ucb - sap euro project
DESCRIPTION
5. 6. UCB - SAP EURO PROJECT. 7. Premise of the SAP EMU Conversion. Conversion is performed at client level All objects that use a currency participating in EMU are converted BEF (10 companies) DEM (1 company) All fiscal years are converted 09/1995 03/1999 - PowerPoint PPT PresentationTRANSCRIPT
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
5
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
UCB - SAP EURO PROJECT
6
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
Premise of the SAP EMU Conversion
• Conversion is performed at client level• All objects that use a currency
participating in EMU are converted BEF (10 companies) DEM (1 company)
• All fiscal years are converted 09/1995 03/1999
• Postings on previous years are forbidden after the conversion
7
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
8
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
9
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
10
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
11
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
12
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
13
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
TECHNICAL PREPARATION
• Constraints– Upgrade 4.0B August/October– Frequent Backup/Restore– High resources consumption– Specific customizing– Copy of production environment (disk space)
Specific test environment requested
14
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
ANALYSIS PHASE
Purpose : Consistency check on • Master data and transactions in all concerned
modules FI, AM, MM, SD, CO, PM, PP• EURO specific Customizing Currencies, GL accounts, ... • System Environment Authorizations, configuration, lock of users, ...
15
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
ANALYSIS PHASE - Customizing
For Conversion• Company code definition must be complete• New document type “EU” specific for EURO postings• Assignment of GL accounts to postings categories As example :
Category GL/Account001 4990000901 Document rounding difference002 4990000902 Clearing procedure rounding difference003 4990000903 Local curr.ledger balance carried fwd debit/credit diffs004 4990000904 FI-MM inventory management rounding difference (items)005 4990000905 GR/IR purchase order history rounding difference (items)006 4990000906 FI-AA general ledger rounding difference (items)
For 1st January 1999• Lock AM transactions for 1999 (acquisitions only)• Creation of EUR currency + EURO rules
16
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
ANALYSIS PHASETransactions Data Checks
It consists in a set of SAP programs which MUST be run to ensure data consistency. Single failed programs can be restarted.
• FI : Clearing, open items, reconciliation accounts, carried forward
• AM : FI/AM coherence (assets value, depreciation, reconciliation accounts, …)
• MM :FI/MM coherence (total stocks = GL accounts)• SD : currencies used• CO :FI/CO consistencies
17
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
ANALYSIS PHASETransactions Data Checks
All checks must be completed
No conversion is possible if a check fails
18
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
CONVERSION PHASE
More than 200 SAP Programs included in an SAP procedure will be run within a strict sequence.
ALL users are disconnected
NO restart is possible if a program fails (restore of a backup is necessary)
19
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
Productive Conversion : Schedule
• BACKUP 4 H 00’• ANALYZE PHASE 6 H 30’• Corrections ?• BACKUP 4 H 00’• CONVERSION 17 H 00’• POSTPROCESSING 2 H 00’
33 H 30’(Estimated time for a restore - 6 H00)
Actual tests realized on a copy of the Production environment of August 1998. (estimated size growth for April 1999 : +25%)
20
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
TESTS RESULTS
UCB business related :• Asset values• Exotic currencies• MM stock value / GL accounts• Clearing documents
SAP related :• Clearing procedure• Business area determination
Global satisfaction : restricted areas of problems.
One week was necessary to clear “roughly” some problems and to make a successful conversion
21
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
ASSETS
Origin :• Rounding in depreciation values• Transfer in Jan/98 from 6 to 10 GL Accounts
positions• Depreciation and retirement in 1998 (will be blocked in 1999 until the conversion)
The differences on the appropriate Asset reconciliation accounts were solved by manual postings
22
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
EXOTIC CURRENCIES
In 5 invoices (Sep 1995 => Mar 1996), currency codes FEB or DM have been found in the pricing procedure. No postings in FI have been done on this base.
The creation of the two currency codes is mandatory. The validity date will be restricted for the 3 days of conversion run.
23
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
MM STOCK VALUES / GL ACCOUNTS
The total values in Material master records are not equal to the values in the GL accounts linked to these Material master records.
Example : values of Finished Goods <> value in GL Account 3300000001
Differences : 1 BEF on 3101000001 7 BEF on 3300000001 0,02 DEM on 3300000001
Differences were posted manually on the GL accounts
24
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
CLEARING DOCUMENTS! Checks are only made on current year.
Origin : manual clearing of documents in foreign currencies
Three kinds of GL accounts are concerned• Vendor Accounts
– Personnel– Others
• Accrual GL Accounts• Bank accounts (and related)
The only solution is to unclear all documents which are in error + all subsequent documents.
25
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
Business Area Determination
Some category of adjustments postings generated by SAP are not taking into account the business area concept.
This problem does not block the conversion but does not meet our requirements.
SAP is working about this subject and some enhancements should be available soon.(in some cases, the business area determination will be impossible and manual postings will be necessary)
26
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
ISSUES : Credit management
Before
After
New credit limit in EUR with rounded amounts? Based on data given by Financial Services, an automated load could be prepared.
27
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
INTERFACE : PHARMACEUTICALS
Incoming GL documents in an EMU CurrencyAlternative :• Document currency amounts in BEF will be
translated automatically by SAP and no more transferred from ROSS System.
• Documents in error are manually updated in SAP
Between EMU currencies, SAP forbids to use exchange rates that differ from the official rates fixed on 1st January 1999.
In both cases, differences between ROSS and SAP could happen.
28
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
TAX REPORTS
• GERMANY : reports must be in DEM until 2002
• BELGIUM : within a year, the reports must be in the same currency. The EUR currency is allowed from January 1999.
In UCB SA-NV, tax reports will be done in EUR from 1st January 1999.
For UCB SA-NV, from January 1999 until the conversion, reports can be printed in BEF and EUR. After the conversion, EUR will be the only possible reporting currency.
29
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
30
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
31
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
32
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
33
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
BANK ACCOUNTS
• No bank accounts should be converted to EUR until the conversion (work load)
• All bank accounts held in BEF will be converted automatically to EUR during the conversion
A manual procedure must be executed for the Bank accounts which must be held in BEF after conversionTransfer of line items to a temporary account, change the currency key of the bank account, transfer of the line items from the temporary account to the changed account (x 6)
34
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
PLANNING
1998 1999AUG SEP OCT NOV DEC JAN FEB MAR APR
Environment Upgrade 3.0F => 4.OB
EURO system InstallationTechnical testsFunctional tests for 1 jan 1999
EURO Currency Active
Conversion tests ValidationData "corrections"Archiving preparation + ValidationArchivingSystems conversionUsers TrainingProduction Environment Conversion
35
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
WORKGROUPS
• Accounting (FI + CO)• Tax• Archiving• Currency management• Credit management + master data• Payments
In order to achieve the work for EUR currency usage on 1st January 1999 and to prepare the conversion, workgroups are proposed by subjects.
36
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
TASKS TO BE ACHIEVED1998 1999
TASKS WHO NOV DEC JAN FEB MAR APR
Clearing ACCorrections + setupNo manual clearing
Documents Archiving AC, TAXDefinitionArchiving
Conversion + Post-Processing AC
Bank Accounts AC
Payment transactions AC
Interfaces PHARMACEUTICALS ACJanuary 1999After Conversion
Commissions (Chemicals) AC, MIS
37
UCB SA-NV SAP TEAM EURO Information Session 17th November 1998
TASKS TO BE ACHIEVED
1998 1999TASKS WHO NOV DEC JAN FEB MAR APR
Credit Management FD
Inter UCB transactions FD
Currency rates CURTranslation ratiosInterfaces1/1/1999 rates
Training ALL
ReportingTax TAXOthers ALL
Production Environment Validation ALLEUR on 1st January 1999Conversion
38