UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects SPECIFY TRUE PROTECTION Understand the difference. Assisting architects and commercial builders in understanding the differences that exist between Termimesh and other termite barrier systems. We are here to help architects specify the true and proven protection that comes with the backing of premium materials, trusted performance and good people who understand commercial construction. This specification package has been designed to help architects specify Termimesh, simply and with real understanding. termimesh.com.au

Upload: others

Post on 08-May-2020

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

UNDERSTANDING SPECIFICATIONTermimesh Specification Package for Architects

SPECIFY TRUE PROTECTIONUnderstand the difference. Assisting architects and commercial builders in understanding the differences that exist between Termimesh and other termite barrier systems.

We are here to help architects specify the true and proven protection that comes with the backing of premium materials, trusted performance and good people who understand commercial construction.

This specification package has been designed to help architects specify Termimesh, simply and with real understanding.

termimesh.com.au

Page 2: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

TECHNICAL AND ON SITE EXPERIENCETermimesh product and installation practices are technically superior to any other mesh option because of our tightly controlled manufacturing standards and highly evolved installation specifications.

We understand exactly where to install mesh to ensure the ongoing protection of the building. Our specifications and installations cover all vulnerable points and we guarantee that they are termite proof.

We have never taken shortcuts with our installations, and never will.

Simply put, our installations are effective because we invented stainless steel mesh termite barrier and have spent over 25 years refining our processes. There is no substitute for on the job experience and every builder knows that.

HELPING ARCHITECTS AND BUILDERSOver 150 individual, CodeMark compliant installation specifications

Design and installation of the System to meet specific requirements on every project

Ensure protection of all termite entry points e.g. Service Penetrations, control joins, cold joints, retaining walls and perimeter cavity walls.

Marked up installation plans

Pre-start meetings

On-going site supervision

WE HAVE DEVELOPED OVER 150 INSTALLATION SPECIFICATIONS TO ASSIST ARCHITECTS IN SPECIFYING TERMIMESH.

DOWNLOAD READY TO USE SPECIFICATION DOCUMENT HERE

TERMIMESH SYSTEM SPECIFICATIONS

Page 3: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

TERMIMESH SERVICE

1.

2.

3.

4.

5.

6.

LIASON WITH ARCHITECT• Identify & advise on areas requiring protection• Assess slab / wall construction & advise of potential design alterations for cost effectiveness• Assist in specification• Design Termimesh system

LIASON WITH BUILDERS AT TENDER• Quote to all tendering builders• Notify of potential savings - trade supervision• Assist in specification• Design Termimesh system

PROJECT AWARDED

PRESTART• Outline Terms & Conditions• Design options• Scheduling• Answer queries

SITE MEETINGBuilding supervisor & TM Supervisor• Brief supervisor of scheduling requirements• Educate associated trades• Confirm discussions of prestart meeting

TERMIMESH SYSTEM INSTALLATION• Installations to specification• Accredited Installers• Supervision checks• Attendance of concrete pour

Page 4: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

1. GENERAL 1.1 RESPONSIBILITIES

General Requirement: Provide termite management systems, as documented. The builder and contractor shall comply with the requirements of the specification with no substitution or alternative use of materials listed below.

Performance Objective: To achieve full building protection.

1.2 STANDARD General Termite Management Systems: To AS 3660.1 Section 5

1.3 SUBMISSIONS Certification Certificate of Installation: Submit certificate complying with AS 3660.1 Appendix A3. Woven stainless steel termite management system: Submit certification that stainless steel type TMA725 has been used to the manufacturer’s recommendation.

Operation and maintenance manuals Maintenance regime: For systems requiring post construction monitoring, provide a maintenance manual with the details of the following:

• Inspection frequency. • Instructions for inspection of termite

activity and treatment effectiveness.• Contact details of installers and manufacturer’s

authorised supplier of replacement parts/components.

• Reapplication requirements.

Records Report: At the end of the defects liability period, submit a report on the efficacy and status of the termite management system.

Warranties Warranty: Submit the manufacturer’s warranty.

1.4 INSPECTION Notice Inspection: Give notice so that inspection may be made of the following:

• Completed earthworks or substrate preparation before system application/installation.

• The completed termite management system.

2. PRODUCTS 2.1 PHYSICAL SYSTEMS

Concrete slab Standard: AS 3660.1 Section 4. Slab penetration and joint protection: Woven stainless steel mesh TMA725 Termiflange.

Termite caps and sheeting Standard: To AS 3660.1 Section 5. Material: TMA725 grade stainless steel mesh

3. EXECUTION 3.1 PHYSICAL SYSTEMS

Concrete slab Standard: To AS 3660.1 Section 4. Termite caps and sheeting Standard: To AS 3660.1 Section 5.

TERMITE MANAGEMENT

TERMITE MANAGEMENT SPECIFICATION

Page 5: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

3.2 COMPLETION Termite management system notice General: Permanently fix a durable notice in a prominent location to NCC Volume One: B1.4 (i) (ii) and Volume Two: 3.1.3.4

Waste materials Progressive cleaning: Make sure no waste materials which could attract termites remain on the site.

Guarantee Type: Extendable. Minimum period: 10 years on materials and workmanship not subject to compulsory annual termite inspections. Can be extended yearly beyond 10 years with approved yearly termite inspections. No limit on the number of extension years.

Completion inspection Report: At the end of the defects liability period, inspect the termite management systems and prepare a report on their efficacy and status.

4. SELECTIONS 4.1 SCHEDULE

Installation Applicators: TERMIMESH personnel or TERMIMESH approved and accredited contractors. Standard: To AS 3660.1

Service slab penetrations All service slab penetrations to be fitted with Termiflanges prior to pouring of slab.

Whole of building protection Extent of work: Refer to the customised TERMIMESH specification to form a complete termite management system including:

• Parging: Termiparge. • Bonding: Termibond epoxy system.

Termite barriers schedule Barrier DesignationLocation:

Concrete slab on ground. Designed to comply with AS2870 or AS3600

All vertical slab penetrations:

TMA725 grade stainless steel woven mesh (Code 2.1)

All joints between new and existing slabs:

TMA725 grade stainless steel woven mesh (Code 9.5

All construction/control joints between slabs:

TMA725 grade stainless steel woven mesh (Code 9.2)

Building perimeters:

TMA725 grade stainless steel woven mesh (designed to suit construction type)

DOWNLOAD READY TO USE SPECIFICATION DOCUMENT HERE

Page 6: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

TERMIMESH SPECIFICATION DETAILS

1. PERIMETER INSTALL - CAVITY WALL1.1 Perimeter Install - Cavity Wall Pre Pour 102A1.2 Perimeter Install - Cavity Wall Post Pour 102B Double brick1.2.1 Perimeter Install - Cavity Wall 102B Stepdown - Double height brick1.2.2 Perimeter Install - Cavity Wall 102B Stepdown - Single height brick1.2.3 Perimeter Install - Cavity Wall Post Pour 102B Brick veneer1.3 Perimeter Install - Cavity Infill Slab 102B1.3.2 Perimeter Install - Cavity Infill Slab with Tiled patio A1.3.3 Perimeter Install - Cavity Infill Slab with Tiled Patio B1.3.4 Perimeter Install - Cavity Infill Slab with Tiled Patio C1.4 Perimeter Install - Cavity Wall for Brick Veneer on Rebated Slab 102C1.4.1 Perimeter Install - Cavity Infill Slab - Brick Veneer1.4.2 Perimeter Install - Cavity Wall for Brick & Block1.4.3 Perimeter Install - Cavity Wall for Brick Veneer on 2 Course Rebated Slab1.4.5 Perimeter Install - Cavity Wall for Brick Veneer on Rebated Slab - Reactive Soils1.5 Perimeter Install - Cavity Wall - Rebated Slab - Flush Brickwork 102D11.3 Perimeter Install - Cavity Wall for Brick Veneer on Rebated Slab

1. PERIMETER INSTALL - SUSPENDED FLOOR1.12 Perimeter Install - Suspended Floor Construction 107 - Double Brick1.12.2 Perimeter Install - Suspended Floor Construction1.13 Perimeter Install - Suspended Floor Construction 1071.13.6 Perimeter Install - Suspended Floor1.13.1 Perimeter Install - Slab on Fill - Suspended Floor1.13.2 Perimeter Install - Slab on Fill - Suspended Floor - Verandahs & Patios

1. PERIMETER INSTALL - MUD BRICK1.8 Perimeter Install - Mud Brick or Post Design - Detail 11.8.1 Perimeter Install - Mud Brick or Post Design - Detail 21.8.2 Perimeter Install - Mud Brick - Infill Slab - Detail 3

1.0 PERIMETER INSTALL - KNOCK OUT1.7 Perimeter Install - Knock Out Block Post Pour 102E with Doorway Stepdown1.7.1 Perimeter Install - Knock Out Block Post Pour Full Block Coverage

(CLICK TO DOWNOAD)

Page 7: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

1. PERIMETER INSTALL - ‘C’ SECTION1.14 Perimeter Install - ‘C’ Section (Generally SA)1.14.1 Perimeter Install - ‘C’ Section - Flashing Under First Course (SA)1.14.2 Perimeter Install - ‘C’ Section (Generally SA)

1. PERIMETER INSTALL - RETROFIT1.11 Perimeter Install - Perimeter Retrofit 1031.11.1 Perimeter Install - External Retrofit to Brick Construction1.11.3 Perimeter Install - External Retrofit to Corrugated Cladding Construction1.11.4 Perimeter Install - External retrofit to Brick Construction - Rendered1.14.3 Perimeter Install - Retrofit to Paving & Decking at Rebate Level1.14.4 Perimeter Install - External Retrofit to Colourbond Clad Construction1.14.5 Perimeter Install - External Retrofit to Timber Clad Construction1.14.6 Perimeter Install - External Retrofit to Construction

1. PERIMETER INSTALL - VARIOUS1.4.4 Perimeter Install - Monolithic Slab & Patio1.6 Perimeter Install - Inspection Zones for pathways1.13.4 Perimeter Install - Retaining Wall to Suspended Floor1.15 Perimeter Install - Rammed Earth Specification1.17 Perimeter Install - 102A Decking Extension7.10 Perimeter Install - Tiled Patio & Verandah

2. TERMIFLANGE PENETRATION - BLOCK OUTS2.9.1 Termiflange Penetration - Block outs - Pre Pour Type 12.9.2 Termiflange Penetration - Block outs - Pre Pour Type 22.9.3 Termiflange Penetration - Block outs - Post Pour2.9.4 Termiflange Penetration - Block outs - Post Pour Structural Columns2.9.6 Termiflange Penetration - Block outs - Pre Pour Structural Columns (104a)2.9.7 Termiflange Penetration - Block outs - Pre Pour Structural Columns (104b)

2. TERMIFLANGE PENETRATION - VARIOUS2.1 Termiflange Penetration - Type 1 - Centre of Slab - Pre Pour 109-12.2 Termiflange Penetration - Type 2 - Top of Slab - Post Pour 109-22.3 Termiflange Penetration - Type 3 - Base of Slab - Pre Pour 109-32.4 Termiflange Penetration - Cluster Penetrations2.5 Termiflange Penetration - Lagged Penetration Protection - Pre Pour2.6 Termiflange Penetration - Lagged Penetration Protection - Post Pour2.7 Termiflange Penetration - Relocated Penetrations2.8 Termiflange Penetration - Electrical Cable - Inside Open Ended Conduit2.9.5 Termiflange Penetration - Cavity Wall Post Pour with Structural Column2.10 Termiflange Penetration - Steel Posts2.11 Termiflange Penetration - Cavity Penetration2.12 Termiflange Penetration - Isolated Pier Protection

Page 8: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

3. ZERO BOUNDARY INSTALL3.3 Zero Boundary Install - Cavity Wall - Brick Veneer Protection3.4 Zero Boundary Install - 104A - 103B Installation3.5.1 Zero Boundary Install - New to Existing Construction Type 23.7 Zero Boundary Install - Cavity Wall - Rebated Slab - Flush Brickwork3.8 Zero Boundary Install - Cavity wall - Double Brick protection3.9 Zero Boundary Install - Cavity wall - Adjacent Buildings

4. TILT UP SLAB INSTALL4.1 Tilt Up Slab Install - Protection to Vertical Joints4.2 Tilt Up Slab Install - Floor & Wall Slab at Wall Panel Junction Detail4.3 Tilt Up Slab Install - Rebated Slab Detail4.3.1 Tilt Up Slab Install - Rebated Slab Detail A4.4 Tilt Up Slab Install - Infill Slab Detail4.5 Tilt Up Slab Install - Stitch Slab Detail4.6 Tilt Up Slab Install - Tilt panels with “Check outs”4.6.1 Tilt Up Slab Install - Tilt Panels with “Check outs”4.6.2 Tilt Up Slab Install - Tilt panels with “Check outs” Internal panels only

5. RETAINING WALL ABUTTING - PERIMETER5.1 Retaining Wall Abutting - Perimeter Wall Toothed Post Construction5.1.1 Retaining Wall Abutting - Retaining Walls Joining Mesh with Lapped Joints5.2 Retaining Wall Abutting - Perimeter Wall Flush Joint Post Construction5.3 Retaining Wall Abutting - Perimeter Wall Toothed Pre Construction5.4 Retaining Wall Abutting - Perimeter Wall Flush Joint Pre Construction

5. RETAINING WALL ABUTTING - BLOCK5.5 Retaining Wall Abutting - Block Retaining Wall Post Construction5.5.2 Retaining Wall Abutting - Block Retaining Wall5.5.7 Retaining Wall Abutting - Block Retaining Wall Post Construction5.5.8 Retaining Wall Abutting - Block Retaining Wall Post Construction5.5.10 Retaining Wall Abutting - Block Retaining Wall Post Construction5.6 Retaining Wall Abutting - Block Retaining Wall Pre Construction5.6.1 Retaining Wall Abutting - Block Retaining Wall Pre Construction

Page 9: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

5. RETAINING WALL ABUTTING - RETAINING WALL5.5.1 Retaining Wall Abutting - Concrete Retaining Wall5.5.4 Retaining Wall Abutting - Retaining Wall Star Cut Blockwork Strip Shielding Detail5.5.5 Retaining Wall Abutting - Retaining Wall Star Cut Blockwork Strip Shield & Retaining Wall Detail5.5.9 Retaining Wall Abutting - Retaining wall Post Construction5.5.13 Retaining Wall Abutting - Retaining Wall Basement5.5.14 Retaining Wall Abutting - Retaining Wall Below Timber Frame5.5.15 Retaining Wall Abutting - Retaining Wall Suspended Floor Protection Only5.5.16 Retaining Wall Abutting - Retaining Wall to Suspended Floor

5. RETAINING WALL ABUTTING - VARIOUS5.5.3 Retaining Wall Abutting - Masonry Step Down Post Construction5.5.11 Retaining Wall Abutting - Liftwell Protection5.5.17 Retaining Wall Abutting - Stripshielding Rendered Wall Detail5.5.18 Retaining Wall Abutting - Chemset Bolt Application5.9.1 Retaining Wall Abutting - Suspended Slab - Post Slab on Ground5.9.2 Retaining Wall Abutting - Suspended Slab - Pre Slab on Ground

6. CONCRETE WALL VERTICAL JOINTS6.1 Concrete Wall Vertical Joints - Installation Type 16.3 Concrete Wall Vertical Joints - Concrete Slab to Concrete Wall

7. ABUTTING PATHS & DRIVEWAYS - SINGLE LEAF7.2 Abutting Paths & Driveways - Single Leaf Wall with Abutting Driveway7.2.1 Abutting Paths - Driveways - Single Leaf Wall with Abutting Driveway (difference in FGLs)7.2.2 Abutting Paths - Driveways - Single Leaf Wall with Abutting Driveway option 17.2.3 Abutting Paths - Driveways - Single Leaf Wall with Abutting Driveway or Garage Hardstand

7. ABUTTING PATHS & DRIVEWAYS - DISABLED ACCESS7.5 Abutting Paths & Driveways - Disabled Ramp Cavity Wall for Brick Veneer7.6 Abutting Paths & Driveways - Disabled Access Joint - Rebated Sills7.7 Abutting Paths & Driveways - Disabled Access - Timber Door Frame with Flush Steel Lintel

7. ABUTTING PATHS & DRIVEWAYS - VARIOUS7.1 Abutting Paths & Driveways - External Concrete Path - Near Slab Level7.1.1 Abutting Paths & Driveways - Paved Concrete Post Construction7.8 Abutting Paths & Driveways - Level Access Joint - Rebated Sills7.9 Abutting Paths & Driveways - Perimeter Wall Installation7.3 Abutting Paths & Driveways – Garage & Patio Control Joint Protection - Cavity Wall for Brick Veneer7.4 Abutting Paths & Driveways - Mowing Strip Detail7.4.1 Abutting Paths & Driveways - To Concrete Path & Driveway - Quik’nTuff System7.4.2 Abutting Paths & Driveways - Perimeter Installation to Paved Area

Page 10: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

8. RENDERED WALLS8.1 Rendered Walls - Rendered walls8.1.1 Rendered Walls - External Corner Detail8.4 Rendered Walls - Rendered Slab Edge - Type 48.5 Rendered Walls - Render Strip Protection - Type 58.5.1 Rendered Walls - Render Strip Protection - Quik’nTuff System8.7.1 Rendered Walls - Quik’nTuff System Protection8.7.3 Rendered Walls - Perimeter Installation - SA8.8 Rendered Walls - James Hardie CMX Details8.11 Rendered Walls - Exotec Panel Protection8.13 Rendered Walls - Infill Floor8.14 Rendered Walls - Minimal Render Strip on Slab Edge

8. RENDERED WALLS - HEBEL PANEL8.7.2 Rendered Walls - Hebel Panel Protection - SA8.7.4 Rendered Walls - Hebel Panel Protection - Waffle Slab Rebate - Dwelling8.7.5 Rendered Walls - Hebel Panel Protection - Column Pier Protection8.7.6 Rendered Walls - Hebel Panel Protection - Typical Section Untiled Concrete8.9 Rendered Walls - Hebel Panel Protection

9. CONTROL JOINT - COLD JOINT9.5 Control Joint - Cold Joints to Extensions9.5.1 Control Joint - Cold Joints - Edge to Surface9.6 Control Joint - Cold Joints to Verandahs & Paths9.6.1 Control Joint - Cold Joint to Extensions

9. CONTROL JOINT - EXTENSIONS9.8 Control Joint - Extension Addition Protection - Cold Joint from Footing9.8.1 Control Joint - Extension Addition Protection - Block Construction

9. CONTROL JOINT - VARIOUS9.1 Control Joint - Steel Key Joints9.2 Control Joint - Pre Pour9.3 Control Joint - Post Pour Type 1 - Inverted Ridge9.4 Control Joint - Post Pour Type 2 - Concertina Fold9.9 Control Joint - Duplex Fire Wall (Party Wall)9.7 Control Joint - Control Joint Protection9.7.1 Control Joint - Driveway Protection

Page 11: UNDERSTANDING SPECIFICATION · UNDERSTANDING SPECIFICATION Termimesh Specification Package for Architects ... New to Existing Construction Type 2 3.7 Zero Boundary Install - Cavity

10. GARAGE & STORE PROTECTION10.1 Garage & Store Protection - Comprehensive Protection10.2 Garage & Store Protection - Structural Only Protection10.3 Garage & Store Protection - Single Brick Internal Wall Detail

11. MISCELLANEOUS11.1 Miscellaneous - Power Pole - Protection Stump11.2 Miscellaneous - Stairwell Installation

12. TERMIBOND EPOXY SYSTEM - PERIMETER12.1E Termibond Epoxy System - Perimeter Installation - Cavity Wall for Brick Veneer on Rebated Slab12.2E Termibond Epoxy System - Perimeter Installation - Cavity Wall Post Pour12.3E Termibond Epoxy System - Perimeter Installation - Cavity Wall Flush Brickwork12.4E Termibond Epoxy System - Perimeter Installation - Knock Out Block Post Pour

12. TERMIBOND EPOXY SYSTEM - ABUTTING DRIVEWAY12.8E Termibond Epoxy System - Abutting Driveway & Path Slabs A12.9E Termibond Epoxy System - Abutting Driveway & Path Slabs B12.11E Termibond Epoxy System - Abutting Driveway & Path Slabs C

12. TERMIBOND EPOXY SYSTEM - VARIOUS12.5E Termibond Epoxy System - Cold Joints - Bonding to Brick Walls Built on Brick Footings12.6E Termibond Epoxy System - Joining Mesh to Mesh12.7E Termibond Epoxy System - Termiflange Penetration Type 2 - Top of slab - Post Pour

13. PLANTER BOXES & GARDENS13.1 Planter boxes & Gardens - Planter Box protection Style 1

DOWNLOAD READY TO USE SPECIFICATION DOCUMENT HERE