upcoming design & construction projects 2nd quarter …
TRANSCRIPT
Container Yard 2 Mid and Container Yard 1 South at Barbours Cut Terminal
The scope of work includes the design and construction of approximately 20 acres of concrete pavement (18” roller compacted concrete) for storage of containers as well as traffic lanes to maintain circulation into and around storage areas.
Design Time Frame NIGP Codes Small Business Opportunities PHA Contact
4th Qtr. 2019 – 1st Qtr. 2020 Consultants9253396258
Contractors913609132790976
• Demolition• Concrete• Grading• Excavation
Derek [email protected]
Turning Basin - Rehabilitation of Wharf 8
Rehabilitation of Wharf 8 at Turning Basin Terminal will consist of structural concrete repair and fender replacement.
Design Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Qtr. 2019 - 4th Qtr. 2019 Consultants9625892533
Contractors9097691223914309143891484
• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography
Jessica [email protected]
BCT - Fire Suppression System
The project consists of (1) the preparation of technical documentation that will be used as a basis to procure, and (2) detailed design and construction of a water tank based fire suppression system at the Barbours Cut Terminal.
Design Time Frame NIGP Codes Small Business Opportunities PHA Contact
2nd Qtr. 2019 – 4th Qtr. 2019 Consultants92539925339255692597
Contractors72027830348307392542
• Engineering Design• Concrete Foundation• Plumbing Work• Electrical Installation• Pump house
Bill Aguirre [email protected]
Turning Basin - Remove and Replace Restrooms in the Transit Sheds and City Dock 8
Design and construction of new restroom facilities within the transit sheds and at City Dock 8 at Turning Basin Terminal.
Design Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Qtr. 2019 – 4th Qtr. 2019 Consultants9253396258
Contractors90924 9136091438 9143090976 9145091316 91468
• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes
Jessica [email protected]
Barbours Cut - Construct Maintenance Facility
Construction of a new Maintenance Facility at the east end of Barbours Cut Container Terminal. This facility will include construction of a new building as well as any required parking, staging and laydown areas.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
4th Qtr. 2019 – 4th Qtr. 2020 90924 9143890976 9145091316 914689136091430
• Utility Systems• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes • Photography
Jessica [email protected]
EXISTING BCT M&R BUILDING
BAYPORT M&R BUILDING
Bayport - Port Road Expansion and Drainage
This project will add 1 additional lane to both the inbound and outbound lanes of existing Port Road. This project will also include installing New RCB under Port Road and in existing Ditch ‘D’ to drain 95.5 acre U shaped Port property.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Quarter 2019 918329184692533
• Concrete reinforcement• Demolition• Earthwork
Harvey [email protected]
Bayport - East End at Bayport Container Terminal (CY2S & CY1N)
Construction of approximately 42 acres of container yard (18” roller compacted concrete) and associated work at Bayport Container Terminal.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
4th Qtr. 2019 – 3rd Qtr. 2021 909769122391360914309143891276
96861925869050591572
• Material Testing• Surveying• Security• Electrical• Signs and striping• Photography
Jessica [email protected]
Bayport - Fire Boat Dock at Bayport West End
Construction of Wood Fireboat Dock, Electrical, and Utilities
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
2nd Qtr. 2020 - 4th Qtr. 2020 909769122391438285005409254023
• Electrical• Utilities
Derek [email protected]
Bayport - Rehabilitation of Wharves 4 and 5
Structural concrete repair and upgrade.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
1st Qtr. 2020 - 1st Qtr. 2021 9148491223914389097691430
• Structural Concrete Repair• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography
Eddy Kharrazi [email protected]
Bayport - Construct Electrical and Telecommunication Infrastructure under Port Road and ExxonMobil Corridor
Install 600 LF Electrical Duct Bank under Port Road
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
4th Qtr. 2019 – 1st Qtr. 2020 238910237130423610
• Site Preparation• Power and Communication
Line Construction• Electrical Apparatus and
Equipment
Barbara H. Smith [email protected]
Bayport - 138Kv Substation Security
The project includes the installation of five surveillance cameras, 300 feet of new fencing, underground conduits, two poles, two manual gates and access control equipment for doors.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Qtr. 2019 – 4th Qtr. 2019 990509902292037287558388391484
• Surveillance cameras• Network Switches• UPS• Card access• Fencing
Bill Aguirre [email protected]
Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal
Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Qtr. 2019 – 2nd Qtr. 2020 9593591223120355706891479
9593494130929673154095953
9258690505915724507293671
9622691485929959752692677
• Fender Replacement• Pile Diving• Surveying• Photography
Jessica [email protected]
Industrial Park East - Annual Pavement, Drainage and Dust Control 2019
Dust Suppression, drainage, road patching, and paving
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
2nd Qtr. 2019 - 4th Qtr. 2019 9132790976906547504592528
• Street, Paving Construction• Site Clearing• Drainage
Derek [email protected]
Manchester - Rehabilitation and Repair of Wharf 2
Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
1st Qtr. 2020 - 1st Qtr. 2021 9148491223914389097691430
• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography
Eddy Kharrazi [email protected]
Turning Basin - Bi-Annual Rail and Switch Replacement - 2019
Repairs or replaces rail and rail switches throughout the Turning Basin Terminal
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Qtr. 2019 - 4th Qtr. 2020 90976929009122392533
• Rail and Ballast• Concrete and Rebar• Rail Switches• Drainage
Barbara H. Smith [email protected]
Turning Basin North - Ramp Road 7 Speed Gate
Gate Replacement, Electrical, and Fiber Optics
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Qtr. 2019 - 4th Qtr. 2019 9143891430285009900020928
• Electrical• Fiber Optics
Derek [email protected]
Turning Basin North - Dock Lighting CD17/CD20
LED Yard lighting
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
3rd Qtr. 2019 - 4th Qtr. 2019 9143828500285562855755955
• Electrical • Lighting
Derek [email protected]
Turning Basin - Rehabilitation and Repair of Wharf 9
Structural concrete repair, fender replacement, and geotechnical rehabilitation.
Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact
4th Qtr. 2019 - 4th Qtr. 2020 9148491223914389097691430
• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography
Derek [email protected]