Page 1: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Using PI for Back Testing Usage-Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management

Gopal GopalKrishnan, P.E. OSIsoft, Inc.

Larry Hruby Basin Electric

Mark Blaszkiewicz Sebastien Cournoyer, CMRP DTE Energy

Page 2: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Agenda

• About Basin Electric, About DTE Energy• History of PI System at Basin Electric and DTE Energy• History of maintenance systems:

– Basin has Ventyx AssetSuite (aka Indus Passport)– DTE has IBM Maximo

• Case studies for back-testing:– Usage-based strategies– Condition-based strategies

• Q & ASebastien Cournoyer, CMRP DTE Energy

Page 3: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

What You Can Expect

• Talk is not product specific – use several tools available in the PI Infrastructure

• Start with maintenance tasks and work backward to see if data exists in operations history that can be used– Collect additional equipment inspection data for proactive

maintenance

• Use PI tools and in-house resources in small increments without new capital outlay

Page 4: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Coal-fired Power Plant

http://en.wikipedia.org/wiki/Fossil_fuel_power_plant

Page 5: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Basin Electric Power Cooperative

• HQ – Bismarck, North Dakota, wholesale provider (generation and transmission) of power to 126 Rural Electric Systems covering portions of 9 states

• Operate coal, wind, gas, oil based power generating facilities and a synthetic natural gas production facility

• Capacity– 3623 MW (Base load)– 405 MW (Peaking – CTs)– 136 MW (Wind)

Page 6: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Basin - Leland Olds Station (LOS)Fuel: Lignite with PRB (Powder River Basin) blending

Unit 1: 220 MW - 1966 Pulverized Coal Boiler (Babcock & Wilcox) Turbine, GE DCS, Emerson Ovation 2007 upgrade

Unit 2: 440 MW - 1975 Cyclone boiler (Babcock & Wilcox) Turbine, Alstom DCS, Emerson Ovation 2006 upgrade

Under Construction: Limestone Scrubbers for SO2 capture ($410MM capital project)

Leland Olds, Stanton, North Dakota

Page 7: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Leland Olds Station (LOS)– Software Infrastructure

OSIsoft PI (piloted in 2005)• 20,000 tags• Emerson Ovation DCS, Rockwell PLCs, GE relays

Ventyx Asset Suite (previously Indus Passport)• Started using in 1998 as Passport, has evolved into Asset

Suite in 2008 • Used for Work Management, PM’s, Inventory,

Equipment spec’s & history, Purchasing, Contracts

Page 8: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Leland Olds – Maintenance Initiatives

• Working toward condition based maintenance (CBM) for years– Vibration, oil analysis, thermography etc.

• Investigated Rockwell and OSI PI as platform to feed CBM and operational data to AssetSuite

• PI data reviewed:– Standard PM work orders usage based– Machine status work order management– Sensor drift and calibration– Control Loop Health– Condition-based notification

Page 9: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

DTE Energy – Detroit Edison

Detroit Edison

• Michigan’s largest electric utility with 2.2 million customers

• Over 11,000 MW of power generation from 7 plants - mostly coal fired

• 54,000 GWh in electric sales

• $4.7 billion in revenue

DTE Energy - Detroit Edison

Page 10: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

DTE - Plants and Performance Center

Greenwood – 785 mwRiver Rouge - 527 mw Fermi – 1,100 mw

Monroe – 3,135 mw

Trenton Channel - 730 mw

Belle River – 1,260 mw

St Clair – 1,417 mw

Harbor Beach – 103 mw

Performance Center – 11,588 mw

Page 11: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

DTE – History of PI and Maximo

• PI is a key infrastructure and technology enabler for real-time operations data as part of the “Enterprise Business System” at DTE

Additional details from a Nov. 2008 presentation at:

www.osisoft.com/osisoft/downloads/Regional_Seminars/Detroit/DTE%20Energy%20(John%20Kapron).pps

• IBM-Maximo is a key application for work management as part of the “Enterprise Business System” at DTE

Additional details at:

http://www-03.ibm.com/press/us/en/pressrelease/21649.wss

Page 12: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Success!

DTE – Details of PI usage

• In use since 1998 – started with a pilot at Monroe in 1998

• Enterprise Agreement for corporate wide use

• PI is an infrastructure product – magnitude of use and functionality is expanding

Page 13: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

DTE - Total Fleet Management

Real-timeProcess Applications

Distributed Control Systems (DCS) Distributed PI Historians

WEB Portal

SME Status Displays

Applications

Expert Systems

FinancialsWork Management

SAP Maximo

Market

MISO, Fuel Coat Framework

Unit Capacity Framework

Drives Performance Excellence Process CostsAsset Health

Operational Performance Market Value

Fleet Optimization

Page 14: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Discrete data Limited value

ActionableInformation – KPI’s

Distributed Control Systems (DCS) Distributed OSIsoft PI Historians

Large Population of Data

Post Event Analysis DCS, PLC & PI

90%

Business IntelligenceOutage & De-rate (UCF)Maintenance & Market

Relate all Data SourcesProcessNet Framework

(PI, ProcessGuard, Maximo, SAP, UCF, P3M, Predictive Monitoring, NeuCo, LIMS, Plant View ..)25%

% CompleteABB

System DashboardsFleet Status Assessment

Fleet Drill downSubject Matter Experts90%

WEB VisualizingPlant Alarm, DCS Real-time WEB Graphics

Easy Access to Information

Standard User InterfaceWEB Visualization

100%

Engineering Applications PMAX, Digital Fuel Tracking, Fuel Cost Framework

Process Discrete Data

Process Discrete Data Engineering ApplicationsRFID, PMAX, DFTS, eNote,

Fuel Cost Framework,Alarm Management 90%

Expert SystemsPredictive Monitoring, Optimization

MBO/PdM/Risk Assessment

Advanced Analysis & Process OptimizationReliability Academy

Equipment, Process, Performance, Reliability ModelsClosed Loop Process Optimization60%

DTE - Control & Technology FrameworkDTE - Control & Technology Framework

Fossil Generation Business Unit Strategy

People Making right decisions when it matters!

Fleet Optimization

Process CostsAsset Health,Market Value

Drives Performance Excellence Fleet Optimization

Process Costs, Asset Health,Reliability

Operational Performance, Market Value

15%

Page 15: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Link Operations and Maintenance

• Business goals– Usage based maintenance (UBM) strategies

• Mostly, data is already in PI– Condition-based maintenance (CBM) strategies

• When relevant data not in PI, collect equipment inspection specifically designed to drive maintenance benefits

• Business justification– Calendar-based maintenance strategy := Amount of

maintenance will be same as last year – UBM and CBM:= Opportunities for savings– Use PI history and Maintenance history to:

• Back-test calendar based PM for conversion to UBM • Back-test corrective work order (CM) events for conversion

to CBM

Page 16: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Usage-based Criteria

• Run-hours - – Coal feed conveyor – Pulverizer– High pressure service water pumps

• Run-modes - number of starts, number of trips – Peaker CT blades

• Run-weight - tonnage processed (mining industry), flow-rate (time-integral) converted to volume

• PI totalizer • PI time-filtered conditional expressions (time-weighted and event-weighted)

Page 17: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Service Water Pump – Usage BasedPumps were off for extended period, however the PM WO still went out - 28 PM hours

Page 18: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Fuel Conditioner – Usage BasedEquipment runs about 80% of total year; usage based maintenance can save 152 PM hours

Page 19: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Coal Conveyor - Usage BasedMaintenance: 60 PM hours per conveyor per year; 22 conveyors per site, 6 sites

Actual runhours: 25% based on PI data, implies a 75% savings

Projected savings: 900+ PM hours (approx. $45,000 at $50/hr) per year per site

Page 20: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Pulverizer - Usage BasedMaintenance: 160 PM hours per pulverizer per year; 16 pulverizers per site, 6 sites

Actual runhours: 80% based on PI data, implies a 20% savings

Projected savings: 480+ PM hours (approx. $25,000 at $50/hr) per year per site

Page 21: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Condition-based Criteria

• Equipment failure is known to be correlated to a slowly degrading metric that can be monitored– Temperature (Motor windings, Bearing) – Pressure or DeltaP (heat-exchanger plugging, filters)– Vibration – Amplitude, FFT etc. ; Also interpret along

with operations data in PI

• Instrument and transmitter calibration• Control loop health

Page 22: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Secondary Air Heater PluggingAir heater tube plugging causes DeltaP (green line) to increase over several months and is a trigger for maintenance

Page 23: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Boiler (convection section) Tubes - PluggingRapid rate of change of Delta P over several days is a trigger for maintenance

Page 24: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Steam Condenser FoulingSteam condenser fouling causes condenser pressure to rise (blue line), note the rapid rise in a matter of few days. Threshold is 4 inHg.

Green line shows the inlet water temperature which is relatively constant

Page 25: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Vibration – Conveyor Motor - Note the rapid rise in vibration amplitude in Jan. and Feb.; also shown in the trend.

- Resolved by a shaft re-alignment – see next slide

Page 26: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Vibration – Conveyor Motor Shaft realignment resolves the vibration issue

Page 27: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Instrument Drift – O2 Analyzer – U2-EBased on redundant dual sensors

Page 28: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Transmitter Drift

Good

Not Good

Boiler feedwater pump discharge pressure

Based on redundant triple transmitters (PressA, PressB and PressC)

XY Plot, PressA (X) vs. PressB (Y1), PressC(Y2)

Page 29: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Transmitter Drift – U1 – Spray FlowGreen – Delta between the transmitters Blue – Unit 1 is at about 220 MW

Page 30: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Firing Rate Control Loop – Boiler Exit O2O2 set point: Approx. 3.2%

Actual process value (green line): Varies from 1% to 5.5%

Page 31: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Firing Rate Control Loop – See NotesAt purple crosshair, air (red) peaks when coal (yellow) dips causing O2 (green) to peak after 30-40 secs.

At white crosshair, air (red) dips when coal (yellow) peaks causing O2 (green) to fall below 1% after a lag of 30-40secs, and so on….

Page 32: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Manual Inputs – Operator Rounds in PI

Source: www.aeec.com/conveyor/Belt_Cleaners/Vplow.aspx (retrieved Jan 2009)

Operator Rounds: V-PLOW status on a coal conveyor belt

Equipment inspection data collection specifically designed to help maintenance tasks (data not already in PI)

Benefits: Proactive maintenance for increased MTBF (mean-time-between-failure)

Page 33: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Breaker Inspection SheetEquipment inspection data specifically designed to help with maintenance tasks (data not already in PI)

Data collection includes numeric values such as resistance, clearance etc.

Page 34: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

• Breaker inspection – 80 attributes per breaker, 1000 breakers – annual inspection or after a trip• Dust Collector• Screw conveyor• Electric motor • Reducer • Bearings• Transfer point / chute liner condition• Limit-torque actuator• Hydraulic cylinder, Pneumatic cylinder• Pumps• Mechanical seals• Conveyor skirting• Conveyor scraper, primary and secondary• Idler, roll assembly• Pulley• Lube system• Coupling• Torque coupling• Valve• Piping

Manual Inputs – Operator Rounds in PIEquipment inspection data specifically designed to help with maintenance tasks (data not already in PI)

Everything we visually inspect, measure or observe can be recorded in PI to track, trend and monitor

Page 35: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Findings• Operations history and maintenance history can validate and

quantify benefits for usage-based criteria prior to deployment

• Use manual input data (Manual Logger) to supplement condition-based strategies

• Review control loops, including the instruments, transmitters and calibrations

• Vibration data – combine with equipment operating conditions for better diagnostics

Page 36: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Enterprise GatewaySOA (service oriented architecture) to exchange information between the PI System and any external system via web services.

Page 37: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Questions?

Page 38: Using PI for Back Testing Usage- Based and Condition-Based Maintenance Strategies Prior to Deployment in Asset Management Gopal GopalKrishnan, P.E. OSIsoft,

Thank you