MODELS• Build-And-Fix Model• Waterfall Model• Rapid Prototyping Model• Incremental Model• Spiral Model• Object-Oriented Model
![Page 3: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/3.jpg)
UHD-CS3320-C03 3
![Page 4: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/4.jpg)
UHD-CS3320-C03 4
BUILD-AND-FIX MODEL• No Specifications• No design• Reworked many times• Totally unsatisfactory
• Need life-cycle model– “Game Plan”– Phases– Milestones
![Page 5: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/5.jpg)
UHD-CS3320-C03 5
WATERFALL MODEL• First developed by Royce in early70’s• Documentation Driven• Verification/Test at each phase• Feedback loops
![Page 6: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/6.jpg)
UHD-CS3320-C03 6
![Page 7: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/7.jpg)
UHD-CS3320-C03 7
ANALYSIS OF THE WATERFALL MODEL• Advantages– Enforced discipline– documentation-driven model– testing by SQA– Maintenance easier
• Disadvantages– Requirements & Spec Analysis– graphical aids are used
![Page 8: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/8.jpg)
UHD-CS3320-C03 8
RAPID PROTOTYPING MODEL
• Rapid Prototype used for requirements and specifications analysis.
• Rapid Prototype contains a subset of the functionality of the target product
• Structure of prototype not important, but speed of development process is--RAPID
• Prototype can be used in requirement phase of WF model
![Page 9: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/9.jpg)
UHD-CS3320-C03 9
![Page 10: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/10.jpg)
UHD-CS3320-C03 10
RAPID PROTOTYPING MODEL cont.• Advantages– Helps get requirements right– Good insight to estimate budget and time
requirements– Help in design phase
==> less feedback loops• Disadvantages– Prototype adds to the cost (overall it may
reduce cost)– Temptation to turn prototype into product
![Page 11: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/11.jpg)
UHD-CS3320-C03 11
RAPID PROTOTYPING MODEL cont.• Key points– Do not turn it into product– Prototype may replace requirement phase
but never the design phase– Waterfall model-- try to get right the first
time– Rapid Prototype-- Allows better feedback
from client at earliest stage of the process.
![Page 12: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/12.jpg)
UHD-CS3320-C03 12
INCREMENTAL MODEL
• The product is constructed step by step• The product is divided into a series of
incremental builds• Each build consist of a set of module that
provide a functionality• Product provided to client build by build• Each new build is integrated with previous
builds and delivered to client • Production may stop at end of any build
![Page 13: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/13.jpg)
UHD-CS3320-C03 13
![Page 14: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/14.jpg)
UHD-CS3320-C03 14
ANALYSIS OF THE INCREMENTAL MODEL• Waterfall: operational quality of complete
product at end• Incremental model: deliver operational quality
of portion of product in “short” time• Reduces the effect of introducing a new system
on users: less traumatic• Smaller capital outlay• The process can be stopped at end of any build• Need open architecture-- good for maintenance
![Page 15: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/15.jpg)
UHD-CS3320-C03 15
ANALYSIS OF THE INCREMENTAL MODELProblems:• If broken into too few builds then it
degenerates into the build-and-fix model• If broken into too many builds then integration
of the builds can turn out to be too costly.• Note: Requirements, Specs and Design are
done for whole product. Only Implementation and Integration are incremental.
• A more risky version: incremental Specs and Design
![Page 16: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/16.jpg)
UHD-CS3320-C03 16
![Page 17: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/17.jpg)
UHD-CS3320-C03 17
SYNCHRONIZE-AND-STABILIZE MODEL• Microsoft’s life-cycle model– Requirements analysis--interview potential
customers– Draw up specifications– Divide project into 3 to 4 builds– Each build carried out by small teams working in
parallel– At end of each day--Synchronize (integrate
modules into build, test & debug)– At end of each build-Stabilize (freeze build)
![Page 18: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/18.jpg)
UHD-CS3320-C03 18
SPIRAL MODEL• Simplified form– Waterfall model plus risk analysis
• Precede each phase by– Alternatives– Risk analysis: performance, budget, milestones
• Follow each phase by– Evaluation– Planning of next phase
• Prototypes may be used to analyze risks
![Page 19: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/19.jpg)
UHD-CS3320-C03 19
![Page 20: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/20.jpg)
UHD-CS3320-C03 20
SPIRAL MODEL• Refer to Figure • radial dimension shows cumulative cost to date• Angular dimension shows progress through the
spiral• Each cycle corresponds to a phase
![Page 21: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/21.jpg)
UHD-CS3320-C03 21
![Page 22: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/22.jpg)
UHD-CS3320-C03 22
ANALYSIS OF SPIRAL MODEL
Advantages:• It is a risk-driven model• Risk analysis highlights the need to stay within
budget, on schedule and quality assurance.• If risks can not be resolved, terminate project• No distinction between development and
maintenance.
![Page 23: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/23.jpg)
UHD-CS3320-C03 23
ANALYSIS OF SPIRAL MODELRestrictions:• Intended for internal (in-house) software– Contract software: risk analysis can not be
done at each phase.• Applicable to only large-scale software– cost of risk analysis
![Page 24: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/24.jpg)
UHD-CS3320-C03 24
OBJECT-ORIENTED MODELS• Intended to overcome shortcomings of previous
models• Emphasis on incorporating – iterations, refinement, and feedback– overlap and parallelism between phases– incremental development
• Danger– Can degenerate into CABTAB (Code A Bit
Test A Bit)
![Page 25: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/25.jpg)
UHD-CS3320-C03 25
![Page 26: UHD-CS3320-C031 SOFTWARE LIFE-CYCLE MODELS CS 3320--Chapter 3](https://reader035.vdocuments.site/reader035/viewer/2022070403/56649f275503460f94c3f9e1/html5/thumbnails/26.jpg)
UHD-CS3320-C03 26
CONCLUSION• Different life-cycle models• Build-and-Fix should be avoided• WF: well known with strengths and weaknesses• Rapid-Prototype: strengthens WF model• Incremental model• Synchronize-and-Stabilize: used with success