7/30/2019 Updated DCI 1st April - 15th April '10
1/6
Page 1
LARSEN & TOUBRO LIMITED - RLBU Division
VENDOR DRAWING APPROVAL STATUS
PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR
CLIENT: INDIAN RAILWAYS (EAST CENTRAL)
DOCUMENT NO R-0001-143-MRS-EL-DCI
DRG. / DOC. No. DESCRIPTION Clients Comment
S.No Date Date Date Date
1 R-0001-143-MRS-EL-VD-0002 132 kV Disconnecting Switches with out Insulators 6-Nov-2008 29-Dec-2008 5-Jan-2009
2 R-0001-143-MRS-EL-VD-0003 LV Switch Boards (8Nos) (L&T EBG Make) 7-Nov-2008
3 R-0001-143-MRS-EL-VD-0004 132 kV SF6 Circuit Breaker with support structures. 10-Nov-2008 29-Dec-2008 12-Jan-2009 12.02.20096
4 R-0001-143-MRS-EL-VD-0005 Light Fixtures(12 Nos) 17-Nov-2008 16-Dec-2008 16-Jan-2009
5 R-0001-143-MRS-EL-VD-0007 132 kV CVT for Metering and protection. 24-Nov-2008 29-Dec-2008 31-Dec-2008
6 R-0001-143-MRS-EL-VD-0008 LV Distribution Board (51 Nos) (Tricolite Make) 24-Nov-2008 18-Dec-2008 12-Jan-2009
7 R-0001-143-MRS-EL-VD-0009 9.5 M Long steel tubular pole. 25-Nov-2008 29-Dec-2008 12-Jan-2009 09.02.09 13.02.2009
8 R-0001-143-MRS-EL-VD-0010 11 kV Capacitor Bank 1-Dec-2008 27.01.2009 2-Feb-2009
9 R-0001-143-MRS-EL-VD-0011 Oil Filtering machine 6000 LPH 2-Dec-2008 7-Jan-2009 23-Jan-2009
10 R-0001-143-MRS-EL-VD-0012 Early Streamer Emission (ESE) air terminal. 3-Dec-2008 6-Jan-2009
11 R-0001-143-MRS-EL-VD-0013 30 METER HIGH MAST (BOQ REF: EL1/B/13) 4-Dec-2008 22-Dec-2008
12 R-0001-143-MRS-EL-VD-0014 12-Dec-2008 27-01-2009 2-Feb-2009
13 R-0001-143-MRS-EL-VD-0015 15-Dec-2008 06.04.09 12.11.09
14 R-0001-143-MRS-EL-VD-0016 132 kV, 10 kA LA. 22-Dec-2008 12-Jan-2009 2-Feb-2009
15 R-0001-143-MRS-EL-VD-0017 132 kV Current Transformer. 21-Jan-1900 21.04.2009
16 R-0001-143-MRS-EL-VD-0018 132/11 kV, 10 MVA transformer. 17-Dec-2008
Latest Submissionto Client
ClientsComment
L&T's Reply/Comment
L&T's Reply/Comment
08/12/200819/12/2008
11/02/200807/01/2009
1/7/200929.01.2009
13/01/2009
21/01/09
07/01/2009&
23/01/2009
11 kV OUT DOOR VCB.A) 800 Amps, 25 kA (BOQ Item 15)B) 1250 Amps, 25 kA (BOQ Item 16)
Capacitor panel for various sub stations.400 kVAR, 300 kVAR, 150 kVAR, 110 kVAR
18.02.2009&
18.04.2009
-
7/30/2019 Updated DCI 1st April - 15th April '10
2/6
Page 2
LARSEN & TOUBRO LIMITED - RLBU Division
VENDOR DRAWING APPROVAL STATUS
PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR
CLIENT: INDIAN RAILWAYS (EAST CENTRAL)
DOCUMENT NO R-0001-143-MRS-EL-DCI
DRG. / DOC. No. DESCRIPTION Clients CommentLatest Submission
to ClientClients
CommentL&T's Reply/
CommentL&T's Reply/
Comment
17 R-0001-143-MRS-EL-VD-0019 11 kV, 10 kA Station class LA. 19-Dec-2008 12-Jan-2009 11.02.2009
18 R-0001-143-MRS-EL-VD-0020 11 kV, P.T. 23-Dec-2008 13-Jan-2009
19 R-0001-143-MRS-EL-VD-0021 11kV C.T. 17-Feb-2009
20 R-0001-143-MRS-EL-VD-0022 11 kV Gang operated AB Switch
21 R-0001-143-MRS-EL-VD-0023 11 kV Double break isolator. 28.04.2009 19.05.2009 03.07.2009
22 R-0001-143-MRS-EL-VD-0024 132 kV control & relay panel. 26.12.2008 11.02.09 21.05.2009
23 R-0001-143-MRS-EL-VD-0025 110 & 24 V battery and battery charger. 10.06.2009 03.07.2009 16.07.2009
24 R-0001-143-MRS-EL-VD-0026 17-Dec-2008 21.02.2009
25 R-0001-143-MRS-EL-VD-0027 5 kVA UPS
26 R-0001-143-MRS-EL-VD-0028 HT Panel (11KV Switch Board) 12.02.2009 23.02.2009 03.03.2009
27 R-0001-143-MRS-EL-VD-0029 27.02.2009 03.06.2009 13.07.2009
28 R-0001-143-MRS-EL-VD-0030 2500 A LT Bus Duct. 21.05.2009
29 R-0001-143-MRS-EL-VD-0031 HT Cables of Various sizes. 29-Jan-2009 08.04.2009 13.04.2009
30 R-0001-143-MRS-EL-VD-0032 LT & Control Cables of Various sizes. 29-Jan-2009
31 R-0001-143-MRS-EL-VD-0034 AAA Conductor 29-Jan-2009 08.04.2009 15.04.2009
32 R-0001-143-MRS-EL-VD-0035 Aluminium tubes 02.06.2009 07.07.2009 23.07.2009 06.08.2009 13.08.2009
33 R-0001-143-MRS-EL-VD-0035 132/11 KV Insulator Hardware 08.04.2009 20.04.2009 24.06.2009
34 R-0001-143-MRS-EL-VD-0043 132 & 11 KV Insulators 15.07.2009 10.08.2009 11.08.2009
35 R-0001-143-MRS-EL-VD-0044 132 & 11KV Clamps and connectors 17.07.2009
16.02.2009&
23.02.2009
Distribution transformers of different ratings:-1600 kVA, 1000kVA, 750 kVA, 250 kVA.
24.03.2009&
25.08.2009
LV Switch boards (Balance Qty)1) Mould Preheat S/S2) MCC Panel for DG-1
3) MCC Panel for DG-24) PDB for DG S/S
12.06.200915.07.200905.08.2009
18.06.200921.07.200911.08.2009
23.04.2009&
21.05.2009
08.05.2009&
11.06.2009
-
7/30/2019 Updated DCI 1st April - 15th April '10
3/6
Page 3 of 6
LARSEN & TOUBRO LIMITED - RBU Division
EDRC'S DRAWING APPROVAL STATUS
PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR
CLIENT: INDIAN RAILWAYS (EAST CENTRAL)Status upto 15/04/20
DOCUMENT NO R-0001-143-MRS-EL-DCI
DRG. / DOC. No. DESCRIPTION Remarks
A 132/11kV Outdoor Switchyard
1 R-0001-143-MRS-EL-CS-0001 132/11kV Switchyard - Single Line Diagram 8-Sep-08 27-Nov-08 17-Dec-08 11-Feb-09 Final approval received
2 R-0001-143-MRS-EL-GA-0002 132/11kV Switchyard - Layout Plan & section 8-Sep-08 27-Nov-08 17/12/2008, 19/01/09 11-Feb-09 Final approval received
3 R-0001-143-MRS-EL-EA-0004 132/11kV Switchyard Earth mat & Lightning protection layout 16-Feb-09 Final approval received
4 R-0001-143-MRS-EL-LL-0005 132/11kV Switchyard Lighting Layout 18-Nov-08 15-Dec-08 09.04.2009 07.08.2009 Final approval received
5 R-0001-143-MRS-EL-CT-0006 132/11kV Switchyard Cable Trench & Tray Layout 15.06.2009 Final approval received
6 R-0001-143-MRS-EL-CS-0010 Single Line Diagram - Switchyard ACDB / DCDB 31-Oct-08 16-Dec-08 Final approval received
7 R-0001-143-MRS-EL-CS-0011 Typical SCADA Architecture 30-Sep-08
Latest Submissionto Client
ClientsComment
L&T's Reply/Comment
ClientsComments
ClientsApproval
29/12/2008
5-Jan-0919-02-09
15.04.2009
22/12/200819.02.200917.04.2009
&11.05.2009
29.04.2009&
15.06.2009
ee ng w s e mens was held on 26th Nov.M/s Metto submit the ourin control
-
7/30/2019 Updated DCI 1st April - 15th April '10
4/6
Page 4 of 6
LARSEN & TOUBRO LIMITED - RBU Division
EDRC'S DRAWING APPROVAL STATUS
PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR
CLIENT: INDIAN RAILWAYS (EAST CENTRAL)Status upto 15/04/2
DOCUMENT NO R-0001-143-MRS-EL-DCI
DRG. / DOC. No. DESCRIPTION RemarksLatest Submission
to ClientClients
CommentL&T's Reply/
CommentClients
CommentsClients
Approval
B Main Receving Station
1 R-0001-143-MRS-EL-GA-0021 132/11kV Switchyard -Control Building Equipment Layout 08.04.2009 Final approval receive
2 R-0001-143-MRS-EL-CT-0022 132/11kV Switchyard -Control Building Cable Routing Layout 21.02.2009 15.06.2009 Final approval receive
3 R-0001-143-MRS-EL-LL-0023 132/11kV Switchyard - Control Building Lighting Layout 31-Dec-08 30/01/2009 19.02.2009 17.06.2009 Final approval receive
4 R-0001-143-MRS-EL-EP-0024 132/11kV Switchyard - Control Building Earthing & Lightning Layout 12.10.09 Final approval receive
C Calculation / Reports
1 R-0001-143-MRS-EL-CA-0002 Earthing Design Calculation 19-Sep-08 7-Nov-08 Final approval receive
2 R-0001-143-MRS-EL-CA-0003 Relay Setting Calculation & Co-ordination Final approval receive
3 R-0001-143-MRS-EL-CA-0004 132/11kV Switchyard-Outdoor Lighting Design Calculation(MRS) 15-Dec-08 13.07.2009 Final approval receive
4 R-0001-143-MRS-EL-CA-0005 Indoor Lighting Design Calculation Switchyard Control Building 31-Dec-08 30/01/2009 19.02.2009 06.03.2009 08.07.2009 Final approval receive
5 R-0001-143-MRS-EL-CA-0006 Battery Sizing Calculation 21.02.2009 Final approval receive
6 R-0001-143-MRS-EL-DB-0007 Proposal for SCADA Based Power Management System 23-Sep-08 7-Nov-08
12/31/200820/01/2009
17.02.200915.04.2009
06.03.2009&
27.04.2009
21.02.2009&
09.06.2009&
04.08.2009
29.05.200914.07.200904.09.2009
11/18/20081/5/2009
20/01/200919.02.2009
11/12/200808.07.200918/03/2010
1/27/200922.07.2009
Meeting with M/s Seimenswas held on 26th Nov.M/s Mto submit the pouring cont
-
7/30/2019 Updated DCI 1st April - 15th April '10
5/6
Page 5 of 6
APPROVAL STATUS OF TRENCH & EQUIPMENT LAYOUT AND LIGHTING & SMALL POWER SOCKET ARRANGEMENT
PROJECT: CAST STEEL WHEEL MANUFACTURING PLANT IN SARAN (CHHAPRA) DISTRICT - BIHAR
CLIENT: INDIAN RAILWAYS (EAST CENTRAL)Status upto 15/04/2010
DOCUMENT NO R-0001-143-EL-DCI
DRG. / DOC. No. DESCRIPTION Clients Approval Remarks
Date Date Date Date
1 R-0001-143-MLT-EL-GA-0031 Approval of Melt S/s Trench & Equipment Layout 20-Jan-09 Final approval received
2 R-0001-143-PRE-EL-GA-0032 Aproval of TPO & MPO Trench & Equipment Layout 20-Jan-09 Final approval received
3 R-0001-143-CR-EL-GA-0034 9-Jan-09 Last Week of Feb Final approval received
4 R-0001-143-FE-EL-GA-0035 20-Jan-09 Final approval received
5 R-0001-143-PHS-EL-GA-0036 20-Jan-09 Final approval received
6 R-0001-143-PCS-EL-GA-0037 9-Jan-09 Last Week of Feb Final approval received
7 R0001-143-DG-EL-GA-0038 Approval of DG Building Trech & Equipment Layout 23.01.2009 Final approval received
8 R-0001-143-ADS-EL-GA-0039 9-Jan-09 Last Week of Feb Final approval received
9 R - 0001-144-EL2-EL-LL-001 21.02.2009 13.02.2009 23.02.2009 26.02.2009 Final approval received
10 R - 0001-144-EL2-EL-LL-002 03.03.2009 13.02.2009 06.04.2009 Final approval received
11 R - 0001-144-EL2-EL-LL-003 19.03.2009 30.07.2009 13.08.2009 Final approval received
12 R - 0001-144-EL2-EL-LL-004 24.03.2009 12.10.2009 Final approval received
13 R - 0001-144-EL2-EL-LL-005 24.03.2009 11.03.2010 Final approval received
14 R - 0001-144-EL2-EL-LL-006 13.03-2009 04.05.2009 06.08.2009 27.01.2010 Final approval received
15 R - 0001-144-EL2-EL-LL-007 05.03.2009 30.03.2009 Final approval received
16 R - 0001-144-EL2-EL-LL-008 05.03.2009 30.03.2009 Final approval received
17 R - 0001-144-EL2-EL-LL-009 05.05.2009 12.03.2010
18 R - 0001-144-EL2-EL-LL-010 05.05.2009 03.09.2009 Final approval received.
19 R - 0001-144-EL2-EL-LL-011 05.05.2009 01.10.09
20 R - 0001-144-EL2-EL-LL-012 07.03.2009 08.04.2009 Final approval received
21 R - 0001-144-EL2-EL-LL-013 5.11.2009 4/1/2010 Final approval received
22 R - 0001-144-EL2-EL-LL-014 5.11.2009 4/1/2010 Final approval received
23 R - 0001-144-EL2-EL-LL-015 06.10.09 25/02/2010 Final approval received
24 R - 0001-144-EL2-EL-LL-016 06.10.09 9/3/2010 Final approval received
25 R - 0001-144-EL2-EL-LL-017 EDRC yet to submit
26 R - 0001-144-EL2-EL-LL-018 5.11.2009 4/1/2010 Final approval received
27 R - 0001-144-EL2-EL-LL-019 18.06.2009 08.07.2009 Final approval received
28 R - 0001-144-EL2-EL-LL-020 5.11.2009 4/1/2010 Final approval received
29 R - 0001-144-EL2-EL-LL-021 01.07.2009
30 R - 0001-144-EL2-EL-LL-022 06.10.09 25/02/2010 Final approval received
LatestSubmission to Client
ClientsComment
L&T'sReply/
Comment
1st Week ofMarch
1st Week ofMarch
Approval of Compressor roomTrench & Equipment Layout
Approval of Fume ExtractionTrench & Equipment Layout
Approval of Pump houseTrench & Equipment Layout
Approval of Plant care shopTrench & Equipment Layout
1/19/2009/20/01/09
23/1/2009
Approval of Administrative buildingTrench & Equipment Layout
Approval of Lighting & Smallpower layout of Training school building
Approval of Lighting & Smallpower layout of Administrative building ground Floor
Approval of Lighting & Smallpower layout of Administrative building first Floor
06.07.200928.07.2009
Approval of Lighting & Smallpower layout of Administrative building second Floor
Approval of Lighting & Smallpower layout of Administrative building third Floor
Approval of Lighting & Smallpower layout of Main store 1
Approval of Lighting & Smallpower layout of Oil barrel shed
Approval of Lighting & Smallpower layout of Gas shed
Approval of Security & time officeLighting & Power socket arrangement
Final approval awaited fromRailways
Approval of Lighting & Smallpower layout of Store shed
Approval of Lighting & Smallpower layout of Main Store-2
EDRC yet to submitted therevised drawing as per Railways
comments.
Approval of Lighting & Smallpower layout of Admin S/s
Approval of Lighting & Smallpower layout of Melt shop
Approval of Lighting & Smallpower layout of Melt Stores
Approval of Lighting & Power socket layout of Officeblock Maint/ Melt/ Mould
Approval of Lighting & Power socket layout of MeltSub-Station
Approval of Mould office blockLighting & Power socket arrangement
Approval of Mould shop 1&2Lighting & Power socket arrangement
Approval of TPO & MPOLighting & Power socket arrangement
Approval of Mould storage area & Repair shopLighting & Power socket arrangement
Approval of Acetylene mainfold roomLighting & Power socket arrangement
08.09.200906.01.10
Location of the Equipment notyet finalized by Railways
Approval of Office block & WPS- Maint
Lighting & Power socket arrangement
-
7/30/2019 Updated DCI 1st April - 15th April '10
6/6
Page 6 of 6
DRG. / DOC. No. DESCRIPTION Clients Approval RemarksLatest
Submissio
n to Client
ClientsComment
L&T'sReply/
Comment
31 R - 0001-144-EL2-EL-LL-023 5.11.2009 4/1/2010 Final approval received
32 R - 0001-144-EL2-EL-LL-025 18.06.2009 08.07.2009 Final approval received
33 R - 0001-144-EL2-EL-LL-026 04.05.2009 22.05.2009 5.3.2010 Approval awaited from Railways
34 R - 0001-144-EL2-EL-LL-027 Drwg Send to EDRC
35 R - 0001-144-EL2-EL-LL-028 05.05.2009 16.09.09 Final approval received
36 R - 0001-144-EL2-EL-LL-029 15.05.2009 15.07.2009
37 R - 0001-144-EL2-EL-LL-030 05.05.2009 16.03.2010 Approval awaited from Railways
38 R - 0001-144-EL2-EL-LL-031 04.05.2009 22.05.2009 Final approval received
39 R - 0001-144-EL2-EL-LL-032 05.05.2009 17.09.09 Final approval received
40 R - 0001-144-EL2-EL-LL-034 19.05.2009 22.05.2009 Final approval received
41 R - 0001-144-EL2-EL-LL-035 05.05.2009 29.07.2009 Final approval received
42 R - 0001-144-EL2-EL-LL-036 05.05.2009 29/05/2009
43 1-144-EL2-EL-LL-037 05.05.2009 30.07.2009 10.08.2009 Final approval received
44 R - 0001-144-EL2-EL-LL-038 04.06.2009 12.08.2009 23/07/2009
45 R - 0001-144-EL2-EL-LL-039 18.05.2009 15.07.2009 23.07.2009 23.09.09 Final approval received
46 R - 0001-144-EL2-EL-LL-040 Overall street light layout 19.03.2009 Approval awaited
47 R - 0001-144-EL2-EL-LL-046 High Mast Layout 18.08.2009 4/2/2010 30.11.09 Final approval received
48 R - 0001-144-EL2-EL-CT-041 Overall plant tunneling & cable trench routing 15.05.2009
49 R - 0001-144-EL2-EL-RL-015 Overall plant road crossing detail layout 28.01.2009 22.04.2009 Final approval received
50 R - 0001-144-EL2-EL-EA-042 Overall Plant earthing Layout 30.07.2009 08.12.09 29/12/2009 Approval awaited from Railways
51 R-0001-144-EL2-EL-EA-0045 Unit Substation Earthing layout 28.07.2009 02.09.09 08.02.2010 Final approval received
52 RBUPNBE-IR-EL-00141 31.07.2009 05.08.2009 22/02/2010 Final approval received
53 RBUPNBE-IR-EL-00050 Fire alarm system of ground floor 20.04.2009 22.04.2009 Final approval received
Approval of Wheel processing shop & Dispatch areaLighting & Power socket arrangement
Approval of Compressor Room SubstationLighting & Power socket arrangement
Approval of Pump House & SubstationsLighting & Power socket arrangement
Approval of Fume Extraction Plant & SubstationsLighting & Power socket arrangement
Approval of Plant care shop & substation
Lighting & Power socket arrangement
Approval of Diesel Generator RoomLighting & Power socket arrangement
EDRC to submit reviseddrawings
Approval of Metallurgical laboratory Lighting &Power socket arrangement
05.08.200916.10.2009
Approval of Canteen Lighting &Power socket arrangement
Approval of Road Transport ShopLighting & Power socket arrangement
Approval of Scrap Preconditioning shop
Lighting & Power socket arrangement
Approval of Engg Office & StoresLighting & Power socket arrangement
Approval of Incinerator ShedLighting & Power socket arrangement
Drwg to be sent to EDRC(Location not finalized)
Approval of Transformer repair shedLighting & Power socket arrangement
Commentreceived from
client on01.06.2009
Approval of Basement areaLighting & Power socket arrangement
EDRC to submit reviseddrawings as per comments
Approval of TunnelLighting & Power socket arrangement
15.05.200910.08.200914.10.09
1) 27.05.20092) 07.10.2009
3)17.11.2009 4)
4/2/2010
01.09.200903.11.2009
11.09.200912.10.09
L&T to submit the reviseddrawing/clarification.
Fire alarm system-Admin Building-1st, 2nd & 3rdFloor