vessel impact - 2012-256 - responsive - 7

Upload: bobmackin

Post on 14-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    1/18

    Obtained by Bob Mackin via Freedom of Information

    [email protected]

    twitter.com/bobmackin

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    2/18

    TechnicalMemorandumCity of Vancouver

    Burrard Bridge RehabilitationVessel Impact Protection -Revision 1

    March 2012

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    3/18

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    4/18

    TECHNICAL MEMORANDUM

    Table of Contents

    SECTION PAGE NO

    Table of Contents i

    City of Vancouver 1

    1 Introduction 1

    4 Conclusion 5

    5 Recommendations 5

    Appendix A Aerial View of the Bridge

    s.13(1); s.15(1)(l); s.17(1)(c), (d), & (f); s.18(a); and s.19(1)(b)

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    5/18

    TECHNICAL MEMORANDUM

    City of VancouverBurrard Bridge Rehabilitation

    Vessel Impact Protection

    Issued: March 27, 2012

    Previous Issue: February 27, 2012

    The City of Vancouver retained Associated Engineering to evaluate the historic Burrard Bridge and make

    recommendations for rehabilitation and safety improvements. As a part of our evaluation, we have

    assessed the effectiveness of and the requirements for the protection of piers in the water that are

    vulnerable to ship impact.

    1 Introduction

    The Burrard Bridge is located in False Creek. Shipping in False Creek consists of barges supplying

    material to the ready-mix concrete plant on Granville Island; light day-cruiser vessels; as well as

    small fishing boats, sailboats, yachts, rowing-boats, kayaks and canoes. The speed limit of 5 knots

    (9 km/h) applies to all navigation in False Creek. As ocean-going freighters do not navigate False

    Creek we have not considered the possibility of a large ocean going freighter colliding with the s ; s ; s c ; s a ; an s

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    6/18

    s. ; s. ; s. c , , ; s. a ; an s.

    s ; s ; s c ; s a ; an s

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    7/18

    s. ; s. ; s. c , , ; s. a ; an s.

    s ; s ; s c ; s a ; an s

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    8/18

    s. ; s. ; s. c , , ; s. a ; an s.

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    9/18

    Technical MemorandumBurrard Bridge Rehabilitation

    Vessel Impact Protection - Revision 1

    4 Conclusion

    In conclusion, based on the results of our evaluation described above, we confirm that the mainpiers of the Burrard Bridge, P3 and P4, can safely withstand our estimated vessel impact force.

    Pier P2, south of the navigation channel, is highly unlikely to be exposed to barge impact; however

    based on our analysis, this pier can readily withstand the resulting impact force as well. Therefore,

    the piers do not need to be protected from vessel impact by an external fender system.

    s.13(1); s.15(1)(l); s.17(1)(c), (d), & (f); s.18(a); and s.19(1)(b)

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    10/18

    s.13(1); s.15(1)(l); s.17(1)(c), (d), & (f); s.18(a); and s.19(1)(b)

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    11/18

    TECHNICAL MEMORANDUM

    Appendix A

    Aerial View of the Bridge

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    12/18

    s. ; s. ; s. c , , ; s. a ; an s.

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    13/18

    ; ; , , ; ;

    s.13(1); s.15(1)(l); s.17(1)(c), (d), & (f); s.18(a); and s.19(1)(b)

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    14/18

    s.13(1); s.15(1)(l); s.17(1)(c), (d), & (f); s.18(a); and s.19(1)(b)

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    15/18

    s.13(1); s.15(1)(l); s.17(1)(c), (d), & (f); s.18(a); and s.19(1)(b)

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    16/18

    s. ; s. ; s. c , , ; s. a ; an s.

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    17/18

    s.13(1); s.15(1)(l); s.17(1)(c), (d), & (f); s.18(a); and s.19(1)(b)

  • 7/30/2019 Vessel Impact - 2012-256 - Responsive - 7

    18/18