vehicle-to-grid Power. Amardeep Dhanju & Dr. Willett Kempton April 14, 2009 Center for Carbon-free Power Integration University of Delaware. Plug-in for charging. V2G with ISO Control. V2G taps an underutilized resource. US car used 1 hour/day, parked 23 h/d - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/1.jpg)
vehicle-to-grid Power vehicle-to-grid Power
Amardeep Dhanju & Dr. Willett Kempton
April 14, 2009
Center for Carbon-free Power IntegrationUniversity of Delaware
Amardeep Dhanju & Dr. Willett Kempton
April 14, 2009
Center for Carbon-free Power IntegrationUniversity of Delaware
![Page 2: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/2.jpg)
Plug-in for chargingPlug-in for charging
![Page 3: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/3.jpg)
V2G with ISO ControlV2G with ISO Control
![Page 4: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/4.jpg)
V2G taps an underutilized resource
• US car used 1 hour/day, parked 23 h/d
• Average daily travel = 32 miles, thus most storage unused most days
• Practical power draw from car: 10 - 20 kW
• US power: generation=978 GW; load=436 GW avg (EIA 2005)
• US 241 million cars (FHWA 2005) x 15 kW = 3,615 GW, thus...
![Page 5: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/5.jpg)
V2G taps an underutilized resource
• US car used 1 hour/day, parked 23 h/d
• Average daily travel = 32 miles, thus most storage unused most days
• Practical power draw from car: 10 - 20 kW
• US power: generation=978 GW; load=436 GW avg (EIA 2005)
• US 241 million cars (FHWA 2005) x 15 kW = 3,615 GW, thus...
• Power of fleet is >3x generation; >8x load!
![Page 6: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/6.jpg)
Energy Markets
![Page 7: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/7.jpg)
Value of regulation
Average Annual Market Clearing Price
($/MW-h)2004 2005 2006
PJM $42.75 $49.73 $32.69
RTO-NE $28.92 $30.22 $24.02
NY ISO $22.59 $39.21 $51.26
ERCOT $22.66 $38.07 n/a
CA ISO $29.00 n/a $36.04
![Page 8: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/8.jpg)
Basic per-Vehicle Values10 –Year Present Value V2G Revenue Potential
Assumptions: 80% availability, Reg. $40/MW-h, Spin. $10/MW-h, 7% discount rate, example calculations
![Page 9: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/9.jpg)
Business case• To sell V2G, need ISO wholesale contract
– 1 MW minimum
• 1 MW, with extra vehicles for reliability margin, requires 200 high power vehicles (eBox, 16-19 kW) or 1,000 - 2,000 low power (e.g. GM Volt, 20 Amp or ~3 kW)
• Minimum 200 for ISO trial
![Page 10: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/10.jpg)
Sequence of Markets• Initial, high-value markets, are A/S
• Regulation• Spinning reserves
• Later, larger markets with lower value per kW:• Defer upgrades to distribution feeders,
transformers• Peak load reduction, valley filling• Power factor correction • Balancing wind, shifting solar peak
![Page 11: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/11.jpg)
MAGICC:Mid-Atlantic Grid-Interactive Cars
Consortium
MAGICC:Mid-Atlantic Grid-Interactive Cars
Consortium
![Page 12: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/12.jpg)
Mid-Atlantic Grid-Interactive Car Consortium (MAGICC)
Partners
• Univ. of Delaware
• PHI: Delmarva Power, Atlantic Electric, PEPCO, etc.
• PJM Interconnect
• AC Propulsion
• ACUA
• Comverge
www.magicconsortium.org
Observers
• Tesla Motors
• Google.org
• A123
• AES Corporation
• State of Delaware (PSC, Energy Office)
• Anon
![Page 13: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/13.jpg)
Current status
• One vehicle working, 6 planned and funded
• Procedure for utility interconnect approval- Done
• Assembler is ready to build vehicles with high power and bi-directional flow capabilities
![Page 14: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/14.jpg)
AGC from ISO to Vehicle via PLC
![Page 15: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/15.jpg)
Move ISO link to server
![Page 16: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/16.jpg)
80 AMP, 240 VAC, with Power-line carrier for IP
![Page 17: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/17.jpg)
What the ISO seesWhat the ISO sees
![Page 18: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/18.jpg)
What the ISO sees
![Page 19: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/19.jpg)
EVs providing regulation
![Page 20: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/20.jpg)
V2G Aggregator(No Car Plugged-in)
![Page 21: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/21.jpg)
V2G Aggregator(Car Plugged-in)
![Page 22: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/22.jpg)
V2G Aggregator(in V2G mode)
![Page 23: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/23.jpg)
Wind and V2G
![Page 24: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/24.jpg)
Simple model of V2G for wind leveling
• 220 MW offshore wind power (modelled from buoy 44009 offshore Delaware)
• Leveling target at 88 MW (40% of nameplate or 14% of average DE load), equal to 8760 average output
• Use storage of 1000 MWh (1 GWh) to level
• Storage from just under 30,000 EVs (28,571 eBoxes), about 4% of DE fleet
• Simplifying assumptions: no other end use storage, no distribution power limits, driving compromised during a few long wind lulls/year
• Equivalently, 3,250 MW capacity (100% of DE electricity) and 58% of fleet
![Page 25: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/25.jpg)
January Wind
![Page 26: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/26.jpg)
January wind + V2G
![Page 27: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/27.jpg)
July Wind
![Page 28: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/28.jpg)
July wind + V2G
![Page 29: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/29.jpg)
V2G as wind leveling• Good to reduce ramp rate, fill short
gaps (up to 6 hours? one day?)
• Multi-day wind lulls in this model
• Still need fossil or some other backup, but runs rarely
• Long term solutions, non-surface or inherent storage
• Half of fleet serves very roughly 100% electric -- needs model with load, etc
![Page 30: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/30.jpg)
Marketing researchMarketing research
![Page 31: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/31.jpg)
Ongoing marketing survey• Web-based survey • Sampling biased but close to early target market• Allows more complex tradeoffs and customization
• Respondents will be chosen randomly from within the PJM service area.• Target of 1,000 respondents needed due to
complex interdependencies of vehicle and V2G contract attributes
![Page 32: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/32.jpg)
• Potential attributes to test:– Recharging time
– Range with a full charge
– Range when participating in V2G contract
– Purchase price
– Annual fuel cost
– Annual income from V2G contract
– Compensate by hours plugged in, versus value to grid
– Trade off between V2G revenue and being guaranteed a certain level of charge
Ongoing marketing survey
![Page 33: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/33.jpg)
Building a FleetBuilding a Fleet
![Page 34: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/34.jpg)
Current Fleet
• AC Propulsion eBoxes (one in DE, one in CA)
• UD Fuel Cell Bus
![Page 35: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/35.jpg)
Fleet expansion
![Page 36: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/36.jpg)
Fleet expansion
![Page 37: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/37.jpg)
Fleet expansion• To test aggregator, need multiple
vehicles
• OEMs not building grid-oriented cars
• DOE award cost-share matched with 2 Delaware agencies + utility
• Add 4 cars in state fleet, V2G dispatch
• Test software on real vehicle use
• V2G market test: 200 cars (several possible partners)
![Page 38: vehicle-to-grid Power](https://reader036.vdocuments.site/reader036/viewer/2022062304/56812fc6550346895d954692/html5/thumbnails/38.jpg)
Summary• Large-scale CO2-free power fluctuates
• Now doing individual vehicle dispatch under AGC; simple model of wind fill-in and providing regulation services
• Work underway
• Software for aggregator & vehicle
• Market research for V2G contracts
• Dispatch on small fleet (~6 cars)
• Fleet for A/S contract (~200)