wall & ceiling mounting with glue · sintra-estoril v - b18 2710-297 sintra, portugal phone: +351...

3
ATP® Wall & Ceiling foam & EPS models MOUNTING INSTRUCTIONS | ATP® FOAM & EPS MODELS JOCAVI TM International Av. Pedro Álvares Cabral Sintra-Estoril V - B18 2710-297 Sintra, Portugal Phone: +351 21 924 30 97 www.jocavi.net | [email protected] JOCAVI TM USA Corporation 727 Commercial Ave, Unit H Carlstadt, NJ 07072 Phone: +1 (973) 536 18 32 Cell: +1 (917) 294 34 11 www.jocaviusa.com | [email protected] NOTICE Prior to application, always clean all surfaces before applying any glue ensuring them free of dust or grease. Mark the mea- surements of the panel on the surface you are applying the panel to. Apply double sided temporary adhesive patches to the back of the panel as shown. The adhesive temporary patches are activated by pressure. To ensure their maximum adhesion strength they are not repositionable, so measure twice and glue only once. Then apply as shown in grey, the definitive PU mounting glue without solvents, for permanent applications (not-included). Apply the cords of glue marked in grey as shown on this left example image. Place the panel on the surface and press it gently and homo- geneously during the mounting glue's curing time, average aprox. time 2 hours. For ceiling panels a temporary auxiliar supporting bar (anchor) between the floor and the panel, can be used . Ensure taking extra care to always use a protective thick and enough dense and very clean material like foam (or a dense pillow) between the panel and the anchor to ensure not to damage the panel finishings. Between the anchor and the floor a protective material like a simple piece of wood or dense foam also should be used to protect floor finishings. Adhesive time is entirely dependant on the weight of the panel to be glued . Always consult the mounting glue specifi- cations. Adhesive gluing times can vary with humidity and temperature. Make sure that the room temperature and humidity is within the acceptable product values available on our website. | BASMEL | BASSKEEPER WALL | CAMOU | COOKIE | CORALREEF | COSMOS | DECOART | FOAMSORB | IVORY | LF TONE | NOVEN | PYRAMID | REFLEX | SEAFOAM | SNOWSORB | STRIPESORB | STRIPESORB ARC | SWELL | WAVYFUSER | WUSORBER |

Upload: others

Post on 19-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

  • ATP® Wall & Ceiling foam & EPS models

    MO

    UN

    TIN

    G IN

    STRU

    CTI

    ON

    S

    |AT

    P® F

    OAM

    & E

    PS M

    OD

    ELS

    JOCAVITM InternationalAv. Pedro Álvares CabralSintra-Estoril V - B182710-297 Sintra, PortugalPhone: +351 21 924 30 97www.jocavi.net | [email protected]

    JOCAVI TM USA Corporation727 Commercial Ave, Unit H

    Carlstadt, NJ 07072Phone: +1 (973) 536 18 32

    Cell: +1 (917) 294 34 11www.jocaviusa.com | [email protected]

    NOTICE

    Prior to application, always clean all surfaces before applying any glue ensuring them free of dust or grease. Mark the mea-surements of the panel on the surface you are applying the panel to. Apply double sided temporary adhesive patches to the back of the panel as shown. The adhesive temporary patches are activated by pressure. To ensure their maximum adhesion strength they are not repositionable, so measure twice and glue only once.

    Then apply as shown in grey, the de�nitive PU mounting glue without solvents, for permanent applications (not-included). Apply the cords of glue marked in grey as shown on this left example image.

    Place the panel on the surface and press it gently and homo-geneously during the mounting glue's curing time, average aprox. time 2 hours.

    For ceiling panels a temporary auxiliar supporting bar (anchor) between the �oor and the panel, can be used .

    Ensure taking extra care to always use a protective thick and enough dense and very clean material like foam (or a dense pillow) between the panel and the anchor to ensure not to damage the panel �nishings.

    Between the anchor and the �oor a protective material like a simple piece of wood or dense foam also should be used to protect �oor �nishings.

    Adhesive time is entirely dependant on the weight of the panel to be glued . Always consult the mounting glue speci�-cations. Adhesive gluing times can vary with humidity and temperature. Make sure that the room temperature and humidity is within the acceptable product values available on our website.

    | BASMEL | BASSKEEPER WALL | CAMOU | COOKIE | CORALREEF | COSMOS | DECOART | FOAMSORB | IVORY | LF TONE | NOVEN | PYRAMID | REFLEX | SEAFOAM | SNOWSORB | STRIPESORB | STRIPESORB ARC | SWELL |

    WAVYFUSER | WUSORBER |

  • MO

    UN

    TIN

    G IN

    STRU

    CTI

    ON

    S

    |C

    eilin

    g su

    spen

    ded

    /spo

    tligh

    ts

    JOCAVITM InternationalAv. Pedro Álvares CabralSintra-Estoril V - B182710-297 Sintra, PortugalPhone: +351 21 924 30 97www.jocavi.net | [email protected]

    JOCAVI TM USA Corporation727 Commercial Ave, Unit H

    Carlstadt, NJ 07072Phone: +1 (973) 536 18 32

    Cell: +1 (917) 294 34 11www.jocaviusa.com | [email protected]

    Ceiling suspended / spotlights | BASMEL | COOKIE | LIGHTWALLTRAP | MELLOWALLTRAP | WALLTRAP |

    Read instructions in full prior to install and then choose one of these two mounting methods an apply it: Ceiling installation method can either be with horizontal suspension cables (left) installed on the walls;or suspension method directly from the ceiling using metalic hooks and wires (right);

    Depending on the size of the panel 1 or 2 persons can be required to suspend it. Always ensure clean and gently handling as panel �nishings can be fragile. Secure the wires to the hooks on the panel to suspend it.

    For panels with lights prepair ahead electrical connections .

    1st method: From the horizontal wires install vertical suspension wires; or2nd method: Suspend the wires to ceiling metalic hooks.

    Measure the ceiling and mark it as needed to best �t its area. 1st method: install suspension cables to the wall; 2nd method: install ceiling sleeves for the suspension metal hooks, use four (4) suspension points per panel, do ensure their robust �xation prior to panel suspension.

    Accessories’ kit; the product is supplied with the necessary accessories. Optionally suspen-sion wires on the right are sold separately and can be made available upon demand. On the back of the panel, locate the mounting hooks.

    x4

    x4

    or

  • MO

    UN

    TIN

    G IN

    STRU

    CTI

    ON

    S

    |C

    eilin

    g su

    spen

    ded

    Clo

    uds

    JOCAVITM InternationalAv. Pedro Álvares CabralSintra-Estoril V - B182710-297 Sintra, PortugalPhone: +351 21 924 30 97www.jocavi.net | [email protected]

    JOCAVI TM USA Corporation727 Commercial Ave, Unit H

    Carlstadt, NJ 07072Phone: +1 (973) 536 18 32

    Cell: +1 (917) 294 34 11www.jocaviusa.com | [email protected]

    Ceiling suspended mounting | BASMEL | LIGHTWALLTRAP | MELLOWCLOUD | MELLOWCLOUD DIF|

    Accessories’ kit; the product is supplied with the necessary accessories. Optionally suspen-sion wires on the right are sold separately and can be made available upon demand. On the back of the panel, locate and measure included (cavities) mounting accessories distances.

    Measure the ceiling and mark it as needed. 1st method: install suspension cables to the wall; or2nd method: install sleeves for the suspension metal hooks, Four (4) suspension points per panel are needed, do ensure their robust �xation prior to panel suspension.

    Read instructions in full prior to install and then choose one of these two mounting methods an apply it: Ceiling installation method can either be with horizontal suspension cables (left) installed on the walls; or suspension method directly from the ceiling using metalic hooks and wires (right);

    1st method: From the horizontal suspension wires install vertical wires, or

    2nd method: Suspend the wires from the ceiling hooks.

    Optionally the hooks can be thighten to the vertical wires with a pliers tool.

    Depending on the size of the panel 2 or 3 persons can be required to suspend it. Always ensure clean and gently handling as panel �nishings can be fragile. Secure the wires to the hooks on the panel to suspend it. You will achieve this result.

    x4x4