tuas water reclamation plant (twrp) · industrial liquids safety schedule budget quality 10 c4a c4c...

23
Tuas Water Reclamation Plant (TWRP) SAFETY ● SCHEDULE ● BUDGET ● QUALITY Mark Wong Head of TWRP, DTSS 2, PUB

Upload: others

Post on 20-Apr-2020

84 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Tuas Water Reclamation Plant (TWRP)

SAFETY ● SCHEDULE ● BUDGET ● QUALITY

Mark WongHead of TWRP, DTSS 2, PUB

Page 2: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

2

Agenda

SAFETY ● SCHEDULE ● BUDGET ● QUALITY

01 Deep Tunnel Sewerage System (DTSS)

TWRP Location and Site

PROJECT OVERVIEW

02 DTSS 2 Safety Mission

Safety: Raising the Bar

SAFETY

03 Contract Packages and Timeline

Major Contracts’ Scope of Works

PROJECT DELIVERY UPDATE

04 Upcoming Major Tenders

DTSS 2 Resources

WHAT’S NEXT

Page 3: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Deep Tunnel Sewerage System (DTSS)

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 3

Page 4: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 4

TWRP Location

Page 5: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 5

RORO

≈1km

≈1km

Wet Weather Treatment Facility

Page 6: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 6

Influent Pumping Stations

Domestic Liquids ModulesIndustrial Liquids Modules

Admin BuildingSolidsOutfall

Wet Weather Treatment Facility

Page 7: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

DTSS 2 Safety Mission

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 7

Page 8: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Safety: Raising the Bar

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 8

• Experiential learning with training simulators at the TWRP Safety Training Facility

• Electronic Permit-to-Work (ePTW) and Incident Management System

• Tenderers shall not accumulate 15 or more demerit points.

Projected >5,000 workers (peak)

Estimated 50 million manhours

Page 9: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

TWRP Contract Packages (as at last industry sharing)

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 9

# Name

C1A Site Development Works

C2A Influent Pumping Stations

C3A Industrial Liquids Modules

C3B Industrial Water Treatment

C3C Domestic Liquids Modules and NEWater

C3D Product Water Storage and Pumping

C4A Biosolids and Digesters

C5A Plant Monitoring and Control System

C6A Administration and Operations Buildings

C6B Site Completion

C6C Wet Weather Treatment Facility

Site-wide Packages:

• C1A• C5A• C6B

C2A

C3C

C3A

C6A

C4A

C3D

C6CC3B

11 Contract Packages

Page 10: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Industrial Liquids

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 10

C4A

C4C

C4B

C3C - Domestic Liquids Modules – Civil and Building Services Works

C3D1 – Domestic Liquids Module 1 – MEICA & NEWater

C3D2 – Domestic Liquids Module 2 – MEICA

C3E – Liquids Modules Odour Control Facilities

C2B C2B – Product Water Storage and Pumping (change in name only)

C4A – Biosolids and Digesters

C4B – Digestion Pre-treatment

C4C – Sidestream Nitrogen Removal Facility

C3B2C3B1

C3A

C3B3 C3C

Domestic Liquids

Solids

C3A – Industrial Liquids Modules – Civil and Building Services Works

C3B1 – Industrial Liquids Module 1 – MEICA

C3B2 – Industrial Liquids Module 2 – MEICA

C3B3 – Industrial Water Plant

C3E

C3D1 C3D2

Page 11: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 11

Updated 18 Contract Packages# Name

C1A Site Development Works

C2A Influent Pumping Stations

C2B Product Water Pumping Facilities

C3AIndustrial Liquids Modules – Civil and Building Services Works

C3B1 Industrial Liquids Module 1 - MEICA

C3B2 Industrial Liquids Module 2 - MEICA

C3B3 Industrial Water Plant

C3CDomestic Liquids Modules – Civil and Building Services Works

C3D1 Domestic Liquids Module 1 – MEICA & NEWater

C3D2 Domestic Liquids Module 2 – MEICA

C3E Liquids Modules Odour Control Facilities

C4A Biosolids and Digesters

C4B Digestion Pre-treatment

C4C Sidestream Nitrogen Removal Facility

C5A Plant Monitoring and Control Systems

C6A Administration and Operations Buildings

C6B Site Completion Works

C6C Wet Weather Treatment Facility

C4A

C4C

C4BC2B

C3B2C3B1

C3A

C3B3 C3C

C3D2C3D1C3E

C2A

C6C

C6A

Site-wide Packages:

• C1A• C5A• C6B

Page 12: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Tenderers’ Workhead Requirements

12SAFETY ● SCHEDULE ● BUDGET ● QUALITY

CW01 A1

OR

CW02 A1

OR

CW02 A1 LIMITED(PUB)

ME11 L6

CIVIL / STRUCTURAL MEICA

e.g. C3B1, C3D1e.g. C3A, C3C

Page 13: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

2019 2020 2021 2022 2023 2024 2025

C1A

C2A

C4A

C3C

C3A

C5A

C3D1

C2B

C3B1

C3E

C3B2

C3D2

C4B

C6A

C4C

C3B3

C6C

C6B

Q3 2019

Q4 2019

Q1 2020

Q2 2020

Q2 2020

Q3 2020

Q1 2021

Q2 2021

Q2 2021

Q4 2021

Q4 2021

Q1 2022

Q3 2022

Q4 2022

Q1 2023

Q3 2023

Q4 2018

Q2 2018

Tendering/Construction Timeline

* Indicative

Page 14: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 14

Contract 2B: Product Water Pumping Facilities

• Scope includes:• NEWater and Industrial Water Holding Tanks• NEWater and Industrial Water Pumping Station• Lime Plant• Chemical Facilities

Page 15: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 15

Contract 3A: Industrial Liquids Modules – Civil and Building Services Works

• Scope includes:• Two liquids treatment modules (initial treatment

capacity of 150,000m3 per day)

• Headworks, primary treatment tanks, secondary bioreactor and membrane tanks

• Building Services

Page 16: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 16

Contract 3C: Domestic Liquids Modules – Civil and Building Services Works

• Scope includes:• Two liquids treatment modules (initial treatment

capacity of 650,000m3 per day) • Headworks, primary treatment tanks, secondary

bioreactor and membrane tanks• Building services

Page 17: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 17

Contract 3D1: Domestic Liquids Module 1 – MEICA & NEWater

• Scope includes:• One liquids treatment modules• Equipment supply and installation for headworks,

primary treatment, secondary bioreactor and membrane tanks

• Polymeric MBR membranes• NEWater production

Page 18: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 18

Contract 3D2: Domestic Liquids Module 2 – MEICA

• Scope includes:• One liquids treatment modules• Equipment supply and installation for Headworks,

primary treatment, secondary bioreactor and membrane tanks

• Polymeric MBR membranes

Page 19: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 19

Contract 5A: Plant Monitoring and Control System

• Scope includes:

Process systems• Site-wide process control system• PLC hardware for whole site (free-issued to other contracts where

required)• SCADA platform• Fibre-optic backbone• Advanced process control• Cyber-security

Non-process systems• Fibre-optic backbone (for plant CCTV, security & fire)• UPS systems• Sitewide WLAN• Power monitoring system• BMS server and SCADA

Page 20: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Process Performance Guarantees

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 20

• Aim of the contract document is to provide efficient equipment and overall plant which meet the water quality requirements.

• PUB and Jacobs are responsible for the overall process while the contractor is responsible for specific equipment, packages and sub-systems (e.g. energy efficiency of the blowers & aeration system).

• These performance guarantees must be demonstrated in the performance tests prior to the completion of the Works.

Page 21: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Upcoming Major Tenders

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 21

• Contract 3C: Domestic Liquids Modules – Civil and Building Services Works – End Nov 2019

• Contract 5A: Plant Monitoring and Control System – Q1 2020

• Contract 3A: Industrial Liquids Modules – Civil and Building Services Works – Q2 2020

• Contract 3D1: Domestic Liquids Module 1 –MEICA & NEWater – Q2 2020

• Contract 2B: Product Water Pumping Facilities – Q3 2020

• Contract 3D2: Domestic Liquids Module 2 –MEICA – Q1 2021

C2B

C3A

C3C

C3D2C3D1

Site-wide Package:

• C5A

Page 22: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

DTSS 2 Resources

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 22

• Visit https://www.pub.gov.sg/dtss/phase2/resourcesfor more information related to DTSS 2 projects

Page 23: Tuas Water Reclamation Plant (TWRP) · Industrial Liquids SAFETY SCHEDULE BUDGET QUALITY 10 C4A C4C C4B C3C - Domestic Liquids Modules –Civil and Building Services Works C3D1 –Domestic

Thank You

SAFETY ● SCHEDULE ● BUDGET ● QUALITY 23