    HARINI ENTERPRISES

    MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI E

    SI NO DESCRIPTION OF ACTIVITIES NOS

    A SUB STRUCTURE

    1(a) EARTH WORK IN EXCAVATION

    ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 2

    ALONG GRID B1 TO B2 2 2.4 2.4 2

    1.(b) EXCAVATION BELOW 2M

    ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 0.1ALONG GRID B1 TO B2 2 2.4 2.4 0.1

    2 RIVER SAND BEDDING

    ALONG GRID A & C 14 2.6 2.6 0.1

    ALONG GRID B1 TO B2 2 2.4 2.4 0.1

    ! PCC FOR FOOTINGS

    "CC ALONG GRID A & C 14 2.6 2.6 0.07#

    "CC ALONG GRID B1 TO B2 2 2.4 2.4 0.07#

    4 FOOTING

    $ SHUTTERING

    AT%1 14 .6 0.2#

    AT%2 2 . 0.2#

    $$ REBAR (!"# BBS $%&&' 1

    $$$ RCC

    AT %1 (RECTANG'LAR) 14 2.4 2.4 0.2#

    AT %1 (TRA"EOIDAL) 14 1.#AT %2 (RECTANG'LAR) 2 2.2 2.2 0.2#

    AT %1 (TRA"EOIDAL) 2 1.24

    # COLUMN UP TO PLINTH LVL

    SHUTTERING

    $ AT C1 14 !.6# 1.

    AT C2 2 !.6# 1.46

    DED'CTION AT GRADE LEVEL

    AT GB! BEAM 'NCTION %OR C1 -20 0.2! 0.!

    AT GB4 BEAM 'NCTION %OR C1 -4 0.2! 0.4#AT GB1 BEAM 'NCTION %OR C1 -10 0.! 0.6

    AT GB2 BEAM 'NCTION %OR C1 -4 0.2! 0.4#

    AT GB1 IN CANTILEVER %OR C2 -1 0.2! 0.6

    AT GB! IN CANTILEVER %OR C2 -1 0.2! 0.!

    PROJECT ) !!+11 ,VA 'B TATION WOR, NORT CENNAI.

    SITE ) MADAVARAM

    CLIENT ) M+. DRA,E & C'LL WATER & ENERG "VT LTD.

    MEASUREMNT ARRIVED BY) M/.Ma3 Na53/ ( Maa3/ C$8$9:DWE) a M/.Ra;a/E:a/$$):M/.Aba/a>a ($=3 E)

    CHECKED * RE+ARRIVED BY ) M/.$8a>?b/aa$a(E$33/ C$8$9:DWE) a M/.Aba/

    LENGTHIN M

    WIDTHIN M

    HEIGHT/ DEPTH

    IN M

  • 7/24/2019 Variation Study for Madhavaram Site.

    2/1702 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    DED'CTION AT "LINT LEVEL

    AT BEAM "B! 'NCTION %OR C1 -20 0.2! 0.!

    AT BEAM "B2 'NCTION %OR C1 & C2 - 0.2! 0.4#

    AT BEAM "B1 'NCTION %OR C1 -6 0.2! 0.4#

    AT BEAM "B6 'NCTION %OR C1 -2 0.! 0.7#

    ATBEAM "B4 'NCTION %OR C2 -4 0.2! 0.4#

    $$ REBAR 1

    $$$ RCC COLUMN

    AT C1 14 !.6# 0.4 0.#

    AT C2 2 !.6# 0.2! 0.#

    6 GRADE BEAM$ PCC

    AT GB-1 # 10.# 0.# 0.07#

    AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.# 0.07#

    AT GB-2 2 4.7# 0.4! 0.07#

    AT GB-2 2 #.2# 0.4! 0.07#

    AT GB-! 10 !.! 0.4! 0.07#

    AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.4! 0.07#

    AT GB-4 ! !.! 0.4! 0.07#

    $$I REBAR 1IVSHURTTERING FOR GBEAMS

    AT GB-1 10 10.# 0.6

    AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.6

    AT GB-2 4 4.7# 0.4#

    AT GB-2 4 #.2# 0.4#

    AT GB-! 20 !.! 0.!

    AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.!

    AT GB-4 6 !.! 0.4#

    8 RCCAT GB-1 # 10.# 0.! 0.6

    AT GB-2 2 4.7# 0.2! 0.4#

    AT GB-2 2 #.2# 0.2! 0.4#

    AT GB-! 10 !.! 0.2! 0.!

    AT GB-4 ! !.! 0.2! 0.4#

    GB1 %OR TAIR 1 1.# 0.! 0.6

    GB! %OR TAIR 1 1.# 0.! 0.!

    7 BACK FILLING STAGE ,

    RE%ER EXCAVTION T 1 2!1.4!DED'CTION

    RIVER AND %ILLING BELOW %OOTING -1 10.616

    "CC BELOW %OOTING -1 7.62

  • 7/24/2019 Variation Study for Madhavaram Site.

    3/170! 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    RCC %OOTING -1 46.06

    COL'MN -1 11.06

    GARDE BEAM "CC -1 4.10

    PLINTH BEAM

    SHUTTERING

    AT "B-1 2 10.# 0.7#

    AT "B-2 4 4.7# 0.4#

    AT "B-2 4 #.2# 0.4#

    AT "B-! 1 !.! 0.!

    AT "B-4 6 !.! 0.4#

    AT "B-# 4 !.!# 0.4#

    AT "B-6 1.2! 0.4#

    REBARRCC

    AT "B-1 1 10.# 0.! 0.7#

    AT "B-2 2 4.7# 0.2! 0.4#

    AT "B-2 2 #.2# 0.2! 0.4#

    AT "B-! !.! 0.2! 0.!

    AT "B-4 4 !.! 0.2! 0.4#

    AT "B-# 2 !.47 0.2! 0.4#

    AT "B-6 4 1.# 0.2! 0.4#

    STAIRS FROM FGL TO -,.M$ 'TTERING

    %OR RIER WALL 4 1.# 0.2

    GRO'ND LANDING 2 1 1.7#

    WAIT LAB 2 !.06 1.7#

    EDGE IDE 2 4.06 0.1#

    LANDING 2 !.! 1.7#

    $$ REBAR

    $$$RCCRAIER WALL 2 1.# 0.1# 0.2

    GRO'ND LANDING 2 1 1.77 0.1#

    WAIT LAB 2 !.06 1.77 0.1#

    LANDING 2 !.! 1.77 0.1#

    10BRICK WORK BELOW PLINTH

    AT "B1 1 10.# 0.2! 1.1

    AT "B2 2 4.7# 0.2! 1.4

    AT "B2 2 #.2# 0.2! 1.4

    AT "B! !.! 0.2! 1.##AT "B4 4 !.! 0.2! 1.4

    AT "B# 2 !.! 0.2! 1.#

    AT "B6 2 1.# 0.2! 1.#

    TE" %ROM 0M LVL TO 1.# M LVL 1.7# 0.2! 0.1#

  • 7/24/2019 Variation Study for Madhavaram Site.

    4/1704 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    11CABLE TRENCH

    $ RIVER SAND FILLING 2 1.1# 2 0.1

    2 6.# 2 0.1

    1 6.# 2.1 0.1

    $$ PCC 2 1.1# 2 0.07#

    2 6.# 2 0.07#

    1 6.# 2.1 0.07#

    $$ SHUTTERING

    'TTERING %OR RA%T 2 12.4# 0.2

    4 6.7 0.2

    'TTERING %OR WALL 2 17.7# 1.6#

    2 10.1 1.#

    4 6.642# 1.#4 6.242# 1.#

    4 7.1 1.#

    4 6.7 1.#

    'TTERING %OR COVER LAB ! 7.1 1.#

    4 1.# 1.#

    DEDUCTIONS

    'N O% IN COMING CABLE D'CT

    WALL -2 1.# 1.#

    D3?

  • 7/24/2019 Variation Study for Madhavaram Site.

    5/170# 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    GRADE BEAM GB1 -4 10.#0 0.! 0.6

    $ RIVER AND %ILLING 1 12.4# 6.7 0.0

    1 10.27 !.! 0.0

    $$ "CC 1 12.4# 6.7 0.1

    1 10.27 !.! 0.1

    $$$REBAR

    B SUPER STRUCTURE UP TO FF

    1 COLUMN UP TO FF

    $ REBAR

    $$ 'TTERING

    AT C1 14 4.42 1.AT C2 2 4.42 1.46

    DED'CTION AT BEAM LEVEL

    AT BEAM %B4 'NCTION %OR C1 -20 0.2! 0.4

    AT BEAM %B# 'NCTION IN C1 -4 0.2! 0.6

    AT BEAM %B 'NCTION IN C1 -2 0.2! 0.#

    AT BEAM %B1 'NCTION IN C1 -10 0.4 0.7#

    AT BEAM %B2&%B! 'NCTION IN C1 - 0.2! 0.6

    AT BEAM %B6 'NCTION %OR C1 -7 0.2! 0.4

    L$=39 ?

  • 7/24/2019 Variation Study for Madhavaram Site.

    6/1706 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    DRO" ABOVE VARANDA 1 2#.6 0.0 1

    ! FF BEAM

    $ REBAR

    $$ 'TTEREING

    AT %B-1 # 10.# 1.62

    AT %B-2 2 4.7# 1.1#

    AT %B-! 2 #.2# 1.1#

    AT %B-4 10 !.! 0.7#

    AT %B-# 2 !.! 1.1#

    AT %B-6 7 1.#2 0.2

    AT %B-7 6 !.! 0.#7

    AT %B- 1 !.! 0.#

    ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.!

    $$$RCC

    AT %B-1 # 10.# 0.4 0.7#

    AT %B-2 2 4.7# 0.2! 0.6

    AT %B-! 2 #.2# 0.2! 0.6

    AT %B-4 10 !.! 0.2! 0.4

    AT %B-# ! !.! 0.2! 0.6

    AT %B-6 7 1.# 0.! 0.4

    AT %B-7 6 !.4 0.2! 0.!

    AT %B- 1 !.! 0.2! 0.#

    ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.2! 0.4#

    4 FF SLAB

    $ 'TTERING

    % 1 # 10.#4 !.!000

    %! 1 #.4# !.!000

    %2 6 1.4# !.!000

    O'TER IDE 2 !!.60 0.1400

    ADDITIONAL LAB ABOVE R 'TTER

    O'TER IDE 2 2.7# 0.1#

    LANDING A LI,E G% 2 2.7# 1.7#

    $$ REBAR 1

    $$$RCC

    %-1 4 10.# !.! 0.14

    %-1 1 10.# !.!# 0.14

    %-2 6 !.4 1.#2 0.14

    %B-! 1 #.!# !.!# 0.1#

    LAB ABOVE ROLLING 1 2.7# 1.7# 0.1#

    1 STAIR FROM -,.1M TO+ 1.21M LVL$ 'TTERING %OR TAIR '" TO %%

    MID LANDING BEAM AT !.67#M 1 !.74# 0.!

    MID LANDING LAB AT !.67#M 1 !.74# 1.!#

    WAIT LAB 1 &2 2 4.0# 2.0!

  • 7/24/2019 Variation Study for Madhavaram Site.

    7/1707 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    I$ REBAR

    I$IRCC

    TAIR %ROM 1.#M TO- #.#M LVL

    MID LANDING BEAM AT !.67#M 1 !.! 0.2! 0.4#

    MID LANDING LAB AT !.67#M 1 !.!# 1.!# 0.2

    WAIT LAB 1 &2 2 4.06 1.6 0.2

    6 34 BRICK WORKS AT GFALONG GRID A&C 12 !.! 0.2! !.7ALONG GRID 1:2 2 10 0.2! !.6#ALONG GRID 7 1 10.# 0.2! !.6#

    WALL BETWEEN GRID B& C 1 !.! 0.2! !.#

    TE" %ROM 1.# TO %% 14 1.72 0.2# 0.14#

    DED'CTIONWINDOW -W -12 1.1 0.2! 1.4

    VENTILATOR-V -10 1.1 0.2! 0.#

    VENTILATOR-V -! 0. 0.2! 0.#

    DOOR D1 -! 0. 0.2! 2.1

    ROLLING 'TTER -1 2.7# 0.2! !.6

    COLLA"ABLE GATE -1 1.# 0.2! 2.4

    OLLE -1 1.2 0.2! 1.2

    7 5.14HALF BRICK WALL

    WALL AT GRID B 1 !.! !.#WALL AT TOILET 2 1. !.#

    DED'CTION 2 1.0# !.#

    DOOR D2 -2 0. 2.1

    C SUP STRUC. FROM FF TO ROOF

    1 COLUMN UP TO ROOF

    $ REBAR

    $$ 'TTERING

    AT C1 14 !.# 1.

    AT C2 2 !.# 1.46

    DED'CTION AT BEAM LEVEL

    AT BEAM RB4 'NCTION IN C1 -22 0.2! 0.4

    AT BEAM RB7 'NCTION IN C1 -2 0.2! 0.#

    AT BEAM RB1 'NCTION IN C1 -10 0.4 0.7#

    AT BEAM RB6 'NCTION IN C1 -4 0.2! 0.#

    AT BEAM RB# 'NCTION IN C1 -7 0.2! 0.#

    ATBEAM 'NCTION C2 -6 0.2! 0.#

    $$$RCC

    AT C1 14 !.# 0.4 0.#

    AT C2 2 !.# 0.2! 0.#

    2 LINTEL 6SSHADE* LATH (DROP

  • 7/24/2019 Variation Study for Madhavaram Site.

    8/170 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    $ 'TTERING %OR 'N ADE 1.6 0.7

    'TTERING %OR LINTEL 24 !.! 0.!

    1 10.# 0.6

    2 10 0.6

    LO%T 2 1.1# 0.6

    2 .! 0.6

    DRO" ABOVE VARANDA 1 2#.6 1

    IIREBAR

    $$$ RCC 'N ADE 1.6 0.6 0.1

    RCC LINTEL 12 !.! 0.2! 0.!

    1 10.# 0.2! 0.!

    ABOVE 4.# WALL 1 2.77# 0.11# 0.!

    1 !.76 0.2! 0.!LO%T 2 1.1# 0.6 0.0

    2 .!4 0.6 0.0

    DRO" ABOVE VARANDA 1 2#.6 0.0 1

    ! ROOF BEAM

    $ SHUTTERING

    AT RB1 # 10.# 1.62

    AT RB! 6 !.4 0.6

    AT RB4 11 !.! 0.

    AT RB# 7 0.7# 1.27AT RB6 2 10 0.72

    AT RB7 1 !.! 0.#

    $$ REBAR

    $$$RCC

    AT RB1 # 10.# 0.4 0.7#

    AT RB! 6 !.4 0.2! 0.!

    AT RB4 11 !.! 0.2! 0.4

    AT RB# 7 1.# 0.! 0.#

    AT RB6 2 10 0.2! 0.#AT RB7 1 !.! 0.2! 0.#

    4 ROOF SLAB

    $ SHUTTERING

    # 10.#0 !.!0

    1 #.2# !.!0

    6 1.#4 !.!0

    O'TER IDE 2 !4.06 0.1#

    $$ REBAR$$$RCC

    RI 4 10.#0 !.!0 0.14

    RI 1 10.#0 !.! 0.14

    R! 1 #.! !.! 0.14

  • 7/24/2019 Variation Study for Madhavaram Site.

    9/170 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    R2 6 1.#2 !.40 0.14

    # 34 BRICK WORKS AT FF

    ALONG GRID A&C 11 !.! 0.2! 2.

    ALONG GRID 1:2 2 10 0.2! 2.7#

    ALONG GRID 1:2&7 1 10.# 0.2! 2.4#

    WALL BETWEEN GRID A& C 2 !.! 0.2! 2.6

    TE" 11 1.7! 0.2# 0.14#

    DED'CTION

    WINDOW -W -11 1.1 0.2! 1.4

    VENTILATOR-V -7 0. 0.2! 0.#

    DOOR D1 -2 0. 0.2! 2.1

    DOOR D -2 0. 0.2! 2.1

    OLL -1 1.2 0.2! 1.2

    6 5.14WALL AT FF

    WALL AT GEN TOILET 2 1.# !.0#

    2 1.0# !.0#

    WALL AT LADIE TOILET 1 1.# !.0#

    2 1.1# !.0#

    DED'CTION -DOOR D2 -4 0. 2.1

    #(a) 34 BRICK WORKS AT VARANDAH 1 2# 0.2! 0.

    7 STAIR CASE STRUCTURE$ SHUTTERING

    TAIR %ROM #.#M TO .04

    MID LANDING BEAM AT 7.44#M 1 !.74# 0.!

    MID LANDING LAB AT .04M 1 !.74# 1.!#

    MALL LANDING AT #.#MLVL 1 1.6 0.7#

    WAIT LAB ! & 4 2 !.12 2.0!

    $$ REBAR FOR STAIR 1

    $$$ RCC FOR STAIRTAIR %ROM #.#M TO .04

    MID LANDING BEAM AT 7.44#M 1 !.74# 0.2! 0.4#

    MID LANDING LAB AT .04M 1 !.74# 1.!# 0.2

    MALL LANDING AT #.#MLVL 1 1.6 0.7# 0.2

    WAIT LAB !&4 2 !.12 1.6 0.2

    ROOF WORKS

    a. ROOF LVL RCC * %&ad !""#

    $ SHUTTEREING

    B1 O?=3/ >$3 1 !.!0 0.#00B1 I3/ >$3 ! !.470 0.!60

    B2 O?=3/ >$3 2 7.11# 0.#00

    B2 I3/ >$3 2 6.42# 0.!60

    B! O?=3/ >$3 1 !.!0 0.!00

  • 7/24/2019 Variation Study for Madhavaram Site.

    10/17010 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    B! I3/ >$3 1 !.470 0.160

    1 1 7.11# !.!0

    C1 2 1.00 2.200

    C2 2 1.460 2.200

    $$ REBAR

    $$$ RCC

    COL'MN C1 AT "ARA"ET 0.0 0.40 0.#0

    COL'MN C1 2 2.40 0.40 0.#0

    COL'MN C2 2 2.40 0.2! 0.#0

    BEAM B1 2 !.!0 0.2! 0.#0

    BEAM B2 2 #.7 0.2! 0.#0

    BEAM ! 1 !.! 0.2! 0.!

    LAB 1 1 6.42# !.47 0.14

    b BRICK WORK 34

    AT "ARA"ET 6 !.! 0.2! 0.

    1 10.# 0.2! 0.

    1 #.2# 0.2! 0.

    AT EAD ROOM 1 16.17 0.2! 1.

    EAD ROOM "ARA"ET 1 20. 0.2! 0.!

    DED'CTION

    DOOR D1 -1 0. 0.2! 1.

    WINDOW -1 1.1 0.2! 1.4

    OLL -1 1.2 0.2! 1.2

    < BRICK WORKS+34 IN PASSAGE 1 2# 0.2! 0.

    DEXTERNAL FINISHING AND YARD WORKS

    TAGE 4 "AMENT 20

    EXTERNAL WOR, & ARD

    1 TRAN%ORMER "LINT

    a EXCAVATION

    TRAN%ORMER %O'NDATION 1 !. 12. 1.#

    CABLE TRENC 2 1.2 12. 1.#2 ! 1.2 1.#

    b RIVER AND %ILLING 1 12.# 6.2 0.1

    < "CC 1 12.# 6.2 0.07#

    SHUTTERING

    1 2#.22 0.2#

    TRA" BEAM 2 1.76 0.!#

    COL'MN 1.2 2.10

    2 1.!6 2.10BEAM B1 2.47# 0.!2#

    BEAM B2 4 2.47# 0.!2#

    LAB 1 !.!# !.!#

    TRAN%ORMER %O'NDATION & %IRE WALL-BAE

  • 7/24/2019 Variation Study for Madhavaram Site.

    11/17011 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    %IRE WALL 2 4.2! 4.#0

    CABLE D'CT RA%T ALONG "LINT 2 1 0.20

    CABLE D'CT RA%T ARRO'ND "LINT-WALL 2 72 1.!0

    COVER LAB 2 1 1.2

    DEDUCTIONS

    'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.!0

    3 REBAR FOR TRS. FORMER FND 2

    @ RCC

    TRAN%ORMER %O'NDATION 1 .! !.27# 0.2#

    TRA" BEAM 2 .! 0.# 0.!#

    COL'MN C1 0.! 0.! 2.10

    BELOW GRO'ND C2 2 0.4# 0.! 1.00

    ABOVE GROND C2 2 0.4# 0.2! 1.10BEAM AT %LOOR LEVEL B1 4 2.17# 0.! 0.!!

    BEAM AT %LOOR LEVEL B2 2.17# 0.! 0.!!

    LAB AT "LINT 2 ! ! 0.1

    %IRE WALL 1 4.# 0.2! 4.#

    CABLE DUCT AROUND PLINTH

    RA%T 2 12.07 1.# 0.20

    4 ! 1.# 0.20

    WALL 1 46.4 0.1# 1.##

    2.17# 0.1# 1.##

    COVER LAB 2 12.07 1.2 0.1#4 ! 1.2 0.1#

    DEDUCTIONS

    'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.! 0.1#

    2

    $ EARTH WORK EXCAVATION 1 2.# 4.2 1.#0

    $$ RIVER SAND 1 2.# !. 0.0

    $$$ PCC 1 2.# !. 0.10

    $8 SHUTTEREING

    RA%T 2 12 0.20

    WALL 2 24 1.#0

    COVER ALB 2 6 1.#

    8 REBAR

    8$ RCC

    RA%T 1 2.# !.6# 0.20

    WALL 2 2.# 0.2 1.20

    1 2.# 0.2# 1.20BEAM 2 !.6# 0.! 0.!0

    BEAM 1 !.6# 0.!# 0.20

    COVER LAB 1 2.# !.6 0.20

    CABLE DUCT FROM PLINTH TOBUILDING

    CABLE D'CT %ROM TRAN%ORMER TOB'ILDING

  • 7/24/2019 Variation Study for Madhavaram Site.

    12/17012 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    ! INCOMING CABLE TRENCH

    $ EXCAVATION 2 !.7 2.# 1.#0

    $$ SAND FILLING 2 !.7 2.1 0.0

    $$$ PCC 2 !.7 2.1 0.10

    $8 SHUTTERING

    RAFT 2 .! 0.20

    WALLL 4 !.7 1.!0

    4 !.7 1.1#

    COVER 2 !.7 1.#

    8 REBAR

    8$ RCC

    RA%T 2 !.7 1. 0.20

    WALL 4 !.7 1.2 0.20

    COVER 2 !.7 1. 0.1#

    4 BACK FILLING 7RD STAGE

    RE%ER T O% EXCAVATION

    DED'CTION

    R AND %ILLING O% TRAN %DN

    "CC O% TRAN %DN

    RCC O% TRAN %DN

    # "AVING 1 66.40 1

    6 ROADROAD BAE (METAL & GRAVEL) 1 1#.00 0.! 6

    "CC B 40MM M#-1F4F 1 1#.00 0.1# 6

    RCC B 20MM M1# 1 1#.00 0.1# 6

    TO"ING B !TO 10MM M1# 1 1#.00 0.0# 6

    REBAR 27# MM C+C-(!.0! ,G+M) 1

    ROAD+ M 1 1#.00 6

    7 'G 'M" (L'M"'M)

    a EXCAVATION 1 4.#0 2.7 1.#

    b RIVER AND %ILLING 1 4.10 2.! 0.1< "CC 1 4.10 2.! 0.1

    'TTERING

    %LOOR 1 12.00 0.2

    WALL 1 22.0 2.1

    COVER LAB 1 !.0 2.1

    3 REBAR 22,G+M O% 'R%ACE AREA 1 44.70 22

    @RCC

    RCC %LOOR 1 !.0 2.1 0.2

    RCC WALL 1 11.40 2.1 0.1#RCC COVER LAB 1 !.0 2.1 0.1#

    "LATERING

    %LOOR 1 !.00 1.

    WALL 1 .60 2.2

  • 7/24/2019 Variation Study for Madhavaram Site.

    13/1701! 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    CEILING 1 !.00 1.

    MANOLE COVER 1

    WEATERING CO'RE & TILING 1 21.7 10.#

    YARD OPEN AREA FILLING 5TH STAGE

    IE O% TE "LTOT 1 42.7!# 16.21 0.7

    DED'CTION %OR BLG AREA -1 22.2 11 0.7

    TRAN%ORMER ARD -1 12.!0 6 0.7

    CABLE TRENCE AREA -1 2.#0 !.6 0.7

    INCOMING TRENC AREA -2 !.70 1. 0.7

    WATER TAN, -1 !.40 2.2 0.7

    TAIR AREA -2 7.40 1.7# 0.7

    E FINISHING WORKS

    1 PLASTERING INTERNALa GF

    WALL-CONTROL ROOM 1 #7.!1 4.2#

    DED'CTION

    W -12 1.1 1.4

    V - 1.1 0.#

    R -1 2.7# 4.1

    D1 -2 0. 2.1

    D1 -1 1.2 2.1

    B3a ?/@a -4 0.11# !.

    D1 & D2 -# 0. 2.1

    'RINAL ENTR -2 1.0# !.

    VENTILATOR -! 0. 0.6

    D1 BATTER ROOM -1 1.2 2.1

    TAIR ROOM 1 17.27 4.2#

    DED'CTION %OR CG -1 1.# 2.1

    DED'CTION %OR OLLE -1 1.2 1.2

    b PLASTERING INTERNAL FF

    WALL O%%ICE 1 #7.! !.!

    DED'CTION

    W -11 1.1 1.4

    D1 -2 0. 2.1

    D -2 1.1 2.1

    GENT TOILET+BAT 2 #.1 !.!

    WALL 'RINAL+"AAGE 1 12.4 !.!

    DED'CTION %OR DOOR-D2& D1 -# 0. 2.1VENTILATOR -# 0. 0.6

    LADIE TOILET 2 #.# !.!

    DED'CTION %OR DOOR-D1 -2 0. 2

    "AAGE 1 .!2 !.!

  • 7/24/2019 Variation Study for Madhavaram Site.

    14/17014 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    DED'CTION D1 & D2 -# 0. 2.1

    VENTILATOR -2 0. 0.6

    TAIR ROOM AT %IRT %LOOR 1 17.27 !.!

    DED'CTION AT ENTRANCE -1 !.! !.1

    OLL -1 1.2 1.2

    < EAD ROOM

    WALL 1 16.# 2.2#

    DED'CTION DOOR -1 0. 1.

    WINDOW -1 1.1 1.4

    OLL -1 1.2 1.2

    2 CEILING PLASTERING

    G

    CEILING 1 1.1# 10.#%B1 BEAM DRO" 4 10.# 1.2

    WET AREA 1 !.!# !.01#

    BATTER ROOM 1 !.!# 2.24

    TAIR MID LANDING 1 !.!# 1.4

    WAIT 1 &2 2 1.7 4.06

    VARANDA 1 22 1.7#

    %B6 BEAM DRO" 7 1.# 0.#2

    %B7 BEAM DRO" 6 !.! 0.16

    RAIR AT 00 LVL

    WAIT 2 !.1!47 1.#

    O%%IT 2 !.!# 1.#

    BEAM "" # &6 DRO" 2 6.47 0.2#

    b CEILING PLASTERING FF

    O%%ICE 1 1.1 10.#

    LO%T 1 ## 1.2

    WEWT AREA 1 !.!# #

    VARANDA 1 22.2 1.7#RB1 BEAM DRO" 4 10.# 1.2

    RB# BEAM DRO" 6 1.# 0.72

    RB! BEAM DRO" 6 !.! 0.!

    TAIR AREA

    MID LANDING 1 !.74# 1.!#

    MALL LANDING 1 1.6 0.7#

    WAIT LAB ! & 4 2 !.12 2.0!

    C EAD ROOM

    CEILING 1 6.# !.!BEAM DRO" B! 1 !.! 0.1#

    BEAM DRO" B2 2 1.# 0.!#

    ! PAINTING INTERNAL

  • 7/24/2019 Variation Study for Madhavaram Site.

    15/1701# 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    a G%

    WALL R%E%ER T %ROM "LATER

    DED'CT WALL TILING G%

    CEILING

    b FF

    WALL RE% T %ROM "LATER

    DED'CT WALL TILING %%

    CEILING

    4 FLOORING

    a GROUND FLOOR

    CERAMIC %LOORING 1 1.1# 10.#

    DED'CTION %OR CABLE TRENC

    -1 14.!# 1.-1 12.## 1.

    GENT TOILET-%LOORING 1 !.1## 2.

    BATTER ROOM 1 !.!# 2.24

    ACCE TE" & TAIR

    %LOOR LANDING LAB AT 0.00M LVL 2 !.7 1.7#

    TE" 20 1.7# 0.46

    TAIR "AAGE AT ENTRANCE 1 #.2# !.!#

    b FLOOR TILING GF STAIRMID LANDING AT !.67#M LVL 1 !.!# 1.2#

    TE" 2 1.6 0.!#

    < FLOOR TILING FF

    %%-%LOORING 1 1.1# 10.#

    GENT TOILET-%LOORING 1 !.!# !.01#

    LADIE TOILET 1 !.!# 2.24

    "AAGE AT VARANDA 1 22.2 1.6!

    TAIR

    TE" %ROM %% TO ROO% 20 1.6 0.!#MALL LANDING AT #.#MLVL 1 !.!# 0.7#

    MID LANDING LAB 1 !.!# 1.2#

    LANDING AT .04MLVL 1 !.!# 1.12

    2 WALL DADO

    a GROUND FLOOR

    WALL TOILET+BAT 2 #. 2.1

    WALL 'RINAL 1 4.7## 2.1

    BAT "AAGE 1 .77 2.1

    DED'CTION %OR DOOR-D2 -4 0. 2.1VENTILATOR -! 0. 0.6

    DED'CTION %OR DOOR-D1 -1 0. 2.1

    WALL SKIRTING

    TAIR AREA 1 17.27 0.1

  • 7/24/2019 Variation Study for Madhavaram Site.

    16/17016 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    DED'CTION %O CG -1 1.# 0.1

    CONTROLL ROOM WALL TILING 2 1.1# 2.1

    2 10.# 2.1

    DEDUCTION

    WINDOW -12 1.1 1.4

    DOOR -2 0. 2.1

    DOOR -1 1.2 2.1

    ROLLING 'TTER -1 2.7# 2.1

    b FF

    GENT TOILET+BAT 2 #.1 2.1

    WALL 'RINAL+"AAGE 1 12.4 2.1

    DED'CTION %OR DOOR-D2& D1 -# 0. 2.1

    VENTILATOR -# 0. 0.6

    LADIE TOILET 2 #.# 2.1

    DED'CTION %OR DOOR-D1 -2 0. 2"AAGE 1 .!2 2.1

    DED'CTION D1 & D2 -# 0. 2.1

    VENTILATOR -2 0. 0.6

    ,IRTING

    O%%ICE 1 #7.!7 0.1

    DED'CTION DOOR D -2 1.1 0.1

    DOOR D1 -2 0. 0.1

    TAIR AREA 1 17.27 0.1

    DED'CTION %OR ENTRANCE -1 !.! 0.1

    "AAGE 2 2!.# 0.1DED'CTION %OR D -2 1.1 0.1

    ! EXTERNAL %INIING WOR,

    a "LATERING EXTERENAL WALL 1 6.2 11.14

    CORNICE AT "ARA"ET LVL 1 66.4

    AT EAD ROOM ROO% 1 22.2

    COL'MN "EOECTION O'T 12 0.2# 10.7#

    COL'MN "EOECTION EAT+WET ! 0.17 10.7#

    WARANDA "ARA"ET WALL AT %% 1 2# 1.

    LAB ABOVE ROLLING 'TTER 1 #.17 2.7!DRO" AT %IRT %LOOR LVL 1 2# 2.1

    COL'MN AT NORT 12 0.2# .!

    ROO% LEVEL DRO" ABOVE VARANDA 1 2#.7 2.1

    'NADE ABOVE WINDOW AT G% 7 !.4 1.2

    'NADE AT %% !.4 1.2

    EAD ROOM "LATERING EXTERNAL 1 1.1! 2.4

    EAD ROOM "ARA"ET 1 22.2 0.6

    COL'MN %ACE 1 1.1 2.7

    "ARA"ET IN "AAGE AT ROO% 2 1.# 1.DED'CTION

    WINDOW -24 0.72 1.02

    CG -1 1.04 1.7

    R -1 2.2 !.7

  • 7/24/2019 Variation Study for Madhavaram Site.

    17/17017 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    DOOR D AT %% -2 0.64 1.7

    DED'CTION %OR TAIR ENTR %% -1 !.! !.7

    DOOD D AT ROO% D1 -1 0.44 1.7

    OLL -! 0.74 0.74

    %IRE WALL 1 .2# .#

    4 EXTERNAL "AINTING

    EXTERNAL WALL

    # AND RAIL

    ANDRAIL AT O TO 1.#M 2

    ANDRAIL AT TAIR

    WAIT LAB 1 &2 2 4.0#

    WAIT LAB !&4 2 !.12

    6 WATER TAN, 1000 LITER 2

    7 BATER ROOM WALL ACID REITANT 1 10.2# 2.1

    ELECTRICAL WOR, WIT %ITTING 1

    "L'M"ING & ANITARWERE 1

    10 EWAGE+ DRAINAGE WOR, !0

    11E"TIC TAN,& OA,WA WIT COVER 1

    12 RAIN WATER LINE & ARVETING 1

    1! 1

    14 IN"ECTION CAMBER !1# G'LL TRA" 2

    16 OINERIE

    a DOOR D (CW C %L' DOOR) 2 1.1 2.1

    DOOR D1 (CW C %L' DOOR) 6 0. 2.1

    b DOOR D2 ("VC DOOR) 6 0. 2.1

    < ROLLING 'TTER 1 2.7# !.6

    COLLA"IBLE GATE(M) 1 1.# 2.1

    3 WINDOW(AL'MINI'M) 2! 1.1 1.4VENTILATOR IN CONTROL ROOM 10 1.1 0.#

    VENTILATOR IN TOILET 0. 0.#

    WINDOW IN TE "LACE O% OLL 1 1.2 1.2

    VENTILATOR IN CONTROL ROOM 1.1 0.#

    VENTILATOR IN TOILET 10 0. 0.#

    @ GRILL WIT "AINTING W1 2#+>J 2! 1.1 1.4

    WINDOW IN TE "LACE O% OLL 1 1.2 1.2

    20 NAME BOARD AT ROO% 1

    21 BOREWELL 1

    22 ACCE LADDER M- 4M AT ROO% 1

    ENTRANCE GATE 6 H$3 2M WIC,EDGATE

  • 7/24/2019 Variation Study for Madhavaram Site.

    18/1701 1-12

    TERPRISES

    8TY SUB TOTAL

    1.2

    2!.04 212.!2

    17.0!#22.07!6 1.10

    .464

    1.1#2 10.616

    7.0

    0.64 7.62

    !!.6

    4.4 !

    2.!244 2.!244

    20.16

    21.002.42

    2.4 46.06

    1.

    10.6#

    -1.!

    -0.414-1.

    -0.414

    -0.1!

    -0.06

    a ("/;3a($=3 E)

  • 7/24/2019 Variation Study for Madhavaram Site.

    19/1701 1-12

    8TY SUB TOTAL

    -1.!

    -0.2

    -0.621

    -0.4#

    -0.414 4.7!

    #.0!1 #.0!1

    10.22

    0.4 11.06

    1.7

    0.06

    0.!1

    0.!4

    1.06

    0.0#

    0.!2 4.10

    !.16 !.16

    6!

    0.

    .##

    .4#

    1.

    0.4#

    .1 111.06

    .4#

    0.

    1.0

    2.2

    1.02

    0.27

    0.14 1#.2!

    2!1.4!

    -10.616

    -7.62

  • 7/24/2019 Variation Study for Madhavaram Site.

    20/17020 1-12

    8TY SUB TOTAL

    -46.060

    -11.060

    -4.102 1#1.62

    1#.7#

    .##

    .4#

    17.2

    .1

    6.0!

    4.42 70.!

    2.!77 2.!77

    2.!6

    0.

    1.0

    2.0#

    1.!7

    0.72

    0.62 .1

    1.20

    !.#0

    10.71

    1.22

    11.## 2.1

    0.# 0.#

    0.0

    0.#!

    1.62

    1.7# 4.00

    2.66

    !.06

    !.!

    10.#4.2#

    2.6

    1.!#

    0.#4 2.7

  • 7/24/2019 Variation Study for Madhavaram Site.

    21/17021 1-12

    8TY SUB TOTAL

    7.27

    2.60

    1.!7 11.24

    #.46

    1.#

    1.02 .4!

    4.4

    #.!6

    #.60#

    !0.!

    !.##!7.4##

    42.6

    40.2

    !1.#

    -4.#

    -1.14

    -4.7# 2.#

    #.72 #.72

    1!.2

    7.64

    12.00

    6.06

    7.7!

    .26.07

    1.4

    .7

    -0.0

    -0.2!

    -0. 70.!0

    10.6

    71.#

  • 7/24/2019 Variation Study for Madhavaram Site.

    22/17022 1-12

    8TY SUB TOTAL

    -7.#6 24#.2#

    6.6

    2.71 .40

    .!6

    !.! 11.7#

    0.!7 0.!7

    !.1 !.1

    111.!12.1

    -1.4

    -0.##2

    -0.2!

    -!

    -1.104

    -0.644

    -2.20

    -0.207 114.#1

    12.!

    1.02 1!.!

    1!.44

    1.0

    21.7!.6

    2.2

    2#.#0 #.6

    0.1 0.1

    1.1#

    4.6#

    0.2!0.11

    0.72

    0.1!

  • 7/24/2019 Variation Study for Madhavaram Site.

    23/1702! 1-12

    8TY SUB TOTAL

    2.0# .04

    6.02 6.1

    #.0#

    10.!

    12.0

    24.7#

    7.#

    .72

    11.2

    !.14

    2.1 166.44

    1#.7#

    1.!1

    1.4#

    !.04

    1.!7

    1.26

    1.41

    0.!

    0.!6 26.!2

    17!.1

    17.

    2.71

    .41

    0.!

    .6! 240.46

    !.70 !.70

    1.40

    4.

    4.!4

    2.7!

    0.72 !2.1

    !.11

    #.1

    16.44 24.74

  • 7/24/2019 Variation Study for Madhavaram Site.

    24/17024 1-12

    8TY SUB TOTAL

    1.0# 1.0#

    0.!4

    0.4

    2.60 !.

    !!.7016.7.1

    2.66

    0.7

    -4.2

    -1.#7

    -0.!2

    -1.!0

    -2.2

    -0.!

    -0.!! #1.!

    11.##1!.!0

    7.!#

    -!.7 2.42

    !.1 !.1

    .20

    10.22

    -2.024

    -0.2!

    -!

    -0.46

    -0.0#

    -0.6 1.21

    .0

    0.1 10.61

  • 7/24/2019 Variation Study for Madhavaram Site.

    25/1702# 1-12

    8TY SUB TOTAL

    .6

    2!.76

    6.!0

    12.00

    24.7!

    12.6#

    2#.60 114.00

    0.7

    0.77

    2.7!

    0.72

    0.10

    0.261.7#

    0.0

    2.0# .27

    #.0#

    14.0

    2.04

    6.6714.40

    !.14 1#2.!7

    #.1! #.1!

    1#.7#

    1.41

    !.!4

    1.#

    2.!00.! 24.7#

    17!.2#

    17.!!

    !0.4

    10.22 2!1.2

    !.21 !.21

    1.40

    4.

    2.##

  • 7/24/2019 Variation Study for Madhavaram Site.

    26/17026 1-12

    8TY SUB TOTAL

    4.!4 !1.27

    2!.!

    12.6#

    #.2

    !.#

    0.6

    -4.42

    -0.7#

    -0.7

    -0.7

    -0.!! !.!#

    .1#

    6.41

    4.#

    7.02

    -7.#6 1.#

    #.1 #.1

    !.11

    #.1

    1.20

    12.2 22.41

    0.7 0.7

    0.!

    1.04

    0.24

    2.04 !.70

    1.6#!.74

    7.11#

    4.626

    1.17

  • 7/24/2019 Variation Study for Madhavaram Site.

    27/17027 1-12

    8TY SUB TOTAL

    0.###

    27.62

    7.20

    6.424 61.44

    1.1 1.1

    1.44

    0.6

    0.##

    0.76

    1.!#

    0.2!

    !.12 .41

    4.10

    2.17

    1.0

    7.07

    1.44

    -0.!

    -0.40

    -0.!! 14.74

    #.1 #.1

    7#.47

    46.4410.0 1!2.71

    7.7# 7.7#

    #.1 #.1

    !#.6!

    !#.6!

    20.160

    #.712!#.6!

    !#.6!

    11.22!

  • 7/24/2019 Variation Study for Madhavaram Site.

    28/1702 1-12

    8TY SUB TOTAL

    !#.6!

    !#.6!

    !#.6!

    4!.200

    -.4#0 !2!.#

    6.022! 6.02

    7.6

    !.2

    1.#1

    0.27

    0.2!0.#

    1.70

    !.1#

    #.12

    7.24

    !.60

    10.1

    4.0#

    4.!#2.16

    -1.26 #4.!

    1#.7# 1#.7#

    0.76

    0.#

    !#.6!

    !#.6!

    1.000 .!

    0.4#4 0.4#

    1.!

    1.20

    0.7#0.66

    0.26

    1.0 6.4

  • 7/24/2019 Variation Study for Madhavaram Site.

    29/1702 1-12

    8TY SUB TOTAL

    27.7# 27.7#

    1.24

    1.##

    !.72

    1.24

    17.02

    11.10 #1.0

    0.!7 0.!7

    2.1

    !.##

    2.11 .47

    1!2.71

    -7.7#

    -#.1

    -#4.! 64.!1

    66.40 66.40

    27.00

    1!.#0

    1!.#0

    4.#0

    0.00 0.00

    1.2! 1.2!

    0.4 0.40.4 0.4

    2.40

    47.

    .1 #.47

    0. 0.

    1.64

    !.#1.2! 6.46

    #.40

    21.12

  • 7/24/2019 Variation Study for Madhavaram Site.

    30/170!0 1-12

    8TY SUB TOTAL

    #.40 !1.2

    1.00

    227.# 227.#

    44.1

    -170.4

    -#1.66

    -6.!0

    -.4

    -#.24

    -1.1! 222.1

    24!.#7

    -20.6

    -6.16

    -11.2

    -!.7

    -2.#2

    -1.#

    42.7#10!.2#

    -1.7#

    -.4#

    -7.

    -1.44

    -2.#2

    7!.40

    -!.1#

    -1.44 !.#

    1.0

    -1.21

    -!.7

    -4.62

    !!.66

    40.2

    -.40-2.40

    !6.!0

    -!.20

    27.46

  • 7/24/2019 Variation Study for Madhavaram Site.

    31/170!1 1-12

    8TY SUB TOTAL

    -.40

    -0.6

    #6.

    -10.2!

    -1.44

    !7.!1

    -1.71

    -1.7#

    -1.44 !#4.1

    10.4#0.40

    10.21

    7.#

    4.74

    1#.1

    !.#0

    #.46

    !.17

    .42

    10.16

    !.24 !4.

    10.

    6#.6

    16.!

    !.##0.40

    6.4

    7.72

    #.1

    1.20

    12.2

    2!.270.#1

    1.0# 421.!7

  • 7/24/2019 Variation Study for Madhavaram Site.

    32/170!2 1-12

    8TY SUB TOTAL

    !#4.1

    -1!2.!6

    !26.1

    !#4.1

    -7#.

    421.!7 1247.67

    10.4

    -27.!!-2!.1

    .1#

    7.#

    12.#

    16.10

    17.77 20!.2#

    4.2!

    1.!! 22.#6

    10.4

    10.21

    7.#

    !6.1

    12.642.#4

    4.2!

    !.7 26.12

    24.7

    .

    1.42

    -6.72-1.44

    -1.6

    1.7!

  • 7/24/2019 Variation Study for Madhavaram Site.

    33/170!! 1-12

    8TY SUB TOTAL

    -0.1#

    76.!

    44.10

    -20.6

    -!.7

    -2.#2

    -#.7 1!2.!6

    21.42

    26.04

    -.40

    -2.40

    2!.10

    -!.2017.47

    -.40

    -0.6

    #.74

    -0.22

    -0.1

    1.7!

    -0.!!

    4.70-0.22 7#.

    7#.7#

    66.40

    22.20

    !2.2#

    #.4

    4#.00

    14.11#2.#0

    27.0

    #!.7

    2.#6

    !2.64

    4!.#1

    1!.!2

    4.

    #.70

    -17.6!

    -1.4

    -.6

  • 7/24/2019 Variation Study for Madhavaram Site.

    34/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    35/170!# @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14

    ANNEXURE II

    BOQ & SCHEDULE OF PRICES

    33 / 11 KV SUB-STATION WORKS AT NORTH CHENNAI, INDIA

    SR. NO. DESCRIPTION OF ITEM

    1

    2

    3 Back filling with excavated earth including consolidation asper specfication.

    4

    5 PCC M1 !1"3"#$ asper specification

    #

    % &CC M25 for lintel'sunshade'(ea) and sla(

    * P+, for) work for all &CC ite)s

    - P+, of reinforce)ent steel M for all &CC ite)s

    1 P+/ paved area 0ccess

    11 P+/ BB )asonar of 3)) thick co)pound wall

    12 P+ plastering +.

    13 P+ painting + B ce)ent paint

    14 ,looring

    15 6xpansion 7oint

    1# 6ntrance gate 0 ou(le leaf with &CC Pillar

    1% 8tor) water drain arrange)ents

    1* nternal 6lectrical works

    1- nternal &oad

    2 Clear water su)p

    6xcavation in all soils .)tr to2. )tr' including disposal of earth upto 1 )trfro) the point.

    6xcavation in all soils 2.1)tr to2.5 )tr' including disposal of earth upto 1 )trfro) the point.

    Back filling with (ought out earth including consolidation asper specfication.!&iversand$

    &CC M25 for strip foundation!co)(ined footing$9rade (ea)'grade sla('ca(letrench wall + grade sla( 9, incl rf plinth and fire wall.

  • 7/24/2019 Variation Study for Madhavaram Site.

    36/170!6 @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14

    21 : sintex 0oilet and la( re;uire)ents

    22 Plu)(ing and sanitar 0 (uilding toilet

    23 inspection cha)(er

    24 9ull rap

    25 ?. @C6 BA6 &6 68M6 >?. @/?. A6@& 8:// C&&?

  • 7/24/2019 Variation Study for Madhavaram Site.

    37/170!7 @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14

    CIVIL WORKS

    HARINI ENTERPRISES

    UNIT QT'.

    SUPPL' & INSTALLATION

    CM %44. *42.2% #2#'#4*.**

    CM %'44. 3%2.3%2 2'%%'44%.#*

    8>M 12'4. 115.25* 1'3*%'%#.32

    8>M 3'52. 11%.312 4'11-'4-*.24

    &M 4*. 23.-1* -%'**.#4

    @8 4. *422% 33#'-*.

    &M 24. -%5.2# 234'#2.4

    /

  • 7/24/2019 Variation Study for Madhavaram Site.

    38/170! @ 170 WORLD CRET TOWER "O RE%F C0227 DATED 0!.0#.14

    /

  • 7/24/2019 Variation Study for Madhavaram Site.

    39/170! 1-12

    HARINI ENTERPRISES

    MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI E

    SI NO DESCRIPTION OF ACTIVITIES NOS

    A SUB STRUCTURE

    1(a) EARTH WORK IN EXCAVATION

    ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 2

    ALONG GRID B1 TO B2 2 2.4 2.4 2

    1.(b) EXCAVATION BELOW 2M

    ALONG GRID A1 TO A7*& C1 TO C7 14 2.6 2.6 0.1ALONG GRID B1 TO B2 2 2.4 2.4 0.1

    2 RIVER SAND BEDDING

    ALONG GRID A & C 14 2.6 2.6 0.1

    ALONG GRID B1 TO B2 2 2.4 2.4 0.1

    ! PCC FOR FOOTINGS

    "CC ALONG GRID A & C 14 2.6 2.6 0.07#

    "CC ALONG GRID B1 TO B2 2 2.4 2.4 0.07#

    4 FOOTING

    $ SHUTTERING

    AT%1 14 .6 0.2#

    AT%2 2 . 0.2#

    $$ REBAR (!"# BBS $%&&' 1

    $$$ RCC

    AT %1 (RECTANG'LAR) 14 2.4 2.4 0.2#

    AT %1 (TRA"EOIDAL) 14 1.#AT %2 (RECTANG'LAR) 2 2.2 2.2 0.2#

    AT %1 (TRA"EOIDAL) 2 1.24

    # COLUMN UP TO PLINTH LVL

    SHUTTERING

    $ AT C1 14 !.6# 1.

    AT C2 2 !.6# 1.46

    DED'CTION AT GRADE LEVEL

    AT GB! BEAM 'NCTION %OR C1 -20 0.2! 0.!

    AT GB4 BEAM 'NCTION %OR C1 -4 0.2! 0.4#AT GB1 BEAM 'NCTION %OR C1 -10 0.! 0.6

    AT GB2 BEAM 'NCTION %OR C1 -4 0.2! 0.4#

    AT GB1 IN CANTILEVER %OR C2 -1 0.2! 0.6

    AT GB! IN CANTILEVER %OR C2 -1 0.2! 0.!

    PROJECT ) !!+11 ,VA 'B TATION WOR, NORT CENNAI.

    SITE ) MADAVARAM

    CLIENT ) M+. DRA,E & C'LL WATER & ENERG "VT LTD.

    MEASUREMNT ARRIVED BY) M/.Ma3 Na53/ ( Maa3/ C$8$9:DWE) a M/.Ra;a/E:a/$$):M/.Aba/a>a ($=3 E)

    CHECKED * RE+ARRIVED BY ) M/.$8a>?b/aa$a(E$33/ C$8$9:DWE) a M/.Aba/

    LENGTHIN M

    WIDTHIN M

    HEIGHT/ DEPTH

    IN M

  • 7/24/2019 Variation Study for Madhavaram Site.

    40/17040 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    DED'CTION AT "LINT LEVEL

    AT BEAM "B! 'NCTION %OR C1 -20 0.2! 0.!

    AT BEAM "B2 'NCTION %OR C1 & C2 - 0.2! 0.4#

    AT BEAM "B1 'NCTION %OR C1 -6 0.2! 0.4#

    AT BEAM "B6 'NCTION %OR C1 -2 0.! 0.7#

    ATBEAM "B4 'NCTION %OR C2 -4 0.2! 0.4#

    $$ REBAR 1

    $$$ RCC COLUMN

    AT C1 14 !.6# 0.4 0.#

    AT C2 2 !.6# 0.2! 0.#

    6 GRADE BEAM$ PCC

    AT GB-1 # 10.# 0.# 0.07#

    AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.# 0.07#

    AT GB-2 2 4.7# 0.4! 0.07#

    AT GB-2 2 #.2# 0.4! 0.07#

    AT GB-! 10 !.! 0.4! 0.07#

    AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.4! 0.07#

    AT GB-4 ! !.! 0.4! 0.07#

    $$I REBAR 1IVSHURTTERING FOR GBEAMS

    AT GB-1 10 10.# 0.6

    AT GB-1 Ca=$9383/ @/ >=a$/ 1 1.# 0.6

    AT GB-2 4 4.7# 0.4#

    AT GB-2 4 #.2# 0.4#

    AT GB-! 20 !.! 0.!

    AT GB-! Ca=$9383/ @/ >=a$/ 1 1.# 0.!

    AT GB-4 6 !.! 0.4#

    8 RCCAT GB-1 # 10.# 0.! 0.6

    AT GB-2 2 4.7# 0.2! 0.4#

    AT GB-2 2 #.2# 0.2! 0.4#

    AT GB-! 10 !.! 0.2! 0.!

    AT GB-4 ! !.! 0.2! 0.4#

    GB1 %OR TAIR 1 1.# 0.! 0.6

    GB! %OR TAIR 1 1.# 0.! 0.!

    7 BACK FILLING STAGE ,

    RE%ER EXCAVTION T 1 2!1.4!DED'CTION

    RIVER AND %ILLING BELOW %OOTING -1 10.616

    "CC BELOW %OOTING -1 7.62

  • 7/24/2019 Variation Study for Madhavaram Site.

    41/17041 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    RCC %OOTING -1 46.06

    COL'MN -1 11.06

    GARDE BEAM "CC -1 4.10

    PLINTH BEAM

    SHUTTERING

    AT "B-1 2 10.# 0.7#

    AT "B-2 4 4.7# 0.4#

    AT "B-2 4 #.2# 0.4#

    AT "B-! 1 !.! 0.!

    AT "B-4 6 !.! 0.4#

    AT "B-# 4 !.!# 0.4#

    AT "B-6 1.2! 0.4#

    REBARRCC

    AT "B-1 1 10.# 0.! 0.7#

    AT "B-2 2 4.7# 0.2! 0.4#

    AT "B-2 2 #.2# 0.2! 0.4#

    AT "B-! !.! 0.2! 0.!

    AT "B-4 4 !.! 0.2! 0.4#

    AT "B-# 2 !.47 0.2! 0.4#

    AT "B-6 4 1.# 0.2! 0.4#

    STAIRS FROM FGL TO -,.M$ 'TTERING

    %OR RIER WALL 4 1.# 0.2

    GRO'ND LANDING 2 1 1.7#

    WAIT LAB 2 !.06 1.7#

    EDGE IDE 2 4.06 0.1#

    LANDING 2 !.! 1.7#

    $$ REBAR

    $$$RCCRAIER WALL 2 1.# 0.1# 0.2

    GRO'ND LANDING 2 1 1.77 0.1#

    WAIT LAB 2 !.06 1.77 0.1#

    LANDING 2 !.! 1.77 0.1#

    10BRICK WORK BELOW PLINTH

    AT "B1 1 10.# 0.2! 1.1

    AT "B2 2 4.7# 0.2! 1.4

    AT "B2 2 #.2# 0.2! 1.4

    AT "B! !.! 0.2! 1.##AT "B4 4 !.! 0.2! 1.4

    AT "B# 2 !.! 0.2! 1.#

    AT "B6 2 1.# 0.2! 1.#

    TE" %ROM 0M LVL TO 1.# M LVL 1.7# 0.2! 0.1#

  • 7/24/2019 Variation Study for Madhavaram Site.

    42/17042 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    11CABLE TRENCH

    $ RIVER SAND FILLING 2 1.1# 2 0.1

    2 6.# 2 0.1

    1 6.# 2.1 0.1

    $$ PCC 2 1.1# 2 0.07#

    2 6.# 2 0.07#

    1 6.# 2.1 0.07#

    $$ SHUTTERING

    'TTERING %OR RA%T 2 12.4# 0.2

    4 6.7 0.2

    'TTERING %OR WALL 2 17.7# 1.6#

    2 10.1 1.#

    4 6.642# 1.#4 6.242# 1.#

    4 7.1 1.#

    4 6.7 1.#

    'TTERING %OR COVER LAB ! 7.1 1.#

    4 1.# 1.#

    DEDUCTIONS

    'N O% IN COMING CABLE D'CT

    WALL -2 1.# 1.#

    D3?

  • 7/24/2019 Variation Study for Madhavaram Site.

    43/1704! 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    GRADE BEAM GB1 -4 10.#0 0.! 0.6

    $ RIVER AND %ILLING 1 12.4# 6.7 0.0

    1 10.27 !.! 0.0

    $$ "CC 1 12.4# 6.7 0.1

    1 10.27 !.! 0.1

    $$$REBAR

    TOTAL(A

    B SUPER STRUCTURE UP TO FF

    1 COLUMN UP TO FF

    $ REBAR$$ 'TTERING

    AT C1 14 4.42 1.

    AT C2 2 4.42 1.46

    DED'CTION AT BEAM LEVEL

    AT BEAM %B4 'NCTION %OR C1 -20 0.2! 0.4

    AT BEAM %B# 'NCTION IN C1 -4 0.2! 0.6

    AT BEAM %B 'NCTION IN C1 -2 0.2! 0.#

    AT BEAM %B1 'NCTION IN C1 -10 0.4 0.7#

    AT BEAM %B2&%B! 'NCTION IN C1 - 0.2! 0.6

    AT BEAM %B6 'NCTION %OR C1 -7 0.2! 0.4L$=39 ?

  • 7/24/2019 Variation Study for Madhavaram Site.

    44/17044 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    MID LVL 4.# 1 !. 0.11# 0.!

    DRO" ABOVE VARANDA 1 2#.6 0.0 1

    ! FF BEAM

    $ REBAR

    $$ 'TTEREING

    AT %B-1 # 10.# 1.62

    AT %B-2 2 4.7# 1.1#

    AT %B-! 2 #.2# 1.1#

    AT %B-4 10 !.! 0.7#

    AT %B-# 2 !.! 1.1#

    AT %B-6 7 1.#2 0.2

    AT %B-7 6 !.! 0.#7

    AT %B- 1 !.! 0.#ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.!

    $$$RCC

    AT %B-1 # 10.# 0.4 0.7#

    AT %B-2 2 4.7# 0.2! 0.6

    AT %B-! 2 #.2# 0.2! 0.6

    AT %B-4 10 !.! 0.2! 0.4

    AT %B-# ! !.! 0.2! 0.6

    AT %B-6 7 1.# 0.! 0.4

    AT %B-7 6 !.4 0.2! 0.!AT %B- 1 !.! 0.2! 0.#

    ABOVE ROLLING 'TTER- "B-6 2 1.7# 0.2! 0.4#

    4 FF SLAB

    $ 'TTERING

    % 1 # 10.#4 !.!000

    %! 1 #.4# !.!000

    %2 6 1.4# !.!000

    O'TER IDE 2 !!.60 0.1400

    ADDITIONAL LAB ABOVE R 'TTERO'TER IDE 2 2.7# 0.1#

    LANDING A LI,E G% 2 2.7# 1.7#

    $$ REBAR 1

    $$$RCC

    %-1 4 10.# !.! 0.14

    %-1 1 10.# !.!# 0.14

    %-2 6 !.4 1.#2 0.14

    %B-! 1 #.!# !.!# 0.1#

    LAB ABOVE ROLLING 1 2.7# 1.7# 0.1#

    1 STAIR FROM -,.1M TO+ 1.21M LVL

    $ 'TTERING %OR TAIR '" TO %%

    MID LANDING BEAM AT !.67#M 1 !.74# 0.!

  • 7/24/2019 Variation Study for Madhavaram Site.

    45/1704# 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    MID LANDING LAB AT !.67#M 1 !.74# 1.!#

    WAIT LAB 1 &2 2 4.0# 2.0!

    I$REBAR

    I$IRCC

    TAIR %ROM 1.#M TO- #.#M LVL

    MID LANDING BEAM AT !.67#M 1 !.! 0.2! 0.4#

    MID LANDING LAB AT !.67#M 1 !.!# 1.!# 0.2

    WAIT LAB 1 &2 2 4.06 1.6 0.2

    6 34 BRICK WORKS AT GFALONG GRID A&C 12 !.! 0.2! !.7ALONG GRID 1:2 2 10 0.2! !.6#ALONG GRID 7 1 10.# 0.2! !.6#

    WALL BETWEEN GRID B& C 1 !.! 0.2! !.#TE" %ROM 1.# TO %% 14 1.72 0.2# 0.14#

    DED'CTION

    WINDOW -W -12 1.1 0.2! 1.4

    VENTILATOR-V -10 1.1 0.2! 0.#

    VENTILATOR-V -! 0. 0.2! 0.#

    DOOR D1 -! 0. 0.2! 2.1

    ROLLING 'TTER -1 2.7# 0.2! !.6

    COLLA"ABLE GATE -1 1.# 0.2! 2.4

    OLLE -1 1.2 0.2! 1.2

    7 5.14HALF BRICK WALL

    WALL AT GRID B 1 !.! !.#

    WALL AT TOILET 2 1. !.#

    DED'CTION 2 1.0# !.#

    DOOR D2 -2 0. 2.1

    TOTAL(B

    C SUP STRUC. FROM FF TO ROOF

    1 COLUMN UP TO ROOF

    $ REBAR

    $$ 'TTERING

    AT C1 14 !.# 1.

    AT C2 2 !.# 1.46

    DED'CTION AT BEAM LEVEL

    AT BEAM RB4 'NCTION IN C1 -22 0.2! 0.4

    AT BEAM RB7 'NCTION IN C1 -2 0.2! 0.#

    AT BEAM RB1 'NCTION IN C1 -10 0.4 0.7#

    AT BEAM RB6 'NCTION IN C1 -4 0.2! 0.#

    AT BEAM RB# 'NCTION IN C1 -7 0.2! 0.#

    ATBEAM 'NCTION C2 -6 0.2! 0.#

    $$$RCC

  • 7/24/2019 Variation Study for Madhavaram Site.

    46/17046 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    AT C1 14 !.# 0.4 0.#

    AT C2 2 !.# 0.2! 0.#

    2 LINTEL 6SSHADE* LATH (DROP

    $ 'TTERING %OR 'N ADE 1.6 0.7

    'TTERING %OR LINTEL 24 !.! 0.!

    1 10.# 0.6

    2 10 0.6

    LO%T 2 1.1# 0.6

    2 .! 0.6

    DRO" ABOVE VARANDA 1 2#.6 1

    IIREBAR

    $$$ RCC 'N ADE 1.6 0.6 0.1RCC LINTEL 12 !.! 0.2! 0.!

    1 10.# 0.2! 0.!

    ABOVE 4.# WALL 1 2.77# 0.11# 0.!

    1 !.76 0.2! 0.!

    LO%T 2 1.1# 0.6 0.0

    2 .!4 0.6 0.0

    DRO" ABOVE VARANDA 1 2#.6 0.0 1

    ! ROOF BEAM

    $ SHUTTERINGAT RB1 # 10.# 1.62

    AT RB! 6 !.4 0.6

    AT RB4 11 !.! 0.

    AT RB# 7 0.7# 1.27

    AT RB6 2 10 0.72

    AT RB7 1 !.! 0.#

    $$ REBAR

    $$$RCC

    AT RB1 # 10.# 0.4 0.7#AT RB! 6 !.4 0.2! 0.!

    AT RB4 11 !.! 0.2! 0.4

    AT RB# 7 1.# 0.! 0.#

    AT RB6 2 10 0.2! 0.#

    AT RB7 1 !.! 0.2! 0.#

    4 ROOF SLAB

    $ SHUTTERING

    # 10.#0 !.!0

    1 #.2# !.!06 1.#4 !.!0

    O'TER IDE 2 !4.06 0.1#

    $$ REBAR

  • 7/24/2019 Variation Study for Madhavaram Site.

    47/17047 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    $$$RCC

    RI 4 10.#0 !.!0 0.14

    RI 1 10.#0 !.! 0.14

    R! 1 #.! !.! 0.14

    R2 6 1.#2 !.40 0.14

    # 34 BRICK WORKS AT FF

    ALONG GRID A&C 11 !.! 0.2! 2.

    ALONG GRID 1:2 2 10 0.2! 2.7#

    ALONG GRID 1:2&7 1 10.# 0.2! 2.4#

    WALL BETWEEN GRID A& C 2 !.! 0.2! 2.6

    TE" 11 1.7! 0.2# 0.14#

    DED'CTION

    WINDOW -W -11 1.1 0.2! 1.4

    VENTILATOR-V -7 0. 0.2! 0.#DOOR D1 -2 0. 0.2! 2.1

    DOOR D -2 0. 0.2! 2.1

    OLL -1 1.2 0.2! 1.2

    6 5.14WALL AT FF

    WALL AT GEN TOILET 2 1.# !.0#

    2 1.0# !.0#

    WALL AT LADIE TOILET 1 1.# !.0#

    2 1.1# !.0#

    DED'CTION -DOOR D2 -4 0. 2.1

    #(a) 34 BRICK WORKS AT VARANDAH 1 2# 0.2! 0.

    7 STAIR CASE STRUCTURE

    $ SHUTTERING

    TAIR %ROM #.#M TO .04

    MID LANDING BEAM AT 7.44#M 1 !.74# 0.!

    MID LANDING LAB AT .04M 1 !.74# 1.!#

    MALL LANDING AT #.#MLVL 1 1.6 0.7#

    WAIT LAB ! & 4 2 !.12 2.0!

    $$ REBAR FOR STAIR 1

    $$$ RCC FOR STAIR

    TAIR %ROM #.#M TO .04

    MID LANDING BEAM AT 7.44#M 1 !.74# 0.2! 0.4#

    MID LANDING LAB AT .04M 1 !.74# 1.!# 0.2

    MALL LANDING AT #.#MLVL 1 1.6 0.7# 0.2

    WAIT LAB !&4 2 !.12 1.6 0.2

    ROOF WORKS

    a. ROOF LVL RCC * %&ad !""#

    $ SHUTTEREING

    B1 O?=3/ >$3 1 !.!0 0.#00

  • 7/24/2019 Variation Study for Madhavaram Site.

    48/1704 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    B1 I3/ >$3 ! !.470 0.!60

    B2 O?=3/ >$3 2 7.11# 0.#00

    B2 I3/ >$3 2 6.42# 0.!60

    B! O?=3/ >$3 1 !.!0 0.!00

    B! I3/ >$3 1 !.470 0.160

    1 1 7.11# !.!0

    C1 2 1.00 2.200

    C2 2 1.460 2.200

    $$ REBAR

    $$$ RCC

    COL'MN C1 AT "ARA"ET 0.0 0.40 0.#0

    COL'MN C1 2 2.40 0.40 0.#0

    COL'MN C2 2 2.40 0.2! 0.#0

    BEAM B1 2 !.!0 0.2! 0.#0BEAM B2 2 #.7 0.2! 0.#0

    BEAM ! 1 !.! 0.2! 0.!

    LAB 1 1 6.42# !.47 0.14

    b BRICK WORK 34

    AT "ARA"ET 6 !.! 0.2! 0.

    1 10.# 0.2! 0.

    1 #.2# 0.2! 0.

    AT EAD ROOM 1 16.17 0.2! 1.

    EAD ROOM "ARA"ET 1 20. 0.2! 0.!DED'CTION

    DOOR D1 -1 0. 0.2! 1.

    WINDOW -1 1.1 0.2! 1.4

    OLL -1 1.2 0.2! 1.2

    < BRICK WORKS+34 IN PASSAGE 1 2# 0.2! 0.

    TOTAL ( C

    DEXTERNAL FINISHING AND YARD WORKS

    TAGE 4 "AMENT 20EXTERNAL WOR, & ARD

    1 TRAN%ORMER "LINT

    a EXCAVATION

    TRAN%ORMER %O'NDATION 1 !. 12. 1.#

    CABLE TRENC 2 1.2 12. 1.#

    2 ! 1.2 1.#

    b RIVER AND %ILLING 1 12.# 6.2 0.1

    < "CC 1 12.# 6.2 0.07#

    SHUTTERING

    1 2#.22 0.2#

    TRA" BEAM 2 1.76 0.!#

    TRAN%ORMER %O'NDATION & %IRE WALL-BAE

  • 7/24/2019 Variation Study for Madhavaram Site.

    49/1704 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    COL'MN 1.2 2.10

    2 1.!6 2.10

    BEAM B1 2.47# 0.!2#

    BEAM B2 4 2.47# 0.!2#

    LAB 1 !.!# !.!#

    %IRE WALL 2 4.2! 4.#0

    CABLE D'CT RA%T ALONG "LINT 2 1 0.20

    CABLE D'CT RA%T ARRO'ND "LINT-WALL 2 72 1.!0

    COVER LAB 2 1 1.2

    DEDUCTIONS

    'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.!0

    3 REBAR FOR TRS. FORMER FND 2

    @ RCCTRAN%ORMER %O'NDATION 1 .! !.27# 0.2#

    TRA" BEAM 2 .! 0.# 0.!#

    COL'MN C1 0.! 0.! 2.10

    BELOW GRO'ND C2 2 0.4# 0.! 1.00

    ABOVE GROND C2 2 0.4# 0.2! 1.10

    BEAM AT %LOOR LEVEL B1 4 2.17# 0.! 0.!!

    BEAM AT %LOOR LEVEL B2 2.17# 0.! 0.!!

    LAB AT "LINT 2 ! ! 0.1

    %IRE WALL 1 4.# 0.2! 4.#

    CABLE DUCT AROUND PLINTHRA%T 2 12.07 1.# 0.20

    4 ! 1.# 0.20

    WALL 1 46.4 0.1# 1.##

    2.17# 0.1# 1.##

    COVER LAB 2 12.07 1.2 0.1#

    4 ! 1.2 0.1#

    DEDUCTIONS

    'N O% CABLE D'CT %ROM CNT. ROOM -2 !.2# 1.! 0.1#

    2

    $ EARTH WORK EXCAVATION 1 2.# 4.2 1.#0

    $$ RIVER SAND 1 2.# !. 0.0

    $$$ PCC 1 2.# !. 0.10

    $8 SHUTTEREING

    RA%T 2 12 0.20

    WALL 2 24 1.#0

    COVER ALB 2 6 1.#8 REBAR

    8$ RCC

    RA%T 1 2.# !.6# 0.20

    WALL 2 2.# 0.2 1.20

    CABLE DUCT FROM PLINTH TOBUILDING

    CABLE D'CT %ROM TRAN%ORMER TOB'ILDING

  • 7/24/2019 Variation Study for Madhavaram Site.

    50/170#0 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    1 2.# 0.2# 1.20

    BEAM 2 !.6# 0.! 0.!0

    BEAM 1 !.6# 0.!# 0.20

    COVER LAB 1 2.# !.6 0.20

    ! INCOMING CABLE TRENCH

    $ EXCAVATION 2 !.7 2.# 1.#0

    $$ SAND FILLING 2 !.7 2.1 0.0

    $$$ PCC 2 !.7 2.1 0.10

    $8 SHUTTERING

    RAFT 2 .! 0.20

    WALLL 4 !.7 1.!0

    4 !.7 1.1#

    COVER 2 !.7 1.#

    8 REBAR

    8$ RCC

    RA%T 2 !.7 1. 0.20

    WALL 4 !.7 1.2 0.20

    COVER 2 !.7 1. 0.1#

    4 BACK FILLING 7RD STAGE

    RE%ER T O% EXCAVATION

    DED'CTION

    R AND %ILLING O% TRAN %DN"CC O% TRAN %DN

    RCC O% TRAN %DN

    # "AVING 1 66.40 1

    6 ROAD

    ROAD BAE (METAL & GRAVEL) 1 1#.00 0.! 6

    "CC B 40MM M#-1F4F 1 1#.00 0.1# 6

    RCC B 20MM M1# 1 1#.00 0.1# 6

    TO"ING B !TO 10MM M1# 1 1#.00 0.0# 6

    REBAR 27# MM C+C-(!.0! ,G+M) 1ROAD+ M 1 1#.00 6

    7 'G 'M" (L'M"'M)

    a EXCAVATION 1 4.#0 2.7 1.#

    b RIVER AND %ILLING 1 4.10 2.! 0.1

    < "CC 1 4.10 2.! 0.1

    'TTERING

    %LOOR 1 12.00 0.2

    WALL 1 22.0 2.1

    COVER LAB 1 !.0 2.1

    3 REBAR 22,G+M O% 'R%ACE AREA 1 44.70 22

    @RCC

    RCC %LOOR 1 !.0 2.1 0.2

  • 7/24/2019 Variation Study for Madhavaram Site.

    51/170#1 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    RCC WALL 1 11.40 2.1 0.1#

    RCC COVER LAB 1 !.0 2.1 0.1#

    "LATERING

    %LOOR 1 !.00 1.

    WALL 1 .60 2.2

    CEILING 1 !.00 1.

    MANOLE COVER 1

    WEATERING CO'RE & TILING 1 21.7 10.#

    YARD OPEN AREA FILLING 5TH STAGE

    IE O% TE "LTOT 1 42.7!# 16.21 0.7

    DED'CTION %OR BLG AREA -1 22.2 11 0.7

    TRAN%ORMER ARD -1 12.!0 6 0.7

    CABLE TRENCE AREA -1 2.#0 !.6 0.7

    INCOMING TRENC AREA -2 !.70 1. 0.7WATER TAN, -1 !.40 2.2 0.7

    TAIR AREA -2 7.40 1.7# 0.7

    TOTAL OF (D

    E FINISHING WORKS

    1 PLASTERING INTERNAL

    a GF

    WALL-CONTROL ROOM 1 #7.!1 4.2#

    DED'CTION

    W -12 1.1 1.4V - 1.1 0.#

    R -1 2.7# 4.1

    D1 -2 0. 2.1

    D1 -1 1.2 2.1

    B3a ?/@a -4 0.11# !.

    D1 & D2 -# 0. 2.1'RINAL ENTR -2 1.0# !.

    VENTILATOR -! 0. 0.6

    D1 BATTER ROOM -1 1.2 2.1

    TAIR ROOM 1 17.27 4.2#

    DED'CTION %OR CG -1 1.# 2.1

    DED'CTION %OR OLLE -1 1.2 1.2

    b PLASTERING INTERNAL FF

    WALL O%%ICE 1 #7.! !.!

    DED'CTIONW -11 1.1 1.4

    D1 -2 0. 2.1

    D -2 1.1 2.1

    GENT TOILET+BAT 2 #.1 !.!

  • 7/24/2019 Variation Study for Madhavaram Site.

    52/170#2 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    WALL 'RINAL+"AAGE 1 12.4 !.!

    DED'CTION %OR DOOR-D2& D1 -# 0. 2.1

    VENTILATOR -# 0. 0.6

    LADIE TOILET 2 #.# !.!

    DED'CTION %OR DOOR-D1 -2 0. 2

    "AAGE 1 .!2 !.!

    DED'CTION D1 & D2 -# 0. 2.1

    VENTILATOR -2 0. 0.6

    TAIR ROOM AT %IRT %LOOR 1 17.27 !.!

    DED'CTION AT ENTRANCE -1 !.! !.1

    OLL -1 1.2 1.2

    < EAD ROOM

    WALL 1 16.# 2.2#

    DED'CTION DOOR -1 0. 1.WINDOW -1 1.1 1.4

    OLL -1 1.2 1.2

    2 CEILING PLASTERING

    G

    CEILING 1 1.1# 10.#

    %B1 BEAM DRO" 4 10.# 1.2

    WET AREA 1 !.!# !.01#

    BATTER ROOM 1 !.!# 2.24

    TAIR MID LANDING 1 !.!# 1.4WAIT 1 &2 2 1.7 4.06

    VARANDA 1 22 1.7#

    %B6 BEAM DRO" 7 1.# 0.#2

    %B7 BEAM DRO" 6 !.! 0.16

    RAIR AT 00 LVL

    WAIT 2 !.1!47 1.#

    O%%IT 2 !.!# 1.#

    BEAM "" # &6 DRO" 2 6.47 0.2#

    b CEILING PLASTERING FF

    O%%ICE 1 1.1 10.#

    LO%T 1 ## 1.2

    WEWT AREA 1 !.!# #

    VARANDA 1 22.2 1.7#

    RB1 BEAM DRO" 4 10.# 1.2

    RB# BEAM DRO" 6 1.# 0.72

    RB! BEAM DRO" 6 !.! 0.!

    TAIR AREAMID LANDING 1 !.74# 1.!#

    MALL LANDING 1 1.6 0.7#

    WAIT LAB ! & 4 2 !.12 2.0!

  • 7/24/2019 Variation Study for Madhavaram Site.

    53/170#! 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    C EAD ROOM

    CEILING 1 6.# !.!

    BEAM DRO" B! 1 !.! 0.1#

    BEAM DRO" B2 2 1.# 0.!#

    ! PAINTING INTERNAL

    a G%

    WALL R%E%ER T %ROM "LATER

    DED'CT WALL TILING G%

    CEILING

    b FF

    WALL RE% T %ROM "LATER

    DED'CT WALL TILING %%

    CEILING

    4 FLOORING

    a GROUND FLOOR

    CERAMIC %LOORING 1 1.1# 10.#

    DED'CTION %OR CABLE TRENC

    -1 14.!# 1.

    -1 12.## 1.

    GENT TOILET-%LOORING 1 !.1## 2.

    BATTER ROOM 1 !.!# 2.24ACCE TE" & TAIR

    %LOOR LANDING LAB AT 0.00M LVL 2 !.7 1.7#

    TE" 20 1.7# 0.46

    TAIR "AAGE AT ENTRANCE 1 #.2# !.!#

    b FLOOR TILING GF STAIR

    MID LANDING AT !.67#M LVL 1 !.!# 1.2#

    TE" 2 1.6 0.!#

    < FLOOR TILING FF%%-%LOORING 1 1.1# 10.#

    GENT TOILET-%LOORING 1 !.!# !.01#

    LADIE TOILET 1 !.!# 2.24

    "AAGE AT VARANDA 1 22.2 1.6!

    TAIR

    TE" %ROM %% TO ROO% 20 1.6 0.!#

    MALL LANDING AT #.#MLVL 1 !.!# 0.7#

    MID LANDING LAB 1 !.!# 1.2#

    LANDING AT .04MLVL 1 !.!# 1.12

    2 WALL DADO

    a GROUND FLOOR

    WALL TOILET+BAT 2 #. 2.1

    WALL 'RINAL 1 4.7## 2.1

  • 7/24/2019 Variation Study for Madhavaram Site.

    54/170#4 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    BAT "AAGE 1 .77 2.1

    DED'CTION %OR DOOR-D2 -4 0. 2.1

    VENTILATOR -! 0. 0.6

    DED'CTION %OR DOOR-D1 -1 0. 2.1

    WALL SKIRTING

    TAIR AREA 1 17.27 0.1

    DED'CTION %O CG -1 1.# 0.1

    CONTROLL ROOM WALL TILING 2 1.1# 2.1

    2 10.# 2.1

    DEDUCTION

    WINDOW -12 1.1 1.4

    DOOR -2 0. 2.1

    DOOR -1 1.2 2.1

    ROLLING 'TTER -1 2.7# 2.1

    b FFGENT TOILET+BAT 2 #.1 2.1

    WALL 'RINAL+"AAGE 1 12.4 2.1

    DED'CTION %OR DOOR-D2& D1 -# 0. 2.1

    VENTILATOR -# 0. 0.6

    LADIE TOILET 2 #.# 2.1

    DED'CTION %OR DOOR-D1 -2 0. 2

    "AAGE 1 .!2 2.1

    DED'CTION D1 & D2 -# 0. 2.1

    VENTILATOR -2 0. 0.6

    ,IRTINGO%%ICE 1 #7.!7 0.1

    DED'CTION DOOR D -2 1.1 0.1

    DOOR D1 -2 0. 0.1

    TAIR AREA 1 17.27 0.1

    DED'CTION %OR ENTRANCE -1 !.! 0.1

    "AAGE 2 2!.# 0.1

    DED'CTION %OR D -2 1.1 0.1

    ! EXTERNAL %INIING WOR,

    a "LATERING EXTERENAL WALL 1 6.2 11.14CORNICE AT "ARA"ET LVL 1 66.4

    AT EAD ROOM ROO% 1 22.2

    COL'MN "EOECTION O'T 12 0.2# 10.7#

    COL'MN "EOECTION EAT+WET ! 0.17 10.7#

    WARANDA "ARA"ET WALL AT %% 1 2# 1.

    LAB ABOVE ROLLING 'TTER 1 #.17 2.7!

    DRO" AT %IRT %LOOR LVL 1 2# 2.1

    COL'MN AT NORT 12 0.2# .!

    ROO% LEVEL DRO" ABOVE VARANDA 1 2#.7 2.1

    'NADE ABOVE WINDOW AT G% 7 !.4 1.2

    'NADE AT %% !.4 1.2

    EAD ROOM "LATERING EXTERNAL 1 1.1! 2.4

    EAD ROOM "ARA"ET 1 22.2 0.6

  • 7/24/2019 Variation Study for Madhavaram Site.

    55/170## 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    COL'MN %ACE 1 1.1 2.7

    "ARA"ET IN "AAGE AT ROO% 2 1.# 1.

    DED'CTION

    WINDOW -24 0.72 1.02

    CG -1 1.04 1.7

    R -1 2.2 !.7

    DOOR D AT %% -2 0.64 1.7

    DED'CTION %OR TAIR ENTR %% -1 !.! !.7

    DOOD D AT ROO% D1 -1 0.44 1.7

    OLL -! 0.74 0.74

    %IRE WALL 1 .2# .#

    4 EXTERNAL "AINTING

    EXTERNAL WALL

    # AND RAIL

    ANDRAIL AT O TO 1.#M 2

    ANDRAIL AT TAIR

    WAIT LAB 1 &2 2 4.0#

    WAIT LAB !&4 2 !.12

    6 WATER TAN, 1000 LITER 2

    7 BATER ROOM WALL ACID REITANT 1 10.2# 2.1

    ELECTRICAL WOR, WIT %ITTING 1

    "L'M"ING & ANITARWERE 110 EWAGE+ DRAINAGE WOR, !0

    11E"TIC TAN,& OA,WA WIT COVER 1

    12 RAIN WATER LINE & ARVETING 1

    1! 1

    14 IN"ECTION CAMBER !

    1# G'LL TRA" 2

    16 OINERIE

    a DOOR D (CW C %L' DOOR) 2 1.1 2.1

    DOOR D1 (CW C %L' DOOR) 6 0. 2.1

    b DOOR D2 ("VC DOOR) 6 0. 2.1

    < ROLLING 'TTER 1 2.7# !.6

    COLLA"IBLE GATE(M) 1 1.# 2.1

    3 WINDOW(AL'MINI'M) 2! 1.1 1.4

    VENTILATOR IN CONTROL ROOM 10 1.1 0.#

    VENTILATOR IN TOILET 0. 0.#

    WINDOW IN TE "LACE O% OLL 1 1.2 1.2

    VENTILATOR IN CONTROL ROOM 1.1 0.#

    VENTILATOR IN TOILET 10 0. 0.#

    @ GRILL WIT "AINTING W1 2#+>J 2! 1.1 1.4

    ENTRANCE GATE 6 H$3 2M WIC,EDGATE

  • 7/24/2019 Variation Study for Madhavaram Site.

    56/170#6 1-12

    SI NO DESCRIPTION OF ACTIVITIES NOSLENGTH

    IN MWIDTHIN M

    HEIGHT/ DEPTH

    IN M

    WINDOW IN TE "LACE O% OLL 1 1.2 1.2

    20 NAME BOARD AT ROO% 1

    21 BOREWELL 1

    22 ACCE LADDER M- 4M AT ROO% 1

    SUB TOTAL (E

    TOTAL

    NOTE ) ALL SPECIAL WORKS BO8S ARE DIRECTLY POSTED IN ABSTRACT

    IM"ORTED EART %OR %ILLING K%ILLING-EXCAVATION

  • 7/24/2019 Variation Study for Madhavaram Site.

    57/170#7 1-12

    TERPRISES

    8TY SUB TOTAL

    1.2

    2!.04 212.!2 212.!2

    17.0!#22.07!6 1.10 1.11

    .464

    1.1#2 10.616 10.616

    7.0

    0.64 7.62 7.62

    !!.6

    4.4 ! !

    2.!244 2.!244 2.!244

    20.16

    21.002.42

    2.4 46.06

    1.

    10.6#

    -1.!

    -0.414-1.

    -0.414

    -0.1!

    -0.06

    a ("/;3a($=3 E)

    EXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

  • 7/24/2019 Variation Study for Madhavaram Site.

    58/170# 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    -1.!

    -0.2

    -0.621

    -0.4#

    -0.414 4.7! 4.7!

    #.0!1 #.0!1 #.0!1

    10.22

    0.4 11.06

    1.7

    0.06

    0.!1

    0.!4

    1.06

    0.0#

    0.!2 4.10 4.10

    !.16 !.16 !.16

    6!

    0.

    .##

    .4#

    1.

    0.4#

    .1 111.06 111.06

    .4#

    0.

    1.0

    2.2

    1.02

    0.27

    0.14 1#.2!

    2!1.4!

    -10.616

    -7.62

  • 7/24/2019 Variation Study for Madhavaram Site.

    59/170# 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    -46.060

    -11.060

    -4.102 1#1.62

    1#.7#

    .##

    .4#

    17.2

    .1

    6.0!

    4.42 70.! 70.!

    2.!77 2.!77 2.!77

    2.!6

    0.

    1.0

    2.0#

    1.!7

    0.72

    0.62 .1

    1.20

    !.#0

    10.71

    1.22

    11.## 2.1 2.1

    0.# 0.# 0.#

    0.0

    0.#!

    1.62

    1.7# 4.00

    2.66

    !.06

    !.!

    10.#4.2#

    2.6

    1.!#

    0.#4 2.7

  • 7/24/2019 Variation Study for Madhavaram Site.

    60/17060 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    7.27

    2.60

    1.!7 11.24 11.24

    #.46

    1.#

    1.02 .4! .4!

    4.4

    #.!6

    #.60#

    !0.!

    !.##!7.4##

    42.6

    40.2

    !1.#

    -4.#

    -1.14

    -4.7# 2.# 2.#

    #.72 #.72 #.72

    1!.2

    7.64

    12.00

    6.06

    7.7!

    .26.07

    1.4

    .7

    -0.0

    -0.2!

    -0. 70.!0

    10.6

    71.#

  • 7/24/2019 Variation Study for Madhavaram Site.

    61/17061 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    -7.#6 24#.2#

    6.6

    2.71 .40 .40

    .!6

    !.! 11.7# 11.7#

    0.!7 0.!7 0.!7

    0,0.70 ,3.,, 7,.0 70.01 70.2 ,3.9

    !.1 !.1 !.1

    111.!

    12.1

    -1.4

    -0.##2

    -0.2!

    -!

    -1.104

    -0.644-2.20

    -0.207 114.#1 114.#1

    12.!

    1.02 1!.!

    1!.44

    1.0

    21.7

    !.6

    2.2

    2#.#0 #.6 #.6

    0.1 0.1 0.1

    1.1#4.6#

    0.2!

    0.11

    0.72

  • 7/24/2019 Variation Study for Madhavaram Site.

    62/17062 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    0.1!

    2.0# .04

    6.02 6.1 6.1

    #.0#

    10.!

    12.0

    24.7#

    7.#

    .72

    11.2

    !.142.1 166.44 166.44

    1#.7#

    1.!1

    1.4#

    !.04

    1.!7

    1.26

    1.410.!

    0.!6 26.!2

    17!.1

    17.

    2.71

    .41

    0.!

    .6! 240.46 240.46

    !.70 !.70 !.70

    1.40

    4.

    4.!4

    2.7!

    0.72 !2.1

    !.11

  • 7/24/2019 Variation Study for Madhavaram Site.

    63/1706! 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    #.1

    16.44 24.74 24.74

    1.0# 1.0# 1.0#

    0.!4

    0.4

    2.60 !.

    !!.7016.7.1

    2.660.7

    -4.2

    -1.#7

    -0.!2

    -1.!0

    -2.2

    -0.!

    -0.!! #1.!

    11.##

    1!.!0

    7.!#

    -!.7 2.42

    70., ,.72

    !.1 !.1 !.1

    .20

    10.22

    -2.024

    -0.2!

    -!

    -0.46

    -0.0#

    -0.6 1.21 1.21

  • 7/24/2019 Variation Study for Madhavaram Site.

    64/17064 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    .0

    0.1 10.61

    .6

    2!.76

    6.!0

    12.00

    24.7!

    12.6#

    2#.60 114.00 114.00

    0.7 0.7

    0.772.7!

    0.72

    0.10

    0.26

    1.7#

    0.0

    2.0# .27

    #.0#

    14.0

    2.04

    6.67

    14.40

    !.14 1#2.!7 1#2.!7

    #.1! #.1! #.1!

    1#.7#1.41

    !.!4

    1.#

    2.!0

    0.! 24.7#

    17!.2#

    17.!!!0.4

    10.22 2!1.2 2!1.2

    !.21 !.21 !.21

  • 7/24/2019 Variation Study for Madhavaram Site.

    65/1706# 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    1.40

    4.

    2.##

    4.!4 !1.27

    2!.!

    12.6#

    #.2

    !.#

    0.6

    -4.42

    -0.7#-0.7

    -0.7

    -0.!! !.!#

    .1#

    6.41

    4.#

    7.02

    -7.#6 1.#

    #.1 #.1

    !.11

    #.1

    1.20

    12.2 22.41 22.41

    0.7 0.7 0.7

    0.!

    1.04

    0.24

    2.04 !.70

    1.6#

  • 7/24/2019 Variation Study for Madhavaram Site.

    66/17066 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    !.74

    7.11#

    4.626

    1.17

    0.###

    27.62

    7.20

    6.424 61.44 61.44

    1.1 1.1 1.1

    1.44

    0.6

    0.##

    0.761.!#

    0.2!

    !.12 .41

    4.10

    2.17

    1.0

    7.07

    1.44

    -0.!

    -0.40

    -0.!! 14.74

    #.1 #.1

    0 0 0 0 672.77 14.#4

    7#.47

    46.44

    10.0 1!2.71 1!2.71

    7.7# 7.7# 7.7#

    #.1 #.1 #.1

    !#.6!

    !#.6!

  • 7/24/2019 Variation Study for Madhavaram Site.

    67/17067 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    20.160

    #.712

    !#.6!

    !#.6!

    11.22!

    !#.6!

    !#.6!

    !#.6!

    4!.200

    -.4#0 !2!.# !2!.#

    6.022! 6.02 6.02

    7.6

    !.2

    1.#1

    0.27

    0.2!

    0.#

    1.70

    !.1#

    #.12

    7.24

    !.60

    10.1

    4.0#

    4.!#

    2.16

    -1.26 #4.!

    1#.7# 1#.7# 1#.7#

    0.76 0.76

    0.# 0.#

    !#.6!

    !#.6!

    1.000 .! .!0.4#4 0.4# 0.4#

    1.!

    1.20

  • 7/24/2019 Variation Study for Madhavaram Site.

    68/1706 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    0.7#

    0.66

    0.26

    1.0 6.4

    27.7# 27.7# 27.7#

    1.24 1.24

    1.## 1.##

    !.72

    1.24

    17.02

    11.10 #1.0 #1.0

    0.!7 0.!7 0.!7

    2.1

    !.##

    2.11 .47

    1!2.71

    -7.7#-#.1

    -#4.! 64.!1

    66.40 66.40

    27.00

    1!.#0

    1!.#0

    4.#0

    0.00 0.00

    1.2! 1.2!

    0.4 0.4

    0.4 0.4

    2.40

    47.

    .1 #.47

    0. 0.

    1.64

  • 7/24/2019 Variation Study for Madhavaram Site.

    69/1706 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    !.#

    1.2! 6.46

    #.40

    21.12

    #.40 !1.2

    1.00

    227.# 227.#

    44.1

    -170.4

    -#1.66

    -6.!0

    -.4-#.24

    -1.1! 222.1

    ,9.0, . 3.91 2.70 55.13 .21

    24!.#7

    -20.6-6.16

    -11.2

    -!.7

    -2.#2

    -1.#

    42.7#

    10!.2#

    -1.7#

    -.4#-7.

    -1.44

    -2.#2

    7!.40

    -!.1#

    -1.44 !.#

    1.0

    -1.21

    -!.7

    -4.62

    !!.66

  • 7/24/2019 Variation Study for Madhavaram Site.

    70/17070 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    40.2

    -.40

    -2.40

    !6.!0

    -!.20

    27.46

    -.40

    -0.6

    #6.

    -10.2!

    -1.44

    !7.!1

    -1.71-1.7#

    -1.44 !#4.1

    10.4

    #0.40

    10.21

    7.#

    4.741#.1

    !.#0

    #.46

    !.17

    .42

    10.16

    !.24 !4.

    10.

    6#.6

    16.!

    !.#

    #0.40

    6.4

    7.72

    #.1

    1.20

    12.2

  • 7/24/2019 Variation Study for Madhavaram Site.

    71/17071 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    2!.27

    0.#1

    1.0# 421.!7

    !#4.1

    -1!2.!6

    !26.1

    !#4.1

    -7#.

    421.!7 1247.67

    10.4

    -27.!!

    -2!.1

    .1#

    7.#

    12.#

    16.10

    17.77 20!.2#

    4.2!

    1.!! 22.#6

    10.4

    10.21

    7.#

    !6.1

    12.64

    2.#4

    4.2!

    !.7 26.12

    24.7

    .

  • 7/24/2019 Variation Study for Madhavaram Site.

    72/17072 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    1.42

    -6.72

    -1.44

    -1.6

    1.7!

    -0.1#

    76.!

    44.10

    -20.6

    -!.7

    -2.#2

    -#.7 1!2.!6

    21.42

    26.04

    -.40

    -2.40

    2!.10

    -!.20

    17.47

    -.40

    -0.6

    #.74

    -0.22

    -0.1

    1.7!

    -0.!!

    4.70

    -0.22 7#.

    7#.7#66.40

    22.20

    !2.2#

    #.4

    4#.00

    14.11

    #2.#0

    27.0

    #!.7

    2.#6

    !2.64

    4!.#1

    1!.!2

  • 7/24/2019 Variation Study for Madhavaram Site.

    73/1707! 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    4.

    #.70

    -17.6!

    -1.4

    -.6

    -2.!

    -12.77

    -0.2

    -1.64

    7. 12#0.00

    12#0.00 12#0.00

    16.00

    .10

    6.!6 !0.46

    2

    21.#! 21.#!

    1

    1!0

    1

    1

    1

    !

    2

    2

    6.00

    11.!4

    .0 .0

    !.1# !.1#

    40.17

    6.4

    4.1

    1.44 #2.6!

    .00

    10.00

    40.17

  • 7/24/2019 Variation Study for Madhavaram Site.

    74/17074 1-12

    8TY SUB TOTALEXCAVATIONIN C'M (1a)

    EXCAVATIONIN C'M (1b)

    RIVERAND

    %ILLING INC'M

    "CC INC'M

    'TTERING IN M

    REBARIN MT

    1.44 116#.00

    1.00 1

    1.00 1

    1.00 1

    0 0 0 0 0 0

    !.#! 1.11 41.01 40.#6 2402.16 #7.#2

    276.!6

  • 7/24/2019 Variation Study for Madhavaram Site.

    75/1707# 1-12

    46.06

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

  • 7/24/2019 Variation Study for Madhavaram Site.

    76/17076 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    11.06

    1#.2!

  • 7/24/2019 Variation Study for Madhavaram Site.

    77/17077 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    1#1.624

    .1

    4.00

    2.7

  • 7/24/2019 Variation Study for Madhavaram Site.

    78/1707 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    70.!0

  • 7/24/2019 Variation Study for Madhavaram Site.

    79/1707 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    24#.2#

    ,11.27 . 02.92 . . . . 73.22

    1!.!

  • 7/24/2019 Variation Study for Madhavaram Site.

    80/1700 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    .04

    26.!2

    !2.1

  • 7/24/2019 Variation Study for Madhavaram Site.

    81/1701 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    !.

    #1.!

    2.42

    25.27 1,.72 02.50

  • 7/24/2019 Variation Study for Madhavaram Site.

    82/1702 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    10.61

    .27

    24.7#

  • 7/24/2019 Variation Study for Madhavaram Site.

    83/170! 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    !1.27

    !.!#

    1.#

    #.1

    !.70

  • 7/24/2019 Variation Study for Madhavaram Site.

    84/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    85/170# 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    #4.!

  • 7/24/2019 Variation Study for Madhavaram Site.

    86/1706 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    6.4

    .47

    64.!1

  • 7/24/2019 Variation Study for Madhavaram Site.

    87/1707 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    222.1

    3.93 . . . . . . 029.,0

    !.#

  • 7/24/2019 Variation Study for Madhavaram Site.

    88/170 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    !#4.1

    !4.

  • 7/24/2019 Variation Study for Madhavaram Site.

    89/170 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    421.!7

  • 7/24/2019 Variation Study for Madhavaram Site.

    90/1700 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

  • 7/24/2019 Variation Study for Madhavaram Site.

    91/1701 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    12#0.00

  • 7/24/2019 Variation Study for Madhavaram Site.

    92/1702 1-12

    RCC ING% C'M

    RCCOTER

    C'M

    BRIC,WOR, IN

    C'M4.#BW IN

    M

    INT ER."LATERIN M

    CEILING"LATERIN M

    EXTL"LATER

    BAC,%ILLING IN

    C'M

    0 0 0 742.77 770.!# 12#0.00 0.00

    22#.62 172.4 144.60 4.01 742.77 770.!# 12#0.00 64.00

  • 7/24/2019 Variation Study for Madhavaram Site.

    93/170! 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    94/1704 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    95/170# 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    96/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    97/1707 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

    . . . .

  • 7/24/2019 Variation Study for Madhavaram Site.

    98/170 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    99/170 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    100/170100 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    101/170101 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    102/170102 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

    0 0 0 0

  • 7/24/2019 Variation Study for Madhavaram Site.

    103/17010! 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    104/170104 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    105/17010# 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

    . . . .

  • 7/24/2019 Variation Study for Madhavaram Site.

    106/170106 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

  • 7/24/2019 Variation Study for Madhavaram Site.

    107/170107 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

    0.00

    1247.67

    20!.2#

    22.#6

    26.12

  • 7/24/2019 Variation Study for Madhavaram Site.

    108/17010 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

    1!2.!6

    7#.

  • 7/24/2019 Variation Study for Madhavaram Site.

    109/17010 1-12

    %LOORTILING IN

    M

    WALLTILING IN

    M

    "AINTINTERNAL

    MEXTER

    "AINTING

    12#0.00

  • 7/24/2019 Variation Study for Madhavaram Site.

    110/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    111/170

    HARINI ENTERPRISES

    BARBENDING SCHEDULE JOINTLY ARRIVED BY M/S. DSWE and HARINI

    M:&! D&'a;=/$b?=$ / 12 2! 14 !22 !.6 11#.20

    %?a=$ %2-a$ / 12 22 2 44 !.4 14.60

    D$>=/$b?=$ / 12 22 2 44 !.4 14.60

    2 C"

  • 7/24/2019 Variation Study for Madhavaram Site.

    112/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    113/170

    M:&! D&'a;!;d A

    T Ma$ R 20 2 1 2 26

    T E=/a a= 3 >?/= 20 1 1 1 1.6

    T E=/a a= $ >?/= 20 1 6 6 2

    B== Ma$ R 16 2 1 2 1

    B== E=/a R a= $=3/3$a=3 b3a> 20 1 6 6 2.6

    B== E=/a R a= 3 b3a 20 1 1 1 2

    B== E=/a R @/ !4 6 204 0.

    2 L3 =$/$> @/ ?/= 20 2 1 2 1.

    B== Ma$ R 20 2 1 2 4.

    B== E=/a 16 2 1 2 4.

    2 L3 =$/$> !4 1 !4 1.

    T @/ b3a $ >=a$/ a/3a 20 2 1 2 4.

    T E=/a a= 3 >?/= 20 2 2 4 1.

    B== Ma$ R 20 2 1 2 4.

    B== E=/a 16 2 1 2 4.

    2 L3 =$/$> !4 1 !4 1.

    4 PLINTH BEAM

    PB,

    T Ma$ R 2# 2 1 2 1

    T E=/a R 2# ! 2 6 4.

    >$ ba/ a= >$3 16 2 1 2 11

    B== Ma$ R 2# 2 1 2 1B== E=/a R 2# ! 1 !

    2 L3 =$/$>

  • 7/24/2019 Variation Study for Madhavaram Site.

    114/170

    M:&! D&'a;!;d

    T Ma$ R 16 2 1 2 1

    T E=/a a= 3 >?/= 20 ! 1 ! 1

    T E=/a $ >?/= 20 ! # 1# 2

    B== Ma$ R 16 ! 1 ! 1

    B== E=/a R 16 1 # # 2

    2 L3 =$/$> !4 # 170 1.0

    PB7 CONTINIOUS a' A >!;d

    T Ma$ R @/ A+6 = A+2 16 2 1 2 1

    T E=/a $ >?/= 20 ! # 1# 2

    B== Ma$ R 16 ! 1 ! 1

    B== E=/a R 16 1 4 4 2

    2 L3 =$/$> !4 4 1!6 1.0

    PB5

    T Ma$ R 83/ 9a H$= "B! 20 2 ! 6 6.!

    T E=/a a= 3 >?/= 20 2 ! 6 1

    B== Ma$ R a= 20 ! ! 4

    B== E=/a R 20 2 ! 6 2

    2 L3 =$/$> !! 4 1!2 1.!

    PB5 AT TOILET AREA

    T & B== Ma$ 20 # 1 # 4.#T 3=/a 20 2 2 4 1.6

    B== E=/a R 20 2 1 2 2

    2 L3 =$/$> !4 1 !4 1.!

    PB1

    T Ma$ R (L/)

    B== Ma$ L R

  • 7/24/2019 Variation Study for Madhavaram Site.

    115/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    116/170

    M:&! D&'a;a3 ba/12# /= >$3 & Ha99 3=3/a9 ' >a3 ba/

    12#

  • 7/24/2019 Variation Study for Madhavaram Site.

    117/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    118/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    119/170

    M:&! D&'a; $3/3 $ %B1

    B== Ma$ 20 2 7 14 2.4

    b== a$ 2# 1 7 7 2.4

    T$3> a= 1!0?/= 2# 2 2 4 2.

    T E=/a a= $ >?/= 2# 2 2 4 4

    B== Ma$ R 20 ! 2 6 1

    B== E=/a R 20 2 2 4 2.

    B== E=/a R 20 2 2 4 !.4

    2 L3 =$/$> a= 100 a= 200 & b== b/ $3/3 $ %B6

  • 7/24/2019 Variation Study for Madhavaram Site.

    120/170

    M:&! D&'a;!;d A

    T Ma$ @/ %B4 T %B 20 2 1 2 1

    T a$ 83/ 9a a= %B 20 2 1 2 1

    T 3=/a a= a= 3 >?/= a= %b4 & %B 20 2 2 4 1

    T E=/a a= $ >?/= 20 2 # 10 2

    B== a$ @/ %B4 20 2 1 2 1

    B== 9a @/ %B4 & %B 20 2 1 2 1

    B== E=/a @/ %B4 & %B 20 2 6 12 2

    2 L3 =$/$> a= 100 a= 1#0 a= 100 a= 1#0 ?/= 16 1 2 2 1.

    T E=/a a= $ >?/= 16 1 # # 2

    B== Ma$ R @/ 3 3 16 2 1 2 1

    B== a$ @/ =3/ 3 16 2 1 2 1

  • 7/24/2019 Variation Study for Madhavaram Site.

    121/170

    M:&! D&'a;=$//?> 1 2 !6 1.

    SLAB

    FS,&nd =ann&$3 !#0 =/$b?=$ @/ ab83 a= !#0$3 !#0 =/$b?=$ @/ ab83 a= !#0?/= 9 >$3 !#0 =/$b?=$ @/ ab83 a= !#0$3 a= 17#

  • 7/24/2019 Variation Study for Madhavaram Site.

    122/170

    M:&! D&'a;9ab 1

    T ba/ a= 1.# 989 16 12 1 12 2.

    D$>=/$b?=$ @/ ab83 10 10 1 10 1.>/ ba/ @/ = = b== 16 12 1 12 1.

    B== ba/ 16 12 1 12 6.

    D$>=/$b?=$ @/ ab83 9 @/ Ha$>= 8>9ab 10 2! 1 2! 1.

    T ba/ a= $ 9a$ 16 12 1 12 !.

    D$>=/$b?=$ @/ ab83 16 16 1 16 !.

  • 7/24/2019 Variation Study for Madhavaram Site.

    123/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    124/170

    M:&! D&'a;3

    T"'a< W' ;n M'"nn&

    C FIRST FLOOR TO ROOF SLAB

    , COLUMN

    C9? C1 2# 10 12 120 4

    C9? C1 2# 10 2 20 !

    T$3> ?=3/ >aaaa 2! # 11# 0.

    9$=39- 93=-10.#0 12 6 ! 1 11

    T$3> 20 1 20 0.

    L=39 a= =$93= a/3aA= / 2 @ 3=> 12 4 1 4 2.#

    =$3> 17 1 17 0.7

    A= / 2 @ 9a$3> 12 4 1 4 2.

    =$3> 1 1 1 0.7

  • 7/24/2019 Variation Study for Madhavaram Site.

    125/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    126/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    127/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    128/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    129/170

    M:&! D&'a;9ab !

    T ba/ a= Q/>= P/ 989 16 12 1 12 2

    D$>=/$b?=$ @/ ab83 10 12 1 12 1.

    >/ ba/ a= P/ 989 16 12 1 12 2

    B== ba/ 16 12 1 12 #.

    83/ 9a @/ ab83 16 12 1 12 0

    D$>=/$b?=$ @/ ab83 10 17 1 17 1

    D$>=/$b?=$ @/ ab83 a= P/ 9a89 10 6 1 6 1

    D$>=/$b?=$ @/ ab83 a= $ 9a$ P/ 989 16 1 !.B== ba/ @/ $ 9a$ = = 16 12 1 12 !

    D$>=/$b?=$ @/ ab83 a= 9a$ 16 1 !.

    >>/ ba/ a= $ 9a$ 989 16 12 1 12 2.

  • 7/24/2019 Variation Study for Madhavaram Site.

    130/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    131/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    132/170

    M:&! D&'a;3

    T"'a< W' ;n M'"nn&

    D WORKS AT YARD

    Ra@= @/ =/a>@/3/ 9$=

    /= >$3 = & b== ba/ a= 120

    B= T & b== 16 2 16 .#

    T E=/a a= 3 >?/= 16 2 2 4 2.6

    T E=/a a= $ >?/= 16 2 4 0.

    T E=/a a= $ >?/= 16 2 2 4 1.4

    B== 3=/a a= 3 16 2 4 1.#

    B== 3=/a a= $$ >?/= 16 2 6 12 1

    T$3> a= 1#0 a= 1#0 $aa9 a= 1#0 a= 1#0 a= 1#0 !0 4 120 1.!

  • 7/24/2019 Variation Study for Madhavaram Site.

    133/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    134/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    135/170

    M:&! D&'a;

  • 7/24/2019 Variation Study for Madhavaram Site.

    136/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    137/170

    , ## ,0 ## , ## 0 ## 01 ##

    66.40

    6.00

    70.40

    24.00

    6.!0

    .!0

    11.!0

    24.00

    6.!0

    17.60

    4.00

    2.70

    2!.70

    72.00

    .#

    7.6

    4.00

    1.6#

    10.40

    !.72

    11.20

  • 7/24/2019 Variation Study for Madhavaram Site.

    138/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    139/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    140/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    141/170

    , ## ,0 ## , ## 0 ## 01 ##

    117.70

    !62.70

    10.00

    !14.16

    !62.70

    10.00

    646.0

    64!.0

    20.00

    2!6.64

    20.00

    47#.60

    40.#0

    !21.0

    71.00

    10.00

  • 7/24/2019 Variation Study for Madhavaram Site.

    142/170

    , ## ,0 ## , ## 0 ## 01 ##

    11.!2

    71.00

    10.00

    24!.60

    #2#.60

    22.#0

    22.00

    #6.00

    !2.00

    112.67 4704.!2 0 0 0 0

    !74.71201 0 0 0 0 0

    1#6.6 !202.6 6#1.4# 60.17 146.16

    0.617 0. 1.# 2.47 !.#

    #.6#0 2.44 1.02 1.70# #.7!4

    ,3.91

    616

  • 7/24/2019 Variation Study for Madhavaram Site.

    143/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    144/170

    , ## ,0 ## , ## 0 ## 01 ##

    .00

    111.00

    2#6.4

    162.00

    10.20

    #46.00

    1.00

    2.00

    !4.!0

    17.1#

    72.00

    11.00

    16.40

    41.7

    1!.

    1!.

    !6.40

    !#.60

    11.20

    4.00

    7.20

    27.00

    24.00

    16.24

  • 7/24/2019 Variation Study for Madhavaram Site.

    145/170

    , ## ,0 ## , ## 0 ## 01 ##

    26.00

    1!.20

    2.00

    1.72

    14.24

    1.72

    24.00

    24.00

    7.20

    27.00

    24.00

    24.00

    !1.20

    24.00

    24.00

    !.26

    1!.#0

    24.00

    24.00

  • 7/24/2019 Variation Study for Madhavaram Site.

    146/170

    , ## ,0 ## , ## 0 ## 01 ##

    1#.60

    4.00

    4!!.2!6 4#!.4# 6.66 !2.#66 12.112 4!0.07!

    !#4.!2

    442.6

    1!0.72

    1!#1.#0

    464.40

    100.00

  • 7/24/2019 Variation Study for Madhavaram Site.

    147/170

    , ## ,0 ## , ## 0 ## 01 ##

    1#.00

    142.4#

    1!!.6!

    4.6

    4#.60

    .00

    2!6.64

    1440.766# 17.2# !0.74776 0 0 0

    !2.76

    1#.#0

    21.6

    1.72

    !#.6#

    40.#6

    61.76

  • 7/24/2019 Variation Study for Madhavaram Site.

    148/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    149/170

  • 7/24/2019 Variation Study for Madhavaram Site.

    150/170

    , ## ,0 ## , ## 0 ## 01 ##

    1!.24

    14.0

    74.40

    !0.00#2 22!.004 4!.67!6 0 0 0

    120.00

    120.00

    !0.70

    46.00

    6#.2#

    4.00

    2#6.4

    126.00

    10.20

    2.00

    27.70

    1!.#

    4.00

    !6.0

  • 7/24/2019 Variation Study for Madhavaram Site.

    151/170

    , ## ,0 ## , ## 0 ## 01 ##

    10.60

    27.!0

    72.00

    2#.60

    11.0

    #.#4

    10.40

    24.00

    24.00

    7.20

    27.00

    24.00

    24.00

    16.0

    26.00

    24.00

    24.00

    !.60

    21.60

    !.60

    #.40

    24.00

    24.00

    14.00

    4.0#

  • 7/24/2019 Variation Study for Madhavaram Site.

    152/170

    , ## ,0 ## , ## 0 ## 01 ##

    .6

    6.60

    17.2

    #.60

    24.00

    24.00

    !.10

    12.6#

    24.00

    24.00.40

    7!7.72#7 0 440.#104 24#.2!4 7.#4 2717.1#0

    2#.20

    !67.#0

    10.44

  • 7/24/2019 Variation Study for Madhavaram Site.

    153/170

    , ## ,0 ## , ## 0 ## 01 ##

    40.00

    111.2#

    !.0

    60.00

    12.00

  • 7/24/2019 Variation Study for Madhavaram Site.

    154/170

    , ## ,0 ## , ## 0 ## 01 ##

    24.00

    70.74

    6.#2

    10.00

    160.0#2 1#.#417 0 0 0 0

    24.00

    1.60

    !!.60

    66.60

    .60

    27.20

    .60

    !#.!7

    !.40

    !#.!72.20