    LARSEN & TOUBRO LIMITED - RLBU Division

    VENDOR DRAWING APPROVAL STATUS

    PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

    CLIENT: INDIAN RAILWAYS (EAST CENTRAL)

    DOCUMENT NO R-0001-143-MRS-EL-DCI

    DRG. / DOC. No. DESCRIPTION Clients Comment

    S.No Date Date Date Date

    1 R-0001-143-MRS-EL-VD-0002 132 kV Disconnecting Switches with out Insulators 6-Nov-2008 29-Dec-2008 5-Jan-2009

    2 R-0001-143-MRS-EL-VD-0003 LV Switch Boards (8Nos) (L&T EBG Make) 7-Nov-2008

    3 R-0001-143-MRS-EL-VD-0004 132 kV SF6 Circuit Breaker with support structures. 10-Nov-2008 29-Dec-2008 12-Jan-2009 12.02.20096

    4 R-0001-143-MRS-EL-VD-0005 Light Fixtures(12 Nos) 17-Nov-2008 16-Dec-2008 16-Jan-2009

    5 R-0001-143-MRS-EL-VD-0007 132 kV CVT for Metering and protection. 24-Nov-2008 29-Dec-2008 31-Dec-2008

    6 R-0001-143-MRS-EL-VD-0008 LV Distribution Board (51 Nos) (Tricolite Make) 24-Nov-2008 18-Dec-2008 12-Jan-2009

    7 R-0001-143-MRS-EL-VD-0009 9.5 M Long steel tubular pole. 25-Nov-2008 29-Dec-2008 12-Jan-2009 09.02.09 13.02.2009

    8 R-0001-143-MRS-EL-VD-0010 11 kV Capacitor Bank 1-Dec-2008 27.01.2009 2-Feb-2009

    9 R-0001-143-MRS-EL-VD-0011 Oil Filtering machine 6000 LPH 2-Dec-2008 7-Jan-2009 23-Jan-2009

    10 R-0001-143-MRS-EL-VD-0012 Early Streamer Emission (ESE) air terminal. 3-Dec-2008 6-Jan-2009

    11 R-0001-143-MRS-EL-VD-0013 30 METER HIGH MAST (BOQ REF: EL1/B/13) 4-Dec-2008 22-Dec-2008

    12 R-0001-143-MRS-EL-VD-0014 12-Dec-2008 27-01-2009 2-Feb-2009

    13 R-0001-143-MRS-EL-VD-0015 15-Dec-2008 06.04.09 12.11.09

    14 R-0001-143-MRS-EL-VD-0016 132 kV, 10 kA LA. 22-Dec-2008 12-Jan-2009 2-Feb-2009

    15 R-0001-143-MRS-EL-VD-0017 132 kV Current Transformer. 21-Jan-1900 21.04.2009

    16 R-0001-143-MRS-EL-VD-0018 132/11 kV, 10 MVA transformer. 17-Dec-2008

    Latest Submissionto Client

    ClientsComment

    L&T's Reply/Comment

    L&T's Reply/Comment

    08/12/200819/12/2008

    11/02/200807/01/2009

    1/7/200929.01.2009

    13/01/2009

    21/01/09

    07/01/2009&

    23/01/2009

    11 kV OUT DOOR VCB.A) 800 Amps, 25 kA (BOQ Item 15)B) 1250 Amps, 25 kA (BOQ Item 16)

    Capacitor panel for various sub stations.400 kVAR, 300 kVAR, 150 kVAR, 110 kVAR

    18.02.2009&

    18.04.2009

  • 7/30/2019 Updated DCI 1st April - 15th April '10

    2/6

    Page 2

    LARSEN & TOUBRO LIMITED - RLBU Division

    VENDOR DRAWING APPROVAL STATUS

    PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

    CLIENT: INDIAN RAILWAYS (EAST CENTRAL)

    DOCUMENT NO R-0001-143-MRS-EL-DCI

    DRG. / DOC. No. DESCRIPTION Clients CommentLatest Submission

    to ClientClients

    CommentL&T's Reply/

    CommentL&T's Reply/

    Comment

    17 R-0001-143-MRS-EL-VD-0019 11 kV, 10 kA Station class LA. 19-Dec-2008 12-Jan-2009 11.02.2009

    18 R-0001-143-MRS-EL-VD-0020 11 kV, P.T. 23-Dec-2008 13-Jan-2009

    19 R-0001-143-MRS-EL-VD-0021 11kV C.T. 17-Feb-2009

    20 R-0001-143-MRS-EL-VD-0022 11 kV Gang operated AB Switch

    21 R-0001-143-MRS-EL-VD-0023 11 kV Double break isolator. 28.04.2009 19.05.2009 03.07.2009

    22 R-0001-143-MRS-EL-VD-0024 132 kV control & relay panel. 26.12.2008 11.02.09 21.05.2009

    23 R-0001-143-MRS-EL-VD-0025 110 & 24 V battery and battery charger. 10.06.2009 03.07.2009 16.07.2009

    24 R-0001-143-MRS-EL-VD-0026 17-Dec-2008 21.02.2009

    25 R-0001-143-MRS-EL-VD-0027 5 kVA UPS

    26 R-0001-143-MRS-EL-VD-0028 HT Panel (11KV Switch Board) 12.02.2009 23.02.2009 03.03.2009

    27 R-0001-143-MRS-EL-VD-0029 27.02.2009 03.06.2009 13.07.2009

    28 R-0001-143-MRS-EL-VD-0030 2500 A LT Bus Duct. 21.05.2009

    29 R-0001-143-MRS-EL-VD-0031 HT Cables of Various sizes. 29-Jan-2009 08.04.2009 13.04.2009

    30 R-0001-143-MRS-EL-VD-0032 LT & Control Cables of Various sizes. 29-Jan-2009

    31 R-0001-143-MRS-EL-VD-0034 AAA Conductor 29-Jan-2009 08.04.2009 15.04.2009

    32 R-0001-143-MRS-EL-VD-0035 Aluminium tubes 02.06.2009 07.07.2009 23.07.2009 06.08.2009 13.08.2009

    33 R-0001-143-MRS-EL-VD-0035 132/11 KV Insulator Hardware 08.04.2009 20.04.2009 24.06.2009

    34 R-0001-143-MRS-EL-VD-0043 132 & 11 KV Insulators 15.07.2009 10.08.2009 11.08.2009

    35 R-0001-143-MRS-EL-VD-0044 132 & 11KV Clamps and connectors 17.07.2009

    16.02.2009&

    23.02.2009

    Distribution transformers of different ratings:-1600 kVA, 1000kVA, 750 kVA, 250 kVA.

    24.03.2009&

    25.08.2009

    LV Switch boards (Balance Qty)1) Mould Preheat S/S2) MCC Panel for DG-1

    3) MCC Panel for DG-24) PDB for DG S/S

    12.06.200915.07.200905.08.2009

    18.06.200921.07.200911.08.2009

    23.04.2009&

    21.05.2009

    08.05.2009&

    11.06.2009

  • 7/30/2019 Updated DCI 1st April - 15th April '10

    3/6

    Page 3 of 6

    LARSEN & TOUBRO LIMITED - RBU Division

    EDRC'S DRAWING APPROVAL STATUS

    PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

    CLIENT: INDIAN RAILWAYS (EAST CENTRAL)Status upto 15/04/20

    DOCUMENT NO R-0001-143-MRS-EL-DCI

    DRG. / DOC. No. DESCRIPTION Remarks

    A 132/11kV Outdoor Switchyard

    1 R-0001-143-MRS-EL-CS-0001 132/11kV Switchyard - Single Line Diagram 8-Sep-08 27-Nov-08 17-Dec-08 11-Feb-09 Final approval received

    2 R-0001-143-MRS-EL-GA-0002 132/11kV Switchyard - Layout Plan & section 8-Sep-08 27-Nov-08 17/12/2008, 19/01/09 11-Feb-09 Final approval received

    3 R-0001-143-MRS-EL-EA-0004 132/11kV Switchyard Earth mat & Lightning protection layout 16-Feb-09 Final approval received

    4 R-0001-143-MRS-EL-LL-0005 132/11kV Switchyard Lighting Layout 18-Nov-08 15-Dec-08 09.04.2009 07.08.2009 Final approval received

    5 R-0001-143-MRS-EL-CT-0006 132/11kV Switchyard Cable Trench & Tray Layout 15.06.2009 Final approval received

    6 R-0001-143-MRS-EL-CS-0010 Single Line Diagram - Switchyard ACDB / DCDB 31-Oct-08 16-Dec-08 Final approval received

    7 R-0001-143-MRS-EL-CS-0011 Typical SCADA Architecture 30-Sep-08

    Latest Submissionto Client

    ClientsComment

    L&T's Reply/Comment

    ClientsComments

    ClientsApproval

    29/12/2008

    5-Jan-0919-02-09

    15.04.2009

    22/12/200819.02.200917.04.2009

    &11.05.2009

    29.04.2009&

    15.06.2009

    ee ng w s e mens was held on 26th Nov.M/s Metto submit the ourin control

  • 7/30/2019 Updated DCI 1st April - 15th April '10

    4/6

    Page 4 of 6

    LARSEN & TOUBRO LIMITED - RBU Division

    EDRC'S DRAWING APPROVAL STATUS

    PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

    CLIENT: INDIAN RAILWAYS (EAST CENTRAL)Status upto 15/04/2

    DOCUMENT NO R-0001-143-MRS-EL-DCI

    DRG. / DOC. No. DESCRIPTION RemarksLatest Submission

    to ClientClients

    CommentL&T's Reply/

    CommentClients

    CommentsClients

    Approval

    B Main Receving Station

    1 R-0001-143-MRS-EL-GA-0021 132/11kV Switchyard -Control Building Equipment Layout 08.04.2009 Final approval receive

    2 R-0001-143-MRS-EL-CT-0022 132/11kV Switchyard -Control Building Cable Routing Layout 21.02.2009 15.06.2009 Final approval receive

    3 R-0001-143-MRS-EL-LL-0023 132/11kV Switchyard - Control Building Lighting Layout 31-Dec-08 30/01/2009 19.02.2009 17.06.2009 Final approval receive

    4 R-0001-143-MRS-EL-EP-0024 132/11kV Switchyard - Control Building Earthing & Lightning Layout 12.10.09 Final approval receive

    C Calculation / Reports

    1 R-0001-143-MRS-EL-CA-0002 Earthing Design Calculation 19-Sep-08 7-Nov-08 Final approval receive

    2 R-0001-143-MRS-EL-CA-0003 Relay Setting Calculation & Co-ordination Final approval receive

    3 R-0001-143-MRS-EL-CA-0004 132/11kV Switchyard-Outdoor Lighting Design Calculation(MRS) 15-Dec-08 13.07.2009 Final approval receive

    4 R-0001-143-MRS-EL-CA-0005 Indoor Lighting Design Calculation Switchyard Control Building 31-Dec-08 30/01/2009 19.02.2009 06.03.2009 08.07.2009 Final approval receive

    5 R-0001-143-MRS-EL-CA-0006 Battery Sizing Calculation 21.02.2009 Final approval receive

    6 R-0001-143-MRS-EL-DB-0007 Proposal for SCADA Based Power Management System 23-Sep-08 7-Nov-08

    12/31/200820/01/2009

    17.02.200915.04.2009

    06.03.2009&

    27.04.2009

    21.02.2009&

    09.06.2009&

    04.08.2009

    29.05.200914.07.200904.09.2009

    11/18/20081/5/2009

    20/01/200919.02.2009

    11/12/200808.07.200918/03/2010

    1/27/200922.07.2009

    Meeting with M/s Seimenswas held on 26th Nov.M/s Mto submit the pouring cont

  • 7/30/2019 Updated DCI 1st April - 15th April '10

    5/6

    Page 5 of 6

    APPROVAL STATUS OF TRENCH & EQUIPMENT LAYOUT AND LIGHTING & SMALL POWER SOCKET ARRANGEMENT

    PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR

    CLIENT: INDIAN RAILWAYS (EAST CENTRAL)Status upto 15/04/2010

    DOCUMENT NO R-0001-143-EL-DCI

    DRG. / DOC. No. DESCRIPTION Clients Approval Remarks

    Date Date Date Date

    1 R-0001-143-MLT-EL-GA-0031 Approval of Melt S/s Trench & Equipment Layout 20-Jan-09 Final approval received

    2 R-0001-143-PRE-EL-GA-0032 Aproval of TPO & MPO Trench & Equipment Layout 20-Jan-09 Final approval received

    3 R-0001-143-CR-EL-GA-0034 9-Jan-09 Last Week of Feb Final approval received

    4 R-0001-143-FE-EL-GA-0035 20-Jan-09 Final approval received

    5 R-0001-143-PHS-EL-GA-0036 20-Jan-09 Final approval received

    6 R-0001-143-PCS-EL-GA-0037 9-Jan-09 Last Week of Feb Final approval received

    7 R0001-143-DG-EL-GA-0038 Approval of DG Building Trech & Equipment Layout 23.01.2009 Final approval received

    8 R-0001-143-ADS-EL-GA-0039 9-Jan-09 Last Week of Feb Final approval received

    9 R - 0001-144-EL2-EL-LL-001 21.02.2009 13.02.2009 23.02.2009 26.02.2009 Final approval received

    10 R - 0001-144-EL2-EL-LL-002 03.03.2009 13.02.2009 06.04.2009 Final approval received

    11 R - 0001-144-EL2-EL-LL-003 19.03.2009 30.07.2009 13.08.2009 Final approval received

    12 R - 0001-144-EL2-EL-LL-004 24.03.2009 12.10.2009 Final approval received

    13 R - 0001-144-EL2-EL-LL-005 24.03.2009 11.03.2010 Final approval received

    14 R - 0001-144-EL2-EL-LL-006 13.03-2009 04.05.2009 06.08.2009 27.01.2010 Final approval received

    15 R - 0001-144-EL2-EL-LL-007 05.03.2009 30.03.2009 Final approval received

    16 R - 0001-144-EL2-EL-LL-008 05.03.2009 30.03.2009 Final approval received

    17 R - 0001-144-EL2-EL-LL-009 05.05.2009 12.03.2010

    18 R - 0001-144-EL2-EL-LL-010 05.05.2009 03.09.2009 Final approval received.

    19 R - 0001-144-EL2-EL-LL-011 05.05.2009 01.10.09

    20 R - 0001-144-EL2-EL-LL-012 07.03.2009 08.04.2009 Final approval received

    21 R - 0001-144-EL2-EL-LL-013 5.11.2009 4/1/2010 Final approval received

    22 R - 0001-144-EL2-EL-LL-014 5.11.2009 4/1/2010 Final approval received

    23 R - 0001-144-EL2-EL-LL-015 06.10.09 25/02/2010 Final approval received

    24 R - 0001-144-EL2-EL-LL-016 06.10.09 9/3/2010 Final approval received

    25 R - 0001-144-EL2-EL-LL-017 EDRC yet to submit

    26 R - 0001-144-EL2-EL-LL-018 5.11.2009 4/1/2010 Final approval received

    27 R - 0001-144-EL2-EL-LL-019 18.06.2009 08.07.2009 Final approval received

    28 R - 0001-144-EL2-EL-LL-020 5.11.2009 4/1/2010 Final approval received

    29 R - 0001-144-EL2-EL-LL-021 01.07.2009

    30 R - 0001-144-EL2-EL-LL-022 06.10.09 25/02/2010 Final approval received

    LatestSubmission to Client

    ClientsComment

    L&T'sReply/

    Comment

    1st Week ofMarch

    1st Week ofMarch

    Approval of Compressor roomTrench & Equipment Layout

    Approval of Fume ExtractionTrench & Equipment Layout

    Approval of Pump houseTrench & Equipment Layout

    Approval of Plant care shopTrench & Equipment Layout

    1/19/2009/20/01/09

    23/1/2009

    Approval of Administrative buildingTrench & Equipment Layout

    Approval of Lighting & Smallpower layout of Training school building

    Approval of Lighting & Smallpower layout of Administrative building ground Floor

    Approval of Lighting & Smallpower layout of Administrative building first Floor

    06.07.200928.07.2009

    Approval of Lighting & Smallpower layout of Administrative building second Floor

    Approval of Lighting & Smallpower layout of Administrative building third Floor

    Approval of Lighting & Smallpower layout of Main store 1

    Approval of Lighting & Smallpower layout of Oil barrel shed

    Approval of Lighting & Smallpower layout of Gas shed

    Approval of Security & time officeLighting & Power socket arrangement

    Final approval awaited fromRailways

    Approval of Lighting & Smallpower layout of Store shed

    Approval of Lighting & Smallpower layout of Main Store-2

    EDRC yet to submitted therevised drawing as per Railways

    comments.

    Approval of Lighting & Smallpower layout of Admin S/s

    Approval of Lighting & Smallpower layout of Melt shop

    Approval of Lighting & Smallpower layout of Melt Stores

    Approval of Lighting & Power socket layout of Officeblock Maint/ Melt/ Mould

    Approval of Lighting & Power socket layout of MeltSub-Station

    Approval of Mould office blockLighting & Power socket arrangement

    Approval of Mould shop 1&2Lighting & Power socket arrangement

    Approval of TPO & MPOLighting & Power socket arrangement

    Approval of Mould storage area & Repair shopLighting & Power socket arrangement

    Approval of Acetylene mainfold roomLighting & Power socket arrangement

    08.09.200906.01.10

    Location of the Equipment notyet finalized by Railways

    Approval of Office block & WPS- Maint

    Lighting & Power socket arrangement

  • 7/30/2019 Updated DCI 1st April - 15th April '10

    6/6

    Page 6 of 6

    DRG. / DOC. No. DESCRIPTION Clients Approval RemarksLatest

    Submissio

    n to Client

    ClientsComment

    L&T'sReply/

    Comment

    31 R - 0001-144-EL2-EL-LL-023 5.11.2009 4/1/2010 Final approval received

    32 R - 0001-144-EL2-EL-LL-025 18.06.2009 08.07.2009 Final approval received

    33 R - 0001-144-EL2-EL-LL-026 04.05.2009 22.05.2009 5.3.2010 Approval awaited from Railways

    34 R - 0001-144-EL2-EL-LL-027 Drwg Send to EDRC

    35 R - 0001-144-EL2-EL-LL-028 05.05.2009 16.09.09 Final approval received

    36 R - 0001-144-EL2-EL-LL-029 15.05.2009 15.07.2009

    37 R - 0001-144-EL2-EL-LL-030 05.05.2009 16.03.2010 Approval awaited from Railways

    38 R - 0001-144-EL2-EL-LL-031 04.05.2009 22.05.2009 Final approval received

    39 R - 0001-144-EL2-EL-LL-032 05.05.2009 17.09.09 Final approval received

    40 R - 0001-144-EL2-EL-LL-034 19.05.2009 22.05.2009 Final approval received

    41 R - 0001-144-EL2-EL-LL-035 05.05.2009 29.07.2009 Final approval received

    42 R - 0001-144-EL2-EL-LL-036 05.05.2009 29/05/2009

    43 1-144-EL2-EL-LL-037 05.05.2009 30.07.2009 10.08.2009 Final approval received

    44 R - 0001-144-EL2-EL-LL-038 04.06.2009 12.08.2009 23/07/2009

    45 R - 0001-144-EL2-EL-LL-039 18.05.2009 15.07.2009 23.07.2009 23.09.09 Final approval received

    46 R - 0001-144-EL2-EL-LL-040 Overall street light layout 19.03.2009 Approval awaited

    47 R - 0001-144-EL2-EL-LL-046 High Mast Layout 18.08.2009 4/2/2010 30.11.09 Final approval received

    48 R - 0001-144-EL2-EL-CT-041 Overall plant tunneling & cable trench routing 15.05.2009

    49 R - 0001-144-EL2-EL-RL-015 Overall plant road crossing detail layout 28.01.2009 22.04.2009 Final approval received

    50 R - 0001-144-EL2-EL-EA-042 Overall Plant earthing Layout 30.07.2009 08.12.09 29/12/2009 Approval awaited from Railways

    51 R-0001-144-EL2-EL-EA-0045 Unit Substation Earthing layout 28.07.2009 02.09.09 08.02.2010 Final approval received

    52 RBUPNBE-IR-EL-00141 31.07.2009 05.08.2009 22/02/2010 Final approval received

    53 RBUPNBE-IR-EL-00050 Fire alarm system of ground floor 20.04.2009 22.04.2009 Final approval received

    Approval of Wheel processing shop & Dispatch areaLighting & Power socket arrangement

    Approval of Compressor Room SubstationLighting & Power socket arrangement

    Approval of Pump House & SubstationsLighting & Power socket arrangement

    Approval of Fume Extraction Plant & SubstationsLighting & Power socket arrangement

    Approval of Plant care shop & substation

    Lighting & Power socket arrangement

    Approval of Diesel Generator RoomLighting & Power socket arrangement

    EDRC to submit reviseddrawings

    Approval of Metallurgical laboratory Lighting &Power socket arrangement

    05.08.200916.10.2009

    Approval of Canteen Lighting &Power socket arrangement

    Approval of Road Transport ShopLighting & Power socket arrangement

    Approval of Scrap Preconditioning shop

    Lighting & Power socket arrangement

    Approval of Engg Office & StoresLighting & Power socket arrangement

    Approval of Incinerator ShedLighting & Power socket arrangement

    Drwg to be sent to EDRC(Location not finalized)

    Approval of Transformer repair shedLighting & Power socket arrangement

    Commentreceived from

    client on01.06.2009

    Approval of Basement areaLighting & Power socket arrangement

    EDRC to submit reviseddrawings as per comments

    Approval of TunnelLighting & Power socket arrangement

    15.05.200910.08.200914.10.09

    1) 27.05.20092) 07.10.2009

    3)17.11.2009 4)

    4/2/2010

    01.09.200903.11.2009

    11.09.200912.10.09

    L&T to submit the reviseddrawing/clarification.

    Fire alarm system-Admin Building-1st, 2nd & 3rdFloor