UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 J anuary 2004 1 Capacity Development for CDM Egypt, Second National Workshop The Project Design Document (PDD) Samir Amous, APEX, Tunisia Samir Amous, APEX, Tunisia Regional Centre for North Africa and Regional Centre for North Africa and Middle-East Middle-East Tel : +216 71 848 094 --- Fax : +216 71 843 Tel : +216 71 848 094 --- Fax : +216 71 843 453 453 amous.apex@gnet. tn

Upload: ronald-howard

Post on 13-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

1

Capacity Development for CDM

Egypt, Second National Workshop

The Project Design Document (PDD)

Samir Amous, APEX, TunisiaSamir Amous, APEX, TunisiaRegional Centre for North Africa and Middle-EastRegional Centre for North Africa and Middle-EastTel : +216 71 848 094 --- Fax : +216 71 843 453Tel : +216 71 848 094 --- Fax : +216 71 843 453

[email protected]

Page 2: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

2

OUTLINE

A. General Description of the Project Activity

B. Baseline Methodology

C. Duration of the Project Activity

D. Monitoring Methodology and Plan

E. Calculation of GHG emissions

F. Environmental Impacts

G.Stakeholder Comments

Page 3: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

3

ANNEXES

Annex 1: Contact information on project participants

Annex 2: Information regarding public funding

Annex 3: New baseline methodology

Annex 4: New monitoring methodology

Annex 5: Table of baseline data

Page 4: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

4

A. General Description of Project Activity

Project title

Short description of the project activity (purpose, contribution to SD)

List of Parties involved in the project activity.

Information allowing a unique identification of the project activity, including the location (Country, Region, State, City, etc.)

Specification of project activity category (see UNFCC CDM website)

Page 5: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

5

A. General Description of Project Activity

Description of transfer of environmentally sound technologies

Explanation on how the GHG emission is reduced

Information on Public Fundingno diversion of ODA

Page 6: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

6

B. Baseline Methodology Title and reference to the Baseline Methodology as

listed in the UNFCCC CDM Website

Justification of the choice of the methodology

Explanation on how & why the project is additional

Description of the project boundary

Details on the Baseline and its development

Page 7: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

7

Baseline options Existing actual or historical emissions

Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment

Average emissions of similar project activities undertaken in the previous five years, in similar social, economic, environmental and technological circumstances, and whose performance is among the top 20% of their category

Small-Scale projects: Standardized baselines already in place

Page 8: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

8

C. Duration of the project activity

Duration of the project activity:

o Starting date: implementation or construction or real action of project activity

o Operational lifetime in years and months

Choice of the crediting period, with starting date specified

o A period of maximum 10 years

o A period of maximum 7 years, with the potential for renewal for two additional periods at most

Page 9: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

9

D. Monitoring Methodology/Plan

Name and Reference of the methodology listed in the UNFCCC Website

Justification of the choice of the Methodology

Name and Contact information of persons/entity determining the monitoring methodology

Table showing the data/indicators to be monitored, and quality required

Page 10: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

10

Provisions of the Monitoring Plan

Collection and archiving data for calculating emissions within the project boundary

Collection and archiving data for determining baselines

Collection and archiving data for calculating Leakages

QA and Control Procedures

Page 11: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

11

E. Calculation of GHG emissions Calculations of GHG emission reductions within the

project boundary (all emissions that are directly controlled or influenced by the project. Should carefully consider the following issues:

o Potential Leakage

o Emission factors, GWP,

Environmental impacts

Stakeholder Comments

Page 12: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

12

F. Environmental impacts

What are the other environmental benefits ?

Any environmental concerns in relation with the project ? How they are addressed ?

Environmental Impact Assessment, any other assessment ? (to be annexed to the PDD)

Page 13: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

13

G. Stakeholder Comments

PDD Publicly available

Stakeholder commentspart of the CDM gameofficial input

Comments should be invited by the DOE in charge of the validation, and compiled

To which extent comments have been taken into account?

Page 14: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

14

ANNEXES

Annex 1: Contact information on project participants

Annex 2: Information regarding public fundingno ODA diversion

Page 15: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

15

Annex 3: New baseline methodology Annex 4: New monitoring methodology

Only if it’s a new methodology

To be attached to a draft PDD

Page 16: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

16

Annex 5: Table of baseline data

Key elements to determine baselines:

Variables

Parameters

Data Sources

Etc.

Page 17: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

17

Small-Scale projectssame outline, but less detailed sections

A. General Description of the Project Activity

B. Baseline Methodology

C. Duration of the Project Activity

D. Monitoring Methodology and Plan

E. Calculation of GHG emissions

F. Environmental Impacts

G.Stakeholder Comments

Page 18: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

UNEP Collaborating Centre on Energy and Environment

Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004

18

Reduced Annexes

Annex 1: Contact information on project participants

Annex 2: Information regarding public funding

Page 19: UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, 12-13 January 2004