transition of care reference implementation & pilots kick-off may 31, 2011

10
Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Upload: claude-griffin

Post on 04-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Transition of Care Reference Implementation & Pilots

Kick-Off

May 31, 2011

Page 2: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Agenda

• Purpose• Review of Architecture• Workgroup Administration• Timeline• Next Steps

Page 3: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Purpose

– Develop tools which create and validate ToC Information Packets.

• (1) a programmatically accessible Reference Library for the Clinical Information Model (CIM)

• (2) a tool which will utilize the reference library to validate and transform ToC data from a source format to a desired ToC Information Packet output.

– Perform Demonstrations and Pilots of the tools developed with participating organizations

Note: Transportation of ToC Information Packets between HIE’s or other entities is out of scope for this effort.

Lewis, Meredith
I would make both bullets "mission statements." Example: Improve the exchange of core clinical information among providers, patients and other authorized entities electronically in support of meaningful use and IOM-identified needs for improvement in the quality of care.
Page 4: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

High Level Architecture

Page 5: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Workgroup Administration

• Workgroup Meeting Time• Committed Member Registration

– Join S&I Framework Wikispaces Site– Register as committed member– Join ToC RI Work Group– Join Google Group “S&I ToC Reference Implementation”– Join Open Health Tools (OHT) code repository

• Consensus Process for Document Approval

Page 6: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Volunteer Opportunities

• Programming• Analysis & Design• Specific tool knowledge• Domain expertise

– Clinical Information Model– Vocabularies– CDA

• Test data and test cases• Validation of results• User-acceptance / Demo or Pilot

Page 7: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Timeline

5/31-RI WG Kick Off• Purpose• Review of

Architecture• Workgroup Admin• Timeline

6/7-WG Mtg 2• Clarify architecture• Code contribution

process• Communication

channels• Draft detailed design

6/14-WG Mtg 3• Confirm detailed design• Available tools discussion• Coding task definition• Coding task selection

Page 8: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Topics for next meeting

• Clarify questions on architecture• Determine code contribution process• Communication channels and collaboration• Present draft detailed design

Page 9: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

Homework

• Sign up for Wiki and Work Group– Indicate where you can help out

• Review Architecture• Environmental scanning of available tools

– HL7 v3, CDA/CCD; C32; CCR – Validation, transformation

• Post feedback on Discussion tab

Page 10: Transition of Care Reference Implementation & Pilots Kick-Off May 31, 2011

VIRTUAL ROUND – QUESTIONS, COMMENTS, CONCERNS?