Value Based Requirements Engineering And Prioritization. Percolating ‘Value’ into the SDLC (Software Development Lifecycle) Nupul Kukreja 2 nd October, 2013. Insightful Questions. Given N requirements and budget/schedule constraints which ones to implement? - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Value Based Requirements Engineering And Prioritization

1

Value Based Requirements EngineeringAnd Prioritization

Percolating ‘Value’ into the SDLC (Software Development Lifecycle)

Nupul Kukreja2nd October, 2013

Page 2: Value Based Requirements Engineering And Prioritization
Page 3: Value Based Requirements Engineering And Prioritization

3

Insightful Questions• Given N requirements and budget/schedule

constraints which ones to implement?• Which test cases should I run given time

constraints?• What programming language should I choose?• Which design should I choose?• What framework should I choose?• What architecture should I choose?• Which project(s) should we choose?• Heck! How do I choose anything?

Page 4: Value Based Requirements Engineering And Prioritization

4

Agenda• The ‘science’ of decision making – what, why

and how?• The role of decision making in Value Based

Requirements Engineering & Prioritization (VBRE/RP)

• Importance of ‘Planning’• VBRP – what, why & how?• Understanding VBRP in CS577• VBRP in Action

Page 5: Value Based Requirements Engineering And Prioritization

5

Agenda: VBSE 4+1 View

Theory-W:SCS Win-Win

Dependency Theory

Utility Theory

DecisionTheory

ControlTheory

1. Protagonist goals3a. Solution Exploration7. Risk, opportunity, change management

2. Identify SCS2a. Results chains

3b, 5a, 7b. Cost/schedule/ performance tradeoffs3b, 7a. Solution Analysis

5a, 7b. Options, solution development & analysis

3. SCS Value Propositions (Win Conditions)

4. SCS expectations management

5a, 7b. Prototyping

6, 7c. Refine, execute, monitor & control plans

6a, 7c. State measurement, prediction correction; Milestone synchronization

5a. Investment analysis, Risk analysis

5. SCS WinWin Negotiation

Page 6: Value Based Requirements Engineering And Prioritization

6

Decision Making – What?Definition:*

• Decision making can be regarded as the mental processes (cognitive process) resulting in the selection of a course of action among several alternative scenarios

• Every decision making process produces a final choice

• The output can be an action or an opinion of choice.

*Courtesy: http://en.wikipedia.org/wiki/Decision_making

Page 7: Value Based Requirements Engineering And Prioritization

7

Decision Making – Making a ChoiceWhich apartment do you want to live in?

Page 8: Value Based Requirements Engineering And Prioritization

8

Making a Choice – How?• So, just how did you choose your apartment?• What all did you ‘see’ / evaluate before signing

the lease?• Examples of possible criteria:– Rent per month– Location i.e., quality of area– Proximity to campus– Presence of a good looking neighbor – …and probably several others

Page 9: Value Based Requirements Engineering And Prioritization

9

Analyzing the ‘Problem’• You have the two key ingredients necessary for a

decision problem:– A list of criteria– A set of alternatives

• Problem: Given a list of criteria AND a set of alternatives select the alternative that best suits the given criteria

Decision Analysis

Criteria

Alternatives

Rank ordered set of alternatives

Apartment Selection

Rank ordered set of apartments

Page 10: Value Based Requirements Engineering And Prioritization

10

Decision Making – Why Bother?• Converts ‘art’ into science– Adds rigor to the act of decision making

• Justification of choice of action i.e., why you chose what you chose?– Helps decrease legal liability

Ex.: Why did Company A select the bid/tender of Company X over Y? (It’s not only cost )

• Documents the institutional memory that lead to that particular decision (i.e., helps trace back to provide justification of decision)

Page 11: Value Based Requirements Engineering And Prioritization

11

Decision Making – How do you do it?• If it is a well studied science (it is) does anything

exist ‘out there’ to help practice this ‘science’?• There are various techniques that can be

employed:– Multi-attribute utility theory (ISE 562 in Fall)– Analytical Hierarchy Process (AHP)– Simple Additive Weighting (SAW)– TOPSIS (Technique of Ordered Preference by

Similarity to Ideal Solution)– …and many more (http://en.wikipedia.org/wiki/MCDA#MCDM_Methods

)

Page 12: Value Based Requirements Engineering And Prioritization

12

Decision Problem – Look and Feel

Criterion 1

Criterion 2

Criterion 3 … Criterion

N

Alternative 1 S11 S12 S13 … S1N

Alternative 2 S21 S22 S23 … S2N

Alternative 3 S31 S32 S33 … S3N

… … … … … …

Alternative N SN1 SN2 SN3 … SNN

Sij = Measure of how well Alternative ‘i‘ does on Criterion ‘j’

Almost always has a matrix-like representation:

When considering multiple criteria in decision making the problem is often referred to as

“Multiple Criteria Decision Analysis” (MCDA) or “Multiple Criteria Decision Making” (MCDM)

Page 13: Value Based Requirements Engineering And Prioritization

13

Okay, Great! But what has any of it got to do with VBSE?

• Everything!! • How do you decide:

Which requirement to implement first?Which component to design first?Which architectural style/pattern to use?Which requirements to test first?Which test-cases form part of the regression

suite?What all to prototype first?For which component to write the “first line of

code”?

ControlTheory

Page 14: Value Based Requirements Engineering And Prioritization

14

Wait! But I’ve already done all of this before and I got it right too!

• Probably! However…• Were you able to justify your choice i.e., how

you came about choosing a specific option?– Was there ever a need to do so?

• Just “how” did you decide?– Perhaps intuition, gut feel, domain knowledge,

tossing a coin, do as the Romans do…• Yes, a simple 1-10 works or even MoSCoW

(Must, Should, Could, Would – have) but for relatively simple problems

Page 15: Value Based Requirements Engineering And Prioritization

15

Short Detour: Planning

Page 16: Value Based Requirements Engineering And Prioritization

16

Purpose of ‘Planning’*• Why do we do it?– Reduce risk & uncertainty– Supporting better decision making– Establishing trust (i.e. frequent delivery)– Conveying expectations

• Planning is a ‘quest for value’– Attempt to find an optimal solution of the overall

product development question: What should be built?

*Agile Estimation & Planning – Mike Cohn

Page 17: Value Based Requirements Engineering And Prioritization

17

A Good Plan• One that stakeholders find sufficiently reliable• One that can be used as basis for decision

making– Approximate time to market– An idea of the set of features

• Made more precise as project moves on• Is a ‘living’ artifact showing the current status

of the project to avoid last minute surprises• Is planned around ‘value’

Page 18: Value Based Requirements Engineering And Prioritization

19

Planning for ‘Value’*• Stakeholders needs must be understood• Just delivering features is not important

– Necessary to balance scope, schedule, cost and value of features comprising the release

• Various factors impacting prioritization– Financial value of having the features– Cost of development– Amount/significance of new knowledge

• Product (what)• Project (how)

– Reducing Risk (Business/Technical)• Schedule• Cost• Functionality

*Agile Estimation & Planning – Mike Cohn

Page 19: Value Based Requirements Engineering And Prioritization

20

Decision Making and Planning for Value• Decision analysis techniques can be ‘overloaded’ to

perform requirements prioritization…• …the rank-ordered output of decision making

techniques could also rank-order requirements!• Requirements prioritized against the

goals/needs/values of the stakeholders VBRP

• The prioritized requirements form the basis of the ‘plan’ – what is being delivered, for how much and by when?

Page 20: Value Based Requirements Engineering And Prioritization

21

The ‘Dimensions’ of Value• Value is a multi-dimensional quantity, a simple 1-10 may

not cut it (too many ties – Must have, Must-must haves, must-must-must haves etc.)

• Value lies in the eyes of the beholder…and so does its dimensions!

• Dimensions are ‘hidden’ within the ‘expected benefits’ of the various stakeholders

• The benefits serve as the goals/objectives/criteria on which to prioritize the requirements

• Point to consider: Are all dimensions* equally important?(*dimensions = benefits = criteria = goals = objectives)

Page 21: Value Based Requirements Engineering And Prioritization

22

Prioritizing Criteria/Value Dimensions• All criteria may NOT be equally important• But just HOW do you prioritize the criteria

themselves?– A simple 1-10 (Yes, it works )– A highly involved process like multi-attribute utility

theory (MAUT) to get the utility functions for each criteria which shows the risk attitude of each criterion

– Or another interesting technique - Project Success Sliders*

* Radical Project Management by Rob Thomsett

Page 22: Value Based Requirements Engineering And Prioritization

23

Project Success Sliders

Image: Radical Project Management by Rob Thomsett

25%

50%

75%

Success Criteria

(defined at start of project)

Page 23: Value Based Requirements Engineering And Prioritization

24

Project Success Sliders

Image: Radical Project Management by Rob Thomsett

25

50

100

75

25

75

50

1

2

4

3

1

3

2

It’s ‘subjective’ but an extremely effective tool to understand the importance of expectations and their relative tradeoffs!

They can (and are) interpreted on a relative scale i.e., twice as important, half as much etc.,

Page 24: Value Based Requirements Engineering And Prioritization

25

Putting It All TogetherYou have:

1.Relative ranking of all criteria2.List of requirements (or win conditions)

What else do you need?• Scores! How well each requirement/win-

condition does on each criteriaYou STILL need something else…• The decision analysis ALGORITHM!

Page 25: Value Based Requirements Engineering And Prioritization

26

Overall Score

Criteria

Alternatives

Criterion 1

Criterion 2

Criterion 3 … Criterion

N

W1 W2 W3 … WN

S(A1) Alternative 1 S11 S12 S13 … S1N

S(A2) Alternative 2 S21 S22 S23 … S2N

S(A3) Alternative 3 S31 S32 S33 … S3N

… … … … … … …

S(AN) Alternative N SN1 SN2 SN3 … SNN

Decision Analysis Algorithm: Given a set of criteria with possible weights and the measure of how the alternatives rank on the respective criteria find an optimal alternative

The scale of the scores could be absolute, relative, 1-10 (Likert

Scale), Fibonacci... …must be consistent across

criterion column

Page 26: Value Based Requirements Engineering And Prioritization

27

Algorithms for Practicing VBRP• There are various algorithms in literature to choose from

along with those from MCDA/M:– Kano Analysis– Planning Poker– 100-point assignment technique– Simple Additive Weighting– Quality Function Deployment (House of Quality)– Cost of Delay– Weigers’ Prioritization– Theory-W (Business value vs. Technical Feasibility)– TOPSIS– …and quite a few more

Page 27: Value Based Requirements Engineering And Prioritization

28

What are we using in CS577?• TOPSIS: Technique of Ordered Preference by Similarity

to Ideal Solution (MCDM Technique)• Integrated in Winbook for prioritizing MMFs and win

conditions• We’ll be using Business Value, Technical Feasibility and

Relative Penalty as the criteria against which to rank the requirements. You may add more (e.g., risk, cost, effort, time – anything you deem appropriate!)

• MMFs Prioritized against stakeholders’ value propositions/goals/objectives

• Success Sliders for prioritizing value propositions

Page 28: Value Based Requirements Engineering And Prioritization

29

Ideal Alternative (S’)

TOPSIS Primer

Criterion 1

Criterion 2

Alternative 1

Alternative 2Non-Ideal Alternative (S*)

Aim: Rank order alternatives by their ‘closeness to ideal’ and ‘distance from non-ideal’Criterion: Has ‘direction of preference’ i.e. more/less of the criterion is preferredIdeal: Best score for each criterion Non-ideal: Worst score for each criterion

Page 29: Value Based Requirements Engineering And Prioritization

30

Page 30: Value Based Requirements Engineering And Prioritization

31

Decision Theory Demo

Which tablet should I buy? http://pattaya.usc.edu:8080/Winbook/projects/2013-USC-Tablets/wall

Page 31: Value Based Requirements Engineering And Prioritization

32

Refinements to TOPSIS/VBRP• Prerequisite Handling (not yet integrated in

Winbook)– Specifying MMF/WC prerequisites and factoring in

prioritization– Simple solution: Priority of item less than all those

in its prerequisite graph • Hierarchical Prioritization (partially integrated)– Prioritizing high level MMFs w.r.t. project goals– Prioritizing WCs w.r.t. MMFs– Prioritizing test cases w.r.t. WCs and so on

Page 32: Value Based Requirements Engineering And Prioritization

33

Points To Note• TOPSIS is ONE way of practicing VBRP• You could even perform COTS tradeoff analyses using it.

(It’s a decision problem!)• Use the VBRP technique that is best suited to the

situation – each technique has its pros and cons. Choose wisely.

• Some prioritization techniques do not lend themselves to a typical spreadsheet like analysis

• The output of some techniques could be bucketed (categorized into the MoSCoW buckets) or ordinal (explicitly rank ordered)

Page 33: Value Based Requirements Engineering And Prioritization

34

Conclusion• Tools and techniques for prioritization are only

one side of the coin…• …negotiations and discussions are the other.

The latter must be held for the former to be of any value. Using the tool will NOT guarantee VBRP

• There will be a Homework on VBRP posted tonight/tomorrow, due next week. Watch the class website.