Slide 1PETROVIETNAM ENGINEERING J.S.C
PETROVIETNAM ENGINEERING CORPORATION
PETROVIETNAM ENGINEERING J.S.C
PREPARE BY: TRAN DUY NAM – HSE ENGINEER
PHAM LE GIANG – HSE ENGINEER
COMPANY: PV ENGINEERING - DEC
PETROVIETNAM ENGINEERING J.S.C
CONTENT OF SPECIFICATION
INTRODUCTION OF PROJECT
PURPOSE OF SPECIFICATION
SCOPE OF SUPPLY
SPARE PARTS
PETROVIETNAM ENGINEERING J.S.C
Include overall information of project (Location, man or unman, how many wells?, connection with other platform?).
Follow form of each project.
I. INTRODUCTION OF PROJECT
PETROVIETNAM ENGINEERING J.S.C
Defines the minimum requirements for the supply, design, materials, fabrication, inspection, testing, painting and preparation for shipment, documentation and VENDOR assistance of Fire Fighting & Safety Equipment.
The equipment shall be complete, tested, pre-commissioned and commissioned in accordance with requirements in enquiry document, taking due account of preservation and transport requirements.
II. PURPOSE OF SPECIFICATION
PETROVIETNAM ENGINEERING J.S.C
III. CODES & STANDARDS APPLY IN SPECIFICATION
The general order of precedence for the documents / standards shall be as listed below:
Mandatory Local Laws and Regulations
This specification
PETROVIETNAM ENGINEERING J.S.C
Code & Standard No
ANSI Z308.1
BS EN10204
IMO
ISO 9001
ISO 17398
NFPA
Vietnam Standards : Fixed Offshore Platforms – Part 2: Fire Protection, Detection and Extinction
CAP 437
ICAO
BS 5378
PETROVIETNAM ENGINEERING J.S.C
IV. SCOPE OF SUPPLY
List the name of all equipment which will be supplied in project
Vendor’s Responsibilities
Example
Ensuring that goods and services supplied meet all applicable regulation on health, safety and environmental requirements
Compliance with this specification and the referenced codes, standards
VENDOR shall be responsible to ensure smooth operation of the project after award.
PETROVIETNAM ENGINEERING CONSULTANCY JOINT STOCK CORPORATION
PETROVIETNAM ENGINEERING J.S.C
V. SPECIFICATION REQUIREMENT
PETROVIETNAM ENGINEERING CONSULTANCY JOINT STOCK CORPORATION
PETROVIETNAM ENGINEERING J.S.C
Prior to shipment, VENDOR shall carry out the required Factory Acceptance Tests (FAT) in the presence of COMPANY/CONTRACTOR engineers or their appointed representatives.
Any unsatisfactory material, equipment, installation, or workmanship shall be replaced or repaired to COMPANY/CONTRACTOR’s satisfaction at VENDOR's cost.
VENDOR shall inform COMPANY/CONTRACTOR as part of the bid, if any of the specified tests cannot be performed. In the absence of such a statement, it shall be understood that all requirements of this specification are fulfilled without exception.
Any manufactured part which does not comply with the Specification or which shows defects during inspection will be rejected and shall be notified in writing.
VI. INSPECTION, TESTING AND CERTIFICATION REQUIREMENT
PETROVIETNAM ENGINEERING CONSULTANCY JOINT STOCK CORPORATION
PETROVIETNAM ENGINEERING J.S.C
VENDOR must supply the spares required for pre-commissioning, commissioning and start-up. A list of spares considered for each package shall be submitted to COMPANY/CONTRACTOR for review
A recommended spare parts list for two (2) years of operation shall also be submitted for CONTRACTOR’s review and purchase separately.
All items supplied shall be packaged separately and clearly marked as ‘Spare Parts’ and shipped with the equipment.
VII. SPARE PARTS
PETROVIETNAM ENGINEERING J.S.C
The surface preparation, coating and painting shall be as per specification
As a minimum, all main items shall be provided with a permanently mounted stainless steel plate.
Name Plates, Tagging and Warning Labels shall be mounted by means of mechanical fastener such as rivet. Means of fastening such as glue etc. are not acceptable.
VIII. PAINTING AND TAGGING
PETROVIETNAM ENGINEERING J.S.C
VENDOR shall guarantee all equipment furnished to be in compliance with this specification and drawings.
VENDOR and his Sub-VENDOR shall operate a quality system satisfying the latest ISO 9001 Quality Standards, or agreed equivalent standard, commensurate with the goods and services provided.
VENDOR shall demonstrate evidence of Quality Assurance in all aspects of VENDOR’s current design and manufacturing practices. Quality Control procedures covering all aspects of design, manufacturing, inspection and test relevant to the equipment shall be included.
IX. GUARANTEE & QUALITY ASSURANCE
PETROVIETNAM ENGINEERING J.S.C
Vendor shall provide manufacturer data book containing all the certificates/reports and Vendor Data Book (VDB) containing the final approved unit and data sheets, installation details, dimensional drawings, technical catalogues, performance criteria, commissioning manual, operations and maintenance manuals etc.
Compilation of the manufacturer data book and the Vendor Data Book shall be as specified in the project requirements.
X. DOCUMENTATION