UPCOMING DESIGN & CONSTRUCTION PROJECTS1st Quarter 2019

(Project & Construction Management)

DESIGN PHASE PROJECTS

Left Blank Intentionally

CONSTRUCTION PHASE PROJECTS

Rehabilitation of Wharf 3, Construction of Electrical Infrastructure and Lash DockDemolition at Barbours Cut Terminal

The project is divided into three parts: Part 1: The wharf 3 will be upgraded in order to support 100 feet gauge dock cranes. This work includes the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure. Part 2: It includes the construction of 3,600 feet of concrete duct bank for power and communications; and, Part 3: It consists of the partial demolition of the Lash Dock.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2019 – 4th Qtr. 2020 909769143091438 9147990976 91223

91485 909249124091244

• Material Testing• Surveying • Storm Water

Controls• Photography• Chain Link Fence

• Security• Electrical• Signs and Paint Striping • Demolition of Structures• Concrete Traffic Barriers• Barge Services

Bill Aguirre [email protected]

Bayport and Barbours Cut - Annual Pavement Replacement 2019

This is a one year contract concrete and asphaltic replacement at two Terminals, Barbours Cut and Bayport. The work will consist of removing damaged and or deteriorating pavement in 2019.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2019 - 4th. Qtr. 2019 91327 • Concrete placement• Saw-cutting• Excavation• Concrete Traffic Barriers

Barbara H. Smith [email protected]

Bayport and Barbours Cut - Annual Wharf Crane & RTG Crane Painting - 2019

This project will consist of blasting, priming and painting the wharf cranes and RTG cranes on an "as needed" basis.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2019 - 4th. Qtr. 2019 914849146192900

• Photography• Fuel Supplier• Portable Toilets

Derek [email protected]

Barbours Cut and Bayport - Annual Fender System Maintenance - 2019

This project includes surface preparation, repair and replacement of various fender system elements at Barbours Cut and Bayport Terminals in 2019.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2019 - 4th Qtr. 2019 91223 • Metal Fabrication• Storm Water Controls• Photography

Barbara H. Smith [email protected]

Bayport - Remodel Gate Services Building for USDA

Remodel approximately 1345 SF of the existing Gate Services Building (GSB) at Bayport Container Terminal to be utilized by the USDA as an inspection laboratory. The project includes enclosing the roof overhang around the building to create a larger than existing tenant space. It also includes the installation of laboratory equipment, office space, a communications equipment room,additional HVAC and associated items.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2019 – 4th Qtr. 2019 9092491461914479143891450

• Painting• Roofing• Drywall Installers• Electrical Controls

Bill Aguirre [email protected]

Bayport - Port Road Expansion and Drainage

This project will add 1 additional lane to both the inbound and outbound lanes of existing Port Road. This project will also include installing New RCB under Port Road and in existing Ditch ‘D’ to drain 95.5 acre U shaped Port property.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Quarter 2019 918329184692533

• Concrete reinforcement• Demolition• Earthwork

Harvey [email protected]

Bayport - Rehabilitation of Wharves 4 and 5

Structural concrete repair and upgrade.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2019 - 4th Qtr. 2020 9148491223914389097691430

• Structural Concrete Repair• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Bayport - Construct Electrical and Telecommunication Infrastructure under Port Road and ExxonMobil Corridor

Install 600 LF Electrical Duct Bank under Port Road

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2019 – 1st Qtr. 2020 238910237130423610

• Site Preparation• Power and Communication

Line Construction• Electrical Apparatus and

Equipment

Barbara H. Smith [email protected]

Bayport - 138Kv Substation Security

The project includes the installation of five surveillance cameras, 300 feet of new fencing, underground conduits, two poles, two manual gates and access control equipment for doors.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2019 – 4th Qtr. 2019 990509902292037287558388391484

• Surveillance cameras• Network Switches• UPS• Card access• Fencing

Bill Aguirre [email protected]

Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal

Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2019 – 2nd Qtr. 2020 914849122391438

• Fender Replacement• Pile Diving

Jessica [email protected]

Industrial Park East - Annual Pavement, Drainage and Dust Control 2019

Dust Suppression, road patching and paving

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2019 - 4th Qtr. 2019 237310238910

• Highway, Street, Bridge Construction

• Site Clearing

Don [email protected]

Relocation of Communications Infrastructure Along Peninsula Boulevard

Harris County is developing a project to expand, repave and provide drainage improvements along Peninsula boulevard between the JacintoPort and Care Terminals. As a result it is necessary to relocate existing storm sewers, outfalls and inlets; some of their relocated utilities are in conflict with existing PHA's manholes, duct banks and conduits carrying fiber optics cables for communications among terminals. This project identifies such conflicts and relocates PHA's infrastructure in conflict with the Harris county project.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2019 – 3rd Qtr. 2019 913167252321018

• Concrete work• Fiber Optics Cables• Directional Boring• HDPE Conduit

Bill Aguirre [email protected]

Manchester - Rehabilitation and Repair of Wharf 2

Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2019 - 4th Qtr. 2020 9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Drainage System at Volkswagen Yard at Turning Basin Terminal

Improvement of existing drainage system tied to IH-610 feeder road at the Volkswagen yard at the Turning Basin terminal.Project 1: TxDot construction of drainage improvements to the 610 feeder road. (Procured by TxDot)Project 2: PHA construction of drainage improvements to the Volkswagen Yard.

Project 2 Construction Time Frame Project 2 NIGP Codes Project 2 Small Business Opportunities PHA Contact

1st Qtr. 2019 - 2nd Qtr. 2019 9136091223

• Storm Drainage Structures• Grading• Concrete

Barbara H. Smith [email protected]

PROJECT 2 PROJECT 1

Turning Basin North - Splash Zone Painting 2018 - 2019

Painting and preservation of splash zone area.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2019 - 4th Qtr. 2019 914849146191484

• Water blasting• Painting• Sandblasting

Derek [email protected]

Turning Basin - Transit Sheds 30-31 - Roof Repair

Roof removal and replacement for Transit Sheds 30/31

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2019 914739097692678

• Roofing• Site Clearing• Waste and Remediation

Derek [email protected]

Turning Basin - Bi-Annual Rail and Switch Replacement - 2019

Repairs or replaces rail and rail switches throughout the Turning Basin Terminal

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2019 - 4th Qtr. 2020 90976929009122392533

• Rail and Ballast• Concrete and Rebar• Rail Switches• Drainage

Barbara H. Smith [email protected]

Turning Basin - Rehabilitation and Repair of Wharf 9

Structural concrete repair, fender replacement, and geotechnical rehabilitation.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2019 - 4th Qtr. 2020 9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi [email protected]

Turning Basin - Annual Concrete Replacement 2019

This is a one year contract of concrete replacement at Turning Basin Terminal. The work will consist of removing damaged and or deteriorating concrete pavement in 2019.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2019 - 4th Qtr. 2019 91327 • Concrete• Excavation• Saw-cutting• Concrete Traffic Barriers

Barbara H. Smith [email protected]