Vendor HQ ILS ProductDiscoveryProduct Release Date Installs
1. InnovativeInterfaces CA Sierra Encore + Duet 2011 1600
2. ExLibris Israel ALMA Primo 2008 2100
3. OCLC OH WorldshareWorldcat Discovery 2011 310
4. SirsiDynix UTSymphony
ILS NA 2012 260
5. EOS International CAEOS.Web Academic NA 2003 108
Vendors Evaluated
Evaluation Process Initial Product Overviews (Aug)
webinars, trade show demos, rep visits Indepth Demos (3hrs) with staff + questions (Sept-Oct)
Review of major modules-Acquisitions, OPAC, Circulation, etc. Project Quotes (Sept-Oct)
Follow up questions--contract details, Ts & Cs, Security, Maintenance, etc. Interview Customer References (Nov)
Migration Process Meets Requirements Customer Support
Team Review (Oct-Nov) OIT Meeting (Oct. 29th)
Current ILS Costs Future ILS Costs
Sierra Reference CustomersInstitution Project Type Yrs Installed Comments
Loyola Marymount Upgrade 2 Good overall
Santa Clara University Upgrade Easy transition
University of San Francisco Upgrade 2 Great customer service
Asuza Pacific* Upgrade 1.5 Great customer service
* multi-campus
Features Benefits Integrates disparate applications into one Lower Cost of Ownership (TCO)
No servers to host and maintain Limited IT management required
Better collection and access services management
Improved, upgraded patron interface
Technology Changes Current State 2 Independent platforms
No shared services 2 customer hosted HW
and SW Customer-managed
backups and upgrades
Future State Single Integrated platform
Shared services 1 Cloud-based vendor
hosted HW and SW Vendor-managed backups
and automatic upgrades
ILS Upgrade and Merger
Service for a new customer joining a single Innovative library. 28 hours of project management 22 hours of consulting on best practices for sharing a system. 130 hours of data loading
Includes loading of bibliographic, item, authority, orders, serial checkin, and patron records as well as the addition of one location-based scope.
Includes loading of circulation checkouts, holds, and fines and circulation migration consulting.
60 hours of online training on core system modules included.
ILS Upgrade and Merger
Timeline: 2.5 – 4 Months Depending on Library Includes : Project Coordination
Logins, Staff Setup, Permissions Project Highlights:
Data Load WebPAC Customization
Scoping Multi IP WAM Setup
Accounting Units Circulation Tables (Patron Tables) Acquisitions/Serials
Library Merger Full Package
Major Tasks Dates
Sign Contract/Place Order l A F
Kick-Off Call l A ESet up additional Accounting and Serial Units on Shared System l BConsultation (24 hours delivered online over 6 days) l l A DSet Up Logins, Initials & Authorizations for Merging Library staff onto Shared System l l l
Code changes in preparation for sample load l l A
Add/Change scopes and prep for sample load l l DExtract and load sample bib and item records from Library mergering into Shared System l l C
Review Bib/Item Sample Record Load l l A C
WebPAC Pro Customization for Scopes l l l A Input Circulation Tables for Merging Library onto Shared System l l A
Load Sample Set of Patron Records l l A C
Review Sample Patron Load l l A CTest Circulation Parameters/Provide Internal Staff Training l l A
Final Extract and Load : Bib/Item/Authority l l A C
Go Live on Cataloging l A
Final Extract and Load : Patron l A C
Circulation Migration l A C D
Transition to Support l A E F
Go Live on WebPAC/Circulation l A
Prep for Acquistions/Serials l A
Extract and load Acquistions/Serials data l C
Go Live on Acquistions/Serials l A
Merger Complete l
Project Close/Review l A E
10/28/14
Oth
er
Inno
vativ
e S
taff
Lib
rary
Sy
stem
En
gin
eer
Da
ta P
rofi
lin
g A
nal
yst
Tra
inin
g C
onsu
ltan
t
Pro
jec
t M
an
ager
Wee
k 9
Wee
k 21
Wee
k 16
Wee
k 17
Wee
k 18
Wee
k 19
Wee
k 20
Wee
k 11
Wee
k 12
Wee
k 13
Wee
k 14
Wee
k 22
Wee
k 15
Wee
k 10
SAMPLE MERGER SCHEDULETask Completed By Owner
Wee
k 1
Wee
k 2
Wee
k 3
Wee
k 4
Wee
k 5
Wee
k 6
Wee
k 7
Wee
k 8
Major Tasks
Target Dates
Innovative Manages
Provision server resources in data center
Install OS Red Hat Linux, PostgreSQL
Install and configure database
Install and configure Sierra
Install and configure Encore
Periodic Operating System upgrades
Operating System Support Schedule and perform
backups Hardware upgrades Hardware support Install Sierra upgrades
ILS Implementation HW + SW Maintenance
III Data Centers Tier 4 data centers (industrial strength) .
SOC 2 Type 2, SAS 70 and ITIL v3 compliant. Higher Security – network, infrastructure and physical access.
Marque SAN and backup manufacturers. EMC for storage arrays.
Tiered storage architecture for improved access times to data.
Highly utilized data runs from solid-state drives - SSD - for enhanced performance.
EMC Data Domain appliances for optical data backup and improved off-site storage capabilities.
III Data Centers Cont’d
All Cisco internal networking for reliability and redundancy. Managed meshed Internet network serving the new data