unit lab rmsa

Upload: douglas-beach

Post on 02-Jun-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 Unit Lab Rmsa

    1/28

    S.

    N.

    Qty Rate Unit Premi

    um%

    Total

    rate1

    54.45 1108.10%cum 425 58.18

    2

    18.15 343.40

    %

    cum 370 16.143

    26.13 100.00 cum - 100.004

    13.01 403.10 cum 450 2217.05

    5

    ABSTRACT OF COST OF LAB/COMPUTER ROOM SIZE 26'-3"X21'-0" W6'-0" VARANDAH RMSA 2012-13

    Earth filling under floors with surplus soilexcavated from foundation and taken only fromoutside the building plinth in 15 cm layer including ramming watering and consolidating

    lead upto 30 metres. (HSR 6.13a)

    Description of Item

    Earth work in excavation in foundations,trenches etc. in all kinds of soil not exceeding 2meter depth including dressing of bottom andsides of trenches, stacking the excavated soil,clear from the edge of excavation and subsequentfilling around masonry, in 15cm layers with

    compaction, including disposal of all surplus soil,as directed within a lead of 30 metres. (HSR 6.6)

    Cement concrete 1:1.5:3 with stone aggregate 20mm nominal size for reinforced concrete work for walls exceeding 20cm thickness (straight andcurved) beams girders stairs columns (square

    Cement concrete 1:4:8 with stone aggregate 40mm nominal size in foundation and

    plinth.(HSR10.39)

    Earth filling under floors from all leads and liftsincluding ramming watering and consolidatingcomplete. [N.S]

  • 8/11/2019 Unit Lab Rmsa

    2/28

    curved) beams girders stairs columns (square

    103.53 5.40 sqmtr 500 32.409

    30.55 393.45 cum 600 2754.15

    1.59 461.40 cum 600 3229.80

    11

    18.00 414.45 cum 600 2901.1512

    4.17 482.40 cum 600 3376.8013

    3.68 12.40 cum 600 86.8014

    First class brick work laid in cement sand mortar 1:6 in foundation and plinth. [HSR 11.2]

    8

    Note: In case the inclination of the R.C.C slab ismore than 25 degree, the labour as well asthrough rate of item No. 9.1 shall be increased by10 percent and nothing extra shall be paid for lesser inclination.

    Centring and shuttering for flat surfaces such assuspended floors, roofs, landings, chhajjas,shelves etc. inclination not exceeding 25 degree

    with horizontal.

    Extra for smooth shuttering

    [HSR 9.1+ Note]

    First class brick work laid in cement sand mortar 1:6 in first storey upto 4 meters above plinth +

    10 First class brick work laid in cement sand mortar 1:3 in foundation and plinth (HSR 11.5)

    Verndha pillar

    First class brick work laid in cement sand mortar 1:3 in first storey upto 4 metres above plinthlevel.[HSR-11.10]

    First class brick work laid in cement sand mortar 1:6 in 1 st storey upto 4 meters above plinth level(HSR 11.7)

    Extra for brick work in Square or Rectangular

    pillars in buildings.(HSR11.42)

  • 8/11/2019 Unit Lab Rmsa

    3/28

    17

    70.44 52.95 sqmtr 600 370.6518

    4 105.00 each - 105.0019

    4 12.30 each 240 41.8220

    4 64.30 each 240 218.6221

    65.87 36.95 sqmtr 400 184.7522

    113.64 28.15 mtr - 28.1523

    Bottom Khurra on ground 1.2 m x 0.6 mconsisting of brick on edge laid in cement mortar

    1:3 over 75 mm cement concrete 1:8:16 including12 mm thick cement plaster 1:3. (HSR 13.57)

    Providing and fixing P.V.C rain water pipe100mm dia 4 feet long on parapet in cement

    mortar 1:3 in parapet complete in all respect, as per direction of Engineer-in-charge. [N.S]

    Terracing consisting of tiles 22.86 cm x 11.43 cmx 3.81 cm laid over 87.50 mm mud filling on alayer of 25mm mud plaster and an other layer of

    mud mortar for laying the tiles, including twocoats of bitumen laid hot at 1.65 Kg. per sqm onthe top of R.C.C slab including grouting withcement sand mortar 1:3 and top surface to be leftclean etc. HSR-13.13

    Top Khurra 0.6mx0.6m. For rain water pipe in25mm thick cement concrete 1:2:4 over 50mmthick cement concrete 1:8:16. (HSR-13.50)

    Providing and fixing asbestos strips 40x6mm size

    in floor including cutting to size complete and tothe entire satisfaction of Engineer-In-Charge.(NS)

    Base course of floors consisting of 100 mm thick cement concrete 1:8:16 and 100 mm sand or stone filling. (HSR 14.1)

    Conglomerate floor 50 mm thick cement concrete

  • 8/11/2019 Unit Lab Rmsa

    4/28

    108.47 13.10 sqmtr 500 78.6029

    101.83 9.25 sqmtr 500 55.5030

    9.72 14.90 sqmtr 500 89.4031

    22.17 30.70 sqmtr 500 184.2032

    28.35 2.95 sqmtr 230 9.7433

    28.35 9.40 sqmtr 230 31.0234

    165.28 1.80 sqmtr 230 5.9435

    307.19 50.00 kg - 50.00

    36 1.44 650.00 sqmtr - 650.00Providing and fixing sliding bolt with nuts andscrews etc. complete- (HSR 17.83)) I

    Painting two coats excluding priming coat withsynthetic enamel paint in all shades on new woodwork or plastered or concrete surface to given aneven shade (HSR 16.3).

    Applying primer coat with metal primer on newsteel or iron work including preparation of surface. (HSR 16.9)

    (HSR 15.12)

    White washing two coats + two coats of color wash. (HSR 16.47+16.50)

    37

    Cement pointing 1:3 deep varity on brick and tilework. (HSR 15.61)

    Fiber sheet in ventilators (NS)

    6 mm thick cement plaster 1:3 with floating coatof neat cement 1.5mm thick and one coat of white washing on bearing of RCC slab.(HSR 15.83)20 mm thick cement plaster damp proof course1:3 with two coats of bitumen at 1.65 Kg per sqm. Laid hot and sanded (HSR 15.77a)Vertical D.P.C

    Steel door with 40x40x6mm angle for doors and35x35x5mm angle for windows, 30x5 mm bracedstrips and 2 mm thick sheet. (N.S)

  • 8/11/2019 Unit Lab Rmsa

    5/28

    39

    10.67 71.55 mtr 500 429.30

    58.69 58.60 mtr 500 351.6040

    33.61 5.35 mtr 240 18.1941

    16.48 917.05 qtl 500 5502.3042

    (b)76mm x 38mm with 35 mm rebate

    Fe-500 EQR TMT steel bars for bars RCC,works, where not including in the complete rateof RCC including bending, binding and placingin position complete. (HSR 18.22)

    (a) 89mmx50mm with 40mm rebate

    Pressed steel sheet frames (Chowkhat), consistingof 2 mm thick steel sheet of the specified section,including iron lugs (hold fasts), iron hinges,

    conforming to PWD specifications, including bolts for fixing stops, locknotch provision for receiving tower bolts, and finished with one coatof ready-mixed paint red lead non-setting primer,of approved quality, fixed in position includingthe cost of cement concrete 1:3:6 for filling in theframe and cement concrete 1:3:6 for lugs

    complete:- (HSR 18.34)

    Cement concrete 1:2:4 gola 10cmx10cm quadrantalong junction of roof with parapet wall finishedsmooth, whrer specially specified. (HSR 13.64)

    Wrought iron and mild steel using angles flats,square, bars, tees and channels) ladders, grills,grating frames, window guards, iron doors openable or fixed stair case or parapet or any other type of railing, gates and tree guards etc.including cost of screws and welded rods or bolts

  • 8/11/2019 Unit Lab Rmsa

    6/28

  • 8/11/2019 Unit Lab Rmsa

    7/28

  • 8/11/2019 Unit Lab Rmsa

    8/28

    3354

    84139

    5135

    52221

    14081

    319

  • 8/11/2019 Unit Lab Rmsa

    9/28

    26109

    420

    167

    874

    12169

    3199

  • 8/11/2019 Unit Lab Rmsa

    10/28

    8526

    5652

    869

    4084

    276

    879

    982

    15360

    936

  • 8/11/2019 Unit Lab Rmsa

    11/28

    4581

    20635

    611

    90678

  • 8/11/2019 Unit Lab Rmsa

    12/28

    2436

    3149

    54214516000

    55814555815

    50233115070

    51740051740

    569140

  • 8/11/2019 Unit Lab Rmsa

    13/28

    Sr.No No. L B H Qty.

    1x1 1 31.50 3.50 3.25 358.31 cft1x1 1 31.50 4.50 3.25 460.69 cft1x2 2 17.75 4.50 3.25 519.19 cft1x2 2 2.125 3.50 3.25 48.34 cft1x4 4 4.00 4.00 3.25 208.00 cft1x3 3 5.00 1.50 2.00 45.00 cft1x4 4 1.125 4.00 3.25 58.50 cft1x2 2 33.75 1.50 1.50 151.88 cft1x1 1 33.00 1.50 1.50 74.25 cft

    1924.16 cft54.45 cum

    DETAIL ESTIMATE FOR LAB/COMPUTER OF SIZE (26'-3"X 21'-0") WITH 6'-0"VERANDAH RMSA 2012-13

    2

    Description of Item

    Centre wall W2

    1 Earth work in excavation infoundations, trenches etc. in allkinds of soil not exceeding 2 meter depth including dressing of bottomand sides of trenches, stacking theexcavated soil, clear from the edgeof excavation and subsequent fillingaround masonry, in 15cm layers

    with compaction, including disposalof all surplus soil, as directed withina lead of 30 metres. (HSR 6.6)

    Horizontal back wall W3

    Room side wall vertical W2

    Front veranda PillarVeranda side wall W3

    Front Toe Wall

    Plinth Protection Toe WallBack pillars

    Earth filling under floors withsurplus soil excavated fromfoundation and taken only from

    id h b ildi li h i 15

  • 8/11/2019 Unit Lab Rmsa

    14/28

  • 8/11/2019 Unit Lab Rmsa

    15/28

    1x1 1 30.00 27.00 0.375 303.75 cft

    8.60 cum

    1x3 3 27.75 0.75 62.44 sft1x2 2 21.00 0.75 31.50 sft1x2 2 6.75 0.75 10.13 sft1x4 4 1.125 1.125 5.06 sft

    109.1310.14 Sqm

    Note: In case the inclination of theR.C.C slab is more than 25 degree,the labour as well as through rate of

    Roof Slab

    Cement concrete 1:1.5:3 with stoneaggregate 20 mm nominal size for reinforced concrete work in slabswith inclination not exceeding 25

    degrees with horizontal excludingsteel reinforcement but includingcentering and shuttering laid in

    position complete in allrespects.(HSR 10.82+10.95a)

    Back pillars

    Centring and shuttering for flatsurfaces such as suspended floors,roofs, landings, chhajjas, shelvesetc. inclination not exceeding 25

    degree with horizontal.

    8

    6

    2 coats of bitumen 20/30 penetration at 1.65 kg. per sqm. On plinth beam laid hot and sanded(NS)Horizontal wall of room Back,Room side wallVerndha wall

    7

  • 8/11/2019 Unit Lab Rmsa

    16/28

    1x1 1 24.375 2.625 0.25 16.00 cft1x1 1 24.75 2.25 0.25 13.92 cft1x1 1 25.13 1.875 0.25 11.78 cft1x1 1 25.50 1.50 0.25 9.56 cft1x1 1 25.88 1.125 3.75 109.16 cft1x1 1 26.25 0.75 0.25 4.92 cft

    1x2 2 25.125 3.375 0.25 42.40 cft

    1x2 2 24.75 3.00 0.25 37.13 cft1x2 2 24.38 2.625 0.25 31.99 cft1x2 2 24.00 2.25 0.25 27.00 cft1x2 2 23.63 1.875 0.25 22.15 cft1x2 2 23.25 1.50 0.25 17.44 cft1x2 2 22.88 1.125 3.25 167.27 cft

    VIIIth step 1x2 2 22.50 1.125 0.25 12.66 cft

    1x1 1 28.875 3.375 0.25 24.36 cft1x1 1 28.50 3.00 0.25 21.38 cft1x1 1 28.125 2.625 0.25 18.46 cft1x1 1 27.75 2.25 0.25 15.61 cft1x1 1 27.375 1.875 0.25 12.83 cft1x1 1 27.00 1.50 0.25 10.13 cft1x1 1 26.625 1.125 3.25 97.35 cft

    VIIIth ste1x1 1 26.25 0.75 0.25 4.92 cft

    1x2 2 3.375 2.625 0.25 4.43 cft1x2 2 3.75 2.25 0.25 4.22 cft

    VIth stepVth step

    VIIth step

    Vth step

    IVth step

    Vth stepIVth step

    9

    Varanda side wall W3

    IInd stepIIIrd step

    VIIth step

    IInd step1st ste

    IIIrd stepIInd step

    IIIrd step

    VIth step

    Centre wall W2

    Side wall W21st ste

    1st steIInd step

    VIth step

    1st

    ste

    Back wall W3

    First class brick work laid in cementsand mortar 1:6 in foundation and

    plinth. [HSR 11.2]

    IVth step

  • 8/11/2019 Unit Lab Rmsa

    17/28

    1x4 4 1.125 1.50 0.25 1.69 cft1x4 4 1.125 1.125 3.75 18.98 cft

    1078.78 cft30.55 cum

    1x4 4 3.375 3.00 0.25 10.13 cft1x4 4 3.00 2.625 0.25 7.88 cft1x4 4 2.625 2.25 0.25 5.91 cft1x4 4 2.25 1.875 0.25 4.22 cft1x4 4 1.875 1.50 0.25 2.81 cft1x4 4 1.50 1.125 3.75 25.31 cft

    56.25 cft1.59 cum

    1x2 2 27.75 0.75 10.00 416.251x2 2 21.00 0.75 10.00 315.001x2 2 5.25 0.75 10.00 78.751x3 3 7.875 0.75 5.00 88.59

    898.59 cft25.45 cum

    1x2 2 3.75 0.75 6.75 37.971x2 2 5.00 0.75 4.25 31.881x2 2 1.75 0.75 4.25 11.16

    Vth step

    IInd step

    H.Wall of Room- Back & Centre

    Deduction

    Side wall of Room

    Front wall above Arch Portion

    VIth step

    Door D

    Vth step

    Middle window W2

    11

    Side wall of verndha

    First class brick work laid in cementsand mortar 1:6 in 1st storey upto 4meters above plinth level (HSR

    11.7)

    Window [Back] W1

    10

    1st stepVerndha pillar

    VIth step

    First class brick work laid in cementsand mortar 1:3 in foundation and

    plinth (HSR 11.5)

    IIIrd stepIVth step

  • 8/11/2019 Unit Lab Rmsa

    18/28

    147.09 cft

    4.17 cum

    130.00 cft3.68 cum

    1x2 2 27.75 0.75 1.50 62.441x2 2 28.875 0.75 1.50 64.97

    127.41 cft

    1x2 2 27.75 0.375 0.375 7.801x2 2 28.875 0.375 0.375 8.12

    15.93 cft111.48 cft

    3.16 cum

    1x3 3 10.125 0.75 0.75 17.09 cft0.48 cumFront Arches

    B/F qty. item No.13 i.e. Pillar

    Extra for brick work in archesincluding cost of Shuttering. (HSR 11.44 b)

    (b) More than 1.50 meters, but upto3 meters span.

    Net Quantity

    15

    14 First class brick work laid in cementsand mortar 1:6 in first storey upto4 meters above plinth + extra for

    additional storey upto 4 metresabove the top of structural roof of Parapet H. wall

    Side wall

    DeductionRoof portion

    13 Extra for brick work in Square or Rectangular pillars in

    buildings.(HSR11.42)

  • 8/11/2019 Unit Lab Rmsa

    19/28

    1x1 1 26.25 28.875 757.97 sft

    70.44 Sqm18

    1x4 4 nos

    19

    1x4 4 nos

    17

    Top Khurra 0.6mx0.6m. For rainwater pipe in 25mm thick cementconcrete 1:2:4 over 50mm thickcement concrete 1:8:16. (HSR-

    13.50)

    20

    Tile terracing

    Bottom Khurra on ground 1.2 m x0 6 m consisting of brick on edge

    Terracing consisting of tiles 22.86cm x 11.43 cm x 3.81 cm laid over 87.50 mm mud filling on a layer of 25mm mud plaster and an other

    layer of mud mortar for laying thetiles, including two coats of bitumen laid hot at 1.65 Kg. per sqm on the top of R.C.C slabincluding grouting with cementsand mortar 1:3 and top surface to

    be left clean etc. (HSR-13.13)

    Providing and fixing P.V.C rainwater pipe 100mm dia 4 feet longon parapet in cement mortar 1:3 in

    parapet complete in all respect, as

    per direction of Engineer-in-charge.[N.S]

  • 8/11/2019 Unit Lab Rmsa

    20/28

    Providing and fixing asbestos strips40x6mm size in floor includingcutting to size complete and to theentire satisfaction of Engineer-In-

    Charge. (NS) 1x5 5 26.25 131.25 rft1x7 7 21.00 147.00 rft

    1x2 2 26.25 52.50 rft1x7 7 6.00 42.00 rft

    372.75 rft113.64 Rmt

    23

    1x1 1 26.25 21.00 551.25 sft

    1x1 1 26.25 6.00 157.50 sft1x2 2 3.75 0.75 5.63 sft1x3 3 7.875 0.75 17.72 sft

    732.09 sft68.04 sqm

    18 mm thick grey polished skirtingor dado consisting of bottom layer of 15 mm thick cement sand plaster 1:3 and finished with 3 mm thick topping of neat cement rubbed and

    polished including rounding off junction with floors. (HSR 14.18)

    1x3 3 26 25 0 333 26 22 sftH Room

    24

    Door D

    Room

    Conglomerate floor 50 mm thick cement concrete topping 1:2:4(HSR 14.10)

    VerticalHorizontal

    Vertical

    Verndha

    Verndha

    22

    Room Horizontal

    Verandah Opening

  • 8/11/2019 Unit Lab Rmsa

    21/28

  • 8/11/2019 Unit Lab Rmsa

    22/28

    1x2 2 5.00 4.25 42.50 sftCentral window 1x2 2 1.75 4.25 14.88 sft

    1x1 1 6.00 6.75 40.50 sft1x1 1 4.75 5.63 26.74 sft

    3 2/3 7.875 0.75 11.87 sft1x3 3 3.0 2.0 18.00 sft

    205.11 sft1167.12 sft108.47 sqm

    1x2 2 30.375 11.50 698.63 sft1x1 1 27.75 11.50 319.13 sft1x1 1 27.75 7.50 208.13 sft

    1225.88 sft

    1x1 1 6.00 6.75 40.50 sft1x1 1 4.75 5.625 26.72 sft1x2 2 5.00 4.50 45.00 sft1x3 3 3.00 2.00 18.00 sft

    130.22 sft1095.66 sft101.83 sqm

    jali (4.75+1.5)

    6 mm thick cement plaster 1:3 withfloating coat of neat cement 1.5mmthick and one coat of white washing

    b i g f RCC l b

    Back jail

    ventilator

    DeductionOpening

    Horizontal wallFront wall

    Back side window

    Arch Portion

    Net Total

    Window

    29

    30

    Ventilator

    Cement pointing 1:3 deep varity on

    brick and tile work. (HSR 15.61)

    OpeningDeduction

    Vertical wall

  • 8/11/2019 Unit Lab Rmsa

    23/28

    2x2.2 4.5 3.75 6.75 113.91 sft2x2.2 4.5 5.00 4.25 95.63 sft2x2.2 4.5 1.75 4.25 33.47 sft2x4 8 3.00 2.00 48.00 sft2x2 4 1.75 2.00 14.00 sft

    305.00 sft28.35 sqm

    28.35 sqm

    13.99sqmtr

    42.82 sqmt108.47 sqmt

    165.28 sqm

    33

    34

    B/F qty. item No. 28

    White washing two coats + twocoats of color wash. (HSR 16.47+16.50)

    Steel door with 40x40x6mm anglefor doors and 35x35x5mm angle for

    Applying primer coat with metal primer on new steel or iron work including preparation of surface.(HSR 16.9)

    Painting two coats excluding priming coat with synthetic enamel paint in all shades on new woodwork or plastered or concretesurface to given an even shade(HSR 16.3).B/F qty. item No. 33

    B/F qty. item No. 27 (lintel beam )

    B/F qty. item No. 29

    V2

    DW1W2V1

    35

    32

  • 8/11/2019 Unit Lab Rmsa

    24/28

  • 8/11/2019 Unit Lab Rmsa

    25/28

    1x2 22(1.75+

    2) 15.00 rft1x4 4 2.666 10.66 rft1x2 2 1.416 2.83 rft

    1x1 12(2.5+6

    ) 17.00 rft192.50 rft58.69 mtr

    1x2 2 26.25 52.50 rft1x2 2 28.875 57.75 rft

    110.25 rft33.61 rmtr

    41

    16.48 Qtl

    Ventilator V1 ( Horizontal)

    As per design detailed

    V2 ( vertical) Cub board

    Wrought iron and mild steel usingangles flats, square, bars, tees andchannels) ladders, grills, grating

    frames, window guards, iron doorsopen able or fixed stair case or

    parapet or any other type of railing,t d t d t i l di

    Cement concrete 1:2:4 gola10cmx10cm quadrant along

    junction of roof with parapet wallfinished smooth, whrer specially

    specified. (HSR 13.64)

    40

    42

    Fe-500 EQR TMT steel bars for bars RCC, works, where notincluding in the complete rate of

    RCC including bending, bindingand placing in position complete.(HSR 18.22)

    V2

  • 8/11/2019 Unit Lab Rmsa

    26/28

    43

    2 No

    44

    1 No.

    1x2 2 0.375 6.00 4.50 Sft1x2 2 0.375 2.50 1.88 Sft

    6.38 Sft0.59

    sqm

    46

    101.83 sqm

    Providing teaching chalk boardswith dark green pigment mixed withneat cement on 12 mm thick cementsand plaster 1:3 with core belling allaround of size cement 6 X 4.5complete as per design and

    providing marble stone at the bottom of size 1'-0"x9" for keepingduster chalk etc. [N.S]

    45

    Finishing walls with exteriordecorative cement based paint suchas snowcem, Robbincem etc. on

    new work , two coats to give aneven shade (HSR 16.61)

    11.43 cm. thick brick wall laid incement sand mortar 1:4 insuperstructure. (HSR 11.48a)

    Painting for logo, new letters andfigures of any shade with syntheticenamel black or any other approvedcolour to give an even shade.Size 6 X2 (N.S)

  • 8/11/2019 Unit Lab Rmsa

    27/28

    Sr. No. Description Shape of Bars Dia of Bars CuttingLength

    No.

    8 tor 10 tor 12 tor 16 tor 20 tor

    1 Roof Beam B1Bottom Bar 1,3 20 30.875 2 x 2 123.50Top Bar 6 20 9.75 2 x 1 19.50Crank 2 20 34.375 2 x 1 68.75Ring 6" c/c 8 4.25 2 x 63 535.50Top Bars 4, 5 20 30.875 2 x 2 123.50

    2 Ver. Beam B2(Hor.)Bottom Bar 1,2,3 16 28.25 1 x 3 84.75Top Bars 4, 5 12 28.25 1 x 2 56.50Ring 9" c/c 8 3.25 1x 37 120.25

    3 Lintel Beam B2(Ver.)Bottom Bar 1,2,3 16 8.50 2 x 3 51.00Top Bars 4, 5 12 8.50 2 x 2 34.00Ring 9" c/c 8 3.50 2 x 9 63.00

    4 Lintel Beam B3(Hor.)top & bottom 1 to 4 12 31.75 2 x 4 254.00Ring 9" c/c 8 3.00 2 x 37 222.00

    5 Lintel Beam B3(Ver.)top & bottom 1 to 4 12 35.00 2 x 4 280.00

    Ring 9" c/c 8 3.0 2 x 42 252.006 Plinth beams 12 31.25 3 x 4 375.00Ring 9" c/c 8 3.0 3 x 37 333.00

    12 35.0 2 x 4 280.00Ring 9" c/c 8 3.0 2 x 39 234.00

    7 Bed plates 12 2.50 6 x 4 60.0012 1.875 2 x 4 15.0012 1.50 2 x 4 12.00

    Ring 6" c/c 8 2.50 23 57.50

    STEEL CALCULATION OF LAB/COMPUTER ROOM 26'-3"X21'-0" WITH 6'-0" VERANDAH

    Total Cutting Length

  • 8/11/2019 Unit Lab Rmsa

    28/28