    Facility Renewal FundingFacility Renewal FundingRequirementsRequirements

    Funding Needs to MaintainFunding Needs to Maintain

    District BuildingsDistrict Buildings

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    2/14

    What was AssessedWhat was Assessed

    All schools except those planned forAll schools except those planned for

    demolition (Douglas & Kitchener) and thosedemolition (Douglas & Kitchener) and thoseless than 5 years old (Dickens)less than 5 years old (Dickens)

    Each Building AssessedEach Building AssessedSite assessmentSite assessment

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    3/14

    MethodologyMethodology

    33--person Teamperson Team

    ElectricalElectrical MechanicalMechanical

    ArchitecturalArchitectural

    Observable itemsObservable items no removal of walls, etc.no removal of walls, etc.

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    4/14

    DeliverablesDeliverables

    Current Condition analysesCurrent Condition analyses existing facilityexisting facility

    deficienciesdeficienciesAnticipated capital renewal analysesAnticipated capital renewal analyses

    including projection of ongoing degradationincluding projection of ongoing degradationCapital Funding analysesCapital Funding analyses scenarioscenario

    comparisonscomparisons

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    5/14

    Current Condition AnalysesCurrent Condition Analyses

    Classification of RequirementsClassification of Requirements

    Priority 1 = Immediate ConcernsPriority 1 = Immediate Concerns 1 year1 year

    Priority 2 = Short Term ConcernsPriority 2 = Short Term Concerns 1 to 2 years1 to 2 years

    Priority 3 = Long Term ConcernsPriority 3 = Long Term Concerns 3 to 5 years3 to 5 years Priority 4 = RecommendedPriority 4 = Recommended

    Priority 5 = Does not meet current codesPriority 5 = Does not meet current codes

    Priority 6 = Non Structural SeismicPriority 6 = Non Structural Seismic

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    6/14

    Green AssessmentsGreen Assessments

    In addition to Condition AssessmentsIn addition to Condition Assessments

    Prepared on 60 BuildingsPrepared on 60 Buildings

    Potential Green Initiatives:Potential Green Initiatives:

    Lighting upgradeLighting upgrade Occupancy sensorsOccupancy sensors

    Daylight sensorsDaylight sensors Plumbing upgradesPlumbing upgrades

    Efficiency upgradesEfficiency upgrades

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    7/14

    Measurement TermsMeasurement Terms

    CRV (Current Replacement Value)CRV (Current Replacement Value)

    Requirements = Sum of priorities 1, 2 and 3Requirements = Sum of priorities 1, 2 and 3

    FCI (Facility Condition Index) =FCI (Facility Condition Index) =

    Requirements / CRVRequirements / CRV

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    8/14

    FCI Rating ScaleFCI Rating Scale

    0.00 > 0.10 = Excellent0.00 > 0.10 = Excellent

    0.10 > 0.20 = Good0.10 > 0.20 = Good

    0.20 > 0.30 = Fair0.20 > 0.30 = Fair

    0.30 > 0.60 = Poor0.30 > 0.60 = Poor0.65 > =0.65 > =Dozer BaitDozer Bait

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    9/14

    Examples of FCI RatingsExamples of FCI Ratings

    Example 1:Example 1: Hudson Outbuilding 1911Hudson Outbuilding 1911 -- 151C151C

    Recently renovated for daycare useRecently renovated for daycare use CRV = $442,081CRV = $442,081

    Requirements = $59,636Requirements = $59,636

    FCI = 0.135 = Good ConditionFCI = 0.135 = Good Condition

    Example 2:Example 2: Killarney Secondary 1961Killarney Secondary 1961 -- Main buildingMain building

    CRV = $45,959,293CRV = $45,959,293 Requirements = $25,553,367Requirements = $25,553,367

    FCI = 0.556 = Poor ConditionFCI = 0.556 = Poor Condition

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    10/14

    VSB Building SummaryVSB Building Summary

    Current Replacement Value of all schools =Current Replacement Value of all schools =

    $1,610,767,115$1,610,767,115Total Requirements identified next 5 years =Total Requirements identified next 5 years =

    $462,893,244$462,893,244

    Average FCI = 0.429Average FCI = 0.429

    2 major sources of funding building renewal:2 major sources of funding building renewal:

    Annual AFG budget & Seismic UpgradesAnnual AFG budget & Seismic Upgrades

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    11/14

    Seismic Program ImpactSeismic Program Impact

    The Facility Renewal AFG budget isThe Facility Renewal AFG budget is

    supplemented by the Seismic Programsupplemented by the Seismic ProgramAverage Seismic Program funding over theAverage Seismic Program funding over the

    last 4 years = $20.9MM/yrlast 4 years = $20.9MM/yr

    Total average annual renewal funds =Total average annual renewal funds =$10.5MM + $20.9MM = $31.4MM/yr$10.5MM + $20.9MM = $31.4MM/yr

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    12/14

    Impact of Current Levels of FundingImpact of Current Levels of Funding

    on VSB Schools FCIon VSB Schools FCI(5 Year Projection)(5 Year Projection)

    Funding-Current AFG Annual Funding ($10.5M)

    Funding

    TotalofAFG+SeismicRenewal($31.4M)

    Funding-Maintain - FCI

    Funding-Target - Funding to reduce FCI to .25 in 10 years

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    13/14

    Impact of Current Levels ofImpact of Current Levels of

    Funding over 15 yearsFunding over 15 years

    FundingFundingMaintainMaintain

    FCIFCI

    FundingFundingCurrenttotalAnnualFunding@$31.4MwithinflationaryincreaseCurrenttotalAnnualFunding@$31.4Mwithinflationaryincreasess

  • 8/6/2019 Vancouver School Board - Facility Renewal Funding Requirements

    14/14

    ConclusionConclusion

    Discussions with the Ministry and advocacy for anincreased rate of seismic upgrades/replacements

    Discussions with the Ministry about increased AFGfunding allocations to properly address building renewalrequirements

    Discussions with the Ministry about progress on theMechanical Systems Upgrade Program (MSUP)

    In order to address the ongoing building renewal needsof VSBs large inventory of older schools, the followingactions need to be taken: