trc construction public company limited opportunity day 1...
TRANSCRIPT
-
TRC Construction Public Company LimitedOpportunity Day 1 September 2020
1
-
Content
Company overview
New Projects & Backlog
Bidding Projects
Financial Highlights
1
2
3
4
2
-
Key Milestone
2005- Registered as a public
company limited - Listed on the Market for
Alternative Investment
- Move to The Stock Exchange of Thailand
- Received 3 mai Awards2013 2020 : Smart IoT
Ecosystem
Established Olive Technology Co.,Ltd.
1998 : ContractorEstablishedTRC Construction Co.,Ltd.
2007 : EPC ContractorAcquisitionSahakarn Wisavakorn Co.,Ltd.
2015
Received 2 SET Awards
2019 : UtilitiesInvestment in AT Energy Solution Co.,Ltd.(subsidiary)
2017 : UtilitiesEstablished TRC Utility Co.,Ltd. (subsidiary)
Investment in SH Crossing Co.,Ltd. (JV)
CG “Excellent”3 consecutive years
3
-
“A Pioneer Organization who delivers innovative project solution in the region” (CLMVT)
“เรามุง่มั่นทีจ่ะสรา้งสรรคน์วตักรรมและตอบสนองความตอ้งการทีด่ทีีส่ดุใหก้ับลกูคา้ทัง้ในประเทศและภมูภิาคเอเชยีตะวนัออกเฉยีงใต ้(CLMVT)”
We will create best working environment and become the best Operational – excellence organization.เราจะสรา้งเสรมิบรรยากาศการทํางานใหด้ทีีส่ดุและเป็นองคก์รทีม่กีารปฏบิตักิารทีมุ่ง่สูค่วามเป็นเลศิ
We will conduct business with good corporate responsibility.เราจะบรหิารจัดการธรุกจิ ดว้ยความรับผดิชอบตอ่สงัคม ชมุชน และสิง่แวดลอ้ม
We will deliver sustainable returns through good governance.สรา้งผลตอบแทนทีน่า่พงึพอใจอยา่งยั่งยนืและบรหิารงานอยา่งโปรง่ใส
TRC MISSION
We will deliver excellent service with high quality , environmental and safety awareness to ensure our clients’ success.สง่มอบบรกิารทีม่คีณุภาพ ตรงตามเวลา มคีวามปลอดภัย และนํามาซึง่ความสําเร็จของธรุกจิลกูคา้
Society
TRC VISION
4
-
◄ Be Innovative
◄ Energetic
◄ Target-oriented
◄ Respect & Trust
◄ Commitment
COREVALUEs
5
-
PerformanceMonitoring
Safety Monitoring
AlertManagement
Report
Real-time Tracking
Construction Utilities & Investment
Smart IoT Ecosystem
TRC BUSINESS
6
-
Founded in 1954, Sahakarn Wisavakorn Co., Ltd. is leading Civil Engineering and Special rank registered contractor with many Thai Government Agencies.
TRC Utilities Co., Ltd
Supply municipality water with capacity 3,300 Q3/day in Tasit SAO, Pluak Daeng, Rayong.
Subsidiary in June 2017
A Specialist contractor in underground work such as HDD and pipe-jacking. SH Crossings Co., Ltd. is a joint venture between SKW and Langfang Huayuan.
Joint Venture in November 2017
In 1991, ASEAN Potash Mining Co., Ltd was established with the ASEAN
member. The Project had been carried out in forms of ore-investigative drill,
channel excavation, trial mining, technical and environmental studies.
A fully integrated solution provider for Smart IoT Ecosystem. Olive Technology Co.,Ltd is
a joint-venture company between TRC and Xsense Information Service.
Subsidiary in March 2020
AT Energy Solution Co., Ltd. is provides turnkey basis in various energy services
solution for industrial customers. AT Energy is a joint-venture company between TRC
and Asia Green Energy (AGE)
Associate in August 2019
EPCC Turnkey Service in Oil & Gas, Petrochemical Industry, Large Scale Governmental Infrastructure
and Energy Sector.
TRC Group & Affiliates
Construction
Utilities & Investment
Smart IoT Ecosystem
7
-
Investment in TRC-UT
38,444 35,934
64,733
44,388
57,860 55,567
52,421 51,681
55,850
49,921
62,802
54,117
67,972
70,897
63,978
83,861
70,981
58,341
Sales (Unit : m3)
2020 2020
(Q 2) (Q 1)
Sales (m3) 213,183 202,847
Sales (MB.) 4.50 4.24
Profit (MB.) 1.14 1.11
2019 ΔQ 2(Q 2) 2020-2019
Sales (m3) 157,815 0.06
Sales (MB.) 3.27 1.23
Profit (MB.) 0.55 0.59
8
-
Investment in AT Energy Solution Co., Ltd.
- Electricity sales from Solar FarmTRC (50%) + AGE (50%)
AT Energy Solution Co., Ltd.
AT Energy One Co., Ltd.
AT Holding Vietnam Co., Ltd.
- Steam sales
Potential Steam sales
49%
100%Potential
9
-
Investment in1. Logistic Solutions Services 2. Building Energy Management System
3. Water Information Management System
10
-
Content
Company overview
New Projects & Backlog
Bidding Projects
Financial Highlights
1
2
3
4
11
-
Owner: Thai O il Public Company LimitedClient: Joint Venture of Petrofac South East Asia Pte. Ltd., Saipem
Singapore Pte. Ltd. and Samsung Engineering (Thailand) Co., Ltd.Scope of Work: Fabrication and Construction of 1 5 Storage TanksContract Value: Baht 4 8 4 millionProject Period: 2 1 months
Fabrication and Construction of 15 New Storage Tanks (Clean Fuel Project at Sriracha Refinery)
Infrastructure works for Ditch improvement Vibhavadi Rangsit Road Section 1 Phase(2 contract)
Owner: Metropolitan Electricity Authority and Metropolitan Waterworks Authority
Scope of Work: Manhole, underground cable works and Layingwater pipes
Contract Value: Total of Baht 6 4 millionProject Period: 2 0 months
2nd Qtr 2020 : TRC Group obtained 6 New Projects total work value 644 MB
The significant projects :
12
-
20.82%78.66%
0.52%
Pipeline system Civil Works Engineering system
Scope of Works No. of Projects Remaining Value (MB)
Civil Work 15 6,765
Pipeline System 4 1,790
Processing Plant 1 45
Total 20 8,600
TRC, 28.03%
SKW, 71.97%
TRC SKW
Company No. of Projects Remaining Value (MB)
TRC 7 2,411
SKW 13 6,189
Total 20 8,600
Civil
Engineering
Pipeline
Backlog by CompanyBacklog by Scope of Works
Backlog
13
-
Projects on HandProject Value
(MB)
Remaining Work
Value%
Remaining
Value (MB)
Expected year of
completion
TRC Projects
1. Block Valve & Facility Station (5TP1) 989.78 17.00% 168.25 2020
2. Raw Water Pipeline System Klong Luang Reservoir - Chonburi 1,833.00 75.67% 1,387.03 2021
3. Piping Spool Fabrication Works 235.57 98.82% 232.79 2021
4. Fabrication and construction of 15 new storage tanks 483.69 100.00% 483.69 2023
5. Other Project (3 Projects) 489.93 139.68 2020-2022
Total TRC Projects 4,031.97 2,411.44
SKW Projects
1. Construction of overpass bridge, Na Ranong Intersection 1,524.37 72.10% 1,099.10 2021
2. Lubricants Distribution Center Project 600.00 59.09% 354.54 2020
3. The construction of Highway (Don Si Non) 558.88 53.51% 299.06 2021
4. Conversion of Overhead Line to Underground System Project, Ratchadaphisek-Asoke Route 2,205.42 88.99% 1,962.65 2022
5. Ditch improvement Vibhavadi Rangsit Road Section 1 697.07 80.27% 559.53 2021
6. Conversion of Overhead Line to Underground System Project, Rama IV Route 517.76 99.31% 514.18 2021
7. Medical Building for Thabo Crown Prince Hospital 691.44 99.96% 691.15 2022
8. Other Project (6 Projects) 1,438.61 708.32 2020-2021
Total SKW Projects 8,233.55 6,188.53
Total TRC Group Projects 12,265.52 8,599.9714
-
28%
Significant Ongoing Projects
24%
Water Pipeline System Klong Luang Reservoir - Chonburi 1,833 MB
Owner : Eastern Water Resources Development and Management Public Company Limited Scope of Work : Construction of Water Pipeline System, length of approximately 45 kilometers and Pump Station.
Construction of Overpass Bridge, Manhole and Underground Duct Bank on Rama 3 Road at Na - Ranong Intersection 1,524 MBOwner : Bangkok Metropolitan Administration and Metropolitan Electricity AuthorityScope of Work: Construction of overpass bridge, Manhole and Underground Duct Bank, Na Ranong Intersection.
41%
Lubricants Distribution Center Project 600 MB
Owner : PTT Oil and Retail Business Public Company Limited Scope of Work : EPC for office Building Lubricants Distribution Center with installation of Automated Storage and Retrieval System.
15
-
20%
11%
Significant Ongoing Projects
Ditch improvement Vibhavadi Rangsit Road Section 1 697 MB
Owner : Nong Khai Province
Scope of Work: Improvement of roadside drainage system and Infrastructure works of Vibhavadi Rangsit Road.
Conversion of Overhead Line to Underground System Project, Ratchadaphisek - Asoke Route 2,205 MB
Owner : Metropolitan Electricity Authority
Scope of Work: Conversion of Overhead Line to Underground System, road length of approximately 8.2 kilometers.
0%
Construction of the Medical Building for Thabo Crown Prince Hospital Project 691 MB
Owner : The Department of Highways, Metropolitan Electricity Authorityand Metropolitan Waterworks Authority
Scope of Work: Construction of a ten-story hospital building with total area of 28,176 square meters.
16
-
Content
Company overview
New Projects & Backlog
Bidding Projects
Financial Highlights
1
2
3
4
17
-
Bidding Project
Potential ProjectNo Type Location Project Value (MB)
1 Pipeline Chonburi Province 896
2 Pipeline Laos 59
3 Pipeline Rayong Province 48
4 Pipeline Rayong Province 121
5 Civil and Infrastructure Chachoengsao Province 1
Total 1,125
Waiting sign contract No Type Location Project Value (MB)
1 Pipeline Chonburi Province 254
2 Civil and Infrastructure Phatthalung Province 889
3 Civil and Infrastructure Bangkok 514
Total 1,657
18
-
Content
Company overview
New Projects & Backlog
Bidding Projects
Financial Highlights
1
2
3
4
19
-
Impact of COVID-19
Procurement Delay Construction Delay
20
-
5 Years Performance
2015 2016 2017 2018 2019
Revenues (MB) 3,955.03 3,736.90 2,435.83 2,304.52 3,426.61Gross Profit (MB) 637.78 750.65 510.41 -88.71 57.29Net Profit (loss) (MB) 305.96 290.76 92.79 -2,041.57 -293.28Gross Profit Margin for Construction services income (%) 16.44% 20.30% 21.54% -3.90% 1.58%Gross Profit Margin Other services income (%) N/A N/A N/A -10.47% 31.39%Net Profit (loss) Margin (%) 7.74% 7.78% 3.81% -88.55% -8.56%Debt to Equity Ratio (Time(s)) 0.89 0.86 0.67 3.35 3.43Earnings (loss) per share (Baht) 0.07 0.057 0.015 -0.331 -0.038Par value per Share (Baht) 0.125 0.125 0.125 0.125 0.125No. of Shares 4,522,766,096 5,135,985,760 5,869,693,296 6,163,165,825 9,587,146,838Market Cap. (Million Baht) 8,909.85 7,344.46 6,221.87 2,465.27 1,150.46
21
-
6-Month & Q2 Operation Performance
Closed 31/01/20 28/02/20 31/03/20 31/04/20 29/05/20 30/6/20
TRC Price (Baht) 0.11 0.09 0.06 0.10 0.12 0.15
www.set.or.th
+/- Change 6 M +/- Change Q2 +/- Change
(2020 - 2019) (2020 - 2019) Q2 2020 - Q1 2020
Revenues (MB) 1,466.77 1,694.50 227.73 665.03 731.13 963.37 66.10 -232.24 Gross Profit (MB) 51.88 101.07 49.19 16.67 3.12 97.94 -13.55 -94.82 Net Profit (loss) (MB) -121.16 -66.43 54.73 -73.35 -78.07 11.64 -4.72 -89.71
GP Margin for Construction services income (%) 3.47% 5.87% 2.40% 2.38% 0.19% 10.13% -2.19% -9.94%
GP Margin Other services income (%) 29.80% 38.22% 8.42% 33.64% 38.67% 37.59% 5.03% 1.08%Net Profit (loss) Margin (%) -8.26% -3.92% 4.34% -11.03% -10.68% 1.21% 0.35% -11.89%
Earnings (loss) per share (Baht) -0.0197 -0.0069 0.0128 -0.0119 -0.0081 0.001 0.0038 -0.0091Par value per Share (Baht) 0.125 0.125 0 0.125 0.125 0.125 - -No. of Shares 6,163,165,825 9,587,146,838 3,423,981,013 6,163,165,825 9,587,146,838 9,587,146,838 3,423,981,013 - Market Cap. (Million Baht) 1,171.00 1,438.07 267.07
6 M 2019 6 M 2020 Q2 2019 Q2 2020 Q1 2020
22
TRC-UT
202020202019Change Qtr 2
(Qtr 2)(Qtr 1)(Qtr 2) 2020-2019
Sales (m3)213,183202,847157,8155536855,368.00
Sales (MB.)4503557.754236889.53271111.81232445.951,232,445.95
Profit (loss) (MB.)1141736.351111395.76549473.41592262.94592,262.94
Backlog
Current Backlog ณ ไตรมาส 1 ปี 2563
TRC's Backlog Scope of WorksNo. of ProjectsRemaining Value (MB)
No.Project NameType of Project Owner/ClientWork Value Uncompleted RemainingProject Period% Completed asRemainingCivil Work146,626662654711276.38
Works(MB)Work Value (MB) Work Value%Year at Mar 2020 Work Value%Pipeline System41,929192843437922.24
2991The Fifth Transmission Pipeline Project Phase 1 (5TP1) Project Contractor : Sinopec International Petroleum Service CorporationE, P, CPTT Public Company Limited989778276.7276199306.927.91%2018202072.09%27.91%Processing Plant1120120199714.21.38
3032Design, Supply, Construction and Commissioning of Refined Glycerin Plant ProjectE, P, CBangchak Biofuel Company Limited (BBF)389752640120199714.230.84%2019202069.16%30.84%Total198,675100.00
3053Raw Water Pipeline System Klong Luang Reservoir-ChonburiE, P, CEastern Water Resources Development and Management Public Company Limited 1833000000141415950077.15%2019202122.85%77.15%
3074จัดจ้างเดินท่อและ Re-Condition อุปกรณ์เพื่อใช้ที่พื้นที่ GPPPE, P, CPTT Public Company Limited7500000250875033.45%2020202066.55%33.45%
3095Piping Spool Fabrication WorksJoint Venture of PSEAL, SSING and SET235566822235566822100.00%202020210100.00%
Total TRC's backlog as at 31 March 202034555977392048634093CompanyNo. of ProjectsRemaining Value (MB)
TRC52,04923.62
SKW's Backlog SKW146,62676.38
No.Project NameType of Project Owner/ClientWork Value Uncompleted RemainingProject Period% Completed asRemainingTotal198,675100.00
Works(MB)Work Value (MB) Work Value%Year at Mar 2020 Work Value%
2017/118-31The Kanlapaphruek Road ExtenstionE, P, CMetropolitan Electricity Authority364878638.329562102481.02%2017202118.98%81.02%
2017/123-32Improvement of Pracharuamjai Road – Mitmaitri RoadE, P, CMetropolitan Electricity Authority4185168395231460.4881.25%2017202098.75%1.25%
2018/1263ทางหลวงหมายเลข 4 อ.ตะกั่วป่า-อ.ท้ายเหมือง ตอนบ.ทับละมุ-บ.ทุ่งมะพร้าวE, P, CThe Department of Highways347383177.65592869.161.61%2018202098.39%1.61%
2018/1274โครงการก่อสร้างสะพานข้ามแยก ณ ระนองE, P, CBangkok Metropolitan Administration125708224398190694078.11%Q3 2018202121.89%78.1100%1524371963
2018/127-14.1งานก่อสร้างบ่อพักและท่อร้อยสายไฟฟ้าใต้ดินในถนนพระราม 3 ร่วมกับโครงการก่อสร้างสะพานข้ามแยก ณ.ระนองE, P, CMetropolitan Electricity Authority267289719.6247483551.492.59%Q4 201820217.41%92.59%122939049180.65%19.351016578854100%
2018/1315Lubricants Distribution Center Project E, P, CPTT Oil and Retail Business Public Company Limited 60000000039108000065.18%Q4 2018202034.82%65.18%
2019/1326โครงการก่อสร้างทางหลวง ดอนสีนนท์ (ฉะเชิงเทรา)E, P, CThe Department of Highways558878504.7378092485.667.65%Q1 2019202132.35%67.65%
2019/1337โครงการเปลี่ยนระบบสายไฟฟ้าอากาศเป็นสายไฟฟ้าใต้ดิน โครงการรัชดาภิเษก-อโศกE, P, CMetropolitan Electricity Authority 2205420561201705559091.46%Q1 201920228.54%91.46%
2019/1368Drainage Syatem - Tungsong (via Wattsan) E, P, CDepartment of Public Works and Town & Country Planning 220881264.5169239224.876.62%Q2 2019202123.38%76.62%
2019/1379Ditch improvement Vibhavadi Rangsit Road Section 3 Phase km.28+030.000 – km.30+300.00E, P, CThe Department of Highways293688504.7238798123.281.31%Q3 2019202118.69%81.31%
2019/13810Ditch improvement Vibhavadi Rangsit Road Section 1 Phase km.5+500.000 – km.10+700.00E, P, CThe Department of Highways633014018.7566762771.589.53%Q3 2019202110.47%89.53%
2019/13911Conversion of Overhead Line to Underground System Project, Rama IV RouteE, P, CMetropolitan Electricity Authority517757000514339803.899.34%Q3 201920210.66%99.34%
2019/13512Multipurpose gymnasium building E, P, CThailand National Sports University 81775700.9381775700.93100.00%Q1 202020210.00%100.00%
2020/14013Infrastructure for Nihonbashi Bangpakong Phase 1E, P, CBangpakong Logistics Park Company Limited55981308.4142131532.7175.26%Q1 2020202024.74%75.26%
2020/14114Medical Building for Thabo Crown Prince Hospital E, P, CNong Khai Province691436034.6691436034.6100.00%Q1 202020220.00%100.00%
Total SKW's backlog as at 31 March 202085139835156626547112
Conclusion of TRC Group's Backlog (Unit: MB)No. of the ProejctsProject ValueRemaining
TRC Backlog as at 31 March 2020534555977392048634093
SKW Backlog as at 31 March 20201485139835156626547112
Total TRC Group Backlog as at 31 March 202019119695812538675181205
Other Project1,783,105,433.33838,389,935.24
backlog Q2
Current Backlog ณ ไตรมาส 2 ปี 2563
TRC's Backlog
No.Project NameType of Project Owner/ClientWork Value Uncompleted RemainingProject PeriodScope of WorksNo. of ProjectsRemaining Value (MB)
Works(MB)Work Value (MB) Work Value%YearCivil WorkPipeline SystemProcessing PlantCivil Work156,76578.663%
2991Block Valve & Facility Station 5TP1 Project Contractor : Sinopec.E, P, CPTT Public Company Limited989778276.7168247789.517.00%20182020Pipeline System0168247789.50Pipeline System41,79020.814%
3032Refined Glycerin Plant ProjectE, P, CBangchak Biofuel Company Limited (BBF)389879412.844626677.2811.45%20192020Processing Plant0044626677.28Processing Plant1450.523%
3053Raw Water Pipeline System Klong Luang Reservoir-ChonburiE, P, CEastern Water Resources Development and Management Public Company Limited 1833000000138703110075.67%20192021Pipeline System013870311000Total208,600
3074Piping and Re-ConditionE, P, CPTT Public Company Limited7500000250875033.45%20202020Pipeline System025087500
3095Piping Spool Fabrication WorksE, P, CJoint Venture of PSEAL, SSING and SET235566822232787133.598.82%20202021Pipeline System0232787133.50
3116Civil and structure work packageE, P, CTHAI OIL PUBLIC COMPANY LIMITED9254714992547149100.00%20202022Civil Work9254714900
3127Fabrication and construction of 15 new storage tanksE, P, CJoint Venture of PSEAL, SSING and SET483694843483694843100.00%20202023Civil Work48369484300CompanyNo. of ProjectsRemaining Value (MB)
Total TRC's backlog as at 30 June 202040319665042411443442TRC72,41128.03%
SKW136,18971.97%
SKW's Backlog Total208,600
No.Project NameType of Project Owner/ClientWork Value Uncompleted RemainingProject Period
Works(MB)Work Value (MB) Work Value%Year
118-3 / 20171The Kanlapaphruek Road ExtenstionE, P, CMetropolitan Electricity Authority364878638.329562102481.02%20172021Civil Work29562102400
123-3 / 20172Improvement of Pracharuamjai Road – Mitmaitri RoadE, P, CMetropolitan Electricity Authority4185168395231460.4881.25%20172020Civil Work5231460.48800
127 / 2018 3Na ranong-overpassE, P, CBangkok Metropolitan Administration125708224388385452570.31%Q3 20182021Civil Work88385452500
127-1/ 20183.1Na ranong-ElectricE, P, CMetropolitan Electricity Authority267289719.6215248411.280.53%Q4 20182021Civil Work215248411.200
131 / 20184Lubricants Distribution Center Project E, P, CPTT Oil and Retail Business Public Company Limited 60000000035454000059.09%Q4 20182020Civil Work35454000000
132 / 20195Construction of highway #3304 : Don Sri NonE, P, CThe Department of Highways558878504.7299055887.553.51%Q1 20192021Civil Work299055887.500
133 / 20196Overhead line to underground System: Ratchada - Asoke E, P, CMetropolitan Electricity Authority 2205420561196264786588.99%Q1 20192022Civil Work196264786500
136 / 20197Drainage Syatem - Tungsong (via Wattsan) E, P, CDepartment of Public Works and Town & Country Planning 220881264.5108231819.649.00%Q2 20192021Civil Work108231819.600
137 / 20198Ditch improvement Vibhavadi Rangsit Road Section 3E, P, CThe Department of Highways293688504.7217960923.774.21%Q3 20192021Civil Work217960923.700
138 / 20199Ditch improvement Vibhavadi Rangsit Road Section 1 E, P, CThe Department of Highways633014018.7496169048.178.38%Q3 20192021Civil Work496169048.100
138-2 / 20209.1Vibhavadirangsit section 1 – MEAE, P, CMetropolitan Electricity Authority34622429.9133926519.0797.99%Q2 20202021Civil Work33926519.0700
138-3 / 20209.2Vibhavadirangsit section 1 – MWAE, P, CMetropolitan Waterworks Authority29430639.2529430639.25100.00%Q2 20202021Civil Work29430639.2500
139 / 201910Overhead Line to Underground System : Rama IV RouteE, P, CMetropolitan Electricity Authority517757000514184476.799.31%Q3 20192021Civil Work514184476.700
135 /201911Multipurpose gymnasium building E, P, CThailand National Sports University 81775700.9359778037.3873.10%Q1 20202021Civil Work59778037.3800
140 / 202012Infrastructure for Nihonbashi Bangpakong Phase 1E, P, CBangpakong Logistics Park Company Limited55981308.4120438775.736.51%Q1 20202020Civil Work20438775.700
140-1 / 202012.1Infrastructure for Nihonbashi Bangpakong Phase 1E, P, CBangpakong Logistics Park Company Limited2897196.261060698.0536.61%Q2 20202020Civil Work1060698.0500
141 / 202013Medical Building for Thabo Crown Prince Hospital E, P, CNong Khai Province691436034.6691152545.899.96%Q1 20202022Civil Work691152545.800
6764774649179057477344626677.28
Total SKW's backlog as at 30 June 202082335506026188532657
Conclusion of TRC Group's Backlog (Unit: MB)No. of the ProejctsProject ValueRemaining
TRC Backlog as at 30 June 20207403196650424114434422,411,443,442.32
SKW Backlog as at 30 June 202013823355060261885326576,188,532,656.60
Total TRC Group Backlog as at 30 June 202020122655171068599976099
Project on hand
489926561.8139682576.3
Project Value (MB)Remaining Work Value%Remaining Value(MB)Expected year of completionCurrent Backlog ณ ไตรมาส 2 ปี 2563
TRC ProjectsTRC's Backlog
1. Block Valve & Facility Station (5TP1)989.7817.00%168.252020No.Project NameWork Value Uncompleted Remaining
2. Raw Water Pipeline System Klong Luang Reservoir - Chonburi1,833.0075.67%1,387.03202124%(MB)Work Value (MB) Work Value%
3. Piping Spool Fabrication Works235.5798.82%232.7920212991Block Valve & Facility Station 5TP1 Project Contractor : Sinopec.989778276.7168247789.517.00%2020
4. Fabrication and construction of 15 new storage tanks483.69100.00%483.6920230%3032Refined Glycerin Plant Project389879412.844626677.2811.45%2020
5. Other Project489.93139.682020-20223053Raw Water Pipeline System Klong Luang Reservoir-Chonburi1833000000138703110075.67%2021
3074Piping and Re-Condition7500000250875033.45%2020
Total TRC Projects4,031.972,411.443095Piping Spool Fabrication Works235566822232787133.598.82%2021
SKW Projects3116Civil and structure work package9254714992547149100.00%2022
1. Construction of overpass bridge, Na Ranong Intersection1,524.3772.10%1,099.10202128%3127Fabrication and construction of 15 new storage tanks483694843483694843100.00%2023
2. Lubricants Distribution Center Project 600.0059.09%354.542020Total TRC's backlog as at 30 June 202040319665042411443442
3. The construction of Highway (Don Si Non)558.8853.51%299.062021
4. Conversion of Overhead Line to Underground System Project, Ratchadaphisek-Asoke Route2,205.4288.99%1,962.65202211%SKW's Backlog
5. Ditch improvement Vibhavadi Rangsit Road Section 1697.0780.27%559.53202120%No.Project NameWork Value Uncompleted Remaining
6. Conversion of Overhead Line to Underground System Project, Rama IV Route517.7699.31%514.182021(MB)Work Value (MB) Work Value%
7. Medical Building for Thabo Crown Prince Hospital 691.4499.96%691.1520220%118-3 / 20171The Kanlapaphruek Road Extenstion364878638.329562102481.02%2021
8. Other Project1,438.61708.322020-2021123-3 / 20172Improvement of Pracharuamjai Road – Mitmaitri Road4185168395231460.4881.25%2020
127 / 2018 3Na ranong-overpass125708224388385452570.31%2021
Total SKW Projects8,233.556,188.53127-1/ 20183.1Na ranong-Electric267289719.6215248411.280.53%1524371963109910293672.10%2021
Total TRC Group Projects12,265.528,599.97131 / 20184Lubricants Distribution Center Project 60000000035454000059.09%2020
132 / 20195Construction of highway #3304 : Don Sri Non558878504.7299055887.553.51%2021
133 / 20196Overhead line to underground System: Ratchada - Asoke 2205420561196264786588.99%2022
136 / 20197Drainage Syatem - Tungsong (via Wattsan) 220881264.5108231819.649.00%2021
137 / 20198Ditch improvement Vibhavadi Rangsit Road Section 3293688504.7217960923.774.21%2021
138 / 20199Ditch improvement Vibhavadi Rangsit Road Section 1 633014018.7496169048.178.38%2021
138-2 / 20209.1Vibhavadirangsit section 1 – MEA34622429.9133926519.0797.99%2021
138-3 / 20209.2Vibhavadirangsit section 1 – MWA29430639.2529430639.25100.00%697067087.9559526206.580.27%2021
139 / 201910Overhead Line to Underground System : Rama IV Route517757000514184476.799.31%2021
135 /201911Multipurpose gymnasium building 81775700.9359778037.3873.10%2021
140 / 202012Infrastructure for Nihonbashi Bangpakong Phase 155981308.4120438775.736.51%2020
140-1 / 202012.1Infrastructure for Nihonbashi Bangpakong Phase 12897196.261060698.0536.61%2020
141 / 202013Medical Building for Thabo Crown Prince Hospital 691436034.6691152545.899.96%2022
Total SKW's backlog as at 30 June 202082335506026188532657
1438619452708322738.9
Performance
Performance
6 M 20196 M 2020 +/- Change 6 MQ2 2019Q2 2020Q1 2020 +/- Change Q2 +/- Change
20152016201720182019(2020 - 2019)(2020 - 2019)Q2 2020 - Q1 2020
Revenues (MB)3,955.033,736.902,435.832,304.523,426.611,466.77 1,694.50 227.73 665.03 731.13 963.37 66.10 -232.24 FS
Gross Profit (MB)637.78750.65510.41-88.7157.2951.88 101.07 49.19 16.67 3.12 97.94 -13.55 -94.82 MD&A
Net Profit (loss) (MB)305.96290.7692.79-2,041.57-293.28-121.16 -66.43 54.73 -73.35 -78.07 11.64 -4.72 -89.71 MD&A
GP Margin for Construction services income (%)16.44%20.30%21.54%-3.90%1.58%3.47%5.87%2.40%2.38%0.19%10.13%-2.19%-9.94%MD&A
GP Margin Other services income (%)N/AN/AN/A-10.47%31.39%29.80%38.22%8.42%33.64%38.67%37.59%5.03%1.08%MD&A
Net Profit (loss) Margin (%)7.74%7.78%3.81%-88.55%-8.56%-8.26%-3.92%4.34%-11.03%-10.68%1.21%0.35%-11.89%MD&A
0.890.860.673.353.43MD&A
Earnings (loss) per share (Baht)0.070.0570.015-0.331-0.038-0.0197-0.00690.0128-0.0119-0.00810.0010.0038-0.0091FS
Par value per Share (Baht)0.1250.1250.1250.1250.1250.1250.12500.1250.1250.125- 0-FS
No. of Shares4,522,766,0965,135,985,7605,869,693,2966,163,165,8259,587,146,8386,163,165,8259,587,146,8383,423,981,0136,163,165,8259,587,146,8389,587,146,8383,423,981,013-FS
Market Cap. (Million Baht)8,909.857,344.466,221.872,465.271,150.461,171.001,438.07267.07Cal. Or Folder ราคาหุ้น TRC
0.00
Market Cap. = No. of Shares x ราคาปิด
Segment
PipelineEngineeringCivilOtherService income
20152131151223613880
20161797115874203697
2017107334595022370
2018100742082962262
20199583892018133378
1 Qtr 2019 1631494773792
4 Qtr 2019 382964903971
1 Qtr 20203381344776955
9 Months 20195762931528102407
Price
SET
Closed31/01/2028/02/2031/03/2031/04/2029/05/206/30/208/21/20
Price0.110.090.060.100.120.150.12
-
Type of Service Income3,880
3,697
2,370 2,262
3,378
1,6721,971
1,797
1,073 1,007 958
476
1,535
1,158
345 420 389209
373
742950 829
2,018
976
1 0 2 6 13 11
2015 2016 2017 2018 2019 1H / 2020Total Pipeline Engineering Civil Other
23
-
SG&A Expenses
82.88 83.41
126.85
86.6482.08 80.86
72.17 69.14 65.3980.29
92.37 90.72102.89
87.64 83.18 80.53
66.8474.32
109.61
69.49 70.97
134.96
332.26349.80
344.91318.43
376.25
8.40%
9.36%
14.04% 13.82%
10.98%
10.13%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
2015 2016 2017 2018 2019 1H / 20200
50
100
150
200
250
300
350
400
Q1 Q2 Q3 Q4 Total %SG&A
24
-
Financial Position
Non-Current Assets
704
Current
Assets2,830
Cash Equivalent 182
Equity840
Non-Current Liabilitie
s 97
Current Liabilities2,306
Bank overdraf
ts and ST-Loan
473
Non-Current Assets
775
Current
Assets2,810
Cash Equivalent 48
Equity773
Non-Current Liabilities 115
Current Liabilities2,219
Bank overdraf
ts and ST-Loan
526
31 Dec 2019, Baht 3,716 Million
30 Jun 2020, Baht 3,633 Million
Financial Position & Financial RatioFinancial Ratio
3.95 4.12
2.763.43 3.30 3.70
31 Mar 19 30 Jun 19 30 Sep 19 30 Dec 19 31 Mar 20 30 Jun 20
D/E RatioMillion Baht
-4.65%
5.87%
-6.12%
0.70%
-10%
-5%
0%
5%
10%
Year 2019 Q1 2020 Q2 2020 1H / 2020
EBITDA Margin
25
-
Disclaimers
Information disclosed on this presentation includes forward looking information of TRC determined by TRC based on information available at the time, as well as information about risks and
factors of uncertainty related to economic trends, intensified competition in the industry, market demand, exchange rates, applicable laws and regulations. Operating results and other
information published in the future may vary due to these factors. TRC is in no way responsible for any damage incurred due to the use of information disclosed on this presentation.
Further, no obligation to revise and/or publish forward-looking information on this presentation based on new information and/or future events.
The information disclosed on this presentation is for information purposes only and does not constitute an offer or invitation to sell or the solicitation of an offer or invitation to purchase or
subscribe for securities in TRC in any jurisdiction nor should it or any part of it form the basis of, or be relied upon in any connection with, any contract or commitment whatsoever.
Thank youEmail: [email protected]: +66 2022 7777 Ext. 3207/3213Fax: +66 2022 7778
Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26