utah’s premier revised

19
Presented by: Mike Sowby – General Manager Jason Harr – Project Manager Jason Denham – Site Manager

Upload: rainchick13

Post on 20-Jun-2015

572 views

Category:

Business


0 download

DESCRIPTION

Utah’s Premier Revised

TRANSCRIPT

Page 1: Utah’s Premier Revised

Presented by: Mike Sowby – General

ManagerJason Harr – Project Manager

Jason Denham – Site Manager

Page 2: Utah’s Premier Revised

Major ProjectsLEED® (Green) Certified Projects

Rooftop Gardens (Vegetated Roof Surfaces)Sub- Surface Drip Irrigation

Page 3: Utah’s Premier Revised

Intermountain Health Care Hospital - Murray1,100 Trees 67,000 Shrubs

Contract Amount: $2.5 Million

Page 4: Utah’s Premier Revised

Project under $50,000LEED® (Green) Certified Project

Sub Surface Drip Irrigation

Page 5: Utah’s Premier Revised

Close to 40 acres of sub-surface drip irrigationContract Amount: $4.5 Million

Page 6: Utah’s Premier Revised

Rooftop Gardens using Utelite e-soilLEED® (Green) Certified Project

Page 7: Utah’s Premier Revised

I-215 and Redwood Pleasant Grove Exit

Legacy Parkway

Page 8: Utah’s Premier Revised

12 Acres of LandscapingTo be completed mid-year 2009

Page 9: Utah’s Premier Revised

Sample of Current PropertiesWarranty

Owner Relationships

Page 10: Utah’s Premier Revised
Page 11: Utah’s Premier Revised
Page 12: Utah’s Premier Revised
Page 13: Utah’s Premier Revised
Page 14: Utah’s Premier Revised
Page 15: Utah’s Premier Revised

Value EngineeringDesign – Build

Budget Numbers

AP – 300 3” Bronze Ball Valve•$234.48

BV – 300 3” Bronze Ball Valve•$80.57

Page 16: Utah’s Premier Revised

Hard Hats on every jobBright Safety Vest with Logo

Safety Glasses

Page 17: Utah’s Premier Revised
Page 18: Utah’s Premier Revised

We have over 250 years of landscape industry experience within our management team.

Page 19: Utah’s Premier Revised