andhra pradesh industrial infrastructure corporation pradesh industrial infrastructure corporation...

26
Andhra Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR Consultancy Services for Techno Economical Feasibility Report for Providing of Rail connectivity to the Industrial lands near Orvakallu, Kurnool(Dist.) in the state of Andhra Pradesh. AUGUST 2015 Andhra Pradesh Industrial Infrastructure Corporation (APIIC) (A Government of Andhr Pradesh Undertaking) No. 5/9/58/B, 4th Floor, Fateh Maidan Road,Basheerbagh, Hyderabad 500004

Upload: trinhdan

Post on 23-Apr-2018

230 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

 

Andhra Pradesh Industrial Infrastructure Corporation 

(A Govt. of  Andhra  Pradesh Undertaking) 

 

 

 

 

 

 

 

INVITES 

REQUEST FOR PROPOSALS 

FOR 

 

 

Consultancy Services for Techno Economical Feasibility 

Report for Providing of Rail connectivity to the Industrial lands 

near Orvakallu, Kurnool(Dist.) in the state of Andhra Pradesh. 

 

 

 

 

AUGUST ‐ 2015 

 

 

Andhra Pradesh Industrial Infrastructure Corporation (APIIC) 

(A Government of Andhr Pradesh Undertaking) 

No. 5/9/58/B, 4th Floor, Fateh Maidan Road,Basheerbagh, Hyderabad ‐ 500004  

Page 2: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 2  

 

 

I N D E X 

 

1.  SECTION 1: BACKGROUND & INFORMATION TO CONSULTANTS.............................................01 

 

2.  SECTION 2 : DATA SHEET ....................................................................................................06 

 

3.  SECTION 3 : TERMS OF REFERENCE .....................................................................................07 

 

4.  SECTION 4 : FORMATS ........................................................................................................11 

 

5.  SECTION 5 : FORM OF CONTRACT .......................................................................................12 

 

6.  GENERAL CONDITIONS OF CONTRACT (GC)..........................................................................13 

Page 3: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 1  

SECTION 1: BACKGROUND & INFORMATION TO CONSULTANTS 

 

1. BACKGROUND: 

 

• Andhra Pradesh  Industrial  Infrastructure Corporation (APIIC), here  in after called as client, has 

mandate of developing  Industrial Parks across Andhra Pradesh. Till date APIIC has Developed 

around 300 Industrial Parks spread over an extent of 121655 Acres in the combined state. 

 

• APIIC is Developing Industrial Hub near Orvakal, Kurnool District. In addition to this, APIIC is also 

Identified  land  beyond Orvakal Mandal  for  development  of  New  Industrial  Estates.  APIIC  is 

developing  required  physical  Infrastructure  in  the  industrial  parks  through  its  own  sources/ 

Support from Government of AP (GoAP) / Government of India (GoI) in view of the demand for 

land  for setting up of  industries. APIIC  is now proposing to provide a Rail Connectivity  to  this 

Industrial area. 

 

• For preparation of Feasibility Report for Development of Rail connectivity to the Industrial park 

near  Kurnool  in  the  state  of  Andhra  Pradesh,  APIIC  is  keen  to  appoint  an  Experienced 

Consultant  empanelled with Railways  and having  requisite  experience  in  carrying out  similar 

assignment. 

 

• Consultants are  invited  to  submit proposal  for Consultancy Services  for  Feasibility Report  for 

Development  of Rail  connectivity  to  the  Industrial  park  near  Kurnool  in  the  state of Andhra 

Pradesh. 

 

• The assignment shall be implemented in accordance with the phasing indicated in the Terms of 

Reference.  The  performance  of  the  contract  under  each  phase  must  be  to  the  client�s 

satisfaction before the work begins on the next phase.  

 

• The   Consultants   must    familiarize    themselves   with    local    conditions   and  take  them  into 

account  in preparing  their Proposals. Any additional  information or clarifications  required  for 

preparing the bid can be sought from client as specified in the Data Sheet.  

 

• The Client will provide the inputs specified in the RFP, assist the consultant in obtaining licenses 

and permits required to carry out the project assignment. 

 

• The  costs  of  preparing  the  proposal  and  of  negotiating  the  contract, including visits to the 

Site or Client’s office, are not reimbursable separately. 

Page 4: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 2  

 

2.   CLARIFICATION AND AMENDMENT TO RFP DOCUMENTS 

 

• Consultants  may  request  a  clarification  on  the  RFP  document  up  to  the  number  of  days 

indicated  in  the  Data  Sheet.  Any  request  for  clarification  must  be  sent  in  writing  by 

Email/FAX/POST  to  the  address  indicated  in  the Data  Sheet.  The Client will  respond  to  such 

requests and will  issue a consolidated clarification  (including an explanation of the query, but 

without identifying the source of inquiry) which shall be intimate all applicants by E‐mails. The 

Consultants  are  advised  to  go  through  such  clarifications  if  any  prior  to  submitting  the 

proposals. 

• At any time before the submission of Proposals, the Client may, for any reason, whether at its 

own  initiative  or  in  response  to  a  clarification  requested  by  an  invited  consulting  firm, may 

modify the RFP documents by amendment. The amendment, if any, shall be issued through an 

addendum which shall be communicated by E‐mail. The Consultants are advised to go through 

such clarifications before submitting the proposals.  

 

• The Client may, at its discretion extend the deadline for the submission of Proposals. The Client 

also  reserves  the  rights, without  any obligation or  liability,  to accept or  reject  any or  all  the 

Proposals at any stage of the process, to cancel or modify the process or any part thereof or to 

vary the terms and conditions at any time without assigning any reason thereof.  

 

3.0 MINIMUM ELIGIBILITY CRITERIA  

 

• By  the bid  submission date,  the Bidders  should be empanelled with Railways as a  registered 

firm for undertaking such assignments. 

• The  Bidders  should  be  a  single  Business  Entity  (A  Business  Entity  shall  mean  a  sole 

proprietorship  firm/  registered  partnership  firm  /  a  company  registered  in  India  under  the 

Companies  Act.)  having  undertaken  and  completed  Detailed  survey  &  having  adequate 

experience on preparation of Feasibility reports for railways on similar works. 

• The  firm  should have  singly completed Detailed Survey work  for at  least one  similar Railway 

project  having  length  of  35  Kms  in  the  last  3  (Three)  years.  Experience  for  the  purpose  of 

assessment for minimum eligibility of a bidder as a member of consortia, for any project/work 

shall not be considered. 

• The Bidder should have an average annual turnover of at  least Rupees Twenty (20) crores per 

year in last three financial years from Consultancy Services. 

Page 5: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 3  

• Consortium / joint venture shall not be eligible and such proposals shall be summarily rejected. 

• Any entity, which has earlier been barred by the APIIC, Government of AP (GoAP), or any other 

State government in India (SG) or Government of India (GoI), or any of the agencies of GoO /SG 

/ GoI from participating  in  its projects and the bar subsists as on the Proposal Due Date, shall 

not be eligible to submit a Proposal. 

 

4.0  PREPARATION, SUBMISSION, RECEIPT AND OPENING OF PROPOSALS 

 

• Consultants  are  requested  to  submit  the  proposal  as  single  packet  system  with  financial 

proposals  in a  sealed  cover  in one envelope with  in packet. The proposal  shall be written  in 

English language.  

• The original Proposal  shall be prepared  in  indelible  ink.  It  shall  contain no  inter‐  lineation or 

overwriting, except as necessary to correct errors made by the firm itself. Any such corrections 

must be initialled by the person or persons who sign(s) the Proposals.   

• The  envelope  shall  bear  the  Name  &  address  of  the  Firm,  submission  address  and  other 

information indicated in the Data Sheet and clearly marked,  

“Proposal for Consultancy Services for Techno Economical Feasibility Report for Development 

of  Rail  connectivity  to  the  Industrial  park  near  Orvakallu,  Kurnool  (Dist.)  in  the  state  of 

Andhra Pradesh.” 

• The completed Proposal must be delivered at the submission address on or before the time and 

date stated in the Data Sheet. No proposal shall be received by the Client after the closing time.  

• VALIDITY OF PROPOSAL: The proposal must be valid for the number of days stated in the Data 

Sheet  from  the  last  day  of  submission  during which  the  Bidder must maintain  available  the 

professional staff proposed for the assignment. The Client will make its best effort to complete 

negotiations at the location stated in the Data Sheet within this period. 

• The proposal  should be  submitted  in hard bound  form with page numbering and  index. Any 

additional  information  shall also be  furnished by  the bidder  in hard bound  form with proper 

indexing and page numbering. 

• The Financial Proposal cover of bidders shall be opened by  the Evaluation Committee on  the 

specified date and time in presence of bidders those who chose to remain present.   

• The following documents are required to be submitted along with the Technical Bid. 

◦ Certificate  issued by Competent Authorities of Railways  stating  the  empanelment of  the 

Applicant for undertaking Feasibility / DPR for Railway projects. 

Page 6: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 4  

◦ Copies  of  the  Experience/completion/  substantial  completion  certificate  issued  by  the 

competent authority in support of the qualifying parameters, for the similar work executed 

during the last  five financial years. 

◦ Attested  copy  of  the  Audited  Balance  Sheet/  Profit  and  loss  account  duly  certified  by 

Chattered  Accountant  with  his membership  number  clearly  specified  in  support  of  the 

qualifying parameter of minimum Annual Financial year (2011‐12, 2012‐13, 2013‐14). 

◦ Attested copy of PAN CARD. 

◦ Attested copy of Service tax registration. 

• The successful bidder will be  required  to produce Original copies of  the above documents on 

request  of  APIIC  for  verification. Offers  of  the  Consultants who  fail  to  produce  the  original 

documents for our verification on the specified date and time are liable for rejection. 

• Conditional Proposals shall be summarily rejected. 

• The Consultants at their own cost may visit  location and  familiarize  themselves regarding  the 

scope of work and site conditions before quoting the offer. 

• Negotiations  will  not  be  conducted  with  the  bidders  as  a  matter  of  routine;  however 

corporation reserves the right to conduct negotiations. 

• The decision of APIIC  to accept or  reject any offer of a party shall be  final.  In  this  regard, no 

correspondence shall be entertained by APIIC. 

• In  the  event  of  the  Corporation�s  office  remaining  closed  on  the  scheduled  dates  for  any 

unforeseen reason, the offer shall be received up to 15.00 hrs on the next working day of the 

Corporation. 

• Cost  of  preparation  and  submission  of  Bids  :  The  Consultant  shall  prepare  the  offer  at  his/ 

its/their own risk and shall bear all time cost of preparing and submitting his/its/their offers, as 

well as all other cost for the work and OWNER shall take no liability for these cost. 

• Each consultant can submit only one bid. 

 

5.0  Evaluation Of Financial Proposals And Negotiations 

 

• The  Bidder with  the  Lowest  Financial Quotation  shall  be  identified  as  the  Preferred 

Consultant. 

• The decision of APIIC as  regards  to acceptance/rejection of eligibility  for parties who 

apply shall be final and binding. 

Page 7: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 5  

• Notwithstanding the above, APIIC reserves the right to accept or reject any or all bids or 

to annul the bidding process. 

• The event of acceptance of the Proposal of the Preferred Bidder without negotiations, 

APIIC shall declare the Preferred Bidder as the Successful Bidder. APIIC will notify the Successful 

Bidder  through  a  Letter of Award  (LoA)  indicating  the  award of  the project  to  the Preferred 

Consultant. 

• The Successful Bidder(s) shall execute the Consultancy Agreement within one week of 

the issue of LoA or within such further time as APIIC may agree to in its sole discretion.  

• Failure of the Successful Bidder to execute the agreement within specified period shall 

constitute sufficient grounds for the annulment of the LoA and Block listing of consultants. 

 

6.0  AWARD OF CONTRACT 

• The contract will be awarded following the negotiations, if needed. 

• Upon award of  the  contract,  the  Successful Bidder  shall deposit 5% of  the Contract 

price  as  performance  security before  signing  the  agreement.  The  Performance  security  shall 

remain valid up to 45 days beyond the stipulated completion period. In case Time extension is 

granted by APIIC, the Successful Bidder shall extend the period of validity of the performance 

security for equivalent extension period. Amount of Performance security  in shape of demand 

draft payable at Hyderabad  or in shape of a Bank Guarantee in the prescribed format from any 

Nationalized Bank in favour of “Andhra Pradesh Industrial Infrastructure Corporation”. 

• The  firm  is expected to commence the Assignment on the date specified  in the Data 

Sheet. 

 

7.0  CONFIDENTIALITY 

• Information  relating  to  evaluation  of  proposals  and  recommendations  concerning 

awards  shall  not  be  disclosed  to  the  Consultants who  submitted  the  proposals  or  to  other 

persons not officially concerned with  the process, until  the winning consulting  firm has been 

notified that it has been awarded the contract.  

 

 

 

 

 

 

Page 8: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 6  

SECTION 2 : DATA SHEET 

 

Sl. No. 

Subject  Details 

1  Assignment & method of selection  

Consultancy Services for Techno Economical Feasibility Report 

for Development of Rail connectivity to the Industrial park near 

Orvakallu, Kurnool(Dist.) in the state of Andhra Pradesh. 

  Client  Andhra Pradesh Industrial Infrastructure Corporation (APIIC) 

(A Government of Andhr Pradesh Undertaking) 

No. 5/9/58/B, 4th Floor, Fateh Maidan Road,  

Basheerbagh, Hyderabad‐500004 

 

Official web site: www.APIIC.in 

Contact Person: Dy. General Manager (Engg) 

mail id : [email protected] 

  Last Date of seeking clarification on RFP 

   20/08/2015

  Amendment if any      Shall be intimated to all empanelled consultants through email. 

  Proposal due date (Bid submission date) 

    24/08/2015 up to 17.00 Hours 

  Validity of proposal      90 days from last date of receipt of proposal 

  Date and Time of opening of bid 

     25/08/2015 at 3.00 P.M      

  Commencement  of 

services 

The firm is expected to commence the Assignment on 15th  day 

from furnishing the Performance security and signing of the 

Contract 

  Duration of contract  6 (Six) weeks from the date of signing agreement. 

 

 

 

 

 

 

 

 

 

 

Page 9: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 7  

SECTION 3 : TERMS OF REFERENCE 

1. PREAMBLE 

Andhra Pradesh  is one of  the most progressive  forward‐looking  and  advanced  States  in  the  country when it comes to infrastructure development and employment generation effort. APIIC Ltd, fully owned by  the GoAP,  is a progressive organization  responsible  for development of  Industrial  Infrastructure  in the state of Andhra Pradesh. APIIC  is known for creating  landmark  infrastructure projects  in the state, which are fueling the economic growth in the state.  

APIIC Ltd has  identified  lands  in Komarolu and Somayajulapally villages of Orvakal(M), Kurnool District for establishment of Integrated steel plants which requires Railway siding facilitating the transportation of raw and finished products.  

APIIC Ltd  is therefore seeking proposals for the preparation of Techno Economic Feasibility Report for green  field  Railway  siding  to  the  subject  lands  connecting  the  existing  Railway  line  near Panyam(Vijayawada – Nandyal – Guntakal line) on Eastern side and Dupadu (Guntakal – Hyderabad line) on North West direction. Key plan  indicating  the sites proposed  for establishment of steel plants and proposed railway line is enclosed herewith for reference. 

2.  OBJECTIVE : 

Broad  objective  of  this  assignment  is  to  prepare  Techno  Economical  Feasibility  Report  for implementation of  a Rail Corridor  connecting  the  Industrial  Parks with Vijayawada  – Nandyal  – GTK Railway Line and GTK – Hyderabad Railway Line. The consultant shall carry out preliminary engineering survey,  Detailed    survey,  Techno‐Economic  Feasibility  report  and  including  obtaining  Approval  from Railways and other statutory bodies concerned. 

3.  SCOPE OF SERVICES. 

• The Consultants has  to execute  the  following works as per  relevant Engineering Code of    Indian Railways under this Contract   

3.1  Stage – I (Reconnaissance Survey and Preliminary Assessment Report)  

• To Plan and Study the railway connectivity from the nearest serving station and access the techno  –  economic  feasibility  of  the  railway  connectivity  by  site  inspection  by  a multi‐disciplinary  team  comprising  members  from  the  associated  disciplines  of traffic/transportation, civil, signaling and electrical engineering.  

• Collection and Review of Policies of Indian Railways in terms of  Development of Rail Siding and associated activities  

• To Study and to mark out possible alignments to connect existing IR network and proposed industrial park on google and toposheets duly avoiding forest, wild life sanctuaries and eco‐sensitive areas for the following routes : 

▪ Vijayawada – Nandyal – Guntakal SC Railway line on Eastern side. 

▪ Guntakal – Hyderabad SC Railway line on North West direction. 

• To  conduct  foot  by  foot  reconnaissance  survey  along  all  the  proposed  alignments,  duly checking various geographical  features and to access modifications  if any on alignment as per site conditions.  

• To prepare conceptual plan for siding take off point and industrial park layout 

• Preparation of comparative statement including block estimated cost for earth work,  

Page 10: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 8  

 

bridges, track signaling, crossing/block stations and miscellaneous civil works etc., for all the 

alternative routes including handling facilities at industrial park.  

• To Discuss with client and finalize the selection of best alignment. 

• Based on the discussion, preparation of assessment report  for connectivity alignment and 

submit to APIIC 

3.2 Stage – II (Detailed Survey, Land Assessment and scheduling) 

• To examine existing  railway  facilities on Main  line  and  also at  serving Railway  station on 

South Central Railways and to suggest Up‐gradation of railway  facilities at serving Railway 

station (if any) for connecting proposed industrial park 

• Assess the volume of the projected traffic and work out the number of trains to be handled 

based on the data provided by APIIC Ltd. 

• Assess the necessary rail Infrastructure for loading, unloading and storage facilities required 

to handle the proposed traffic at the industrial park 

• To  design  Junction  arrangements  at  serving  Railway  station  to  handle  client’s  projected 

volume of inward and outward traffic expeditiously and economically. 

• To study the section for commercial / operational / mechanical requirements of Railways to 

assess the modifications / provisions to avoid future difficulties in detailed project study.  

• To  carry  out  detailed  route  survey  (with  DGPS  and  Total  station)  from  serving  Railway 

station to proposed industrial park site along the selected route and also to take levels en‐

route to assess terrain.  

• To take detailed longitudinal and transverse levels along the alignment with Auto level.  

• To fix bench marks at 500m intervals along the line to facilitate checks during construction work.  

• To fix permanent reference points along alignment. 

• Assess the requirement of  flyovers / Road Over/ Under Bridges, cross drainage works and Level Crossings, if any. 

• To  assess  the  grades  over  the  proposed  alignment  and  to  work  out  the  approximate 

estimated quantities.  

• Block  Cost  Estimate  for  the  development  of  Railway  facilities  including  Civil  Works 

(Permanent Way, Bridges and Level Crossings etc.) Signalling & Telecommunication Works 

for the selected alignment based on detailed survey. 

• To prepare and submit Feasibility report along with abstract cost estimates to APIIC as per 

the railway requirement bifurcating in to two packages. 

Page 11: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 9  

• The document should be in line with the railway engineering code.  

• Assessment of Row required for Rail Corridor – in finalized alignment. 

• Preparation of Land Acquisition Plan  showing extent of  land  required  for development of 

planned  facilities  superimposed  on  village  maps,  Revenue  survey  numbers.  The  land 

acquisition  plan  shall  include  the  details  of  type  of  land  (agriculture,  forest, 

Government/alienated etc…) and  land  scheduling along  the preferred alignment with due 

verification by revenue authorities  

3.3 Stage – III (In‐principle approval) 

• To  discuss  with  Railway  authorities  on  proposed  connectivity,  proposed  Up‐

gradation/modifications at serving Railway station and proposed Industrial park layout with 

facilities and to ascertain their opinion. 

• To  submit  Feasibility  report  along with  abstract  cost  estimates  as  per  standard  railway 

norms for In principle approval to Railway authorities  

• Attend the meetings, provide responses to clarifications as and when required. 

• To  interact  and  to  obtain  ‘In  Principle’  approval  of  Railways  and  other  authorities 

concerned. 

4.  COMPLETION PERIOD: 

• Time for completion of Scope of work mentioned at Para 3.1 shall be 6 weeks from LOA. 

• Time for completion of Scope of work mentioned at Para 3.2 shall be 12 weeks NTP for Detailed 

survey.  

• Time for completion of Scope of work mentioned at Para 3.3 shall be 6 weeks NTP for Railway 

Submission.  

5.  REPORTING REQUIREMENTS 

5.1  The Consultant shall submit the following reports  in five copies (hard) and one computer diskette/ CD 

(soft copy) in the manner stated below: 

Sl. No. 

Deliverables Time frame 

1.  Pre‐feasibility report with comparative statement for alternative routes vide scope of works  mentioned in Para 3.1 

6 weeks 

2.  Feasibility report for selected route on completion of Detailed survey  vide scope of works  mentioned in Para 3.2 

12 weeks 

3.  Obtaining In‐Principle Approval of Feasibility report from Railways vide scope of works  mentioned in Para 3.3 (This stage shall be done only after intimation/clearance from the client) 

6 weeks 

 

Page 12: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 10  

6.  PAYMENT SCHEDULE 

 

6.1.  Stage – I (Reconnaissance Survey and Preliminary Assessment Report) 20% of agreed fee 

Sl. No. 

Description  % of payment 

1  On completion of reconnaissance survey and submission of Draft report to APIIC 

60% 

2  On submission of Pre‐feasibility/Inception report to APIIC  40% 

 

6.2  Stage – II (Detailed Survey, Land Assessment and scheduling) 60% of agreed fee 

 

Sl. No. 

Description  % of payment 

1  On Mobilisation of survey teams to site  10% 2  On  completion of detailed survey field activities and 

submitting of alignment and profile drawings in Auto CAD. 30%

3  On submission of land schedules 20%4  On submission of draft Feasibility report to APIIC for 

comments 20% 

5  On submission final Report  20%  

6.3 Stage – III (In‐principle approval) 20% of agreed fee 

 

Sl. No. 

Description  % of payment 

1.  On submission of In‐priniciple approval application for the Railways 

20%

2.  On obtaining In‐priniciple approval from Railways and other statutory authorities concerned 

80%

 

7.  PERFORMANCE SECURITY 

 

Upon award of the contract, the Consultants shall deposit 5% of the Agreement value of the project as 

performance security. The performance security shall remain valid up to 45 days beyond the stipulated 

completion period.  In  case Time extension  is granted by APIIC,  the Bidder  shall extend  the period of 

validity of the performance security  for equivalent extension period. Amount of Performance security 

shall  be  in  shape  of  demand  draft  payable  at  Hyderabad  or  in  shape  of  a  Bank  Guarantee  in  the 

prescribed  format  from any Nationalized Bank  in  favour of  “Andhra Pradesh  Industrial  Infrastructure 

Corporation” The Bank Guarantee(s) shall be released after satisfactory completion of the assignment. 

 

 

Page 13: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 11  

 

SECTION 4 : FORMATS 

 

FINANCIAL PROPOSAL 

 

Name  of  work  :  Consultancy  Services  for  Preparation  of  Feasibility  Report  for  providing  Rail 

connectivity. 

Description   Amount Quoted (Rs.) Total  consultancy  fee  for all  the  services  to be  rendered  in 

connection with the subject work Lump sum amount 

Rs: ……..……………………………………… 

(Rupees …………………………………….. 

…………………………………..…….. Only) 

 

NOTE:  1) Fee quoted above is a lump sum inclusive of all incidental charges involved in the specified   

                     assignment but exclusive of applicable Service Tax. 

  2) Financial bid/proposal shall be placed in the separate cover, sealed and then attach to the  

                    Technical credentials, packet. 

 

Page 14: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 12  

FORM OF CONTRACT

Name of the Work: Consultancy Services for Techno Economical Feasibility Report for Providing of Rail connectivity to the Industrial lands near Orvakallu, Kurnool(Dist.) in the state of Andhra Pradesh. 

 

This Agreement  is made on the ________ day of ______________  ‘ 2015 between APIIC, Hyderabad , 

Andhra  Pradesh,  herein  after  called  “  the  Employer”  of  the  one  part  and  _________________ 

Hyderabad  herein after called “the Consultant” of the other part. 

 

Page 15: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 13  

 

GENERAL CONDITIONS OF CONTRACT (GC) 

 

 

1.  General Provisions 

 

1.1  Definitions 

 

  Unless  the  context  otherwise  requires,  the  following  terms whenever  used  in  this  contract 

have the following meanings: 

 

(a)  “Applicable Law” means  the  laws and any other  instruments having the  force of  law  in  India, as they 

may be issued and in force from time to time; 

 

(b)  “Contract” means the Contract signed by the parties, to which these general conditions of contract (GC) 

are attached, together with all the documents listed in Clause 1 of such signed Contract; 

 

(c)  “Contract Price” means the price to be paid for the performance of the Services, in accordance with the 

clause 6; 

 

(d)  “GC” means the General Conditions of the Contract; 

 

(e)  “Government” means the Government of India or Government of Andhra Pradesh 

 

(f)  “Local currency” means the currency of the Government (Rupees); 

 

(g)  “Member”,  in case  the Consultants consist of a  joint venture of more  than one entity, means any of 

these  entities,  and  “Members” means  all  of  these  entities  “Member  in  charge” means  the  entity 

specified in the SC to act on their behalf in exercising all the Consultants� rights and obligations towards 

the Client under this Contract; 

 

(h)  “Party” means the Clients or the Consultants, as in case may be, and Parties means both of them; 

 

(i)  “Personnel” means persons hired by the Bidder or by any Sub‐Bidder as employees and assigned to the 

performance of the Services or any part thereof; 

Page 16: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 14  

(j)  “SC” means the Special Conditions of the Contract by which these General Conditions may be amended 

or supplemented; 

 

(k)  “Services” means the work to be performed by the Consultants pursuant to this contract as described in 

TOR; and 

 

(l)  “Consultants� means a registered Bidder firm with its office at  Hyderabad 

 

(m)  “Sub‐Consultants” means any entity  to which  the Consultants subcontract any part of  the Services  in 

accordance with the provisions of Clauses 3.5 and 4. 

 

(n)  “Third Party” means any person or entity other than the Government, the Client, the Consultants or a 

Sub‐Bidder. 

 

 

(o)  “Effective Date” means the date on which this contract comes  into force and effective  in pursuant to 

Clause G.C. 2.1 

 

1.2  Relation between the Parties 

Nothing  contained  herein  shall  be  construed  as  establishing  a  relation  of master  and  servant  or  of 

principal  and  agent  as  between  the  Client  and  the  Consultants.  The  Consultants,  subject  to  this 

Contract, have complete charge of Personnel and Sub ‐Consultants, if any, performing the Services and 

shall be fully responsible for the Services performed by them or on their behalf. 

 

1.3  Law Governing the Contract 

This Contract,  its meaning and  the  relation between  the Parties  shall be governed by  the Applicable 

Law. 

 

1.4  Language 

This  contract  has  been  executed  in  the  language  specified  in  the  SC,  which  shall  be  binding  and 

controlling language for all matters relating to the meaning or interpretation of this contract. 

 

1.5  Headings 

 

The headings shall not limit, alter or affect the meaning of this Contract. 

Page 17: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 15  

 

1.6  Notices 

 

(1).  Any notice, request or consent required or permitted to be given or 

  made pursuant to this Contract shall be in writing. Any such notice, 

  request or consent shall be deemed to have been given or made when 

  delivered in person to an Authorised Representative of the Party to

  whom  the  communication  is  addressed  or  when  sent  by  registered 

  mail/courier, telex, telegram or facsimile to such Party at the address 

  specified in the SC. 

(2).  Notice will deem to be effective as specified in the SC. 

(3).  A Party may change its address for notice hereunder by giving the other 

  Party notice of such change pursuant to the provisions listed in the SC 

  with respect to Clause GC 1.6 (2). 

 

2.  Commencement, Completion, Modification and Termination of Contract 

 

2.1  Effectiveness of Contract 

This Contract shall come into force and effect on the date (“Effective Date”) of the Client�s notice to the 

Consultants instructing the Consultants to begin carrying out the Services. This notice shall confirm that 

the effectiveness conditions, if any, listed in the SC have been met. 

 

2.2  Termination of Contract for Failure to become Effective 

If this Contract fails to become effective within such time period after the date of the Contract signed by 

the Parties as shall be specified  in  the SC, either Party may, by not  less  than 4  (four) weeks� written 

notice  to  the  other  Party,  declare  this  Contract  to  be  null  and  void,  and  in  the  event  of  such  a 

declaration by either Party, neither Party shall have any claim against other Party with respect hereto. 

 

2.3  Expiration of the Contract 

Unless terminated earlier pursuant to clause 2.7 hereof, this contract shall expire when Services have 

been completed and all payments have been made at the end of such time period after the Effective 

Date as specified in SC. 

 

 

Page 18: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 16  

2.4  Modification 

Modification of the terms and conditions of this contract, including any modification of the scope of the 

Services or of the Contract Price, may only be made by written agreement between the Parties. 

 

2.5  Force Majeure 

 

2.5.1 Definition 

 

(a)  For  the purpose of  this  contract,  “Force Majeure” means  an event, which  is beyond  the  reasonable 

control of a Party and which makes a Party�s performance of its obligations hereunder impossible or so 

impractical as to be considered impossible in the circumstances, and includes, but is not limited to, war, 

riots,  civil  disorder,  earthquake,  fire,  explosion,  storm,  flood  or  other  adverse  weather  conditions, 

strikes, lockouts or other industrial action (except where such strikes, lockouts or other industrial action 

are within the power of the Party invoking Force Majeure to prevent), confiscation or any other action 

by government agencies. 

(b)  Force Majeure shall not include (i) any event which is caused by the negligence or intentional action of a 

Party or such Party�s Sub‐Consultants or agents or employees, nor (ii) any event which a diligent Party 

could reasonably have been expected to both (a) take into account at the time of the conclusion of this 

Contract and (b) avoid or overcome in carrying out of its obligations hereunder. 

 

(c)  Force  Majeure  shall  not  include  insufficiency  of  funds  or  failure  to  make  any  payment  required 

hereunder. 

 

2.5.2 No Breach of Contract 

The failure of a party to fulfill any of it�s obligations under the contract shall not be considered to be a 

breach  of,  or  default  under  this  contract  in  so  far  as  such  inability  arises  from  an  event  of  Force 

Majeure, provided that the party affected by such an event has taken all reasonable precautions, due 

care  and  reasonable  alternative  measures,  all  with  the  objective  of  carrying  out  the  terms  and 

conditions of this contract. 

 

2.5.3 Measures to be Taken 

 

(a)  A  Party  affected  by  an  event  of  Force Majeure  shall  take  all  reasonable measures  to  remove  such 

Party�s inability to fulfil its obligations hereunder with a minimum delay. 

 

(b)  A Party affected by an event of Force Majeure shall notify the other Party of such an event as soon as 

Page 19: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 17  

possible, and  in any event not  later  than  fourteen  (14) days  following  the occurrence of  such event, 

providing  evidence  of  the  nature  and  cause  of  such  event,  and  shall  similarly  give  notice  of  the 

restoration of normal conditions as soon as possible. 

 

(c)  The Parties  shall  take  all  reasonable measures  to minimise  the  consequences of  any  event of  Force 

Majeure. 

 

2.5.4  Extension of Time 

Any period, within which a party shall, pursuant to this Contract, complete any action or task shall be 

extended for a period equal to the time during which such Party was unable to perform such action as a 

result of Force Majeure. 

 

2.5.5  Payments 

During the period of their inability to perform the Services as a result of an event of Force Majeure, the 

Consultants shall be entitled to continue to be paid under the terms of this contract, as well as to be 

reimbursed for additional costs reasonably incurred by them during such period for the purposes of the 

Services and reactivating the Services after the end of such period. 

 

2.5.6  Consultations 

Not  later than thirty (30) days after the Consultants, as the result of an event of Force Majeure, have 

become unable to perform a material portion of the Services, the Parties shall consult with each other 

with a view to agreeing an appropriate measures to be taken in the circumstances. 

 

2.6  Suspension 

The  Client may,  by  written  notice  of  suspension  to  the  Consultants,  suspend  all  payments  to  the 

Consultants hereunder  if  the Consultants  fail  to perform any of  their obligations under  this Contract, 

including the carrying out of the Services, provided that such notice of suspension (i) shall specify the 

nature of the failure, and (ii) shall request the Consultants to remedy such  failure within a period not 

exceeding thirty (30) days after receipt by the Consultants of such notice of suspension. 

 

2.7  Termination 

 

2.7.1  By the Client 

 

The  Client may,  by  not  less  than  thirty  (30)  days� written  notice  of  termination  to  the  Consultants 

(except  in the event  listed  in paragraph [f] below, for which there shall be a written notice of not  less 

Page 20: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 18  

than  sixty  (60) days),  such notice  to be  given  after  the occurrence of  any of  the  events  specified  in 

paragraphs (a) through (e) of this Clause GC 2.7.1, terminate the Contract: 

 

(a)  if  the  Consultants  do  not  remedy  a  failure  in  the  performance  of  their  obligations  hereunder,  as 

specified  in a notice of suspension pursuant to Clause GC 2.7 hereinabove, within thirty  (30) days� of 

receipt of such notice of suspension or within such further period as the Client may have subsequently 

approved in writing; 

 

(b)  if the Consultants become (or,  if Consultants consist of more than one entity,  if any of their Members 

becomes)  insolvent or bankrupt or enter  into any agreements with their creditors for relief of debt or 

take  advantage  of  any  law  for  benefit  of  debtors  or  go  into  liquidation  or  receivership  whether 

compulsory or voluntary; 

 

(c)  if the Consultants submit to the Client a statement which has a material effect on the rights, obligations 

or interests of the Client and which the Consultants know to be false; 

 

(d)  if,  as  the  result  of  Force Majeure,  the  Consultants  are  unable  to  perform  a material  portion  of  the 

Services for a period of not less than sixty (60) days; 

 

(e)  if the Client, in its sole discretion and for any reason whatsoever, decides to terminate this Contract; or, 

 

2.7.2  By the Consultants 

The Consultants may, by not  less than thirty (30) days� written notice to the Client, such notice to be 

given after  the occurrence of any of  the events  specified  in paragraphs  (a) and  (d) of  this Clause GC 

2.7.2, terminate this Contract: 

 

(a)  if the Client fails to pay any money due to the Consultants pursuant to this Contract and not subject to 

dispute  pursuant  to  Clause  8  hereof within  thirty  (30)  days  after  receiving written  notice  from  the 

Consultants that such payment is overdue; 

 

(b)  if the Client is in material breach of  its obligations pursuant to this Contract and has not remedied the 

same within thirty (30) days (or such longer period as the Consultants may have subsequently approved 

in writing) following the receipt by the 

 

  Client of the Consultants notice specifying such breach; 

Page 21: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 19  

(c)  if, as the result of Force Majeure, the Bidder are unable to perform a material portion of the Services for 

a period of not less than sixty (60) days; or, 

(d)  The client shall neither divert the work(in part or in full) for execution by himself or by other agency nor 

shall  interfere  with  contract  administration  of  Consultants  under  relevant  contract.  In  such  events 

clients shall be liable for payment of suitable compensation to Consultants. 

 

(e)  if the Client fails to comply with any final decision reached pursuant to Clause 8 of GC. 

 

2.7.3  Cessation of Services 

Under  termination  of  this  Contract  by  notice  of  either  Party  to  the  other,  the  Consultants  shall 

immediately upon dispatch or receipt of such notice, take all necessary steps to bring the Services to a 

close  in a prompt and orderly manner and shall make every reasonable effort to keep expenditure for 

this purpose  to a minimum. With  respect  to documents prepared by  the Consultants and equipment 

and materials furnished by the Client, the Consultants proceed as provided, respectively. 

 

2.7.4  Payments upon Termination 

Upon  termination of  this Contract,  the Client  shall make  the  following payments  to  the Consultants 

(after  offsetting  against  these  payments  any  amount  that may  be  due  from  the  Consultants  to  the 

Client): 

 

(a)  reimbursable  expenditures  hereof  for  expenditures  actually  incurred  prior  to  the  effective  date  of 

termination; and, 

 

3.  Obligations of the Consultants 

 

3.1  General 

 

3.1.1  Standards of Performance 

 

The  Consultants  shall  perform  the  Services  and  carry  out  their  obligations  hereunder  with  all  due 

diligence, efficiency and economy,  in accordance with generally accepted professional techniques and 

practices,  and  shall  observe  sound  management  practices,  and  employ  appropriate  advanced 

technology and safe methods. The Consultants shall always act, in respect of any matter relating to this 

Contract or Services, as faithful advisers to the Client, and shall at all times support and safeguard the 

Clients� legitimate interests in any dealings with Sub‐Consultants or Third Parties. 

 

Page 22: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 20  

3.1.2  Law Governing Services 

 

The Consultants  shall perform  the  Services  in  accordance with  the Applicable  Law  and  shall  take  all 

practical steps to ensure that any Sub‐Consultants, as well as the Personnel of the Consultants and any 

Sub‐Consultants  in writing of  relevant  local  customs  and  the Consultants  in writing of  relevant  local 

customs and the Consultants shall, after such notifications, respect such customs. 

 

3.2  Confidentiality 

 

The Consultants, their Sub‐Consultants, and the personnel of either of them shall not, either during the 

term  or  within  two  (2)  years  after  the  expiration  of  this  Contract,  disclose  any  proprietary  or 

confidential  information relating to the Project, the Services, this Contract, or the Client�s business or 

operations without the prior written consent of the Client. 

 

3.3  Reporting Obligations 

 

The Consultants shall submit to the Client the reports and documents specified form,  in the numbers, 

and within the periods set forth in the TOR. 

 

3.4  Performance Security 

 

The  Consultants  shall  be  required  to  deposit  5% of  the  contract  price  as  performance  security.  The 

performance security shall remain valid up to 45 days beyond the stipulated completion period .In case 

time extension  is granted by APIIC,  the Bidder shall extend  the period of validity of  the performance 

security for equivalent extension period . Amount of performance security shall be in shape of demand 

draft  payable  at  Hyderabad  or  in  shape  of  a  Bank  Guarantee  in  the  prescribed  format  from  any 

Nationalised Bank in favour of “Andhra Pradesh Industrial Infrastructure Corporation”. 

 

4.  Obligations of the Client 

 

4.1  Assistance and Exemptions 

Unless otherwise specified in the SC, the Client shall use its best efforts to ensure that the Government 

shall: 

 

(a)  provide the documents as shall be necessary, to enable Consultants, Sub‐Consultants and Personnel to 

perform the Services; 

Page 23: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 21  

 

(b)  issue  to  officials,  agents  and  representatives  of  the  Government  all  such  instructions  as  may  be 

necessary or appropriate for the prompt and effective implementation of Services by the Consultants. 

 

(c)  provide the Consultants, Sub‐Consultants and Personnel any such other assistance and exemptions as 

specified in the SC. 

 

4.2  Access to Land 

 

The Client warrants that the Bidder shall have free of charge unimpeded access to all land in respect of 

which  access  is  required  for  the performance of  the  Services.  The Client will be  responsible  for  any 

damage  to  such  land  or  any  property  thereon  resulting  from  such  access  and  will  indemnify  the 

Consultants and each of the personnel in respect of liability for any such damage unless such damage is 

caused by the default or negligence of the Consultants/any Sub‐Consultants or the Personnel of either 

of them. 

 

4.3  Change in the Applicable Law 

 

The Consultants shall not be entitled to be compensated except  in the case of the Service Tax should 

there  be  any  change  in  the  Applicable  Law with  respect  to  taxes  and  duties  after  the  date  of  this 

Contract. 

 

The Consultants shall be entitled to be paid the Service Tax as per the Applicable Law. 

 

5.  Payments to the Consultants 

 

5.1  Currency of Payment 

 

The payments for the Services for this Contract shall be payable in Indian Rupees. 

 

6.  Settlement of Disputes 

 

6.1  Amicable Settlement 

 

The parties shall use their best efforts to settle amicably all the disputes arising out of or in connection 

with this Contract or its interpretation in Court of Law. 

Page 24: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 22  

 

7.0   Liquidated Damages for delay in execution:  

 

  Consultant shall be  liable to pay Liquidated damages for delay, but not by way of penalty, for 

the period of delay @ 0.5% per week of Consultation Fee subject to a maximum of 5 % of total 

FEE. The same shall be deducted from running bills of Consultant. 

 

LD shall be leviable only for delay attributable to consultant or its associates and not for delays 

attributable to APIIC. 

 

For the purpose of LD, APIIC shall not be required to prove actual loss or damage. 

 

Any  correspondence or minutes of meeting  and/or  acceptance of delayed work  shall not be 

construed as waiving of LD or granting extension for completion period.  

 

8.0    Completion Certificate:  

Certificate for Completion of milestone activity or for any  intermediate progress will be  issued 

by APIIC. when the works are completed  fully or  intermediate milestones are achieved to the 

satisfaction of APIIC. 

 

9.0  Tax deduction at Source: 

 

• While making payments, income tax at prescribed rates, shall be deducted from the bills of the 

Consultant. Amount so deducted shall be deposited with Income Tax Department.  

 

• Other  recoveries  at  source,  as  per  the  statutory  requirement,  shall  also  be made  from  the 

Consultant’s bills  at prescribed  rates  from  time  to  time  and deposited with  concerned Govt. 

Department. 

 

10.0  Indemnification: 

 

Consultant shall indemnify APIIC against any loss or damage whatsoever, that may be suffered 

by  the  company  (APIIC) or Railways, National Highway   or State Highway Department or any 

other  agency    third parties,  as  a  result of  any  lapse or  failure or non‐compliance  to Rules  / 

regulations / safety norms on their (Consultants’ Part).  

 

Page 25: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 23  

11     Settlement of disputes, Arbitration and Jurisdiction: 

 

11.1   Settlement of Disputes: 

Any dispute or differences, including those considered as such by only one of the parties arising 

out  of  this  or  in  connection with  the  contract,  during  execution  of  this  contract or  after  its 

completion, shall be to the extent possible settled  amicably between the parties. 

 

11.2   Arbitration:  

The arbitration clause No. 73 as provided in the P.S. to APSS shall not apply to this contract. The 

Civil Courts of Hyderabad / Secunderabad only shall have jurisdiction to entertain the disputes 

arising out of this contract by way of civil suits. 

 

11.3 Governing Laws and Jurisdiction:  

The award shall be governed by Indian   laws and Rules amended from time to time and shall be 

subject to exclusive jurisdiction of Competent Court at Hyderabad. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 26: Andhra Pradesh Industrial Infrastructure Corporation Pradesh Industrial Infrastructure Corporation (A Govt. of Andhra Pradesh Undertaking) INVITES REQUEST FOR PROPOSALS FOR

Page : 24