    Building Plan 1

    Assistant Professor : Ms. Tris Kee

    Email: [email protected]

  • 7/30/2019 Tris Kee Arch4003 Ppi

    2/107

    Building Submission and Occupation Permit Procedure

    Production drawings and specification

  • 7/30/2019 Tris Kee Arch4003 Ppi

    3/107

    BO objectives = Provide for theplanning, design and construction of buildings and associated works;to make provision for the rendering safe of dangerous buildings and land;

    to make provision for regular inspections of buildings and the associatedrepairs to prevent the buildings from becoming unsafe; andto make provision for matters connected therewith.

  • 7/30/2019 Tris Kee Arch4003 Ppi

    4/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    5/107

    What happened in the 1940s and 1950s?

  • 7/30/2019 Tris Kee Arch4003 Ppi

    6/107

    The fire reflected the urgent need for aconsolidated ordinance for regulatingbuilding development

  • 7/30/2019 Tris Kee Arch4003 Ppi

    7/107

    Some early public housing in HK

    Mark II Residential Block since 1950s

    Mark II residential blocks resemble thecharacter

    Wang Tau HomEstate, Wong Tai Sin

  • 7/30/2019 Tris Kee Arch4003 Ppi

    8/107

    register() means a register maintained under this Ordinance and includes a sub-register;

    registered architect () means a person whose name is on the register of registered architects establishedand maintained under section 8 of the Architects Registration Ordinance

    registered general building contractor() means a person whose name is for the time being onthe register of general building contractors;

    registered geotechnical engineer() means a person whose name is for the time being on thegeotechnical engineers' register

    registered inspector() means a person whose name is for the time being on the inspectors' register

    registered minor works contractor() means a person whose name is for the time being on theregister or provisional register of minor works contractors

    registered professional engineer() means a person whose name is on the register of registeredprofessional engineers established and maintained under section 7 of the Engineers Registration Ordinance

    registered professional surveyor() means a person whose name is on the register of registeredprofessional surveyors established and maintained under section 7 of the Surveyors Registration Ordinance

    registered specialist contractor() means a person whose name is for the time being on the register

    of specialist contractors

    registered structural engineer() means a person whose name is for the time being on the structuralengineers' register

    Under Building Ordinance

  • 7/30/2019 Tris Kee Arch4003 Ppi

    9/107

    Registration Committee ()

    meansAuthorized Persons Registration Committee,a Structural Engineers Registration Committee,a Geotechnical Engineers Registration Committee,an Inspectors Registration Committee or a Contractors

    Registration Committee, as the case requires;

  • 7/30/2019 Tris Kee Arch4003 Ppi

    10/107

    An Authorized Persons Registration Committee consists of(a) 4 authorized persons nominated by the Architects Registration Board from the list ofarchitects in theauthorized persons' register;(b) 2 authorized persons nominated by the Engineers Registration Board from the list ofengineers in theauthorized persons' register;(c) 1 authorized person nominated by the Surveyors Registration Board from the list ofsurveyors in theauthorized persons' register;

    (d) an Assistant Director of Buildings nominated by the Building Authority; and(e) 1 person selected by the Building Authority from among the persons nominated inaccordance withsubsection (5E).

  • 7/30/2019 Tris Kee Arch4003 Ppi

    11/107

    Appointment and duties of authorized person, registered

    structural engineer or registered geotechnical engineer

    Subject to subsection (1A), every person for whom building works or streetworks are to be carried out shall appoint

    (a) an authorized person as the co-ordinator of such building works or streetworks;(b) a registered structural engineer for the structural elements of suchbuilding works or street works if so

    required under this Ordinance;(c) a registered geotechnical engineer for the geotechnical elements of suchbuilding works or street works

  • 7/30/2019 Tris Kee Arch4003 Ppi

    12/107

    Approval and consent required for commencement of

    building works

    no person shall commence or carry out any building works or street works

    withouthaving first obtained from the Building Authority(a) his approval in writing of documents submitted to him in accordancewith the regulations; and(b) his consent in writing for the commencement of the building works or

    street works shown in the approvedplan.

    Approval and consent process

    No retrospective approval!

    UBW

  • 7/30/2019 Tris Kee Arch4003 Ppi

    13/107

    neither the approval of any plans nor the consent to the commencement of anybuilding works or street works shall be deemed

    (a) to confer any title to land;(b) to act as a waiver of any term in any lease or licence; or(c) to grant any exemption from or to permit any contravention of any of theprovisions of this Ordinance or of any other enactment.

  • 7/30/2019 Tris Kee Arch4003 Ppi

    14/107

    Building Authority not deemed to consent if supervision

    plan not lodged

    The Building Authority is not deemed to have consented, if the authorizedperson has NO supervision plan for the building works or street works.

  • 7/30/2019 Tris Kee Arch4003 Ppi

    15/107

    Grounds on which approval or consent may be refused

    Clause 16

    Not as prescribed by regulationNot approved by FSDNot specified form

    Not approved by TPBNo feeWrong documentsDd an H not compatible with neighborBuilding work dangerous

    Further particular not sufficient etc etc.

  • 7/30/2019 Tris Kee Arch4003 Ppi

    16/107

    Occupation of new building

    On receiving an application in the

    appropriate specified form,

    the Building Authority may issue

    (a) an occupation permit in respect of the

    new building which is the subject of suchapplication; or(b) a temporary occupation permit inrespect of the whole or any part of a newbuilding which is completed and

    which is the subject of the application.

  • 7/30/2019 Tris Kee Arch4003 Ppi

    17/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    18/107

    On the issue of a temporary occupation permit:

    The Building Authority may impose such conditions as he may considernecessary including a condition limiting the duration of the temporary

    occupation permit to such period as he may consider necessary andmay revoke a temporary occupation permit for breach of any suchconditionby the service on the building owner of notice of revocation in writing.

  • 7/30/2019 Tris Kee Arch4003 Ppi

    19/107

    The Building Authority may refuse OP:

    section where(a) any part of the building works has been carried out in contravention of BO(b) street or any access road, on to which the building abuts or fronts or by which access isobtained, remain to be completed;(c) a lift has not yet been installed therein, unless theliftway has been protected to the satisfaction of the Building Authority in such manner as to

    avoid any danger to persons using the building;(d) X Director of Fire Services in the terms fire service installations and equipment(e) in the case of a building to which by regulations a supply of water is required to beconnected

  • 7/30/2019 Tris Kee Arch4003 Ppi

    20/107

    BD

    Upon the expiration of14 days from the date of receipt bythe Building Authority of an application in theappropriate specified form, for a temporary occupationpermit or for an occupation permit, such permit shall be

    deemed to have been granted unless the Building Authorityhas by notice in writing served on the buildingowner refused to issue such permit, specifying the groundfor such refusal.

    Q? What will BD inspector check?

  • 7/30/2019 Tris Kee Arch4003 Ppi

    21/107

    Check GFA,Check lighting and ventilation requirementsCheck FSICheck MOE, width of door, fire alarmCheck refuge floorCheck MOA, Fire Rescue StairwayCheck FRP, 4 hour rated walls , fire shutter, fire damper, fire sealCheck GFA concession

    GFA

  • 7/30/2019 Tris Kee Arch4003 Ppi

    22/107

    Building Plan / Production Drawings

    Learning objectives

    1. How to read a Buildings Plan, Elevation, Section2. How to communicate though drawings

    3. Reflected Ceiling Plan4. Legend5. Scale6. Title block7. Grid

  • 7/30/2019 Tris Kee Arch4003 Ppi

    23/107

    Building Plan

    Purpose of Building Drawings

    Purpose of drawings ?

    1. Communication

    2. BD, FSD Submission

    3. Contractor

    4. Construction

    5. Building Management

    6. Future A&A works

    7. Lease

    8. Salable areas

  • 7/30/2019 Tris Kee Arch4003 Ppi

    24/107

    Building Plan

    Means of Communication!!

    1. Clarity

    2. Accuracy

    3. Dimensions / size

    4. Indication of materials

    5. Specifications

  • 7/30/2019 Tris Kee Arch4003 Ppi

    25/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    26/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    27/107

    How to translate the designconcept to working drawingswhere the physicality of aproject is communicated

  • 7/30/2019 Tris Kee Arch4003 Ppi

    28/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    29/107

    Building Plan

    Purpose of Building Drawings

    1. Contract documentation

    2. Tender purpose

    3. Construction purpose

    4. Communication between

    Client, Architect,Contractor andSuppliers

  • 7/30/2019 Tris Kee Arch4003 Ppi

    30/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    31/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    32/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    33/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    34/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    35/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    36/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    37/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    38/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    39/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    40/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    41/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    42/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    43/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    44/107

    Other information

    Legend

  • 7/30/2019 Tris Kee Arch4003 Ppi

    45/107

    Elevation

  • 7/30/2019 Tris Kee Arch4003 Ppi

    46/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    47/107

    Reflected Ceiling Plan

  • 7/30/2019 Tris Kee Arch4003 Ppi

    48/107

    Reflected Ceiling Plan

  • 7/30/2019 Tris Kee Arch4003 Ppi

    49/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    50/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    51/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    52/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    53/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    54/107

    Homework pls submit on Moodle

  • 7/30/2019 Tris Kee Arch4003 Ppi

    55/107

    Pls form a group of 3 students

    Identify an approved building plans from existing housing developments in HK.

    Go to the Buildings Department / internet / site to search for critical elements tocomplete the buildings plan.

    Scale, critical dimensions, grid, size, orientation, width, block plan etc.

    Pls go to web site to select one building blocks you prefer to work with:

    http://www.housingauthority.gov.hk/common/pdf/global-elements/estate-locator/standard-block-typical-floor-plans/11-SingleI.pdf

  • 7/30/2019 Tris Kee Arch4003 Ppi

    56/107

    Building Plans

    Due date : Dec 6, 2012Pls submit work directly on moodle

    Please form a group of 2-3 studentsBased on the web site below, identify one housing type and produce

    a Typical Floor Building Plan in AutoCad.A typical building plan should include key dimensions, scale, grid,unit size, orientation, width, areas of key units etc.Other than the Housing Authority web page, you are encouraged tosearch drawings from the Buildings Department, or visit the sites by

    yourselves.Please submit 1 typical floor plan of any existing housing blocks andupload a J PEG (min 300 dpi) to moodle.

    http://www.housingauthority.gov.hk/en/global-elements/estate-

    locator/standard-block-typical-floor-plans/index.html

  • 7/30/2019 Tris Kee Arch4003 Ppi

    57/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    58/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    59/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    60/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    61/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    62/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    63/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    64/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    65/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    66/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    67/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    68/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    69/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    70/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    71/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    72/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    73/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    74/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    75/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    76/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    77/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    78/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    79/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    80/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    81/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    82/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    83/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    84/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    85/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    86/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    87/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    88/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    89/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    90/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    91/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    92/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    93/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    94/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    95/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    96/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    97/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    98/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    99/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    100/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    101/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    102/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    103/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    104/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    105/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    106/107

  • 7/30/2019 Tris Kee Arch4003 Ppi

    107/107