tp14112-runway incursion ppt

24
Briefing on Runway Incursions October 11, 2001

Upload: kirti-beniwal

Post on 06-Mar-2015

61 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TP14112-Runway Incursion PPT

Briefing on Runway Incursions

October 11, 2001

Page 2: TP14112-Runway Incursion PPT

2

Outline

• Background

• Methodology

• Findings

– Trends

– High risk airports

– Contributing Factors

• Recommendations

• Specific Initiatives

• Incursion Prevention Action Team (IPAT)

Page 3: TP14112-Runway Incursion PPT

3

Background

• 1999 – TC and NC noted an increase in runway incursions;

• TC commissioned study to identify causal factors and make recommendations; and

• NC commissioned parallel study at sites with ATS facilities.

Page 4: TP14112-Runway Incursion PPT

4

Methodology

• Risk Assessment and Safety Studies Branch of SPSC

• Refine definition of Runway Incursion

• Participated in NC-organized stakeholder meetings at sites across Canada

• RI occurrence data extracted from NC, TC and TSB sources and analyzed using “Weighted Aggregate Risk” formula

• Literature search

• Participated on “expert panel” – preventive strategies

Page 5: TP14112-Runway Incursion PPT

5

Definition

Any occurrence at an aerodrome involving the unauthorized or unplanned presence of:

• Aircraft;

• Vehicle; or

• Person

on the protected area of a surface designated for aircraft landings or departures”.

Page 6: TP14112-Runway Incursion PPT

6

Findings

0

50

100

150

200

250

300

350

400

450

1993 1994 1995 1996 1997 1998 1999 2000 2001

Year

Re

po

rte

d I

ncu

rsio

ns

Page 7: TP14112-Runway Incursion PPT

7

Findings (cont’d)

0

50

100

150

200

250

300

350

400

1997 1998 1999 2000

An

nu

al In

curs

ion

s

-

1,000

2,000

3,000

4,000

5,000

6,000

Incursions Movements (,000)

Page 8: TP14112-Runway Incursion PPT

8

High Risk Airports

• Calgary

• Boundary Bay

• Edmonton City Centre

• Montreal - Dorval

• Toronto LBPIA, Buttonville and Winnipeg

• Hamilton

• Kitchener

• Quebec City

• Ottawa and Edmonton Intn’l

Page 9: TP14112-Runway Incursion PPT

9

Conclusions

• Study team unable to find any single factor or combination of factors that have changed so radically as to account for such an increase in incursions since 1996

Page 10: TP14112-Runway Incursion PPT

10

Contributing Factors

• Traffic Volume

• Capacity-enhancing Procedures

• Airport Layouts

• Complexity

• Human Factors

Page 11: TP14112-Runway Incursion PPT

11

Traffic Volume v RI Potential

0

5

10

15

20

25

30

1 2 3 4 5

Number of Aircraft

Nu

mb

er

of

Scen

ari

os

Page 12: TP14112-Runway Incursion PPT

12

Capacity-enhancing Proceduresv RI Potential

Single Runway

2 Parallel Runways

2 Runway SIRO

0

10

20

30

40

50

60

70

80

1 2 3 4 5

Number of Aircraft

Nu

mb

er o

f S

cen

ario

s

Page 13: TP14112-Runway Incursion PPT

13

Airport Layouts

• Inconsistent standards

• Ground movement safety systems

• Standard Taxi routes and improved access to airport diagrams

Page 14: TP14112-Runway Incursion PPT

14

Complexity

• Combined influence of traffic volume, capacity-enhancing procedures, airport layouts is greater than the sum of its constituent parts

• Second order effects – reduced visibility, unfamiliarity, momentary distraction – could produce final link leading to an accident

Page 15: TP14112-Runway Incursion PPT

15

Human Factors

16%

34%

50%

OI PD VPD

Page 16: TP14112-Runway Incursion PPT

16

Recommendations

• 23 Recommendations– Regulatory initiatives– Further evaluation and research– Awareness and education

Page 17: TP14112-Runway Incursion PPT

17

Regulatory initiatives

• Aerodrome signage, lighting and marking

• Procedures for access and control of vehicles at airports

• Visibility of hold lines

• Land and Hold Short Operations (LAHSO)

• Training standards for pilots of air operators

Page 18: TP14112-Runway Incursion PPT

18

Further evaluation and research

• Better monitoring;

• Enhanced collection/analysis of incursion data;

• Investigate all incursions; and• Develop preventive measures based on

analysis.

Page 19: TP14112-Runway Incursion PPT

19

Calgary International and Edmonton City Centre Airports

• Team set up in June 2001 to study incursion risk and assess the adequacy of current and future preventative measures.

Page 20: TP14112-Runway Incursion PPT

20

Calgary International Airport

• New airport diagrams published in the Canada Air Pilot;

• Signage for one-way taxiways were improved; and

• A study of taxiways is in progress under the Development and Construction Plan of the airport.

Page 21: TP14112-Runway Incursion PPT

21

Edmonton City Centre Airport

• Guard lights and new, high visibility signs installed in Spring 2001;

• Fence erected around a building identified as source of pedestrian incursions;

• Apron reconfiguration and reconstruction to limit aircraft incursion on the east side of the airport is now complete;

• Review of maintenance vehicle operations on the airport was carried out resulting in an amendment to AOM;

• Designated field working areas established identifying the precise work areas to NAV CANADA and to the equipment operators; and

• Incursion awareness notices were posted at FBO.

Page 22: TP14112-Runway Incursion PPT

22

Awareness and Education

• Articles in aviation safety periodicals • Posters (in production);• Presentations at Regional Aviation Safety

Councils;• Other promotional items (e.g.: pamphlets,

video, etc.); and• An Aerodrome Safety Circular on runway

incursion initiatives will be released shortly.

Page 23: TP14112-Runway Incursion PPT

23

NAVCANADA Initiatives

• Amended procedures for controller/pilot/ground vehicle communications;

• Installation of Converging Runway Display Aid (CRDA) equipment at Calgary; and

• Installation of Airport surface Detection Equipment (ASDE) at airports such as Toronto.

Page 24: TP14112-Runway Incursion PPT

24

Incursion Prevention Action Team (IPAT)

• Formed in April 2001, IPAT mandate to oversee the implementation of recommendations from both TC and NC reports;

• Met 6 times so far; last meeting held on 26 September; and

• Annual report will be produced and submitted to NCAMX at end of fiscal year.