variation study for madhavaram site
TRANSCRIPT
-
7/24/2019 Variation Study for Madhavaram Site.
1/1701 1-12
HARINI ENTERPRISES
MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI E
SI NO DESCRIPTION OF ACTIVITIES NOS
A SUB STRUCTURE
1(a) EARTH WORK IN EXCAVATION
ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 2
ALONG GRID B1 TO B2 2 2.4 2.4 2
1.(b) EXCAVATION BELOW 2M
ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 0.1ALONG GRID B1 TO B2 2 2.4 2.4 0.1
2 RIVER SAND BEDDING
ALONG GRID A & C 14 2.6 2.6 0.1
ALONG GRID B1 TO B2 2 2.4 2.4 0.1
! PCC FOR FOOTINGS
"CC ALONG GRID A & C 14 2.6 2.6 0.07#
"CC ALONG GRID B1 TO B2 2 2.4 2.4 0.07#
4 FOOTING
$ SHUTTERING
AT%1 14 .6 0.2#
AT%2 2 . 0.2#
$$ REBAR (!"# BBS $%&&' 1
$$$ RCC
AT %1 (RECTANG'LAR) 14 2.4 2.4 0.2#
AT %1 (TRA"EOIDAL) 14 1.#AT %2 (RECTANG'LAR) 2 2.2 2.2 0.2#
AT %1 (TRA"EOIDAL) 2 1.24
# COLUMN UP TO PLINTH LVL
SHUTTERING
$ AT C1 14 !.6# 1.
AT C2 2 !.6# 1.46
DED'CTION AT GRADE LEVEL
AT GB! BEAM 'NCTION %OR C1 -20 0.2! 0.!
AT GB4 BEAM 'NCTION %OR C1 -4 0.2! 0.4#AT GB1 BEAM 'NCTION %OR C1 -10 0.! 0.6
AT GB2 BEAM 'NCTION %OR C1 -4 0.2! 0.4#
AT GB1 IN CANTILEVER %OR C2 -1 0.2! 0.6
AT GB! IN CANTILEVER %OR C2 -1 0.2! 0.!
PROJECT ) !!+11 ,VA 'B TATION WOR, NORT CENNAI.
SITE ) MADAVARAM
CLIENT ) M+. DRA,E & C'LL WATER & ENERG "VT LTD.
MEASUREMNT ARRIVED BY) M/.Ma3 Na53/ ( Maa3/ C$8$9:DWE) a M/.Ra;a/E:a/$$):M/.Aba/a>a ($=3 E)
CHECKED * RE+ARRIVED BY ) M/.$8a>?b/aa$a(E$33/ C$8$9:DWE) a M/.Aba/
LENGTHIN M
WIDTHIN M
HEIGHT/ DEPTH
IN M
-
7/24/2019 Variation Study for Madhavaram Site.
2/1702 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
DED'CTION AT "LINT LEVEL
AT BEAM "B! 'NCTION %OR C1 -20 0.2! 0.!
AT BEAM "B2 'NCTION %OR C1 & C2 - 0.2! 0.4#
AT BEAM "B1 'NCTION %OR C1 -6 0.2! 0.4#
AT BEAM "B6 'NCTION %OR C1 -2 0.! 0.7#
ATBEAM "B4 'NCTION %OR C2 -4 0.2! 0.4#
$$ REBAR 1
$$$ RCC COLUMN
AT C1 14 !.6# 0.4 0.#
AT C2 2 !.6# 0.2! 0.#
6 GRADE BEAM$ PCC
AT GB-1 # 10.# 0.# 0.07#
AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.# 0.07#
AT GB-2 2 4.7# 0.4! 0.07#
AT GB-2 2 #.2# 0.4! 0.07#
AT GB-! 10 !.! 0.4! 0.07#
AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.4! 0.07#
AT GB-4 ! !.! 0.4! 0.07#
$$I REBAR 1IVSHURTTERING FOR GBEAMS
AT GB-1 10 10.# 0.6
AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.6
AT GB-2 4 4.7# 0.4#
AT GB-2 4 #.2# 0.4#
AT GB-! 20 !.! 0.!
AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.!
AT GB-4 6 !.! 0.4#
8 RCCAT GB-1 # 10.# 0.! 0.6
AT GB-2 2 4.7# 0.2! 0.4#
AT GB-2 2 #.2# 0.2! 0.4#
AT GB-! 10 !.! 0.2! 0.!
AT GB-4 ! !.! 0.2! 0.4#
GB1 %OR TAIR 1 1.# 0.! 0.6
GB! %OR TAIR 1 1.# 0.! 0.!
7 BACK FILLING STAGE ,
RE%ER EXCAVTION T 1 2!1.4!DED'CTION
RIVER AND %ILLING BELOW %OOTING -1 10.616
"CC BELOW %OOTING -1 7.62
-
7/24/2019 Variation Study for Madhavaram Site.
3/170! 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
RCC %OOTING -1 46.06
COL'MN -1 11.06
GARDE BEAM "CC -1 4.10
PLINTH BEAM
SHUTTERING
AT "B-1 2 10.# 0.7#
AT "B-2 4 4.7# 0.4#
AT "B-2 4 #.2# 0.4#
AT "B-! 1 !.! 0.!
AT "B-4 6 !.! 0.4#
AT "B-# 4 !.!# 0.4#
AT "B-6 1.2! 0.4#
REBARRCC
AT "B-1 1 10.# 0.! 0.7#
AT "B-2 2 4.7# 0.2! 0.4#
AT "B-2 2 #.2# 0.2! 0.4#
AT "B-! !.! 0.2! 0.!
AT "B-4 4 !.! 0.2! 0.4#
AT "B-# 2 !.47 0.2! 0.4#
AT "B-6 4 1.# 0.2! 0.4#
STAIRS FROM FGL TO -,.M$ 'TTERING
%OR RIER WALL 4 1.# 0.2
GRO'ND LANDING 2 1 1.7#
WAIT LAB 2 !.06 1.7#
EDGE IDE 2 4.06 0.1#
LANDING 2 !.! 1.7#
$$ REBAR
$$$RCCRAIER WALL 2 1.# 0.1# 0.2
GRO'ND LANDING 2 1 1.77 0.1#
WAIT LAB 2 !.06 1.77 0.1#
LANDING 2 !.! 1.77 0.1#
10BRICK WORK BELOW PLINTH
AT "B1 1 10.# 0.2! 1.1
AT "B2 2 4.7# 0.2! 1.4
AT "B2 2 #.2# 0.2! 1.4
AT "B! !.! 0.2! 1.##AT "B4 4 !.! 0.2! 1.4
AT "B# 2 !.! 0.2! 1.#
AT "B6 2 1.# 0.2! 1.#
TE" %ROM 0M LVL TO 1.# M LVL 1.7# 0.2! 0.1#
-
7/24/2019 Variation Study for Madhavaram Site.
4/1704 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
11CABLE TRENCH
$ RIVER SAND FILLING 2 1.1# 2 0.1
2 6.# 2 0.1
1 6.# 2.1 0.1
$$ PCC 2 1.1# 2 0.07#
2 6.# 2 0.07#
1 6.# 2.1 0.07#
$$ SHUTTERING
'TTERING %OR RA%T 2 12.4# 0.2
4 6.7 0.2
'TTERING %OR WALL 2 17.7# 1.6#
2 10.1 1.#
4 6.642# 1.#4 6.242# 1.#
4 7.1 1.#
4 6.7 1.#
'TTERING %OR COVER LAB ! 7.1 1.#
4 1.# 1.#
DEDUCTIONS
'N O% IN COMING CABLE D'CT
WALL -2 1.# 1.#
D3?
-
7/24/2019 Variation Study for Madhavaram Site.
5/170# 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
GRADE BEAM GB1 -4 10.#0 0.! 0.6
$ RIVER AND %ILLING 1 12.4# 6.7 0.0
1 10.27 !.! 0.0
$$ "CC 1 12.4# 6.7 0.1
1 10.27 !.! 0.1
$$$REBAR
B SUPER STRUCTURE UP TO FF
1 COLUMN UP TO FF
$ REBAR
$$ 'TTERING
AT C1 14 4.42 1.AT C2 2 4.42 1.46
DED'CTION AT BEAM LEVEL
AT BEAM %B4 'NCTION %OR C1 -20 0.2! 0.4
AT BEAM %B# 'NCTION IN C1 -4 0.2! 0.6
AT BEAM %B 'NCTION IN C1 -2 0.2! 0.#
AT BEAM %B1 'NCTION IN C1 -10 0.4 0.7#
AT BEAM %B2&%B! 'NCTION IN C1 - 0.2! 0.6
AT BEAM %B6 'NCTION %OR C1 -7 0.2! 0.4
L$=39 ?
-
7/24/2019 Variation Study for Madhavaram Site.
6/1706 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
DRO" ABOVE VARANDA 1 2#.6 0.0 1
! FF BEAM
$ REBAR
$$ 'TTEREING
AT %B-1 # 10.# 1.62
AT %B-2 2 4.7# 1.1#
AT %B-! 2 #.2# 1.1#
AT %B-4 10 !.! 0.7#
AT %B-# 2 !.! 1.1#
AT %B-6 7 1.#2 0.2
AT %B-7 6 !.! 0.#7
AT %B- 1 !.! 0.#
ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.!
$$$RCC
AT %B-1 # 10.# 0.4 0.7#
AT %B-2 2 4.7# 0.2! 0.6
AT %B-! 2 #.2# 0.2! 0.6
AT %B-4 10 !.! 0.2! 0.4
AT %B-# ! !.! 0.2! 0.6
AT %B-6 7 1.# 0.! 0.4
AT %B-7 6 !.4 0.2! 0.!
AT %B- 1 !.! 0.2! 0.#
ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.2! 0.4#
4 FF SLAB
$ 'TTERING
% 1 # 10.#4 !.!000
%! 1 #.4# !.!000
%2 6 1.4# !.!000
O'TER IDE 2 !!.60 0.1400
ADDITIONAL LAB ABOVE R 'TTER
O'TER IDE 2 2.7# 0.1#
LANDING A LI,E G% 2 2.7# 1.7#
$$ REBAR 1
$$$RCC
%-1 4 10.# !.! 0.14
%-1 1 10.# !.!# 0.14
%-2 6 !.4 1.#2 0.14
%B-! 1 #.!# !.!# 0.1#
LAB ABOVE ROLLING 1 2.7# 1.7# 0.1#
1 STAIR FROM -,.1M TO+ 1.21M LVL$ 'TTERING %OR TAIR '" TO %%
MID LANDING BEAM AT !.67#M 1 !.74# 0.!
MID LANDING LAB AT !.67#M 1 !.74# 1.!#
WAIT LAB 1 &2 2 4.0# 2.0!
-
7/24/2019 Variation Study for Madhavaram Site.
7/1707 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
I$ REBAR
I$IRCC
TAIR %ROM 1.#M TO- #.#M LVL
MID LANDING BEAM AT !.67#M 1 !.! 0.2! 0.4#
MID LANDING LAB AT !.67#M 1 !.!# 1.!# 0.2
WAIT LAB 1 &2 2 4.06 1.6 0.2
6 34 BRICK WORKS AT GFALONG GRID A&C 12 !.! 0.2! !.7ALONG GRID 1:2 2 10 0.2! !.6#ALONG GRID 7 1 10.# 0.2! !.6#
WALL BETWEEN GRID B& C 1 !.! 0.2! !.#
TE" %ROM 1.# TO %% 14 1.72 0.2# 0.14#
DED'CTIONWINDOW -W -12 1.1 0.2! 1.4
VENTILATOR-V -10 1.1 0.2! 0.#
VENTILATOR-V -! 0. 0.2! 0.#
DOOR D1 -! 0. 0.2! 2.1
ROLLING 'TTER -1 2.7# 0.2! !.6
COLLA"ABLE GATE -1 1.# 0.2! 2.4
OLLE -1 1.2 0.2! 1.2
7 5.14HALF BRICK WALL
WALL AT GRID B 1 !.! !.#WALL AT TOILET 2 1. !.#
DED'CTION 2 1.0# !.#
DOOR D2 -2 0. 2.1
C SUP STRUC. FROM FF TO ROOF
1 COLUMN UP TO ROOF
$ REBAR
$$ 'TTERING
AT C1 14 !.# 1.
AT C2 2 !.# 1.46
DED'CTION AT BEAM LEVEL
AT BEAM RB4 'NCTION IN C1 -22 0.2! 0.4
AT BEAM RB7 'NCTION IN C1 -2 0.2! 0.#
AT BEAM RB1 'NCTION IN C1 -10 0.4 0.7#
AT BEAM RB6 'NCTION IN C1 -4 0.2! 0.#
AT BEAM RB# 'NCTION IN C1 -7 0.2! 0.#
ATBEAM 'NCTION C2 -6 0.2! 0.#
$$$RCC
AT C1 14 !.# 0.4 0.#
AT C2 2 !.# 0.2! 0.#
2 LINTEL 6SSHADE* LATH (DROP
-
7/24/2019 Variation Study for Madhavaram Site.
8/170 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
$ 'TTERING %OR 'N ADE 1.6 0.7
'TTERING %OR LINTEL 24 !.! 0.!
1 10.# 0.6
2 10 0.6
LO%T 2 1.1# 0.6
2 .! 0.6
DRO" ABOVE VARANDA 1 2#.6 1
IIREBAR
$$$ RCC 'N ADE 1.6 0.6 0.1
RCC LINTEL 12 !.! 0.2! 0.!
1 10.# 0.2! 0.!
ABOVE 4.# WALL 1 2.77# 0.11# 0.!
1 !.76 0.2! 0.!LO%T 2 1.1# 0.6 0.0
2 .!4 0.6 0.0
DRO" ABOVE VARANDA 1 2#.6 0.0 1
! ROOF BEAM
$ SHUTTERING
AT RB1 # 10.# 1.62
AT RB! 6 !.4 0.6
AT RB4 11 !.! 0.
AT RB# 7 0.7# 1.27AT RB6 2 10 0.72
AT RB7 1 !.! 0.#
$$ REBAR
$$$RCC
AT RB1 # 10.# 0.4 0.7#
AT RB! 6 !.4 0.2! 0.!
AT RB4 11 !.! 0.2! 0.4
AT RB# 7 1.# 0.! 0.#
AT RB6 2 10 0.2! 0.#AT RB7 1 !.! 0.2! 0.#
4 ROOF SLAB
$ SHUTTERING
# 10.#0 !.!0
1 #.2# !.!0
6 1.#4 !.!0
O'TER IDE 2 !4.06 0.1#
$$ REBAR$$$RCC
RI 4 10.#0 !.!0 0.14
RI 1 10.#0 !.! 0.14
R! 1 #.! !.! 0.14
-
7/24/2019 Variation Study for Madhavaram Site.
9/170 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
R2 6 1.#2 !.40 0.14
# 34 BRICK WORKS AT FF
ALONG GRID A&C 11 !.! 0.2! 2.
ALONG GRID 1:2 2 10 0.2! 2.7#
ALONG GRID 1:2&7 1 10.# 0.2! 2.4#
WALL BETWEEN GRID A& C 2 !.! 0.2! 2.6
TE" 11 1.7! 0.2# 0.14#
DED'CTION
WINDOW -W -11 1.1 0.2! 1.4
VENTILATOR-V -7 0. 0.2! 0.#
DOOR D1 -2 0. 0.2! 2.1
DOOR D -2 0. 0.2! 2.1
OLL -1 1.2 0.2! 1.2
6 5.14WALL AT FF
WALL AT GEN TOILET 2 1.# !.0#
2 1.0# !.0#
WALL AT LADIE TOILET 1 1.# !.0#
2 1.1# !.0#
DED'CTION -DOOR D2 -4 0. 2.1
#(a) 34 BRICK WORKS AT VARANDAH 1 2# 0.2! 0.
7 STAIR CASE STRUCTURE$ SHUTTERING
TAIR %ROM #.#M TO .04
MID LANDING BEAM AT 7.44#M 1 !.74# 0.!
MID LANDING LAB AT .04M 1 !.74# 1.!#
MALL LANDING AT #.#MLVL 1 1.6 0.7#
WAIT LAB ! & 4 2 !.12 2.0!
$$ REBAR FOR STAIR 1
$$$ RCC FOR STAIRTAIR %ROM #.#M TO .04
MID LANDING BEAM AT 7.44#M 1 !.74# 0.2! 0.4#
MID LANDING LAB AT .04M 1 !.74# 1.!# 0.2
MALL LANDING AT #.#MLVL 1 1.6 0.7# 0.2
WAIT LAB !&4 2 !.12 1.6 0.2
ROOF WORKS
a. ROOF LVL RCC * %&ad !""#
$ SHUTTEREING
B1 O?=3/ >$3 1 !.!0 0.#00B1 I3/ >$3 ! !.470 0.!60
B2 O?=3/ >$3 2 7.11# 0.#00
B2 I3/ >$3 2 6.42# 0.!60
B! O?=3/ >$3 1 !.!0 0.!00
-
7/24/2019 Variation Study for Madhavaram Site.
10/17010 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
B! I3/ >$3 1 !.470 0.160
1 1 7.11# !.!0
C1 2 1.00 2.200
C2 2 1.460 2.200
$$ REBAR
$$$ RCC
COL'MN C1 AT "ARA"ET 0.0 0.40 0.#0
COL'MN C1 2 2.40 0.40 0.#0
COL'MN C2 2 2.40 0.2! 0.#0
BEAM B1 2 !.!0 0.2! 0.#0
BEAM B2 2 #.7 0.2! 0.#0
BEAM ! 1 !.! 0.2! 0.!
LAB 1 1 6.42# !.47 0.14
b BRICK WORK 34
AT "ARA"ET 6 !.! 0.2! 0.
1 10.# 0.2! 0.
1 #.2# 0.2! 0.
AT EAD ROOM 1 16.17 0.2! 1.
EAD ROOM "ARA"ET 1 20. 0.2! 0.!
DED'CTION
DOOR D1 -1 0. 0.2! 1.
WINDOW -1 1.1 0.2! 1.4
OLL -1 1.2 0.2! 1.2
< BRICK WORKS+34 IN PASSAGE 1 2# 0.2! 0.
DEXTERNAL FINISHING AND YARD WORKS
TAGE 4 "AMENT 20
EXTERNAL WOR, & ARD
1 TRAN%ORMER "LINT
a EXCAVATION
TRAN%ORMER %O'NDATION 1 !. 12. 1.#
CABLE TRENC 2 1.2 12. 1.#2 ! 1.2 1.#
b RIVER AND %ILLING 1 12.# 6.2 0.1
< "CC 1 12.# 6.2 0.07#
SHUTTERING
1 2#.22 0.2#
TRA" BEAM 2 1.76 0.!#
COL'MN 1.2 2.10
2 1.!6 2.10BEAM B1 2.47# 0.!2#
BEAM B2 4 2.47# 0.!2#
LAB 1 !.!# !.!#
TRAN%ORMER %O'NDATION & %IRE WALL-BAE
-
7/24/2019 Variation Study for Madhavaram Site.
11/17011 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
%IRE WALL 2 4.2! 4.#0
CABLE D'CT RA%T ALONG "LINT 2 1 0.20
CABLE D'CT RA%T ARRO'ND "LINT-WALL 2 72 1.!0
COVER LAB 2 1 1.2
DEDUCTIONS
'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.!0
3 REBAR FOR TRS. FORMER FND 2
@ RCC
TRAN%ORMER %O'NDATION 1 .! !.27# 0.2#
TRA" BEAM 2 .! 0.# 0.!#
COL'MN C1 0.! 0.! 2.10
BELOW GRO'ND C2 2 0.4# 0.! 1.00
ABOVE GROND C2 2 0.4# 0.2! 1.10BEAM AT %LOOR LEVEL B1 4 2.17# 0.! 0.!!
BEAM AT %LOOR LEVEL B2 2.17# 0.! 0.!!
LAB AT "LINT 2 ! ! 0.1
%IRE WALL 1 4.# 0.2! 4.#
CABLE DUCT AROUND PLINTH
RA%T 2 12.07 1.# 0.20
4 ! 1.# 0.20
WALL 1 46.4 0.1# 1.##
2.17# 0.1# 1.##
COVER LAB 2 12.07 1.2 0.1#4 ! 1.2 0.1#
DEDUCTIONS
'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.! 0.1#
2
$ EARTH WORK EXCAVATION 1 2.# 4.2 1.#0
$$ RIVER SAND 1 2.# !. 0.0
$$$ PCC 1 2.# !. 0.10
$8 SHUTTEREING
RA%T 2 12 0.20
WALL 2 24 1.#0
COVER ALB 2 6 1.#
8 REBAR
8$ RCC
RA%T 1 2.# !.6# 0.20
WALL 2 2.# 0.2 1.20
1 2.# 0.2# 1.20BEAM 2 !.6# 0.! 0.!0
BEAM 1 !.6# 0.!# 0.20
COVER LAB 1 2.# !.6 0.20
CABLE DUCT FROM PLINTH TOBUILDING
CABLE D'CT %ROM TRAN%ORMER TOB'ILDING
-
7/24/2019 Variation Study for Madhavaram Site.
12/17012 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
! INCOMING CABLE TRENCH
$ EXCAVATION 2 !.7 2.# 1.#0
$$ SAND FILLING 2 !.7 2.1 0.0
$$$ PCC 2 !.7 2.1 0.10
$8 SHUTTERING
RAFT 2 .! 0.20
WALLL 4 !.7 1.!0
4 !.7 1.1#
COVER 2 !.7 1.#
8 REBAR
8$ RCC
RA%T 2 !.7 1. 0.20
WALL 4 !.7 1.2 0.20
COVER 2 !.7 1. 0.1#
4 BACK FILLING 7RD STAGE
RE%ER T O% EXCAVATION
DED'CTION
R AND %ILLING O% TRAN %DN
"CC O% TRAN %DN
RCC O% TRAN %DN
# "AVING 1 66.40 1
6 ROADROAD BAE (METAL & GRAVEL) 1 1#.00 0.! 6
"CC B 40MM M#-1F4F 1 1#.00 0.1# 6
RCC B 20MM M1# 1 1#.00 0.1# 6
TO"ING B !TO 10MM M1# 1 1#.00 0.0# 6
REBAR 27# MM C+C-(!.0! ,G+M) 1
ROAD+ M 1 1#.00 6
7 'G 'M" (L'M"'M)
a EXCAVATION 1 4.#0 2.7 1.#
b RIVER AND %ILLING 1 4.10 2.! 0.1< "CC 1 4.10 2.! 0.1
'TTERING
%LOOR 1 12.00 0.2
WALL 1 22.0 2.1
COVER LAB 1 !.0 2.1
3 REBAR 22,G+M O% 'R%ACE AREA 1 44.70 22
@RCC
RCC %LOOR 1 !.0 2.1 0.2
RCC WALL 1 11.40 2.1 0.1#RCC COVER LAB 1 !.0 2.1 0.1#
"LATERING
%LOOR 1 !.00 1.
WALL 1 .60 2.2
-
7/24/2019 Variation Study for Madhavaram Site.
13/1701! 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
CEILING 1 !.00 1.
MANOLE COVER 1
WEATERING CO'RE & TILING 1 21.7 10.#
YARD OPEN AREA FILLING 5TH STAGE
IE O% TE "LTOT 1 42.7!# 16.21 0.7
DED'CTION %OR BLG AREA -1 22.2 11 0.7
TRAN%ORMER ARD -1 12.!0 6 0.7
CABLE TRENCE AREA -1 2.#0 !.6 0.7
INCOMING TRENC AREA -2 !.70 1. 0.7
WATER TAN, -1 !.40 2.2 0.7
TAIR AREA -2 7.40 1.7# 0.7
E FINISHING WORKS
1 PLASTERING INTERNALa GF
WALL-CONTROL ROOM 1 #7.!1 4.2#
DED'CTION
W -12 1.1 1.4
V - 1.1 0.#
R -1 2.7# 4.1
D1 -2 0. 2.1
D1 -1 1.2 2.1
B3a ?/@a -4 0.11# !.
D1 & D2 -# 0. 2.1
'RINAL ENTR -2 1.0# !.
VENTILATOR -! 0. 0.6
D1 BATTER ROOM -1 1.2 2.1
TAIR ROOM 1 17.27 4.2#
DED'CTION %OR CG -1 1.# 2.1
DED'CTION %OR OLLE -1 1.2 1.2
b PLASTERING INTERNAL FF
WALL O%%ICE 1 #7.! !.!
DED'CTION
W -11 1.1 1.4
D1 -2 0. 2.1
D -2 1.1 2.1
GENT TOILET+BAT 2 #.1 !.!
WALL 'RINAL+"AAGE 1 12.4 !.!
DED'CTION %OR DOOR-D2& D1 -# 0. 2.1VENTILATOR -# 0. 0.6
LADIE TOILET 2 #.# !.!
DED'CTION %OR DOOR-D1 -2 0. 2
"AAGE 1 .!2 !.!
-
7/24/2019 Variation Study for Madhavaram Site.
14/17014 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
DED'CTION D1 & D2 -# 0. 2.1
VENTILATOR -2 0. 0.6
TAIR ROOM AT %IRT %LOOR 1 17.27 !.!
DED'CTION AT ENTRANCE -1 !.! !.1
OLL -1 1.2 1.2
< EAD ROOM
WALL 1 16.# 2.2#
DED'CTION DOOR -1 0. 1.
WINDOW -1 1.1 1.4
OLL -1 1.2 1.2
2 CEILING PLASTERING
G
CEILING 1 1.1# 10.#%B1 BEAM DRO" 4 10.# 1.2
WET AREA 1 !.!# !.01#
BATTER ROOM 1 !.!# 2.24
TAIR MID LANDING 1 !.!# 1.4
WAIT 1 &2 2 1.7 4.06
VARANDA 1 22 1.7#
%B6 BEAM DRO" 7 1.# 0.#2
%B7 BEAM DRO" 6 !.! 0.16
RAIR AT 00 LVL
WAIT 2 !.1!47 1.#
O%%IT 2 !.!# 1.#
BEAM "" # &6 DRO" 2 6.47 0.2#
b CEILING PLASTERING FF
O%%ICE 1 1.1 10.#
LO%T 1 ## 1.2
WEWT AREA 1 !.!# #
VARANDA 1 22.2 1.7#RB1 BEAM DRO" 4 10.# 1.2
RB# BEAM DRO" 6 1.# 0.72
RB! BEAM DRO" 6 !.! 0.!
TAIR AREA
MID LANDING 1 !.74# 1.!#
MALL LANDING 1 1.6 0.7#
WAIT LAB ! & 4 2 !.12 2.0!
C EAD ROOM
CEILING 1 6.# !.!BEAM DRO" B! 1 !.! 0.1#
BEAM DRO" B2 2 1.# 0.!#
! PAINTING INTERNAL
-
7/24/2019 Variation Study for Madhavaram Site.
15/1701# 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
a G%
WALL R%E%ER T %ROM "LATER
DED'CT WALL TILING G%
CEILING
b FF
WALL RE% T %ROM "LATER
DED'CT WALL TILING %%
CEILING
4 FLOORING
a GROUND FLOOR
CERAMIC %LOORING 1 1.1# 10.#
DED'CTION %OR CABLE TRENC
-1 14.!# 1.-1 12.## 1.
GENT TOILET-%LOORING 1 !.1## 2.
BATTER ROOM 1 !.!# 2.24
ACCE TE" & TAIR
%LOOR LANDING LAB AT 0.00M LVL 2 !.7 1.7#
TE" 20 1.7# 0.46
TAIR "AAGE AT ENTRANCE 1 #.2# !.!#
b FLOOR TILING GF STAIRMID LANDING AT !.67#M LVL 1 !.!# 1.2#
TE" 2 1.6 0.!#
< FLOOR TILING FF
%%-%LOORING 1 1.1# 10.#
GENT TOILET-%LOORING 1 !.!# !.01#
LADIE TOILET 1 !.!# 2.24
"AAGE AT VARANDA 1 22.2 1.6!
TAIR
TE" %ROM %% TO ROO% 20 1.6 0.!#MALL LANDING AT #.#MLVL 1 !.!# 0.7#
MID LANDING LAB 1 !.!# 1.2#
LANDING AT .04MLVL 1 !.!# 1.12
2 WALL DADO
a GROUND FLOOR
WALL TOILET+BAT 2 #. 2.1
WALL 'RINAL 1 4.7## 2.1
BAT "AAGE 1 .77 2.1
DED'CTION %OR DOOR-D2 -4 0. 2.1VENTILATOR -! 0. 0.6
DED'CTION %OR DOOR-D1 -1 0. 2.1
WALL SKIRTING
TAIR AREA 1 17.27 0.1
-
7/24/2019 Variation Study for Madhavaram Site.
16/17016 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
DED'CTION %O CG -1 1.# 0.1
CONTROLL ROOM WALL TILING 2 1.1# 2.1
2 10.# 2.1
DEDUCTION
WINDOW -12 1.1 1.4
DOOR -2 0. 2.1
DOOR -1 1.2 2.1
ROLLING 'TTER -1 2.7# 2.1
b FF
GENT TOILET+BAT 2 #.1 2.1
WALL 'RINAL+"AAGE 1 12.4 2.1
DED'CTION %OR DOOR-D2& D1 -# 0. 2.1
VENTILATOR -# 0. 0.6
LADIE TOILET 2 #.# 2.1
DED'CTION %OR DOOR-D1 -2 0. 2"AAGE 1 .!2 2.1
DED'CTION D1 & D2 -# 0. 2.1
VENTILATOR -2 0. 0.6
,IRTING
O%%ICE 1 #7.!7 0.1
DED'CTION DOOR D -2 1.1 0.1
DOOR D1 -2 0. 0.1
TAIR AREA 1 17.27 0.1
DED'CTION %OR ENTRANCE -1 !.! 0.1
"AAGE 2 2!.# 0.1DED'CTION %OR D -2 1.1 0.1
! EXTERNAL %INIING WOR,
a "LATERING EXTERENAL WALL 1 6.2 11.14
CORNICE AT "ARA"ET LVL 1 66.4
AT EAD ROOM ROO% 1 22.2
COL'MN "EOECTION O'T 12 0.2# 10.7#
COL'MN "EOECTION EAT+WET ! 0.17 10.7#
WARANDA "ARA"ET WALL AT %% 1 2# 1.
LAB ABOVE ROLLING 'TTER 1 #.17 2.7!DRO" AT %IRT %LOOR LVL 1 2# 2.1
COL'MN AT NORT 12 0.2# .!
ROO% LEVEL DRO" ABOVE VARANDA 1 2#.7 2.1
'NADE ABOVE WINDOW AT G% 7 !.4 1.2
'NADE AT %% !.4 1.2
EAD ROOM "LATERING EXTERNAL 1 1.1! 2.4
EAD ROOM "ARA"ET 1 22.2 0.6
COL'MN %ACE 1 1.1 2.7
"ARA"ET IN "AAGE AT ROO% 2 1.# 1.DED'CTION
WINDOW -24 0.72 1.02
CG -1 1.04 1.7
R -1 2.2 !.7
-
7/24/2019 Variation Study for Madhavaram Site.
17/17017 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
DOOR D AT %% -2 0.64 1.7
DED'CTION %OR TAIR ENTR %% -1 !.! !.7
DOOD D AT ROO% D1 -1 0.44 1.7
OLL -! 0.74 0.74
%IRE WALL 1 .2# .#
4 EXTERNAL "AINTING
EXTERNAL WALL
# AND RAIL
ANDRAIL AT O TO 1.#M 2
ANDRAIL AT TAIR
WAIT LAB 1 &2 2 4.0#
WAIT LAB !&4 2 !.12
6 WATER TAN, 1000 LITER 2
7 BATER ROOM WALL ACID REITANT 1 10.2# 2.1
ELECTRICAL WOR, WIT %ITTING 1
"L'M"ING & ANITARWERE 1
10 EWAGE+ DRAINAGE WOR, !0
11E"TIC TAN,& OA,WA WIT COVER 1
12 RAIN WATER LINE & ARVETING 1
1! 1
14 IN"ECTION CAMBER !1# G'LL TRA" 2
16 OINERIE
a DOOR D (CW C %L' DOOR) 2 1.1 2.1
DOOR D1 (CW C %L' DOOR) 6 0. 2.1
b DOOR D2 ("VC DOOR) 6 0. 2.1
< ROLLING 'TTER 1 2.7# !.6
COLLA"IBLE GATE(M) 1 1.# 2.1
3 WINDOW(AL'MINI'M) 2! 1.1 1.4VENTILATOR IN CONTROL ROOM 10 1.1 0.#
VENTILATOR IN TOILET 0. 0.#
WINDOW IN TE "LACE O% OLL 1 1.2 1.2
VENTILATOR IN CONTROL ROOM 1.1 0.#
VENTILATOR IN TOILET 10 0. 0.#
@ GRILL WIT "AINTING W1 2#+>J 2! 1.1 1.4
WINDOW IN TE "LACE O% OLL 1 1.2 1.2
20 NAME BOARD AT ROO% 1
21 BOREWELL 1
22 ACCE LADDER M- 4M AT ROO% 1
ENTRANCE GATE 6 H$3 2M WIC,EDGATE
-
7/24/2019 Variation Study for Madhavaram Site.
18/1701 1-12
TERPRISES
8TY SUB TOTAL
1.2
2!.04 212.!2
17.0!#22.07!6 1.10
.464
1.1#2 10.616
7.0
0.64 7.62
!!.6
4.4 !
2.!244 2.!244
20.16
21.002.42
2.4 46.06
1.
10.6#
-1.!
-0.414-1.
-0.414
-0.1!
-0.06
a ("/;3a($=3 E)
-
7/24/2019 Variation Study for Madhavaram Site.
19/1701 1-12
8TY SUB TOTAL
-1.!
-0.2
-0.621
-0.4#
-0.414 4.7!
#.0!1 #.0!1
10.22
0.4 11.06
1.7
0.06
0.!1
0.!4
1.06
0.0#
0.!2 4.10
!.16 !.16
6!
0.
.##
.4#
1.
0.4#
.1 111.06
.4#
0.
1.0
2.2
1.02
0.27
0.14 1#.2!
2!1.4!
-10.616
-7.62
-
7/24/2019 Variation Study for Madhavaram Site.
20/17020 1-12
8TY SUB TOTAL
-46.060
-11.060
-4.102 1#1.62
1#.7#
.##
.4#
17.2
.1
6.0!
4.42 70.!
2.!77 2.!77
2.!6
0.
1.0
2.0#
1.!7
0.72
0.62 .1
1.20
!.#0
10.71
1.22
11.## 2.1
0.# 0.#
0.0
0.#!
1.62
1.7# 4.00
2.66
!.06
!.!
10.#4.2#
2.6
1.!#
0.#4 2.7
-
7/24/2019 Variation Study for Madhavaram Site.
21/17021 1-12
8TY SUB TOTAL
7.27
2.60
1.!7 11.24
#.46
1.#
1.02 .4!
4.4
#.!6
#.60#
!0.!
!.##!7.4##
42.6
40.2
!1.#
-4.#
-1.14
-4.7# 2.#
#.72 #.72
1!.2
7.64
12.00
6.06
7.7!
.26.07
1.4
.7
-0.0
-0.2!
-0. 70.!0
10.6
71.#
-
7/24/2019 Variation Study for Madhavaram Site.
22/17022 1-12
8TY SUB TOTAL
-7.#6 24#.2#
6.6
2.71 .40
.!6
!.! 11.7#
0.!7 0.!7
!.1 !.1
111.!12.1
-1.4
-0.##2
-0.2!
-!
-1.104
-0.644
-2.20
-0.207 114.#1
12.!
1.02 1!.!
1!.44
1.0
21.7!.6
2.2
2#.#0 #.6
0.1 0.1
1.1#
4.6#
0.2!0.11
0.72
0.1!
-
7/24/2019 Variation Study for Madhavaram Site.
23/1702! 1-12
8TY SUB TOTAL
2.0# .04
6.02 6.1
#.0#
10.!
12.0
24.7#
7.#
.72
11.2
!.14
2.1 166.44
1#.7#
1.!1
1.4#
!.04
1.!7
1.26
1.41
0.!
0.!6 26.!2
17!.1
17.
2.71
.41
0.!
.6! 240.46
!.70 !.70
1.40
4.
4.!4
2.7!
0.72 !2.1
!.11
#.1
16.44 24.74
-
7/24/2019 Variation Study for Madhavaram Site.
24/17024 1-12
8TY SUB TOTAL
1.0# 1.0#
0.!4
0.4
2.60 !.
!!.7016.7.1
2.66
0.7
-4.2
-1.#7
-0.!2
-1.!0
-2.2
-0.!
-0.!! #1.!
11.##1!.!0
7.!#
-!.7 2.42
!.1 !.1
.20
10.22
-2.024
-0.2!
-!
-0.46
-0.0#
-0.6 1.21
.0
0.1 10.61
-
7/24/2019 Variation Study for Madhavaram Site.
25/1702# 1-12
8TY SUB TOTAL
.6
2!.76
6.!0
12.00
24.7!
12.6#
2#.60 114.00
0.7
0.77
2.7!
0.72
0.10
0.261.7#
0.0
2.0# .27
#.0#
14.0
2.04
6.6714.40
!.14 1#2.!7
#.1! #.1!
1#.7#
1.41
!.!4
1.#
2.!00.! 24.7#
17!.2#
17.!!
!0.4
10.22 2!1.2
!.21 !.21
1.40
4.
2.##
-
7/24/2019 Variation Study for Madhavaram Site.
26/17026 1-12
8TY SUB TOTAL
4.!4 !1.27
2!.!
12.6#
#.2
!.#
0.6
-4.42
-0.7#
-0.7
-0.7
-0.!! !.!#
.1#
6.41
4.#
7.02
-7.#6 1.#
#.1 #.1
!.11
#.1
1.20
12.2 22.41
0.7 0.7
0.!
1.04
0.24
2.04 !.70
1.6#!.74
7.11#
4.626
1.17
-
7/24/2019 Variation Study for Madhavaram Site.
27/17027 1-12
8TY SUB TOTAL
0.###
27.62
7.20
6.424 61.44
1.1 1.1
1.44
0.6
0.##
0.76
1.!#
0.2!
!.12 .41
4.10
2.17
1.0
7.07
1.44
-0.!
-0.40
-0.!! 14.74
#.1 #.1
7#.47
46.4410.0 1!2.71
7.7# 7.7#
#.1 #.1
!#.6!
!#.6!
20.160
#.712!#.6!
!#.6!
11.22!
-
7/24/2019 Variation Study for Madhavaram Site.
28/1702 1-12
8TY SUB TOTAL
!#.6!
!#.6!
!#.6!
4!.200
-.4#0 !2!.#
6.022! 6.02
7.6
!.2
1.#1
0.27
0.2!0.#
1.70
!.1#
#.12
7.24
!.60
10.1
4.0#
4.!#2.16
-1.26 #4.!
1#.7# 1#.7#
0.76
0.#
!#.6!
!#.6!
1.000 .!
0.4#4 0.4#
1.!
1.20
0.7#0.66
0.26
1.0 6.4
-
7/24/2019 Variation Study for Madhavaram Site.
29/1702 1-12
8TY SUB TOTAL
27.7# 27.7#
1.24
1.##
!.72
1.24
17.02
11.10 #1.0
0.!7 0.!7
2.1
!.##
2.11 .47
1!2.71
-7.7#
-#.1
-#4.! 64.!1
66.40 66.40
27.00
1!.#0
1!.#0
4.#0
0.00 0.00
1.2! 1.2!
0.4 0.40.4 0.4
2.40
47.
.1 #.47
0. 0.
1.64
!.#1.2! 6.46
#.40
21.12
-
7/24/2019 Variation Study for Madhavaram Site.
30/170!0 1-12
8TY SUB TOTAL
#.40 !1.2
1.00
227.# 227.#
44.1
-170.4
-#1.66
-6.!0
-.4
-#.24
-1.1! 222.1
24!.#7
-20.6
-6.16
-11.2
-!.7
-2.#2
-1.#
42.7#10!.2#
-1.7#
-.4#
-7.
-1.44
-2.#2
7!.40
-!.1#
-1.44 !.#
1.0
-1.21
-!.7
-4.62
!!.66
40.2
-.40-2.40
!6.!0
-!.20
27.46
-
7/24/2019 Variation Study for Madhavaram Site.
31/170!1 1-12
8TY SUB TOTAL
-.40
-0.6
#6.
-10.2!
-1.44
!7.!1
-1.71
-1.7#
-1.44 !#4.1
10.4#0.40
10.21
7.#
4.74
1#.1
!.#0
#.46
!.17
.42
10.16
!.24 !4.
10.
6#.6
16.!
!.##0.40
6.4
7.72
#.1
1.20
12.2
2!.270.#1
1.0# 421.!7
-
7/24/2019 Variation Study for Madhavaram Site.
32/170!2 1-12
8TY SUB TOTAL
!#4.1
-1!2.!6
!26.1
!#4.1
-7#.
421.!7 1247.67
10.4
-27.!!-2!.1
.1#
7.#
12.#
16.10
17.77 20!.2#
4.2!
1.!! 22.#6
10.4
10.21
7.#
!6.1
12.642.#4
4.2!
!.7 26.12
24.7
.
1.42
-6.72-1.44
-1.6
1.7!
-
7/24/2019 Variation Study for Madhavaram Site.
33/170!! 1-12
8TY SUB TOTAL
-0.1#
76.!
44.10
-20.6
-!.7
-2.#2
-#.7 1!2.!6
21.42
26.04
-.40
-2.40
2!.10
-!.2017.47
-.40
-0.6
#.74
-0.22
-0.1
1.7!
-0.!!
4.70-0.22 7#.
7#.7#
66.40
22.20
!2.2#
#.4
4#.00
14.11#2.#0
27.0
#!.7
2.#6
!2.64
4!.#1
1!.!2
4.
#.70
-17.6!
-1.4
-.6
-
7/24/2019 Variation Study for Madhavaram Site.
34/170
-
7/24/2019 Variation Study for Madhavaram Site.
35/170!# @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14
ANNEXURE II
BOQ & SCHEDULE OF PRICES
33 / 11 KV SUB-STATION WORKS AT NORTH CHENNAI, INDIA
SR. NO. DESCRIPTION OF ITEM
1
2
3 Back filling with excavated earth including consolidation asper specfication.
4
5 PCC M1 !1"3"#$ asper specification
#
% &CC M25 for lintel'sunshade'(ea) and sla(
* P+, for) work for all &CC ite)s
- P+, of reinforce)ent steel M for all &CC ite)s
1 P+/ paved area 0ccess
11 P+/ BB )asonar of 3)) thick co)pound wall
12 P+ plastering +.
13 P+ painting + B ce)ent paint
14 ,looring
15 6xpansion 7oint
1# 6ntrance gate 0 ou(le leaf with &CC Pillar
1% 8tor) water drain arrange)ents
1* nternal 6lectrical works
1- nternal &oad
2 Clear water su)p
6xcavation in all soils .)tr to2. )tr' including disposal of earth upto 1 )trfro) the point.
6xcavation in all soils 2.1)tr to2.5 )tr' including disposal of earth upto 1 )trfro) the point.
Back filling with (ought out earth including consolidation asper specfication.!&iversand$
&CC M25 for strip foundation!co)(ined footing$9rade (ea)'grade sla('ca(letrench wall + grade sla( 9, incl rf plinth and fire wall.
-
7/24/2019 Variation Study for Madhavaram Site.
36/170!6 @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14
21 : sintex 0oilet and la( re;uire)ents
22 Plu)(ing and sanitar 0 (uilding toilet
23 inspection cha)(er
24 9ull rap
25 ?. @C6 BA6 &6 68M6 >?. @/?. A6@& 8:// C&&?
-
7/24/2019 Variation Study for Madhavaram Site.
37/170!7 @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14
CIVIL WORKS
HARINI ENTERPRISES
UNIT QT'.
SUPPL' & INSTALLATION
CM %44. *42.2% #2#'#4*.**
CM %'44. 3%2.3%2 2'%%'44%.#*
8>M 12'4. 115.25* 1'3*%'%#.32
8>M 3'52. 11%.312 4'11-'4-*.24
&M 4*. 23.-1* -%'**.#4
@8 4. *422% 33#'-*.
&M 24. -%5.2# 234'#2.4
/
-
7/24/2019 Variation Study for Madhavaram Site.
38/170! @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14
/
-
7/24/2019 Variation Study for Madhavaram Site.
39/170! 1-12
HARINI ENTERPRISES
MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI E
SI NO DESCRIPTION OF ACTIVITIES NOS
A SUB STRUCTURE
1(a) EARTH WORK IN EXCAVATION
ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 2
ALONG GRID B1 TO B2 2 2.4 2.4 2
1.(b) EXCAVATION BELOW 2M
ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 0.1ALONG GRID B1 TO B2 2 2.4 2.4 0.1
2 RIVER SAND BEDDING
ALONG GRID A & C 14 2.6 2.6 0.1
ALONG GRID B1 TO B2 2 2.4 2.4 0.1
! PCC FOR FOOTINGS
"CC ALONG GRID A & C 14 2.6 2.6 0.07#
"CC ALONG GRID B1 TO B2 2 2.4 2.4 0.07#
4 FOOTING
$ SHUTTERING
AT%1 14 .6 0.2#
AT%2 2 . 0.2#
$$ REBAR (!"# BBS $%&&' 1
$$$ RCC
AT %1 (RECTANG'LAR) 14 2.4 2.4 0.2#
AT %1 (TRA"EOIDAL) 14 1.#AT %2 (RECTANG'LAR) 2 2.2 2.2 0.2#
AT %1 (TRA"EOIDAL) 2 1.24
# COLUMN UP TO PLINTH LVL
SHUTTERING
$ AT C1 14 !.6# 1.
AT C2 2 !.6# 1.46
DED'CTION AT GRADE LEVEL
AT GB! BEAM 'NCTION %OR C1 -20 0.2! 0.!
AT GB4 BEAM 'NCTION %OR C1 -4 0.2! 0.4#AT GB1 BEAM 'NCTION %OR C1 -10 0.! 0.6
AT GB2 BEAM 'NCTION %OR C1 -4 0.2! 0.4#
AT GB1 IN CANTILEVER %OR C2 -1 0.2! 0.6
AT GB! IN CANTILEVER %OR C2 -1 0.2! 0.!
PROJECT ) !!+11 ,VA 'B TATION WOR, NORT CENNAI.
SITE ) MADAVARAM
CLIENT ) M+. DRA,E & C'LL WATER & ENERG "VT LTD.
MEASUREMNT ARRIVED BY) M/.Ma3 Na53/ ( Maa3/ C$8$9:DWE) a M/.Ra;a/E:a/$$):M/.Aba/a>a ($=3 E)
CHECKED * RE+ARRIVED BY ) M/.$8a>?b/aa$a(E$33/ C$8$9:DWE) a M/.Aba/
LENGTHIN M
WIDTHIN M
HEIGHT/ DEPTH
IN M
-
7/24/2019 Variation Study for Madhavaram Site.
40/17040 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
DED'CTION AT "LINT LEVEL
AT BEAM "B! 'NCTION %OR C1 -20 0.2! 0.!
AT BEAM "B2 'NCTION %OR C1 & C2 - 0.2! 0.4#
AT BEAM "B1 'NCTION %OR C1 -6 0.2! 0.4#
AT BEAM "B6 'NCTION %OR C1 -2 0.! 0.7#
ATBEAM "B4 'NCTION %OR C2 -4 0.2! 0.4#
$$ REBAR 1
$$$ RCC COLUMN
AT C1 14 !.6# 0.4 0.#
AT C2 2 !.6# 0.2! 0.#
6 GRADE BEAM$ PCC
AT GB-1 # 10.# 0.# 0.07#
AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.# 0.07#
AT GB-2 2 4.7# 0.4! 0.07#
AT GB-2 2 #.2# 0.4! 0.07#
AT GB-! 10 !.! 0.4! 0.07#
AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.4! 0.07#
AT GB-4 ! !.! 0.4! 0.07#
$$I REBAR 1IVSHURTTERING FOR GBEAMS
AT GB-1 10 10.# 0.6
AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.6
AT GB-2 4 4.7# 0.4#
AT GB-2 4 #.2# 0.4#
AT GB-! 20 !.! 0.!
AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.!
AT GB-4 6 !.! 0.4#
8 RCCAT GB-1 # 10.# 0.! 0.6
AT GB-2 2 4.7# 0.2! 0.4#
AT GB-2 2 #.2# 0.2! 0.4#
AT GB-! 10 !.! 0.2! 0.!
AT GB-4 ! !.! 0.2! 0.4#
GB1 %OR TAIR 1 1.# 0.! 0.6
GB! %OR TAIR 1 1.# 0.! 0.!
7 BACK FILLING STAGE ,
RE%ER EXCAVTION T 1 2!1.4!DED'CTION
RIVER AND %ILLING BELOW %OOTING -1 10.616
"CC BELOW %OOTING -1 7.62
-
7/24/2019 Variation Study for Madhavaram Site.
41/17041 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
RCC %OOTING -1 46.06
COL'MN -1 11.06
GARDE BEAM "CC -1 4.10
PLINTH BEAM
SHUTTERING
AT "B-1 2 10.# 0.7#
AT "B-2 4 4.7# 0.4#
AT "B-2 4 #.2# 0.4#
AT "B-! 1 !.! 0.!
AT "B-4 6 !.! 0.4#
AT "B-# 4 !.!# 0.4#
AT "B-6 1.2! 0.4#
REBARRCC
AT "B-1 1 10.# 0.! 0.7#
AT "B-2 2 4.7# 0.2! 0.4#
AT "B-2 2 #.2# 0.2! 0.4#
AT "B-! !.! 0.2! 0.!
AT "B-4 4 !.! 0.2! 0.4#
AT "B-# 2 !.47 0.2! 0.4#
AT "B-6 4 1.# 0.2! 0.4#
STAIRS FROM FGL TO -,.M$ 'TTERING
%OR RIER WALL 4 1.# 0.2
GRO'ND LANDING 2 1 1.7#
WAIT LAB 2 !.06 1.7#
EDGE IDE 2 4.06 0.1#
LANDING 2 !.! 1.7#
$$ REBAR
$$$RCCRAIER WALL 2 1.# 0.1# 0.2
GRO'ND LANDING 2 1 1.77 0.1#
WAIT LAB 2 !.06 1.77 0.1#
LANDING 2 !.! 1.77 0.1#
10BRICK WORK BELOW PLINTH
AT "B1 1 10.# 0.2! 1.1
AT "B2 2 4.7# 0.2! 1.4
AT "B2 2 #.2# 0.2! 1.4
AT "B! !.! 0.2! 1.##AT "B4 4 !.! 0.2! 1.4
AT "B# 2 !.! 0.2! 1.#
AT "B6 2 1.# 0.2! 1.#
TE" %ROM 0M LVL TO 1.# M LVL 1.7# 0.2! 0.1#
-
7/24/2019 Variation Study for Madhavaram Site.
42/17042 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
11CABLE TRENCH
$ RIVER SAND FILLING 2 1.1# 2 0.1
2 6.# 2 0.1
1 6.# 2.1 0.1
$$ PCC 2 1.1# 2 0.07#
2 6.# 2 0.07#
1 6.# 2.1 0.07#
$$ SHUTTERING
'TTERING %OR RA%T 2 12.4# 0.2
4 6.7 0.2
'TTERING %OR WALL 2 17.7# 1.6#
2 10.1 1.#
4 6.642# 1.#4 6.242# 1.#
4 7.1 1.#
4 6.7 1.#
'TTERING %OR COVER LAB ! 7.1 1.#
4 1.# 1.#
DEDUCTIONS
'N O% IN COMING CABLE D'CT
WALL -2 1.# 1.#
D3?
-
7/24/2019 Variation Study for Madhavaram Site.
43/1704! 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
GRADE BEAM GB1 -4 10.#0 0.! 0.6
$ RIVER AND %ILLING 1 12.4# 6.7 0.0
1 10.27 !.! 0.0
$$ "CC 1 12.4# 6.7 0.1
1 10.27 !.! 0.1
$$$REBAR
TOTAL(A
B SUPER STRUCTURE UP TO FF
1 COLUMN UP TO FF
$ REBAR$$ 'TTERING
AT C1 14 4.42 1.
AT C2 2 4.42 1.46
DED'CTION AT BEAM LEVEL
AT BEAM %B4 'NCTION %OR C1 -20 0.2! 0.4
AT BEAM %B# 'NCTION IN C1 -4 0.2! 0.6
AT BEAM %B 'NCTION IN C1 -2 0.2! 0.#
AT BEAM %B1 'NCTION IN C1 -10 0.4 0.7#
AT BEAM %B2&%B! 'NCTION IN C1 - 0.2! 0.6
AT BEAM %B6 'NCTION %OR C1 -7 0.2! 0.4L$=39 ?
-
7/24/2019 Variation Study for Madhavaram Site.
44/17044 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
MID LVL 4.# 1 !. 0.11# 0.!
DRO" ABOVE VARANDA 1 2#.6 0.0 1
! FF BEAM
$ REBAR
$$ 'TTEREING
AT %B-1 # 10.# 1.62
AT %B-2 2 4.7# 1.1#
AT %B-! 2 #.2# 1.1#
AT %B-4 10 !.! 0.7#
AT %B-# 2 !.! 1.1#
AT %B-6 7 1.#2 0.2
AT %B-7 6 !.! 0.#7
AT %B- 1 !.! 0.#ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.!
$$$RCC
AT %B-1 # 10.# 0.4 0.7#
AT %B-2 2 4.7# 0.2! 0.6
AT %B-! 2 #.2# 0.2! 0.6
AT %B-4 10 !.! 0.2! 0.4
AT %B-# ! !.! 0.2! 0.6
AT %B-6 7 1.# 0.! 0.4
AT %B-7 6 !.4 0.2! 0.!AT %B- 1 !.! 0.2! 0.#
ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.2! 0.4#
4 FF SLAB
$ 'TTERING
% 1 # 10.#4 !.!000
%! 1 #.4# !.!000
%2 6 1.4# !.!000
O'TER IDE 2 !!.60 0.1400
ADDITIONAL LAB ABOVE R 'TTERO'TER IDE 2 2.7# 0.1#
LANDING A LI,E G% 2 2.7# 1.7#
$$ REBAR 1
$$$RCC
%-1 4 10.# !.! 0.14
%-1 1 10.# !.!# 0.14
%-2 6 !.4 1.#2 0.14
%B-! 1 #.!# !.!# 0.1#
LAB ABOVE ROLLING 1 2.7# 1.7# 0.1#
1 STAIR FROM -,.1M TO+ 1.21M LVL
$ 'TTERING %OR TAIR '" TO %%
MID LANDING BEAM AT !.67#M 1 !.74# 0.!
-
7/24/2019 Variation Study for Madhavaram Site.
45/1704# 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
MID LANDING LAB AT !.67#M 1 !.74# 1.!#
WAIT LAB 1 &2 2 4.0# 2.0!
I$REBAR
I$IRCC
TAIR %ROM 1.#M TO- #.#M LVL
MID LANDING BEAM AT !.67#M 1 !.! 0.2! 0.4#
MID LANDING LAB AT !.67#M 1 !.!# 1.!# 0.2
WAIT LAB 1 &2 2 4.06 1.6 0.2
6 34 BRICK WORKS AT GFALONG GRID A&C 12 !.! 0.2! !.7ALONG GRID 1:2 2 10 0.2! !.6#ALONG GRID 7 1 10.# 0.2! !.6#
WALL BETWEEN GRID B& C 1 !.! 0.2! !.#TE" %ROM 1.# TO %% 14 1.72 0.2# 0.14#
DED'CTION
WINDOW -W -12 1.1 0.2! 1.4
VENTILATOR-V -10 1.1 0.2! 0.#
VENTILATOR-V -! 0. 0.2! 0.#
DOOR D1 -! 0. 0.2! 2.1
ROLLING 'TTER -1 2.7# 0.2! !.6
COLLA"ABLE GATE -1 1.# 0.2! 2.4
OLLE -1 1.2 0.2! 1.2
7 5.14HALF BRICK WALL
WALL AT GRID B 1 !.! !.#
WALL AT TOILET 2 1. !.#
DED'CTION 2 1.0# !.#
DOOR D2 -2 0. 2.1
TOTAL(B
C SUP STRUC. FROM FF TO ROOF
1 COLUMN UP TO ROOF
$ REBAR
$$ 'TTERING
AT C1 14 !.# 1.
AT C2 2 !.# 1.46
DED'CTION AT BEAM LEVEL
AT BEAM RB4 'NCTION IN C1 -22 0.2! 0.4
AT BEAM RB7 'NCTION IN C1 -2 0.2! 0.#
AT BEAM RB1 'NCTION IN C1 -10 0.4 0.7#
AT BEAM RB6 'NCTION IN C1 -4 0.2! 0.#
AT BEAM RB# 'NCTION IN C1 -7 0.2! 0.#
ATBEAM 'NCTION C2 -6 0.2! 0.#
$$$RCC
-
7/24/2019 Variation Study for Madhavaram Site.
46/17046 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
AT C1 14 !.# 0.4 0.#
AT C2 2 !.# 0.2! 0.#
2 LINTEL 6SSHADE* LATH (DROP
$ 'TTERING %OR 'N ADE 1.6 0.7
'TTERING %OR LINTEL 24 !.! 0.!
1 10.# 0.6
2 10 0.6
LO%T 2 1.1# 0.6
2 .! 0.6
DRO" ABOVE VARANDA 1 2#.6 1
IIREBAR
$$$ RCC 'N ADE 1.6 0.6 0.1RCC LINTEL 12 !.! 0.2! 0.!
1 10.# 0.2! 0.!
ABOVE 4.# WALL 1 2.77# 0.11# 0.!
1 !.76 0.2! 0.!
LO%T 2 1.1# 0.6 0.0
2 .!4 0.6 0.0
DRO" ABOVE VARANDA 1 2#.6 0.0 1
! ROOF BEAM
$ SHUTTERINGAT RB1 # 10.# 1.62
AT RB! 6 !.4 0.6
AT RB4 11 !.! 0.
AT RB# 7 0.7# 1.27
AT RB6 2 10 0.72
AT RB7 1 !.! 0.#
$$ REBAR
$$$RCC
AT RB1 # 10.# 0.4 0.7#AT RB! 6 !.4 0.2! 0.!
AT RB4 11 !.! 0.2! 0.4
AT RB# 7 1.# 0.! 0.#
AT RB6 2 10 0.2! 0.#
AT RB7 1 !.! 0.2! 0.#
4 ROOF SLAB
$ SHUTTERING
# 10.#0 !.!0
1 #.2# !.!06 1.#4 !.!0
O'TER IDE 2 !4.06 0.1#
$$ REBAR
-
7/24/2019 Variation Study for Madhavaram Site.
47/17047 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
$$$RCC
RI 4 10.#0 !.!0 0.14
RI 1 10.#0 !.! 0.14
R! 1 #.! !.! 0.14
R2 6 1.#2 !.40 0.14
# 34 BRICK WORKS AT FF
ALONG GRID A&C 11 !.! 0.2! 2.
ALONG GRID 1:2 2 10 0.2! 2.7#
ALONG GRID 1:2&7 1 10.# 0.2! 2.4#
WALL BETWEEN GRID A& C 2 !.! 0.2! 2.6
TE" 11 1.7! 0.2# 0.14#
DED'CTION
WINDOW -W -11 1.1 0.2! 1.4
VENTILATOR-V -7 0. 0.2! 0.#DOOR D1 -2 0. 0.2! 2.1
DOOR D -2 0. 0.2! 2.1
OLL -1 1.2 0.2! 1.2
6 5.14WALL AT FF
WALL AT GEN TOILET 2 1.# !.0#
2 1.0# !.0#
WALL AT LADIE TOILET 1 1.# !.0#
2 1.1# !.0#
DED'CTION -DOOR D2 -4 0. 2.1
#(a) 34 BRICK WORKS AT VARANDAH 1 2# 0.2! 0.
7 STAIR CASE STRUCTURE
$ SHUTTERING
TAIR %ROM #.#M TO .04
MID LANDING BEAM AT 7.44#M 1 !.74# 0.!
MID LANDING LAB AT .04M 1 !.74# 1.!#
MALL LANDING AT #.#MLVL 1 1.6 0.7#
WAIT LAB ! & 4 2 !.12 2.0!
$$ REBAR FOR STAIR 1
$$$ RCC FOR STAIR
TAIR %ROM #.#M TO .04
MID LANDING BEAM AT 7.44#M 1 !.74# 0.2! 0.4#
MID LANDING LAB AT .04M 1 !.74# 1.!# 0.2
MALL LANDING AT #.#MLVL 1 1.6 0.7# 0.2
WAIT LAB !&4 2 !.12 1.6 0.2
ROOF WORKS
a. ROOF LVL RCC * %&ad !""#
$ SHUTTEREING
B1 O?=3/ >$3 1 !.!0 0.#00
-
7/24/2019 Variation Study for Madhavaram Site.
48/1704 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
B1 I3/ >$3 ! !.470 0.!60
B2 O?=3/ >$3 2 7.11# 0.#00
B2 I3/ >$3 2 6.42# 0.!60
B! O?=3/ >$3 1 !.!0 0.!00
B! I3/ >$3 1 !.470 0.160
1 1 7.11# !.!0
C1 2 1.00 2.200
C2 2 1.460 2.200
$$ REBAR
$$$ RCC
COL'MN C1 AT "ARA"ET 0.0 0.40 0.#0
COL'MN C1 2 2.40 0.40 0.#0
COL'MN C2 2 2.40 0.2! 0.#0
BEAM B1 2 !.!0 0.2! 0.#0BEAM B2 2 #.7 0.2! 0.#0
BEAM ! 1 !.! 0.2! 0.!
LAB 1 1 6.42# !.47 0.14
b BRICK WORK 34
AT "ARA"ET 6 !.! 0.2! 0.
1 10.# 0.2! 0.
1 #.2# 0.2! 0.
AT EAD ROOM 1 16.17 0.2! 1.
EAD ROOM "ARA"ET 1 20. 0.2! 0.!DED'CTION
DOOR D1 -1 0. 0.2! 1.
WINDOW -1 1.1 0.2! 1.4
OLL -1 1.2 0.2! 1.2
< BRICK WORKS+34 IN PASSAGE 1 2# 0.2! 0.
TOTAL ( C
DEXTERNAL FINISHING AND YARD WORKS
TAGE 4 "AMENT 20EXTERNAL WOR, & ARD
1 TRAN%ORMER "LINT
a EXCAVATION
TRAN%ORMER %O'NDATION 1 !. 12. 1.#
CABLE TRENC 2 1.2 12. 1.#
2 ! 1.2 1.#
b RIVER AND %ILLING 1 12.# 6.2 0.1
< "CC 1 12.# 6.2 0.07#
SHUTTERING
1 2#.22 0.2#
TRA" BEAM 2 1.76 0.!#
TRAN%ORMER %O'NDATION & %IRE WALL-BAE
-
7/24/2019 Variation Study for Madhavaram Site.
49/1704 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
COL'MN 1.2 2.10
2 1.!6 2.10
BEAM B1 2.47# 0.!2#
BEAM B2 4 2.47# 0.!2#
LAB 1 !.!# !.!#
%IRE WALL 2 4.2! 4.#0
CABLE D'CT RA%T ALONG "LINT 2 1 0.20
CABLE D'CT RA%T ARRO'ND "LINT-WALL 2 72 1.!0
COVER LAB 2 1 1.2
DEDUCTIONS
'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.!0
3 REBAR FOR TRS. FORMER FND 2
@ RCCTRAN%ORMER %O'NDATION 1 .! !.27# 0.2#
TRA" BEAM 2 .! 0.# 0.!#
COL'MN C1 0.! 0.! 2.10
BELOW GRO'ND C2 2 0.4# 0.! 1.00
ABOVE GROND C2 2 0.4# 0.2! 1.10
BEAM AT %LOOR LEVEL B1 4 2.17# 0.! 0.!!
BEAM AT %LOOR LEVEL B2 2.17# 0.! 0.!!
LAB AT "LINT 2 ! ! 0.1
%IRE WALL 1 4.# 0.2! 4.#
CABLE DUCT AROUND PLINTHRA%T 2 12.07 1.# 0.20
4 ! 1.# 0.20
WALL 1 46.4 0.1# 1.##
2.17# 0.1# 1.##
COVER LAB 2 12.07 1.2 0.1#
4 ! 1.2 0.1#
DEDUCTIONS
'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.! 0.1#
2
$ EARTH WORK EXCAVATION 1 2.# 4.2 1.#0
$$ RIVER SAND 1 2.# !. 0.0
$$$ PCC 1 2.# !. 0.10
$8 SHUTTEREING
RA%T 2 12 0.20
WALL 2 24 1.#0
COVER ALB 2 6 1.#8 REBAR
8$ RCC
RA%T 1 2.# !.6# 0.20
WALL 2 2.# 0.2 1.20
CABLE DUCT FROM PLINTH TOBUILDING
CABLE D'CT %ROM TRAN%ORMER TOB'ILDING
-
7/24/2019 Variation Study for Madhavaram Site.
50/170#0 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
1 2.# 0.2# 1.20
BEAM 2 !.6# 0.! 0.!0
BEAM 1 !.6# 0.!# 0.20
COVER LAB 1 2.# !.6 0.20
! INCOMING CABLE TRENCH
$ EXCAVATION 2 !.7 2.# 1.#0
$$ SAND FILLING 2 !.7 2.1 0.0
$$$ PCC 2 !.7 2.1 0.10
$8 SHUTTERING
RAFT 2 .! 0.20
WALLL 4 !.7 1.!0
4 !.7 1.1#
COVER 2 !.7 1.#
8 REBAR
8$ RCC
RA%T 2 !.7 1. 0.20
WALL 4 !.7 1.2 0.20
COVER 2 !.7 1. 0.1#
4 BACK FILLING 7RD STAGE
RE%ER T O% EXCAVATION
DED'CTION
R AND %ILLING O% TRAN %DN"CC O% TRAN %DN
RCC O% TRAN %DN
# "AVING 1 66.40 1
6 ROAD
ROAD BAE (METAL & GRAVEL) 1 1#.00 0.! 6
"CC B 40MM M#-1F4F 1 1#.00 0.1# 6
RCC B 20MM M1# 1 1#.00 0.1# 6
TO"ING B !TO 10MM M1# 1 1#.00 0.0# 6
REBAR 27# MM C+C-(!.0! ,G+M) 1ROAD+ M 1 1#.00 6
7 'G 'M" (L'M"'M)
a EXCAVATION 1 4.#0 2.7 1.#
b RIVER AND %ILLING 1 4.10 2.! 0.1
< "CC 1 4.10 2.! 0.1
'TTERING
%LOOR 1 12.00 0.2
WALL 1 22.0 2.1
COVER LAB 1 !.0 2.1
3 REBAR 22,G+M O% 'R%ACE AREA 1 44.70 22
@RCC
RCC %LOOR 1 !.0 2.1 0.2
-
7/24/2019 Variation Study for Madhavaram Site.
51/170#1 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
RCC WALL 1 11.40 2.1 0.1#
RCC COVER LAB 1 !.0 2.1 0.1#
"LATERING
%LOOR 1 !.00 1.
WALL 1 .60 2.2
CEILING 1 !.00 1.
MANOLE COVER 1
WEATERING CO'RE & TILING 1 21.7 10.#
YARD OPEN AREA FILLING 5TH STAGE
IE O% TE "LTOT 1 42.7!# 16.21 0.7
DED'CTION %OR BLG AREA -1 22.2 11 0.7
TRAN%ORMER ARD -1 12.!0 6 0.7
CABLE TRENCE AREA -1 2.#0 !.6 0.7
INCOMING TRENC AREA -2 !.70 1. 0.7WATER TAN, -1 !.40 2.2 0.7
TAIR AREA -2 7.40 1.7# 0.7
TOTAL OF (D
E FINISHING WORKS
1 PLASTERING INTERNAL
a GF
WALL-CONTROL ROOM 1 #7.!1 4.2#
DED'CTION
W -12 1.1 1.4V - 1.1 0.#
R -1 2.7# 4.1
D1 -2 0. 2.1
D1 -1 1.2 2.1
B3a ?/@a -4 0.11# !.
D1 & D2 -# 0. 2.1'RINAL ENTR -2 1.0# !.
VENTILATOR -! 0. 0.6
D1 BATTER ROOM -1 1.2 2.1
TAIR ROOM 1 17.27 4.2#
DED'CTION %OR CG -1 1.# 2.1
DED'CTION %OR OLLE -1 1.2 1.2
b PLASTERING INTERNAL FF
WALL O%%ICE 1 #7.! !.!
DED'CTIONW -11 1.1 1.4
D1 -2 0. 2.1
D -2 1.1 2.1
GENT TOILET+BAT 2 #.1 !.!
-
7/24/2019 Variation Study for Madhavaram Site.
52/170#2 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
WALL 'RINAL+"AAGE 1 12.4 !.!
DED'CTION %OR DOOR-D2& D1 -# 0. 2.1
VENTILATOR -# 0. 0.6
LADIE TOILET 2 #.# !.!
DED'CTION %OR DOOR-D1 -2 0. 2
"AAGE 1 .!2 !.!
DED'CTION D1 & D2 -# 0. 2.1
VENTILATOR -2 0. 0.6
TAIR ROOM AT %IRT %LOOR 1 17.27 !.!
DED'CTION AT ENTRANCE -1 !.! !.1
OLL -1 1.2 1.2
< EAD ROOM
WALL 1 16.# 2.2#
DED'CTION DOOR -1 0. 1.WINDOW -1 1.1 1.4
OLL -1 1.2 1.2
2 CEILING PLASTERING
G
CEILING 1 1.1# 10.#
%B1 BEAM DRO" 4 10.# 1.2
WET AREA 1 !.!# !.01#
BATTER ROOM 1 !.!# 2.24
TAIR MID LANDING 1 !.!# 1.4WAIT 1 &2 2 1.7 4.06
VARANDA 1 22 1.7#
%B6 BEAM DRO" 7 1.# 0.#2
%B7 BEAM DRO" 6 !.! 0.16
RAIR AT 00 LVL
WAIT 2 !.1!47 1.#
O%%IT 2 !.!# 1.#
BEAM "" # &6 DRO" 2 6.47 0.2#
b CEILING PLASTERING FF
O%%ICE 1 1.1 10.#
LO%T 1 ## 1.2
WEWT AREA 1 !.!# #
VARANDA 1 22.2 1.7#
RB1 BEAM DRO" 4 10.# 1.2
RB# BEAM DRO" 6 1.# 0.72
RB! BEAM DRO" 6 !.! 0.!
TAIR AREAMID LANDING 1 !.74# 1.!#
MALL LANDING 1 1.6 0.7#
WAIT LAB ! & 4 2 !.12 2.0!
-
7/24/2019 Variation Study for Madhavaram Site.
53/170#! 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
C EAD ROOM
CEILING 1 6.# !.!
BEAM DRO" B! 1 !.! 0.1#
BEAM DRO" B2 2 1.# 0.!#
! PAINTING INTERNAL
a G%
WALL R%E%ER T %ROM "LATER
DED'CT WALL TILING G%
CEILING
b FF
WALL RE% T %ROM "LATER
DED'CT WALL TILING %%
CEILING
4 FLOORING
a GROUND FLOOR
CERAMIC %LOORING 1 1.1# 10.#
DED'CTION %OR CABLE TRENC
-1 14.!# 1.
-1 12.## 1.
GENT TOILET-%LOORING 1 !.1## 2.
BATTER ROOM 1 !.!# 2.24ACCE TE" & TAIR
%LOOR LANDING LAB AT 0.00M LVL 2 !.7 1.7#
TE" 20 1.7# 0.46
TAIR "AAGE AT ENTRANCE 1 #.2# !.!#
b FLOOR TILING GF STAIR
MID LANDING AT !.67#M LVL 1 !.!# 1.2#
TE" 2 1.6 0.!#
< FLOOR TILING FF%%-%LOORING 1 1.1# 10.#
GENT TOILET-%LOORING 1 !.!# !.01#
LADIE TOILET 1 !.!# 2.24
"AAGE AT VARANDA 1 22.2 1.6!
TAIR
TE" %ROM %% TO ROO% 20 1.6 0.!#
MALL LANDING AT #.#MLVL 1 !.!# 0.7#
MID LANDING LAB 1 !.!# 1.2#
LANDING AT .04MLVL 1 !.!# 1.12
2 WALL DADO
a GROUND FLOOR
WALL TOILET+BAT 2 #. 2.1
WALL 'RINAL 1 4.7## 2.1
-
7/24/2019 Variation Study for Madhavaram Site.
54/170#4 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
BAT "AAGE 1 .77 2.1
DED'CTION %OR DOOR-D2 -4 0. 2.1
VENTILATOR -! 0. 0.6
DED'CTION %OR DOOR-D1 -1 0. 2.1
WALL SKIRTING
TAIR AREA 1 17.27 0.1
DED'CTION %O CG -1 1.# 0.1
CONTROLL ROOM WALL TILING 2 1.1# 2.1
2 10.# 2.1
DEDUCTION
WINDOW -12 1.1 1.4
DOOR -2 0. 2.1
DOOR -1 1.2 2.1
ROLLING 'TTER -1 2.7# 2.1
b FFGENT TOILET+BAT 2 #.1 2.1
WALL 'RINAL+"AAGE 1 12.4 2.1
DED'CTION %OR DOOR-D2& D1 -# 0. 2.1
VENTILATOR -# 0. 0.6
LADIE TOILET 2 #.# 2.1
DED'CTION %OR DOOR-D1 -2 0. 2
"AAGE 1 .!2 2.1
DED'CTION D1 & D2 -# 0. 2.1
VENTILATOR -2 0. 0.6
,IRTINGO%%ICE 1 #7.!7 0.1
DED'CTION DOOR D -2 1.1 0.1
DOOR D1 -2 0. 0.1
TAIR AREA 1 17.27 0.1
DED'CTION %OR ENTRANCE -1 !.! 0.1
"AAGE 2 2!.# 0.1
DED'CTION %OR D -2 1.1 0.1
! EXTERNAL %INIING WOR,
a "LATERING EXTERENAL WALL 1 6.2 11.14CORNICE AT "ARA"ET LVL 1 66.4
AT EAD ROOM ROO% 1 22.2
COL'MN "EOECTION O'T 12 0.2# 10.7#
COL'MN "EOECTION EAT+WET ! 0.17 10.7#
WARANDA "ARA"ET WALL AT %% 1 2# 1.
LAB ABOVE ROLLING 'TTER 1 #.17 2.7!
DRO" AT %IRT %LOOR LVL 1 2# 2.1
COL'MN AT NORT 12 0.2# .!
ROO% LEVEL DRO" ABOVE VARANDA 1 2#.7 2.1
'NADE ABOVE WINDOW AT G% 7 !.4 1.2
'NADE AT %% !.4 1.2
EAD ROOM "LATERING EXTERNAL 1 1.1! 2.4
EAD ROOM "ARA"ET 1 22.2 0.6
-
7/24/2019 Variation Study for Madhavaram Site.
55/170## 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
COL'MN %ACE 1 1.1 2.7
"ARA"ET IN "AAGE AT ROO% 2 1.# 1.
DED'CTION
WINDOW -24 0.72 1.02
CG -1 1.04 1.7
R -1 2.2 !.7
DOOR D AT %% -2 0.64 1.7
DED'CTION %OR TAIR ENTR %% -1 !.! !.7
DOOD D AT ROO% D1 -1 0.44 1.7
OLL -! 0.74 0.74
%IRE WALL 1 .2# .#
4 EXTERNAL "AINTING
EXTERNAL WALL
# AND RAIL
ANDRAIL AT O TO 1.#M 2
ANDRAIL AT TAIR
WAIT LAB 1 &2 2 4.0#
WAIT LAB !&4 2 !.12
6 WATER TAN, 1000 LITER 2
7 BATER ROOM WALL ACID REITANT 1 10.2# 2.1
ELECTRICAL WOR, WIT %ITTING 1
"L'M"ING & ANITARWERE 110 EWAGE+ DRAINAGE WOR, !0
11E"TIC TAN,& OA,WA WIT COVER 1
12 RAIN WATER LINE & ARVETING 1
1! 1
14 IN"ECTION CAMBER !
1# G'LL TRA" 2
16 OINERIE
a DOOR D (CW C %L' DOOR) 2 1.1 2.1
DOOR D1 (CW C %L' DOOR) 6 0. 2.1
b DOOR D2 ("VC DOOR) 6 0. 2.1
< ROLLING 'TTER 1 2.7# !.6
COLLA"IBLE GATE(M) 1 1.# 2.1
3 WINDOW(AL'MINI'M) 2! 1.1 1.4
VENTILATOR IN CONTROL ROOM 10 1.1 0.#
VENTILATOR IN TOILET 0. 0.#
WINDOW IN TE "LACE O% OLL 1 1.2 1.2
VENTILATOR IN CONTROL ROOM 1.1 0.#
VENTILATOR IN TOILET 10 0. 0.#
@ GRILL WIT "AINTING W1 2#+>J 2! 1.1 1.4
ENTRANCE GATE 6 H$3 2M WIC,EDGATE
-
7/24/2019 Variation Study for Madhavaram Site.
56/170#6 1-12
SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH
IN MWIDTHIN M
HEIGHT/ DEPTH
IN M
WINDOW IN TE "LACE O% OLL 1 1.2 1.2
20 NAME BOARD AT ROO% 1
21 BOREWELL 1
22 ACCE LADDER M- 4M AT ROO% 1
SUB TOTAL (E
TOTAL
NOTE ) ALL SPECIAL WORKS BO8S ARE DIRECTLY POSTED IN ABSTRACT
IM"ORTED EART %OR %ILLING K%ILLING-EXCAVATION
-
7/24/2019 Variation Study for Madhavaram Site.
57/170#7 1-12
TERPRISES
8TY SUB TOTAL
1.2
2!.04 212.!2 212.!2
17.0!#22.07!6 1.10 1.11
.464
1.1#2 10.616 10.616
7.0
0.64 7.62 7.62
!!.6
4.4 ! !
2.!244 2.!244 2.!244
20.16
21.002.42
2.4 46.06
1.
10.6#
-1.!
-0.414-1.
-0.414
-0.1!
-0.06
a ("/;3a($=3 E)
EXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
-
7/24/2019 Variation Study for Madhavaram Site.
58/170# 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
-1.!
-0.2
-0.621
-0.4#
-0.414 4.7! 4.7!
#.0!1 #.0!1 #.0!1
10.22
0.4 11.06
1.7
0.06
0.!1
0.!4
1.06
0.0#
0.!2 4.10 4.10
!.16 !.16 !.16
6!
0.
.##
.4#
1.
0.4#
.1 111.06 111.06
.4#
0.
1.0
2.2
1.02
0.27
0.14 1#.2!
2!1.4!
-10.616
-7.62
-
7/24/2019 Variation Study for Madhavaram Site.
59/170# 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
-46.060
-11.060
-4.102 1#1.62
1#.7#
.##
.4#
17.2
.1
6.0!
4.42 70.! 70.!
2.!77 2.!77 2.!77
2.!6
0.
1.0
2.0#
1.!7
0.72
0.62 .1
1.20
!.#0
10.71
1.22
11.## 2.1 2.1
0.# 0.# 0.#
0.0
0.#!
1.62
1.7# 4.00
2.66
!.06
!.!
10.#4.2#
2.6
1.!#
0.#4 2.7
-
7/24/2019 Variation Study for Madhavaram Site.
60/17060 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
7.27
2.60
1.!7 11.24 11.24
#.46
1.#
1.02 .4! .4!
4.4
#.!6
#.60#
!0.!
!.##!7.4##
42.6
40.2
!1.#
-4.#
-1.14
-4.7# 2.# 2.#
#.72 #.72 #.72
1!.2
7.64
12.00
6.06
7.7!
.26.07
1.4
.7
-0.0
-0.2!
-0. 70.!0
10.6
71.#
-
7/24/2019 Variation Study for Madhavaram Site.
61/17061 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
-7.#6 24#.2#
6.6
2.71 .40 .40
.!6
!.! 11.7# 11.7#
0.!7 0.!7 0.!7
0,0.70 ,3.,, 7,.0 70.01 70.2 ,3.9
!.1 !.1 !.1
111.!
12.1
-1.4
-0.##2
-0.2!
-!
-1.104
-0.644-2.20
-0.207 114.#1 114.#1
12.!
1.02 1!.!
1!.44
1.0
21.7
!.6
2.2
2#.#0 #.6 #.6
0.1 0.1 0.1
1.1#4.6#
0.2!
0.11
0.72
-
7/24/2019 Variation Study for Madhavaram Site.
62/17062 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
0.1!
2.0# .04
6.02 6.1 6.1
#.0#
10.!
12.0
24.7#
7.#
.72
11.2
!.142.1 166.44 166.44
1#.7#
1.!1
1.4#
!.04
1.!7
1.26
1.410.!
0.!6 26.!2
17!.1
17.
2.71
.41
0.!
.6! 240.46 240.46
!.70 !.70 !.70
1.40
4.
4.!4
2.7!
0.72 !2.1
!.11
-
7/24/2019 Variation Study for Madhavaram Site.
63/1706! 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
#.1
16.44 24.74 24.74
1.0# 1.0# 1.0#
0.!4
0.4
2.60 !.
!!.7016.7.1
2.660.7
-4.2
-1.#7
-0.!2
-1.!0
-2.2
-0.!
-0.!! #1.!
11.##
1!.!0
7.!#
-!.7 2.42
70., ,.72
!.1 !.1 !.1
.20
10.22
-2.024
-0.2!
-!
-0.46
-0.0#
-0.6 1.21 1.21
-
7/24/2019 Variation Study for Madhavaram Site.
64/17064 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
.0
0.1 10.61
.6
2!.76
6.!0
12.00
24.7!
12.6#
2#.60 114.00 114.00
0.7 0.7
0.772.7!
0.72
0.10
0.26
1.7#
0.0
2.0# .27
#.0#
14.0
2.04
6.67
14.40
!.14 1#2.!7 1#2.!7
#.1! #.1! #.1!
1#.7#1.41
!.!4
1.#
2.!0
0.! 24.7#
17!.2#
17.!!!0.4
10.22 2!1.2 2!1.2
!.21 !.21 !.21
-
7/24/2019 Variation Study for Madhavaram Site.
65/1706# 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
1.40
4.
2.##
4.!4 !1.27
2!.!
12.6#
#.2
!.#
0.6
-4.42
-0.7#-0.7
-0.7
-0.!! !.!#
.1#
6.41
4.#
7.02
-7.#6 1.#
#.1 #.1
!.11
#.1
1.20
12.2 22.41 22.41
0.7 0.7 0.7
0.!
1.04
0.24
2.04 !.70
1.6#
-
7/24/2019 Variation Study for Madhavaram Site.
66/17066 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
!.74
7.11#
4.626
1.17
0.###
27.62
7.20
6.424 61.44 61.44
1.1 1.1 1.1
1.44
0.6
0.##
0.761.!#
0.2!
!.12 .41
4.10
2.17
1.0
7.07
1.44
-0.!
-0.40
-0.!! 14.74
#.1 #.1
0 0 0 0 672.77 14.#4
7#.47
46.44
10.0 1!2.71 1!2.71
7.7# 7.7# 7.7#
#.1 #.1 #.1
!#.6!
!#.6!
-
7/24/2019 Variation Study for Madhavaram Site.
67/17067 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
20.160
#.712
!#.6!
!#.6!
11.22!
!#.6!
!#.6!
!#.6!
4!.200
-.4#0 !2!.# !2!.#
6.022! 6.02 6.02
7.6
!.2
1.#1
0.27
0.2!
0.#
1.70
!.1#
#.12
7.24
!.60
10.1
4.0#
4.!#
2.16
-1.26 #4.!
1#.7# 1#.7# 1#.7#
0.76 0.76
0.# 0.#
!#.6!
!#.6!
1.000 .! .!0.4#4 0.4# 0.4#
1.!
1.20
-
7/24/2019 Variation Study for Madhavaram Site.
68/1706 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
0.7#
0.66
0.26
1.0 6.4
27.7# 27.7# 27.7#
1.24 1.24
1.## 1.##
!.72
1.24
17.02
11.10 #1.0 #1.0
0.!7 0.!7 0.!7
2.1
!.##
2.11 .47
1!2.71
-7.7#-#.1
-#4.! 64.!1
66.40 66.40
27.00
1!.#0
1!.#0
4.#0
0.00 0.00
1.2! 1.2!
0.4 0.4
0.4 0.4
2.40
47.
.1 #.47
0. 0.
1.64
-
7/24/2019 Variation Study for Madhavaram Site.
69/1706 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
!.#
1.2! 6.46
#.40
21.12
#.40 !1.2
1.00
227.# 227.#
44.1
-170.4
-#1.66
-6.!0
-.4-#.24
-1.1! 222.1
,9.0, . 3.91 2.70 55.13 .21
24!.#7
-20.6-6.16
-11.2
-!.7
-2.#2
-1.#
42.7#
10!.2#
-1.7#
-.4#-7.
-1.44
-2.#2
7!.40
-!.1#
-1.44 !.#
1.0
-1.21
-!.7
-4.62
!!.66
-
7/24/2019 Variation Study for Madhavaram Site.
70/17070 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
40.2
-.40
-2.40
!6.!0
-!.20
27.46
-.40
-0.6
#6.
-10.2!
-1.44
!7.!1
-1.71-1.7#
-1.44 !#4.1
10.4
#0.40
10.21
7.#
4.741#.1
!.#0
#.46
!.17
.42
10.16
!.24 !4.
10.
6#.6
16.!
!.#
#0.40
6.4
7.72
#.1
1.20
12.2
-
7/24/2019 Variation Study for Madhavaram Site.
71/17071 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
2!.27
0.#1
1.0# 421.!7
!#4.1
-1!2.!6
!26.1
!#4.1
-7#.
421.!7 1247.67
10.4
-27.!!
-2!.1
.1#
7.#
12.#
16.10
17.77 20!.2#
4.2!
1.!! 22.#6
10.4
10.21
7.#
!6.1
12.64
2.#4
4.2!
!.7 26.12
24.7
.
-
7/24/2019 Variation Study for Madhavaram Site.
72/17072 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
1.42
-6.72
-1.44
-1.6
1.7!
-0.1#
76.!
44.10
-20.6
-!.7
-2.#2
-#.7 1!2.!6
21.42
26.04
-.40
-2.40
2!.10
-!.20
17.47
-.40
-0.6
#.74
-0.22
-0.1
1.7!
-0.!!
4.70
-0.22 7#.
7#.7#66.40
22.20
!2.2#
#.4
4#.00
14.11
#2.#0
27.0
#!.7
2.#6
!2.64
4!.#1
1!.!2
-
7/24/2019 Variation Study for Madhavaram Site.
73/1707! 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
4.
#.70
-17.6!
-1.4
-.6
-2.!
-12.77
-0.2
-1.64
7. 12#0.00
12#0.00 12#0.00
16.00
.10
6.!6 !0.46
2
21.#! 21.#!
1
1!0
1
1
1
!
2
2
6.00
11.!4
.0 .0
!.1# !.1#
40.17
6.4
4.1
1.44 #2.6!
.00
10.00
40.17
-
7/24/2019 Variation Study for Madhavaram Site.
74/17074 1-12
8TY SUB TOTALEXCAVATIONIN C'M (1a)
EXCAVATIONIN C'M (1b)
RIVERAND
%ILLING INC'M
"CC INC'M
'TTERING IN M
REBARIN MT
1.44 116#.00
1.00 1
1.00 1
1.00 1
0 0 0 0 0 0
!.#! 1.11 41.01 40.#6 2402.16 #7.#2
276.!6
-
7/24/2019 Variation Study for Madhavaram Site.
75/1707# 1-12
46.06
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
-
7/24/2019 Variation Study for Madhavaram Site.
76/17076 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
11.06
1#.2!
-
7/24/2019 Variation Study for Madhavaram Site.
77/17077 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
1#1.624
.1
4.00
2.7
-
7/24/2019 Variation Study for Madhavaram Site.
78/1707 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
70.!0
-
7/24/2019 Variation Study for Madhavaram Site.
79/1707 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
24#.2#
,11.27 . 02.92 . . . . 73.22
1!.!
-
7/24/2019 Variation Study for Madhavaram Site.
80/1700 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
.04
26.!2
!2.1
-
7/24/2019 Variation Study for Madhavaram Site.
81/1701 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
!.
#1.!
2.42
25.27 1,.72 02.50
-
7/24/2019 Variation Study for Madhavaram Site.
82/1702 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
10.61
.27
24.7#
-
7/24/2019 Variation Study for Madhavaram Site.
83/170! 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
!1.27
!.!#
1.#
#.1
!.70
-
7/24/2019 Variation Study for Madhavaram Site.
84/170
-
7/24/2019 Variation Study for Madhavaram Site.
85/170# 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
#4.!
-
7/24/2019 Variation Study for Madhavaram Site.
86/1706 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
6.4
.47
64.!1
-
7/24/2019 Variation Study for Madhavaram Site.
87/1707 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
222.1
3.93 . . . . . . 029.,0
!.#
-
7/24/2019 Variation Study for Madhavaram Site.
88/170 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
!#4.1
!4.
-
7/24/2019 Variation Study for Madhavaram Site.
89/170 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
421.!7
-
7/24/2019 Variation Study for Madhavaram Site.
90/1700 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
-
7/24/2019 Variation Study for Madhavaram Site.
91/1701 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
12#0.00
-
7/24/2019 Variation Study for Madhavaram Site.
92/1702 1-12
RCC ING% C'M
RCCOTER
C'M
BRIC,WOR, IN
C'M4.#BW IN
M
INT ER."LATERIN M
CEILING"LATERIN M
EXTL"LATER
BAC,%ILLING IN
C'M
0 0 0 742.77 770.!# 12#0.00 0.00
22#.62 172.4 144.60 4.01 742.77 770.!# 12#0.00 64.00
-
7/24/2019 Variation Study for Madhavaram Site.
93/170! 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
94/1704 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
95/170# 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
96/170
-
7/24/2019 Variation Study for Madhavaram Site.
97/1707 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
. . . .
-
7/24/2019 Variation Study for Madhavaram Site.
98/170 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
99/170 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
100/170100 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
101/170101 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
102/170102 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
0 0 0 0
-
7/24/2019 Variation Study for Madhavaram Site.
103/17010! 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
104/170104 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
105/17010# 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
. . . .
-
7/24/2019 Variation Study for Madhavaram Site.
106/170106 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
-
7/24/2019 Variation Study for Madhavaram Site.
107/170107 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
0.00
1247.67
20!.2#
22.#6
26.12
-
7/24/2019 Variation Study for Madhavaram Site.
108/17010 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
1!2.!6
7#.
-
7/24/2019 Variation Study for Madhavaram Site.
109/17010 1-12
%LOORTILING IN
M
WALLTILING IN
M
"AINTINTERNAL
MEXTER
"AINTING
12#0.00
-
7/24/2019 Variation Study for Madhavaram Site.
110/170
-
7/24/2019 Variation Study for Madhavaram Site.
111/170
HARINI ENTERPRISES
BARBENDING SCHEDULE JOINTLY ARRIVED BY M/S. DSWE and HARINI
M:&! D&'a;=/$b?=$ / 12 2! 14 !22 !.6 11#.20
%?a=$ %2-a$ / 12 22 2 44 !.4 14.60
D$>=/$b?=$ / 12 22 2 44 !.4 14.60
2 C"
-
7/24/2019 Variation Study for Madhavaram Site.
112/170
-
7/24/2019 Variation Study for Madhavaram Site.
113/170
M:&! D&'a;!;d A
T Ma$ R 20 2 1 2 26
T E=/a a= 3 >?/= 20 1 1 1 1.6
T E=/a a= $ >?/= 20 1 6 6 2
B== Ma$ R 16 2 1 2 1
B== E=/a R a= $=3/3$a=3 b3a> 20 1 6 6 2.6
B== E=/a R a= 3 b3a 20 1 1 1 2
B== E=/a R @/ !4 6 204 0.
2 L3 =$/$> @/ ?/= 20 2 1 2 1.
B== Ma$ R 20 2 1 2 4.
B== E=/a 16 2 1 2 4.
2 L3 =$/$> !4 1 !4 1.
T @/ b3a $ >=a$/ a/3a 20 2 1 2 4.
T E=/a a= 3 >?/= 20 2 2 4 1.
B== Ma$ R 20 2 1 2 4.
B== E=/a 16 2 1 2 4.
2 L3 =$/$> !4 1 !4 1.
4 PLINTH BEAM
PB,
T Ma$ R 2# 2 1 2 1
T E=/a R 2# ! 2 6 4.
>$ ba/ a= >$3 16 2 1 2 11
B== Ma$ R 2# 2 1 2 1B== E=/a R 2# ! 1 !
2 L3 =$/$>
-
7/24/2019 Variation Study for Madhavaram Site.
114/170
M:&! D&'a;!;d
T Ma$ R 16 2 1 2 1
T E=/a a= 3 >?/= 20 ! 1 ! 1
T E=/a $ >?/= 20 ! # 1# 2
B== Ma$ R 16 ! 1 ! 1
B== E=/a R 16 1 # # 2
2 L3 =$/$> !4 # 170 1.0
PB7 CONTINIOUS a' A >!;d
T Ma$ R @/ A+6 = A+2 16 2 1 2 1
T E=/a $ >?/= 20 ! # 1# 2
B== Ma$ R 16 ! 1 ! 1
B== E=/a R 16 1 4 4 2
2 L3 =$/$> !4 4 1!6 1.0
PB5
T Ma$ R 83/ 9a H$= "B! 20 2 ! 6 6.!
T E=/a a= 3 >?/= 20 2 ! 6 1
B== Ma$ R a= 20 ! ! 4
B== E=/a R 20 2 ! 6 2
2 L3 =$/$> !! 4 1!2 1.!
PB5 AT TOILET AREA
T & B== Ma$ 20 # 1 # 4.#T 3=/a 20 2 2 4 1.6
B== E=/a R 20 2 1 2 2
2 L3 =$/$> !4 1 !4 1.!
PB1
T Ma$ R (L/)
B== Ma$ L R
-
7/24/2019 Variation Study for Madhavaram Site.
115/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
116/170
M:&! D&'a;a3 ba/12# /= >$3 & Ha99 3=3/a9 ' >a3 ba/
12#
-
7/24/2019 Variation Study for Madhavaram Site.
117/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
118/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
119/170
M:&! D&'a; $3/3 $ %B1
B== Ma$ 20 2 7 14 2.4
b== a$ 2# 1 7 7 2.4
T$3> a= 1!0?/= 2# 2 2 4 2.
T E=/a a= $ >?/= 2# 2 2 4 4
B== Ma$ R 20 ! 2 6 1
B== E=/a R 20 2 2 4 2.
B== E=/a R 20 2 2 4 !.4
2 L3 =$/$> a= 100 a= 200 & b== b/ $3/3 $ %B6
-
7/24/2019 Variation Study for Madhavaram Site.
120/170
M:&! D&'a;!;d A
T Ma$ @/ %B4 T %B 20 2 1 2 1
T a$ 83/ 9a a= %B 20 2 1 2 1
T 3=/a a= a= 3 >?/= a= %b4 & %B 20 2 2 4 1
T E=/a a= $ >?/= 20 2 # 10 2
B== a$ @/ %B4 20 2 1 2 1
B== 9a @/ %B4 & %B 20 2 1 2 1
B== E=/a @/ %B4 & %B 20 2 6 12 2
2 L3 =$/$> a= 100 a= 1#0 a= 100 a= 1#0 ?/= 16 1 2 2 1.
T E=/a a= $ >?/= 16 1 # # 2
B== Ma$ R @/ 3 3 16 2 1 2 1
B== a$ @/ =3/ 3 16 2 1 2 1
-
7/24/2019 Variation Study for Madhavaram Site.
121/170
M:&! D&'a;=$//?> 1 2 !6 1.
SLAB
FS,&nd =ann&$3 !#0 =/$b?=$ @/ ab83 a= !#0$3 !#0 =/$b?=$ @/ ab83 a= !#0?/= 9 >$3 !#0 =/$b?=$ @/ ab83 a= !#0$3 a= 17#
-
7/24/2019 Variation Study for Madhavaram Site.
122/170
M:&! D&'a;9ab 1
T ba/ a= 1.# 989 16 12 1 12 2.
D$>=/$b?=$ @/ ab83 10 10 1 10 1.>/ ba/ @/ = = b== 16 12 1 12 1.
B== ba/ 16 12 1 12 6.
D$>=/$b?=$ @/ ab83 9 @/ Ha$>= 8>9ab 10 2! 1 2! 1.
T ba/ a= $ 9a$ 16 12 1 12 !.
D$>=/$b?=$ @/ ab83 16 16 1 16 !.
-
7/24/2019 Variation Study for Madhavaram Site.
123/170
-
7/24/2019 Variation Study for Madhavaram Site.
124/170
M:&! D&'a;3
T"'a< W' ;n M'"nn&
C FIRST FLOOR TO ROOF SLAB
, COLUMN
C9? C1 2# 10 12 120 4
C9? C1 2# 10 2 20 !
T$3> ?=3/ >aaaa 2! # 11# 0.
9$=39- 93=-10.#0 12 6 ! 1 11
T$3> 20 1 20 0.
L=39 a= =$93= a/3aA= / 2 @ 3=> 12 4 1 4 2.#
=$3> 17 1 17 0.7
A= / 2 @ 9a$3> 12 4 1 4 2.
=$3> 1 1 1 0.7
-
7/24/2019 Variation Study for Madhavaram Site.
125/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
126/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
127/170
-
7/24/2019 Variation Study for Madhavaram Site.
128/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
129/170
M:&! D&'a;9ab !
T ba/ a= Q/>= P/ 989 16 12 1 12 2
D$>=/$b?=$ @/ ab83 10 12 1 12 1.
>/ ba/ a= P/ 989 16 12 1 12 2
B== ba/ 16 12 1 12 #.
83/ 9a @/ ab83 16 12 1 12 0
D$>=/$b?=$ @/ ab83 10 17 1 17 1
D$>=/$b?=$ @/ ab83 a= P/ 9a89 10 6 1 6 1
D$>=/$b?=$ @/ ab83 a= $ 9a$ P/ 989 16 1 !.B== ba/ @/ $ 9a$ = = 16 12 1 12 !
D$>=/$b?=$ @/ ab83 a= 9a$ 16 1 !.
>>/ ba/ a= $ 9a$ 989 16 12 1 12 2.
-
7/24/2019 Variation Study for Madhavaram Site.
130/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
131/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
132/170
M:&! D&'a;3
T"'a< W' ;n M'"nn&
D WORKS AT YARD
Ra@= @/ =/a>@/3/ 9$=
/= >$3 = & b== ba/ a= 120
B= T & b== 16 2 16 .#
T E=/a a= 3 >?/= 16 2 2 4 2.6
T E=/a a= $ >?/= 16 2 4 0.
T E=/a a= $ >?/= 16 2 2 4 1.4
B== 3=/a a= 3 16 2 4 1.#
B== 3=/a a= $$ >?/= 16 2 6 12 1
T$3> a= 1#0 a= 1#0 $aa9 a= 1#0 a= 1#0 a= 1#0 !0 4 120 1.!
-
7/24/2019 Variation Study for Madhavaram Site.
133/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
134/170
-
7/24/2019 Variation Study for Madhavaram Site.
135/170
M:&! D&'a;
-
7/24/2019 Variation Study for Madhavaram Site.
136/170
-
7/24/2019 Variation Study for Madhavaram Site.
137/170
, ## ,0 ## , ## 0 ## 01 ##
66.40
6.00
70.40
24.00
6.!0
.!0
11.!0
24.00
6.!0
17.60
4.00
2.70
2!.70
72.00
.#
7.6
4.00
1.6#
10.40
!.72
11.20
-
7/24/2019 Variation Study for Madhavaram Site.
138/170
-
7/24/2019 Variation Study for Madhavaram Site.
139/170
-
7/24/2019 Variation Study for Madhavaram Site.
140/170
-
7/24/2019 Variation Study for Madhavaram Site.
141/170
, ## ,0 ## , ## 0 ## 01 ##
117.70
!62.70
10.00
!14.16
!62.70
10.00
646.0
64!.0
20.00
2!6.64
20.00
47#.60
40.#0
!21.0
71.00
10.00
-
7/24/2019 Variation Study for Madhavaram Site.
142/170
, ## ,0 ## , ## 0 ## 01 ##
11.!2
71.00
10.00
24!.60
#2#.60
22.#0
22.00
#6.00
!2.00
112.67 4704.!2 0 0 0 0
!74.71201 0 0 0 0 0
1#6.6 !202.6 6#1.4# 60.17 146.16
0.617 0. 1.# 2.47 !.#
#.6#0 2.44 1.02 1.70# #.7!4
,3.91
616
-
7/24/2019 Variation Study for Madhavaram Site.
143/170
-
7/24/2019 Variation Study for Madhavaram Site.
144/170
, ## ,0 ## , ## 0 ## 01 ##
.00
111.00
2#6.4
162.00
10.20
#46.00
1.00
2.00
!4.!0
17.1#
72.00
11.00
16.40
41.7
1!.
1!.
!6.40
!#.60
11.20
4.00
7.20
27.00
24.00
16.24
-
7/24/2019 Variation Study for Madhavaram Site.
145/170
, ## ,0 ## , ## 0 ## 01 ##
26.00
1!.20
2.00
1.72
14.24
1.72
24.00
24.00
7.20
27.00
24.00
24.00
!1.20
24.00
24.00
!.26
1!.#0
24.00
24.00
-
7/24/2019 Variation Study for Madhavaram Site.
146/170
, ## ,0 ## , ## 0 ## 01 ##
1#.60
4.00
4!!.2!6 4#!.4# 6.66 !2.#66 12.112 4!0.07!
!#4.!2
442.6
1!0.72
1!#1.#0
464.40
100.00
-
7/24/2019 Variation Study for Madhavaram Site.
147/170
, ## ,0 ## , ## 0 ## 01 ##
1#.00
142.4#
1!!.6!
4.6
4#.60
.00
2!6.64
1440.766# 17.2# !0.74776 0 0 0
!2.76
1#.#0
21.6
1.72
!#.6#
40.#6
61.76
-
7/24/2019 Variation Study for Madhavaram Site.
148/170
-
7/24/2019 Variation Study for Madhavaram Site.
149/170
-
7/24/2019 Variation Study for Madhavaram Site.
150/170
, ## ,0 ## , ## 0 ## 01 ##
1!.24
14.0
74.40
!0.00#2 22!.004 4!.67!6 0 0 0
120.00
120.00
!0.70
46.00
6#.2#
4.00
2#6.4
126.00
10.20
2.00
27.70
1!.#
4.00
!6.0
-
7/24/2019 Variation Study for Madhavaram Site.
151/170
, ## ,0 ## , ## 0 ## 01 ##
10.60
27.!0
72.00
2#.60
11.0
#.#4
10.40
24.00
24.00
7.20
27.00
24.00
24.00
16.0
26.00
24.00
24.00
!.60
21.60
!.60
#.40
24.00
24.00
14.00
4.0#
-
7/24/2019 Variation Study for Madhavaram Site.
152/170
, ## ,0 ## , ## 0 ## 01 ##
.6
6.60
17.2
#.60
24.00
24.00
!.10
12.6#
24.00
24.00.40
7!7.72#7 0 440.#104 24#.2!4 7.#4 2717.1#0
2#.20
!67.#0
10.44
-
7/24/2019 Variation Study for Madhavaram Site.
153/170
, ## ,0 ## , ## 0 ## 01 ##
40.00
111.2#
!.0
60.00
12.00
-
7/24/2019 Variation Study for Madhavaram Site.
154/170
, ## ,0 ## , ## 0 ## 01 ##
24.00
70.74
6.#2
10.00
160.0#2 1#.#417 0 0 0 0
24.00
1.60
!!.60
66.60
.60
27.20
.60
!#.!7
!.40
!#.!72.20
-
7/24/2019 Variation Study for Madhavaram Site.
155/170
, ## ,0 ## , ## 0