tuul-songino project overview 22.05.2015
TRANSCRIPT
TUUL- SONGINO
Water Resources Complex
Project Overview
2016
ULAANBAATAR PUMPED STORAGE POWER STATION LLC
TUUL-SONGINO WATER RESOURCES COMPLEX
LOCATION
Tuul-Songino water resources complex project 2
CURRENT STATUS OF ULAANBAATAR CITY
WATER SUPPLY AND WASTE TREATMENT
Central waste water
cleaning facility
170 000 м3 / day :
Householder’s waste
Water 60%
Others 40%
TUUL
RIVER
Tuul-Songino water resources complex project
Thermal
power
station
25%
Others
30%
City
household
ers
45%
3
Municipal waste water treatment
facility
200 000 м3 per day
Pumped Storage Power Station
5 000 м3 per day
Thermal power plant 3 and 4
76 000 м3 per day
Хотын ногоон байгууламжид
15 000 м3 per day
Tuul River
50 000 м3 per day
New Thermal power plant 5
24 000 м3 per day
PROJECT IMPLEMENTATION
TUUL SONGINO WATER RESOURCES COMPLEX
MUNICIPAL WASTE WATER TREATMENT FACILITY
Tuul-Songino water resources complex project 4
MUNICIPAL WASTE WATER TREATMENT FACILITY FOOTPRINT
5Tuul-Songino water resources complex project
Specification
рН
EC
S/cm
COD
ХХХ
мг/л
BOD
БХХ
мг/л
SS
Умб
мг/л
NH4
мг/л
NO2
мг/л
NO3
мг/л
P
эрд
мг/
л
1, Urban waste water
treatment standard
nature of the Mongolian
MNS49436-9 - 50 20 50 6 0,1 2.5 1.5
2, Urban waste water
re-use GB 18918-2002
international standards 7 25-35 0-5 5-15 0.1 0.02 9 0.05
MUNICIPAL WASTE WATER TREATMENT FACILITY
Treated Water Quality Standards
Tuul-Songino water resources complex project6
ULAANBAATAR PUMPED STORAGE POWER
STATION / WATER TREATMENT TECHNOLOGY
This project will solve the city's wastewater treatment problem by re-using existing water resources.
Tuul-Songino water resources complex project 7
0
100
200
300
400
500
600
700
800
900
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PRESENT CONDITION OF THE CENTRAL ENERGY SYSTEM
680 мВт
Tuul-Songino water resources complex project 8
Above the line shows imported electricity; green area under the line indicates exported or excess electricity
-200
0
200
400
600
800
1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
The Station will produce 100 MW of ElectricityDaily Load Consumption
Tuul-Songino water resources complex project
TUUL-SONGINO WATER RESOURCES COMPLEX PROJECT WILL INCLUDE A PUMPED STORAGE
POWER STATION
9
During the Export of electricity period, there will be 706 MW available and during the Peak Load period there will be 850 MW available for delivery to the Central Energy System.
PROJECT SITE: SONGINO KHAIRKHAN DISTRICT, 32 KHOROO
Tuul-Songino water resources complex project
TECHNICAL PARAMETERS OF THE ULAANBAATAR PUMPED STORAGE POWER
STATION
Tuul-Songino water resources complex project11
Capacity (Pump-Turbine) 2x50MW 100 ÌW
Annual electricity production 300 MKWh
Dam length 580 ì
Dam height 68 м
Dam Reservoir volume 1,850 Mln. ì3
Upstream water level max/min 1,490/1,1470 ì
Downstream water level max/min 1,245/1,242 ì
Rated head H = 245 ì
Unit number 2 Set
Vertical Francis type pump-turbine 51,5/57,5 МW
Water discharge Q = 27,94 м3/сек
Мах. operation time Т = 8,36 hours
Payback period with constriction period 14-15 years
Max. Working head Н = 224/249
Min. Working head Н = 209/219,3
Name of capital investment years
To projects investment / tangible assets 14.25 million 2014
Land $1.340 million 2007
Exploration, evaluation assets $7.850 million 2007-2009
Long-Term Investments $4.500 million 2001-2015
The project area includesInvestment funds
$474 thousand 2007-2010
Cars/Real Estate/Furniture $84.5 thousand 2007-2008
Total Project Unit Investments $28.5 Million
Tuul-Songino water resources complex project 12
“ULAANBAATAR-PUMPED STORAGE POWER
STATION ” LLC CURRENT INVESTMENT
Tuul-Songino water resources complex project
LOAN PROCESS AND REQUEST
CONCESSION OWNED
PPA & WPA
“EPC”
CONTRACTOR FOREIGN
BANK
DOMESTIC COMMERCIAL
BANK
13
The project requires a loan of US$ 300 million over 15 years
SUMMARY INFORMATION OF FEASIBILITY STUDY
IRR for both Projects 14.8%IRR for Power-Storage Power Station 12.4%IRR for Water Treatment Plant 20.3%
Sales Price of Power (USD per kWh) 0.113
Sales Price of Water (USD per ton) 0.33
Purchased Price of Power (USD per kWh) 0.011
Power Generation Capacity
(KW)110,000
Pumped Power Load
(KW) 110,000
Annually Power Production
(GkWh) 309
Annually Power Purchasing
(GkWh) 435
14Tuul-Songino water resources complex project
CONCESSION OWNER & EPC RELATIONSHIP
Concession owned
“ULAANBAATAR-PSPS” LLC
(EPC CONTRACTOR)
STATE-OWNED COMPANIES OF
CHINA
SUBCONTACTOR
MONGOLIAN AND CHINESE
COMPANIES
(PPA)
ULAANBAATAR CITY &
“TRANSMISSION NETWORK:” LLC
Tuul-Songino water resources complex project 15
Representation of the 100 MW Pumping Storage Power Station Regulates Daily Load Consumption
Tuul-Songino water resources complex project 16
Tuul-Songino water resources complex project17
ENVIRONMENTAL ADVANTAGEES
Detailed Environment Influence Evaluation Study was carried out in 2006 and updated in 2012.
Implementation of the project prevented 300,000 tons of coal from being burned and decreased greenhouse gas emissions by 150,000,000 m3.
Ground water pollution along the Tuul River Basin will be greatly decreased.
165 000 m3/day of purified waste water will reach surface water standards and can then be released into the Tuul River.
12.4.2016 г. 18
INCORPORATION
ADDRESS
1ST FLOOR YAMRAJ
BUILDING P.O. BOX 875,
ROAD TOWN ,TORTOLA ,
BRITISH VIRGIN ISLANDS
BUSINESS ADDRESS
CYPRUS, NICOSIA 5
VISANTIOU STREET
SPYRIDIES
TOWER,2064 STROVOLO
S ,+35722210000
BULGARIA ADDRESS
VARNA 9000
,BULGARIA,MIHALIL
KOLONI 6
,+359877758222,
CONTACT
DETAILS