U-City Project
Future Projects
1. Barka TownshipProject Value: $ 300 million
Client: Margan Towell Investment Company
Status: Design Stage
Consultant: Al Abraj Consulting Engineering & Architects
Tender Issue Date: Q2 2011
Tender Award Date: Q4 2011
Remarks: The government of Oman is undertaking many development projects to
modernise the economy, improve the standard of living, and become a more active player in
the global marketplace to add to this government objective the Alargan Towell InvestmentCompany plans to construct another prestigious development in Oman known as Barka
Township. The 79000 square meters (sqm) of development will be part of the urban
development of Muscat that will be directly accessible to the arterial road network and will
include retail and commercial centre.
2. Duqm Town Ship Residential and Commercial Court ComplexProject Value: $ 150 million
Client: Supreme Committee for Town Planning
Status: Consultant Bidding Stage
Tender Issue Date: Q4 2011
Tender Award Date: Q1 2012
Remarks: Supreme Committee for Town Planning is planning to develop residential and
commercial building at Duqm Town.
Scope of Work: Residential Complex, Commercial Building, Associated Facilities
3. Mirbat Beach Development Phase 2Project Value: $ 800 million
Client: Dhofar Tourism Company
Status: Design Stage
Consultant: Parsons Corporation
Tender Issue Date: Q2, 2011
Tender Award Date: Q4, 2011
Remarks: Dhofar Tourism Company, which is jointly owned by Omani Investors and the
Government of Qatar plans to construct an ambitious tourism and residential development
at Mirbat in Dhofar Governate. Set on two million square meters of land, Mirbat Beach in
-
8/3/2019 U City Project
2/4
the first phase will include a Royal Tulip Resort & Spa Mirbat Salalah, a five-star property
which is believed to be the centerpiece of the project. The development will also feature
1500 residential units that will include townhouses, village houses, villas, and apartments.
Leaving aside 10000 square meters (sqm) of retail space and 10000 sqm of office space
along with a second five-star hotel with 300 rooms, nine-hole golf-course and clubhouse,
water park, a private hospital / clinic with helipad, nursery and child care facility, as well as
entertainment centre for adults and children.
4. Mirbat Beach Development Phase 3,4,5Project Value: $ 1.8 billion
Client: Dhofar Tourism Company
Status: Design Stage
Consultant: Parsons Corporation
Tender Issue Date: Q1 2012
Tender Award Date: Q3 2012
Remarks: Phase 3 to 5 of the projects includes the construction of town houses, golf villas,
sports complex, horse riding facilities, residential villas, and associated facilities.
On-Going Project
1. Blue City Project Phase 3-4Project Value: $ 10 billion
Client: Al Sawadi Investment & Tourism Company
Status: Construction
Completion Date: 2014
Remarks: Construction of 20,000 population city on the outskirts of Muscat closer to Barka.
2. Water Front Investments TheWaveProject Value: US$ 580 million
Client: National Investment Funds Company (NIFCO)
Majid Al-Futtaim Group of Companies
Waterfront Investment Oman
Completion Date: Q4 2015
EPC Contractor: Boskalis Westminster Middle East
Remarks:
The Wavefront Investment (formerly Oman Tourism Development Company) is planning to
develop a stretch of coastline between Muscat and Seeb, north of Seeb International
Airport. The beach will have a huge resort which will reflect the unique Omani culture and
heritage. The government having contributed the land is seeking private investors to
participate in the development. The resort will cover almost 2 million sq mts along with
400000 sq mt of reclaimed land. The project will be completed in two phases.
-
8/3/2019 U City Project
3/4
Clients Related to U-City Project
No
Client Contact Point Telephone Facsimile Email We
1 Oman Tourism
Development Company
(Omran)
Khalid Mirza
Development
Manager
24391111 24391112 [email protected] http://www
2 Dhofar Tourism
Company
Khalid Fadah
Project
Manager
23290641 23290614 contact@mirbatbeac
h.com
http://www
h.com
3 Supreme Committee for
Town Planning
Salim
Mohammed AlAffani Project
Engineer
24481311 24698913 [email protected]
m
N
4 Majan Development
Company
Said Al
Mukhaini
24811066 24811066 [email protected]
http://www
opment.co
5 Ministry of Transport &
Communication
Hilal Salam 24700136 24696670 [email protected] http://www
m
6 Towell Investment
Company
Ali Hassan
Moosa
24820440 24823298 [email protected]
m
http://www
-
8/3/2019 U City Project
4/4
Needs for U-City Solutions
y Establishment of better health care solutions: the government of Oman is planningto build a world class health care city that comprises of advance hospitals and clinics
that will be equipped with latest technology. The need for better health care system
has always been courted by the people of Oman.
y Development of Strategic areas such as DuqmDuqm is being transformed from a 6,000 population village to a world class township
and industrial zones. With industries such as petrochemical, refinery and various
manufacturing industries, Duqm is seen as a future commercial hub of Oman. The
government of Oman is also building a world class port and dry dock facility that will
put the town of Duqm as one of the most strategic sea port in the world. In order to
compliment all the facilities, the government is transforming Duqm into a city.
y Establishment of Academic City:Projects such as Blue city comprises of educational institutions such as college and
school. However the availability of world class universities is lacking in the Sultanate.
New projects such as Blue city, and various other projects is vital to improve the
education sector in Oman.