tttikm1

39
Program Management Dr. Kannan Srinivasan Associate Professor Achutha Menon Centre for Health Science Studies Sree Chitra Tirunal Institute for Medical Sciences and Technology Thiruvanthapuram

Upload: ksrini

Post on 22-May-2015

203 views

Category:

Documents


1 download

DESCRIPTION

Program Management

TRANSCRIPT

Page 1: Tttikm1

Program Management

Dr. Kannan SrinivasanAssociate Professor

Achutha Menon Centre for Health Science StudiesSree Chitra Tirunal Institute for Medical Sciences and

TechnologyThiruvanthapuram

Page 2: Tttikm1

PlanningGoal

Mission

Objectives

Functions

Targets

Programs(Service alternatives)(Resources)

Page 3: Tttikm1

Comprehensive rationalism

● Steps in rational planning

What is situation?

Take action Where do we want

to go?

Which alternative Which possible alternatives

is best? are there for action?

Page 4: Tttikm1

Comprehensive rationalism

● Mixed scanning cycle

What is situation

in broad terms?

Take action Where do we want

to go?

Which alternative What are the priority areas?

is best? are there for action?

What are the alternatives

for action in the priority areas

Page 5: Tttikm1

Devt(Health) & related SEsystems

FormulationNatl (health) policies

Broad programming

Detailed programming

Implementation

Reprogramming

Info

rmation s

upport

Evalu

ation

Pro

gra

mm

e b

udgeting

Managerial Process for National Health Development WHO

Page 6: Tttikm1

Planning Spiral

Situation Analysis

Evaluation Priority, goal, and objective setting

Implementation Option appraisal and monitoring

Programming

Page 7: Tttikm1

Situational analysis

● Current projected situation– Demographic pattern, future needs(development needs)

● Socio-economy and provision of non-development services and infrastructure

● Infrastructure of the development sector and the pattern of services provided– facilities, utilization, organisational structure,

interrelationships, current and future resources of the sector-financial and real resources- personnel, equipment, buildings

● Environment- political and policy environment● SWOT

Page 8: Tttikm1

Priority Setting

● The determination of the goals and targets of an organization– What it wants to achieve– Influenced by the situational analysis,

development(education, health) needs and broad policy objectives of the organization or state

– Whether priorities are feasible within politico-social climate and within the context of available resources

– Clear criteria for the selection of priority problems needed

– Political feasibility

Page 9: Tttikm1

Rationale for planning

• Inevitable shortfall between available resources and the competing uses to which those resources could be put

• How decisions as to the use of such resources should be made

• Or

• How priorities should be set

Page 10: Tttikm1

Approaches

• For allocation

• Demand based market mechanism

• Need-based planning approach

Page 11: Tttikm1

• One major function of the planning process is to determine major needs, to devise suitable programs for meeting them and allocate resources accordingly

• Not much resources to meet all sector(health) needs

• Which one to meet and which have to be left

• Economic development will not remove the need for priority setting but alter pattern

Page 12: Tttikm1

Setting Priorities

• Different approaches lead to different results

The Class discuss on

• Who should set priorities?

• How one should set priorities?

• The underlying factors and attitudes towards priorities

Page 13: Tttikm1

Logical Framework Analysis

• A designing approach that can be used for planning, designing, implementing and evaluating projects or programs

• Steps in LFA

• Situational Analysis

• Strategy Analysis

• Project Planning matrix

• Implementation

Page 14: Tttikm1

Situation Analysis• Stakeholder Analysis

• Problem Analysis

• Objective Analysis

Page 15: Tttikm1

Stakeholder Analysis

• Stakeholder Analysis

– Who are the stakeholders involved in the project and how are they affected?

• Who will be involved?

• Where ?

• Who will facilitate the development?

• What background materials, documents, and expertise needed?

• What materials and logistics required?

Page 16: Tttikm1

Analysis of Problems

Which are the problems the project is addressing?

What are the root causes of the those problems?

What is the larger picture in which those problems and their root causes exist?

What are the linkages between problems?

Page 17: Tttikm1

Problem Tree

• Brainstorming techniques can be used to identify the main problems

• Problems may be displayed and they should then be clustered into groups of similar issues

• Problem tree is developed

• Moving problems from the clusters of problems

• Adding new problems that emerge

• Problems can be moved up or down the tree as required

Page 18: Tttikm1
Page 19: Tttikm1
Page 20: Tttikm1
Page 21: Tttikm1
Page 22: Tttikm1
Page 23: Tttikm1

Objective Analysis

• identify

• Categorize

• Specify

• balancing out

• Objective Tree

• Problems restated as objectives

• Positive mirror image of the problem tree

Page 24: Tttikm1
Page 25: Tttikm1
Page 26: Tttikm1

Strategy Analysis

• Ordering sequence of the problem and objective trees

• Clustering objectives

• Feasibility of different interventions

• Continuous task in project management

Page 27: Tttikm1

Logical Framework Analysis(LFA)

Narrative Summary Objectively Verifiable Indicators

Means of Verification

Important Assumptions

Goals / Objectives Measures of goal achievement

Various sources of information, methods used

Goal/ purpose linkages

Project Purpose End of project status

Various sources of information, methods used

Output / Purpose linkages

Outputs /Results Magnitudes of outputs, planned completion dates

Various sources of information,methods used

Input /Output linkages

Inputs / Activities Types / levels of resources, starting date

Project data, other sources of information

Initial assumptions regarding the causality of the program

Page 28: Tttikm1

Project location and intervention design

• Choose project sites based on market surveys - assess demand

• Ensure target audiences, scope, objectives, etc. of project are clearly spelt out before implementation

• The importance of building trust and confidence at the initiating stage is critical

• It is a challenge to keep up with actual policy processes and make the research relevant to governance realities

• Projects are most successful when there is full involvement and cooperation by stakeholders

• The success of information system implementation is dependent on the institution’s organizational readiness

• Human resources, workflow environment and policy should be considered throughout system development and implementation

Page 29: Tttikm1

Partnerships and management

• Pay due attention to selection of appropriate partner • Ensure terms of reference with partner organizations are in

place before the proposal submission stage itself and begin community-based work only after the committed grant amount is transferred into the project account

• Consider use of a MoU between implementing partners to define a clear program of work and scope of responsibilities

• Project should be prepared to respond to unforeseen political developments and transitions in government

• Projects need advice on Intellectual Property Rights issues and making the agreement more detailed

• Public-private partnerships with governments and NGOs help to improve the quality of services being offered and increase acceptance

Page 30: Tttikm1

The unforeseen event

• Increased controls on NGOs and tightening of rules for accepting foreign donations

• Premature staff departures • Delays in obtaining necessary licenses – in this case to

broadcast using wireless technologies• The project found employers were reluctant to allow them to

conduct interviews with employees• Unexpected technical limitations - in this case, Open Type Font

specifications• Project work hampered by political events and technical

problems that were beyond its control• Unexpected restrictions imposed on the project team due to

unforeseen events, thereby seriously hampering progress and resulting in a loss of momentum for the project

• Unexpected technical bugs and premature staff departures

Page 31: Tttikm1

Planning for success• Service providers are not always the best people to develop the kind of online

services most relevant to rural communities. It is vital to perform a market survey before starting such a project and then bring in partners such as government institutions, private companies and content providers who will back the content and services

• Social preparation programs, awareness workshops and training are indispensable components in operating telecentres, especially in rural areas where people are not comfortable or familiar with technology

• It is crucial to identify a local champion who is dedicated to using ICT as a tool for development, improving the telecentre to make it relevant to the community’s context, and making its operation sustainable

• In rural communities, a combination of ICTs with motivated individuals is most effective in combating social problems

• Overall impact of the project can be realized fully only with a significant outreach program to train the end-users

• For optimum utilization of the end product/service, advertising the product/service and training end-users is critical

• Since data-sharing culture is still conservative in the region, a proactive role in convincing partners to actively participate is necessary

Page 32: Tttikm1

Participatory processes

• The project team developed a participatory model that empowered those involved, built capacity and democratized knowledge.

• People in rural areas are ready and capable to successfully adopt these new skills and technologies not only for education, but also to improve themselves and their communities

Page 33: Tttikm1

• The project performed a participatory needs assessment to determine the information requirements and the capacity of the users. The results of the assessment formed the basis for the preliminary system design .

• It is critical to build trust and confidence at the initiating stages of any community-based work.

• The project stresses the value social intermediaries play in bridging the information divide. Institutions such as schools, the workplace, and NGOs offer important access points for individuals. Informal networks of friends and family also play an important role in building awareness and distributing knowledge.

• An Internet Exchange can only be successful with the full cooperation of the ISPs.

• Educating the ISPs about how to set up the networks is more valuable in the long run than having experts do it for them.

• In implementing the project, the project saw that it was critical to establish control at the local level through a local coordinator and cooperation units .

• The project worked in close cooperation with local government health institutions and personnel who are the primary users of the system .

Page 34: Tttikm1

Adaptive research• Following the analysis of the telecentre after one year of operation, the project defined

three additional research principles to improve its model .• Technology is merely a tool; without efforts in marketing, product improvement and

other non-ICT related capacity development training, the technology usage will not be maximized

• To prevent information and knowledge gaps from widening, the project suggests integrating traditional models of communication such as community radio, church bells and two-way radios with more modern ICTs .

• Through interaction with editors of journals and participants of the workshop, the project identified several features to improve its system.

• The rule-based approach was selected over a more sophisticated method because a sufficiently large parallel text corpus for the English-Nepali language pair was not available.

• With deeper analysis and understanding of the needs and requirements of end-users, one is able to ensure that technology serves the genuine needs of communities and does not become an end in itself .

• By paying close attention to health centre events and culture and by employing purposeful immersion in the end-user’s way of life, the researchers were able to gain immense insight into their needs and requirements and apply these insights into software code, a process they call evolutionary software development .

• The project was extended by six months to allow for a longer period of data collection and validation, which will ensure proper analysis and interpretation .

Page 35: Tttikm1

Common organizational models and patterns

• l Provide relevant services by partnering with other providers and make each service independently sustainable. Partner with local organizations that can train operators and spread awareness of computers and the Internet .

• l The project began with a call for participation and selected three partners based on the criteria of technical capability and geographic representation .

• l Deploying IPv6 has been enhanced through collaboration with schools and universities, ISPs, telecommunications companies and other IPv6 stakeholders .

• l The Free and Open Source Localization Toolkit is further developing and testing its documentation through a south-south collaboration (Cambodia/South Africa) project called WordForge .

• l The team has noted the importance of creating public-private partnerships with governments, NGOs and health institutions for remote health delivery to rural areas.

• They see that such partnerships can improve the quality of services being offered and increase acceptance of it by villagers

Page 36: Tttikm1

Financial stability• Services offered by the centre generate enough revenue to cover costs; the project team has

identified new services to serve the local community.

• The application delivered has quite a high maintenance cost that has obvious implications for the project’s sustainability .

• To be a viable business, build wide area networks to connect a larger number of potential users over sparsely populated areas .

• The key to creating demand and financial viability of the telecentre is to provide information and content that is relevant to the local community. Complementing this is the need to provide programmes aimed at building relevant ICT skills, particularly in rural areas where people are not comfortable or familiar with technology .

• To cover its costs and to ensure its financial viability, the centre must charge fees for training programmes, and even when these fees remain low, many people in the area still cannot afford the services

• Preliminary research found that most initiatives are planned with a pilot-based approach.

• In many cases, these rely on funding and subsidies to make the model a success. None of the initiatives studied were economically sustainable through private enterprise on a large scale

• The project team notes that obtaining the license or acquiring the software from a commercially available GIS is prohibitively expensive. Using free and open source technologies allows users greater access to the significant benefits of powerful GIS applications

Page 37: Tttikm1

Lasting impact, continuity and scaling-up• Since wireless networking eliminates the process of laying cables to connect villages, the design provides a viable and

effective means of bridging the digital divide and bringing low-cost communication to the most needy

• Sustainability of the telecentre requires community participation in telecentre operation and management

• The research findings contributed to the development of a national IT curriculum and the development of e-government

• Those who attend ICT learning programmes further spread the message through word of mouth and other informal channels, creating a ripple effect that is difficult to quantify

• Once the systems have been tested and firmly established in one federation, the project will document its learning and expand the implementation to cover three other federations in the region (see project 18). l While ICTs enable the creation of new kinds of jobs, they also undermine the need for other kinds of jobs. The net effect depends upon the nature of labour market institutions that facilitate labour to move from vanishing jobs to new ones

• The results are anticipated to be used in the development of a continuing education programme focusing on ICT-assisted reporting techniques for local journalists .

• The project built capacity at the Centre and enabled it to develop a partnership with PAN Localization and Microsoft’s Language Interface Pack for Urdu

• The project foresees that once the most challenging aspects of the project development process are completed, the infrastructure framework can then be used to build many different kinds of resource sharing systems

• Once project team reaches its desired result, it is planning discussions with the Ministry of Education and Culture to investigate further cooperation in distributing the text-to-speech system .

• The forest fire forecasting system can be adopted and replicated in other geographical areas with necessary modifications in the ranks and weights, based on the specific characteristics of the local area

• Additional research activities evolved from this project .

• The project has seen a number of opportunities for further development and replication .