TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED VIDYUTSOUDHA::HYDERABAD-82 A B S T R A C T Estt-APTRANSCO– Allotment of newly created posts of 3 DE/Elecl., 92 ADE/Elecl., 24 AE/AAE(Elecl.) & 46 Sub-Engineer(Elecl.) and redeployment of certain existing posts of ADE(Elecl.), AE/AAE(Elecl.) and Sub-Engineer/Elecl., – Orders – Issued. ------------------------------------------------------------------------------------------------------------- (PERSONNEL SERVICES) T.O.O. (Per- Addl.Secy). Ms. No. 9 Date: 06-04-2009 Read the following: Ref:- 1) T.O.O. (Per- Addl.Secy). Ms. No.141, Date: 17-09-2008 2) T.O.O. (Per- Addl.Secy). Rt. No.316, Date: 16-02-2009 3) T.O.O. (Per- Addl.Secy). Ms. No.288, Date: 16-03-2009 # # # O R D E R: In the reference (3) read above, orders were issued sanctioning, inter-alia, 165 Electrical Engineering posts viz., DE/Elecl.=3, ADE/Elecl.=92, AE/AAE(Elecl.)=24, & Sub-Engineer/Elecl.=46. 2. In continuation with orders issued vide reference (3) cited, APTRANSCO after careful consideration hereby accords approval for allocation of 165 Electrical Engineering posts as follows. i) Allocation of 3 Nos. DE(Elecl.) posts :- The posts shall be designated and kept under the control of the following Offices. Sl. No. Name of the post Be kept under the control of (a) DE/MRT/ 400KVL&SS, Mamidipally SE/400KVL&SS (O&M), Mamidipally to look after the existing 2 Nos. MRT Subdivisions of the Circle. (b) DE/MRT/TLC, Visakhapatnam SE/TLC/ Visakhapatnam to look after the existing 2 Nos. MRT Subdivisions connected with TLC works. (c) DE(Tech &MPP) to CGM(HRD&Trg) CGM(HRD& Training) for utilization as DE(Technical) as well as to look after Man Power Planning (MPP) Cell. Accordingly, the DE post diverted for utilization as DE/Tech to CGM(HRD&Trg) vide reference (2) cited shall be restored to Disciplinary Cases wing. Further, the MPP Cell hitherto under Additional Secretary be kept under the control of CGM(HRD&Trg). (ii) Allocation of ADE(Elecl.), AE/AAE(Elecl.) and Sub-Engineer(Elecl.) posts:- (a) The posts now created and the existing posts in EHV Substations shall be deployed/ reallocated among the Substations as per the following staff pattern recommended by Technical Committee. Shift Maintenance Total Sl. No. Substation ADE AE/ AAE Sub- Eng. ADE AE/ AAE Sub- Eng. ADE AE/ AAE Sub- Eng. 1 400 KVSS 4 4 4 1 1 1 5 5 5 Pattern I 4 4 1 1 5 1 4 2 220 KVSS Pattern II 4 1 1 1 5 Pattern I 4 1 5 3 132 KVSS Pattern II 1 1 ---Contd.

Upload: ledat

Post on 10-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

VIDYUTSOUDHA::HYDERABAD-82

A B S T R A C T Estt-APTRANSCO– Allotment of newly created posts of 3 DE/Elecl., 92 ADE/Elecl., 24 AE/AAE(Elecl.) & 46 Sub-Engineer(Elecl.) and redeployment of certain existing posts of ADE(Elecl.), AE/AAE(Elecl.) and Sub-Engineer/Elecl., – Orders – Issued. -------------------------------------------------------------------------------------------------------------

(PERSONNEL SERVICES)

T.O.O. (Per- Addl.Secy). Ms. No. 9 Date: 06-04-2009

Read the following: Ref:- 1) T.O.O. (Per- Addl.Secy). Ms. No.141, Date: 17-09-2008 2) T.O.O. (Per- Addl.Secy). Rt. No.316, Date: 16-02-2009 3) T.O.O. (Per- Addl.Secy). Ms. No.288, Date: 16-03-2009

# # # O R D E R:

In the reference (3) read above, orders were issued sanctioning, inter-alia, 165 Electrical Engineering posts viz., DE/Elecl.=3, ADE/Elecl.=92, AE/AAE(Elecl.)=24, & Sub-Engineer/Elecl.=46. 2. In continuation with orders issued vide reference (3) cited, APTRANSCO after careful consideration hereby accords approval for allocation of 165 Electrical Engineering posts as follows.

i) Allocation of 3 Nos. DE(Elecl.) posts :- The posts shall be designated and kept under the control of the following Offices.

Sl. No.

Name of the post Be kept under the control of

(a) DE/MRT/ 400KVL&SS, Mamidipally

SE/400KVL&SS (O&M), Mamidipally to look after the existing 2 Nos. MRT Subdivisions of the Circle.

(b) DE/MRT/TLC, Visakhapatnam

SE/TLC/ Visakhapatnam to look after the existing 2 Nos. MRT Subdivisions connected with TLC works.

(c) DE(Tech &MPP) to CGM(HRD&Trg)

CGM(HRD& Training) for utilization as DE(Technical) as well as to look after Man Power Planning (MPP) Cell. Accordingly, the DE post diverted for utilization as DE/Tech to CGM(HRD&Trg) vide reference (2) cited shall be restored to Disciplinary Cases wing. Further, the MPP Cell hitherto under Additional Secretary be kept under the control of CGM(HRD&Trg).

(ii) Allocation of ADE(Elecl.), AE/AAE(Elecl.) and Sub-Engineer(Elecl.) posts:-

(a) The posts now created and the existing posts in EHV Substations shall be deployed/ reallocated among the Substations as per the following staff pattern recommended by Technical Committee.

Shift Maintenance Total Sl. No.

Substation ADE AE/

AAE Sub-Eng.

ADE AE/ AAE

Sub-Eng.

ADE AE/ AAE

Sub-Eng.

1 400 KVSS 4 4 4 1 1 1 5 5 5 Pattern I 4 4 1 1 5 1 4

2 220 KVSS Pattern II 4 1 1 1 5 Pattern I 4 1 5

3 132 KVSS Pattern II 1 1

---Contd.

-2-

(b) Accordingly, the details of posts Substation wise are indicated vide Annexure. Jist of the posts Zone wise is as follows.

Sl.

No. Zone ADE

(Elecl.) AE/AAE

(Elecl.) Sub-Engineer

(Elecl.) Total

1 CE/TL&SS/ VSP 20 4 5 29 2 CE/TL&SS/ VJA 11 4 16 31 3 CE/TL&SS/ KDP 17 6 12 35 4 CE/TL&SS/ Hyd 27 4 13 44 5 CE/TL&SS/ WGL 17 6 23 Total 92 24 46 162

3. Copy of this order is available on internet and can be accessed at address www.aptransco.gov.in

Encl: Annexure

SUTIRTHA BHATTACHARYA CHAIRMAN AND MANAGING DIRECTOR

To The CEs/TL&SS, Visakhapatnam, Vijayawada, Kadapa, Hyderabad & Warangal The CGM(HRD&Trg), APTRANSCO, Vidyutsoudha, Hyderabad.

Copy communicated to:- The Special Chief Secretary to Govt., Energy Dept., Govt., of AP, AP Secretariat, Hyderabad.

Copy to the:- All Functional Heads//All Sections CGM(HRD& Training) --- With a request to take further necessary action. PS to JMD(HRD, Comml,IPC &IT) DE/Tech to Director(Transmission) DE/Tech to Director(Grid Operations) DE/Tech to Director(Projects &Coordination) PS to JMD(Vigilance & Security) PS to Director (Finance & Revenue) PS to Chairman &Managing Director Peshi of Officer-on-Special Duty Pay Officer//AO(CPR)//Dy.CCA(Audit)//RAO(EBCA) CE/RAC, Reforms&IT --- With a request to place the T.O.O in APTRANSCO website. CRS//Stock File//Spare. C.No.Addl.Secy/ADE(MPP)/A1/967/2005

//FORWARDED :: BY ORDER//

ASST. DIVISIONAL ENGINEER

------------------------------------------------------------------------------------------------------------ Energy saved is Energy produced

Electricity saved is Electricity produced

Annexure to T.O.O.(Per-Addl.Secy.) Ms.No.9, dt,06.04.2009 Existing Posts Additional /

Redeployment of Posts

Total Posts Sl. No.

SS KV Name of the Sub Station

ADE AE Sub-Eng.

ADE AE Sub-Eng.

ADE AE Sub-Eng.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)= (4)+(7)

(11)= (5)+(8)

(12)= (6)+(9)

A CE / TL& SS / VISAKHAPATNAM

1 400 KV Vemagiri 5 5 5 5 5 5 2 220 KV Tekkali 5 1 4 5 1 4 3 220 KV Garividi 4 1 4 1 5 1 4 4 220 KV Gazuwaka 5 1 3 1 5 1 4 5 220 KV Vizag Steel Plant Sw.St. 4 1 4 1 5 1 4 6 220 KV Gangavaram port 1 5 1 5 7 220 KV Parawada 5 1 4 5 1 4 8 220 KV Brandix(Achutapuram)(Vizag 1 5 1 5 9 220 KV Kakinada 4 1 5 1 (-) 1 5 1 4 10 220 KV Rampochodavaram 1 1 4 1 5 11 220 KV Peddapuram (Samaralakota) 4 6 3 1 (-) 5 1 5 1 4 12 220 KV Bhimadole 4 2 4 1 (-) 1 5 1 4 13 220 KV Nidadavolu 1 1 4 4 5 1 4 14 220 KV Bhimavaram(Undi) 1 5 1 5 15 220 KV Kamavarapukota 1 5 1 5

16 220 KV Vemagiri 5 (-) 5 17 HVDC Mothugudem 14 4 1 (-) 7 (-) 2 1 7 2 18 132 KV Chilakapalem (Srikakulam) 4 1 5 19 132 KV Ichapuram 3 (-) 2 1 20 132 KV T.B. Vara 4 1 5 21 132 KV Vijayanagaram (Vantitadi) 3 2 5 22 132 KV Tekkali 5 (-) 5 23 132 KV Simhachalam 5 3 (-) 3 5

24 132 KV Naval Warf 2 (-) 1 1 25 132 KV Peddapuram 4 3 1 (-) 3 5 26 132 KV Ramachandra Puram 1 1 (-) 1 1 27 132 KV Kamavarapu Kota 1 1 28 132 KV Bhimavaram 4 1 5 29 132 KV Kovvuru 3 2 5 30 132 KV Pedavegi 1 1 31 132 KV Nidadavolu 3 (-) 2 1 32 132 KV Kakinada 3 (-) 3 SUB-TOTAL/ VSP 36 83 38 20 4 5 56 87 43 B CE / TL& SS / VIJAYAWADA 1 220 KV Gudiwada 5 1 4 5 1 4 2 220 KV Nunna Sw Stn. 4 2 4 1 (-) 1 5 1 4 3 220 KV Chillakallu 4 1 1 4 5 1 4 4 220 KV Guntur (Tadikonda) 4 1 4 1 5 1 4 5 220 KV Tallapally 5 1 4 5 1 4 6 220 KV Rentachintal 5 1 4 5 1 4 7 220 KV Ongole 5 4 1 5 1 4 8 220 KV Markapur 2 5 3 (-) 4 4 5 1 4 9 132 KV Nandigama 1 1 10 132 KV Nujiveedu 2 (-) 1 1 11 133 KV Bhavanipuram 1 (-) 1 12 132 KV Repalle 2 (-) 1 1 13 132 KV Macharla 2 (-) 1 1 14 132 KV Piduguralla 2 (-) 1 1 15 132 KV Marripalem 1 1 16 132 KV Nallapadu 1 1 17 132 KV Ongole 5 4 (-) 4 5 18 132 KV Kanigiri 3 2 5 19 132 KV Inkollu Sw Stn. 1 1 20 132 KV Martur 1 1 21 132 KV Dornala 1 1 22 132 KV Kavali 2 3 5 23 132 KV Chendodu 3 2 5 24 132 KV Venkatagiri 2 (-) 1 1 SUB-TOTAL/ VJA 29 35 16 11 4 16 40 39 32

Page 1 of 4

Annexure to T.O.O.(Per-Addl.Secy.) Ms.No.9, dt,06.04.2009 Existing Posts Additional /

Redeployment of Posts

Total Posts Sl. No.

SS KV Name of the Sub Station

ADE AE Sub-Eng.

ADE AE Sub-Eng.

ADE AE Sub-Eng.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)= (4)+(7)

(11)= (5)+(8)

(12)= (6)+(9)

C CE / TL& SS /KADAPA 1 400 KV Narnoor (O&M) 5 5 5 5 5 5

2 220 KV Kadapa 4 2 4 1 (-) 1 5 1 4

3 220 KV C.K.Palli 5 4 1 5 1 4

4 220 KV Rajampeta 2 1 4 3 5 1 4

5 220 KV Kodur 1 5 1 5

6 220 KV Mydukur 1 1 4 4 5 1 4

7 220 KV Yerraguntla 5 2 4 (-) 1 5 1 4

8 220 KV Kalikiri 5 2 4 (-) 1 5 1 4

9 220 KV Anantapur 5 1 4 5 1 4

10 220 KV Hindupur 4 1 4 1 5 1 4

11 220 KV Gooty (R.S) 4 1 4 1 5 1 4

12 220 KV Gooty (S.S) 4 1 4 1 5 1 4

13 220 KV Ramagiri 1 5 1 5

14 220 KV Kalyanadurg 1 5 1 5

15 220 KV Tadiparti 5 5 (-) 4 4 5 1 4

16 220 KV Nandyal 5 1 4 5 1 4

17 220 KV Kurnool (AP Carbides) 5 4 1 5 1 4

18 220 KV Somayajulapalli 4 1 1 4 5 1 4

19 132 KV Badvel 3 (-) 2 1

20 132 KV Rayachoti 4 1 5

21 132 KV Moolavanka 1 1

22 132 KV Proddutur 4 1 5

23 132 KV Pulivendula 3 (-) 2 1

24 132 KV Kondapuram 1 1

25 132 KV Nagalapuram 1 1

26 132 KV Tirupati 1 5 (-) 1 5

27 132 KV Palamaneru 2 (-) 1 1

28 132 KV Dharmavaram 5 4 (-) 4 5

29 132 KV Uravakonda 1 1

30 132 KV Puttaparty 3 (-) 2 1

31 132 KV Kalyanadurg 5 (-) 5

32 132 KV Kurnool 5 1 (-) 1 5

33 132 KV Banaganapalli 1 1

34 132 KV Atmakur 3 (-) 2 1

35 132 KV Dhone 4 1 5

36 132 KV Nandikotkoor 1 1

37 132 KV Adhoni 1 4 (-) 4 1

SUB-TOTAL/ KDP 61 70 49 17 6 12 78 76 61

Page 2 of 4

Annexure to T.O.O.(Per-Addl.Secy.) Ms.No.9, dt,06.04.2009 Existing Posts Additional /

Redeployment of Posts

Total Posts Sl. No.

SS KV Name of the Sub Station

ADE AE Sub-Eng.

ADE AE Sub-Eng.

ADE AE Sub-Eng.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)= (4)+(7)

(11)= (5)+(8)

(12)= (6)+(9)

D CE / TL& SS /HYDERABAD 1 400 KV Gajwel 5 5 5 5 5 5

2 220 KV Ghanapur 4 1 4 1 5 1 4

3 220 KV Malkaram 5 2 (-) 1 4 5 1 4

4 220 KV Medchal 4 2 1 (-) 1 4 5 1 4

5 220 KV Shapurnagar 4 1 4 1 5 1 4

6 220 KV Langarhouze (Gachibowli) 4 1 4 1 5 1 4

7 220 KV Tandur 5 1 4 5 1 4

8 220 KV Dindi 1 3 2 1 5

9 220 KV Shadnagar 1 1 4 1 5

10 220 KV Yeddumailaram 5 5 4 (-) 4 5 1 4

11 220 KV Minpur 1 5 4 (-) 4 4 5 1 4

12 220 KV Siddipet 1 1 4 4 5 1 4

13 220 KV Narkatpally 5 4 5 (-) 4 5 1 4

14 220 KV Bhongiri 5 1 3 1 5 1 4

15 220 KV Miryalguda 4 1 4 1 5 1 4

16 220 KV Chalakurthy 5 1 1 5

17 220 KV K.M pally 1 2 4 3 (-) 4 1 5

18 220 KV Sivarampally 4 1 1 4 5 1 4

19 220 KV Shamshabad 5 1 4 5 1 4

20 220 KV HIAL(Hyd. International Airport)

3 5 3 5

21 132 KV Gunrock 4 1 5

22 132 KV Chilakalaguda (GIS) 2 (-) 1 1

23 132 KV Erragadda 1 5 4 (-) 1 (-) 4 5

24 132 KV R.C.Puram 5 4 (-) 4 5

25 132 KV Tandur 1 (-) 1

26 132 KV Wanaparthy 4 4 1 (-) 4 5

27 132 KV Mahaboobnagar 5 4 (-) 4 5

28 132 KV Kalwakurthy 4 1 5

29 132 KV Kandi 2 3 5

30 132 KV Gummadidala 2 (-) 1 1

31 132 KV Ramayampeta 1 1

32 132 KV Aleru (Kolanupaka) 4 1 5

33 132 KV Bibinagar 5 1 (-) 1 5

34 132 KV K.Mally Pally 1 1

35 132 KV Vepalasingaram 1 1

36 132 KV Sithapuram (SS) 1 1

37 132 KV Imlibun 1 5 (-) 1 5

38 132 KV Shamshabad 5 (-) 5

SUB-TOTAL/ HYD 55 96 48 27 4 13 82 100 61

Page 3 of 4

Annexure to T.O.O.(Per-Addl.Secy.) Ms.No.9, dt,06.04.2009 Existing Posts Additional /

Redeployment of Posts

Total Posts Sl. No.

SS KV Name of the Sub Station

ADE AE Sub-Eng.

ADE AE Sub-Eng.

ADE AE Sub-Eng.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)= (4)+(7)

(11)= (5)+(8)

(12)= (6)+(9)

E CE / TL& SS /WARANGAL 1 400 KV Dichpally 5 5 5 5 5 5

2 220 KV Warangal 4 1 4 1 1 5 1 5

3 220 KV Waddekotha Pally 5 4 1 (-) 4 1 5

4 220 KV Pulakurthy LIS 1 1 4 1 5

5 220 KV Bheemghanpur LIS 1 5 1 5

6 220 KV Gangaram LIS 1 5 1 5

7 220 KV Manuguru 4 1 4 1 5 1 4

8 220 KV Ramagundam 5 4 1 5 1 4

9 220 KV Bheemgal 1 1 4 1 5

10 220 KV Kamareddy 5 1 4 5 1 4

11 220 KV Nirmal 5 5 (-) 4 4 5 1 4

12 132 KV Raghunathapalli 5 (-) 4 1

13 132 KV Nekkonda 2 (-) 1 1

14 132 KV Mustyal 5 (-) 4 1

15 132 KV Kamalapuram 3 (-) 2 1

16 132 KV Waddepally / Madikonda 5 (-) 4 1

17 132 KV Mulugu 1 1

18 132 KV Dharmasagar(LIS) 1 1

19 132 KV Narsampet 1 1

20 132 KV Jangaon 1 1

21 132 KV Kataram 1 1

22 132 KV Ramagundam 5 4 (-) 4 5

23 132 KV Karimnagar 4 1 5

24 132 KV Husnabad 2 (-) 1 1

25 132 KV Sircilla 5 (-) 4 1

26 132 KV Jagityal 2 (-) 1 1

27 132 KV Nizamabad 4 2 1 (-) 2 5

28 132 KV Kamareddy 4 1 5

29 132 KV Pochampad 4 4 1 (-) 4 5

30 132 KV Renjal 5 (-) 4 1

31 132 KV Banaswada 1 1

32 132 KV Sirikonda 1 1

33 132 KV Bhagepally (LIS) 1 1

34 132 KV Kosli (LIS) 1 1

35 132 KV Janakampeta (LIS) 1 1

36 132 KV Dhormora (LIS) 1 1

37 132 KV Ch. Kondur (LIS) 1 1

38 132 KV Adilabad 3 (-) 2 1

39 132 KV Ichoda 1 1

SUB-TOTAL/ WGL 18 77 26 17 6 35 83 26

GRAND TOTAL : 199 361 177 92 24 46 291 385 223

SUTIRTHA BHATTACHARYA

CHAIRMAN & MANAGING DIRECTOR

//FORWARDED:: BY ORDER//

ASST. DIVISIONAL ENGINEER