Town of Plainville Complete Streets Project Review Presentation Tuesday, January 21, 2020 - 6:30 PM Plainville Board of Selectmen Meeting 190 South Street Plainville, MA 02762

Upload: others

Post on 13-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

Town of Plainville Complete StreetsProject Review Presentation

Tuesday, January 21, 2020 - 6:30 PMPlainville Board of Selectmen Meeting190 South StreetPlainville, MA 02762

Page 2: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

MassDOT Complete Streets Funding Program

The program is divided into the following three tiers:

Tier 1 ▪ Attend a Complete Streets Training (Introductory or Advanced) ▪ Adopt a Complete Streets Policy

Tier 2 ▪ Complete a Five Year Prioritization Plan

Up to $50,000 in technical assistance funding is available to communities

Tier 3 ▪ Apply for Construction Funding for selected projects

Each community can apply for up to $400,000 in construction funding to implement the projects on their Prioritization Plan. A community may apply more than once provided that there isn’t a construction project underway.

“The Basics”

Plainville is here!

Page 3: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

Types of Projects

Pedestrian Improvements Bicycle Improvements

Transit Improvements

Page 4: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

Project MapWhere are the projects located?

55

FRAN

KLIN

WRENTHAM

NORTHATTLEBOROUGH

FOXB

ORO

UG

H

WAS

HING

TON

STRE

ET

EAST BACON STREET

TAUNTONSTREET

HIGH

STRE

ET

SOUTHSTREET

WEST BACON STREET

MESSENGER STREET

GEORGE STREET

WALNUT STREET

ALLE

NST

REET

GREENSTREET

SCHO

OL

STRE

ET

HAW

KINS

STRE

ET

152

106

1A

1A

495

95

495

1

1

Plainville Complete Streets - Potential Projects

Water

Town Boundaries

Roadways

Structures

Parcels

Data sources: MassGIS and MassDOT. This map isfor the sole purpose of aiding regional decisions

and is not warranted for any other use.

December 2019 0.5 Miles

Pedestrian Improvements

Bicycle Improvements

Bicycle & Pedestrian Improvements

Speed Radar Feedback Signage

Transit Shelter

Bicycle Racks

Schools5

Page 5: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

East Bacon Street (Phase I)Bicycle & Pedestrian Improvements

Project DescriptionReplace the existing sidewalk surface with a new 5 foot wide asphalt sidewalk on the right side of the road (South Street to Vernon Young Drive). Granite curbing is to stay in place and installed in areas where gaps exist. Install a new 5 foot wide asphalt sidewalk with asphalt curbing on the right side of the road (Vernon Young Drive to Washington Street). Add ADA/AAB compliant curb ramps with tactile warning panels and high visbility crosswalks at all intersecting streets. Add sharrows and bicycle signage (R4-11).

Project LimitsSouth Street to Washington Street

Total Length3,545 Feet

Project Number1

Estimated Cost$343,841

55

NORTHATTLEBOROUGH

WAS

HING

TON

STRE

ET

EAST BACON STREET

SCHOOL STREET

SOUTH STREET

WEST BACON STREET

Looking Eastbound Looking Westbound

Page 6: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

East Bacon and Messenger Street (Phase II)Bicycle & Pedestrian Improvements

Project DescriptionInstall 5 foot wide asphalt sidewalk where needed and replace the existing sidewalk surface with a new 5 foot wide asphalt sidewalk on the right side of the road as needed (Washington Street to Taunton Street). Granite curbing is to stay in place and installed in areas where gaps exist. Add ADA/AAB compliant curb ramps with tactile warning panels and high visibility crosswalks at all intersecting streets. Restripe roadway to provide 5 foot wide bicycle lanes with MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17).

Project LimitsWashington Street to Taunton Street

Total Length4,638 Feet

Project Number2

Estimated Cost$350,748

55

NORTHATTLEBOROUGH

MESSENGER STREET

WAS

HING

TON

STRE

ET

EAST BACON STREET

TAUNTO

NSTREET

GEORGE STREET

152

Looking Eastbound Looking Westbound

Page 7: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

Messenger Street School Crosswalk Improvements

Project DescriptionInstall two sets of Rectangular Rapid Flashing Beacons, one set at the crossing for the Jackson School School and one set at the crossing for the Wood School. Add ADA/AAB compliant curb ramps with tactile warning panels and high visibility crosswalks at each crossing.

Project LimitsSouth Street to Washington Street

Total LengthN/A

Project Number3

Estimated Cost$32,292

5

5

NORTHATTLEBOROUGH

TAUN

TON

STREET

MESSENGER STREET

EAST BACON

STREET

152

Looking Eastbound Looking Westbound

Page 8: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

Messenger Street & Taunton StreetIntersection Improvements

Project DescriptionInstall accessible pedestrian signals. Add ADA/AAB compliant curb ramps with tactile warning panels and high visibility crosswalks.

Project LimitsMessenger Street at Taunton Street

Total LengthN/A

Project Number4

Estimated Cost$25,944

5

5

NORTH

ATTLEBOROUGH

EAST BACON

STREET

MESSENGER STREET

TAUNTONSTREET

Looking Northbound Looking Southbound

Page 9: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

South StreetBicycle & Pedestrian Improvements

Project DescriptionReplace the existing sidewalk surface with a new 5 foot wide asphalt sidewalk with asphalt curbing on the left side of the road (Sharlene Dr. to 353 South St). Replace the existing sidewalk surface with a new 5 foot wide asphalt sidewalk on the left side of the road (353 South St. to Commerce Blvd). Replace the existing sidewalk surface with a new 5 foot wide asphalt sidewalk with asphalt curbing on the left side of the road (Commerce Blvd to 439 South St.). Install a new 5 foot wide asphalt sidewalk with asphalt curbing on the left side of the road (439 South St. to the Wrentham Line). Add ADA/AAB compliant curb ramps with tactile warning panels and high visibility crosswalks at all intersecting streets. Restripe roadway to provide 5 foot wide bicycle lanes with pavement markings and signage (R3-17).

Project LimitsSharlene Drive to Wrentham Town Line

Total Length5,822 Feet

Project Number5

Estimated Cost$585,191

WRENTHAM

SCHO

OL

STRE

ET

HIGH ST

REET

SOUTH

STREET

GREENSTREET

WALNUTSTREET

Looking Northbound Looking Westbound

Page 10: Town of Plainville Complete Streets Project Review Presentation · 2020-06-29 · MUTCD approved bicycle lane pavement markings and bicycle lane signage (R3-17). Project Limits Washington

Christopher YarworthDirector of Planning & [email protected] 508.695.3010 x494www.plainville.ma.us

Eric Arbeene, AICPPrincipal Comprehensive [email protected] ext. 318www.srpedd.org

Contacts

Questions?