FH NFH FH FA NFH FH FA NFH
1 Sabarmati 1 3 5 23 6 11 35 14
2 Mehsana 0 1 5 21 3 8 32 6
3 Palanpur 0 1 7 8 3 12 12 10
4 Himatnagar 0 2 6 42 5 13 48 14
TOTAL 1 7 23 94 17 44 127 44
Cumulative since the first
quarter of the current FY
year
NUMBER OF ACCIDENTS FOR THE QUARTER (July-07 TO September-07)
Departmental Out side
No.of accidents in the quarter
Name of areaSr. No.
Uttar Gujarat Vij Company Ltd ,Mehsana
QUARTER :-2nd July-07 to septmber-07
YEAR :-2007-08
Performa - SOP 001 : Fatal and Non-fatal accident report for quarter ending September-07
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 2
Sr.
No.
Location of
Accident and
details of the
victim
Date of
occurance
Type of
Acciden
t
Cause of Accident Finding of CEI / EI/ AEI
Remedies
suggested by
CEI / EI/ AEI in
various cases
Whether the
remedy
suggested is
complied
Action taken to avoid
recurrence of such
Accident.
1 2 3 4 5 6 7 8 9
1
Rakanpur
Ramjibhai C
ChauhanRamjibh
ai C Chauhan
17/4/2007 FHO
Ramjibhai C Chauhan;/while reversing back portion
of truck touched to jumper of 11 kv Rakanpur feeder
at dist. Tr.,victim got shock through truck body
which touched to DO fuses of dist tr.
Awaited
2 Hasalpur 04/10/2007 FHO
while attempting theft of conductor of newly erected
line ,cond. Touched to live conductor of the other
crossing 11 kv Umiya feeder and victim got shock..
Awaited
3 Sagpur 04/12/2007 FHOvictim came into contact with live 11 kv snapped
conductor of Sonisar feeder.Awaited
4
Anapur gadh /
M K Patel, V/S
Helper
15/4/2007 NFHDWhile doing maint. Of jumper on T/C got induction
and fallen on ground, even though L/C was taken.Awaited
5 Navi Shedhavi 24/4/2007 FAOowner Ramjibhai Chauhan, Leakage current not
found.Awaited
6 Vataman Nani 23/4/2007 FHOS.P. Chauhan, victim came in contact with 11 kv live
wire.Awaited
7 Hathi pagla 24/4/2007 NFHO R.K.Parghi, came in contact with 11 kv line. Awaited
8 Soja 28/4/2007 FHOBharatbhai K. Patel, drunkard ,in drunk position
climbed on L/T pole and met with fatal accident.Awaited
Uttar Gujarat Vij Company Ltd ,Mehsana
Half Yearly April-07 to septmber-07
YEAR :-2007-08
Action taken report for safety measures complied for the Accidents occurred in the six monthly
Performa-SoP002:-Action taken report for safety measures complied for the accidents occurred
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 3
9 Shella 28/4/2007 NFHO
Jawansinh P. Bariya, contractor person ,while
restringing maint work , dead LT line wire touched to
live HT line crossing over the LT line.
Awaited
10 Sami 29/4/2007 FAO
Owner Fakir Imamsha Babusha, leakage current at
Tr. Centre due to faulty motor of water works G.P.
and buffalo came into contact with it.
Awaited
11 Gotarka 23/4/2007 FHOV.N. Rabari, victim came in contact with L/T line
wire while attempting theft of power Awaited
12 Antarnes 24/4/07 FAO L.T. wire broken and fallen on buffalo. Awaited
13Zala na Muvada
(Bordi)30/4/2007 FHO
Victim climbed on LT line pole to take GI wire and
got shock..Awaited
14 Changodar 30/4/2007 FAOLeakage current through water near transformer
centre.Awaited
15 Dabaran/Malpur 05/04/2007 NFHO
Conductor of 11 kv Nava feeder broken due to pin
punctured and fallen on victim--Mashar Maniben
Dolabhai-- directly and got injured.
Regular maintenance of lines
should be done and good
quality pin insulators and
other materials should be
utilized.
Necessary
instruction
passed on to all
field officers.
16 Dhima(22/4/2007)
10/5/2007NFHO
Victim Shri K.C. Harijan-- climbed on live line pole
with the intension of suicide and met with N-F-HAwaited
17 Gundi 05/02/2007 FAOwhile rubbing its horn with stay wire stay insulator
broken and wire touched to liveAwaited
18 Sughad 05/09/2007 NFHO
while working on line, contractor person took L/C of
11 kv GIDC and NMC feeder taken whereas work
was to be carried out on the structure on 11 kv GIDC
and Bhaijipura feeders are errected.
Awaited
19 Hilol 05/09/2007 FAO
Leakage current passed through GI wire ,because
phase wireof service line touched to GI wire at
consumer premises Two Nos. of buffalos came into
contact with it.
Awaited
20 Biliya 13/5/2007 FAOLeakage current flow from the defective motor of
village water works.
Regular maint. Of lines and
proper capacity fuse
provision on L/T side and
maintenance of efficient
earthing system to be carrird
out.
Necessary
instruction
passed on to all
field officers.
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 4
21Rampura-
Panswal05/12/2007 FHO
Victim Kanbi Kokilaben Nanjibhai,came in contact
with 11 kv live line.Awaited
22 Dabhala 14/5/2007 FAOLeakage current flow from the defective motor of
village water works.
Regular maint. Of lines and
maintenance of efficient
earthing system to be carrird
out.
Necessary
instruction
passed on to all
field officers.
23 Kuvasana 19/5/2007 NFHD
Shri S P Patel, helper ,while maintenance of 11 kv
line, obstracting LT service cable passing nearby,
victim tried to remove the same by cutting with plier
,victim got shock and met with N-F-H accident
Awaited
24 Sidhpur 19/5/2007 NFHD
R.M.Parmar-Helper &B.K.Thakor ,ALM ,While
working on line came in contact with 11 kv return
power
Awaited
25 Borsan 20/5/2007 FHO
Senva Motibhai Ramabhai, Due to leakage current
from party's own submersible motor at party's
premises, the leakage current reflected on earthing
of transformer centre and victimmight have touched
and met with accident.
Awaited
26 Harij 21/5/2007 FAO
While passing nearby Nagrik Bank camelmight have
touched with GI wire of St.Light service ,and due to
leakage in GI wire which touched to live phase wire
of another service line on the pole.
Awaited
27 Kesarpura 18/5/2007 FHO
Fateali Abidali Dodiya--victim while climbing on the
tree,unfortunately came into contact with live wire of
nearby 11 kv Arsodiya feeder.
Awaited
28 Pethapur 28/5/2007 NFHO
Salim Jamed Shaikh.(contractor Labour), While
doing work on 400 kv Dehgam Ranchhodpura
erection work victim got shock.
Awaited
29 Maflipur 28/5/2007 NFHO
Pravinbhai Kantibhai Raval, while doing
construction work victim touched to 11 kv
Bhetavada fdr. And got shock.
Awaited
30 Khoda 27/5/2007 FHO
J.P.Thakor(F-H),M.R.Thakor(N-F-H), while working
maintenance on line came in contact with return
power of another 11 kv feeder.
Awaited
31 Methan 05/07/2007 NFHO
victim Thakor Ranjitbhai Kalyanbhai, contractor
labour got shock due to induction during
maintenance work.
Awaited
32 Kheralu 06/04/2007 FAO Leakage current at L/T pole. Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 5
33 Nagla 06/02/2007 NFHO
Ishabhai Karsanbhai Bhil, while attempting theft of
alluminium conductor of 11kv Laxmanpura,on loc.
No. 92 got shock
Awaited
34 Dhandhuka 06/04/2007 FAOOwner Jetiben Harjibhai Bharvad, Earth leakage
current from damagwd service line.Awaited
35 Makhiyav 06/05/2007 FAOOwner Naranbhai Chavda,Earth leakage current due
to poor earthing at T/C Awaited
36 Kathawada 06/06/2007 FHOVidhiben Jagdishbhai Parmar, leakage current
passes in GI wire through open service wire.Awaited
37 Pamul 06/05/2007 FHO
Smt. Ambicaben K. Rathod, leakage current passed
in TV channel cable through a wire for unauthorised
st. lt. connection by someone ,having joints.TV
channel wire was touching to GI wire tied up for
cloth drying ,victim tried to put wet cloth on GI wire
an
Awaited
38 Vasai 06/05/2007 FAO Leakage current from transformer centre.
Regular maint. Of lines and
proper capacity fuse
provision on L/T side and
maintenance of efficient
earthing system to be carrird
out.
Necessary
instruction
passed on to all
field officers.
39Krishnapura
Kampa06/07/2007 FHO
Victim Kamlaben Kantilal Patel, got shock due to
faulty interanal wiring of consumer.Awaited
40Patan(Sande-sar
Pati)06/05/2007 FAO
Leakage current in earthing from faulty O/G cable at
TR centre.Awaited
41 Kotada(D) 06/08/2007 FAOBuffalo came into contact with snapped L/T
conductorAwaited
42 Jamla 06/07/2007 FAO Buffalo came into contact with snapped L/T
conductor, Owner unknown person.Awaited
43 Kalol city 14/6/2007 FHO
Ajitkumarsing B. Rajput, while working on luxury
bus roof came in contact with live 11 kv
Ambicanagar urban feeder.
Awaited
44 Limodra Dhunda 15/6/2007 FHO
Damor Vanabhai Nanabhai , victim climbed on the
pole for cutting the GI wire and got shock, and died
afterwords.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 6
45 Idar Town 18/6/2007 NFHO
Ranjanben Maheshbhai Bhoi, due to private
premises faulty wiring,leakage current passed
through GI wire for cloth drying through roof.
Awaited
46 Balol 20/6/2007 NFHD
Anshuman Patel, V.S. ,While carrying out maint. ,11
kv new switch providing work at of Indrap fdr ,got
induction and fell down. Detailed cause under
investigation.
Awaited
47 Patan 25/6/2007 FAO
Due to faulty st. lt. holder leakage current passes to
gider through st. lt. pipe.buffalo came into contact
wirth girder pole and got shock.
Awaited
48 Kundal 26/6/2007 FAOLeakage current flows from the L.T. pole, buffalo
came into contact with it.Awaited
49 BORISANA 15/6/07 FAOOwner BHIKABHAI VIHABHAI RABARI , Leakage not
foundAwaited
50 JETHDA 21/6/07 FAO
Owner DHIRUBHAI CHAKUBHAI BHARWAD
,Leakage current on transformer structure due to
poor earthing
Awaited
51 RACHRDA 22/6/07 FHO
ANILBHAI BHAGVANBHAI WAGHELA ,while
charging of DO fuse with wet wooden rod,victim got
shock.
Awaited
52 RAJPUR 25/6/07 FAOOwner AMRUTBHAI SURBHANBHAI ,due to cyclone
cond snapped ,buffalo came into contact with it.Awaited
53 BHAT 25/6/07 NFHD
MANNAT (V.S.) While working on 11 kv Bhat Feeder
,victim touched to near by 11 kv Claris feeder and
got electric shock.
Awaited
54 Hathoj 24/6/2007 FAO
Owner; Thakarda Diviben Vinshaji, leakage current
passed from earth wire due to short circuit due to
wet atmosphere.
Regular maintenance of
water works meter and
switch boards and it should
be kept at proper place.
Necessary
instruction
passed on to all
field officers.
55 Rantila 06/04/2007 NFHO
Pandya Shantibhai Mashrubhai ,victim tried to repair
L/T line and another person attended DO fuse of
Transformer..
Awaited
56 Vasna Buzarg 26/6/2007 FAOOwner Bipinbhai Chandubhai, leakage current
through girder pole.Awaited
57 Manpura Shihori 22/6/2007 FHO
Waghela Punaji Prathanji ,F-H,Victim himself
climbed on contact with 11 kv live wire while
operating D.O. and Waghela Mobatji Ramaji ,N-F-H.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 7
58 Palanpur 06/04/2007 FAOLeakage current passed through St.Lt. S/C wire
through Tubular steel pole.Awaited
59 Halmatiya 21/6/2007 NFHD
Makwana Jitendrasinh Jehaji,App. L/M , due to
induction of 11 kv Maruti feeder, on crossing LT line
victim got shock an fell down.
Proper clearance should be
maintained btween two
crossing lines and L/C of all
crossing lines should be
taken before work starts.
Necessary
instruction
passed on to all
field officers.
60 Laloda 27/6/07 FHO
Parmar Mangalsinh Jehaji ,while taking height
measurement ,metallic scale touched to the 11 kv
line.
Awaited
61 Vasai-Betali 21/6/2007 NFHO
Kotwal Sardarbhai Ashabhai ,leakge current from
burnt jumper passes to earth wire and victim came
into contact with earth wire.
Awaited
62 Vijapur 28/6/2007 FAO Leakage current flows from st. lt. pole. Awaited
63 Maniyari 23/6/2007 FAOConductor snapped, buffalo came into contact with
it.Awaited
64 Amblipura 22/6/2007 FAO Leakage current flows from LT pole. Awaited
65 Galudan 06/01/2007 FAOowner Kantiji M Thakor, leakage current due to poor
earthing at Tr centre . Awaited
66 Bolundra 26/6/2007 FAOowner Bamniya Sureshbhai Chhaganbhai , leakage
current in earth wire from damaged cable.
Regular maint. Of lines and
maintenance of efficient
earthing system to be carrird
out.
Necessary
instruction
passed on to all
field officers.
67 Galsundra 29/6/2007 FAOOwner;-Valjibhai H. Patel , Under investigation . No
leakage current found.Awaited
Necessary
instruction
passed on to all
field officers.
68 Rangpur 25/6/2007 FHO
Chavda Ishwarsinh Amthaji , while handling the
electric motor for water ,victim got shock an met
with Fatal Human accident.
Awaited
69 Kolikhad 22/6/2007 NFHD
Khant Bipinbhai Virambhai ,While working on 11 kv
Dugrawada fdr. ,victim got shock due to return
power on 11 kv Kolikhad Ag feeder ,got shock.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 8
70 Bayad 27/6/2007 NFHO While repairing st. lt. Nagarpalika person got shock.
While working on line safety
tools should be utilized and
power on line should be
made off before starting the
work.
Necessary
instruction
passed on to all
field officers.
71 Sarsoli Kampa 23/6/07 FAOOwner;- Goswami K.N., Due to cyclone conductor
snapped and buffalo came into contact with it.
Regular maint. Of lines and
maintenance of efficient
earthing system to be carrird
out.
Necessary
instruction
passed on to all
field officers.
72 Jamgadh 22/6/2007 FAOOwner :-Asari S S , No leakage current was found,
also buffalo was shifted from accident site. Awaited
73 Padar 25/6/07 FAOConductor snapped due to tree branch fallen on line,
it came into contact with it.Awaited
74 Vajepur 1.7.07 FAO
Due to shackle insulator punctured leakage current
passed to earth wire through D-clamp, animal came
in contact with earth wire and got shocked.
Awaited
75 Gambhipura 3.7.07 FAO
Due to cyclone conductor snapped due to tree
branch fallen on L/T line ,and bullock came in
contact with it.
Awaited
76 Jesingpur 4.7.07 FAO
Leakage current passed from earth wire of the
Transformer centre because of the internal fault in
the transformer centre cable in the distribution box,
while passing from there animal came into contact
and met with accident.
Awaited
77 Dhamboliya 5.7.07 FAO
Leakage current passed from earth wire of the
Transformer centre because of the internal fault in
the transformer centre cable in the distribution box,
while passing from there animal came into contact
and met with accident.
Awaited
78Kundol
(Degamda)5.7.07 FAO
Leakage current passed from earth wire of the
Transformer centre because of the internal fault in
the transformer centre cable in the distribution box,
while passing from there animal came into contact
and met with accident.
Awaited
79 Limbhoi 3.7.07 FAONo evidence of Electrical accident found during
panchnama.Awaited
80 Jitpur 30.6.07 FAO
The private cable connecting the switch board to the
bore of the water works connection was broken
,animal while passing from that place touched the
wire and got shock and died due to leakage current
from the cable..
Awaited
81 Mahadevpura 2.7.07 FAO
"Due to heavy rain & Cyclone the tree fall on the line
& LT Line broken. Cow came in direct contact with
this live wire & died")
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 9
82 Khedawada 3.7.07 FAO
"Service line broken due to heavy rain & cyclone
which came in contact with wet PSC Pole. The cow
came in contact with GI wire of Pole.
Awaited
83 Ranechi 30.6.07 NFHO6 year old boy touched to broken live wire of AG L/T
line and met with N-F-H accident.Awaited
84 Vadali // Juna
Cahmu9.7.07 NFHD
Victim R.S. Gameti Helper,climbed on the 11 kv
Dharod Fdr. Instead of 11 Kv Jetpur Fdr.of which line
clear was taken. Got shock on hand and fallen from
the pole .
Technical person should
remain present and all
should work carefully on
line.
Necessary
instruction
passed on to all
field officers.
85 Ujediya 9.7.07 FHO
G I wire was tied up between neem tree and inside
the house.Due to heavy rain lakage current passed
in G I wire through neem tree. Victim caught the G I
wire and Got Electric Shock. No leakage path was
observed during investigation.
Awaited
86 Dhandha 7.7.07 NFHO
Victim ,Kharva Rameshji Budhaji and Kharva Sagar
Mathurji, young boys While playing on the terrace,
They touched the nearby 11 kv line,passing near the
terrace,and met with non fatal elec. Accident.
Clearance between building
and 11 kv line was
insufficient.
Necessary
instruction
passed on to all
field officers.
87 Shantipura 4.7.07 FAO
Due to short ckt. at T/C, the leakage current passed
through the earth wire,and Buffalow while passing
from that place got elec. Shock and died.
Awaited
88 Rajpur 7.7.07 FAO
Due to the cyclone Newly erected LT line pole fallen
and touch the jumper of that new line at the tapping
place to the existing line, thus current flew through
the wire.and Bullock came in contact with the fallen
wire,got shock and died.
Awaited
89 Barvav 8.7.07 FAO
Due to Phase of St. Light Touch the stay wire of that
pole and because of broken stay insulator the
leakage current passed through the stay wire
,Buffalow came into contact with it got elec. Shock.
Awaited
90 Lambadiya 10.7.07 FAO
Due to the cable of the T/C fired, the current passed
through the earth wire of the Distribution Box as the
cable touched the dist. Box.Cow touched the earth
wire ,got shock and died.
Awaited
91 Sadatpura 10.7.07 FAO
Due to cyclone The jumper of phase wire touched to
the Fabrication of the extension structure and
leakage current passed through the earthwire.and
Buffalow while passing from that place got elcectric
shock and died.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 10
92 Salal 9.7.07 FAO
Due to burnt cable of the T/C ,as the open wire
touched to the the channel ,the leakage current
passed through the earth wire.The water was
accumulated around the T/C ,so while passing
through water near pole cow got electric shock.
Awaited
93 Vadagam 07/11/2007 FAO
Due to rain and cyclone one pole of 11 kv Akrund
feeder tilted near river bank, buffalo came into
contact with live wire due to lesser clearance and
got shock.
Awaited
94 Rupan 14/7/2007 FAOL/T conductor broken due to cyclone and heavy rain
and buffalo came into contact with it.Awaited
95Amrutpura
Kampa07/11/2007 FAO
No evidence of electrical accident found during
panchnama.
96 Mankadi 07/11/2007 FAO
Due to cyclone L/T pole broken ,L/T wire touched to
D clamp and leakage current in earth wire passed
through D clamp,Goat came into contact with it.
Awaited
97 Kamthadiya 14/7/2007 FAOBullock came into contact with broken L/T wire due
to rain.Awaited
98 Utarda 07/01/2007 FHO
Rasilaben Jagishbhai Masar, loose flexible wire
having joints was utilised for bulb .One end was
connected to kitkat fuse and neutral wire having
joints was connected to earth wire outside the room
in premises, wire fallen on ground where water was
accumulated. So victim got shock.
Awaited
99 Lunasan 1.7.07 FAOLeakage current flows from LT pole, buffalo came in
contact with it & met with FAAwaited
100 Lakhvad 1.7.07 FAO
Leakage current flows from the Sarpanch ,G.P. W/W
motor ,when buffalo was passing nearby the the
catchment of water near Water works,buffalo got
shock & met with FA.Awaited
101 Kharod 2.7.07 FAO
Tree fallen on the LT line due to heavy rain & due to
this coductor along with psc pole fallaen on cow
which was passing near by the pole.
Regular mainte-nance of
lines and tree cutting to be
done..
Necessary
instruction
passed on to all
field officers.
102 Kundal 3.7.07 FAOLeakage current flows from the LT pole, buffalo
came into contact & met with FA Awaited
103 Rampura 3.7.07 FAO
Tree fallen on the LT line due to heavy rain & due to
this psc pole broken ,cow & buffalo came into
contact with it..Awaited
104 Kansarakui 4.7.07 FAOLeakage current flows from the LT pole, cow came
into contact & met with FAAwaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 11
105 Miyasana 4.7.07 FAO
Due to defective wiring at AG installation at
consumer premises, leakage current flows, buffalo
came into contact with it.
Awaited
106 Vadnagar 07/10/2007 FAO
Due to leakage current flows from the ruptured cable
of Nagar palica water works,connecting starter to
motor and due to heavy rain it flows from cable to
ground.cow came into contact with it.
Awaited
107 Karnala 20/7/2007 FHO
Leakage current passed from faulty ceiling fan to
steel hook,as there was no rubber bushing provided
,And from steel hook to steel sheets of roof and steel
pipe provided in roof for support. Victim Harish
Husainbhai Parbadia came into contact with the
steel pipe and got electric shock.
Awaited
108 Sunok 1.7.07 FHO
Victim Shri S.C.Patel came in contact with the open
live wire of loose wiring of his own fan,while tapping
the same in his own premises.Awaited
109 Changa 30.6.07 NFHO
Shri P H Vayda & S D Vayda,young children were
playing on roof with the MS round bar in hand came
in contact with 11 KV Changa Feeder, passing
nearby to the roof and electrocuted.Awaited
110 Kotda-D 8.6.07 FAO
L. T. wire broken and fallen on Buffalo. Owner N M
Suthar. Awaited
111 Vaghpura 18.6.07 FAO
H.T. Line of 11-KV Naliya fdr wire broken and fallen
on Buffalo.Owner S R Thakor, Awaited
112 Vedancha 07/03/2007 FHO
Due to damage of internal wiring the leakage current
was passed through the grill of the house. Kum.
M.R. Foshi & Smt. A.R. Foshi, came in contact with
grill and Kum.M.R. Foshi met with fatal accident
while Smt. A.R. Foshi met with Non-Fatal accident.
Awaited
113 Bantawada 07/06/2007 NFHOVictim Shri B.C.Nayka , came in contact with 11 kv
pirojpura feeder while cutting tree. Awaited
114 Ambaji 07/02/2007 FHO
Due to heavy rain and wind pressure, tree fallen on
L/T line, L/T line conductor broken and fallen on
victim Shri J.L.Kodarvi.
Awaited
115 Panjpur 17/7/2007 NFHO
The clearance of 11 kv Ratanpur JGY feeder reduced
Due to heavy rain DP structure of 11 kv Ratanpur
JGY feeder tilted . Victim climbed on the earth
retaining wall 6 to 7 feet high built up by Irrigation
Dept.,and rotating her hand clockwise with metallic
tin in her hand ,touched to live wire and got
shock.Victim P D Rathod
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 12
116 Nandol 07/01/2007 FAO
Owner :-Fatesg Motisng Solanki ,leakage current
through poor earthing at transformer centre buffalo
came into contact and got shocked.
Awaited
117 Anandpura 07/04/2007 FHD
Victim :-Mahendra Revabhai Parmar ,Village
Helper.Anandpura ,,while working on 11 kv ONGC
feeder, Anandpura tap line, isolated AB switch at
Loc no 9/7 ,on which one of the phase was made
direct, without isolating above direct phase ,started
work on Loc no 9/45.
Awaited
118 Vadsar 07/04/2007 FAOOwner :- Ajmerbha Bababhai Rabari, No leakage
found.Awaited
119 Charal 07/05/2007 NFHO
While workng for transformer replacement on 11 kv
Daduka feeder , L/C of 11 kv Daduka feeder was
taken of 66 kv Sanand s/s ,but nearby 11 kv
Makhiyav feeder pole was tilted due to heavy rain
and live conductor touched to 11 kv Daduka
feeder,live power came on 11 kv Daduka feeder. and
victim got shock .
Awaited
120 Vasva 07/06/2007 FAOLeakage current at Transformer Centre
owner Gambhirsinh J ZalaAwaited
121 Kavitha 07/08/2007 FAOLeakage current at Transformer Centre
owner Madhubhai D NayakAwaited
122 Vinchiya 07/09/2007 FAOLeakage current at Transformer Centre
owner Alabhai DanabhaiAwaited
123 Sadara 18/7/2007 NFHD
S S Parmar ,Helper was attending consumer
complaint by switching off the power supply of the
circuit on pole,but neutral was charged due to some
outsider was doing tree cutting, tree brances
touched to phase and neutral wire of other circuit,as
there was common neutral for both the circuits.
Awaited
124 Bhuvaldi 13/7/2007 FHO
Victim Lalaji Vinuja Thakor. Leakage current
observed in barbed wire fencing of Tr. Centre
through earth wire. Leakage observed on Tr. Neutral
earth wire through neutral of consmer end due to
defective internal ,wiring R phase voltage observed
on neutral of consumer,victim came into contact
with barbed wire and got shock.
Awaited
125 Sanand8/4/2007
26/7/07FAO
Due to cyclone due to short ckt between two phase
wires ,sparking observed, fire took place and
animals were injured by fire which were under the
line and died.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 13
126 Kundal 07/12/2007 FAO
Due to poor earthing leakage current observed in
neutral wire at T/C, buffalo came into contact with it
and met with accident.
Awaited
127 Parshottam pura21/6/2007
26/7/2007NFHD
Victim;-J C Raval, The DO fuse of Purshottampura
tap line were removed due to fault and remaining
line was charged. Victim for attending jumper
climbed onthe said tap line after confirming the DO
fuses are removed. Helper of the other village tried
to take charge of the line by attnding DO fuses with
thin fuse wire ,the victim working on the line got
shock and fell down and got injured.
Awaited
128 Viramgam 06/06/2007 FAO
Due to poor earthing leakage current observed in
neutral wire at T/C, buffalo came into contact with it
and met with accident.
Awaited
129 Gunjala23/7/2007
1/8/2007FAO Leakage current flows from the L/T pole. Awaited
130 Vsnsa30/6/2007
1/8/2007NFHO
victim K R Thakor , L/T cond. Broken and fallen on
the ground,victim might have come into contact with
it.
Awaited
131 Patan19/6/2007
1/8/2007NFHO
victim S A Damor, while watering through pvc pipe
victim might have come into induction zone of 11 kv
line ,which was passing above the building.
Awaited
132 Kheralu9/7/2007
1/8/2007FAO Leakage current flows from the street light pole. Awaited
133 Budheli 26.7.07 FHO
At party primises victim(Patel Vinodbhai
Bhaichandbhai) use single phase motor for water
pumping.The motor was short & Victim came in
contact with this motor and get shock &died.
Awaited
134 Khedbrama 29.7.07 NFHO
A victim (Mali Haribhai Devjibhai) was stand on
cabinate of truck which is park below iikv line at
petrolpump& came in contact with live wire of11kv
line and get shock &died.
Awaited
135Rajpur (Vanraj
Quarry)21.7.07 NFHD
During attending Ag LT Provided with cable in
quarry area ,during cable jointing he(Prajapati
Vithalbhai Lakhanbhai) came in contact with live part
of the jointof cable and get electroduction.
Awaited
136 Hamiriya 14.7.07 FAO
Leakage current at earthing wire of transformer
centre. Buffalo passing nearby it came into contact
with it and died. Owner Bariya Kalaji Sadaji.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 14
137Satarda( Bor na
Muvada)25.7.07 FAO
Due to the fault in the service cable leakage current
found in the neutral of t/c structure. The neutral wire
of that t/c structure was earth , so current was
passed from the earth wire . The water was also
accumulated around the t/c structure. while passing
from there the buffalow of shri Khant Javanji Ratanji
came in contact with that earth wire, got electric
shock and died.
Awaited
138 Sakhvaniya 29.7.07 FAO
Due to the cyclone the jumper of the AG LT line was
broken and touched the stay wire , , but the stay
insulator was broken so the leakage current was
passed from the wire, the goat while passing from
that place came in contact with the wire,got shocked
and died.
Awaited
139 Asadan 6.7.07 FAO
Due to the short circuit in the service wire the
leakage current passed through the earth wire of the
t/c. and he- buffalo came in contact with that wire,
got shocked and died.
Service line should be laid
with using G/I wire and Reel
insulator, and efficient
earthing to be provided on
L/T side.
Necessary
instruction
passed on to all
field officers.
140 Bilodara 08/01/2007 FAOConductor snapped and fallen on buffalo. Owner
Waghela Jivanji ChhaganjiAwaited
141 Chitroda 08/02/2007 FAO
Due to cyclone L.T. conductor was broken and fallen
on the Cow of Patel Daljibhai Motibhai directly.and it
got shocked and died.
Awaited
142Pratapgadh
(Sabli)08/02/2007 FAO
Due to cyclone The L.T. wire became loose from the
insulator binding and touch the D clamp. and
leakage current passed from the earth wire, while
passsing from that place the Buffalow of shri Sagar
Chandubhai Manibhai came in contact with the earth
wire, got shocked and died.
Awaited
143 Abhrampura 08/03/2007 NFHONo apperent evidence of electrical accident found
during investigation at siteAwaited
144 Bopal30/7/2007
7/8/2007NFHO
Contractor person, while dismentling of TR centre
,eventhough supervisor denied , he climbed on line
and tried to test the line whether it is live or not.
Awaited
145 Vas0veliya31/7/2007
7/8/2007FAO
owner Danabhai Nathabhai , leakage current
through GI earth wire of TR centre , and buffalo
came into contact with it.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 15
146 Andej31/7/2007
7/8/2007FAO
Owner Husenbhai R Waghela, leakage current
through GI earth wire of TC , and buffalo came into
contact with it.
Awaited
147 Dhandhuka 08/03/2007 FAO
Owner M R Waghela, leakage current through GI
earth wire of TC , and buffalo came into contact with
it.
Awaited
148 Dholka-T 08/04/2007 FAO
Owner Ayubhai Pirbhai Ganit, leakage current
through GI earth wire of TC , and buffalo came into
contact with it.
Awaited
149 Barejadi 08/05/2007 FAO
Owner Kanjibhai Devshibhai , leakage current
through GI earth wire of TC , and buffalo came into
contact with it.
Awaited
150 Bareja30/7/07
8/8/2007NFHD
Makwana S G , Helper, victim climbed on L/T pole for
connecting new lighting connection, came into
contact with live wire due to damage in cable
insulation.
Awaited
151 Vidaj 08/07/2007 FAONo apperent evidence of electrical accident found
during investigation at siteAwaited
152 Kabso 8.8.07 FAO
Due to the cyclone The LT wire broken and fallen on
the ground. While passing from that place the 3 nos.
of bullocks of (Chauhan Devusingh Jethusinh ,Patel
Bhagabhai Hirabhai & Patel Dahyabhai Hirabhai)
repectively came in contact with the live wires , got
shocked and died.
Awaited
153 Jadar 10.8.07 FAO
There was the burnt insulation of the phase wire at
the consumer's panel. so leakage current observed
in neutral and to the x'mer neutral, and finally in
x'mer earth wire. While passing from that place the
buffalow (of Chauhan Ramanji Radhuji) came in
contact with that earth wire, got shocked and died.
Awaited
154 Vasnirel 2.8.07 FAONo evidence found about leakage while detail
investigating and pnachnama. P.m. report awaited.Awaited
155 Sadara 3/7/2007 13/8/07 FAO
Popatji H Thakor,breakage of L/T pin insulator
,phase conductotr was lying on angle cross
arm,leakage current passed in earth wire, buffalo
came into contact with it.
Awaited
156 Juval-Rupavati26/7/2007
13/8/07FAO
Devabhai H Bharvad, leakage current in GI earth
wire, and buffalo came in contact with it.Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 16
157 Mandvi 08/12/2007 FAO Leakage current Awaited
158 Harij 08/09/2007 FHO
Leakage current observed in steel wire tied up with
the steel bar ,in which ceiling fan was hooked, due to
faulty fan. Victim tried to keep the wet clothes on
steel wire & got shock. Victim Ramilaben
Awaited
159 Sanand 08/03/2007 NFHO
Illegal construction was under progress .Victim Kum
Jashodaben Ramanbhai Makwana & Alkaben
Natvarbhai Makwana,, while working on newly under
construction tarrace victim came into cotact with
live 1-ph ,3 wire line and met with non-fatal
accident.Detailed cause under investigation.
Awaited
160 Mehsana 08/09/2007 FAO
Due to faulty motor of Nagarpalika Water
works,leakage current flows on neutral and earthing
of transformer.
Awaited
161 Kukarwada 08/12/2007 FHO
Victim J V Patel , accident occurred at consumer
premises ,Due to defective motor of potato chips
machine of consumer.
Awaited
162 Rahemanpura 21/8/2007 FAOL/T conductor snapped ,buffalo came into contact
with it.Awaited
163 Kot 20/8/2007 FAO
Owner R B Patni, leakage current in stay wire due to
rubbing of horns with the stay wire, it touched to HT
wire.
Awaited
164 Bhavnagar 22/8/2007 FAO leakage current . Awaited
165 Chhatral 22/8/07 FAOowner I M Rabari, leakage current due to poor
earthing at Trans.Centre.Awaited
166 Badarkha 24/8/2007 FHOVictim Aditya Ghanshyamsinh Rathod, L/T line
conductor broken and fallen on victim. Awaited
167 Unjha 28/8/2007 FAO Report awaited Awaited
168 Palanpur 25/8/2007 FAO Report awaited Awaited
169 Sarel 08/01/2007 FAOLeakage current flows from the Tr. Earth wire,
buffalo came into contact with it and died.Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 17
170 Nadi-Shala 28/8/2007 FAOLeakage current flows from the Tr. Earth wire,
buffalo came into contact with it and died.Awaited
171 Korda 25/8/2007 FHO .
Kunvarshi Karsanbhai Rabari--fatal , Dineshbhai
Balvantsing Thakor and other 5 persons met with N-
F-H accident. Students were travelling on roof of the
bus. One of them stood up on spare tyre kept on
roof of the bus,came into contact with live wire of 11
kv Rampura JGY feeder and met with fatal accident
and other 6 persons were having burn injuries.
Awaited
172 Andej 31/8/2007 FAOowner Amir Babarbhai , conductor snapped and
buffalo came int contact with it.Awaited
173 Dehgam T27/6/2007
3/9/2007FHO
Hiralal R Katara, victim tried to catch papaya tree
and came into contact with live lineAwaited
174 Kasana 5.8.07 NFHO
Victim (Patel Hasmukhbhai Kodarbhai.) in drunk
position himself while climbing on the pole of 11 Kv
Line touched to the live 11 Kv Line for attending
P/F..
Awaited
175 Itavdi 17.8.07 FAO
Due to phase wire snapped from D shackle touching
with earth wire causes leckage current in earthing
wire of 25 KVA T/c. The buffalo come in contact with
earth wire
Awaited
176 Rakhiyal 1.8.07 FAO
At the time of our Departmental Panchnama there
was no any dead body of buffalo at site, nor broken
conducter, hence no electrical accident.
Acci.occured due to heavy rain & flooded mesvo
river.
Awaited
177 Bamanvad 16.8.07 FAO
Due to breaking of L.T.Conducter fallen on the
ground, while passing from that place bullock of
Vankar Jayantibhai Jivabhai got shocked and died.
Awaited
178 Sunokh 24.8.07 FAO
Ther was short circuit in the premises of the
consumer , so return power came to the t/c, passed
through the earth wire. While passing from that
place buffalow of Tarar Amrutbhai Shambhubhai
came in contact with that wire , got shocked and
died.
Awaited
179 Shinavad(rajpur) 23.8.07 FAONo evidence found about leakage while detail
investigating and pnachnama. P.m. report awaited.Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 18
180 Balisana 21.8.07 FAO
On girder pole GI wire of 1ph service line came in
contact with open phase of service line due to strike
of buffalow of Gordhanbhai Karsanbhai Patel to
girder pole & lakage current passes through GI to
girder pole to body of buffalow
Awaited
181 Parbada 27.8.07 FAO
Due to cyclone branch of tree broken & fallen on to
the LT line & hence conductor broken & fallen on to
the buffalow of Rajusingh R Chauhan passing under
said LT line & current directly passed through the
body of buffalow and it died.
Awaited
182 Nani Demai 28.8.07 FAO
Due to cyclone branch of tree broken & fallen on to
the LT line & hence conductor broken & fallen on to
the buffalow of Vanaji Babaji Makwana passing
under said LT line & current directly passed through
the body of buffalow and it died.
Awaited
183 Juna Manka 20.06.07 FAOL/T conductor snapped ,buffalo came into contact
with it.Awaited
184 Badol 8.9.07 FHO
During Rainy season, and due to the lightning
stroke, the insulators damaged and LT wire was
broken and fallen on the ground, while passing from
that place smt. Makawana Reshmaben Kantiji came
in contact with that wire, got shocked and died.
Awaited
185 Moli 8.9.07 NFHO
For the protection of crop , the owner of the farm
had tapped the wire from the L/T line passing nearby
the farm and had given that tapped wire to the
fancing ,surrounded of his farm.While passing from
that place Kotwal Kaliben Shankarbhai came in
contact with that tapped wire and got non fatal elec.
shock, through her leg.
Awaited
186 Rajendra nagar 6.9.07 FAO
During Rainy season and due to cyclone the binding
of pin was broken and the phase wire touch the d-
clamp, and the leakage current was passed from the
earth wire, while passing from that place the bullock
of shri Rabari Lakhabhai Bhalabhai came in contacxt
with the earth wire, got shock and died.
Awaited
187 Badoli 12.9.07 FHO
From wooden board of Ag connection, there were
two flexible wires extended for lighting in the other
room in the farm. Now one of the wire had damag in
insulation and that wire touched the steel sheet. So
the leakage current was passed from the steel sheet
to supporting pole.There was the G.I. wire tied with
that pole for drying the clothes . Victim Shri Parghi
Dithabhai Saniyabhai came in contact with that G.I.
wire, got shocked and died.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 19
188 Galodiya 5.9.07 FHO
Due to faluty starter in the premises of the victim,
While operating the switch Victim shri Parghi
Tejabhai Arjanbhai got electric shock and died.
Awaited
189 Manipur 13.9.07 NFHO
Live conductor touched to GI earth wire due to
binding opened from shackle insulator. Victim
Kinjalben Rathod came into contact with GI wire and
got electric shock.
Awaited
190 Virochan- nagar 13.9.07 FHOL/T conductor snapped and victim Sejalkhan came
in contact with it and got shock.Awaited
191 Patan 7.9.07 FHOVictim directly touched to 11 kv live line
(approximately 1 metre away) from the tarrace.Awaited
192 Hadad 6.9.07 FAO
Disc insulator punctured and leakage current
observed in girder pole ,buffalo came into contact
with it.
Awaited
193 Ladol 23.9.07 FAODue to faulty starter of Ag conn. Leakage current
flows from Tr. Earthing, cow came in contact with it.Awaited
194 Valam 14.9.07 NFHD
Victim-Helper Vidyut Sahayak-Thakor Diwanji Viraji-
While attending Ag complaint victim removed all
three D/O fuses of transformer and started ork.
Unfortunately one strend of 1/18 copper wire was
hanging on upper contact of D/O fuse, due to wind
touched to lower contact of D/O fuse and
transformer was charged and victim got shock.
Awaited
195 Kothi Gam 18.9.07 FHO
Victim--Smt Gangaben Ramabhai Patel, victim got
sock in her own premises while operating defective
5 Amp. Switch.
Awaited
196 Amblipura 11.9.07 FHO under investigation Awaited
197 Alwada Goliya 24.9.07 NFHD
Victim--Solanki Rupsangji Panuji, V/S Helper ,while
attending fault conuctor of line found broken, so D R
Parmar L/I took the L/C of Vaktapura feeder and
work started on line for jointing of conductor and
Awaited
198 Dabhi 24.9.07 FHO Malek Mehbubkhan Hayatkhan, Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 20
199 Paloli 25.9.07 FAODue to snapping of conductor and camel came into
contact with it.Awaited
200 Sanand 14.9.07 NFHO
Victim--Nathubhai R. Chauhan ,Sanand N.P.
Employee, leakage current through GI earth wire
while repairing St. Lt. and fallen from pole and got
fracture on leg.
Awaited
201 Bopal 20.9.07 FAOLeakage current in stay wire through damaged cable
and buffalo came into contact with it.Awaited
202 Bopal 21.9.07 FAOCame into contact with live wire snapped due to
cyclone and fallen on ground.Awaited
203 Sughad 22.9.07 FAO Leakage current through GI wire. Awaited
204 Randheja 25.9.07 FAO
Leakage current in GI earth wire of Tr. Centre
through faulty motor of AG connection,buffalo came
into contact through water logged near Tr. Centre.
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 21
205 Odhav 23.9.07 NFHOVictim--Chhaganbhai Ukabhai Parmar, during illegal
constructionAwaited
206Vinoba Bhave
Nagar22.9.07 FAO
Due to defective wiring in consumer premises for
motor leakage current observed in cable ,buffalo
came into contact with it.
Awaited
207 Naz 22.9.07 FAOConductor snapped due to cyclone and buffalo came
into contact with it.Awaited
208 Jaspur 24.9.07 FHO
Victim Harsukhbhai S Magarwa, have made direct
connection by tapping from L.T. line, for heater and
touched live heater coil and got shock.
Awaited
209 Bhempoda 19.9.07 FAO
Due to internal fault of consumer installation having
three phase connection, one phase was short, and
due to that leakage current was passed from neutral
of t/c. and through the earth wire of the t/c, while
passing from tjhat place the goat came in contact
with that earth wire, got shocked and died.this
accident was occured in the campus area of the Dy.
Exe. Engr, Vatrak s/dn.
Awaited
210 Dalpatpura 22.9.07 FAO
Due to cyclone and heavy wind tree fallen on the LT
line and snapping of conductor occurred, and the
Buffalow of Shri Parmar Jayantibhai Savabhai came
in contact with the live conductor , and got shocked
and died.
Awaited
211 Ghadi 22.9.07 FAO
Due to cyclone and heavy wind tree fallen on the LT
line and snapping of conductor occurred, and the
goat came in contact with the live conductor , and
got shocked and died.
Awaited
212 Chiboda 24.9.07 FAO
Due to heavy cyclone & rain tree fallen on LT line &
single phase service wire broken. Phase wire of
service touch to state light fixture and current pass
through earth wire victim came in to contact of earth
wire & get shock & died.
Awaited
213 Sariyad 27.9.07 FAO
Due to faulty motor of SGP W/W leakage current
observed on earthing of T/C ,buffalo came in contact
with it.
Awaited
214 Patan 26.8.07 FAOLeakage current flows from earth wire of Tr centre,
buffalo came into contact with it.Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Page 22
215 Chalasan 22.9.07 FHO
Accident occurred at consumer premises ,during
visit and investigation no any leakage current
observad. Victim
Awaited
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Nature of
Complaints
Complaint
Classification &
its No.
1 2 3 4 5 6 7 8 9 10 11
This form of Register is Maintained by . Gujarat Vij Company Ltd
Whether
redressed
within
stipulated time
as per
standards of
performance
Yes/No
Uttar Gujarat Vij Company Ltd ,Mehsana
QUARTER :-2nd July-07 to septmber-07
Performa Sop 003 A: (already in the SoP regulation )
Format for registering the complaints at complaint centers and offices of Junior Engineer / Assistant Engineer
APPENDIX-A
YEAR :-2007-08
Total
duration
of
Interruptio
n
(8x9)=10)
(in
hrs./mts)
Sr.
No.
No. of
Consumers
affected
Name , Address & A/C NO. of
the complainant
Unique no. of
complaint
Time & Date
of receiving
complaints
Complaints classification
Time & date of
redressal of
grievance
Total time
taken (in
Hrs/mts)
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Within 50%
of
stipulated
time
Within
stipulated
time
Upto
double the
stipulated
time
More than
double the
stipulated
time
1 2 3 4 5 6 7 8 9 10
A(i) 0 46352 51568 14625 36943 0 0 51568 0
A(ii) 0 17827 18242 8526 9716 0 0 18242 0
A(iii) 0 4831 5113 2412 2701 0 0 5113 0
B(i) 0 838 1086 269 817 0 0 1086 0
B(ii) 0 414 582 92 490 0 0 582 0
C(i) 0 10162 10342 3437 6905 0 0 10342 0
C(ii) 0 1275 1505 518 987 0 0 1505 0
D(i) 0 3430 3638 1431 2207 0 0 3638 0
D(ii) 0 198 373 35 338 0 0 373 0
E(i) 0 2486 2725 910 1815 0 0 2725 0
E(ii) 0 3132 3367 492 2875 0 0 3367 0
F(i) 0 1808 2046 621 1425 0 0 2046 0
F(ii) 0 653 912 123 789 0 0 912 0
F(iii) 0 459 658 112 546 0 0 658 0
F(iv) 0 964 1134 303 831 0 0 1134 0
G 0 311 569 85 484 0 0 569 0
H 0 4616 6742 443 6299 0 0 6742 0
0 99756 110602 34434 76168 0 0 110602 0
Total (5) to
(8)
Classifi
cation
Pending
complainto
f previous
month
Complaint
s received
during the
month
Total
complaints
QUARTER :-2nd July-07 to septmber-07
YEAR :-2007-08
Balance
complaints
to be
redressed
(4) - (9)
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SoP 003 B:
APPENDIX - B (already in the SoP regulation )
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
In stipulated time Beyond stipulated time
No.of complaints redressed during the month
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
CLASSIFICATION OF COMPLAINTS:
(A) Interruption in power supply.
(i) Loose connections from pole
(ii) Interruption due to line breakdown
(iii) Interruption due to failure of transformer
(B) Quality of power supply(i) Ordinary case, which requires no augmentation.
(ii) Where augmentation is required.
(C) Meters
(i) Stopped/Defective Meters.
(ii) Billing on average basis for more than two bills
(D) Overhead lines
(i) Loose Wires
(ii) Inadequate ground clearance
(E) Bills
(i) For current bills where no additional information is required.
(ii) Where additional information relating to correctness of reading etc. is required.
(F) Service connections (Domestic & Non Domestic)
(i) Where extension of mains is not required.
(ii) Where extension of mains is required.
(iii) Modification in connected load.
(iv) Name change/reconnection.
(G) Refund of amount due in regard to temporary connection.
(H) Others
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr. No.Actons or steps carried out by distribution licensee towards
public awareness in the quarterLikely number of consumers influrenced Details about media
1 2 3
1 Display board of SOP at circle, Division & S/Dn 55860 Notice Board
2Display board of Name of information officers under RTI Act 2005 at
Circle,Division,Sub- division offices. 39900 Notice Board
3Consumer care centers at various 17 places
15300Verbal & Notice Board
at CCC
4 Advertisement through Daily News papers 22300 Daily News papers
5 Pamphlets distributed among public 35000 Pamphlets
6Advertisement through slide in TV / Banners
12725 T V Channels
7 On Uttar Gujarat Vij Company Ltd Web site 4500 Internate
8 Through Regular Energy Bill 75650 Energy Bill
Uttar Gujarat Vij Company Ltd ,Mehsana
QUARTER :-2nd July-07 to septmber-07
YEAR :-2007-08
Performa SoP 004
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Name of
complaina
nt
Complaint
Unique
Number
Coplaint
classificati
on
Time & Date
of 1st
meeting
Details of
Redressal
Procedure
carried out
Time & Date
of 2nd
meeting
Details of
Redressal
Procedure
carried out
Time & Date
of 3rd
meeting
Details of
Redressal
Procedure
carried out
Remarks &
result about
the complaint
Orders in
favour of
consumer
or discom
1 2 3 4 5 6 7 8 9 10 11
Uttar Gujarat Vij Company Ltd ,Mehsana
This register is maintained by the Uttar Gujarat Vij Company Ltd
YEAR :-2007-08
Performa SoP 005 A: Action taken report by the Redressal Committee
QUARTER :-2nd July-07 to septmber-07
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr. No. MonthDate and time meeting
conducted
No. of complaints
registered at the meeting
NO. of complaints pending at the
end of the meeting
1 July.-07 17-07-07 at 12.00 hr 8 1
2 August.-07 7-08-07 at 12.00 hr
& 16-08-07 at 12.00 hr 12 1
3 September.07 11-09-07 at 12.00 hr 5 1
QUARTER :-2nd July-07 to septmber-07
YEAR :-2007-08
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SoP 005 B: Action taken report by the Redressal Committee
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr.
No.
No. of existing Distribution
transformer at the start of the
quarter / year
30.6.2007
No.of Distribution
transformers added during
the quarter / year
(July-07 To Sept-07)
Tota number of
Distribution transformers
As on 30.9.2007
Total number of
Distribution
tranformer failed
(Three months)
% failure rate of
Distribution
transformer
A B C=A+B D H= (D) * 100/C
1 104926 925 105851 5880 5.55
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SOP 006 : Failure of Distribution Transformer.
QUARTER :-2nd July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr.
No.
Category of
consumers
Sample size
(Numbers)
Stadard specified
in regulation
Deviation of results
from the sample test
(Numbers)
% age compliance
(6)=(5)*100/(3)
1 2 3 4 5 6
LT Consumers
1 Domestic 2%
2 Commercial 2%
3 Industrial 2%
4 Agriculatural 2%
5 Public work works 2%
HT Consumers
6 HT Industrial 2%
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SOP 008 : Sample Test result for Neutral Voltage
Compliance Sample Test result for Neutral Voltage
To be sent Annualy
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Voltage levelSample size
(Numbers)
Limit or
prescribed
Standard
Deviation of results
from the sample test
(Numbers)
% age compliance
(5)=(4)*100/(2)
1 2 3 4 5
Low Voltage +6% to -6%
High Voltage +6% to -6%
Extra High Voltage +10% to -10%
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SOP 009 : Sample Test result for Voltage variations
Compliance Sample Test result for Voltage variations
To be sent Annualy
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr.
No.
Category of
consumers
Sample size
(Numbers)
Limit or
prescribed
Standard
Deviation of results
from the sample test
(Numbers)
% age compliance
(6)=(5)*100/(3)
1 2 3 4 5 6
1 LT Consumers 4%
2 HT Consumers 3%
3 EHT Consumers 3%
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SOP 0010 : Sample Test result for Harmonics
Compliance Sample Test result for Harmonics
To be sent Annualy
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr. No. Month
Ni-Total No.of
customers for
each momentary
interruptions
Nт-Total No.of
customers servedCI = ΣNi SAIFI= CI/Nт
1 2 3 4 5=Total of (3) 6=5/4
1 Jul-07 * 2059969 6375232 3.09
2 Aug-07 * 2064830 4532477 2.20
3 Sep-07 * 2084778 3202930 1.54
TOTAL 6209577 14110639 2.27
* Feeder wise data is calculated seperately for whole company
Uttar Gujarat Vij Company Ltd ,Mehsana
SoP 011 - A : System Average Interruption Frequency Index (SAIFI)
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr. No. Month
ri-Restoration
time for each
interruption
event
Nт-No.of
interrupted
constomers
for each
sustained
interruption
event
ri * Ni - Total
customer
interruption
duration in
HH:MM
Nт-Total No.of
customers
served
Customer
interruption
Duration
CMI = ΣriNi in
HH:MM
SAIDI= CMI/Ni
in HH:MM
1 2 3 4 (5)=(3)*(4) 6 (7) =Total of (5) (8) = (7) / (6)
1 Jul-07 * * 14750029:00 2059969 14750029:00 7:16
2 Aug-07 * * 8351674:00 2064830 8351674:00 4:04
3 Sep-07 * * 5134069:00 2084778 5134069:00 2:46
TOTAL 28235772:00 6209577 28235772:00 4:55
* Feeder wise data is calculated seperately for whole company
Uttar Gujarat Vij Company Ltd ,Mehsana
SoP 011 - B : System Average Duration Index (SAIDI)
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr. No. Month
Number of
momentary
interruptions
Imi
Nmi-Total
No.of
constomers
for each
momentary
interruptions
Imi*Nmi- No.of
constomers
momentary
interruptions
Nт-Total No.of
customers
servedΣIMiNmi
MAIFI=
ΣIMiNmi/Ni
1 2 3 4 (5)=(3)*(4) 6 (7) =Total of (5) (8) = (7) / (6)
1 Jul-07 * * 39743095 2059969 39743095 19.29
2 Aug-07 * * 33274084 2064830 33274084 16.11
3 Sep-07 * * 30096752 2084778 30096752 14.44
TOTAL 103113931 6209577 103113931 16.61
* Feeder wise data is calculated seperately for whole company
Uttar Gujarat Vij Company Ltd ,Mehsana
SoP 011 - C : Momentary Average Interruption frequency Index (MAIFI)
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
1
iEnergy Delivered into EHT / 11 KV and LT Distribution
System from EHT / 11 KV SSs (Mus)A 5195.69
ii Energy Sold (Billed) EHT direct sales (Mus) B 877.41
iii Energy Sold (Billed) in the 11 KV LT system (Mus) C 3594.3
iv Total Sales (Mus) (B+C) 4471.71
v Losses (Mus) {(A) - (B+C)} 723.98
vi % Losses {(A) - (B+C)} X 100 / (A) 13.93
Losses in 11 KV System and Connected Equipment
SoP 012 - CALCULATION OF SYSTEM LOSSES AT EHT / 11 KV
Uttar Gujarat Vij Company Ltd ,Mehsana
Performance SoP 012 - System Losses at EHT / 11 KV and below
QUARTER :-Half Yearly April-07 to August-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Consumer
Category
No. of faulty meters
at the start of the
quarter / year
No. of faulty
meters added
during the quarter
/ year
Total No. of
defective / faulty
meter
No. of faulty Meters
repaired and
replaced
No. of faulty meters
pending at the end
of the quarter
1 2 3=2+1 4 5=3-4
Single Phase 24622 26154 50776 26605 24171
Three Phase 625 4884 5509 4869 640
H.T. 0 0 0 0 0
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SOP 013 : Meter faults
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Qtr. MonthsUnits input
(Mus)
Units Billed
(Mus)
Billing
Efficiency
Revenue Billed
(Rs. Lacs)
Revenue
Collected (Rs.
Lacs)
Collection
Efficiency %
Business
EfficiencyATC Loss %
A B C=(B/A)*100 D E F=(E/D)*100 G=(C*F)/100 H=100-G
Apr-07 1331.99 943.13 70.806 22052 21914 99.37 70.36 29.64
May-07 1343.53 986.77 73.446 27870 25761 92.43 67.89 32.11
Jun-07 1028.95 972.42 94.506 23621 19948 84.45 79.81 20.19
Sub Total 3704.47 2902.32 78.346 73543 67623 91.95 72.04 27.96
Jul-07 762.51 778.91 102.151 25473 20055 78.73 80.42 19.58
Aug-07 726.48 778.02 107.094 20960 18898 90.16 96.56 3.44
Sep-07 0 0.00 0.000 0 0 0.00 0.00 100.00
Sub Total 1488.99 1556.93 104.563 46433 38953 83.89 87.72 12.28
Oct-07
Nov-07
Dec-07
Sub Total
Jan.-08
Feb-.08
March.-08
Sub Total
V Grand Total 5193.46 4459.25 85.863 119976 106576 88.83 76.27 23.73
YEAR :-2007-08
III
IV
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SoP 014: Statement Showing the ATC losses, collection efficiency and Billing Efficiency
I
II
QUARTER :-2nd, July-07 to septmber-07
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Consumer Category
Total No. of
consumers
connected As on
July-07
Total New
application
received at the
end of the quarter
/ year
No. of release of
connections in the
quarter / year
No. of pending
applications for
release of new
connections in the
quarter / year Paid &
Pending
Domestic 1617403 46075 40892 737 1658295
Commercial 204205 2424 2152 81 206357
Industrial LT 28223 1495 1139 65 29362
Agriculture (Total) 209605 2915 2451 408 212056
Industrial HT 1498 162 88 53 1586
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SOP 015 : Release of New connection status as on Sept-07
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
Sr. No. Event Compensation
No. of cases where
compensation was given
(in numbers)
Amt.of compensation paid
(in Rs.)
Duty to provide supply
a) New connection
b) Additional load
c) Temporary supply
d) Shifting service
connection
e) Transfer of service
connection
f) Change in tariff category
of consumer
2 Complaints in billing Rs.50 for non reply within
the period prescribed in
Regulations
3 Replacement of metersLT Rs.25 per day of delay
maximum Rs.2,500 and HT
Rs. 250 per day of delay
maximum of Rs. 5,000/-
4 Interruption of supply LT Rs.25 for every 6 hrs. of
delay maximum of Rs.500
and HT Rs. 50 for every 6
hrs. delay maximum Rs.
1000
5 Voltage fluctuations and
complaintsRs.50 for failure to visit or
convey findings wihin the
stipulated period
6 Responding to consumers
complaints
Rs. 25 for each day of delay
maximum Rs. 500
7 Grievance Handling Rs. 25 for failure in handling
grievance.
Rs.50 per day of delay from
the limit specified in the
performance regulations
1
Uttar Gujarat Vij Company Ltd ,Mehsana
Performa SoP 016 : Compensation details
COMPENSATION DETAILS
QUARTER :-2nd, July-07 to septmber-07
YEAR :-2007-08
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls
TOTAL :- …NIL… ……NIL…..
C:\Documents and Settings\UB Chauhan\Desktop\SOP\18-10-2008\SoP 2007-08\SOP Report-2nd Qtr.xls