turbo docs p-01267_repair mhi st rotor unit 5-1
TRANSCRIPT
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
1/34
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
2/34
PT. Sulzer Turbo Services Indonesia
PRO-01FR-36Rev.00 This material is the exclusive property of PT. Sulzer Turbo Services Indonesia.
TABLE OF CONTENTS:
SCOPE OF WORKS
AS RECEIVED INSPECTION REPORT
LP ROTOR – INCOMING VISUAL INSPECTION REPORT
LP ROTOR – RUN OUT INSPECTION REPORT
LP ROTOR – BEARING JOURNAL INSPECTION REPORT
LP ROTOR – GLAND SEAL DIAMETER INSPECTION REPORT
LP ROTOR – HARDNESS INSPECTION REPORT
LP ROTOR – SURFACE ROUGHNESS INSPECTION REPORT
LP ROTOR – MAGNETIC PARTICLE TESTING REPORT
FINAL INSPECTION REPORT
LP ROTOR – BEARING JOURNAL INSPECTION REPORT
LP ROTOR – HARDNESS INSPECTION REPORT
LP ROTOR – SURFACE ROUGHNESS INSPECTION REPORT
LP ROTOR – RUN OUT INSPECTION REPORT
LP ROTOR – PROBE AREAS ELECTRICAL RUN OUT INSPECTION REPORT
LP ROTOR – BALANCE REPORT TWO PLANES
LP ROTOR – RESIDUAL UNBALANCE INSPECTION REPORT
LP ROTOR – MAGNETIC PARTICLE TESTING REPORT
LP ROTOR – DEMAGNETIZATION REPORT
PHOTOGRAPHS
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
3/34
PT. Sulzer Turbo Services Indonesia
PRO-01FR-100 Rev.01 This material is the exclusive property of PT. Sulzer Turbo Services Indonesia
SCOPE OF WORKS:
1. RECEIVE & INVENTORY.
2. PERFORM INCOMING INSPECTION.
3. CLEANING BY BLASTING THE ROTOR.
4. PERFORM INCOMING NDT INSPECTION.
5. WELD REPAIR BOTH JOURNAL ROTOR (GEN. SIDE & GOV. SIDE)
6. STRAIGHTENING LP ROTOR.
7. FINAL INSPECTION & NDT.
8. PERFORM LOW SPEED BALANCING ROTOR AS PER STANDAR SPECIFICATION.
9. FINAL QC INSPECTION INCLUDE DEMAGNETIZATION10. PRESERVE & PACKAGING ROTOR.
11. SHIPMENT.
12. PROVIDE REPORT.
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
4/34
PRO-01FR-44 REV.04
AS RECEIVEDINSPECTION REPORT
CUSTOMER : PJB – UP MUARA KARANGMFG./MODEL : MITSUBISHI / 200 MWEQUIP./NO. : LP ROTOR / UNIT #5
P.O. NO. : LOI NO. 160.LOI/612/UPHB/2014TSID PROJECT : P-01267
Rotating Equipment Services
Purwakarta Service Center
PT. Sulzer Turbo Services Indonesia
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
5/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
INCOMINGVISUAL INSPECTION REPORT
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
REPORT NO. : BI-AR-01
INSPECTED BY: UMR DATE : MAY 21, 2014INSTRUCTIONS:
1. PHOTOGRAPH COMPONENT CONDITION AS RECEIVED. TAKE INDIVIDUAL PHOTOGRAPHS OF ANY AREA WHICH EXHIBITSABNORMAL WEAR OR DAMAGE.
2. RECORD ALL F.O.D., EROSION, HANDLING DAMAGE, RUST BUILD UP OR ANY OTHER OBVIOUS DEFECTS.3. VISUALLY INSPECT AND RECORD GENERAL CONDITION.4. MARK EACH COMPONENT WITH THE JOB NUMBER USING METAL TAGS OR AN APPROVED MARKED.5. TAKE SAMPLES OF ANY DEPOSITS.
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-33 Rev.04 Page 1 of 1
As received visual inspection the LP ROTOR are as follow :
1. Coupling Gen Side exhibited medium scratches on bolt holes and axial faces, medium nick on flange, lighpitting, light scratch on male spigot
2. Exhibited light to medium scratches, medium pitting, medium rubs on seal area.
3. Bearing Journal Gen Side exhibited heavy rubs & pitting corrosion,deep rubs 0.5 – 0.28. medium rubs &discrbration on oil deflector area, light scratch & medium pitting on probe area.
4. Gland seal Gen Side exhibited medium rubs.
5. - Stage #8 Gov & Gen side exhibited medium erosion on leading edge blades & tie wire, light to mediumpitting on disck, medium scaling.
- Stage #7 Gov & Gen side exhibited light erosion on leading edge blades, medium erosion on tie wire
- Stg #6,5,4,3,2 Gov & Gen side exhibited light pitting on blades, light rubs on shroud , medium pitting ondisk,light rubs on interstage spill strip exhibited , light rubs.
- Stg # 1 Gov & Gen side exhibited medium pitting corrosion on blades, interstage spill strip in fair conditions,balance weight area in fair condition.
6. Gland seal Gove Side exhibited light to medium rubs.
7. Bearing Journal Gov Side exhibited heavy rubs with 0,8 deep, heavy rubs on seal area, light scratches &pitting on probe area.
8. Coupling area Gov Side exhibted medium rubs on seal area , medium nick & dent on flange, , bolt holesexhibited medium rubs, medium nick & dent bolt holes area, light scratches & pitting on axial face, light rubson male spigot.
APPROVED BY: ASP.
74 6
1
32
5
8
GEN SIDEGOV SIDE
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
6/34
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
7/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-56 Rev.04
LP ROTORRUNOUT INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: YD
STATUS: AS RECEIVED FINAL SURFACES: RADIAL AXIAL UNITS: 1
NOTE:
1. ALL PHASE ANGLE RECORDED : CCW AS VIEWED FROM "GOV SIDE".
2. ZERO DEGREE POINTS IS: STAMP N0 "1" ON DISK.
3. ROTOR/SHAFT/PART IS SUPPORTED BY: LATHE MACHINE.
POS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0º 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
45º -1 -0.5 -0.5 0 0 0 -0.5 -0.5 0 1 1 0 0 -0.5 -1 0 -2 -0.5 0
90º -1 -0.5 -0.5 0 0 0 0.5 0 0.5 1 1.5 -1 1 0.5 -1 0 -3 -2 0
135º -1 -1 -0.5 0 0 0 -0.5 0 1 3 2 -1 1 1.5 -1 0.5 0 -1.5 0
180º -1 -1 0 0 -0.5 -1.5 -0.5 0.5 -0.5 2 2 -1 2 -0.5 -1 0 -0.5 -0.5 0
225 -0.5 -1 0 0 0 -1.5 -0.5 -0.5 0 1.5 2 -2 -2 3.5 -2 -1 -1 -1.5 0
270º -1 -0.5 0 0 -0.5 -1.5 -0.5 -0.5 0 1 1 -2 -4 4 -1 0 0.5 2 0
315º -1 -0.5 0 0 0 -1.5 0 -0.5 0 1 1 -2 -1 3.5 -1 0 0.5 1.5 0
TOTAL 1 1 0.5 0 0.5 -1.5 0.5 0.5 1.5 3 2 2 5 4.5 2 1.5 3.5 3.5 0
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
8/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-55 Rev.04
LP ROTORBEARING JOURNAL DIAMETER INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: EKA
STATUS: AS RECEIVED FINAL SURFACES: INSIDE DIAMETER OUTSIDE DIAMETER U
NOTE:
1. ALL PHASE ANGLE RECORDED : 0 / 90º
2. ZERO DEGREE POINTS IS: STAMP “1” ON DISK
GEN. SIDE
1 2 3 4
POS 1 2 3 4 5 6
0 º Ø379.20 Ø379.08 Ø379.17 Ø379.19 Ø379.19 Ø379.18 Ø3
90º Ø379.19 Ø379.09 Ø379.15 Ø379.19 Ø379.19 Ø379.17 Ø37
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
9/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-58 Rev.04
LP ROTORGLAND SEAL DIAMETER INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: EKA
STATUS: AS RECEIVED FINAL SURFACES: INSIDE DIAMETER OUTSIDE DIAMETER U
NOTE:
1. ALL PHASE ANGLE RECORDED : 0 / 90º
2. ZERO DEGREE POINTS IS: STAMP “1” ON DISK
GEN. SIDE
2 3 4 5 6 7
POS 1 2 3 4 5 6 7
0 º Ø418.00 Ø508.03 Ø508.06 Ø508.05 Ø508.12 Ø508.12 Ø508.12 Ø4
90º Ø418.00 Ø508.03 Ø508.05 Ø508.06 Ø508.12 Ø508.12 Ø508.12 Ø4
1 8
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
10/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-78 Rev.04
LP ROTORBEARING JOURNAL HARDNESS INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: YN.
STATUS: AS RECEIVED FINAL
NOTE:
1. THE PICKUP DATA SHOULD BE DIFFERENCE MAXIMUM 3 HRC BEFORE CALCULATING AVERAGE VALUE
2. TAKE ON THE SURFACE OF CLOSE RUNNING CLEARANCE
GEN. SIDE
1 2 3 4
NO 1 2 3 4 5 6
HARDNESS 25.9 29.9 27.5 29.1 27.5 28.8
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
11/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-90 Rev.04
LP ROTORSURFACE ROUGHNESS INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: EKA.
STATUS: AS RECEIVED FINAL
1 2
NO 1 2 3 4
SURFACE
ROUGHNESS (Ra)0.57 ~ 0.92 0.82 ~ 1.19 0.72 ~1.08 0.80 ~ 1.01
GEN. SIDE
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
12/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
MAGNETIC PARTICLE TESTINGREPORT
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
INSPECTED BY : HR REPORT NO. : NDT. 01 / 036M / IV – ‘14MT LEVEL : II DATE : APRIL 12, 2014
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-08 Rev.03 Page 1 of 3
QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:
1 UNIT = LP ROTOR AS RECEIVED REPAIRFINAL
RESIDUAL FIELD CHECK GAUSS
DEMAGNETIZATION
PROCEDURE NO. : PRO-01WI-41
TEST AREA : BEARING JOURNAL AREA ( GEN. SIDE & GOV. SIDE ) WITNESS ON TEST/DEFECTIVE AREAS BY:
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:HEAD SHOT/CLAMP KEROSENE COUPLING ENDCOIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTERCONDUCTOR
MAGNAGLO 14AM HRUST END
PROD MEDIA:
AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS
YOKE OTHERSAC DC DRY POWDER (VISIBLE) PARTS WITH DISCONTINUITIES MARKED
PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION
INSPECTIONS RESULTS:
NO CRACK INDICATION ON ABOVE INSPECTED AREA, EXCEPT HEAVY RUBS. SEE THE ATTACHMENT
I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTEDIN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD
HRINSPECTOR SIGNATURE
ENGINEERING/NDT LEVEL III/QC COMMENTS:
APPROVED BY : ES
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
13/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
MAGNETIC PARTICLE TESTINGREPORT
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
INSPECTED BY : HR REPORT NO. : NDT. 01 / 036M / IV – ‘14MT LEVEL : II DATE : APRIL 12, 2014
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-08 Rev.03 Page 2 of 3
BEARING JOURNAL ( GOV. Side )
Fig.1 Steam turbine rotor after sand blasting Fig. 2 No crack indication on bearing journal Gov. side
Fig.3 Heavy rubs on bearing journal area Fig. 4 Heavy rubs on bearing journal area
Fig. 5 Typical deep rubs on bearing journal Fig. 6 Typical of den t on oil seal area
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
14/34
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
15/34
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
16/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-55 Rev.04
LP ROTORBEARING JOURNAL DIAMETER INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: DNY
STATUS: AS RECEIVED FINAL SURFACES: INSIDE DIAMETER OUTSIDE DIAMETER U
NOTE:
1. ALL PHASE ANGLE RECORDED : 0 / 90º
2. ZERO DEGREE POINTS IS: STAMP “1” ON DISK
GEN. SIDE
1 2 3 4
POS 1 2 3 4 5 6
0 º Ø379.25 Ø379.24 Ø379.25 Ø379.25 Ø379.25 Ø379.24 Ø3
90º Ø379.23 Ø379.23 Ø379.24 Ø379.25 Ø379.24 Ø379.24 Ø37
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
17/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-78 Rev.04
LP ROTORBEARING JOURNAL HARDNESS INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: KARNO.
STATUS: AS RECEIVED FINAL
NOTE:
1. TAKE ON THE SURFACE OF CLOSE RUNNING CLEARANCE
GEN. SIDE
1 2 3 4
POSWELDING AREA HAZ AREA BASE METAL AREA HAZ AREA
1 2 3 4 5 6 7
HARDNESS 24.4 ~ 28.5 23.2 ~ 26.5 24.0 ~ 26.9 24.7 ~ 26.4 25.1 ~ 27.0 29.1 ~ 30.1 23.6 ~ 25.8 23.2 ~ 26.5
5 6
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
18/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-90 Rev.04
LP ROTORSURFACE ROUGHNESS INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: EKA.
STATUS: AS RECEIVED FINAL
1 2
NO 1 2 3 4
SURFACE
ROUGHNESS (Ra)0.17 ~ 0.20 0.12 ~ 0.19 0.17 ~ 0.18 0.22 ~ 0.23
GEN. SIDE
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
19/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-56 Rev.04
LP ROTORRUNOUT INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: UMR.
STATUS: AS RECEIVED OTHERS/…………. FINAL SURFACES: RADIAL AXIAL UNITS: 1/
NOTE:
1. ALL PHASE ANGLE RECORDED : CCW AS VIEWED FROM GOV. SIDE.
2. ZERO DEGREE POINTS IS: STAMNP “1” ON DISK
3. ROTOR/SHAFT/PART IS SUPPORTED BY: V-BLOCKS
1
2
3 4 56 7 8
9
10 11
A1
A2
C
GEN. SIDE
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
20/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-56 Rev.04
LP ROTORRUNOUT INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: UMR.
STATUS: AS RECEIVED FINAL SURFACES: RADIAL AXIAL UNITS: 1
NOTE:
1. ALL PHASE ANGLE RECORDED : CCW AS VIEWED FROM "GOV SIDE".
2. ZERO DEGREE POINTS IS: STAMP N0 "1" ON DISK.
3. ROTOR/SHAFT/PART IS SUPPORTED BY: V-BLOCKS
POS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0º 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 045º 0 -05 -0.5 1 0.5 -0.5 0 0 -0.5 0 -1 0 0 0 0 0 0 0 0 90º -0.5 0.5 -1 -1.5 0 -0.5 0 1 -2 -1 0 0.5 0 0 0 0 0 0 0
135º -1 1 -1.5 0 0.5 -0.5 0 0.5 -0.5 0 1 0.5 0 0 0 -0.5 0 0 0 180º -1 1.5 -0.5 0 0.5 -0.5 1 0.5 -1 -2 2 0 0 0 0 -0.5 0 -0.5 0 225 -1.5 1 -0.5 0.5 0.5 -0.5 0.5 0.5 0 -2 1 0 0 0 0 0 0 -0.5 0 270º -1 1 0 0 0.5 -0.5 0 0.5 0 -2 2 0 1 0.5 0 0 -0.5 0 0 315º 0 1 0 0 0.5 0 0 0.5 0 -2 1 0 0 0.5 0 0 -0.5 0 0
TOTAL 1.5 2 1.5 2.5 0.5 0.5 1 1 2 2 3 0.5 1 0.5 0 0.5 0.5 0.5 0
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
21/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-41 Rev.04
LP ROTORPROBE AREAS ELECTRICAL RUNOUT INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: SGH
STATUS: AS RECEIVED FINAL SURFACES: RADIAL AXIAL UNITS:
ERO LOCATION : RADIAL GS
RESULT: ELC. R/O = 22 µ m
MAX. ALLOWABLE ELECTRICAL
RUNOT:
RADIAL = 25 µ m
COMMENTS:
- ACCEPTABLE
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
22/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-41 Rev.04
LP ROTORPROBE AREAS ELECTRICAL RUNOUT INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: SGH.
STATUS: AS RECEIVED FINAL SURFACES: RADIAL AXIAL UNITS:
ERO LOCATION : RADIAL TS
RESULT: ELC. R/O = 24 µ m
MAX. ALLOWABLE ELECTRICAL
RUNOT:
RADIAL = 25 µ m
COMMENTS:
- ACCEPTABLE
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
23/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-30 Rev.04 Page 1 of 1
LP ROTORBALANCE REPORT
(TWO PLANES)
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
REPORT NO. : BIFNL-06
INSPECTED BY: YD DATE : JUNE 07, 2014 BALANCE PROCEDURE:
FULL ASSEMBLY BAL. CHECK BAL. INDIVIDUAL BAL. PROGRESSIVE BAL.
TYPE OF ROTOR:STEAM TURBINE. COMPRESSOR PUMP. OTHER / GENERATOR
WHEEL/DISK NUMBER: . SHAFT ONLY
TYPE MACHINE USED: H 20 BU H 40 BU H 6 B ABRO
CORR. METHOD: ADDITIONAL REMOVAL PERMANENT TEMPORARY OTHERS
BALANCE SPEED: 200 RPM INITIAL BALANCE MACHINE READING:
1329 GRAMS, AT RADIUS 420 MM, AT 96 DEGREES, ON GEN/S SIDE.
1385 GRAMS, AT RADIUS 420 MM, AT 100 DEGREES, ON GOV/S SIDE.
FINAL BALANCE MACHINE READING:
51 GRAMS, AT RADIUS 420 MM, AT 45 DEGREES, ON GEN/S SIDE.
114 GRAMS, AT RADIUS 420 MM, AT 245 DEGREES, ON GOV/S SIDE.
ALLOWABLE RESIDUAL UNBALANCE TOLERANCE (ACC. TO ANSI/API STANDARD):
177 GRAMS, AT RADIUS 420 MM, ON GEN/S SIDE.
177 GRAMS, AT RADIUS 420 MM, ON GOV/S SIDE.
BALANCE MACHINE SETUP:
a: 830 . mm b: 3120 . mm c: 770 .mm
r1: 420 .mm r2: 420 . mm
“ZERO” DEGREE POINT IS: MARKING “1” HOLE BALANCE WEIGHT
(BALANCING ROTATION = OPERATION ROTATION)
KEY WEIGHTS USE (IN GRAMS): N/A
OTHER REMARKS: FINAL BALANCING ROTOR ASSY
COMMENTS:
ACCEPTABLE
APPROVED BY: ASP.
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
24/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-23 Rev.04
LP ROTORRESIDUAL UNBALANCE INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: YD
STATUS: INITIAL FINAL PLANE:1 COUPLING EXCITER
♦ ROTOR/PART DESCRIPTION: STEAM TURBINE ROTOR
♦ MAXIMUM CONTINUOUS SPEED ( N ): 3000 RPM.
♦ JOURNAL STATIC WEIGHT LOAD ( W ): 19250 Kg.
♦ UNBALANCE RADIUS: 420 mm. TRIAL WEIGHT:650 Gr
ALLOWABLE RESIDUAL UNBALANCE TOLERANCE: 74 340 gr-mm.
Note: If not specified, Residual Unbalance Tolerance Allowable is:
6350 W/N (gr-mm.). Acc. To ANSI / API Standard.No. AMP PHASE
1 629 Gr. 5 Degree
2 689 Gr. 97 Degree
3 475 Gr. 183 Degree
4 470 Gr. 265 Degree
5 Gr. Degree
6 Gr. Degree
♦ TRIAL UNBALANCE : 420 x 650 = 273 000 Gr-mm.
♦ Y = MAX. READING - MIN. READING = 109 2
♦ X =MAX. READING + MIN. READING
= 659 2
RESIDUAL UNBALANCE :
273000 x 109 = 45 155 gr-mm. (PASS)
659
200
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
25/34
PRODUCTION Form
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-23 Rev.04
LP ROTORRESIDUAL UNBALANCE INSPECTION REPORT
MFG/MODEL
S/N & EQUIP. NO.
CUSTOMER
TSID PROJECT
REPORT NO.
INSPECTED BY: YD
STATUS: INITIAL FINAL PLANE:2 COUPLING EXCITER
♦ ROTOR/PART DESCRIPTION: STEAM TURBINE ROTOR
♦ MAXIMUM CONTINUOUS SPEED ( N ): 3000 RPM.
♦ JOURNAL STATIC WEIGHT LOAD ( W ): 19250 Kg.
♦ UNBALANCE RADIUS: 420 mm. TRIAL WEIGHT: 650 Gr
ALLOWABLE RESIDUAL UNBALANCE TOLERANCE: 74 340 gr-mm.
Note: If not specified, Residual Unbalance Tolerance Allowable is:
6350 W/N (gr-mm.). Acc. To ANSI / API Standard.No. AMP PHASE
1 655 Gr. 7 Degree
2 695 Gr. 93 Degree
3 645 Gr. 181 Degree
4 605 Gr. 274 Degree
5 Gr. Degree
6 Gr. Degree
♦ TRIAL UNBALANCE : 420 x 650 = 273 000 Gr-mm.
♦ Y = MAX. READING - MIN. READING = 45 2
♦ X =MAX. READING + MIN. READING
= 650 2
RESIDUAL UNBALANCE :
273000 x 45 = 18900 gr-mm. (PASS)
650
200
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
26/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
MAGNETIC PARTICLE TESTINGREPORT
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
INSPECTED BY : CH/ MN/ AM REPORT NO. : NDT. 01 / 015M / VI – ‘14MT LEVEL : II DATE : JUNE 03, 2014
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-08 Rev.03 Page 1 of 2
QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:
1 UNIT = LP ROTOR AS RECEIVED REPAIRFINAL
RESIDUAL FIELD CHECK GAUSS
DEMAGNETIZATION
PROCEDURE NO. : PRO-01WI-41
TEST AREA : BEARING JOURNAL AREA ( GOV SIDE – GEN SIDE ) WITNESS ON TEST/DEFECTIVE AREAS BY:
MAGNETIZER: METHOD: PARTICLE TYPE: RESIDUAL MAGNETISM :
MOBILE UNIT CONTINUOUS ARDROX 8800 GAUSS METER AT SURFACE:HEAD SHOT/CLAMP KEROSENE COUPLING ENDCOIL/CABLE WRAP RESIDUAL (SOLVENT MIX) CENTERCONDUCTOR
MAGNAGLO 14AM HRUST END
PROD MEDIA:
AMP.: AC/DC WET BATH (FLUORESCENT) (SPRAY CAN) DEMAGNETIZED BELOW 2.0 GAUSS
YOKE OTHERSAC DC DRY POWDER (VISIBLE) PARTS WITH DISCONTINUITIES MARKED
PERMANENT SPRAY CAN (FLUORESCENT) RUST PRESERVATION
INSPECTIONS RESULTS:
NO CRACK INDICATION ON ABOVE INSPECTED AREA, SEE THE ATTACHMENT :
I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTEDIN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD
CHINSPECTOR SIGNATURE
ENGINEERING/NDT LEVEL III/QC COMMENTS:
ACCEPTABLE
APPROVED BY : ES
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
27/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
MAGNETIC PARTICLE TESTINGREPORT
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
INSPECTED BY : CH/ MN/ AM REPORT NO. : NDT. 01 / 015M / VI – ‘14MT LEVEL : II DATE : JUNE 03, 2014
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-08 Rev.03 Page 2 of 2
Fig.1 Position MT inspection on the Rotor Fig. 2 MT inspection on the Rotor
Fig.3 No Crack indication on bearing journal Gen Side
Fig. 4 No Crack indication on bearing journal Gen Side
Fig. 5 No Crack indication on bearing journal Gov Side
Fig. 6 No Crack indication on bearing journal Gov Side
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
28/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
DEMAGNETIZATIONREPORT
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
INSPECTED BY : ES REPORT NO. : NDT.01 / 026D/ VI-‘14UT LEVEL : III DATE : JUNE 06, 2014
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-102 Rev.03 Page 1 of 3
QTY PART NO. ITEM DESCRIPTION TEST PERFORMED:
AS RECEIVED
1 UNIT = LP ROTOR REPAIR
FINAL
TEST AREA :ALL VISIBLE SURFACE PROCEDURE NO. : PRO-01WI-41
DEMAGNETIZER: AMPERE RESIDUAL MAGNETISM READING WITH
MOBILE UNIT / CABLE WRAP 1000 – 1500 AMP
GAUSS METER AT SURFACE:
MAGNAFLUX AC 0 COUPLING END / DE
YOKE 6 0 CENTER
0 THRUST END/ NDE
INSPECTION RESULT :
DEMAGNETIZATION BELOW 2 GAUSS, SEE PHOTOGRAPHS IN THE ATTACHMENT:
I CERTIFY THAT THE ABOVE LISTED ITEMS WERE INSPECTEDIN ACCORDANCE WITH APPLICABLE SULZER TSID STANDARD
HROPERATOR SIGNATURE
ENGINEERING/NDT LEVEL III/QC COMMENTS:
ACCEPTABLE
APPROVED BY : ES
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
29/34
PRODUCTION Form PT. Sulzer Turbo Services Indonesia
DEMAGNETIZATIONREPORT
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
INSPECTED BY : ES REPORT NO. : NDT.01 / 026D/ VI-‘14UT LEVEL : III DATE : JUNE 06, 2014
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-102 Rev.03 Page 2 of 3
Fig.1 Demagnetization on Gov. Side LP rotor Fig.2 Residual magnetism on Gov. SideCoupling : 1 gauss
Fig.3 Residual magnetism on Journal Gov.Side :1.5 gauss
Fig.4 Residual magnetism on gland seal Gov.Side :1 gauss
Fig.5 Demagnetization on Gen. Side LP rotor Fig.6 Residual magnetism on gland seal Gen.Side :1 gauss
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
30/34
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
31/34
PRO-01FR-44 REV.04
PHOTOGRAPHS
CUSTOMER : PJB – UP MUARA KARANGMFG./MODEL : MITSUBISHI / 200 MW
EQUIP./NO. : LP ROTOR / UNIT #5P.O. NO. : LOI NO. 160.LOI/612/UPHB/2014TSID PROJECT : P-01267
Rotating Equipment Services
Purwakarta Service Center
PT. Sulzer Turbo Services Indonesia
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
32/34
PRODUCTION Forms PT. Sulzer Turbo Services Indonesia
PHOTOGRAPHS
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-32 Rev.04 Page 1 of 3
Fig 01. Incoming condition of rotor Fig 02. Incoming condition bearing journal rotor
Fig 03. Check depth of rubs journal rotor Fig 04. Blasting rotor preparation
Fig 05. Incoming visual inspection Fig 06. Incoming magnetic paticle test inspection
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
33/34
PRODUCTION Forms PT. Sulzer Turbo Services Indonesia
PHOTOGRAPHS
MFG/MODEL : MITSUBISHI / 200 MW
S/N & EQUIP. NO. : TBA / UNIT #5
CUSTOMER : PJB – UP MUARA KARANG
TSID PROJECT : P-01267
This material is the exclusive property of PT. Sulzer Turbo Services IndonesiaPRO-01FR-32 Rev.04 Page 2 of 3
Fig 07. Under cutting both journals for weld prep Fig 08. Welding repair both journals
Fig 09. Rough cutting both journals after weldingrepair Fig 10. Ultrasonic test after rought cutting
Fig 11. Stress relieve process Fig 12. Final machining both journals to target size
-
8/17/2019 Turbo Docs P-01267_Repair MHI ST Rotor Unit 5-1
34/34