MEMORANDUM DT: September 20, 1995 TO: Mohamed Deria, Sanitary Engineer 3 Waste Engineering and Enforcement Division FR: Kevin Sullivan, Environmental Analyst 3 Waste Engineering and Enforcement Division RE: InterRoyal Corporation, Plainfield EPA Inspection for Possible Removal Action Summarized herein is new information which may make an EPA removal action at InterRoyal a higher priority than was the case in 1991 when EPA last investigated such action. Drinking water supplies and private residences were found to be in closer proximity to the site than reported in 1991, and current site conditions make chemical storage a greater risk today. The information was gathered in preparation for the EPA removal inspection scheduled for 9-21-95. Information sources: 1991 EPA Removal Program PA/SI Report, DEP public files and verbal communication with Richard Mercier, President and Owner, Gallup Water Services (860-564-7973). PROXIMITY TO WATER SUPPLIES AND RESIDENCES - Public drinking water supply wells approximately 1200' away. The supply well(s) for the Gallup Water Service are located only 1200' west of the InterRoyal site. The wells are installed about 65' into a stratified drift aquifer. Gallup serves approximately 3200 people. The InterRoyal site is within the Level B aquifer protection area mapped for the Gallup supply well(s). Please see various map copies attached to illustrate spatial relations. [Drinking water supplies previously reported as "none".] Neighboring potential sources of pollution include the adjacent Pervel Industries site, and nearby Gallup's Quarry NPL site. - Private residences immediately adjacent to/surround the site. Residential neighborhoods adjoin the InterRoyal site, with the nearest homes only about 150' away. [Homes previously reported to be 1/4 of a mile away.] (K S <WP\G:\KTS\INTEROYL\REMV0995.MEM> .^V Us

Upload: others

Post on 23-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Waste Engineering and Enforcement Division RE: InterRoya ...NATIONAL GEODETI VERTICAC DATUL OMF 1929 CONNECTICUT UTM GRI AND D 198 MAGNETI3 NORTCH ,-> DECLINATION AT CENTE OR SHEEf

MEMORANDUM

DT: September 20, 1995

TO: Mohamed Deria, Sanitary Engineer 3Waste Engineering and Enforcement Division

FR: Kevin Sullivan, Environmental Analyst 3Waste Engineering and Enforcement Division

RE: InterRoyal Corporation, PlainfieldEPA Inspection for Possible Removal Action

Summarized herein is new information which may make an EPAremoval action at InterRoyal a higher priority than was the case in1991 when EPA last investigated such action. Drinking watersupplies and private residences were found to be in closerproximity to the site than reported in 1991, and current siteconditions make chemical storage a greater risk today.

The information was gathered in preparation for the EPAremoval inspection scheduled for 9-21-95. Information sources:1991 EPA Removal Program PA/SI Report, DEP public files and verbalcommunication with Richard Mercier, President and Owner, GallupWater Services (860-564-7973).

PROXIMITY TO WATER SUPPLIES AND RESIDENCES

- Public drinking water supply wells approximately 1200' away.

The supply well(s) for the Gallup Water Service are locatedonly 1200' west of the InterRoyal site. The wells areinstalled about 65' into a stratified drift aquifer. Gallupserves approximately 3200 people. The InterRoyal site iswithin the Level B aquifer protection area mapped for theGallup supply well(s). Please see various map copies attachedto illustrate spatial relations. [Drinking water suppliespreviously reported as "none".] Neighboring potential sourcesof pollution include the adjacent Pervel Industries site, andnearby Gallup's Quarry NPL site.

- Private residences immediately adjacent to/surround the site.

Residential neighborhoods adjoin the InterRoyal site, with thenearest homes only about 150' away. [Homes previouslyreported to be 1/4 of a mile away.] (K

S<WP\G:\KTS\INTEROYL\REMV0995.MEM> .̂ V

Us

Page 2: Waste Engineering and Enforcement Division RE: InterRoya ...NATIONAL GEODETI VERTICAC DATUL OMF 1929 CONNECTICUT UTM GRI AND D 198 MAGNETI3 NORTCH ,-> DECLINATION AT CENTE OR SHEEf

CURRENT SITE CONDITIONS

- Water shut-off to fire suppression system inside building.

Water service has been shut-off to prevent damage from freezing pipes in winter. One of the two shut-off valves is inside the building, so the system could only be partially reactivated in case of a fire emergency. [Fire suppression system apparently not previously considered.]

- Conduits for aquifer contamination in the building.

Existing floor drains and an unused process supply in the basement provide pathways for direct contamination of the underlying drinking water supply aquifer in the event of chemical leakage or use of water during fire suppression. [Floor drains and the process supply well apparently not previously considered.]

- Soil, groundwater and surface water contamination are known.

Investigations carried-out since the 1991 removal inspection have confirmed the existence of soil, groundwater and surface water contamination at InterRoyal. [Such contamination previously reported as "none" or "potential".]

<WP\G: \KTS\INTEROYL\REMV0995 .MEM>

Page 3: Waste Engineering and Enforcement Division RE: InterRoya ...NATIONAL GEODETI VERTICAC DATUL OMF 1929 CONNECTICUT UTM GRI AND D 198 MAGNETI3 NORTCH ,-> DECLINATION AT CENTE OR SHEEf

SCALE 124000 1 MILE

1000 1000 2000 3000 4000 5000 6000 7000 FEET

5 0 1 KILOMETER

258 MllS\ 1*57' CONTOUR INTERVAL 10 FEET 35 MILS NATIONAL GEODETIC VERTICAL DATUM OF 1929

CONNECTICUT

UTM GRID AND 1983 MAGNETIC NORTH ,->

DECLINATION AT CENTER Of SHEET QUADRANGLE LOCATION

FIGURE 1 SITE LOCATION MAP REGION I TECHNICAL ASSISTANCE TEAM

INTER ROYAL SITE DATE

PLAINFIELD, CONNECTICUT a/9i J. RESCA 1413 DATE TOO •

a/si 01-9107-18

Page 4: Waste Engineering and Enforcement Division RE: InterRoya ...NATIONAL GEODETI VERTICAC DATUL OMF 1929 CONNECTICUT UTM GRI AND D 198 MAGNETI3 NORTCH ,-> DECLINATION AT CENTE OR SHEEf
Page 5: Waste Engineering and Enforcement Division RE: InterRoya ...NATIONAL GEODETI VERTICAC DATUL OMF 1929 CONNECTICUT UTM GRI AND D 198 MAGNETI3 NORTCH ,-> DECLINATION AT CENTE OR SHEEf

s..

Page 6: Waste Engineering and Enforcement Division RE: InterRoya ...NATIONAL GEODETI VERTICAC DATUL OMF 1929 CONNECTICUT UTM GRI AND D 198 MAGNETI3 NORTCH ,-> DECLINATION AT CENTE OR SHEEf

Y