Controlling Services Spend at a $9 Billion Organization
![Page 2: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/2.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & Setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 3: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/3.jpg)
3
UPMC Overview
$9 billion in revenue
20+ hospitals, operating nearly 4,000 beds
400+ service locations
50,000+ employees
200,000 admissions
![Page 4: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/4.jpg)
UPMC’s Supply Chain Environment
Spend Managed:
• $1.8 billion
Transaction Volumes:
• Process 70,000+ invoices per month
• Process 4,000+ purchase requisitions per week
• Manage over 600 point of consumption material carts
• Receive 1.1M packages per year; central distribution center
![Page 5: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/5.jpg)
UPMC’s Supply Chain Team
Single SCM Organization:
• 370 team members…
![Page 6: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/6.jpg)
UPMC Supply Chain
7.9 Million cellular phone minutes
355 Million KWh of electricity
956 Miles of rolled paper towels
11 Million minutes of audio conferencing
26 Million lbs municipal solid waste
33,739 lbs of ground coffee
8.1M Clorox wipes
84 Million exam gloves
2.2 Million alcohol prep pads
1.6 Million syringes used
4.1 Million isolation & cover gowns
542,523 lbs of poultry
31,035 Miles of toilet paper
6,495 Airline tickets
![Page 7: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/7.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 8: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/8.jpg)
• Overview
– Enables control and oversight of services spend
– Reduces excessive service costs
– Creates visibility and enforces compliance
– Allows effective management of the process from request through settlement
sPro Overview
![Page 9: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/9.jpg)
sPro Overview
Standardized Templates
• ePro requisition
• sPro Work Order
Settle Manage Procure
Financials Projects
Requestor Service
Providers
Supplier Collaboration
• View Work Orders
• Submit progress logs
• Electronic bill
presentment
• Plan and budget
• PO Integration
Request Analyze
Centralized Information
• Approved suppliers
• Negotiated contracts and rates Secure
Access
![Page 10: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/10.jpg)
sPro Enables Flexible Progress Payments and Approvals
Rate Based
Milestone
Fixed Amount
• Supplier enters payment amount in progress
logs
• Multiple entries permitted for partial completion
• Payment is made when the agreed upon
milestones are completed
• Suppliers can designate a milestone complete
once
• Supplier enters the percentage of completion
• Payment amount based on percentage
completion of the total work order amount
• Payment amount based on the agreed rate for
the activity
• Payment based on the quantity entered in the
progress log
Percentage
• Require approval from
requesters
• Enforce contracted
payment schedules and
rates
• Eliminate premature,
excessive and/or
incorrect payment
requests
![Page 11: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/11.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 12: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/12.jpg)
UPMC sPro Deployment - Project Benefits / Goals
• Increase control over our services spend
• Automate invoice activity and put the onus on the vendor to start the process to collect their payments
• Reduce the use of blanket orders for services
• Accommodate progress payments driven by milestones or the percentage of a total dollar value
• Capture/definition of rates for services
• Better management of Project-related services
sPro is helping UPMC to achieve the following goals:
• Leverage existing eProcurement application and workflow
• Ensure use of contracted rates and suppliers
• Increase control by introducing “invoice” approvals that are performed by the original requester of the service
• Eliminate match exceptions and related rework
• Automate manual invoice processes
• Earn discounts through early payments
• Provide self-service inquiry capability to help suppliers apply payments correctly
Benefits of sPro deployment include:
![Page 13: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/13.jpg)
UPMC sPro Deployment - Project Scope
• In-Scope
– Configuration, testing and deployment of sPro for deliverable-based Work
Orders with the following settlement methods: • Fixed Amount
• Percentage
• Milestone
• Rate-Based
– Integration with Project Costing through the Purchasing module
– Supplier interaction with Services Procurement via the External Supplier Portal
– Initial pilot with a small group of users / one vendor
– Subsequent vendor by vendor roll-out
• Out-of-scope
– Resource-based Work Orders with timesheet reporting/approval
– Integration with Strategic Sourcing (customized to eliminate this)
– Integration with Purchasing Contracts
![Page 14: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/14.jpg)
UPMC sPro Deployment - Project Methodology
Plan
•Investigated functionality in Demo and conducted initial testing - delivered functionality did not meet UPMC’s needs or function fully
•Determined that UPMC would customize portions of the application
•Developed the project plan based on the Functional and Technical Design Documents
Design
•Gathered and documented business requirements & process for sPro and the External Supplier Portal
•Developed Functional Design Documents for customizations needed to support business requirements
•Created Technical Design Documents to establish a record of the technical changes needed
Build
•Completed and documented sPro configuration
•Created prototypes of various page changes/pages
•Executed technical development required to build customizations/custom processes and ready the External Supplier Portal
Test
•Initial testing was required after applying a large patch from Oracle
•Conducted multiple rounds of testing (shakedown, unit, integration, regression) with sPro and all related modules with DEV, TST, PRD migration
•Self-Service Portal, eProcurement, sPro, PO, External Supplier Portal, AP, GL, Project Costing
Train
•Conducted intro/overview sessions for each user group
•Developed process documents for each section of sPro, organized by user function/tasks
•Created and delivered training for End Users, Purchasing Staff and Vendor Contacts
Deploy
•Initiated a pilot deployment with a small group of users (~30-60 days)
•Identified a list of target suppliers for future deployment and initiated planning
![Page 15: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/15.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 16: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/16.jpg)
High-Level Process Design
![Page 17: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/17.jpg)
Complete configuration and security setup
Select the Vendor
– Complete Checklist / Supplier Review – Is sPro a good fit?
• Includes review of ongoing orders/end users throughout UPMC
• Goods, services or a combination?
– Evaluate current invoicing methods and possible settlement method types
– Assess taxability and other unique requirements for doing business with the supplier
Communication to End Users and Vendors - ID contacts & gather details; overview
of tools & related process
Complete Vendor and End User Access Requests and related setup
Contract review / addendum (including rates if needed) and sign tech agreements
Complete category/Service Type, Vendor and Activity setup in ePro/sPro
Conduct Vendor and End User Training
Cutover planning (from old Purchase Orders to sPro) and coordination of new
order creation – particularly critical with Projects
Set up steps required prior to use of sPro
![Page 18: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/18.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 19: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/19.jpg)
eProcurement Requisitions for Services
New Links!
•Manage Progress Logs
•sPro Inquiry
Requisitions begin in the
same way…
![Page 20: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/20.jpg)
eProcurement Requisitions for Services
Selecting “Services Requisition”
defaults the origin code to SPC
Selecting “Services Requisition”
also makes a new link available
on the Special Request tab
![Page 21: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/21.jpg)
eProcurement Requisitions for Services
By clicking the “Fixed Cost Service” link, we can enter details about the service requisition.
![Page 22: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/22.jpg)
eProcurement Requisitions for Services
The “Review and Submit” page in ePro is the same for service requisitions.
![Page 23: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/23.jpg)
eProcurement Requisitions for Services
Services requisitions follow the same, established eProcurement workflow as all other requisitions.
![Page 24: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/24.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 25: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/25.jpg)
Processing Work Orders – Accessing Work Orders
New Navigation to sPro
Primary menu option for
Service Coordinators
![Page 26: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/26.jpg)
Processing Work Orders - Searching for Work Orders
Search for Work Orders
Select Work Orders to
review/take action
![Page 27: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/27.jpg)
Processing Work Orders (Service tab)
WO header details
Defaulted Info from the ePro
req
Service information is
defaulted from the req,
including: •Service Type (Category)
•Initial settlement type
•High-level scope of work
•Requesting dept and location
![Page 28: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/28.jpg)
Processing Work Orders (Service tab, continued)
Populated with Service
information from req,
including: •Projected start date
•End date
•Vendor information
![Page 29: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/29.jpg)
Processing Work Orders (Approvals and Alerts tab)
The Progress Log Approver is
the ePro Requester!
![Page 30: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/30.jpg)
Processing Work Orders (Comments tab)
Comments from ePro req will
appear on the WO; additional
comments can be added
![Page 31: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/31.jpg)
Processing Work Orders (Cost tab)
Value of WO defaults from req
total
Progress Log Template (type of
settlement method) and Activities
(how progress is reported)
determine WO structure and how
vendor will invoice
Chartfield information defaults
from req
If project-related, a “ghost” PO
will be created upon release
![Page 32: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/32.jpg)
Processing Work Orders (Cost tab) - Activities
Activities must be set up in sPro
before they can be selected on a
Work Order.
After an activity is picked, Service
Coordinators enter a number of
hours to be worked (rate-based) or
total value (fixed amount) or amount
upon completion (milestone).
30.00
![Page 33: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/33.jpg)
Processing Work Orders (Consumption tab)
The Consumption tab
appears after the WO is
released and shows the
amount consumed,
remaining and invoiced.
![Page 34: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/34.jpg)
• Service Coordinators determine the appropriate service/settlement
method/activities and update the WO accordingly
• Service Coordinators use a work instruction to determine taxability and
associate activities if needed to capture sales tax
• After a WO is finalized, it must be submitted and released
• Service Coordinators can only manage/process their own WOs
• WOs cannot be modified at all after release
– If the funds are completely depleted, a new requisition must be entered
• A “ghost” PO will be created for project-related WOs only
– This is necessary to facilitate integration with Project Costing
– No action required by Service Coordinators – POs build as approved and
dispatched
Processing Work Orders - Key Items to Note
![Page 35: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/35.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 36: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/36.jpg)
External Supplier Portal – Logging In
Service Provider
Contacts receive a
personal User ID and
Password
![Page 37: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/37.jpg)
External Supplier Portal – Navigation
Selecting “Services Requisition”
defaults the origin code to SPC
This is the main Navigation screen
within the External Supplier Portal
Initially, the Portal will be used for
Services Procurement only but future
deployments of other tools are planned
![Page 38: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/38.jpg)
External Supplier Portal – sPro Navigation / Menu Options
After clicking on “Services
Procurement,” additional menu options
are available
![Page 39: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/39.jpg)
External Supplier Portal – sPro - View Work Order
Suppliers can search within their list of
Work Orders
To select a Work Order, click the blue
underlined link
![Page 40: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/40.jpg)
External Supplier Portal – sPro - View Work Order
The Work Order Details tab provides
overview information
High-level detail includes the name of
the Requester
More detailed Service Information
covers the type of service, requesting
location and high-level scope of work
![Page 41: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/41.jpg)
External Supplier Portal – sPro - View Work Order
Duration Information provides the
length of the service term
Supplier information is displayed here
The Progress Log approver is the
same person as the Requester
![Page 42: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/42.jpg)
External Supplier Portal – sPro - View Work Order
42
Work Order details (such as the total
value) are visible, but cannot be edited
by the Vendor
![Page 43: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/43.jpg)
External Supplier Portal – sPro - Maintain Progress Logs
Suppliers can search for WOs to enter
Progress Logs , or can search existing
Progress Logs
![Page 44: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/44.jpg)
Submit Progress Logs – Pick an activity
44
![Page 45: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/45.jpg)
Submit Progress Logs (rate-based)
45
Select an Activity to indicate
the work performed, Input the
number of hours worked
The Vendor’s
invoice number is
entered here
![Page 46: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/46.jpg)
Submit Progress Logs (fixed amount)
The Vendor’s
invoice number is
entered here
Add comments to
send to the
Approver; may
include dates of
service or other
details
Select an Activity to indicate
the work performed, Input a
Complete Date and the
Billable Amount
![Page 47: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/47.jpg)
External Supplier Portal – sPro - Submit Progress Logs
The “Details” link
launches a page
that covers the
details/history of
this Progress Log
The “History
Information” link
displays the status
of all Progress Logs
submitted against
the Work Order
![Page 48: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/48.jpg)
External Supplier Portal – sPro - Submit Progress Logs
After clicking “Submit
for Approval” a
confirmation is
requested
After clicking OK, we return
to the “Maintain Progress
Logs” screen and see the
new Progress Log
displayed in the list
![Page 49: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/49.jpg)
External Supplier Portal – sPro - Vendor Invoice Inquiry
A custom sPro Inquiry page can be used to track the status of Progress Logs from submission to payment
This page can be used by multiple contacts within the Vendor’s organization
![Page 50: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/50.jpg)
• Each contact at a Vendor company will have their own User ID and Password
• Only one “Service Provider Contact” can be assigned to a Work Order – this is
the only person who can submit Progress Logs for that Work Order
• The SCM Sourcing Specialist works closely with the Vendor to construct the
Work Order and explain how progress will be submitted (settlement method)
• Once the value of the Work Order is fully consumed, no Progress Logs can be
submitted and the process must begin again with a new requisition/Work Order
• If a Progress Log is denied, the Vendor has the opportunity to modify and
resubmit for approval
• UPMC is treating the Progress Log as the Vendor’s “Invoice” to UPMC
• This is the only method to invoice UPMC and be paid for the specified services -
no paper invoices may be submitted
External Supplier Portal – sPro - Key Items to Note
![Page 51: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/51.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 52: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/52.jpg)
Progress Log Review / Approval
52
Approvers begin the process
to approve Progress Logs on
the eProcurement Homepage
![Page 53: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/53.jpg)
Progress Log Review / Approval
Progress Log Approvers can
search for specific Progress
Logs, or work from a list
![Page 54: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/54.jpg)
Progress Log Review / Approval
Approvers can review
comments and the work
completed by Activity, and
can approve or deny the
Progress Log
![Page 55: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/55.jpg)
Progress Log Review / Approval
Additional detail is available
for each Activity line,
including the approval history
of the progress log
![Page 56: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/56.jpg)
Progress Log Review / Approval
56
If the Progress Log is denied,
users are trained to enter a
comment.
Whether the Progress Log is
approved or denied, a
confirmation is required.
![Page 57: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/57.jpg)
sPro Inquiry – Internal UPMC Users
A custom sPro Inquiry page can be used to track the status of Progress Logs from submission to payment.
![Page 58: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/58.jpg)
• UPMC is treating the Progress Log as the supplier’s invoice of record
• Approvers have the ability to review any supporting documentation that
the Vendor attached to the Progress Log
• Progress Log Approvers may only approve or deny a Progress Log – we
do not permit edits
• If the work is not fully completed or there are other issues with the
Progress Log, Approvers are instructed to deny the Progress Log and
enter detailed comments
• The Vendor receives notifications when Progress Logs are approved or
denied
Key Items to Note – Progress Log Approval
![Page 59: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/59.jpg)
• UPMC Overview
• Introduction to sPro
• Project Goals / Benefits / Scope / Methodology
• Business Process Design & setup
• Using sPro
– eProcurement Requisitions for Services
– Processing Work Orders
– External Supplier Portal (Viewing Work Orders, Entering Progress Logs, Inquiry)
– Approving/denying Progress Logs and Inquiry
• Challenges
• Lessons Learned
• Supplier Deployment Plans / Next Steps
• Questions
Agenda
![Page 60: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/60.jpg)
• Few organizations have deployed sPro focusing on Deliverable-based
Work Orders/Progress Logs
– Not many opportunities existed to compare notes and benchmark
• sPro configuration offers an overwhelming number of options
– Narrowing this down to the appropriate setup for UPMC was time-intensive and
involved “trial by error” investigation
• Testing revealed that a relatively large patch was needed from Oracle in
order for the deliverable-based Work Orders to function properly
– This required a fair amount of additional development and testing that was not
anticipated
• A significant development effort and time investment was required to
complete all customizations
• Defining security and properly establishing user setup was an iterative
process
– sPro user setup differs from all other PSFT modules that we are aware of and the
order of events is extremely important
Challenges
![Page 61: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/61.jpg)
• Engagement from operational areas is critical in the early stages of requirements
development to validate the business process that is created and ensure it will
meet operational needs – eProcurement users, Strategic Sourcing, Purchasing, Accounts Payable, Project Costing, Project
Finance, Finance/Accounting, Construction Accounting, General Ledger
• Very detailed configuration documentation proved to be a worthwhile
expenditure of time and resources – Reconfiguration was required many times over the course of the project due to refreshes and
migration to other instances – small differences in config can produce major issues
• Significant custom development on a new module will generally take longer than
anticipated
• An external consulting resource was very helpful in researching sPro
capabilities/issues and assisting with development/testing
• Thoughtful and thorough unit/integration/regression testing identified issues
early and provided critical feedback to development – Approximately 500 test scripts were executed
Lessons Learned
![Page 62: UPMC](https://reader030.vdocuments.site/reader030/viewer/2022020207/54c236b64a79590d1b8b4573/html5/thumbnails/62.jpg)
• Complete the pilot deployment with our initial supplier
– Feedback from end users and the Vendor is extremely positive
• Eliminated blanket orders, paper invoices and related processing time (including
lost invoices)
• Greater visibility for End Users into consumption against the Work Order
• Vendors are enthusiastic about the ability to review progress log and payment
status on their own
– A pilot wrap-up session will help identify opportunities for improvement and future
enhancements
• Extended roll out plans
– Developed process documents for future vendor deployments
• Example suppliers include: Linen, Landscaping, Snow Removal, Cabling, IT
consulting, IT services, recruiting services, equipment repair
– Created a list of initial priority vendors for roll out
– Future deployments will be vendor by vendor
Supplier Deployment Plans / Next Steps