Programming DivisionPlanning CommissionMinistry of Planning
Trends of Disaster Related Public Fund Allocation in Bangladesh
An analysis of ADPs during 6th Five Year Plan period (FY 2011- FY 2015)
1
Context and Rationale
2
• Sendai Framework for DRR
• Sustainable Development Goals (SDGs)
• Conference of Parties (CoP)
• Standing Orders on Disasters (SoD)
• Disaster Management Act
• National Disaster Management Policy
• National Plan for Disaster
Management
• Perspective Plan (Vision 2021)
• Sixth Five Year Plan (2011 - 2015)
• Seventh Five Year
Plan (2016-2020)
Resilience Nexus
International National (DRR)National
(Development)
Objectives of the Study
1. Assessment of the extent of integration of Disaster Risk Reduction (DRR) and Disaster Preparedness (DP) in Annual Development Programmes (ADP)
2. Determine the share of public fund allocated for DRR & DP
3. Recommend improvements in the currentpractices
3
Stakeholders
• Programming Division, Planning Commission, The People’s Republic of Bangladesh - provided technical support.
• NARRI Consortium - facilitated the whole study by providing resources as well as field support.
• Department of Disaster Science and Management, University of Dhaka – conducted the study.
4
Selection of ProjectsSix ministries were identified, considering the mandates given in the Rules of Business (RoB)
164 projects were selected as DRR sensitive based on the following criteria-Title CheckDPP AnalysisExpert Opinion
Categorization & WeightageThose 164 projects were categorized and assigned with weightage by carrying out KII with the officials, subsequently checked and verified based on expert opinion and field insights.
• High= 70-100% of the total allocation is dedicated to DRR (Weightage Value 0.85)
• Medium-= 40-69% of the total allocation is dedicated to DRR (Weightage Value 0.55)
• Low =less than 40% of the total allocation is dedicated to DRR (Weightage Value 0.20) 5
Distribution of DRR Sensitive Projects
6
Ministry-wise
Sector-wise
DRR Sensitive Projects: Ministry-wise Allocation
7
0
1000000
2000000
3000000
4000000
5000000
6000000
Ministry ofHousing andPublic Works
Ministry ofLGRD&C
Ministry ofWater
Resources
Ministry ofAgriculture
Ministry ofEnvironment
and Forest
Ministry ofDisaster
Managementand Relief
AD
P A
llo
cat
ion
du
rin
g 6
FY
P (
in L
akh
ta
ka)
Total ADP Allocation (FY2011-FY2015)
DRR Sensitive Total ADPAllocation (FY2011- FY2015
Weighted DRR Sensitive TotalADP Allocation (FY2011-FY2015
8
Annual trend of overall Allocation and Expenditures for the selected
ministries during 6FYP Period (FY 2011- FY 2015)
Allocation Sources of the Selected 164 Projects during 6FYP period
9
10
Year-wise distribution of financial contributions for the projects
during 6FYP Period (FY 2011- FY 2015)
Year-wise budget distribution of the Selected 164 Projects during 6FYP period
11
0
50000
100000
150000
200000
250000
300000
2010-11 2011-12 2012-13 2013-14 2014-15
AD
P A
llo
cat
ion
fo
r se
lect
ed
pro
ject
s d
uri
ng
6F
YP
(in
Lak
h B
DT
)
GOB Contribution
Project Aid
DRR Sensitive ADP Allocation Trends of Ministries during 6FYP Period
12
0
5000
10000
15000
20000
25000
30000
2010-11 2011-12 2012-13 2013-14 2014-15
AD
P A
llo
cat
ion
(i
n L
akh
Tak
a)
MoEF
0
20000
40000
60000
80000
100000
2010-11 2011-12 2012-13 2013-14 2014-15
AD
P A
llo
cat
ion
(i
n L
akh
Tak
a)
MoDMR
0
2000
4000
6000
8000
10000
2010-11 2011-12 2012-13 2013-14 2014-15
AD
P A
llo
cat
ion
(i
n L
akh
Tak
a)MoA
0
20000
40000
60000
80000
100000
120000
2010-11 2011-12 2012-13 2013-14 2014-15
AD
O A
llo
cat
ion
(in
Lak
h
BD
T)
MoLGRDC
0
50000
100000
150000
200000
250000
2010-11 2011-12 2012-13 2013-14 2014-15
AD
P A
llo
cat
ion
(i
n L
akh
Tak
a)
MoWR Linear (DRRSesitiveRevised ADPAllocation)
Linear(WeightedDRR SesitiveRevised ADPAllocation)
0
500
1000
1500
2010-11 2011-12 2012-13 2013-14 2014-15A
DP
All
oc
atio
n
(in
Lak
h T
aka)
MoHPWDRR SesitiveRevised ADPAllocation
Wighted DRRSesitive RevisedADP Allocation
13
Projects addressing specific hazards
14
• 37.2%- multi- hazard (61)
• 57.3%- specific hazard (94)
• 5.5%- unspecified resilience (9)
Ministry Projects Addressing Total
Number of
Identified
Projects
Unspecified
Hazard
Specific
Hazard
Multiple
Hazards
MoLGRDC 2 (6.7%) 13 (43.3%) 15 (50%) 30
MoHPW 4 (40%) 6 (60%) 0 (0%) 10
MoWR 2 (2.2%) 58 (63.0%) 32(34.8%) 92
MoA 0 (0%) 3 (100%) 0 (0%) 3
MoEF 1 (6.25%) 9 (56.25%) 6 (37.5%) 16
MoDMR 0 (0%) 5 (38.5%) 8 (61.5%) 13
Hazard Type
Way Forward A network of focal points for better coordination among
relevant ministries
Economic codes in budget classification for disaster related allocation (increase the visibility of the embedded investments for DRR)
DRR issues need further illustrations in DPP and Planning Guidelines
Disaster impact assessment (DIA)
Central database management system
Lag time reduction (difference between project approval date and actual start date)
Development of smart indicators for M&E of 7th FYP
Conduct further in-depth studies 15
Thank You!!Please Contact:• Dr. Nurun Nahar, Deputy Chief, Planning commission
• Professor Dr. A. S. M. Maksud KamalChairmanDepartment of Disaster Science and ManagementUniversity of Dhaka, Bangladesh
[email protected];[email protected]
•
16