update on ctf3 installation and planning
DESCRIPTION
Update on CTF3 installation and planning. L. Rinolfi. Brief history of the CTF3 installation. CLEX 2008. TL2 2008. Photo injector tests for PHIN 2008. 2004 - 2008. 30 GHz production (PETS line) and Test Stand for CLIC structures. 2006 - 2007. 2006. 2005. TL1. - PowerPoint PPT PresentationTRANSCRIPT
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Update on CTF3 installation and planning
L. Rinolfi
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Photo injector tests for PHIN
2008
TL2 2008
D FFD
D F D
D F D D F D
D F D
DF DF DF DF DF DF DF DF DF
D F D
F DF D
D FFFDD
D F DD F D
D F DD F D D F DD F D
D F DD F D
DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF
D F DD F D
F DF DF DF D
Drive Beam AcceleratorDL
DL = Delay Loop (factor 2)
CR
CR = Combiner Ring (factor 4)
CLEX 2008
Injector with thermionic gun
2003
2004
20052006 - 2007
30 GHz production(PETS line)
and Test Stand for CLIC structures
2004 - 2008
Brief history of the CTF3 installation
2006
TL1
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Conclusion of the 1st meeting
Installation into the Injector, Drive Beam Linac, Delay Loop, Transfer Line TL1 and Combiner Ring is completed.
Installation of the Transfer Line TL2 will be finished and connected to the Combiner Ring for the end of June 2008.
Installation into CLEX (Phase 0) will be finished for the end of June 2008.
Installation into CTF2 (for PHIN) will be finished for the end of August 2008. Tests with beam foreseen for September 2008 during the installation of the Tail Clipper into the TL2 line.
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
RF deflectors in CR
Klystrons
3 GHz40 MW
3 GHz
30 MW
3 GHz
Gun
SHB2SHB1
PB2 B1A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12
LIPS BOC BOC
A13 A14
40 MW
3 GHz
LIPS
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
30 MW
3 GHz
A17 A18
50 Hz 10 Hz50 Hz50 Hz 50 Hz 10 Hz 50 Hz 50 Hz 50 Hz50 Hz
SHB3
TDS SICA
BOCLIPS LIPS LIPS
40 MW
MKS 02
MKS 03
MKS 05
MKS 06
MKS 07
MKS 11
MKS 12
MKS 13
MKS 14
MKS 15
TWT 01
TWT 02
TWT 03
Photo-injector
CTF2
20 MW
1.5 GHz
50 Hz
MKL 02
1 RF deflector
RF deflectors2 RF deflectors
Combiner Ring
40 kW1.5 GHz
BW 200 MHz LIPS
Delay Loop
PHIN RF gun in CTF2
1 RF deflector
RF deflector in CLEX
CLEX
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Combiner Ring
In order to cure the vertical instabilities, two new (3 GHz)
RF deflectors (in Al) have been designed by LNF (Frascati) and
are under construction.
RF deflectors CR. HDS 0150 & CR.HDS 1050
They are foreseen:- to be at CERN end of June, - to be tested with RF power beginning of July, - to be installed in the machine later on
See A. Ghigo talk
Beam current
V- BPM
H- BPM
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Transfer Line TL2
SH
C 0
120
SH
D 0
110
QF
G 0
140
QD
G 0
160
QF
H 0
210
QF
H 0
180
QF
L 0
270
QD
L 0
280
QD
H 0
220
QF
H 0
230
QD
H 0
330
QF
H 0
350
QD
H 0
370
QD
L 0
430
QF
L 0
450
QD
L 0
470
QFL 0530QDL 0550
QFL 0570QFL 0620QDL 0650
QFL 0680
QFL 0730QDL 0750
QFL 0770
QD
D 0
820
QF
D 0
840
XLC 0580
XLC 0720
XLA 0630XLA 0670
BH
H 0
200
BH
G 0
500
BH
H 0
600
BH
H 0
700
BH
G 0
800
BV
A 0
300
BV
B 0
400
Magnets
Dipoles (Horizontal) 5
Dipoles (Vertical) 2
Quadrupoles 27Sextupoles 4
Correctors 12
Instrumentation
BPM 6 WCM 1
BPI 6 MTV 1
BPR 1
Vacuum
VPI 9
VVS 2
Combiner Ring
CLEX
e-
KH
C 0
250
Tail ClipperS
LV
025
5Collimator
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
TL2 line
Tail ClipperCC.KHC 0250
CollimatorCC.SLV 0255
e- beamDoor 604
Tail clipper & Collimator
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Apr May J unWk 14 15 16 17 18 19 20 21 22 23 24 25 26
Mo 31 7 14 21 28 5 12 19 26 2 9 16 23
Tu
We
Th
Fr
Sa
Su
J ul Aug Sep
Wk 27 28 29 30 31 32 33 34 35 36 37 38 39
Mo 30 7 14 21 28 4 11 18 25 1 8 15 22
Tu
We
Th
Fr
Sa
Su
Oct Nov Dec
Wk 40 41 42 43 44 45 46 47 48 49 50 51 52
Mo 29 6 13 20 27 3 10 17 24 1 8 15 22
Tu
We
Th
Fr
Sa
Su
CTF3
SHUTDOW
N
Ascen
Whit.
J eune G.
CTF3 stop
Beam in Combiner Ring with beam extraction to the CC dump only
Open Days
Start with beam in DL + CR
Installation Tail clipper with Dump
into TL2
During this period the Combiner Ring and CLEX will work with independent access control
During this period the Combiner Ring and CLEX will remain under access control altogether
Hardware tests forTL2 line
Beam in PETS
Connect TL2 line to CR
CTF3 - DL - CR - TL2 Schedule
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
TL2
Two-BeamTest Stand
(TBTS)
Test Beam Line (TBL) decelerator
Space reserved for Instrumentation Test Beam
line (ITB)
RF gun
CALIFES
Drive Beame-
e-
Probe beam
e-
e-
Space re
serve
d for 1
6 PETS
CLEX Layout
TL2 '
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
1) TL2, TL2', TBTS, TBL Nothing new regarding installation compared to the previous CTF3 meeting (18th April 2008)
Waiting for alignment from CERN surveyors (this week)
Vacuum chambers remains to be installed
CLEX status
2) CALIFES Put all the line at the atmospheric pressure
Waiting for alignment from CERN surveyors (this week)
Cabling all dipolar correctors by CEA (this week)
RF wave guides still foreseen to be at CERN mid-June
Finish the cabling of the Vacuum Control
Bake-out of the RF gun and laser chamber downstream
See F. Orsini talk
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
CLEX hardware tests
1) Tests of power supplies (81 in total) 30 power supplies tested and operational
6 power supplies not tested (ripple, water leak, not connected to magnets)
45 power supplies for correctors not yet arrived at CERN
Remote control not yet OK for several devices
2) Polarity tests Done on all standard magnets
Found 10 wrong polarities
All dipolar correctors remain to be done
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Apr May J unWk 14 15 16 17 18 19 20 21 22 23 24 25 26
Mo 31 7 14 21 28 5 12 19 26 2 9 16 23
Tu
We
Th
Fr
Sa
Su
J ul Aug Sep
Wk 27 28 29 30 31 32 33 34 35 36 37 38 39
Mo 30 7 14 21 28 4 11 18 25 1 8 15 22
Tu
We
Th
Fr
Sa
Su
Ascen
Whit.
J eune G.
Beam in Combiner Ring with beam extraction to the CC dump only
During this period the Combiner Ring and CLEX will remain under access control altogether
=> No installations in CLEX
Open Days
Start beam for CALIFES
RF conditioning for CALIFES
Laser Tests for CALIFES (2 slots)
Photo-cathodes production
Tests of the Safety chains (Laser,...)
Connect TL2 line to CR
CTF3 - CLEX Schedule 2008
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Photo-injector PHIN into CTF2
A single klystron MKS 14 shared with RF reflectors
into the Combiner Ring and the RF deflector of
CALIFES
PHIN RF gun expected next week at CERN
and laser beam still under development
RF gun not yet in place here
Possibility to use MKS 14 klystron to test the 2 new Al RF deflectors coming from LNF if the wave guides are in place before connecting the PHIN RF gun
See K. Elsener talk
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
CTF3 - CTF2 Schedule 2008
Apr May J unWk 14 15 16 17 18 19 20 21 22 23 24 25 26
Mo 31 7 14 21 28 5 12 19 26 2 9 16 23
Tu
We
Th
Fr
Sa
Su
J ul Aug Sep
Wk 27 28 29 30 31 32 33 34 35 36 37 38 39
Mo 30 7 14 21 28 4 11 18 25 1 8 15 22
Tu
We
Th
Fr
Sa
Su
Oct Nov Dec
Wk 40 41 42 43 44 45 46 47 48 49 50 51 52
Mo 29 6 13 20 27 3 10 17 24 1 8 15 22
Tu
We
Th
Fr
Sa
Su
CTF3
SHUTDOW
N
Ascen
Whit.
J eune G.
CTF3 stop
Start with beam for 30 GHz tests
Beam for PHIN tests
or30GHz tests
Open Days
Connect MKS 14 for PHIN
Beam in DL + CR + CLEX
Beam in PETS +DL + CR + CLEX
Start beam for CALIFES
Beam in PETSBeam for
30GHz tests
PHIN tests possible during
this period
Beam in Combiner RingCTF2 open under access control
Beam in PETS
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Conclusion
Installation into the Injector, Drive Beam Linac, Delay Loop, Transfer Line TL1 and Combiner Ring => OK
Installation of the Transfer Line TL2 connected to the Combiner Ring for the end of June 2008 but:
- Indian dipole magnets ?
- Power supplies for dipolar correctors ?
Installation into CLEX (Phase 0) will be finished for the end of June 2008 but:
- Laser for CALIFES ?
2nd CTF3 Committee meeting L. Rinolfi 15th May 2008
Conclusion (con't)
Installation into CTF2 for the photo-injector
- LAL proposed help during week 25 (Monday 16th June 2008)
- However this week is foreseen to be dedicated full time for 30 GHz
- Hardware tests for PO and CO not yet in the Schedule
- Installation expected to be finished for the end of August
- Tests with beam could take place in October 2008 during the installation of the Tail Clipper into the TL2 line.
- Strong request from CARE to finalize the test as deliverable for EU-FP6-JRA-PHIN