Contact Us Construction Sections B04 /B05 Project Overview Construction Section B06 POTTERS MILLS GAP Transportation Project 322 Project Overview 144 322 N Sandcrest Road 322 To State College To Milroy Sand Mountain Road B06 Estimated Construction Cost: $100,000,000 B05 Construction Cost: $8,676,545 B04 Completed: September 25, 2015 Final Cost: $1,944,805 The project needs include: Safety concerns exist in the project area between Potters Mills and Sand Mountain Road. Congestion exists in the project area between Potters Mills and Sand Mountain Road. Access issues exist at project area intersections and adjacent properties. The purpose of the Potters Mills Gap (PMG) Transportation Project is to improve safety, reduce congestion, and alleviate access concerns along the section of Route 322 from the Centre County/Mifflin County line to west of the Route 322/Route 144 intersection at Potters Mills. For construction purposes, the PMG Transportation Project has been divided into three construction sections (B04, B05 and B06) as shown on the inset map. Construction began in March 2015 on Section B04, a new bridge over Route 322, and was completed in September 2015. Section B05 construction started August 2016. The remaining section, Section B06, is now in design with construction anticipated to begin in Spring 2018. Section B05 and the Section B04 bridge will complete the Sand Mountain Road interchange. Section B06 will extend the four-lane limited access Route 322 to a new interchange west of Potters Mills, and will provide a local access road from Potters Mills to Sand Mountain Road. PROJECT OVERVIEW

Upload: others

Post on 26-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: To State B04 Completed: September 25, 2015 · B04 /B05 Project Overview Construction Section B06 POTTERS MILLS GAP Transportation Project 322 Project Overview 144 322 N Sandcr est

ContactUs

ConstructionSectionsB04 /B05

Project Overview

Construction Section

B06

POTTERS MILLS GAPTr a n s p o r t a t i o n P r o j e c t

322

Project Overview

144

322

N

Sandcrest Road

322

To StateCollegeTo M

ilroy

Sand

Mou

ntai

n Ro

ad

B06Estimated Construction Cost:$100,000,000

B05Construction Cost: $8,676,545

B04Completed: September 25, 2015 Final Cost: $1,944,805

The project needs include:

• Safety concerns exist in theproject area between Potters Millsand Sand Mountain Road.

• Congestion exists in the projectarea between Potters Mills andSand Mountain Road.

• Access issues exist at projectarea intersections and adjacentproperties.

The purpose of the Potters Mills Gap (PMG) Transportation Project is to improve safety, reduce congestion, and alleviate access concerns along the section of Route 322 from the Centre County/Mifflin County line to west of the Route 322/Route 144 intersection at Potters Mills.

For construction purposes, the PMG Transportation Project has been divided into three construction sections (B04, B05 and B06) as shown on the inset map.

Construction began in March 2015 on Section B04, a new bridge over Route 322, and was completed in September 2015.

Section B05 construction started August 2016. The remaining section, Section B06, is now in design with construction anticipated to begin in Spring 2018. Section B05 and the Section B04 bridge will complete the Sand Mountain Road interchange. Section B06 will extend the four-lane limited access Route 322 to a new interchange west of Potters Mills, and will provide a local access road from Potters Mills to Sand Mountain Road.

PROJECT OVERVIEW

Page 2: To State B04 Completed: September 25, 2015 · B04 /B05 Project Overview Construction Section B06 POTTERS MILLS GAP Transportation Project 322 Project Overview 144 322 N Sandcr est

ContactUs

ConstructionSectionsB04 /B05

Project Overview

Construction Section

B06

POTTERS MILLS GAPTr a n s p o r t a t i o n P r o j e c t

322

Section B04/B05

Legend

Proposed SR 0322 & Ramps

Proposed SR 2015 & 2017

Proposed Structure

Proposed Driveways

Pavement Removal

Wetland Boundary

Stream

Limit of Cut

Limit of Fill

C

F400 FEET2000

SCALE

RAMP A

RAMP C

SAN

D M

TN

R

OA

D

RAMP B

RAMP D

UN

DERW

OO

D RO

AD

WES

T S

AN

D M

TN

RO

AD

SEVEN MOUNTAIN

CAMPGROUND ROAD

SANDCREST ROAD SR 2017

KEARNS ROAD SECTION B04 (BRIDGE ONLY)

SR 2015

MA

IN R

OA

D

ROCK MOUND

• A full interchange at Sand Mountain Road will eliminate theexisting at-grade intersection of Sand Mountain Road andRoute 322.

• Four new at-grade ramps will be constructed in a tightdiamond configuration adjacent to existing Route 322.

• The interchange incorporates a connection with SandcrestRoad that was developed with public input and support andconsiderations for safety, engineering and environmentaleffects.

• The bridge for the interchange was completed onSeptember 23, 2015.

• The reconstructed Sandcrest Road and rehabilitated Route2015 will connect the ramp terminals at Sand MountainRoad with the overhead bridge constructed in Section B04.

• A rock mound located in the Route 322 median, east of theSand Mountain Road intersection, has been removed.

• Construction Cost for Section B05: $8,676,545

• Final Construction Cost for Section B04: $1,944,805

Section B04 and B05 | Sand Mountain Road Interchange

Section B04 Bridge

Page 3: To State B04 Completed: September 25, 2015 · B04 /B05 Project Overview Construction Section B06 POTTERS MILLS GAP Transportation Project 322 Project Overview 144 322 N Sandcr est

ContactUs

ConstructionSectionsB04 /B05

Project Overview

Construction Section

B06

POTTERS MILLS GAPTr a n s p o r t a t i o n P r o j e c t

322

Section B06

VIEW BROCHURE

WATCH VIDEO

ROUNDABOUT INFORMATION:

To Milroy

LegendProposed SR 0322 & RampsProposed SR 2015 & Crowfield RdProposed StructureProposed Driveways & Township RoadsPavement RemovalWetland Boundary

StreamLimit of CutLimit of Fill

A

B C

D

• Section B06 is currently in Design.

• Potters Mills Interchange is to be constructed to the west of theexisting Route 322 intersection with Route 144.

• Creates a local road connection between Potters Mills andSand Mountain Road.

• Potter Run arch culvert will be removed and replaced with anew bridge.

• A roundabout will be constructed to connect the western interchangeof the newly aligned 322 to the local roads. This will include serviceroads that provide connections to Wild Turkey Drive, Coulter Lane, Miller Road and other properties losing direct access to Route 322.

• The at-grade intersection of Decker Valley Road/Crowfield Road withRoute 322 will be eliminated.

• Estimated Construction Start: Spring 2018

• Estimated Construction Cost: $100,000,000

Section B06 | Route 322 and Western Interchange

24’Travel LanesShldr Shldr

24’Travel Lanes ShldrShldr9’

Travel Lane

9’Travel Lane

11’Travel Lane

11’Travel Lane

Cross Section Looking EastboundSTA 741+00

Existing US 322 Location

US 322Westbound

US 322Eastbound Local Road

AA

A

24’Travel Lane ShldrShldr

24’Travel LaneShldr

Existing Bloom Road

Shldr

11’Travel Lane

11’Travel Lane

Cross Section Looking EastboundSTA 717+00

Existing US 322 Location

US 322Eastbound

Local Road

US 322Westbound

B

B

24’Travel Lanes Shldr

11’Travel Lane

11’Travel Lane

Shldr

24’Travel LanesShldr Shldr

Potter Run

Cross Section Looking EastboundSTA 706+50

Existing US 322 Location

US 322Westbound

US 322Eastbound

Local Road

C

C

Cross Section Looking EastboundSTA 684+50

12’Travel LaneShldr

12’Travel Lane Shldr

US 322Eastbound

US 322Westbound

Shldr

12’Travel Lane

12’Travel Lane

15’RampLaneShldr

Shldr Shldr

9’Travel Lane

9’Travel Lane

Eastboundon Ramp

Local RoadShldr Shldr

15’Ramp Lane

Westbound off Ramp

D

D

Page 4: To State B04 Completed: September 25, 2015 · B04 /B05 Project Overview Construction Section B06 POTTERS MILLS GAP Transportation Project 322 Project Overview 144 322 N Sandcr est

ContactUs

ConstructionSectionsB04 /B05

Project Overview

Construction Section

B06

POTTERS MILLS GAPTr a n s p o r t a t i o n P r o j e c t

322

CRAIG SATTESAHNPennsylvania Department of Transportation, Engineering District 2-0Project [email protected]

Contact Us

MARLA FANNINPennsylvania Department of Transportation, Engineering District 2-0Community Relations [email protected]

For more information, contact: