![Page 1: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/1.jpg)
US Resiliency Council
PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System
Presented by
Ron MayesCo-Founder of USRC
![Page 2: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/2.jpg)
The Earthquake Risk Exposure Dilemma
• People lack the information they need to make better risk management choices for themselves
• This has serious and large societal consequences
• Current choices are made within a complex, entrenched system
Improving this situation requires new risk information to be created, delivered and shared in ways that can significantly
impact what people believe and do.
![Page 3: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/3.jpg)
Potential Buildings at Risk
• Unreinforced masonry buildings • 30%+/- of concrete buildings, those built before 1976• Pre-cast and flat slab concrete structures• Concrete tilt-ups pre-1997• Welded steel moment frame buildings pre-1994 • Multistory wood frame with tuck under parking• Soft story buildings
![Page 4: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/4.jpg)
Barriers to Understanding and Communicating the Risks
• Predicting and conveying the earthquake performance of a building, and its implications, are difficult tasks
• Most people have mistaken beliefs about what current code means for performance
– Common perception: buildings will perform better than they actually will
![Page 5: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/5.jpg)
Quote from 1990’s Uniform Building Code
(emphasis added)
“These Recommendations primarily
are intended to safeguard against
major failures and loss of life, not to
limit damage, maintain functions, or
provide for easy repairs.”
![Page 6: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/6.jpg)
Three Types of Hazard Input Assumptions That Can Be Used to Assess Performance
Design Basis – Code Design Level 2/3 MCE with return periods ranging from 350 to 800 years
Scenario EventSpecific Magnitude Earthquake – e.g. 7.5
Maximum Considered Earthquake (MCE)Collapse Prevention is Code Goal
2% probability of being exceeded in 50 years but with an upper bound cap.
Return periods ranging from 1500 to 2500 years
![Page 7: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/7.jpg)
Quotes from ASCE 7-10 Seismic Code(2000 onwards)
• There is a low likelihood of collapse in the Maximum considered earthquake (MCE)
• Life threatening damage will be unlikely in the Design level earthquake, which is 2/3 the MCE
• Given the occurrence of an MCE, there will be substantial damage in many structures rendering these unfit for occupancy or use
![Page 8: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/8.jpg)
Christchurch Earthquake NZ 22 Feb. 2011
• September 2010 was the design earthquake • February 2011 was the maximum credible event
![Page 9: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/9.jpg)
70% of buildings in downtown are now demolished
• Did building codes provide the performance expected ? – Depends who answers the
question– Structural engineers say yes – Public are shocked and say no
Christchurch Earthquake NZ 22 Feb. 2011
![Page 10: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/10.jpg)
The Future: Performance Based Design
ATC 58: a 10-year $12M FEMA Funded Project
Earthquake performance expressed in
Deaths, Dollars, and Downtime
Results and implications are expressed in ways that decision makers can understand, afford, and implement.
![Page 11: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/11.jpg)
Confluence of Three Major Developments
• ATC 58 provides inputs for a multi-dimensional rating
• Rating systems currently available– Existing building: – New buildings:
• Mayor Garcetti’s State of the LA City Speech (4/10/14)– “Develop the first rating system in the US to detail the earthquake
safety of our buildings”
Without these tools a discussion of implementing a rating system would not have been possible five years ago.
![Page 12: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/12.jpg)
US Resiliency Council
Founded in 2011 to be the administrative vehicle for implementing rating systems for buildings (similar to USGBC-LEED)
Strategy:
– Use information and market forces to incentivize action
– Bring together diverse stakeholders and technical experts into leadership and advisory positions
– Promote quality, usability, and fairness to increase public acceptance, adoption and implementation
Vision:
– Expandable to multi-hazards (hurricanes/tornadoes, flood, blast etc)
![Page 13: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/13.jpg)
OwnersLendersInsurersTenantsElecteds
RegulatorsContractorsEngineers
Current USRC Structure – 501(c)3 non-profit
Technical Advisory Board
Board of Directors
Accredited Professionals
Peer Reviewers
Executive Director
Users of Ratings
Stakeholders Advisory Board
EngineersProfessional
Organizations
![Page 14: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/14.jpg)
Committed Founding Members of the USRC
• All major professional organizations in EQ Engineering – SEAOC, NCSEA, EERI, ATC, LA Tall Building Council, PEER
• San Francisco City and major structural engineering firms. Current Founding Members of USRC
Firm Firm Arup Newmark Capital ATC Partner Engineering &Science Bentley PEER Brandow and Johnston Rutherford & Chekene Buehler & Buehler San Francisco City Core Brace Saif Hussain & Associates CSI Saunders Retrofit Constractors David Friedman SEAOCDegenkolb SEAOCC DIS SEAONC EERI SEAOSCEPS SEAOSD Forell/Elsesser SGH Hilti SikaHohbach-Lewin & Assoc. Simpson Strong TieHolmes Group SOM John A Martin Structural Focus Kate Stillwell Thornton Tomasetti KPFF Walter P. Moore LA Tall Building Council Weidlinger Marx Okubo ZFA Nabih Youssef & Assoc.
![Page 15: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/15.jpg)
USRC’s Strategy and Theory of Change for Earthquake Performance Ratings
Review, approve, adapt, and utilize
existing evaluation methodologies
Provide training, accreditation,
quality control, and information access
services
Make valid, usable,
trustworthyrisk information
accessible to people who
need it
Spurs actions and systemic change that reduces seismic risk in the building stock
USRC…
and…
to… which then…
Activities OutputsIntermediate and
Long Term Outcomes
Overall increased disaster resilience in the broader community.
leading to…
![Page 16: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/16.jpg)
Potential Seismic Rating “Stakeholders”
Includes :• On-site—tenants, lessees, employees • Building professionals—engineers, architects, contractors• Real estate—
o developers, brokers, property managerso owners and potential owners (investors, corporations,
governments, individuals)
• Financial sector—lenders, insurers, re-insurers• Public sector—utilities, planners, local agencies, schools,
religious institutions, federal agencies
![Page 17: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/17.jpg)
Evidence of Stakeholder Perceptions: 2011 ATC 71-2 Workshop
Over 40 participants representing:
Earthquake Performance Rating System Workshop (FEMA, SEAONC)
Owners
Banking
Insurance
Real EstateEngineering
Architecture
Universities
![Page 18: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/18.jpg)
Key Elements of a Rating SystemATC 71-2 Workshop
DDDMultiple Dimensions
Peer Review
Appropriate Cost Structure
Credibility of System
Communication Format
![Page 19: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/19.jpg)
ATC 71-2 Workshop Findings
• Significant majority of attendees were in favor of having a system
• Implement it ASAP
Key Unresolved Issues:
Who should produce a rating?
How can quality, credibility, and fairness be assured?
How much will it cost?
![Page 20: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/20.jpg)
ATC 71-2 Workshop Findings: Rating Dimensions
• Report 3 Dimensions– Safety– Repair Cost– Time to Regain Function
• Potentially combine 2 or more dimensions into 1 rating for certain uses– e.g., a city or business may choose to use just 1 dimension such as
safety
![Page 21: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/21.jpg)
Two Rating Systems Have Been Developed
• 6-year SEAONC effort to develop Earthquake Performance Rating System (EPRS) for existing buildings– Translates the results of an ASCE 31/41 evaluation
• REDi system developed by Arup for the design of new buildings – Provides recommendations for performance goals that exceed
those inherent in current code requirements, and a planning process for achieving them
![Page 22: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/22.jpg)
Attributes of a SEAONC and REDi Rating
Safety
Repair Cost
Time to Regain Function
Three Dimensions – similar to ATC 58
![Page 23: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/23.jpg)
USRC Rating Definitions Provide a Standardized Way to Communicate Expected Performance
Cod
e
Min
imu
mLe
nding Healthcar
eEventually Multi-hazard: Seismic Wind Flood …
![Page 24: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/24.jpg)
USRC Rating Types
Owner Wants a Rating
Verified Rating Issued by USRC Full peer review
Costs TBD
Professional Rating Issued by USRC
1 in X projects peer reviewed Costs TBD
For display on building and marketing material or
Required by Jurisdiction
For use by financial and real estate professionals
![Page 25: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/25.jpg)
USRC Ratings Process
Owner Wants a Rating
Owner hires a USRC “Certified” Engineer
Certified Engineer performs evaluation. Sends USRC
prelim. rating with fee TBD
USRC Organizes Peer Review and Issues
Verified Rating
USRC Tracks and Issues Professional Rating.
USRC also organizes random audit of 1 in X projects
Engineer may use Appeal Process if they believe Rating is better
than methodology provides, Costs TBD
Anyone can check with USRC on Validity of Rater
and Rating – no details revealed
![Page 26: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/26.jpg)
“Certification” Process
• Many organizations including LEED require formal accreditation to perform evaluations
• It is important to have competent licensed engineers with the needed experience and expertise to perform ratings analyses
• SEAOC has been asked to recommend required credentials
• These recommendations will be reviewed and approved by the USRC Technical and Stakeholders Advisory Boards, and then implemented by USRC
Different terms can be used to describe this process, e.g., certification, credentialing, accreditation. Does it matter to you which?
![Page 27: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/27.jpg)
Peer Review
• SEAOC has also been asked to recommend a peer review and appeal process
• Peer review will be mandated for all Verified Ratings and 1 in 7 (+/-) Professional Ratings
• Qualifications of peer reviewers will include overall experience and appropriate expertise with specific building types
• The review be completed blind
• SEAOC recommendations will be reviewed and approved by the Technical and Stakeholders Advisory Boards
![Page 28: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/28.jpg)
Highest Priority Areas Needing Your Input
USRC has reviewed the available rating systems
The next step is to tailor them for appropriate contexts of use and to build coalitions for implementation:
1. Identify the applications for the ratings
2. Address barriers to use
3. Develop trust and external support
![Page 29: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/29.jpg)
1. Organizational structure– inclusivity, credibility, adaptability
2. USRC’s overall approach to adding value– Training, accreditation, and peer review processes– How it is bridging stakeholders and technical groups together– Multi-hazard potential
3. Collect specific issues to address in next segment
Part 1 Discussion: Your Comments & Questions So Far
![Page 30: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/30.jpg)
US Resiliency Council
PART 2: Rating System Details and
Appropriate Applications
Presented by
Ron MayesCo-Founder of USRC
![Page 31: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/31.jpg)
Outline of Topics For Your Feedback
RATING DEFINITIONS &
DIMENSIONS
Making sure ratings portray
understandable and
meaningful consequences
DDDAPPLICATIONS
Identifying the most appropriate and promising program contexts
![Page 32: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/32.jpg)
REDi™ Rating System
A framework to implement
“resilience-based earthquake
design” for achieving
‘beyond-code’ resilience
objectives.
![Page 33: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/33.jpg)
Key Precepts of REDi Rating System
• “True resilience” can only be achieved by adopting enhanced design and planning measures
• Promote speedy functional recovery by targeting beyond-code performance targets
• Resilience objectives are for a consistent return period, have confidence levels and are described in terms understandable to stakeholders
• Assessment of recovery times must consider externalities otherwise they will be unrealistic
![Page 34: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/34.jpg)
Key Precepts of REDi Rating System
• Assessment of recovery times and financial losses must consider performance of all damageable non-structural components and contents
• The loss assessment must be robust (based on P-58) and could be applicable to all buildings, including existing buildings
• Try not to over-complicate or over-simplify what it takes to achieve a resilient building
![Page 35: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/35.jpg)
REDi Resilience Objectives
![Page 36: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/36.jpg)
The REDi Roadmap - Resilience by Design and Preparedness
![Page 37: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/37.jpg)
External Verification of a REDi Resilience Assessment
![Page 38: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/38.jpg)
Defining Post-Earthquake Recovery States
Re-occupancy
Functionality
Full recovery
Time after earthquake
Refer to “Glossary of Terms” in REDi Guidelines for full definition
![Page 39: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/39.jpg)
Paths to Re-occupancy and Functional Recovery if Building Undamaged
Utilities Restored or Back-up Systems
Earthquake Occurs
Functional RecoveryRe-occupancy
![Page 40: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/40.jpg)
Paths to Functional Recovery if Building Damaged
Earthquake OccursInspection
$$$
EngineersPermitting
Contractors
Long-lead Items
Building Repairs
Impeding Factors
Earthquake Occurs
Functional Recovery
Utilities Restored or Back-up Systems
![Page 41: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/41.jpg)
Consideration of Externalities for Functionality
Features Code Platinum Gold Silver
Utility disruption1
Impeding Factors
Impact from damaged adjacent buildings and non-building structures Rec. Rec.
Not located in high liquefaction or tsunami hazard zone Rec. Rec.
Other ground failures: landslide, fault-rupture, avalanche, etc
Business impact assessment incl. employee availability, site access, continuity of transit networks, and supply chain
Rec. Rec.
1 See REDi Resilience Objectives
![Page 42: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/42.jpg)
Consideration of Externalities for Functionality
Features Code Platinum Gold Silver
Utility disruption
Impeding Factors
Explicitly considered in Downtime assessment
![Page 43: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/43.jpg)
History of SEAONC’sEarthquake Performance Rating System
• 6-year SEAONC effort to develop Earthquake Performance Rating System (EPRS) for Existing Buildings– Translates the results of an ASCE 31/41 evaluation
![Page 44: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/44.jpg)
Insight #1
We do not need a new evaluation tool…
Rating System Insight #1
![Page 45: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/45.jpg)
Attributes of the SEAONC Rating System
• Multi-objective: 3 Dimensions– Safety– Repair Cost– Time to Regain Function
• Symbolic: star count, 5 levels for each dimension – This assists in reaching non-native English speakers
• Positively-framed– “the more stars the better”– A “No Rating” option
• Anchored on a very low performance level; “typical” or “average” performance level is unknown
Attributes of SEAONC’s EPRS
![Page 46: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/46.jpg)
Resilience Dimensions
Economic
Social
Safety
Damage
Function
3 Rating Dimensions
Semi-independent consequences:All spring from the same damage
Resilience Definitions Rating Dimensions
![Page 47: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/47.jpg)
Five levels within Each Dimension
• Enough to capture (almost) the full range of performance • Still relatively broad bins• Not quintiles
– Counts of buildings in each bin are unknown– No expectation that every level will be full of or have same # of
buildings
Five Levels within Each Dimension
![Page 48: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/48.jpg)
Pragmatic Distinctions
• Safety– Clearest expression of owner/tenant interest– Most critical for correcting impressions about what “to code”
means
• Repair cost– Industry and regulatory precedent– More intuitive to owners than “estimated loss”
• Recovery– Re-occupancy functional recovery full recovery
Pragmatic Distinctions
![Page 49: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/49.jpg)
A “No Rating” Option
• Because the methodologies are limited– ASCE 31 says nothing about Repair Cost
• Allows flexibility
• A useful cost saver and clarifying feature for ratings programs
A “No Rating” Option
![Page 50: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/50.jpg)
The 3-part EPRS Rating Levels
Safety5« Entrapment
Unlikely
4« Injuries Unlikely
3« Death Unlikely
2« Death in isolated locations
1« Death in multiple locations
NR No rating
Repair cost5« Within operating
budget (< 5%)
4« Under deductible (< 10%)
3« Industry SEL standard (< 20%)
2« Repairable(< 50%)
1« Substantial(50%+)
NR No rating
Recovery5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
EPRS Dimensions & Thresholds
![Page 51: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/51.jpg)
What an EPRS Rating Represents
• “EPRS Ratings are intended to correspond to average performance given a single earthquake with ground shaking of that used for the design of a new building.”
• A prediction is not a promise
• Degree of uncertainty differs for each dimension
What an EPRS Rating Means
![Page 52: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/52.jpg)
Clarifying the Assumed Seismic Hazard
• “Design earthquake” not “Maximum credible”
• Design earthquake is 2/3 MCE
• Open question:– Should MCE performance be considered for safety but not the
other dimensions?
Clarifying the Assumed Seismic Hazard
![Page 53: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/53.jpg)
SEAONC Rating Scope
In:– Structure, Nonstructural Elements, Geologic– Some fixed equipment– Associated non-building structures
Out:– Most contents– Utilities, other “externalities” beyond
immediate on-site structures• different to REDi system
ASCE 31/41 Scope of Evaluation
![Page 54: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/54.jpg)
SEAONC Ratings Definitions: Safety
«««««
Entrapment (highly) unlikely.Performance would not lead to conditions commonly associated with earthquake-related entrapment.
«««« Injuries (highly) unlikely Performance would not lead to conditions commonly associated with earthquake-related injuries requiring more than first aid.
«««
Deaths (highly) unlikely.Performance would not lead to conditions commonly associated with earthquake-related death.
«« Death in isolated locations expected.Performance in certain locations within or adjacent to the building would lead to conditions known to be associated with earthquake-related death.
«
Death in multiple or widespread locations expected.Performance as a whole would lead to multiple or widespread conditions known to be associated with earthquake-related death.
NR No rating.The rating methodology does not justify or support a Safety Rating, or no Safety Rating was requested.
EPRS Rating Definition: Safety
![Page 55: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/55.jpg)
Safety Dimension Definition and Comments
• How to balance clear communication with acknowledgement of uncertainties
• What does it take—in terms of building performance and the analysis burden—to get more stars?– To exceed ««« safety rating, knowledge of additional
factors (falling hazards, factors affecting egress) is necessary
– These are typically excluded from a conventional structural evaluation
Safety Dimension Definition and Issues
DDD
![Page 56: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/56.jpg)
SEAONC Ratings Definitions: Repair Cost
«««««
Within typical operating budget.Performance would lead to conditions requiring earthquake-related repairs commonly costing less than 5% of building replacement value.
«««« Within typical insurance deductible.Performance would lead to conditions requiring earthquake-related repairs commonly costing less than 10% of building replacement value.
«««
Within industry Scenario Expected Loss (SEL) limit.Performance would lead to conditions requiring earthquake-related repairs commonly costing less than 20% of building replacement value.
««
Repairable damage.Performance would lead to conditions requiring earthquake-related repairs commonly costing less than 50% of building replacement value.
«
Substantial damage.Performance would lead to conditions requiring earthquake-related repairs costing more than 50% of building replacement value (as used by the International Building Code as an upgrade trigger).
NR No rating.The rating methodology does not justify or support a Repair Cost Rating, or no Repair Cost Rating was requested.
EPRS Rating Definition: Repair Cost
![Page 57: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/57.jpg)
Safety Dimension Definition and Comments
• Appropriate duration of rating relevance– Should a rating “expire” or carry a disclaimer for
like standards of engineering or financial practice, property values, and prices changes?
• How well can methodologies estimate cost in the wake of a major regional event?
Repair Cost Dimension Definition and Issues
DDD
![Page 58: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/58.jpg)
• “Recovery” is a bumpy process that goes through stages• The EPRS rating focuses on basic resumption of uses
SEAONC Ratings Definitions: RecoveryEPRS Defines Recovery as Functionality
![Page 59: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/59.jpg)
The Recovery Triangle
Time
Functionality orService Level
TEQTfullTreoccupancy Tfunctional
The Recovery Triangle
![Page 60: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/60.jpg)
SEAONC Ratings Definitions: Recovery
«««««
Within hours (or within hours to days).Performance would support the building’s basic intended functions within hours following the earthquake.
«««« Within days (or within days to weeks) .Performance would support the building’s basic intended functions within days following the earthquake.
«««
Within weeks (or within weeks to months).Performance would support the building’s basic intended functions within weeks following the earthquake.
««
Within months (or within months to years).Performance would support the building’s basic intended functions within months following the earthquake.
«
Within years.Performance would support the building’s basic intended functions within years following the earthquake.
NR No rating.The rating methodology does not justify or support a Recovery Rating, or no Recovery Rating was requested.
EPRS Rating Definition: Recovery DDD
![Page 61: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/61.jpg)
Unpredictable Recovery Bottlenecks and Hurdles
Earthquake OccursInspection
$$$
EngineersPermitting
Contractors
Long-lead Items
Building Repairs
Impeding Factors
Earthquake Occurs
Functional Recovery
Utilities Restored or Back-up Systems
![Page 62: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/62.jpg)
• Wording: Time to regain functionality?
• The concept and prediction of functionality:– Understandable
• Basic fitness for intended use, feasible to operate—assuming utilities
– Usefulness• Much more helpful than predicted “green, yellow, or red” tag• Predicting full recovery timetable is not feasible
• How important is it to include impeding factors, even if doing so makes the prediction less certain and harder to produce?
Recovery Dimension Definition and Comments
Recovery Dimension Definition & Issues
DDD
![Page 63: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/63.jpg)
Rating System Insight #2
• One rating system cannot serve every rating program.
• Rating program varieties:– “Mandatory” or “voluntary”– By an authority or by parties– Public or private information
• A comprehensive system is more adaptable to diverse perspectives– Focus on stakeholder needs– Develop “Specialized Ratings”
Rating System Insight #2
![Page 64: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/64.jpg)
Initial ASCE 31 Mapping
Safety5« Entrapment Unlikely
4« Injuries Unlikely
3« Death Unlikely
2« Death in isolated locations
1« Death in multiple locations
NR No rating
Repair cost5« Within operating
budget (< 5%)
4« Under deductible (< 10%)
3« Industry SEL standard (< 20%)
2« Repairable(< 50%)
1« Substantial(50%+)
NR No rating
Recovery5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
Full Life Safety< Life Safety
Full Immediate Occupancy
![Page 65: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/65.jpg)
More Translation Mappings
Safety
5« No entrapment
4« No injuries
3« No death
2« Death in isolated locations
1« Death in multiple locations
NR No rating
Repair cost
5« Within operating budget (< 5%)
4« Under deductible (< 10%)
3« Industry SEL standard (< 20%)
2« Repairable(< 50%)
1« Substantial(50%+)
NR No rating
Recovery
5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
Reoccupancy
5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
REDi Gold REDi Platinum
ASCE 41-16 EHR
Operational
![Page 66: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/66.jpg)
“Specialized Ratings”
• REDi Gold– Immediate reoccupancy– Functional recovery < 1 month– SEL < 5%– Injury “unlikely”
“Specialized Ratings”
![Page 67: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/67.jpg)
Specialized Ratings: SPUR
• SPUR Level C– Safe
• “Significant structural damage”
– Usable after repairs• Yellow tag likely• 4 month to 3 year repair
time likely
Specialized Ratings: SPUR
![Page 68: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/68.jpg)
Specialized Rating Mappings
Safety
5« No entrapment
4« No injuries
3« No death
2« Death in isolated locations
1« Death in multiple locations
NR No rating
Repair cost
5« Within operating budget (< 5%)
4« Under deductible (< 10%)
3« Industry SEL standard (< 20%)
2« Repairable(< 50%)
1« Substantial(50%+)
NR No rating
Recovery
5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
Reoccupancy
5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
REDi Gold SPUR C
![Page 69: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/69.jpg)
Specialized Targets
Safety
5« No entrapment
4« No injuries
3« No death
2« Death in isolated locations
1« Death in multiple locations
NR No rating
Repair cost
5« Within operating budget (< 5%)
4« Under deductible (< 10%)
3« Industry SEL standard (< 20%)
2« Repairable(< 50%)
1« Substantial(50%+)
NR No rating
Recovery
5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
Reoccupancy
5« Within hours
4« Within days
3« Within weeks
2« Within months
1« Within years
NR No rating
L.A. Residential?
PML?
S.F. “Soft Story”
![Page 70: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/70.jpg)
Key Rating Program Features
1. What is the universe of affected properties? • code year, building type, occupancy class, use,
#stories, #units, and/or ownership
2. Who performs the rating analysis and why?
3. Who will have access to the rating information? • Only the parties to a transaction, future buyers and
tenants, insurers, everyone ?
![Page 71: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/71.jpg)
Program Examples: Soft-Story Policies in the SF Bay Area
Note:• All these programs started from some kind of inventory• Inventories can be based on more or less broad and distinct criteria , goals, &
assumptions, which directly affects the number of buildings involved or persons burdened in some way as well as the likelihood of different classification errors
• Berkeley’s program may still progress into a mandatory retrofit phase
Inventory Only
Notification Only
Mandatory Screening
Mandatory Evaluation
Mandatory Retrofit
Santa Clara County
San Leandro Oakland Berkeley Fremont
Richmond AlamedaSan
Francisco
The Coercion Spectrum
![Page 72: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/72.jpg)
Applications Where a USRC Rating System Might Be Used: Finding Appropriate Fits
Short Term Possibilities:• New construction as part of permit process
– Voluntarily by developers if market demand is perceived– Mandated for buildings with some criteria
• Rating as part of a real estate transaction (commercial)• Alternative to the current PML process• Public buildings
Unlikely in the Short Term:• Mandated for all existing buildings
![Page 73: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/73.jpg)
1. Dimensions– Understandability and meaningfulness
• Terminology• Handling of uncertainty
– Re-occupancy/functional recovery• Impeding factors• Externalities
2. Applications – Appropriate contexts or program formats
3. Collect specific issues to address in written comments and next round
Part 2 Discussion: Your Comments & Questions on the Rating System & Programs
![Page 74: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/74.jpg)
Validity
UtilityFairness
• Understandable• Comprehensive• Affordable• Decisive
• Accuracy• Precision• Reliability
• Consistency• Appropriate Access• Credibility/Trust• Downsides Minimized• Accountability• Proportionate Outcomes
Desirable Features in Risk Communication
S. Rabinovici
![Page 75: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/75.jpg)
Validity
UtilityFairness
Key Elements of USRC’s Approach
• Multidimensional• Market value• Personalized
• Technical Vetting• Training• Accreditation• Periodic Update
• Standardization• Peer Review• Verification• Open Process
S. Rabinovici
![Page 76: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/76.jpg)
Follow-up to this meeting
LA City program timeline
Next SAC meeting– Implementation– Barriers to use– Fostering external support
Your Recommendations
Next Steps: Written Feedback and 2nd SAC Meeting
Who else should we be talking to?
![Page 77: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/77.jpg)
Multi-Level Qualitative
![Page 78: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/78.jpg)
The Value of a Rating Is a Net Effect
Consider an owner—Having a rating can have many desirable and undesirable effects:– Possible public relations benefit– New awareness of multiple types of risk exposure– New knowledge about potential implications of not taking action
and about what taking action might entail or result in– New information (or desire for it) about how their building
compares to others– Raises the question of whether to keep the building as is, upgrade
it, or sell– May create new disclosure or liability concerns– Raises insurance issues– May decrease how much they can sell for or rent out
![Page 79: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/79.jpg)
Examples:
• LA Restaurant Hygiene
• Water Quality Report Cards
• Hospital Safety
• School Quality
Grading or Report Card Systems
![Page 80: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/80.jpg)
Simple Labels or Warnings
![Page 81: US Resiliency Council PART 1: Mission, Organization, and Strategy for an Earthquake Performance Rating System Presented by Ron Mayes Co-Founder of USRC](https://reader035.vdocuments.site/reader035/viewer/2022062713/56649ceb5503460f949b73b5/html5/thumbnails/81.jpg)
Too Many Approaches Muddles the Message