MOODY NOLAN | PERKINS+WILL
UPPER ARLINGTON SCHOOLSBUILDING TEAM MEETING #2
NOVEMBER 10-12, 2015
YOURVOICE MATTERS
MOODY NOLAN PERKINS+WILL HILLIARD JEANE KORDA EMH&T MKSK TURNER
![Page 2: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/2.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 3: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/3.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
OUR PROGRESS
![Page 4: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/4.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
OUR PROGRESS
![Page 5: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/5.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
OUR PROGRESS
![Page 6: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/6.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
OUR PROGRESS at UA High School7:00 - 8:30PM
![Page 7: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/7.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 8: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/8.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 9: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/9.jpg)
Master Planning Process
PHYSICALASSESSMENT
What physical assets are in need of repair
or replacement?
EDUCATIONALASSESSMENT
How do our facilities support the educational
focus of the District?
FINANCIALASSESSMENT
What are the priorities and
associated costs?
![Page 10: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/10.jpg)
PHYSICALASSESSMENT
What physical assets are in need of repair
or replacement?
EDUCATIONALASSESSMENT
How do our facilities support the educational
focus of the District?
FINANCIALASSESSMENT
What are the priorities and
associated costs?
How can we improve our
physical assets….
FACILITIES MASTER PLAN
….and advance our relentless
focus on learning
….while remaining fiscally
responsible?
Master Planning Process
![Page 11: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/11.jpg)
Guiding Principles
![Page 12: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/12.jpg)
EDUCATIONAL ASSESSMENTHow did we do it?
Principal Meetings + Site Visits
Student Focus Groups
Building Team Meetings
![Page 13: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/13.jpg)
Daylighting
Materials
Room Size & Shape
Acoustics
Indoor Air Quality
Thermal Comfort
Technology
Flexibility
Supports Collaboration
Lighting
Furniture/ Ergonomics
Safety & Security
Circulation / Adjacencies
EDUCATIONAL ASSESSMENTWhat did we look at?
![Page 14: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/14.jpg)
20th Century
• Teacher-centered• Passive learning• Organized by age/subject• Rote memorization• Industrial efficiency
21st Century
• Student-centered• Active learning• Multi-age learning communities• Project based and experiential• Students not tied to fixed location
TODAY'S CLASSROOMFLEXIBLE / AGILE / ACTIVE
![Page 15: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/15.jpg)
CENTRAL MIDDEL SCHOOLFLEXIBILITY
COLUMBUS, INDIANA
adaptable
TODAY'S CLASSROOMFLEXIBLE / AGILE / ACTIVE
![Page 16: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/16.jpg)
CENTRAL MIDDEL SCHOOLFLEXIBILITY
COLUMBUS, INDIANA
TODAY'S CLASSROOM
traditionallecture
FLEXIBLE / AGILE / ACTIVE
![Page 17: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/17.jpg)
.
TODAY'S CLASSROOM
seminar
FLEXIBLE / AGILE / ACTIVE
![Page 18: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/18.jpg)
.
TODAY'S CLASSROOM
project teams
FLEXIBLE / AGILE / ACTIVE
![Page 19: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/19.jpg)
.
TODAY'S CLASSROOM
group discussions
FLEXIBLE / AGILE / ACTIVE
![Page 20: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/20.jpg)
215
758
418
598
508
407
CURRENT ENROLLMENT
BURBANK
BARRINGTON
GREENSVIEW
TREMONT
WICKLIFFE
WINDERMERE
1 Source: Upper Arlington Enrollment Projections-(November 2015)
CURRENTSF/STUDENT
177 SF
112 SF
115 SF
133 SF*
100 SF
135 SF
* With planned additions
10 YEARSF/STUDENT
N/A
96 SF
91 SF
106 SF
86 SF
111 SF
10 YEAR PROJECTION
N/A
887
526
749
589
494
1
SQUARE FEET PER STUDENT
![Page 21: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/21.jpg)
701
705
1,816
SQUARE FEET PER STUDENT
HASTINGS
JONES
UAHS
1 Source: Upper Arlington Enrollment Projections-(November 2015)
717
806
1,947
191 SF
186 SF
162 SF
187 SF
162 SF
151 SF
CURRENT ENROLLMENT
CURRENTSF/STUDENT
10 YEARSF/STUDENT
10 YEAR PROJECTION
1
![Page 22: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/22.jpg)
• More robust technology
• PE/Athletics provided for all students (Title IX)
• Increasing recognition of special education students
• Americans With Disabilities Act (ADA)
• Smaller class size
• Increase in programs / classes offered
• Additional pre-kindergarten and full-day kindergarten
• Additional support staff
• Change in concept of food service / cafeterias
• Space for adult and community use
• Project based learning encouraging collaboration
• Flexible furniture
• Flexible space
WHY DO TODAY'S SCHOOLS NEED MORE SPACE?
Source: School Planning & Management (July 2010)
![Page 23: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/23.jpg)
perkinswill.com
![Page 24: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/24.jpg)
BARRINGTON
1939
WINDERMERE
1958
GREENSVIEW
1965
JONES1923
TREMONT
1952WICKLIFFE
1956
HASTINGS1961
BURBANK
1971
UAHS1956
ES MS HSECFACILITY AGEORIGINAL BUILDING
![Page 25: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/25.jpg)
BARRINGTON
2009
WINDERMERE
2000
GREENSVIEW
2009
JONES1997
TREMONT
2015
WICKLIFFE
1997
2001
HASTINGS1978
ES MS HSEC
UAHS1983
BURBANK
N/A
1971
FACILITY AGELAST MAJOR ADDITION
![Page 26: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/26.jpg)
CHRONOLOGY DIAGRAMTREMONT ELEMENTARY SCHOOL
![Page 27: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/27.jpg)
GRADES: K-5
HEIGHT: TWO STORIES
SITE SIZE: 15.00 ACRES
BUILDING SIZE: 56,136 SF
CURRENT NUMBER OF STUDENTS: 598
CURRENT SF/STUDENT: 94 SF
10 YEAR ENROLLMENT PROJECTION: 749
10 YEAR SF/STUDENT: 106 SF
EDUCATIONAL ASSESSMENT SUMMARYTREMONT ELEMENTARY SCHOOL
WITH PLANNED ADDITIONS: 79,596 SF
WITH PLANNED ADDITIONS SF/STUDENT: 133 SF
![Page 28: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/28.jpg)
TREMONT ELEMENTARY SCHOOLMAJOR CHALLENGES
BUILDING:
• LACK OF SECURE ENTRY VESTIBULE (WILL BE
RECTIFIED IN NEW ADDITION)
• SIZE OF CLASSROOMS (EXCEPT THOSE IN NEW
ADDITION)
• SHARED SPACES ARE NOT CENTRALLY ZONED /
TRAVEL TIME
• LACK OF COLLABORATIVE SPACE
• FOOD SERVICE CONFIGURATION INCREASES TIME
TO GET FOOD (WILL BE RECTIFIED IN NEW ADDITION)
• RESOURCE TEACHERS NOT CONVENIENTLY
LOCATED
• NOT ENOUGH STUDENT STORAGE, CONDITION OF
STUDENT STORAGE
SITE:
• LACK OF CLEAR MAIN ENTRY (WILL BE
RECTIFIED IN NEW ADDITION)
![Page 29: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/29.jpg)
SITE DIAGRAMTREMONT ELEMENTARY SCHOOL
![Page 30: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/30.jpg)
FUNCTIONAL ZONING ANALYSISTREMONT ELEMENTARY SCHOOL
![Page 31: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/31.jpg)
FUNCTIONAL ZONING ANALYSISTREMONT ELEMENTARY SCHOOL
![Page 32: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/32.jpg)
FUNCTIONAL ZONING ANALYSISTREMONT ELEMENTARY SCHOOL
![Page 33: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/33.jpg)
CIRCULATION ANALYSISTREMONT ELEMENTARY SCHOOL
LENGTH FROM ONE END OF THE BUILDING TO THE OTHER: 720 LINEAR FEET(CURRENT IS 490 LINEAR FEET)
AVERAGE WIDTH OF CORRIDOR:9’-8”
![Page 34: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/34.jpg)
![Page 35: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/35.jpg)
![Page 36: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/36.jpg)
![Page 37: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/37.jpg)
CLASSROOM SIZE ANALYSISTREMONT ELEMENTARY SCHOOL
![Page 38: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/38.jpg)
CLASSROOM SIZE ANALYSISTREMONT ELEMENTARY SCHOOL
![Page 39: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/39.jpg)
CLASSROOM SIZE ANALYSISTREMONT ELEMENTARY SCHOOL
![Page 40: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/40.jpg)
![Page 41: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/41.jpg)
![Page 42: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/42.jpg)
![Page 43: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/43.jpg)
Administration
Corridor
EntryVestibule
SecuredVisitor Entry
BUILDING SECURITYFACILITY ENTRY - BEST PRACTICES
Visitor Path
Secured Entry
Security Checkpoint
Visibility
Front Door
![Page 44: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/44.jpg)
![Page 45: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/45.jpg)
SECURITY ANALYSISTREMONT ELEMENTARY SCHOOL
Main Entry
![Page 46: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/46.jpg)
SECURITY ANALYSISTREMONT ELEMENTARY SCHOOL
Secure Vestibule
![Page 47: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/47.jpg)
TREMONT ELEMENTARY SCHOOLMAJOR CHALLENGES
BUILDING:
• LACK OF SECURE ENTRY VESTIBULE (WILL BE
RECTIFIED IN NEW ADDITION)
• SIZE OF CLASSROOMS (EXCEPT THOSE IN NEW
ADDITION)
• SHARED SPACES ARE NOT CENTRALLY ZONED /
TRAVEL TIME
• LACK OF COLLABORATIVE SPACE
• FOOD SERVICE CONFIGURATION INCREASES TIME
TO GET FOOD (WILL BE RECTIFIED IN NEW ADDITION)
• RESOURCE TEACHERS NOT CONVENIENTLY
LOCATED
• NOT ENOUGH STUDENT STORAGE, CONDITION OF
STUDENT STORAGE
SITE:
• LACK OF CLEAR MAIN ENTRY (WILL BE
RECTIFIED IN NEW ADDITION)
![Page 48: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/48.jpg)
![Page 49: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/49.jpg)
OFCC 2014 ASSESSMENTWHAT DOES IT INCLUDE?
State-funded facility assessment conducted by the Ohio Facilities Construction Commission (OFCC)
• Completed November 2014 (one year ago)
• Detailed assessment of building components and systems
• Identifies required replacements and associated costs
• Utilizes OFCC’s Ohio School Design Manual (OSDM) standards as the basis of required replacements and required space to be added(using State-based calculations)
DOES NOT reflect programmatic input from the District
DOES NOT include assessment of outdoor athletics and recreation/playground areas and components
DOES NOT include costs for phasing, general requirements,and swing space during construction
![Page 50: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/50.jpg)
2015 PHYSICAL ASSESSMENTPROCESS WE WENT THROUGH
In-depth review of all 9 buildings and recent reports
Architectural / engineering / costing teamMoody Nolan / Korda / EMH&T / Turner
Assess the condition of major systems and componentsBased on observationsBased on District inputBased on collective expertise
![Page 51: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/51.jpg)
2015 PHYSICAL ASSESSMENTOUR CHARGE
Identify the cost to maintain and repair the buildings for the next 15 years to ensure operation well into the future• Determine the cost to “maintain the status quo through 2030”• Assumes no building additions• Assumes no new learning environments• New systems will last 20-25 years on average
![Page 52: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/52.jpg)
Plumbing and Fixtures
Electrical Systems
Lighting
Finishes and Furnishings
Structure
Doors and Windows
Roofing
Drainage
Site and Athletics
Accessibility, Life Safety
2015 PHYSICAL ASSESSMENTWhat did we look at?
HVAC Systems
![Page 53: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/53.jpg)
![Page 54: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/54.jpg)
TREMONT ELEMENTARY SCHOOLARCHITECTURAL CHARACTER
![Page 55: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/55.jpg)
TREMONT ELEMENTARY SCHOOLARCHITECTURAL CHARACTER
![Page 56: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/56.jpg)
TREMONT ELEMENTARY SCHOOLARCHITECTURAL CHARACTER
![Page 57: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/57.jpg)
TREMONT ELEMENTARY SCHOOLARCHITECTURAL CHARACTER
![Page 58: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/58.jpg)
TREMONT ELEMENTARY SCHOOLARCHITECTURAL CHARACTER
![Page 59: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/59.jpg)
TREMONT ELEMENTARY SCHOOLARCHITECTURAL CHARACTER
![Page 60: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/60.jpg)
TREMONT ELEMENTARY SCHOOLFLOOR PLANS
![Page 61: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/61.jpg)
TREMONT ELEMENTARY SCHOOLFLOOR PLANS
![Page 62: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/62.jpg)
TREMONT ELEMENTARY SCHOOLCHRONOLOGY DIAGRAM
![Page 63: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/63.jpg)
TREMONT ELEMENTARY SCHOOLKEY PHYSICAL ASSESSMENT ISSUES
![Page 64: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/64.jpg)
TREMONT ELEMENTARY SCHOOLSITE AERIAL
![Page 65: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/65.jpg)
TREMONT ELEMENTARY SCHOOLKEY PHYSICAL ASSESSMENT ISSUES
![Page 66: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/66.jpg)
TREMONT ELEMENTARY SCHOOLKEY PHYSICAL ASSESSMENT ISSUES
![Page 67: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/67.jpg)
TREMONT ELEMENTARY SCHOOLKEY PHYSICAL ASSESSMENT ISSUES
![Page 68: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/68.jpg)
TREMONT ELEMENTARY SCHOOLKEY PHYSICAL ASSESSMENT ISSUES
![Page 69: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/69.jpg)
Replace boilers, chillers, exhaust fans and controlsSome original 1952, 1953, and 1959 electrical panels, MDP, feeders, and branch
circuits remain that are at end of life and need replacementDomestic and sanitary pipingADA access at classroom entries (i.e. side clearance requirements)Stairwell enclosures where required to meet current codeCasework and finishes in original core of the buildingExterior lightingHazardous material abatementTechnologySite - minor drainage issue in Kindergarten playground
NOTE: Coordinate required repair and replacement work with what is planned in 2016 addition / renovation project.
TREMONT ELEMENTARY SCHOOLKEY PHYSICAL ASSESSMENT ISSUES
![Page 70: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/70.jpg)
TREMONT ELEMENTARY SCHOOLSUMMARY: DISTRIBUTION OF REQUIRED INVESTMENT
Building Enclosure
Mechanical and Electrical Systems
Interior Finishes, Furnishings, Technology
Accessibility, Health, Safety
Site and Outdoor Athletics/Recreation
Other Project Related Costs (permits, fees, etc.)
WORK REQUIREDTIMING OF REQUIRED INVESTMENT
0 - 5 YRS 5 -10 YRS 10 - 15 YRS
![Page 71: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/71.jpg)
TREMONT ELEMENTARY SCHOOLSUMMARY: DISTRIBUTION OF REQUIRED INVESTMENT
Building Enclosure
Mechanical and Electrical Systems
Interior Finishes, Furnishings, Technology
Accessibility, Health, Safety
Site and Outdoor Athletics/Recreation
Other Project Related Costs (permits, fees, etc.)
WORK REQUIRED - NOWTIMING OF REQUIRED INVESTMENT
0 - 5 YRS 5 -10 YRS 10 - 15 YRS
![Page 72: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/72.jpg)
TREMONT ELEMENTARY SCHOOLSUMMARY: DISTRIBUTION OF REQUIRED INVESTMENT
Building Enclosure
Mechanical and Electrical Systems
Interior Finishes, Furnishings, Technology
Accessibility, Health, Safety
Site and Outdoor Athletics/Recreation
Other Project Related Costs (permits, fees, etc.)
WORK REQUIRED - SOONTIMING OF REQUIRED INVESTMENT
0 - 5 YRS 5 -10 YRS 10 - 15 YRS
![Page 73: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/73.jpg)
TREMONT ELEMENTARY SCHOOLSUMMARY: DISTRIBUTION OF REQUIRED INVESTMENT
Building Enclosure
Mechanical and Electrical Systems
Interior Finishes, Furnishings, Technology
Accessibility, Health, Safety
Site and Outdoor Athletics/Recreation
Other Project Related Costs (permits, fees, etc.)
WORK REQUIRED - LATERTIMING OF REQUIRED INVESTMENT
0 - 5 YRS 5 -10 YRS 10 - 15 YRS
![Page 74: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/74.jpg)
TREMONT ELEMENTARY SCHOOLSUMMARY: DISTRIBUTION OF REQUIRED INVESTMENT
Building Enclosure
4%
Mechanical and Electrical Systems
48%
Interior Finishes, Furnishings, Technology
17%Accessibility, Health,
Safety
12%Site and Outdoor Athletics/Recreation
3%
Other Project Related Costs
15%
Building Enclosure
Mechanical and Electrical Systems
Interior Finishes, Furnishings, Technology
Accessibility, Health, Safety
Site and Outdoor Athletics/Recreation
Other Project Related Costs
DISTRIBUTION OF WORK REQUIRED
![Page 75: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/75.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 76: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/76.jpg)
1. Is there anything about the assessments that surprised you?
2. Based on what we’ve learned so far, where is the current facility in alignment with the guiding principles and where is it not?
BUILDING TEAM CONVERSATION
![Page 77: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/77.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 78: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/78.jpg)
How Are Facility Projects Funded?
Common practice throughout the Ohio is issuing bonds
District has issued bonds in the past Last bond issuance – approximately 20 years ago
Bonds are similar to home mortgages
Allows district to spread cost over a period of years
![Page 79: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/79.jpg)
Bond Issue
Requires approval (vote) of tax payers
Pay-back period up to 38 years
Interest rate is impacted by bond rating• Bond rating is similar to credit rating• Upper Arlington’s Standard and Poor’s (S&P) –
AAA bond rating – best possible• Key factors: community support and financial
planning
![Page 80: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/80.jpg)
Bond Example
A district issues bonds in the amount of $100,000,000 for a facility project and plans to pay them off over 38 years with a 5% interest rate.
Using our current property valuation, with the above variables:
Approximate millage for project would be 3 mills NOT 100 mills as someone may assume
This is an example to illustrate millage related to bonds. Amounts were chosen for simplicity and are not related to any specific project. Millage is impacted by valuation changes, interest rate at time of issuance, and duration of pay back period.
![Page 81: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/81.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 82: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/82.jpg)
TREMONT ELEMENTARY SCHOOLSUMMARY: DISTRIBUTION OF REQUIRED INVESTMENT
Building Enclosure
4%
Mechanical and Electrical Systems
48%
Interior Finishes, Furnishings, Technology
17%Accessibility, Health,
Safety
12%Site and Outdoor Athletics/Recreation
3%
Other Project Related Costs
15%
Building Enclosure
Mechanical and Electrical Systems
Interior Finishes, Furnishings, Technology
Accessibility, Health, Safety
Site and Outdoor Athletics/Recreation
Other Project Related Costs
DISTRIBUTION OF WORK REQUIRED
![Page 83: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/83.jpg)
TREMONT ELEMENTARY SCHOOLSUMMARY: DISTRIBUTION OF REQUIRED INVESTMENT
Building Enclosure
$432,000
Mechanical and Electrical Systems
$4,728,000
Interior Finishes, Furnishings, Technology
$1,701,000
Accessibility, Health, Safety
$1,166,000Site and Outdoor
Athletics/Recreation
$304,000
Other Project Related Costs
$1,499,000
Building Enclosure
Mechanical and Electrical Systems
Interior Finishes, Furnishings, Technology
Accessibility, Health, Safety
Site and Outdoor Athletics/Recreation
Other Project Related Costs
COST OF WORK REQUIRED = $9,830,000
![Page 84: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/84.jpg)
TREMONT ELEMENTARY SCHOOLCOST SUMMARY - SHORT
Other Project Related Costs include: Land survey, soil borings/Phase I Environmental Site Assessment, agency approval fees (building code), construction testing, printing of bid documents, advertising for bids, builders risk insurance, bond fees, design professionals compensation, CM compensation, commissioning and maintenance plan advisor, and Other Project Related Costs contingency.
![Page 85: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/85.jpg)
TREMONT ELEMENTARY SCHOOLCOST SUMMARY - LONG
![Page 86: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/86.jpg)
COST DETAIL EXAMPLE
![Page 87: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/87.jpg)
TREMONT ELEMENTARY SCHOOLGENERAL REQUIREMENTS AND CONTINGENCIES
Owner / Design / Estimating ContingencyConstruction ContingencyPhasing & Swing Space CostsGeneral Requirements
![Page 88: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/88.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 89: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/89.jpg)
1. What is your reaction to the financial information?
2. What are your expectations or desires for the options phase?
BUILDING TEAM CONVERSATION
![Page 90: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/90.jpg)
Principal
Principal and Design Team
Design Team and Construction Advisor
AgendaWelcome
Key Takeaways from Building Team Meeting #1
Facility Assessment InformationEducational Assessment and Impact of Facilities on Learning
OFCC Explanation and Assessment
Physical Assessment Results
Building Team Conversation
Financial Context Discussion
Individual Building Financial Information
Building Team Conversation
Next Steps and Closing
Building Team Participants
District
Design Team and Construction Advisor
Building Team Participants
Principal and Design Team
![Page 91: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/91.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
WHAT'S NEXT?
![Page 92: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/92.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
WHAT'S NEXT?
![Page 93: UPPER ARLINGTON SCHOOLS](https://reader034.vdocuments.site/reader034/viewer/2022051420/627e51e2dd71854dd17317f3/html5/thumbnails/93.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
at UA High School7:00 - 8:30PM
WHAT'S NEXT?