vision zero 12th ave s protected bike lanes · s jackson s st s st bike bike to bike on side of...
TRANSCRIPT
Date (xx/xx/xxxx) Department Name Page NumberMarch 4, 2020 Bike Advisory Board Meeting1
Vision Zero 12th Ave SProtected Bike Lanes
Date (xx/xx/xxxx) Department Name Page NumberMarch 4, 2020 Bike Advisory Board Meeting2
Status - 100% Design Scope of Work:
• Safety projects:• S Weller St• S Charles St/Golf Dr S
• Protected Bike Lanes: S King St to S Charles St to connect trail and Neighborhood Greenway
• Construct portions of S King St Neighborhood Greenway at King St intersection
• Construction Starts July 2020
Date (xx/xx/xxxx) Department Name Page NumberMarch 4, 2020 Bike Advisory Board Meeting3
Date (xx/xx/xxxx) Department Name Page NumberMarch 4, 2020 Bike Advisory Board Meeting4
In-Lane Bus Stop Bike Lane Design at S Weller St
Date (xx/xx/xxxx) Department Name Page NumberMarch 4, 2020 Bike Advisory Board Meeting5
S Charles St and 12th Ave S Intersection Design
Date (xx/xx/xxxx) Department Name Page NumberMarch 4, 2020 Bike Advisory Board Meeting6
S King St and S Weller St Intersection Designs
Date (xx/xx/xxxx) Department Name Page NumberMarch 4, 2020 Bike Advisory Board Meeting7
Questions?