tx presentation 11 26 2011 v2

15

Upload: george-howard

Post on 17-Jul-2015

40 views

Category:

Technology


0 download

TRANSCRIPT

Who We AreBank Sponsor: Prairie Creek Ventures

Design/Monitoring:

Warren Ranch Group

Restoration Systems• Established in Raleigh, NC in 1998 “to

improve the quality of environmental restoration and mitigation”

• Established the first stream bank created via dam removal and the first water quality bank in the US

• 10 Employees with over 40 projects in 8 different states

• 25,000 acres of wetlands and 50 miles of streams

Katy Prairie Conservancy• Executive Director Mary Anne Piacentini• Est. 1992 “To protect a sustainable portion

of the Katy Prairie for the benefit of its wildlife and all Texans forever.”

• 18k acres currently protected with the goal of reaching 50k

How Did We Get Here?• 2007 National Mitigation Banking Conference• 2008 Mitigation Rule Released • 2009 Draft Prospectus Submitted• 2011 (July) Interim Stream Condition

Assessment SOP Released• 2011 (Oct/Nov) Katy Prairie Stream Mitigation

Umbrella Bank approved

Katy Prairie Stream Mitigation Umbrella Bank

• The first major stream bank permitted in the Galveston District and one of the largest in the US

• Total feet of potential stream restoration is over 100,000’

• Phase I (Warren Creek) totals 17,760’ of stream restoration

• Phase I has the potential to generate over 52,000 stream credits

Construction

• 17,760’ of Priority Level I Stream Restoration• 100’ Riparian Buffer• Prairie Pothole Wetland Restoration• Cattle Exclusion• Invasive Species Management• Texas Prairie Dawn Protection

Monitoring & Long Term Management

• Monitor project for a minimum of 7 years• Phase I will monitor physical, chemical and

biological parameters• Long Term Management will be supervised

by the Texas Land Conservancy

Why this Bank is Unique

• Location- <32 miles from Downtown Houston

• Scale- will be one of largest stream banks in the US

• Relationship- revenue generated will be utilized to protect and restore additional areas.

Permittee Information(Credit Release Schedule)

Permittee Information(Service Area)

• Primary• Spring (12040102) • Buffalo (12040104)

• Secondary• West Fork of San Jacinto (12040101)• West Galveston Bay (12040204) • Austin-Oyster (12040205)

Contact Information

Travis [email protected]

919.819.0014www.restorationsystems.com