KONGSBERG MARITIME AZIMUTH THRUSTERS
Type UUC for underwater mounting
Underwater mounting/demountingThe UUC is designed for easy underwater mounting and dismantling without drydocking the vessel.
This is of outmost importance in connection with semi-sub oil drilling rigs, production vessels and other large vessels, where drydocking is a problem.
TYPE UUC FOR
UNDERWATER MOUNTING
03.Azimuth-1 of 2-12.05.11kongsberg.com
The thruster is lowered by supply boat, crane barge or by vessel’s own crane.
The thruster is lifted by three inboard wires.
Outer dome is removed and vertical shaft etc. are installed.
Underwater mounting in deep water
Drillship “Deepwater Discovery”6 x UUC 7001Owner: TransoceanYard: Samsung
Pipelayer “CSO Deep Blue”2 x UUC 7001Owner: CoflexipStenaOffshoreYard: Hyundai Mipo
Drilling“PaulWolff”6 x UUC 5001Owner: TransoceanYard: Samsung
Drilling “Leiv Eiriksson”8 x UUC 7001Owner: Ocean RigYard: Friede Goldman
Drilling “Stena Don”6 x UUC 5001Owner: Stena DrillingYard: Kvaerner
Drilling “Deepwater Horizon”8 x UUC 7001Owner: TransoceanYard: HHI
Switchboard: +47 815 73 700Global support 24/7: +47 33 03 24 07E-mail sales: [email protected] E-mail support: [email protected]
Kongsberg MaritimeP.O.Box 483, NO-3601Kongsberg, Norway
03.Azimuth-2 of 2-12.05.11
References
Underwater mounting in shallow water by bottom cradle
Seating/Dome/Launching plate-assembly is mounted in the hull before launching.
Thruster is mounted completely and ready for operation
The seating is welded in hull steel construction or is part of hull.