw
ell, it is the water sy
stem
’s weakest link
as the
re are no practical m
eans to
deliver water by bypassing the
clearw
ell, while m
aintaining
the requ
ired volume, quality, and
con
tact time.
RISK
(S)
Clearw
ell failure will cease all water delivery to all the Au
thority
’s customers (resid
entia
l, commercial, ind
ustrial,
institu
tional, bu
lk ra
te customers, pub
lic health
and
safety provide
rs, fire
protection, governm
ental facilitie
s, other
water distrib
utors, etc.), creating a pu
blic health
emergency.
IMPA
CT ON OPE
RATIONS
Ability to
meet system re
liability and water quality regulatio
ns.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n as th
e clearw
ell is a
n essential elemen
t of the
water
distrib
ution system
. CO
MMITMEN
T SCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
1,570
1,570
Constructio
n
10
,780
10
,780
Total Project Cost
0 0
00
00
12,350
12
,350
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
00
00
12,350
12
,350
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PROJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Clearw
ell Emergency Re
spon
se Project
PROJECT
NO.
2013
‐930
‐231
‐0
STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Installatio
n of tw
o pu
mp suction wet wells at Aspinwall and
Bruecken Pu
mp Stations and
associated piping
and
appu
rten
ances to bypass th
e existing clearw
ell.
PROJECT
JUSTIFICAT
ION
This project w
ill provide
a m
eans to
bypass the
existing clearw
ell. Note: Disinfectio
n requ
iremen
ts will not be
achieved
while bypassin
g is occurin
g. A
ddition
ally, this infrastructure will be requ
ired to m
aintain water su
pply
to PWSA
’s customers for th
e rehabilitation or re
placem
ent o
f the
existing clearw
ell.
RISK
(S)
Clearw
ell failure will cease all water delivery to all the Au
thority
’s customers (resid
entia
l, commercial, ind
ustrial,
institu
tional, bu
lk ra
te customers, pub
lic health
and
safety provide
rs, fire
protection, governm
ental facilitie
s, other
water distrib
utors, etc.), creating a pu
blic health
emergency.
IMPA
CT ON OPE
RATIONS
Ability to
meet system re
liability and water quality regulatio
ns.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n as th
e clearw
ell is a
n essential elemen
t of the
water
distrib
ution system
. CO
MMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 17
0
170
Desig
n3,060
3,060
Constructio
n24
,570
24,570
Total Project Cost
170
3,06
0 0
24,570
00
0 27
,800
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
170
440
1,79
03,29
013
,960
8,15
00
27,800
* Co
ncep
t level costs based
on previous re
ports, m
inus im
provem
ents to
Aspinwall P.S., Brue
cken
P.S., Highland
Reservoir P.S. and
Rising
Main, and
Aspinwall Pum
p Station to Lanph
er Reservoir Risin
g Main.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Clearw
ell Improvem
ents
PROJECT
NO.
Unassigne
d STAT
US
Not Started
PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f the
existing 10
8 year old clearwell (fin
ished
water structure).
PROJECT
JUSTIFICAT
ION
The clearw
ell w
as con
structed
in 1908 and has n
ot und
ergone
any
major m
odificatio
ns or u
pgrade
s since. It h
as tw
o main functio
ns: p
roviding
equ
aliza
tion storage that allows the
filte
rs to
ope
rate inde
pend
ently
of p
oten
tial
fluctuatio
ns in
system
dem
ands and
providing
sufficien
t reten
tion contact tim
e for d
isinfectio
n agen
ts to
meet the
requ
iremen
ts of the
Surface W
ater Treatmen
t Rule and Long
‐Term 2 Enh
anced Surface Water Treatmen
t Rule.
Considering the age and cond
ition
of the
clearwell, it is the water sy
stem
’s weakest link
as the
re are no practical
means to
deliver water by bypassing the clearw
ell, while m
aintaining
the requ
ired volume, quality, and
con
tact time.
RISK
(S)
Clearw
ell failure will cease all water delivery to all the Au
thority
’s customers (resid
entia
l, commercial, ind
ustrial,
institu
tional, bu
lk ra
te customers, pub
lic health
and
safety provide
rs, fire
protection, governm
ental facilitie
s, other
water distrib
utors, etc.), creating a pu
blic health
emergency.
IMPA
CT ON OPE
RATIONS
Ability to
meet system re
liability and water quality regulatio
ns.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n as th
e clearw
ell is a
n essential elemen
t of the
water
distrib
ution system
. CO
MMITMEN
T SCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
4,400
4,400
Constructio
n
35
,290
35
,290
Total Project Cost
0 0
00
4,40
00
35,290
39
,690
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
00
755
2,49
536
,440
39
,690
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Highland
Park Mem
brane Filtration Plant A
ssessm
ent a
nd Critical Process Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Capacity
, Ope
ratio
ns and
Mainten
ance Efficien
cy, Level of
Service
PROJECT
DESCR
IPTION
Complete a cond
ition
assessm
ent o
f systems sup
porting the treatm
ent p
rocess and
perform
critical im
provem
ents to
maintain water treatm
ent a
nd allow fu
ll warranty of re
placem
ent m
odules. Im
provem
ents m
ay includ
e electrical,
chem
ical fe
ed, straine
rs, and
other su
pport systems.
PROJECT
JUSTIFICAT
ION
Mem
brane mod
ule failure ra
te has con
tinually increased over th
e last se
veral years and
are m
ore than
5 years beyon
d the manufacturer’s
recommen
ded replacem
ent cycle. To
allow m
odule mem
brane manufacturers to
exten
d a full
warranty, a sy
stem
con
ditio
n assessmen
t is n
eede
d. A
detailed cond
ition
assessm
ent is n
eede
d to add
ress other
critical w
orker safety and de
gradation of equ
ipmen
t that a
re essen
tial to maintain the water treatm
ent p
rocess.
RISK
(S)
Expo
ses the
Autho
rity to highe
r costs to
add
ress emergency failures a
nd exposes th
e Highland
No. 1 Service Area to a
potentially deficient or n
on‐com
plaint water su
pply.
IMPA
CT ON OPE
RATIONS
Increase ope
ratin
g fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Provide covered system
storage for the
Highland No. 1 Service Area and elim
inate the microfiltration plant.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
10
10
Desig
n
130
13
0Co
nstructio
n
84
5
845
Total Project Cost
0 14
0 84
50
00
0 98
5CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 80
85
550
00
0 98
5*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Highland
Park Mem
brane Filtration Plant T
ransform
er Rep
air a
nd UPS Rep
lacemen
t PR
OJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Capacity
, Ope
ratio
ns and
Mainten
ance Efficien
cy, Level of
Service
PROJECT
DESCR
IPTION
Replacem
ent o
f a failed cooling fan on
the electrical transformer su
pplying all pow
er to
the Mem
brane Filtration Plant
(MFP) and
replacem
ent o
f the
2nd Floor UPS providing
backup po
wer to
process con
trols.
PROJECT
JUSTIFICAT
ION
The Au
thority
owns th
e electrical transformer su
pplying po
wer to
the MFP. The transfom
er includ
es th
ree cooling
fans which permit continue
d op
eration du
ring summer m
onths, but one
of the
se fans has failed and requ
ires
replacem
ent to en
sure con
tinuo
us facility po
wer. The UPS on the 2n
d floor needs to
be replaced
to provide
continuo
us backup po
wer to
process con
trol panels o
n the 2n
d floor. The existing UPS has not been un
der w
arranty
since 201
1 and a sim
ilar U
PS failed in 2016, at w
hich time it was re
placed
. RISK
(S)
Loss of e
lectrical pow
er to
the MFP will re
sult in loss of w
ater se
rvice to th
e Highland
Reservoir No. 1 se
rvice area.
IMPA
CT ON OPE
RATIONS
Provides electrical pow
er to
facility to allow con
tinual w
ater treatm
ent.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
10
10Co
nstructio
n
61
61
Total Project Cost
0 71
0
00
00
71CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 71
0
00
00
71*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Highland
Park Mem
brane Filtration Plant F
iberglass R
einforced Plastic
Che
mical Tank Inspectio
ns
and Re
habilitation/Re
placem
ent
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility
PROJECT
DESCR
IPTION
Inspectio
n and rehabilitation and/or re
placem
ent o
f the
fibe
rglass re
inforced
plastic che
mical ta
nks.
PROJECT
JUSTIFICAT
ION
Based on
the age, se
rvice, and
visu
al observatio
ns of the
tanks ,rehabilitation is ne
eded
to m
aintain the integrity
of
the tanks. Kno
wn repairs includ
e the replacem
ent o
f the
300
gallon sodium
hypochlorite
day ta
nk and
repair/mod
ificatio
n of th
e vent piping on
the caustic
tank.
RISK
(S)
Failure of a
che
mical storage tank
poses a significant health
and
safety risk to
personn
el. Expo
ses the
Autho
rity and
the Highland
No. 1 Service Area to a poten
tially deficient or n
on‐com
plaint water su
pply, w
here
emergency/un
planne
d repairs will ty
pically add
30 to 50%
to th
e capital expen
ses req
uired.
IMPA
CT ON OPE
RATIONS
Increased fle
xibility and reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
0 18
18Co
nstructio
n
51
51
Total Project Cost
0 69
0
00
00
69CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 40
29
00
00
69*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Highland
Park Mem
brane Filtration Floo
r Drainage Mod
ificatio
nsPR
OJECT
NO.
Unassigne
d STAT
US
Not Started
PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy
PROJECT
DESCR
IPTION
Install curbing
aroun
d flo
or pen
etratio
ns on flo
or to
prevent water from
draining do
wn to lower level. Re
‐slope
or
grind flo
or to
provide
water drainage to existing flo
or drains.
PROJECT
JUSTIFICAT
ION
The existing concrete floo
r whe
re th
e mem
brane racks sit is no
t level or slope
d to drains. Leakage ro
utinely occurs
from
the racks d
ue to
mod
ule failures a
nd expansio
n/contraction of th
e racks. Floor pen
etratio
ns are not curbe
d resulting
in water ru
nning do
wn on
to electrical equ
ipmen
t on the lower level, damaging eq
uipm
ent a
nd th
e interio
r walls.
RISK
(S)
Continue
d damage to electrical and
mechanic eq
uipm
ent a
nd th
e bu
ilding structure. Poten
tial safety risk to staff
enterin
g and working
in th
e bu
ilding. Exposes th
e Au
thority
and
the Highland
No. 1 Service Area to a poten
tially
deficient or n
on‐com
plaint water su
pply. Em
ergency/un
planne
d repairs will ty
pically add
30 to 50%
to th
e capital
expe
nses re
quire
d.
IMPA
CT ON OPE
RATIONS
Increased fle
xibility and reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Provide covered system
storage for the
Highland No. 1 Service Area and elim
inate the Mem
brane Filtration Plant.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
140
14
0Co
nstructio
n
73
0
730
Total Project Cost
0 0
00
140
730
0 87
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
00
100
730
40
870
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Treatmen
t Plant
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Highland
Park Mem
brane Filtration Mod
ule Re
placem
ent P
rogram
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Capacity
, Ope
ratio
ns and
Mainten
ance Efficien
cy, Level of
Service
PROJECT
DESCR
IPTION
Replace mem
brane mod
ules. The Mem
brane Filtration Plant (MFP) include
s a to
tal of 1
0 racks e
ach with
80 mod
ules.
PROJECT
JUSTIFICAT
ION
Mem
brane mod
ules have reache
d the en
d of th
eir u
seful life
and
are beginning
to fail at an increasin
g rate.
RISK
(S)
Expo
ses the
Autho
rity to highe
r costs to
add
ress emergency facility failures a
nd th
e Highland
No. 1 Service Area to a
potentially deficient or n
on‐com
plaint water su
pply.
IMPA
CT ON OPE
RATIONS
Increase ope
ratin
g fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
short term practical alte
rnatives to
the recommen
ded actio
n. Lon
g term
alte
rnative is providing covered
finish
ed water storage for the
Highland No. 1 Service Area and elim
inating the MFP.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
1515
30
Constructio
n
1,460
1,460
2,920
Total Project Cost
0 0
1,47
51,47
50
00
2,95
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
480
1,48
099
00
0 2,95
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Garfie
ld/9
PROJECT
NAM
E Garfie
ld W
ater Storage Tank Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance, Reliability, Capacity
, Level of Service
PROJECT
DESCR
IPTION
Perform a com
preh
ensiv
e inspectio
n of th
e existing elevated
storage tank, evaluate the system
's ne
ed fo
r the
installatio
n of an additio
nal tank, and
rehabilitation of th
e existing tank.
PROJECT
JUSTIFICAT
ION
The Garfie
ld Elevated Storage Tank
was con
structed
in 195
9 and last re
habilitated
in 1992. The
existing tank
doe
s not
have su
fficien
t capacity
to m
eet P
A DE
P's req
uiremen
ts fo
r sizing, w
hich states th
at a ta
nk m
ust h
ave sufficien
t capacity to
meet a
verage day dem
and plus fire flow
dem
and. A
ddition
ally, the
re are no second
ary feed
s into this
system
, which m
akes ta
king
this tank
out of service ope
ratio
nally difficult. This p
roject will provide
ade
quate storage
through system
redu
ndancy to
meet the
pressure district's dem
and, fire flow
con
ditio
ns if th
e (New
) Highland Pu
mp
Station expe
riences outages, and
con
tinual service to
critical customers d
uring main breaks and
pum
p station ou
tages.
RISK
(S)
Expo
ses the
Autho
rity's c
ustomers to po
or water quality from
coatin
g prob
lems o
r a poten
tially deficient water
supp
ly. Du
e to th
e pressure district's dem
and, th
e existing tank
canno
t be removed
from
service for cleaning or
rehabilitation.
IMPA
CT ON OPE
RATIONS
Increased fle
xibility and reliability, sy
stem
com
pliance, and
improved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Due to th
is pressure district's dem
and, critical customers served, and
lack of e
xisting capacity, rep
lacemen
t of the
existing tank
may be warranted
. CO
MMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
59
0
590
Constructio
n
3,380
3,380
Total Project Cost
0 59
0 3,38
00
00
0 3,97
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 17
0 89
02,73
018
00
0 3,97
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Lincoln‐Lemington
/12
PROJECT
NAM
E Lincoln Water Storage Tank Im
provem
ents or R
eplacemen
tPR
OJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance, Reliability, Capacity
, Level of Service
PROJECT
DESCR
IPTION
Perform a com
preh
ensiv
e inspectio
n of th
e existing storage tank
and
rehabilitation or re
placem
ent o
f the
existing
tank.
PROJECT
JUSTIFICAT
ION
Constructed in 1939, th
is tank
is nearin
g the en
d of its u
seful life
. The last inspectio
n, which was perform
ed in
200
8,
noted de
ficiencies that n
eed to be addressed to ensure water quality standards a
re m
et.
RISK
(S)
Expo
ses the
Autho
rity's c
ustomers to po
or water quality from
coatin
g prob
lems o
r a poten
tially deficient water su
pply
in th
e even
t of tank failure.
IMPA
CT ON OPE
RATIONS
Increased fle
xibility and reliability and system
com
pliance.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Rehabilitation of th
e existing tank, w
hich m
ay be a larger investmen
t than replacem
ent.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
61
0 0
61
0Co
nstructio
n
3,500
3,500
Total Project Cost
0 61
0 3,50
00
00
0 4,11
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 17
0 93
02,83
018
00
0 4,11
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PROJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
City View, Spring Hill, Spring Garde
n, Troy Hill/24
,26
PR
OJECT
NAM
E Sprin
g Hill Water Storage Tanks
Improvem
ents or R
eplacemen
tPR
OJECT
NO.
Unassigne
d STAT
US
Not Started
PR
IORITY
Safety, R
egulatory Co
mpliance, Reliability, Capacity
, Level of Service
PROJECT
DESCR
IPTION
Perform a com
preh
ensiv
e inspectio
n of th
e existing storage tanks a
nd re
habilitation or re
placem
ent o
f the
existing
tanks.
PROJECT
JUSTIFICAT
ION
Constructed in 1929 of riveted steel, the coatings and
structure of th
ese tanks m
ay re
quire
rehabilitation du
e to
corrosion.
The
existing shell ladde
r, ladd
er cage, and
rolling
roof ladd
er do no
t meet current OSH
A dimen
sional
requ
iremen
ts.
RISK
(S)
Expo
ses the
Autho
rity's c
ustomers to po
or water quality from
coatin
g prob
lems o
r a poten
tially deficient water su
pply
in th
e even
t of tank failure. Ad
ditio
nally, it e
xposes th
e Au
thority
’s staff and
con
tractors to
safety issues.
IMPA
CT ON OPE
RATIONS
Increased fle
xibility and reliability and system
com
pliance.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Rehabilitation of th
e existing tank, w
hich m
ay be a larger investmen
t than replacem
ent.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
310
31
0Co
nstructio
n
1,820
1,820
Total Project Cost
0 0
310
1,81
00
00
2,13
0CA
SH FLO
W SUMMAR
Y** (000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
9048
01,46
010
00
2,13
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Aspinw
all Pum
p Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Capacity
, Ope
ratio
ns and
Mainten
ance Efficien
cy, Level of
Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems.
PROJECT
JUSTIFICAT
ION
The pu
mp station was con
structed
in 1914 and many of th
e compo
nents w
ere installed in 1958. The
pum
p station is
in need of re
novatio
ns and
upgrade
s to maintain service, re
store a 20
to 25 year useful life
expectancy, and
to provide
safer con
ditio
ns fo
r the
staff. Add
ition
ally, installatio
n of variable freq
uency drives will re
duce water pressure surges
durin
g start‐up
that can
detrim
entally im
pact th
e 60
‐inch risin
g main to Lanph
er Reservoir, allow th
e pu
mps to
op
erate over a wide range of flow
, and
will re
duce th
e requ
ired size of th
e ne
w clearwell.
RISK
(S)
Expo
ses the
Autho
rity's to higher capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a po
tentially
deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay be expo
sed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
TSCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 10
0
10
0De
sign
2,770
2,770
Constructio
n
26
,590
26
,590
Total Project Cost
100
2,77
0 0
26,590
00
0 29
,460
CASH
FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 40
0 1,82
03,29
010
,095
10,095
3,76
0 29
,460
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Brue
cken
Pum
p Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Capacity
, Ope
ratio
ns and
Mainten
ance Efficien
cy, Level of
Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems.
PROJECT
JUSTIFICAT
ION
The pu
mp station was con
structed
in 1931. The
pum
p station is in need of re
novatio
ns and
upgrade
s to maintain
service, re
store a 20
to 25 year useful life
expectancy, and
to provide
safer con
ditio
ns fo
r the
staff. Add
ition
ally,
installatio
n of variable freq
uency drives will re
duce water pressure surges during start‐up
, allow th
e pu
mps to
ope
rate
more efficiently over a
wide range of flow
dem
ands, and
will re
duce th
e requ
ired size of th
e ne
w clearwell.
RISK
(S)
Expo
ses the
Autho
rity to highe
r capita
l costs to
add
ress emergency facility failures a
nd its c
ustomers to a po
tentially
deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay be expo
sed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
TSCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 10
0
10
0De
sign
2,410
2,410
Constructio
n
22
,570
22
,570
Total Project Cost
100
2,41
0 0
22,570
00
0 25
,080
CASH
FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 36
5 1,58
02,82
08,56
08,56
03,19
5 25
,080
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Garfie
ld/10
PROJECT
NAM
E Garfie
ld Pum
p Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Capacity
, Ope
ratio
ns and
Mainten
ance Efficien
cy, Level of
Service
PROJECT
DESCR
IPTION
Installatio
n of an interim
skid m
ounted
, fully enclosed, packaged pu
mp station with
a pum
ping
capacity
of 5
MGD,
emergency pipe
con
nections, and
integration into PWSA
’s SCA
DA sy
stem
for rem
ote mon
itorin
g and op
eration. At a
minim
um, reh
abilitatio
n of th
e existing station will includ
e installatio
n of new
electrical com
pone
nts, variable
freq
uency drives, pum
ps, m
otors, and
valves. In additio
n, im
provem
ents to
HVA
C and ancillary building system
s are
anticipated
. Upo
n completion of th
e rehabilitation, th
e interim
pum
p station will be removed
and
utilize
d for future
pump station rehabilitation and up
grade projects, and
will be available for e
mergency service.
PROJECT
JUSTIFICAT
ION
The Garfie
ld Pum
p Station supp
lies w
ater from
Highland Re
servoir N
o. 1 to
the Garfie
ld Tank and is the on
ly m
eans of
service to th
e Garfie
ld Tank, with
no othe
r pum
p station or intercon
nection available to su
pply water to
the district.
Due to sa
fety and
reliability concerns, O
peratio
ns has determined
it is no longer sa
fe to
enter th
e pu
mp station.
RISK
(S)
An interrup
tion in th
e supp
ly of w
ater, including
fire flow
, to the Garfie
ld pressure district. Significant h
ealth
and
safety risk to
staff.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station and allow fo
r pum
ping
from
Highland No. 2
Reservoir to Highland
No. 1 Service Area. See
Highland Re
servoir P
ump Station and Risin
g Main.
COMMITMEN
TSCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
90
610
70
0Co
nstructio
n 62
0
3,530
4,150
Total Project Cost
710
610
3,53
00
00
0 4,85
0CA
SH FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 88
0 68
02,86
542
50
0 4,85
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Highland
Reservoir Pu
mp Station and Risin
g Main
PROJECT
NO.
Unassigne
d STAT
US
New
PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, C
apacity
, Level of Service
PROJECT
DESCR
IPTION
Constructio
n of a new
finished
water pum
p station and transm
ission main to su
pply water to
the Highland
No.1
Service Area from
Highland No. 2 Reservoir.
PROJECT
JUSTIFICAT
ION
All com
pliant water su
pply fo
r the
Highland No. 1 Service Area curren
tly flow
s throu
gh th
e Highland
No. 1 Reservoir
and the Mem
brane Filtration Plant (MFP). The
re is no othe
r sou
rce water su
pply fo
r the
Highland No. 1 Service Area.
In add
ition
to providing
alte
rnate supp
ly, this p
roject is to
tempo
rarily provide fin
ished
water th
at m
eets th
e chlorin
e disin
fection rules to the Highland
No. 1 Service Area du
ring the Clearw
ell Rep
lacemen
t Project. Ad
ditio
nally, this n
ew
facility could also be de
signe
d to se
rvice the Garfie
ld pressure district, thus elim
inating the rehabilitation of th
e (New
) Highland
Pum
p Station.
RISK
(S)
Failure of the
two Risin
g Mains (N
o.1 or No. 2), MFP, or B
ruecken Pu
mp Station wou
ld re
sult in th
e loss of com
pliant
water su
pply to
app
roximately 40
% of the
Autho
rity’s c
ustomer base.
IMPA
CT ON OPE
RATIONS
Increased op
eration and mainten
ance labo
r and
expen
ses. Increased
ope
ratin
g fle
xibility in th
e future.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Alternative 1: Con
struction of a new
clearwell at the
site of the
existing west sed
imen
tatio
n basin
. Ho
wever, a
previous stud
y cond
ucted by an en
gine
ering consultant still re
commen
ded the additio
n of th
ese assets as p
art o
f the
Clearw
ell Rep
lacemen
t project.
Alternative 2: Inclusion in th
e expansion and rehabilitation of th
e existing (New
) Highland Pu
mp Station.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
3,520
3,520
Constructio
n
28
,170
28
,170
Total Project Cost
0 3,52
0 0
28,170
00
0 31
,690
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 61
0 1,99
02,80
010
,700
10,700
4,89
0 31
,690
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Squirrel Hill, R
egen
t Squ
are, Point Breeze,
Green
field/14
PROJECT
NAM
E He
rron
Hill Pum
p Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems a
s prio
ritize
d by
the recommen
ded Finished
Water
Pump Stations Con
ditio
n Assessmen
t Project.
PROJECT
JUSTIFICAT
ION
The pu
mp station was orig
inally con
structed
in th
e late 1890's. The
pum
p station is in need of re
novatio
ns and
up
grades to
maintain service, re
store a 20
to 25 year useful life
expectancy, and
to provide
safer con
ditio
ns fo
r the
staff. To op
timize
capita
l expen
ditures a
nd m
inim
ize disrup
tions, con
struction projects m
ust b
e prioritize
d and
coordinated.
RISK
(S)
Lack of facility plann
ing expo
ses P
WSA
to highe
r capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a
potentially deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay
be exposed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
T SCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 50
50
Desig
n
1,130
1,130
Constructio
n
9,180
9,180
Total Project Cost
50
0 0
00
010
,310
10
,360
CASH
FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 50
0
00
010
,310
10
,360
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Upp
er Hill/5
PR
OJECT
NAM
E He
rron
Hill Tank Pu
mp Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems a
s prio
ritize
d by
the recommen
ded Finished
Water
Pump Stations Con
ditio
n Assessmen
t Project.
PROJECT
JUSTIFICAT
ION
The pu
mp station is in need of re
novatio
ns and
upgrade
s to maintain service, re
store a 20
to 25 year useful life
expe
ctancy, and
to provide
safer con
ditio
ns fo
r the
staff. To op
timize
capita
l expen
ditures a
nd m
inim
ize disrup
tions,
constructio
n projects m
ust b
e prioritize
d and coordinated.
RISK
(S)
Lack of facility plann
ing expo
ses P
WSA
to highe
r capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a
potentially deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay
be exposed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
T SCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 8
8De
sign
130
130
Constructio
n
89
0 89
0To
tal Project Cost
8 0
00
00
1,02
0 1,02
8CA
SH FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 8
00
00
1,02
0 1,02
8*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Brighton
Heights, C
alifo
rnia Kirk
bride, M
arshall‐
Shadeland, Northview
Heights, Perry, Pineview,
Sprin
g Garde
n, Sum
mer Hill/21, 24, 25, 26, 27
PROJECT
NAM
E Ho
ward Pu
mp Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems a
s prio
ritize
d by
the recommen
ded Finished
Water
Pump Stations Con
ditio
n Assessmen
t Project.
PROJECT
JUSTIFICAT
ION
The pu
mp station was orig
inally con
structed
between 19
00 and
1904. The
pum
p station is in need of re
novatio
ns and
up
grades to
maintain service, re
store a 20
to 25 year useful life
expectancy, and
to provide
safer con
ditio
ns fo
r the
staff. To op
timize
capita
l expen
ditures a
nd m
inim
ize disrup
tions, con
struction projects m
ust b
e prioritize
d and
coordinated.
RISK
(S)
Lack of facility plann
ing expo
ses P
WSA
to highe
r capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a
potentially deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay
be exposed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
TSCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 85
85
Desig
n
1,900
1,900
Constructio
n
15
,410
15
,410
Total Project Cost
85
0 0
00
017
,310
17
,395
CASH
FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 85
0
00
017
,310
17
,395
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Bloo
mfie
ld//8
PR
OJECT
NAM
E Inline Pu
mp Station (Coral and
Pacific) Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems a
s prio
ritize
d by
the recommen
ded Finished
Water
Pump Stations Con
ditio
n Assessmen
t Project.
PROJECT
JUSTIFICAT
ION
The pu
mp station is in need of re
novatio
ns and
upgrade
s to maintain service, re
store a 20
to 25 year useful life
expe
ctancy, and
to provide
safer con
ditio
ns fo
r the
staff. To op
timize
capita
l expen
ditures a
nd m
inim
ize disrup
tions,
constructio
n projects m
ust b
e prioritize
d and coordinated.
RISK
(S)
Lack of facility plann
ing expo
ses P
WSA
to highe
r capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a
potentially deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay
be exposed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
TSCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 10
10
Desig
n
80
80
Constructio
n
51
0
510
Total Project Cost
10
80
510
00
00
600
CASH
FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 65
51
025
00
0 60
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Lincoln‐Lemington
/12
PR
OJECT
NAM
E Lincoln Pu
mp Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems a
s prio
ritize
d by
the recommen
ded Finished
Water
Pump Stations Con
ditio
n Assessmen
t Project.
PROJECT
JUSTIFICAT
ION
The pu
mp station was orig
inally con
structed
in 195
2. The
pum
p station is in need of re
novatio
ns and
upgrade
s to
maintain service, re
store a 20
to 25 year useful life
expectancy, and
to provide
safer con
ditio
ns fo
r the
staff. To
optim
ize capita
l expen
ditures a
nd m
inim
ize disrup
tions, con
struction projects m
ust b
e prioritize
d and coordinated.
RISK
(S)
Lack of facility plann
ing expo
ses P
WSA
to highe
r capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a
potentially deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay
be exposed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
T SCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 20
20
Desig
n
35
0 35
0Co
nstructio
n
2,550
2,550
Total Project Cost
20
0 0
00
02,90
0 2,92
0CA
SH FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 20
0
00
02,90
0 2,92
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Sheradan, Elliott, West E
nd, W
estw
ood, Ridgemon
t, Du
quesne
Heights, Sou
th Sho
re, M
ount W
ashington,
Allentow
n, Sou
thsid
e Slop
es/16, 17, 18, 20
PROJECT
NAM
E Mission Pu
mp Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems a
s prio
ritize
d by
the recommen
ded Finished
Water
Pump Stations Con
ditio
n Assessmen
t Project.
PROJECT
JUSTIFICAT
ION
The Mission Pu
mp Station is the on
ly pum
ping
station located south of th
e Mon
ongahe
la River and
was orig
inally
constructed be
tween 1910
and
1912. The
pum
p station is in need of re
novatio
ns and
upgrade
s to maintain service,
restore a 20
to 25 year useful life
expectancy, and
to provide
safer con
ditio
ns fo
r the
staff. To op
timize
capita
l expe
nditu
res a
nd m
inim
ize disrup
tions, con
struction projects m
ust b
e prioritize
d and coordinated.
RISK
(S)
Lack of facility plann
ing expo
ses P
WSA
to highe
r capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a
potentially deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay
be exposed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
TSCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 65
65
Desig
n
1,725
1,725
Constructio
n
13
,995
13
,995
Total Project Cost
65
0 0
00
015
,720
15
,785
CASH
FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 65
0
00
015
,720
15
,785
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
Glen Ha
zel, Ha
zelwoo
d, Squ
irrel Hill Sou
th, Swisshe
lm
Park/ 1
4, 15
PROJECT
NAM
E Saline Pu
mp Station Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Assessmen
t/Stud
y PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Ope
ratio
ns
and Mainten
ance Efficien
cy, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f aged pu
mp and valve eq
uipm
ent, electrical equ
ipmen
t, HV
AC, and
auxiliary system
s and
rehabilitation
of th
e bu
ilding archite
ctural and
ene
rgy managem
ent systems a
s prio
ritize
d by
the recommen
ded Finished
Water
Pump Stations Con
ditio
n Assessmen
t Project.
PROJECT
JUSTIFICAT
ION
The pu
mp station was orig
inally con
structed
in 193
5. The
pum
p station is in need of re
novatio
ns and
upgrade
s to
maintain service, re
store a 20
to 25 year useful life
expectancy, and
to provide
safer con
ditio
ns fo
r the
staff. To
optim
ize capita
l expen
ditures a
nd m
inim
ize disrup
tions, con
struction projects m
ust b
e prioritize
d and coordinated.
RISK
(S)
Lack of facility plann
ing expo
ses P
WSA
to highe
r capita
l costs to
add
ress emergency failures a
nd its c
ustomers to a
potentially deficient water su
pply. Po
tential increase of ope
ratio
ns and
mainten
ance expen
ses. Staff mem
bers m
ay
be exposed
to electrical arc flashe
s due
to th
e age of th
e electrical sy
stem
s.
IMPA
CT ON OPE
RATIONS
Increased op
erating efficiency, flexibility, and
reliability and im
proved
safety con
ditio
ns fo
r staff.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Constructio
n of a new
facility to re
place the existing pu
mp station.
COMMITMEN
TSCHED
ULE*1
(000’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☒
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y 15
15
Desig
n
40
0 40
0Co
nstructio
n
2,900
2,900
Total Project Cost
15
0 0
00
03,30
0 3,31
5CA
SH FLO
W SUMMAR
Y**1
(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 15
0
00
03,30
0 3,31
5*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
1 Pen
ding
com
pletion and review
of the
recommen
datio
ns from
the Re
commen
ded Pu
mp Station Assessmen
t Project, the
com
mitm
ent a
nd cash flo
w will be refin
ed.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
.
PROJECT
CLA
SS
Water Pum
ping
and
Storage
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Aspinw
all Pum
p Station to Lanph
er Reservoir Risin
g Main
PROJECT
NO.
2013
‐930
‐231
‐0
STAT
US
Desig
n PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, Level of Service
PROJECT
DESCR
IPTION
Constructio
n of a new
, red
undant risin
g main from
Aspinwall Pum
p Station to Lanph
er Reservoir.
PROJECT
JUSTIFICAT
ION
The existing 60
‐inch risin
g main that su
pplies the
Lanph
er Reservoir is a 15
0 year old riveted steel pipe, has se
veral tap
conn
ectio
ns to
critical and
bulk custom
ers, and
has experienced
recent pipe failures. The
new
propo
sed rising main
wou
ld se
rve as a prim
ary supp
ly so
urce fo
r Lanph
er Reservoir du
ring the Clearw
ell Rep
lacemen
t Project and
a
redu
ndant sup
ply line in case of a failure or p
lann
ed cleaning and rehabilitation of th
e existing 60
‐inch su
pply m
ain.
RISK
(S)
Failure of the
risin
g main could im
pact up to half o
f PWSA
’s customers, includ
ing St. M
argaret H
ospital, and othe
r bulk
custom
ers, includ
ing Aspinw
all, Blaw
nox, Etna, Sharpsburg, Fox Chape
l, and Shaler.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Rehabilitation of th
e existing 60
‐inch su
pply m
ain and constructio
n of a parallel m
ain in se
ctions th
at canno
t be
curren
tly isolated
to clean, inspe
ct, or reh
abilitate.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
156
5,160
5,316
Constructio
n
43
,520
43
,520
Total Project Cost
156
5,16
0 0
43,520
00
0 48
,836
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
156
510
2,72
02,10
024
,770
18,580
0 48
,836
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
This page was intentiona
lly left blank
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Lead
Service Line Re
placem
ent P
rogram
PROJECT
NO.
2016
‐325
‐105
‐0
STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance
PROJECT
DESCR
IPTION
Replacem
ent o
f 7% of lead service lines per year.
PROJECT
JUSTIFICAT
ION
Due to th
e exceed
ance of the
action levels from
com
pliance tests for lead
and
cop
per, the Pe
nnsylvania Dep
artm
ent
of Enviro
nmen
tal Protection requ
ired the Au
thority
to perform
add
ition
al distrib
ution system
water quality
mon
itorin
g, optim
izatio
n of corrosio
n control treatmen
t, pu
blic edu
catio
n, and
lead
service line replacem
ent.
RISK
(S)
Failure to
com
ply will re
sult in re
gulatory fine
s and
poses a pub
lic health
risk.
IMPA
CT ON OPE
RATIONS
Redu
ction in se
rvice line failure due
to re
placing with
new
infrastructure, red
ucing de
mands on Ope
ratio
ns Rep
air
Crew
s.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
78
0 55
557
058
561
5Ongoing
3,105
Constructio
n
22,920
16
,305
16,800
17,295
17,825
Ongoing
91
,145
Total Project Cost
0 23
,700
16
,860
17,370
17,880
18,440
Ongoing
94
,250
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 11
,480
16
,490
16,990
17,500
18,030
Ongoing
80
,490
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Large Diam
eter W
ater M
ain Re
habilitation or Rep
lacemen
t Program
PROJECT
NO.
Annu
al
STAT
US
Not Started
PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Strategic replacem
ent o
r reh
abilitatio
n of large diam
eter water m
ains (1
6‐inch and
larger) and
app
urtenances to
im
prove system
reliability and hydraulics, includ
ing internal and
external inspe
ctions.
PROJECT
JUSTIFICAT
ION
PWSA
's water sy
stem
has app
roximately 12
2 miles o
f large diameter water m
ains. B
y maintaining
a proactiv
e approach to
asset m
anagem
ent, efforts c
an be directed
towards re
med
ying
assets b
efore their failure, thu
s resultin
g in a sa
vings in the replacem
ent cost a
s com
pared to emergency/reactiv
e repair costs. Typically, large diameter pipe is
not readily available and has a
6 to
8 week lead
time for d
elivery. A
large pe
rcen
tage of the
Autho
rity's large diameter
mains are riveted steel, which canno
t be easily repaire
d with
out the
use of field fa
bricated
specialty
fittings.
RISK
(S)
The conseq
uences of failure fo
r larger m
ains are m
uch greater than for smaller d
istrib
ution mains, w
hich ty
pically
includ
e sig
nificant service outages (larger a
rea and longer time fram
e im
pacts), as w
ell as p
rope
rty and roadway
damage. This is e
specially true
for the
Highland No. 1 Pressure District a
nd all districts fe
d by
Highland No. 1.
IMPA
CT ON OPE
RATIONS
Increased system
reliability and im
proved
sytem m
anagem
ent.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Continue
to exten
d utility com
pone
nt life until a high
failure ra
te justifies re
placem
ent.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☒Expe
nse: ☐
Engine
ering ☐Sewer ☒
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
13
02,400
2,480
2,550
Ongoing
7,560
Desig
n
1,360
1,390
1,440
Ongoing
4,190
Constructio
n
11
,100
Ongoing
11
,100
Total Project Cost
0 0
130
3,76
03,87
015
,090
Ongoing
22
,850
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
901,51
53,76
06,16
0Ongoing
11
,525
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Large Va
lve Re
placem
ent P
rogram
PROJECT
NO.
Annu
al
STAT
US
Not Started
PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f existing (defectiv
e or non
‐ope
ratio
nal) or installatio
n of new
large diam
eter valves, includ
ing pressure
redu
cing
valves a
nd air release valves, on 16
‐inch and
larger diameter water m
ains th
rougho
ut th
e water distrib
ution
system
. PR
OJECT
JUSTIFICAT
ION
Increasin
g the nu
mbe
r of o
perable valves in
the system
will re
duce th
e nu
mbe
r of customers that m
ay be im
pacted
and the nu
mbe
r of valves that w
ould need to be closed
during em
ergency cond
ition
s. A
ddition
ally, the
y are requ
ired
for the
inspectio
n and rehabilitation of th
e mains.
RISK
(S)
The conseq
uences of failure fo
r larger m
ains are m
uch greater than for smaller d
istrib
ution mains, w
hich cou
ld includ
e sig
nificant service outages.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Utilize
Autho
rity staff and
equ
ipmen
t to pe
rform all repairs. This w
ould re
quire
an increase in
ope
ratio
ns expen
ses for
both personn
el and
equ
ipmen
t.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
460
475
490
500
Ongoing
1,925
Constructio
n
3,425
3,530
3,640
Ongoing
10
,595
Total Project Cost
0 0
460
3,90
04,02
04,14
0Ongoing
12
,520
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
400
3,09
53,87
53,99
5Ongoing
11
,365
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Va
lve Re
placem
ent P
rogram
PR
OJECT
NO.
Annu
al
STAT
US
Constructio
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Level of
Service
PROJECT
DESCR
IPTION
Replacem
ent o
f defectiv
e or non
‐ope
ratio
nal valves o
n transm
ission and distrib
ution mains th
rougho
ut th
e water
distrib
ution system
, excluding
valves rep
laced du
ring waterline relays.
PROJECT
JUSTIFICAT
ION
Increasin
g the nu
mbe
r of o
perable valves in
the system
will re
duce th
e nu
mbe
r of customers that m
ay be im
pacted
and the nu
mbe
r of valves that w
ould need to be closed
during em
ergency cond
ition
s.
RISK
(S)
A larger num
ber o
f customers m
ay be subject to service ou
tages.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Utilize
Autho
rity staff and
equ
ipmen
t to pe
rform all repairs. This w
ould re
quire
an increase in
ope
ratio
ns expen
ses for
both personn
el and
equ
ipmen
t.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
30
30
3535
35Ongoing
16
5Co
nstructio
n 2,400
2,915
3,155
3,265
3,380
3,380
Ongoing
18
,495
Total Project Cost
2,40
0 2,94
5 3,18
53,30
03,41
53,41
5Ongoing
18
,660
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
1,14
0 2,21
0 3,77
02,99
03,36
03,42
0Ongoing
16
,890
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Hy
drant R
eplacemen
t Program
PR
OJECT
NO.
Annu
al
STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Replacem
ent o
f broken hydrants th
rougho
ut th
e water distrib
ution system
. Program goal is to replace a minim
um of
100 hydrants per year, exclud
ing hydrants re
placed
during waterline relays.
PROJECT
JUSTIFICAT
ION
Increasin
g the nu
mbe
r of o
peratio
nal hydrants p
rovide
s better fire
protection for the
City
of P
ittsburgh.
RISK
(S)
Custom
ers w
ill be subject to inadeq
uate pressure for fire
fighting activ
ities.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Utilize
Autho
rity staff and
equ
ipmen
t to pe
rform all repairs. This w
ould re
quire
an increase in
ope
ratio
ns expen
ses for
both personn
el and
equ
ipmen
t.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
20
20
2020
20Ongoing
10
0Co
nstructio
n
1,160
1,295
1,295
1,410
1,410
Ongoing
6,570
Total Project Cost
0 1,18
0 1,31
51,31
51,43
01,43
0Ongoing
6,67
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 39
0 1,22
01,32
01,35
01,43
0Ongoing
5,71
0+*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Sm
all D
iameter M
ain Re
placem
ent a
nd Fire
Protection Distrib
ution System
Improvem
ents
PROJECT
NO.
2013
‐325
‐288
‐0, 2013‐325‐21
1‐0, Ann
ual
STAT
US
Desig
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Regional
Coop
eration/Stew
ardship, Level of Service
PROJECT
DESCR
IPTION
Strategic replacem
ent o
f water m
ains to
improve system
reliability as well as improve water pressure, m
aintain water
quality
, and
minim
ize disturbance to th
e commun
ity. Program
will initially fo
cus o
n replacing existing 4‐inch and
6‐
inch unlined
cast iron mains and
mains with
a history of freq
uent breaks.
PROJECT
JUSTIFICAT
ION
By m
aintaining
a proactiv
e approach to
asset m
anagem
ent, efforts c
an be directed
towards re
med
ying
assets b
efore
their failure, thu
s saving in overall replacem
ent cost. Ad
ditio
nally, projects w
ill be coordinated with
other utilities to
minim
ize disturbance to th
e commun
ity and
street su
rface restoration costs. W
ater quality will also
improve by
removing tube
rculated
mains.
RISK
(S)
Custom
ers m
ay be subject to service ou
tages o
r the
poten
tial for inadeq
uate pressure for fire
fighting activ
ities.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Continue
to exten
d utility com
pone
nt life until a high
failure ra
te justifies re
placem
ent.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
364
1,330
2,015
2,680
3,455
Ongoing
Ongoing
9,844
Constructio
n 5,406
0 9,195
14,060
19,170
24,705
Ongoing
72
,536
Total Project Cost
5,77
0 1,33
0 11
,210
16,740
22,625
24,705
Ongoing
82
,380
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
4,07
0 2,36
0 5,33
015
,290
19,770
22,600
Ongoing
69
,420
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Urgen
t Water Relay
PROJECT
NO.
2016
‐325,102
‐0, A
nnual
STAT
US
Constructio
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Level of
Service
PROJECT
DESCR
IPTION
Replacem
ent o
f existing water m
ains, valves, fittings, service con
nections, and
hydrants d
ue to
emergency situatio
ns.
PROJECT
JUSTIFICAT
ION
The existing water distrib
ution system
is aging
and
immed
iate re
pairs are re
quire
d to add
ress failures that cou
ld be
significant p
ublic sa
fety hazards.
RISK
(S)
Custom
ers w
ill be subject to service ou
tages o
r inade
quate pressure fo
r fire
fighting activ
ities until break is addressed.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Utilize
Autho
rity staff and
equ
ipmen
t to pe
rform all repairs. This w
ould re
quire
an increase in
ope
ratio
ns expen
ses for
both personn
el and
equ
ipmen
t.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
45
165
180
195
195
195
Ongoing
97
5Co
nstructio
n 1,225
1,305
1,420
1,525
1,525
1,525
Ongoing
8,525
Total Project Cost
1,27
0 1,47
0 1,60
01,72
01,72
01,72
0Ongoing
9,50
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
270
1,42
0 1,51
01,63
01,72
01,72
0Ongoing
8,27
0+*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
North Sho
re & Cen
tral Business D
istrict/1,22
PROJECT
NAM
E Ft. D
uque
sne Bridge W
ater Air Re
lease Va
lve Re
pair
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Safety, R
eliability/Ope
ratio
nal Flexibility, Regional
Coop
eration/Stew
ardship, Level of Service
PROJECT
DESCR
IPTION
Perform transie
nt analysis
along
existing 30
‐inch water m
ain that is su
spen
ded from
the Fort Duq
uesne Bridge. De
sign
and construct n
ew pipe supp
orts and
thrust re
straint b
ased
on the results of the
analysis. Includ
es th
e replacem
ent o
f the existing air‐release valve on
the 30
‐inch water m
ain, includ
ing insulatio
n or heat tracing
to re
duce poten
tial for
freezin
g and cracking
of the
valve.
PROJECT
JUSTIFICAT
ION
A recent PEN
NDO
T inspectio
n of th
e Fort Duq
uesne Bridge iden
tified priority code
1 defects in
the supp
ort o
f the
existing 30
‐inch diameter water m
ain. A
ddition
ally, the
existing 2‐inch diameter air‐release valve located on
the main
has a
history of failure. The
water m
ain is located be
low th
e lower deck of th
e Fort Duq
uesne Bridge and
serves as a
n em
ergency intercon
nection be
tween pressure gradien
ts and
is a vita
l com
pone
nt to
the system
ope
ratio
n.
RISK
(S)
Custom
ers m
ay be subject to service ou
tages o
r the
poten
tial for inadeq
uate pressure for fire
fighting activ
ities.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
13
5
135
Constructio
n
635
63
5To
tal Project Cost
0 77
0 0
00
00
770
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 10
0 64
030
00
0 77
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Water Distrib
ution System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Washo
ut Disc
onne
ction Program
PROJECT
NO.
Annu
al
STAT
US
Not Started
PR
IORITY
Safety, R
egulatory Co
mpliance, Level of Service
PROJECT
DESCR
IPTION
Investigation and, if necessary, disc
onne
ction of large water m
ain washo
uts from th
e sewer sy
stem
.
PROJECT
JUSTIFICAT
ION
A nu
mbe
r of o
lder washo
uts o
n larger m
ains were directly con
nected
to se
wers w
ith a closed valve du
ring
constructio
n. The
se washo
uts m
ust b
e completely discon
nected
from
the sewer.
RISK
(S)
Custom
ers m
ay be subject to he
alth im
pacts, if th
e valves were accide
ntally ope
ned or broken, due
to cross
contam
ination.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
2,120
2,120
Constructio
n
11
,590
11
,590
Total Project Cost
0 0
00
00
13,710
13
,710
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
00
00
13,710
13
,710
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
This page was intentiona
lly left blank
.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Urgen
t Sew
er Recon
struction
PROJECT
NO.
Annu
al
STAT
US
Constructio
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Reconstructio
n of existing sewers, m
anho
les, catch basins, and
inlets due
to emergency situatio
ns or p
ipe failures.
PROJECT
JUSTIFICAT
ION
The existing sewer sy
stem
is aging
and
immed
iate re
pairs are re
quire
d to add
ress failures that cou
ld be sig
nificant
public sa
fety hazards.
RISK
(S)
Custom
ers m
ay be subject to basemen
t backups or o
verflows m
ay occur due
to collapsed
pipes. The
Autho
rity may be
subject to related fin
es due
to se
wer overflows o
r for non
‐com
pliance as outlined
in th
e Co
nsen
t Order and
Ag
reem
ent.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Utilize
Autho
rity staff and
equ
ipmen
t to pe
rform all repairs. This w
ould re
quire
an increase in
ope
ratio
ns expen
ses for
both personn
el and
equ
ipmen
t.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
16
5 18
019
519
519
5Ongoing
93
0Co
nstructio
n 1,005
1,305
1,420
1,525
1,525
1,525
Ongoing
8,305
Total Project Cost
1,00
5 1,47
0 1,60
01,72
01,72
01,72
0Ongoing
9,23
5CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
10
1,41
5 1,51
01,63
01,72
01,72
0Ongoing
8,00
5+*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Sewers U
nder Critical Structures P
rogram
PROJECT
NO.
Annu
al
STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Rehabilitation, re
locatio
n, and
aband
onmen
t, if applicable, of e
xisting sewer infrastructure located un
der o
r adjacen
t to buildings, brid
ges, or railro
ads o
r located
on steep slo
pes.
PROJECT
JUSTIFICAT
ION
In re
cent years, the
re has been an
increasin
g rate of failure of this a
sset ty
pe due
to limite
d accessibility and
pipe age.
By m
aintaining
a proactiv
e approach to
asset m
anagem
ent, efforts c
an be directed
towards re
med
ying
assets b
efore
their failure, thu
s saving in overall replacem
ent cost.
RISK
(S)
Failure of this a
sset ty
pe cou
ld re
sult in significant prope
rty/structure damage, increased replacem
ent cost, and
increased service ou
tages o
r bypass p
umping.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Continue
to exten
d utility com
pone
nt life until a high
failure ra
te justifies re
placem
ent.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
75
8 78
080
382
785
2Ongoing
4,020
Constructio
n
5,824
5,993
6,173
6,363
Ongoing
24
,353
Total Project Cost
0 75
8 6,60
46,79
67,00
07,21
5Ongoing
28
,373
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 67
5 6,09
06,61
56,87
57,01
5Ongoing
27
,270
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Sm
all D
iameter Sew
er Reh
abilitatio
n Program
PROJECT
NO.
Annu
al
STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Proactive, tren
chless re
habilitation of less th
an 36‐inch diameter se
wer m
ains to
restore structural integrity
, red
uce
root intrusion, and
redu
ce infiltration and inflo
w; including
cleaning and pre and po
st con
struction CC
TV inspectio
ns.
PROJECT
JUSTIFICAT
ION
Provides th
e Au
thority
with
a m
eans to
add
ress se
veral m
oderate/major structural defects in
pipe segm
ents prio
r to
complete failure. This trenchless p
ipe rene
wal m
etho
d rene
ws the
asset, elim
inates disrup
tive excavatio
n, and
is m
ore
cost effe
ctive than
replacem
ent.
RISK
(S)
If mod
erate/major structural defects are not proactiv
ely addressed, com
plete failure will eventually occur and
excavatio
n will be requ
ired. A
ny com
plete failure th
at occurs w
ill re
sult in dramatically increased expe
nditu
res for
repair.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Perform excavated
point re
pairs to
add
ress defectiv
e sections of p
ipe, re
place segm
ent in its entire
ty, or con
tinue
to
extend
asset life until failure.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
67
0 82
098
51,165
1,320
Ongoing
4,960
Constructio
n
6,690
8,290
9,985
11,795
13,620
Ongoing
50
,380
Total Project Cost
0 7,36
0 9,11
010
,970
12,960
14,940
Ongoing
55
,340
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 66
0 7,51
09,27
011
,150
13,120
Ongoing
41
,710
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Large Diam
eter Sew
er Reh
abilitatio
n Program
PROJECT
NO.
Annu
al
STAT
US
Desig
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Proactive, tren
chless re
habilitation of 36‐inch diameter or g
reater se
wer m
ains to
restore structural integrity
, red
uce
root intrusion, and
redu
ce infiltration and inflo
w; including
cleaning and pre and po
st con
struction CC
TV inspectio
ns.
PROJECT
JUSTIFICAT
ION
Provides th
e Au
thority
with
a m
eans to
add
ress se
veral m
oderate/major structural defects in
pipe segm
ents prio
r to
complete failure. This trenchless p
ipe rene
wal m
etho
d rene
ws the
asset, elim
inates disrup
tive excavatio
n, and
is m
ore
cost effe
ctive than
replacem
ent.
RISK
(S)
If mod
erate/major structural defects are not proactiv
ely addressed, com
plete failure will eventually occur and
excavatio
n will be requ
ired. A
ny com
plete failure th
at occurs w
ill re
sult in dramatically increased expe
nditu
res for
repair.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Perform excavated
point re
pairs to
add
ress defectiv
e sections of p
ipe, re
place segm
ent in its entire
ty, or con
tinue
to
extend
asset life until failure.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
17
5 34
051
570
574
5Ongoing
2,480
Constructio
n
1,615
3,400
5,235
7,155
7,365
Ongoing
24
,770
Total Project Cost
0 1,79
0 3,74
05,75
07,86
08,11
0Ongoing
27
,250
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 17
0 1,95
03,92
05,93
07,88
0Ongoing
19
,850
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
Vario
us
PROJECT
NAM
E 20
18 W
astewater System Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, Level of Service
PROJECT
DESCR
IPTION
Reconstructio
n of existing sewer m
ains on Wiese Street, Wilbur Street, Creedm
oor A
venu
e, Ornam
ent W
ay,
Coop
erfie
ld Avenu
e, N. She
ridan
Avenu
e, Port W
ay, and
Swim
burne Street.
PROJECT
JUSTIFICAT
ION
Repairs were issue
d on
previou
s ann
ual con
tracts; h
owever, w
ere no
t perform
ed due
to utility
con
flicts a
nd limite
d site access.
RISK
(S)
Custom
ers m
ay be subject to basemen
t backups or o
verflows m
ay occur due
to collapsed
pipes. The
Autho
rity may be
subject to related fin
es due
to se
wer overflows o
r for non
‐com
pliance as outlined
in th
e Co
nsen
t Order and
Ag
reem
ent.
IMPA
CT ON OPE
RATIONS
Increased op
erating reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Utilize
Autho
rity staff and
equ
ipmen
t to pe
rform all repairs and
manho
le installatio
ns. This w
ould re
quire
an increase
in ope
ratio
ns expen
ses for both pe
rson
nel and
equ
ipmen
t.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
88
0
880
Constructio
n
4,390
4,390
Total Project Cost
0 88
0 4,39
00
00
0 5,27
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 36
5 3,12
01,78
50
00
5,27
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
Green
field/15
PROJECT
NAM
E Be
echw
ood Bo
ulevard/Green
field Brid
ge Sew
er Rep
lacemen
tPR
OJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, Level of Service
PROJECT
DESCR
IPTION
Installatio
n of a new
sanitary se
wer and
app
urtenances, including
grin
der p
umps, on Expo
sition Way to
existing
manho
le M
H054
L013
on Alger S
treet to provide pe
rmanen
t service fo
r 4101 and 4103
Beechwoo
d Bo
ulevard.
PROJECT
JUSTIFICAT
ION
Gray water began
surfacing at th
e Green
field Brid
ge con
struction site. D
ye te
sting at 4101 and 4103
Beechwoo
d Bo
ulevard revealed
that th
ese prop
ertie
s were the source of the
gray water. A concrete holding
tank
was installed to
tempo
rarily collect th
e sanitary flow
s from th
ese prop
ertie
s until a ne
w sa
nitary se
wer is con
structed
to se
rvice these
prop
ertie
s.
RISK
(S)
The concrete holding
tank
was installed as a te
mpo
rary m
easure only and pe
rmanen
t sew
er se
rvice ne
eds to be
restored
. IM
PACT
ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Installatio
n of a new
sanitary se
wer and
app
urtenances from
Beechwoo
d Bo
ulevard to th
e existing 30
‐inch m
ain.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
14
0
140
Constructio
n
550
55
0To
tal Project Cost
0 69
0 0
00
00
690
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 42
0 27
00
00
0 69
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
Highland
Park/11
PROJECT
NAM
E Mellon Terrace Sewer System Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, R
egional Coo
peratio
n/ Stewardship, Level
of Service
PROJECT
DESCR
IPTION
Realignm
ent o
f app
roximately 66
5 linear feet o
f 24‐inch com
bine
d sewer m
ain on
Mellon Terrace.
PROJECT
JUSTIFICAT
ION
Repairs were issue
d on
previou
s ann
ual con
tracts; h
owever, w
ere no
t perform
ed due
to dep
th and
soil cond
ition
s.
Additio
nally, the
Dep
artm
ent o
f Pub
lic W
orks is plann
ing to re
pair/rebu
ild th
e roadway.
RISK
(S)
Custom
ers m
ay be subject to basemen
t backups or o
verflows m
ay occur due
to collapsed
pipes. The
Autho
rity may be
subject to related fin
es due
to se
wer overflows o
r for non
‐com
pliance as outlined
in th
e Co
nsen
t Order and
Ag
reem
ent.
IMPA
CT ON OPE
RATIONS
Increased op
erating reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Utilize
Autho
rity staff and
equ
ipmen
t to pe
rform th
e repairs. This w
ould re
quire
an increase in
ope
ratio
ns expen
ses
for b
oth pe
rson
nel and
equ
ipmen
t.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☒Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
345
34
5Co
nstructio
n
1,685
1,685
Total Project Cost
0 0
00
2,03
00
0 2,03
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
00
340
1,69
00
2,03
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Wastewater System
NEIGHBO
RHOOD/W
ARD
Lincoln Place/31
PROJECT
NAM
E 31
st W
ard Sewer System
PROJECT
NO.
Unassigne
d STAT
US
Desig
n PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, R
egional Coo
peratio
n/ Stewardship, Level
of Service
PROJECT
DESCR
IPTION
Evaluatio
n to iden
tify and locate th
e source(s) o
f the
infiltration and inflo
w (I/I), removal of p
ublic I/I sou
rces, and
rehabilitation/replacem
ent o
f the
Rogers S
treet a
nd M
ifflin
Road Pu
mp Station and force main.
PROJECT
JUSTIFICAT
ION
Both se
wage pu
mp stations and
the force main that con
vey flo
w to
the Streets R
un Sanita
ry Trunk
Sew
er were
constructed in th
e late 194
0’s a
nd are re
aching
the en
d of th
eir u
seful life
. Add
ition
ally, past studies su
ggest this
sewershed
may be sig
nificantly
impacted
by high
levels of infiltration/inflo
w.
RISK
(S)
The Au
thority
may be subject to related fin
es due
sanitary se
wer overflows c
aused by
pum
p station system
failures o
r excessive infiltration and inflo
w in
the system
.
IMPA
CT ON OPE
RATIONS
Increased op
erating fle
xibility and reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Abando
nmen
t of the
existing pu
mp stations and
installatio
n of a new
gravity m
ain to con
vey flo
ws to the West M
ifflin
Sanitary Autho
rity.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
1,520
1,520
Constructio
n
12
,000
12
,005
Total Project Cost
0 1,52
0 12
,000
00
00
13,520
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 48
0 1,91
09,73
01,40
00
0 13
,520
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Stormwater System
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Stormwater System Im
provem
ents
PROJECT
NO.
Annu
al
STAT
US
Desig
n PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, C
apacity
, Regional Coo
peratio
n/
Stew
ardship, Level of Service
PROJECT
DESCR
IPTION
Strategic replacem
ent o
r reh
abilitatio
n of storm m
ains to
improve system
reliability and minim
ize disturbance to th
e commun
ity.
PROJECT
JUSTIFICAT
ION
By m
aintaining
a proactiv
e approach to
asset m
anagem
ent, efforts c
an be directed
towards re
med
ying
assets b
efore
their failure, thu
s saving in overall replacem
ent cost. Add
ition
ally, projects w
ill be coordinated with
other utilities to
minim
ize disturbance to th
e commun
ity and
street su
rface restoration costs.
RISK
(S)
Overla
nd and
street floo
ding
cou
ld occur due
to collapsed
pipes or failed ou
tfall structures.
IMPA
CT ON OPE
RATIONS
Increased op
erating reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Continue
to exten
d utility com
pone
nt life until a high
failure ra
te justifies re
placem
ent.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
24
5 25
426
327
027
8Ongoing
1,310
Constructio
n
2,309
2,374
2,453
2,521
2,598
Ongoing
12
,255
Total Project Cost
0 2,55
4 2,62
82,71
62,79
12,87
6Ongoing
13
,565
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 21
0 2,56
02,63
52,72
02,80
0Ongoing
10
,925
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Stormwater System
NEIGHBO
RHOOD/W
ARD
Strip
District/2 and Craw
ford‐Rob
erts/3
PROJECT
NAM
E 11
th Street S
torm
Relief Sew
er
PROJECT
NO.
Unassigne
d STAT
US
Not Started
PR
IORITY
Regulatory Com
pliance, Reliability/Ope
ratio
nal
Flexibility, C
apacity
, Regional Coo
peratio
n/
Stew
ardship, Level of Service
PROJECT
DESCR
IPTION
Extension of ded
icated
storm se
wer on 11
th Street from W
ashington Place to th
e Alleghen
y River.
PROJECT
JUSTIFICAT
ION
As part o
f the
Low
er Hill Red
evelop
men
t Project and
capacity
issues in
the Fifth Av
enue
system
, sep
arate storm
sewers w
ere constructed to re
route and convey ra
inwater from
this area, but were reconn
ected into th
e combine
d system
at W
ashington Place and Ce
ntre Avenu
e. To complete the separatio
n and ultim
ately redu
ce com
bine
d sewer
overflo
ws, th
is last phase of w
ork is requ
ired.
RISK
(S)
Combine
d sewer overflows w
ill con
tinue
to occur due
to limite
d capacity of the
existing mains.
IMPA
CT ON OPE
RATIONS
Increased op
erating reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Increase capacity
of the
com
bine
d sewer trun
k sewers o
r evaluate the suita
bility and effectiven
ess o
f green
infrastructure fo
r this sew
ershed
.
COMMITMEN
T SCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
2,250
2,250
Constructio
n
14
,030
14
,030
Total Project Cost
0 0
00
00
16,280
16
,280
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
00
00
16,280
16
,280
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Stormwater System
NEIGHBO
RHOOD/W
ARD
Carrick/29
PROJECT
NAM
E Maytid
e Storm System Im
provem
ents
PROJECT
NO.
Unassigne
d STAT
US
Not Started
PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Reconstructio
n of storm infrastructure from
Merritt A
venu
e to th
e storm intercep
tor o
n Ra
villa Avenu
e and the
realignm
ent o
f the
10‐inch sa
nitary se
wer on Maytid
e (Sande
rson
to Valline).
PROJECT
JUSTIFICAT
ION
Localized
prope
rty and street floo
ding
has been well‐d
ocum
ented for several years at this location and the
unde
velope
d rig
ht‐of‐w
ay of Sande
rson
has significantly deteriorated. A
ddition
ally, an inspectio
n of th
e 10
‐inch
sanitary se
wer on Maytid
e Street re
vealed
structural and
con
struction de
fects.
RISK
(S)
Continual degradatio
n to a steep slo
pe cou
ld re
sult in prope
rty damage and an
increased cost to
stabilize. Cu
stom
ers
may be subject to basemen
t backups or o
verflows m
ay occur due
to collapsed
pipes.
IMPA
CT ON OPE
RATIONS
Increased op
erating reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
There are no
practical alte
rnatives to
the recommen
ded actio
n.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
320
320
Constructio
n
1,420
1,420
Total Project Cost
0 0
00
00
1,74
0 1,74
0CA
SH FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 0
00
00
1,74
0 1,74
0*C
oncept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
** Includ
es con
tingencies.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Stormwater System
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E Catch Ba
sin and
Inlet R
eplacemen
tPR
OJECT
NO.
Annu
al
STAT
US
Constructio
n PR
IORITY
Safety, R
egulatory Co
mpliance,
Reliability/Ope
ratio
nal Flexibility, Level of Service
PROJECT
DESCR
IPTION
Strategic replacem
ent o
f catch basins a
nd storm inlets th
rougho
ut th
e system
to re
place failed un
its, storm
water
control reliability, and
minim
ize disturbance to th
e commun
ity.
PROJECT
JUSTIFICAT
ION
By m
aintaining
a proactiv
e approach to
asset m
anagem
ent, efforts c
an be directed
towards re
med
ying
assets b
efore
their failure, thu
s saving in overall replacem
ent cost.
RISK
(S)
Overla
nd and
street floo
ding
cou
ld occur due
to a defectiv
e or und
ersized
catch basin or storm
inlet, creatin
g a pu
blic
health and
safety hazard du
ring wet weather events. Exposes Autho
rity to poten
tial fines and
pen
altie
s for not
meetin
g the annu
al re
quire
men
ts listed
in th
e Minim
um Con
trol M
easures u
nder th
e NPD
ES permit.
IMPA
CT ON OPE
RATIONS
Increased op
erating reliability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Continue
to exten
d utility com
pone
nt life until a high
failure ra
te justifies re
placem
ent.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☐Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
25
25
2525
25Ongoing
12
5Co
nstructio
n 1,299
3,550
3,665
3,777
3,890
4,002
Ongoing
20
,183
Total Project Cost
1,29
9 3,57
5 3,69
03,80
23,91
54,02
7Ongoing
20
,308
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
425
2,02
3 3,61
03,73
03,84
03,95
0Ongoing
17
,578
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Green
Infrastructure
NEIGHBO
RHOOD/W
ARD
System
wide
PR
OJECT
NAM
E City‐W
ide Green
Infrastructure Projects
PROJECT
NO.
Vario
us
STAT
US
Desig
n PR
IORITY
Regulatory Com
pliance, Capacity
, Regional
Coop
eration/Stew
ardship, Level of Service,
Sustainability
PROJECT
DESCR
IPTION
Projects will be iden
tified, designe
d, con
structed
, mon
itored, and
evaluated
for com
pliance with
PAD
EP and
USEPA
Source Red
uctio
n strategies. The curren
t list of p
rojects to be
con
structed
for is a
ttache
d he
reto.
PROJECT
JUSTIFICAT
ION
At th
e requ
est o
f the
office of the
Mayor of the
City
of P
ittsburgh, W
illiam Ped
uto, th
e Au
thority
has been tasked
with
evaluatin
g the be
nefits o
f incorpo
ratin
g extensive and hydraulically/cost‐effective green infrastructure (G
I) througho
ut th
e en
tire City of P
ittsburgh
to re
duce th
e pe
ak and
sustaine
d stormwater flow
s to the existing combine
d sewer sy
stem
.
RISK
(S)
Significant capita
l expen
ditures in gray infrastructure re
quire
d to m
eet C
ombine
d Sewer Overflow (C
SO) red
uctio
ns, in
additio
n to th
e abatem
ent o
f localize
d basemen
t backups and
street floo
ding. In additio
n, th
e speed at which th
e project n
eeds to
be de
signe
d, con
structed
, mon
itored, and
docum
ented for the
regulators’ accep
tance and
acknow
ledged
CSO
redu
ction and to m
eet the
City
’s deadlines.
IMPA
CT ON OPE
RATIONS
Ongoing
mainten
ance of any re
commen
ded Be
st M
anagem
ent P
ractices (B
MP) green
facilities.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Implem
ent g
ray infrastructure outlined
in th
e Au
thority
’s W
et W
eather Feasib
ility Study.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
E(S)
Phase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☒Co
st Share
☐Other
Assessmen
t/Stud
y
Desig
n 18
8 3,475
6,000
6,000
6,000
6,000
Ongoing
27
,663
Constructio
n 75
1 1,940
14,000
14,000
14,000
14,000
Ongoing
58
,691
Total Project Cost
939
5,41
5 20
,000
20,000
20,000
20,000
Ongoing
86
,354
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
400
5,50
0 14
,000
14,000
14,000
14,000
Ongoing
61
,900
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
FY 2017 to 2021 Ca
pital Improvem
ent P
lan
GRE
EN IN
FRAS
TRUCT
URE
PRO
JECT
S
PROJECT
NAM
E PR
OJECT
DESCR
IPTION
COMMITMEN
T SCHED
ULE* (000
’s)
Pre
2017
20
17
2018
20
19
2020
20
21
TOTA
L
Centre and
Herron
Project is located
in th
e Hill District n
eighbo
rhoo
d of th
e City of
Pittsburgh
is tributary to th
e M‐19 ou
tfall and
will capture and
direct im
pervious ro
ad and
side
walk runo
ff through a curb cut
into a biosw
ale feature with
subsurface storage. The
biosw
ale will
receive flo
w con
tribution from
a 0.93 im
pervious acres area, with
an
overall 3.54
acre area drainage area.
94
689
0 0
0 0
783
Hillcrest Street
Project is located
in th
e Garfie
ld neighbo
rhoo
dof th
e City of
Pittsburgh
and
is tributary to th
e A‐22
outfall. This p
roject will
direct stormwater from
dow
nspo
uts a
s well as run
off from
roadways a
nd side
walks into a vacant C
ity of P
ittsburgh
owne
d parcel. The
0.25 acre parcel w
ill be a visib
le asset to
the
commun
ity with
land
scaping and a walkw
ay th
rough the parcel.
Surface and subsurface storage will be bu
ilt into th
e project site
, effectively hand
ling 1.6 acres o
f impe
rvious su
rface from
the
surrou
nding area.
167
819
0 0
0 0
986
Lawn and Oph
elia Parks
Project is located
in th
e South Oakland
neighbo
rhoo
d in th
e City
of Pittsburgh
and
is tributary to th
e M‐19B
outfall. This project is
intend
ed to
be a commun
ity gathe
ring space combine
d with
stormwater m
anagem
ent features. It is a
nticipated
that 1.9
impe
rvious acres from
neighbo
ring roads a
nd ro
ofs c
an be
managed
.
0 16
0 68
5 0
0 0
845
Maryland Av
enue
Project is located
in th
e Shadyside ne
ighb
orho
od in th
e City of
Pittsburgh
and
is tributary to th
e A‐22
outfall. This p
roject will
consist of d
istrib
uted
GI systems in fo
ur ta
rgeted
areas.
0 91
0 5,125
140
0 0
6,175
FY 2017 to 2021 Ca
pital Improvem
ent P
lan
GRE
EN IN
FRAS
TRUCT
URE
PRO
JECT
S
PROJECT
NAM
E PR
OJECT
DESCR
IPTION
COMMITMEN
T SCHED
ULE* (000
’s)
Pre
2017
20
17
2018
20
19
2020
20
21
TOTA
L
McKinley Park
Project is located
in th
e Be
ltzho
over neighbo
rhoo
d in th
e City of
Pittsburgh
and
is tributary to th
e S‐29
outfall in th
e Saw M
ill Run
Ba
sin. Th
is project is inten
ded to be a commun
ity gathe
ring
space combine
d with
stormwater m
anagem
ent features.
0 30
0 0
0 0
0 30
0
Mellon Terrace
Project is located
in th
e Highland Park neighbo
rhoo
d of th
e City
of Pittsburgh
and
is tributary to th
e A‐41
outfall. It is a
nticipated
that 2.8 im
pervious acres can
be managed
. 0
0 0
0 23
0 1,010
1,240
Melwoo
d Av
enue
Project is located
in th
e Po
lish Hill neighbo
rhoo
d of th
e City of
Pittsburgh
and
is tributary to th
e A‐22
outfall. Run
off from th
e adjacent streets o
f Melwoo
d Av
enue
, Cargill Street, and
Be
thoven
Street w
ill be captured
and
managed
by roadsid
e bioreten
tion features located in th
e pu
blic right o
f way. It is
anticipated
that 1.4 im
pervious acres from
these adjacent ro
ads
will be captured
and
managed
through the bioswale features.
158
847
0 0
0 0
1,005
Poplar and
Kearns
Project is located
in Green
Tree Bo
rough and is tributary to th
e C‐
25 se
wershed
and
includ
es th
e installatio
n of 600
line
ar fe
et of
30‐in
ch diameter ded
icated
storm se
wer on Po
pular S
treet.
0 60
0 0
0 0
0 60
0
Saline Street
Project is located
in th
e Green
field and
Squ
irrel Hill Sou
thne
ighb
orho
ods o
f the
City
of P
ittsburgh
and
is tributary to th
e M‐
29 outfall. It is a
nticipated
that 3.0 im
pervious acres from
ne
ighb
oring roads c
an be managed
.
0 24
5 1,080
0 0
0 1,325
FY 2017 to 2021 Ca
pital Improvem
ent P
lan
GRE
EN IN
FRAS
TRUCT
URE
PRO
JECT
S
PROJECT
NAM
E PR
OJECT
DESCR
IPTION
COMMITMEN
T SCHED
ULE* (000
’s)
Pre
2017
20
17
2018
20
19
2020
20
21
TOTA
L
Sham
rock W
ay
Project is located
in th
e Garfie
ld neighbo
rhoo
d in th
e City of
Pittsburgh
and
is tributary to th
e A‐22
outfall. Run
off from
adjacent streets w
ill be captured
and
managed
on 10
con
tiguo
us
vacant lots. It is anticipated
that 3.4 im
pervious acres from
ne
ighb
oring roads c
an be managed
.
0 29
0 1,220
0 0
0 1,510
Volunteer's Field
Project is located
in th
e Ca
rrick ne
ighb
orho
od of the
City
of
Pittsburgh
and
is tributary to Saw
Mill Run
. Installatio
n of GI
BMPs with
in th
e Park to
redu
ce se
dimen
t and
other pollutant
loads a
long
with
stormwater volum
e and pe
ak flow
redu
ction.
0 12
0 50
0 0
0 0
620
Washington Bo
ulevard
To be de
term
ined
. 30
0 TB
D TB
D TB
D TB
D TB
D TB
D
Wightman
Park
Project is located
in th
e Squirrel Hill neighbo
rhoo
d of th
e City of
Pittsburgh
and
is tributary to th
e M‐29 ou
tfall. Stormwater
managem
ent w
ithin th
e park itself as well as the
necessary piping
or inlet w
ork to dire
ct up to 3.25 im
pervious acres from
the
adjacent streets into the park. The
Wightman
Park project a
long
with
future street biosw
ale projects are expected to increase th
e im
pervious acres captured as well as a
lleviate repo
rted
sewer
basemen
t backups in
the ne
ighb
orho
od aroun
d Wightman
Park.
0 27
0 1,200
0 0
0 1,470
Woo
ds Run
Stream
Removal – Phase 1
This project w
ill re
direct an existing stream
inflo
w locatio
n into a
detain and
slow
release subsurface storage facility. The
stream
base and
wet weather flow
currently disc
harge directly into th
e 36
‐inch diameter PWSA
com
bine
d sewer on Mairdale Av
enue
.
0 33
0 1,460
0 0
0 1,790
TBD = To
Be De
term
ined
FY 2017 to 2021Ca
pital Improvem
ent P
lan
PR
OJECT
CLA
SS
Misc
ellane
ous
NEIGHBO
RHOOD/W
ARD
System
wide
PROJECT
NAM
E Utility
Cost S
hares
PROJECT
NO.
Unassigne
d STAT
US
Constructio
n PR
IORITY
Region
al Coo
peratio
n/Stew
ardship
PROJECT
DESCR
IPTION
Fund
ing for infrastructure replacem
ent d
ue to
coo
rdination with
other agencies o
r utilities.
PROJECT
JUSTIFICAT
ION
Coordinatio
n with
other utililties c
an re
duce expen
ditures u
p to 75%
of the
total project cost a
nd re
duces the
length
of time that th
e pu
blic is inconven
ienced
due
to con
struction efforts.
RISK
(S)
If infrastructure fails in
a pub
lic ro
adway with
in th
e du
ratio
n of th
e De
partmen
t of P
ublic W
ork’s p
avem
ent
moratorium, the
Autho
rity will be requ
ired to re
store the roadway su
rface curb to
curb.
IMPA
CT ON OPE
RATIONS
Increase re
liability.
ALTERN
ATIVES TO THE RE
COMMEN
DED
ACT
ION
Accepting the presen
t con
ditio
n of th
e infrastructure.
COMMITMEN
TSCHED
ULE* (000
’s)
FUNDING SOURC
EPh
ase
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
☒Capital
☐Expe
nse: ☐
Engine
ering ☐Sewer ☐
Water
☒Co
st Share
☐Other
Assessmen
t/Stud
y
0De
sign
60
0 60
060
060
060
0Ongoing
3,000
Constructio
n
2,400
2,400
2,400
2,400
2,400
Ongoing
12
,000
Total Project Cost
0 3,00
0 3,00
03,00
03,00
03,00
0Ongoing
15
,000
CASH
FLO
W SUMMAR
Y**(000
’s)
Pre 20
17
2017
20
1820
1920
2020
21Po
st 202
1 To
tal
Total
0 60
0 3,00
03,00
03,00
03,00
0Ongoing
10
,200
+
*Con
cept level costs based
on previous re
ports, Capita
l Improvem
ent P
lans develop
ed by othe
rs, or sim
ilar type projects.
**Includ
es con
tingencies.
+ Total sh
own is expe
nditu
res throu
gh FY202
1.
This page was intentiona
lly left blank
.