tozzi yard presentation
DESCRIPTION
Our Construction YardTRANSCRIPT
CONTENTS
1. YARD DESCRIPTION
2. FABRICATION ACTIVITIES
3. INSTALLATION ACTIVITIES
4. LOAD OUT
5. MAN HOUR
Tozzi Sud S.p.A.
1. YARD DESCRIPTION
Tozzi Sud S.p.A.
Tozzi Sud S.p.A. Yard is located in San Vitale Port, close to Ravenna (Italy).
Yard was founded in 2006, following the acquisition of order for the design and construction of modules used as Electrical Rooms (Local Equipment Room - LER), for the project:
"Agip KCO - KASHAGAN Experimental Development Program - Offshore Complex D ".
In 2009 new yard has been arranged, close to the existent yard, following the acquisition of order for the design and construction of Process modules and Temporary Refuge (Process and Utilities Building - PUB Italian SOW ), for the project: "Agip KCO - KASHAGAN Experimental Development Program - Offshore Complex D ".
Tozzi Sud S.p.A. YARD DESCRIPTION
Tozzi Sud S.p.A. YARD DESCRIPTION
Vista aerea
YARD AERIAL VIEW
SURFACE AREA: 55.000 sqm
Tozzi Sud S.p.A. YARD DESCRIPTION
Tozzi Sud S.p.A. YARD DESCRIPTION
YARD POSITION INSIDE
SAN VITALE PORT – RAVENNA
WORKSHOP LOCATED CLOSE TO YARD
(ABOUT 1.000 mt)
Tozzi Sud S.p.A. YARD DESCRIPTION
Tozzi Sud S.p.A. YARD DESCRIPTION
TYPICAL WORKSHOP USED FOR
FABRICATION OUTSIDE THE YARD
YARD FACILITIES
COVERED STORAGE AREA
INSIDE YARD
(300 sqm)
OFFICES
(1500 sqm)
COVERED STORAGE AREA
CLOSE TO YARD
(1.000 sqm)
Tozzi Sud S.p.A. YARD DESCRIPTION – YARD FACILITIES
2. FABRICATION ACTIVITIES
Tozzi Sud S.p.A.
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Local Equipment Room
Size (DxWxH meter) Weight (T)
LER HVAC LER HVAC
1 Drilling Island – Complex D 55,1 x15,2 x8,4 36,0 x 11,2 x10,4 1024 493
2 Island A - Complex A 36,2 x15,2 x10,4 / 801 /
3 PSA1 - Complex D 48,5 x15,2 x8,4 42,5 x 15,2 x 10,4 943 816
4 Riser Island - Complex D 48,5 x15,2 x8,4 24,5 x 15,2 x 10,4 922 471
5 PSA2 - Complex D 48,5 x15,2 x8,4 42,5 x15,2 x 10,4 942 771
6 PUA - Complex D 57,5 x15,2 x8,4 43,7 x 15,2 x 10,4 1090 900
7 LSA - Complex D 52,5 x15,2 x8,4 36,5 x15,2 x10,4 1000 657
8 Drilling Island East - Complex D 66,5 x15,2 4x8,4 48,5 x15,2 x10,4 1188 955
9 EDG - Complex D 43,5 x15,2 x10,4 48,5 x15,2 x10,4 0 1550 950
10 LSA IBEEV- Complex D 33,7 x16,2 x11,7 800
TOTAL 16.273 tons
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Process and Utilities Building Size (DxWxH meter) Weight (T)
1 PSA1 OIL EXPORT PUMP HOUSE - Complex D Composed by n° 2 buildings
21.6 x 25.2 x 9.5 652
2 PSA1 OIL BOOSTER PUMP HOUSE - Complex D 28 x 15 x 9.5 433
3 PUA COMPRESSOR BUILDING - Complex D Composed by n° 2 buildings
38 x 14.8 x 10.7 736
4 PUA CHEMICAL INJ. PUMP HOUSE - Complex D 13 x 45.3 x 5.9 515
5 PUA METHANOL INJ. PUMP HOUSE - Complex D 38 x 14.8 x 10.7 585
6 LSA WABAS - Complex D 46.7 x 9.2 x 13.8 561
7 PSA2 OIL EXPORT PUMP HOUSE - Complex D Composed by n° 2 buildings
21.6 x 25.2 x 9.5 724
8 PSA2 OIL BOOSTER PUMP HOUSE - Complex D 28 x 15 x 9.5 441
9 DI TEMPORARY REFUGE IBEEV CREW FACILITIES - Complex D 14.2 x 42 x 9.5 916
10 DI TEMPORARY REFUGE EQUIPMENT MODULE - Complex D 14.2 x 42 x 9.5 1177
TOTAL 6.740 tons
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
FABRICATION ACTIVITIES
Tozzi Sud S.p.A.
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
Tozzi Sud S.p.A. FABRICATION ACTIVITIES
3. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A.
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
INSTALLATION ACTIVITIES
Tozzi Sud S.p.A.
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
INSTALLATION ACTIVITIES
Tozzi Sud S.p.A.
4. LOAD OUT
Tozzi Sud S.p.A.
LOAD OUT
Tozzi Sud S.p.A.
Tozzi Sud S.p.A. LOAD OUT
Tozzi Sud S.p.A. LOAD OUT
Tozzi Sud S.p.A. LOAD OUT
Tozzi Sud S.p.A. LOAD OUT
Tozzi Sud S.p.A. LOAD OUT
Tozzi Sud S.p.A. LOAD OUT
Tozzi Sud S.p.A. INSTALLATION ACTIVITIES
5. MAN HOUR
Tozzi Sud S.p.A.
Tozzi Sud S.p.A. MAN HOUR
2006 – 2011
LER Project - Total Worked Hour
about 3.000.000
2006 – 2011
PUB Project - Total Worked Hour
about 2.450.000
Tozzi Sud S.p.A. MAN HOUR
TOTAL MANHOUR 2010
832.000 Hr
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
Jan -
2010
Fe
b -
2010
Mar
- 2010
Apr
- 2010
May -
2010
Jun -
2010
Jul -
2010
Aug -
2010
Oct -
2010
Nov -
2010
Dec -
2010
LER PROJECT - WORKED HOURS 2010
LER PROJECT - WORKED HOURS 2010
Tozzi Sud S.p.A. MAN HOUR
TOTAL MANHOUR 2011
200.000 Hr
0
5000
10000
15000
20000
25000
30000
35000
Jan -
2011
Feb -
2011
Mar
- 2011
Apr
- 2011
May -
2011
Jun -
2011
Jul -
2011
Aug -
2011
LER PROJECT - WORKED HOURS 2011
LER PROJECT - WORKED HOURS 2011
Tozzi Sud S.p.A. MAN HOUR
TOTAL MANHOUR 2010
1.165.000 Hr
0
20000
40000
60000
80000
100000
120000
140000
160000
Jan -
2010
Feb -
2010
Mar
- 2010
Apr
- 2010
May -
2010
Jun -
2010
Jul -
2010
Sep -
2010
Oct -
2010
Nov -
2010
Dec -
2010
PUB PROJECT - WORKED HOURS 2010
PUB PROJECT - WORKED HOURS 2010
Tozzi Sud S.p.A. MAN HOUR
TOTAL MANHOUR 2011
426.000 Hr
41000
42000
43000
44000
45000
46000
47000
48000
49000
50000
Jan -
2011
Feb -
2011
Mar
- 2011
Apr
- 2011
May -
2011
Jun -
2011
Jul -
2011
Sep -
2011
PUB PROJECT - WORKED HOURS 2011
PUB PROJECT - WORKED HOURS 2011