PEDEC CONTRACTOR: South Azadegan Oil Field Development Project - Phase I Surface Production Facilities CLIENT: Document Title : Valve Inspection And Test Plan CLIENT CONSULTANT: Document No. : Purchase Order Number Identification Letters Sequence No. Revision No. Class : A EP00-PO-02-0001 IR 001 V01 Page No. : 1 of 8 Valve Inspection and Test Plan V01 26-Dec-2015 M. Sabouri M. Sabouri M. Sabouri V00 24-Nov-2015 Issue For Approval M. Sabouri M. Sabouri M. Sabouri Rev. Date Status Prepared Checked Approved R.S. The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Upload: keivanasadykntu

Post on 14-Feb-2016

399 views

Category:

Documents


27 download

DESCRIPTION

Valve Inspection and Test Plan

TRANSCRIPT

Page 1: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 1 of 8

Valve Inspection and Test Plan

V01 26-Dec-2015 M. Sabouri M. Sabouri M. Sabouri

V00 24-Nov-2015 Issue For Approval M. Sabouri M. Sabouri M. Sabouri

Rev. Date Status Prepared Checked Approved R.S.

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 2: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 2 of 8

Tabulation of Revised Pages

SHEET REVISIONS SHEET REVISIONSV00 V01 V02 V03 V04 V05 V06 V07 V08 V00 V01 V02 V03 V04 V05 V06 V07 V08

1 X X 512 X X 523 X 534 X 545 X X 556 X X 567 X X 578 X X 589 59

10 6011 6112 6213 6314 6415 6516 6617 6718 6819 6920 7021 7122 7223 7324 7425 7526 7627 7728 7829 7930 8031 8132 8233 8334 8435 8536 8637 8738 8839 8940 9041 9142 9243 9344 9445 9546 9647 9748 9849 9950 100

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 3: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 3 of 8

Table of Contents

1. Involvement codes and Abbreviation.........................................................................4

2. Inspection activity table.............................................................................................5

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 4: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 4 of 8

1. Involvement codes and AbbreviationH Hold Point

The activity may not carried out without Client's attendance.

(Inspection activity must notify ten (30) days in advance)

IL LAVORO NON POTRA' PROSEGUIRE SENZA L'INTERVENTO DELL' ENTE STESSO

W Witness

Work may proceed at the end of the notification period with or without Client's attendance

NOTIFICA ALL'ENTE ISPETTIVO. IN CASO DI RINUNCIA SI PROSEGUIRA' NEL LAVORO

M Monitoring or Spot Witnessor If Client do no elect to be present, the activity may proceed with his own inspectionSW (No notification is required)

ATTIVITA' DI SORVEGLIANZA INCLUSO IL REVIEW DELLA DOCUMENTAZIONE

R Review

Review at the final documentation stage(No notification is required)

VERIFICA DELLA DOCUMENTAZIONE DA PARTE DELL'ENTE ISPETTIVO

RA Review and Approved Documents shall be reviewed and approved; work shall not proceed without document approval (No notification is required)

I DOCUMENTI DEVONO ESSERE VISIONATI ED APPROVATI; IL LAVORO NON PUO' PROCEDERE SENZA L'APPROVAZIONE DEL DOCUMENTO

ENTI ISPETTIVI - INSPECTION AUTHORITY

A = RMT VM B = Customer C = Final Customer D = Third Party

Abbreviation:App.x: Appendix C.S.: Carbon Steel DWG: DrawingITP: Inspection & Test Plan IRN: Inspection Release Note KOM; Kick of MeetingMPI: Magnetic Particle Inspection MRB: Manufacturing Record Book MOM: Minutes of MeetingNDE: Non Destructive ExaminationPO: Purchase OrderPROC: ProcedurePIM: Pre Inspection MeetingTPI: Third Party Inspector

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 5: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 5 of 8

2. Inspection activity table

Pos Activity DescriptionApplicable Documents

Acceptance Criteria

Reporting / documents

Inspection activityNote

A B C D

1 KOM / PIM

1.1 Kick of meeting93008-MM-

MOM-MGM-0013 - MOM H H H H -

1.2 Pre Inspection meeting Project Specification - MOM H H H H -

2 Document Review

2.1 NDE Procedure RMT Relevant Procedure

Project Specification Approved Document H R R R -

2.2 FAT Procedure RMT Relevant Procedure

Project Specification Approved Document H R R R -

2.3 Painting Procedure RMT Relevant Procedure

Project Specification Approved Document H R R R -

2.4 Packing & Marking Procedure RMT Relevant

ProcedureProject

Specification Approved Document H R R R -

2.5 QCP RMT Relevant Procedure

Project Specification Approved Document H R R R

2.6 SIL certificate IEC 61508 Project Specification H R R R

3 Material

3.1Chemical & mechanical

properties of body & closures

Applicable ASTMRMT VM

purchasing spec.Applicable

ASTMMaterial Test

certificateEN 10204 3.1

R R R R -

3.2Chemical & mechanical

properties of ball, seats, stem and bolting

Applicable ASTMRMT VM

purchasing spec.Applicable

ASTMMaterial Test report

EN 10204 3.1 R R R R -

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 6: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 6 of 8

Pos Activity DescriptionApplicable Documents

Acceptance Criteria

Reporting /

documents

Inspection activity

NoteA B C D

4 Visual & dim. inspection

4.1 Rough materialASTM

workmanshipRMT VM drawing

RMT VM proc CP 07

RMT VM IST 02

n.a.internal form-

H SW

SW W -

4.2Machined component

(including flange facings)

API 6D-ASME B16.5

RMT VM drawing

RMT VM proc CP 07

RMT VM IST 02

n.a.-internal

form-H S

WSW W -

5 N.D.E.

5.110% Wet MPI on c.s. machined bodies &

closuresRMT VM procIST 07.MTP-01

ASME B16.34 App.x II

NDE Report H R SW W -

6 Testing

6.1 Hydrostatic Body Test RMT VM procIST 16.API-6DQ1 API 6D Test Report H

100% W

10% W

10%H

10%

6.2 Hydrostatic Seat Test (Leakage Test)

RMT VM procIST 16.API-6DQ1 API 6D Test Report H

100%W

10% W

10%H

10%

6.3 Pneumatic Seat Test RMT VM procIST 16.API-6DQ1 API 6D Test Report H

100%W

10% W

10%H

10%

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 7: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 7 of 8

Pos Activity Description

Applicable Documents

Acceptance Criteria

Reporting / documents

Inspection activityNote

A B C D

6.4

Functional Test of valve and actuator assembled with all

accessorieswith stroking time

measurement& Partial Stroke test

RMT VM procIST 16.API-

6DQ1Valve Data Sheet Test Report H

100%W

10%H

10%H

10%

6.5 Visual and dimensional check

ASTM workmanship

RMT VM drawing

As per approved DWG

Visual and Dimensional conformity certificate

H100%

W10%

SW

H10%

6.6Check of gauging and

instrumentation calibration certificate

- - Calibration Certificate H R R R

7 Painting / Marking-Tagging

7.1 Painting of valvesRMT VM proc

IST 08.PAI 600A

RMT VM procIST 08.PAI 600A Painting report W W W W -

7.2 Marking TaggingProject

specificationsAPI 6D

RMT VM proc. CP 10

n.a.-internal form- H W W W -

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 8: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 8 of 8

Pos Activity DescriptionApplicable Documents Acceptance Criteria Reporting /

documents

Inspection activity

NoteA B C D

8 Packing / Marking

8.1 Quantity Check Contract Offer H

8.2 Valves Packing RMT VM procIST 12.PAC 600A - - H SW SW H -

8.3 Packing Marking - Packing List Packing List H SW SW H -

9 Release Note Release Note R R R H

10 Final data book

10.1Check of Inspection Book

including review of certificates

MRB Index RMT VM proc CP 15 Data Book H R R R -

The original and all copies of this drawing together with the copyright therein are the sole property of PEDEC.

Page 9: Valve Inspection and Test Plan

PEDEC

CONTRACTOR: South Azadegan Oil Field Development Project - Phase I

Surface Production FacilitiesEarly Production

CLIENT:

Document Title : Valve Inspection And Test PlanCLIENT CONSULTANT:

Document No. :Purchase Order Number Identification Letters Sequence No. Revision

No. Class : A

EP00-PO-02-0001 IR 001 V01 Page No. : 9 of 8