Page 1: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

Town of Eastham – Integrated Approach to Nutrient Management Jane Crowley, RS MS | Town of Eastham Anastasia Rudenko, PE ENV SP | GHD Jessica Janney | GHD

Page 2: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Presentation outline

•  Community profile •  Planning effort history •  Human health need

–  Public water supply •  Environmental health needs

–  Coastal estuaries –  Freshwater Ponds

•  Next steps

Page 3: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Community profile

•  Seasonal community with 5,700 year-round residents – substantial increase in summer

•  All properties are currently served by private drinking water wells and on-site septic systems

•  Documented nutrient impacts to coastal waters and ponds

Page 4: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Planning effort history

Interim Needs Assessment Report and Alternatives Screening Analysis Report (March 2009)

Wastewater Management Planning Project Plan Evaluation Report

(June 2009)

Human health needs Environmental health needs

Public water supply Nauset-Town Cove Estuary – advanced

treatment

Rock Harbor Estuary re-classification and/or advanced treatment

Freshwater ponds treatment

2009 Planning Efforts

Page 5: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Planning effort history – evaluation findings

1.  Town-wide municipal drinking water system from a protected source is needed – under implementation

2.  Town-wide sewer system is not needed, but advanced wastewater treatment is needed for selected areas of Town – reevaluation based on updated MEP report and 208 Plan

3.  Pond water quality problems are best solved by in-pond treatment – implemented for Herring Pond and Great Pond

Page 6: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Planning effort history – evaluation findings

1.  Town-wide municipal drinking water system from a protected source is needed

2.  Town-wide sewer system is not needed, but advanced wastewater treatment is needed for selected areas of Town

3.  Pond water quality problems are best solved by in-pond treatment

Page 7: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Human Health Need

•  Public Water System •  $146,000,000 project

•  Funded completely through the tax base

•  Approved at Town meeting after several failed attempts

•  Currently the largest infrastructure project on the Cape

Page 8: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Eastham Municipal Water Project Voter History Town Approval Requires both: •  Funding Approval requires 2/3 majority support at Town Meeting •  Majority approval at Ballot May 2007 System Failed to gain 2/3 support October 2007 System Failed to gain 2/3 support May 2009 Construction and permit supply well

sites approved May 2012 System Failed to gain 2/3 support May 2013 System Failed to gain 2/3 support May 2013 Approved at Ballot June 2013 System Failed to gain 2/3 support May 2014 Approved Phase 1 - Partial System ($40.8M) May 2015 Approved Town Wide System ($85M)

Page 9: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Page 10: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Human health need – public water supply

Drinking water impacts •  On-Site Septic Systems •  Impact of the Town landfill •  Being addressed with the installation

of Town water system –  Water transmission system being

installed –  Initial phase of project underway,

properties will start being connected in Fall 2016

Page 11: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Eastham Landfill Source of Contamination to Private Wells

•  Closed Landfill approximately 10.4 acres directly across the street from single family homes

•  In operation 1937 to mid 1990’s •  Post Closure Groundwater monitoring as required by DEP lead to detection of

1,4 Dioxane that resulted in an Immediate Response Action Plan (IRA) first Detected November 2012

•  1.4 Dioxane is present in industrial sources and household products •  Fully miscible in ground water •  Infinitely soluble, moves in groundwater, not easily removed •  Investigation ongoing to define the extent of migration… involved EPA, DEP

and Boston University •  Likely to be carcinogenic •  About 40 households currently receiving bottled water •  More than 300 wells sampled

Page 12: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

1,4 Dioxane Detected

Page 13: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Planning effort history – evaluation findings

1.  Town-wide municipal drinking water system from a protected source is needed

2.  Town-wide sewer system is not needed, but advanced wastewater treatment is needed for selected areas of Town

3.  Pond water quality problems are best solved by in-pond treatment

Page 14: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Current planning efforts

•  Completed Interim Needs Assessment Report and Interim Alternatives Screening Analysis Report in 2009

•  New information since 2009: –  Refined watershed delineations –  New Massachusetts Estuaries Project (MEP) reports with estimated

removal %’s –  Cape Cod Commission 208 Plan Update

•  Wastewater management planning –  Update Needs Assessment Report –  Update Alternatives Screening Analysis Reports

Page 15: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Environmental health need – coastal estuaries

2009 Current

Page 16: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

208 planning effort summary

•  Cape Cod Commission has submitted Section 208 Cape Cod area-wide water quality management plan update (208 Plan Update) signed by Governor Baker in June 2015

•  Submitted to EPA •  EPA Approved September 2015

Page 17: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

208 planning tools – Watershed MVP

•  CCC Tracker Model –  Estimates quantities (linear ft, areas,

number of properties serviced, number of systems etc.) of different technologies to meet a nutrient mitigation goal

–  Quantities can be input into 208 Map viewer to determine proposed locations for the technologies

–  Further studies would be needed to determine optimal locations for these technologies based on variables not included in the 208 Map Viewer (such as site suitability and public acceptance).

Page 18: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Current planning efforts (continued)

•  Public outreach –  Presentations at public meetings –  Workshops –  Newsletter on project

•  Evaluations –  Development of hybrid approaches (combination of traditional and non-

traditional approaches) for two targeted watersheds •  Continued coordination with MassDEP, Cape Cod Commission, and

neighboring towns •  Look for piloting and project opportunities

Page 19: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Planning effort history – evaluation findings

1.  Town-wide municipal drinking water system from a protected source is needed

2.  Town-wide sewer system is not needed, but advanced wastewater treatment is needed for selected areas of Town

3.  Pond water quality problems are best solved by in-pond treatment

Page 20: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Environmental health need – freshwater ponds

Eastham Ponds Action Plan •  Included 11 kettle ponds •  Community concerns regarding deteriorating

conditions •  Loss of water clarity, algal blooms, odors,

excessive weeds affecting recreation, changes in fish community

•  Pond Action Plan was a recommended action of the Eastham Wastewater Management Plan

•  PAP completed in 2011, ongoing implementation and assessment

Page 21: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Phosphorus levels are key to pond health

Total phosphorus Attributes Fisheries and recreation 6 – 12 ppb   Clear water, well oxygenated   Cold water fishery  

12 – 24 ppb  Shallow lakes may become anoxic, water moderately clear  

Transitional fishery  

24 – 96 ppb  Deep water anoxia Diminished clarity More plants  

Less suitable for contact recreation, warm water fishery  

96 – 192 ppb   Persistent algal blooms Anoxia  

Unattractive for recreation Harmful algal blooms Fish kills possible

Great Pond Herring Pond (252) Water Clarity

Cape Cod Commission criteria for “healthy ponds”

Page 22: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Page 23: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Objective

•  Find effective strategies to protect and restore kettle ponds for their desired uses – now and in the future

•  Develop specific, targeted recommendations for community consideration

Page 24: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Summary of remedial measures

Technique Suitability Description

Alum treatment program

Stratified lakes, excessive algae, internal P a major component of budget, iron-rich sediments

Application of alum to prevent soluble P release from sediments during anoxic conditions

Enhanced circulation

Small ponds with transient DO depletion, excessive algae

Whole lake circulation to eliminate anoxia in lower waters where sediment recycling of P occurs

Watershed BMPs Ponds affected by development

Stormwater management, septic discharge setbacks, public education, land acquisition

Dredging (nearshore areas)

Ponds impaired by loss of depth, emergent vegetation

Removal of sediment and vegetation from pond bottom.

Page 25: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Pond ranking

Criteria used Science-based •  Extent of use impairment

-  Swimmable/fishable Policy Considerations •  Ownership/public access •  Size of pond •  Prior treatment

Pond Priority Bridge Low

Depot Medium

Little Depot Medium

Great High

Herring High

Jemima Medium

Minister High

Molls Low

Muddy Medium

Schoolhouse High

Widow Harding Low

Page 26: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Alum effectiveness – deep ponds

•  Most effective on: •  Ponds with significant internal phosphorus loading from sediments •  Ponds that undergo stable thermal stratification and seasonal anoxia

Page 27: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Alum Treatment

•  Collect sediment samples from pond •  Assay the sediments and calculate

application rate to immobilize iron-bound P in the pond’s sediments

•  Apply calibrated mixture of aluminum

sulfate (alum) and sodium aluminate based on site-specific dose calculation

•  Permit requires four quarterly sampling events following chemical treatment

Page 28: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Page 29: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Phosphorus content – Herring Pond

Alum treatment

0 20 40 60 80

100 120

Oct

-12

Dec

-12

Feb-

13

Apr

-13

Jun-

13

Aug

-13

Oct

-13

Dec

-13

Feb-

14

Apr

-14

Jun-

14

Aug

-14

Oct

-14

Dec

-14

Feb-

15

Apr

-15

Jun-

15

Aug

-15

Oct

-15

Dec

-15 Vo

lum

e-w

eigh

ted

P C

once

ntra

tion

(ppb

)

Date

Volume-weighted P Concentration (ppb)

Volume-weighted P Concentration (ppb)

Page 30: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Water clarity improvement – Herring Pond

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

2007 2008 2009 2010 2011 2012 2013 2014

Sum

mer

Sec

chi d

isk

tran

spar

eny,

m

Alum treatment

Page 31: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Great pond results

•  Measure to protect water quality against deterioration

•  Less dramatic than Herring Pond •  Internal phosphorus mass reduced by

about one-half •  Summer water clarity improved

Page 32: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Next challenge – shallow ponds

•  Fewer tools available •  Alum possible, but effects are less

dramatic; requires multiple applications

•  Enhanced mixing •  Monitor and control invasive species

Page 33: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Next steps

•  Shallow pond remediation •  Hybrid evaluations for coastal estuaries

CCC watershed reports and permits by June 2016

Environmental monitoring and adaptive management

Targeted Watershed Management Plans

(TWMPs)

Comprehensive Wastewater Management Plan (CWMP) –

MEPA Review Process

Continue Wastewater Planning Services (2015) Current Project

Page 34: Town of Eastham – Integrated Approach to Nutrient Management · Human health need – public water supply Drinking water impacts • On-Site Septic Systems • Impact of the Town

GHD @ NEWEA 2016

Thank you! Questions? [email protected] [email protected] [email protected]