web viewthere will be no gaseous emition but due to high vibration because of electricity usage...

13
Bullet Train Project Materials: Raw material Iron tracks Nuts and bolts Copper wires Metal coils lining a guide-way or track Large guidance magnets attached to the underside of the train Concrete Processed material and components Computers (including its accessories) Servers Internet and Copper wires Computers will be needed for the control room to control the train because bullet trains do not have drivers just as traditional trains. It runs from control room. About 20 computers will be needed. Moreover this demand can increase if we offer online reservation system in future. Approximately 5 servers will be needed to control the flow of traffic from and to client computers. Internet packages with 8-10 Mbps speed will be required at-least for control room. Wire system 10x of the total tracks length will be required. Computers and servers can be available from foreign source and internet and copper wires will be available from domestic source. Past trend of prices is that newer computer technologies always cost high for latest models but lower for old models. Computer technology becomes old with

Upload: vuonghuong

Post on 11-Feb-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

Bullet Train Project

Materials:

Raw material

Iron tracks Nuts and bolts Copper wires Metal coils lining a guide-way or track Large guidance magnets attached to the underside of the train Concrete

Processed material and components

Computers (including its accessories) Servers Internet and Copper wires

Computers will be needed for the control room to control the train because bullet trains do not have drivers just as traditional trains. It runs from control room. About 20 computers will be needed. Moreover this demand can increase if we offer online reservation system in future. Approximately 5 servers will be needed to control the flow of traffic from and to client computers. Internet packages with 8-10 Mbps speed will be required at-least for control room. Wire system 10x of the total tracks length will be required. Computers and servers can be available from foreign source and internet and copper wires will be available from domestic source. Past trend of prices is that newer computer technologies always cost high for latest models but lower for old models. Computer technology becomes old with frequency of the newer technology in the market. Future trend is predicted to be the same as past.

Auxiliary material and parts

Tools kits for labor Extinguisher for fire

Utility

Electrical power resource

Page 2: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

Electric power of 22,800 kilowatts will be needed for each bullet train. And we are hoping for 2 bullet trains. We intend to have our own power house for not interrupting in general electricity for domestic and industrial consumption. This will provide us maximum security from shortage of electricity.

Important information:

18 million passengers in a year300 billion dollars350km/h 39 monthsShanghai and Beijing7 times more speed approximately49 million rupees per km cost in India 1987Cost in 2010 is $9.5 million per kmPower needed by China’s fastest #1 bullet train is 22,800 kilowattsMaximum speed should be 300km/h in order to be safe

Production Technology:

There are two ways for bullet trains track laying. These are:

Page 3: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

Either we use tunnels Or use bridges for tracks

Best will be to make bridges rather than tunnels because of minimum level of friction on bridge is possible as compared to tunnels. Moreover it is better to build bridges due to less time taken for completion as compared to tunnels which need more time to be prepared. Secondly, tunnels are made in mountains, while the area, which we are going to cover are plains so there is no need of tunnels. Travelling intra-country has preference of construction of bridges.

Choice of technology:

The technology, we use depend on 6 heads like:

Usage by other people:

People of other developed countries have used it previously. It originated from Japan where winter is cold enough and summer is moderate. So, cold weather will not affect the bullet train system. Other countries like,

Africa: Algeria, Morocco

Asia:China Japan, Hong Kong, South Korea, Saudi Arabia, Taiwan, Uzbekistan

Europe: Austria, Bulgaria, Denmark, France, Germany, Greece, Italy, Norway, Portugal, Spain, Sweden, Turkey and UK.

USA: North America

And Belgium - France - Germany - the Netherlands use tunnel based system, spain uses bridge based system. France uses tunnel based system for inter-country travel and bullet train on bridges for intra-country travel (local from one city to another).

Primary raw material:

Our primary raw material is electro-magnet which is made by electricity when current flows from the conductor. So, electricity is majorly required which we intend to product privately from another project. Obviously, we have to complete this project before our bullet train project. And the electricity project requires approximately 2 to 3 years for completion which is estimated very roughly. So this project is not feasible to be performed before 2 years. Or if it is necessary to be performed within these 2-3 years, then govt. Contracts must be made and demand of enough electricity from its own source is required. But it may be exploiting public interest and we intent to benefit and facilitate the society. The project is not feasible for at-least 2 to 3 years.

Product mix:

Page 4: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

It’s a one time cost and we are delivering services to our customers. Which may be having high price. Because considering the other trends, Daewoo bus system costs Rs. 500 a ticket. But when we compared to India, it cost 5000 rupees for travelling via bullet train. Considering their currency price, our ticket should be PKR. 8100 (approximately, if we do target pricing.)

Ease of absorption:

Our Pakistan railway system has been very poor since last decade. People moving for anyother city have to be late for 5-6 hours normally which is increased in case of special occasions which reaches about 24 hour-48 hour delay. In the presence of such type of conditions in the market, the bullet train system is requirement and need. It will not only be accepted by people but will be asbsorbed in the market easily.

Latest developments:

China has introduced fasted train of 380 km/h which is now-a-days considered as unsafe. So, now we have to introduce 280 km/h to 300 km/h fast train that will be readily accepted by the people here and will be more safe as compared to China’s new fastest 380 km/h train. Moreover the driver cabin is not required or present in bullet trains so trained drivers are not needed. Just the computer operators for control room and maintenance staff for trains are needed.

Investment outley and production cost:

India costed 9.5 million dollars in 2010. Now converting in Pakistani currency and adding inflation

The bullet train project may be costing 15.39 million dollar per km.

Inflated at 21.546

Route of Faisalabad to Islamabad= 321.5 km

Total cost will be = 6927.039 million dollars. Or 6.9 billion dollars.

Route of Multan to Faisalabad= 246.2km

Total cost will be = 5304.6252 million dollars or 5.3 billion dollars

Rote of Lahore to Faisalabad= 175.6km

Total cost will be = 3783.4776 million dollar or 3.8 billion dollars.

Page 5: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

Total funds requirement for tracks(single) is 16 billion dollars

Double track will cost about 32 billion dollar at-least.

Cost of bullet train will

Product Mix:

We are offering services to general public for facilitating them. We want that our Pakistani nationals complete their journey safely and securely with speedy travelling. We aim to develop the infrastructure of Pakistan by developing transport and travelling.

Plant Capacity:

Input constraints are about minimum and can be taken where-ever needed. Market conditions for this project are seeming feasible because customers demand low cost and on-time vehicle with appropriate speed. The firm will purchase the assets like building machinery for bridges and tracks because the project is huge. May be the full amount of machinery be depreciated during completion.Govt. policy will be feasible and we hope that there will be no restrictions in this project because govt. has already promised with general public while confessing for the votes that bullet trains will be operating from Karachi to Khyber. If we will perform this on behalf of govt. for Punjab region, it is probable that govt. will appreciate and provide tax benefits and incentives.

6. Location and Sight:

1. Proximity to Raw Material:

As per our project, we are going to import Bullet train.

1. In case of bullet train there is less proximity to raw material but more to the market.

2. For the construction of bridges , we will have to construct bridges on which tracks will be laid.In this case proximity to raw material in case of Faisalabad and Lahore will be more than to the Islamabad and Multan.But proximity to market will be balanced in all cities.

Page 6: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

3. In case of construction of tracks, as it will be an imported technology so there will be less proximity to raw materil but more to the market because labor is available in Pakistan.

2. Availability of Infrastructure:

We need infrastructure for our project.

1. We need connection of electricity because bullet train will be run by electricity.It will include following activities:

Electricity central office Security System System of Announcements

2. We also need Telecommunication system for being in connection.3. Gas and Water utilities are also needed for it.4. We need area for construction for bridges which will be over the road.

3. Other Factors:

1. Environmental Pollution:

There will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage is more than its noise.Other than that there is no need of disposing any kind of material wastage in case of bullet train.

2. Labor Situations:

First of all we will remove the system of double hiring of people and we wil hire labor from it.As cheap labor is available in Pakistan but it is not mostly skilled.So, we will have to give training to th elanor force to run such type of train.

3. Climate Conditions:

There is no issue of climate for completion of our project because Pakistan have four seasons which is good for it.As the train will run through electricity for this purpose we will install some type of conductor so that there will be no short circuit and of there will be too much bad climate then we will delay train.

Page 7: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

4. General Living Conditions:

There will be an impact of such type of train on the living of people because it is fast as well as comfortable for the people so they will prefer it for their day to day traveling.It will also replace the old and outdated syatem of railway in Pakistan in result of which living of people will be better

7. Machine and Equipment:

As it is a process based job so we need same kind of equipment for working of our project.It means no need of variation of machines and equipments.

For Railway Track Construction:

The material used for railway construction is , graders, bulldozers and otherheavy machinery., rollers, thermit etc.

Electrical Equipment

Electrical Equipment includes generators and compressors because we will need it so that in case of load shedding we may use it and there will be no wastage of time,

Control PanelsThere will be load control panels for our project because over load and inder load of electricity may be harmful for train passengers.

LiftsThere is a need of lift or such kind of the thing because to reach the bridge we need to use such kind of lift

8. Structure and Civil Work

1. Site Prepration and Development

Site cleaning Bore well digging

o Bore

Page 8: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

o Bore Well vendors Temporary Shed construction Site Marking Sump construction

o  Soil digging for sumpo  Sump Construction

Foundation digging o  Soil digging for Pillarso  Soil digging for foundation [OR] Paya

Start carpenter work — for window frames and door frames Footing [OR] Pillar base Pillars until Plinths Stone Foundation [OR] paya Plinth beam Fill soil inside Plinths. Filling cement and 40 MM Jelly on top of Soil — this will be done inside

plingth area Setting up main door frame and other room door frames Wall construction until window frame base Setup all window frames based on its sizes until 7 feet from the floor Setup lintel and saja Wall construction until beams Setup kitchen ventilator and bathroom ventilators Sheet centring for beams and also roof

o  Fix sheets based on water levelo  Apply plaster for the gaps between sheetso  Apply oil for sheets

Bar bending work for beams and roof o  Inverter beams

Electric pipes setup inside roof Molding Storing water on top of the roof After 18 days remove sheet centring Hocking for the roof Electric pipes

o  Clear any blockage in the roof pipeso  Laying electric pipes in the walls and setup electric boxes

Plumbing work for kitchen and bathroom o  Setup water pipes and sewage pipes till outside of the wallo  Setup Indian latrine if you are going with this optiono  Water proofing for bathroomso  Close all water and sewage pipes with temporary caps

Setup kitchen platform and sink Tiles laying in bathroom and kitchen for walls Plastering of roof and walls inside Plastering of outside walls

Page 9: Web viewThere will be no gaseous emition but due to high vibration because of electricity usage there will be noise pollution.But its advantage ... 4 buildings will be

Applying putty for window frames Fixing window frames Granite Lying Granite tiles Laying in bathroom if you are going with this option Fixing bathroom fittings Finishing outside plumbing work and tank House Elevation Painting Electric work

o  Electrical wiringo  Dummy plate fixing/ electrical holderso  Electrical switches setup

Apply paint coating outside Laying electric service wire from pole to meter board Fixing meters in panel board. Digging pit for power earth Digging pit Motor & connection to tank Parking tiles Compound wall Sewage lines to pit

2. Buildings:

4 buildings will be constructed in 4 cities i.e. Faisalabad, Lahore, Islamabad, Multan.We need to build it for prper railway spot of passengers.

9. Projects Charts (project tree)

10. Work Schedule